FLOOR STANDING GAS CONDENSING BOILERS CONDITION OF USE CLASSIFICATION
|
|
- Myra Stanley
- 5 years ago
- Views:
Transcription
1 C /6- ECO FLOOR STANDING GAS CONDENSING OILERS C - Eco: from 56 to 5 kw, gas condensing boilers simple body, for hot water central heating and DHW production with independent calorifier C 6- Eco: from to 116 kw, gas condensing boilers double body, for hot water central heating and DHW production with independent calorifier Heating and DHW production with independent calorifier Condensing C - Eco (control panel in lateral position) C 6- Eco (control panel in front position) All of these boilers are fitted as standard with the DIEMATIC control panel, which is used to control and regulate a domestic hot water circuit and one or two circuit(s) with mixing valve. In larger installations, it is possible to connect 2 to C - Eco boilers or 5 C 6- Eco boilers in cascade (see p. 5 to ). Various air/flue gas connection configurations are possible. We offer two types of solution: by vertical forced flue or to a chimney (see p. 1). All natural gases EC Identification No. 006P CONDITION OF USE - Max working pressure : 6 bar - Min. working pressure : 0,8 bar - Max. working temperature : 0 C - Safety thermostat : 1 C CLASSIFICATION C - Eco : 2-2P - C - C - C 5 C 6- Eco : 2-2P - C - C 5 OPERATING ON NATURAL GASES
2 PRESENTATION C - Eco and C 6- Eco boilers are floor-standing gas condensing boilers, delivered assembled and tested in the factory. They offer high levels of performance. - Annual operating efficiency up to % - Efficiency class CE - Low pollutant emissions: NOx < 60 mg/kwh CO < 20 mg/kwh - Low noise level and electricity consumption thanks to the modulating fan < 60 d (A) regardless of the output 5 to 1680 W maximum depending on the output Particularity of C 6- Eco models: They comprise 2 C - Eco boilers, each with a DIEMATIC control panel, wired in cascade and assembled by a flue gas collector with motorised flue damper. The strong points of these boilers: - Exchanger in cast aluminium/silicium sections, highly resistant to corrosion, with self-cleaning properties linked to the flow of condensates requiring no minimum water flow (except when operating > 5 C) - Cylindrical total premix gas burner with metallic fibre coating, modulating from 20 to 0 % for C - and from 15 to 0% for C 6- Perfect adaptation of boiler output to the actual needs of the installation Optimum combustion quality on the full output range thanks to the constant air/gas ratio - Electronic Ignition - Ionisation sensor - DIEMATIC control panel (1 panel on C - Eco, 2 panels on C 6- Eco) in which the control system is open to all installation configurations, including the most complex: operation in cascade possible for 2 to C - Eco boilers or 5 C 6- Eco boilers. Each of the slave boilers can control and regulate 2 additional circuits with mixing valve. It is designed to communicate with DIEMATIC VM control systems and with compatible teleprocessing systems - Optional return separation possible (2nd return to be dually controlled for C 6- Eco) for maximum exploitation of condensation - Easy installation oiler positioning particularly easy thanks to the castor + rail guidance system, which can be used to slide the boiler from its pallet to move it to its final position. Compactness: 1, m 2 floor space and 560 kg for 5 kw oiler assembled and tested in the factory - Easy maintenance thanks to : Self-cleaning condensing boiler body Rapid burner access via removable cover Rapid exchanger access via the inspection hatch C _Q005 MODELS AVAILALE oiler Model Useful output at 0/0 C kw C -280 Eco 56 to C6_Q0001A C_Q0001A - For heating only, domestic hot water production via an independent DHW tank C - Eco boilers are available in 2 versions: for connection to the right or the left - For heating only, domestic hot water production via an independent DHW tank Particularity: - Comprising 2 C - Eco boilers wired in cascade and assembled by a flue gas collector with motorised flaps C -50 Eco 1 to 5 C -0 Eco 8 to C -500 Eco 8 to C -50 Eco 11 to 5 C 6-00 Eco to 06 C Eco 11 to 85 C 6-00 Eco 10 to 8 C 6-1 Eco 156 to 116 2
3 OILER TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS oiler type C -.. Eco C 6-.. Eco Nominal output at 50/0 C kw Effi ciency at % 0% Pn at average temp. 0 C % 6,,, 8,1 8,5,, 8,1 8,5 output and C water temp. 0% Pn at return temp. 0 C %,, 8,1 8,5 8,, 8,1 8,5 8, Water fl ow at Δt = 20 K m /h 11, 1,2 1,0 1, 22, 28,,1, 5, Min. nominal output at 50/0 C kw Min./Max. nominal output at 80/60 C kw 51/261 65/ /5 2/62 6/51 8/65 12/0 122/2 18/62 Water resistance at Δt = 20 K mbar Gas fl ow natural gas H m /h Flue gas mass fl ow rate kg/h Max. fl ue gas temperature at 0/0 C C Flue gas pressure available Pa Water content l Minimum water fl ow (*) m /h none none none none none none none none none Floor area m 2 0, 0, 1,2 1,2 1,2 2, 2,8 2,8 2,8 Net weight kg (*) except when operating > 5 C MAIN COMPONENTS C - Eco Combustive air inlet Gas inlet DIEMATIC control panel (in lateral position) Air box Gas filter Handle Modulating burner Cast aluminium/ silicium exchanger Condensates discharge Flue gas nozzle Condensates recycling tank ase frame on castors Exchanger inspection hatch C _F0002A Flame detection cell Ignition/ionisation electrode Gas multiblock Venturi Fan Model shown: C - Eco left version (lateral panel) Flue gas collector C 6- Eco Motorised flue damper C 6_F0002A Model shown: C 6- Eco (front panel)
4 A OILER TECHNICAL SPECIFICATIONS MAIN DIMENSIONS (mm and inches) C - Eco - left version C L E A C - Eco - right version E 680 L C C 6- Eco 6 5 D E Tableau frontal C C_F0001D C -280 C -50 C -0 C -500 C -50 A C E L ➀ Heating flow Ø 80 mm ➁ Heating return Ø 80 mm ➂ Gas inlet R 2 ➃ Second return nozzle Ø 65 mm (optional) ➄ Condensates run-off, siphon provided, for PVC pipe Ø 2 mm ➅ Flue gas nozzle Ø 250 mm ➆ Combustive air inlet Ø 250 mm L A C6_F0001C C 6-00 C C 6-00 C 6-1 A C D E L ➀ Heating flow Ø 80 mm ➁ Heating return Ø 80 mm ➂ Gas inlet R 2 ➃ Second return nozzle Ø 65 mm (optional) ➄ Condensate run-off, siphon provided, for PVC pipe Ø 2 mm ➅ Flue gas nozzle Ø 50 mm ➆ Combustive air inlet Ø 250 mm Note: the control panels on the C /6-.. Eco are mounted in the front position. It is possible to position them laterally: see instructions delivered with the boiler.
5 CONTROL PANEL The DIEMATIC control panel is a very advanced control panel, which includes electronic programmable regulation to modulate the boiler temperature by activating the burner according to the outside temperature and also to the room temperature, if a CDI 2 or CDR 2 interactive remote control (optional) is connected (see page 6). DIEMATIC control panel is capable of automatically operating a central heating installation with a direct circuit without mixing valve (which can even be configured as a swimming pool circuit). Connection of a domestic hot water sensor enables the programming and regulation of a DHW circuit by activating a control unit on the load pump; DHW circulation loop can be handled thanks to an auxiliary contact which includes its own programming. The addition of 1 or 2 PC + sensor for a valve circuit options (package FM 8) enables the regulation of 1 or 2 circuits with mixing Note: the connection terminal block on the DIEMATIC control panel is fitted with a 0- V inlet thanks to which it is possible to control the boiler using an external system which includes a 0- V outlet with set temperature value. valve: a CDI 2, CDR 2 or a simplified remote control for each of these circuits can also be delivered as optional equipment. The connection of other additional circuits is also possible using DIEMATIC VM control units. DIEMATIC control panel also provides antifreeze protection for the heating system water if the owner is absent (absence programmable up to 1 year in advance for a period of up to days). Moreover, in larger installations, it is possible to connect up to boilers C Eco or 5 boilers C 6 Eco in cascade with the DIEMATIC control panel, each boiler can be equiped with 1 or 2 PC + sensors for 1 valve circuit options: to do so, simply connect them to each other using a US cable. Particular case: C 6- Eco The C 6- Eco is fitted with 2 DIEMATIC control panels allowing the 2 boilers which it comprises to operate in cascade. These 2 panels are connected to each other by a US cable and the cascade flow sensor connected to the boiler chosen as the slave, the other boiler being the master. CONTROL PANEL DIEMATIC Timed A circuit breaker (located behind the control panel) On light / Alarm DIEMATIC control module, flap closed On/Off switch DIEMATIC control module with 2 levels of access: user/installer Reset button C2_Q00 Temperature setting keys: - comfort temperature (from 5 to 0 C) - low temperature (from 5 to 0 C) - DHW temperature (if a calorifier is connected) (from to 80 C) Setting the boiler output for measuring emissions and testing the safety thermostat (by simultaneously pressing both keys) SUNDAY Operating mode selection keys Auto : automatic operation according to the time programme on the various circuits : forced operation at comfort temperature until midnight : forced operation at low temperature until midnight : antifreeze mode for the period programmed : DHW tank load mode enabled + or - setting keys Display 855F020 DIEMATIC control module, flap open Keys for accessing settings and measurements - page scrolling - line scrolling - back to the previous line SUNDAY Manual Summer shutdown key: heating is shut down but DHW production continues STANDARD Standard programme key P1: Monday to Sunday 6h-22h P2: Monday to Sunday h-21h P: Monday to Friday 5h-8h, 16h-22h, Saturday and Sunday h-2h P: Monday to Friday 6h-8h, 11h-1h0, 16h-22h, Saturday 6h-2h, Sunday h-2h DHW prog.: reheating enabled 5h-22h Auxiliary prog. circuit: 6h-22h Programme keys: - input comfort period or tank load enabled - input low period or tank load disabled - return to graphic programme bar Selection key for programming circuit A,, C A..C PROGR Fitter settings access key Key for selecting the heating programme - P1, P2, P or P per circuit: - programmes are preset in the factory (see standard key). - programmes - P2, P, P - can be customised 855F021 5
6 CONTROL PANEL DIEMATIC CONTROL PANEL OPTIONS PC + sensor for 1 mixing valve - Package FM 8 855Q06 This is used to control a mixing valve with a twodirection electrothermal or electromechanical motor. The valve circuit and its circulating pump can be programmed independently. Note: DIEMATIC control panels can be fitted with 1 or 2 PC + sensor options for 1 mixing valve. In the case of cascade installations, each of the boilers can be fitted with 1 or 2 of these PCs. Domestic hot water sensor or flow sensor common to the cascade - Package AD Q022 This is used to control the temperature and programming of DHW production. It is also used as the flow sensor common to the cascade in the case of a cascade installation and is delivered as standard with the C 6- Eco to enable the 2 boilers it comprises to operate in cascade. 8666Q12A 855Q0 Radio outside temperature sensor - Package AD 21 oiler radio module (radio transmitter) - Package AD 22 The radio outside temperature sensor can be delivered as optional equipment for systems in which the installation of the external wire connection sensor delivered with DIEMATIC control panels would be too complex. If this sensor is used : - With a wire connection remote control (FM 51 or FM 52), it is necessary to order the oiler radio module as well - With a radio remote control (FM 161), ordering the oiler radio module is not necessary CDI 2 interactive remote control - Package FM 51 CDR 2 interactive remote radio control (with radio transmitter) - Package FM 161 CDR 2 remote radio control module (without transmitter) - Package FM Q11 These are used to override all instructions from the DIEMATIC control panel from the room in which they are installed. In addition, they enable the selfadaptability of the heating regime for the circuit concerned (one CDI 2 or CDR 2 per circuit). In the case of the CDR 2, the data are transmitted by radio waves from the place where the CDR 2 is installed to the transmitter/receiver box placed close to the boiler. Simplified remote control with room sensor - Package FM Q0 The connection of a simplified remote control is used to override certain instructions from the DIEMATIC control panel from the room in which it is installed: programme override (permanent comfort or low) and set room temperature override (±.5 C). It is also used to enable the self-adaptability of the heating curve for the circuit concerned (1 remote control per circuit). US connecting cable (length 12 m) - Package AD 1 82Q020 It is used to make the connection between 2 boilers fitted with the DIEMATIC control panel in a cascade installation, or to connect a DIEMATIC VM control unit. 6
7 CONTROL PANEL 8801Q018 Dip sensor with tube - Package AD 218 This dip sensor (NTC 1) is delivered with an IP5 junction box and a 1/2 sensor tube, length under head 120 mm. It is used instead of the attachable sensors provided with the PC and valve options. It can also be used on the header pipe when connecting 2 boilers in cascade. 851Q01 Set of 2 sensors for storage tank - Package AD 216 Includes 1 DHW sensor and 1 heating sensor for managing a storage tank with a boiler fitted with a DIEMATIC control panel. DIEMATIC VM control system - Package AD 120 With the addition of a US cable, the DIEMATIC-m control panel can be completed with one or more DIEMATIC VM modules (up to 20), making it possible to control 2 additional hydraulic circuits each. Each of these circuits may be either : - a heating circuit with motorised 2-way valve - or a domestic hot water preparation circuit - or an auxiliary circuit. MC5E_Q0021 Alarm report PC and control of 1 external gas valve o a compulsory flue damper - Package GR 12 This PC comprises a dry contact outlet which It is fitted to the boiler control panel. signals a burner error and a second outlet used to control an external gas valve.
8 OILER OPTIONS C_Q000 C_Q0008 2nd return nozzle : option prefitted on delivery, to be specified on order (1) for C -280 Eco for C -50 Eco and C 6-00 Eco (1) for C -0 Eco and C Eco (1) for C -500 Eco and C 6-00 Eco (1) for C -50 Eco and C 6-1 Eco (1) These packages are used to differentiate the low and high temperature return circuits and thus to exploit condensation to the full. They include a 2nd return pipe and a water distribution pipe. (1) order two for C 6- Eco Gas tightness control gas valve unit : option prefitted on delivery, to be specified on order (1) It is adapted to the gas train and checks the tightness of the safety valves during the pre-sweep. If a leak is detected, the boiler goes into safety shutdown and the fault will be signalled by the DIEMATIC control panel. (1) order two for C 6- Eco C2_Q0016 C_Q0006A C2_Q000 C20_Q mbar pressure regulator GDJ 50 - Package AD 26 It is fitted to the gas inlet circuit. It is necessary if the gas mains supply is at 00 mbar. Air intake filter - Package GS 20 (1) It is fitted to the combustive air inlet and obviates a fall in output if the pre-mix gas burner is clogged owing to it being in a dusty atmosphere. (1) order two for C 6- Eco Compulsory flue damper Ø 250 mm - Package GS 2 (only for C - Eco) If a cascade is over pressurised, the installation of one gate valve per boiler prevents the blow back Clearing knife - Package GS 21 It allows the exchanger to be cleaned, which is accessed via the inspection trap in the body. of combustion products to the boilers that have been shut down. DU 1/1 P 52/5 C2_Q001 Condensates neutralisation system With lift pump: Package DU 1 (boilers up to 120 kw) Package DU 1 (boilers up to 120 to 50 kw) The acidic condensates flow through a tank filled with granules before being discharged into the waste water network. Without pump: Package P 52 (up to 1,200 l of condensates) Package P 5 (up to 8,00 l of condensates) To define the type of neutraliser for the P range, it should be considered that 1 litre of condensates is the equivalent of around 1 m of gas consumed. 1,5 à 2% 858F050 Neutralisation granules (available from CPR) For DU 1 and DU 15: ref kg For P 52 and P 5: ref kg An annual check of the system, particularly the effectiveness of the granules, by measuring the ph is necessary. If need be, the granules must be replaced. 8 P/C 880Q Q001A DHW production De Dietrich series independent DHW tanks with a capacity of 650 to 00 litres can be used for domestic hot water production for individual and collective residences as well as for industrial and commercial premises. They are lined with food quality standard high quartz content vitrified enamel and protected by a magnesium anode for C/P and 650, and correx imposed current for 800 and 00. The specifications and performances of these tanks are given in the product catalogue and the technical booklets.
9 INFORMATION REQUIRED FOR INSTALLATION STATUTORY INSTRUCTIONS ON INSTALLATION AND MAINTENANCE The installation and maintenance of the appliance must be carried out by a qualified professional in compliance with the statutory texts of the codes of practice in force. INSTALLATION IN OILER ROOMS C /6- Eco boilers are fitted with a castor + rail guidance system allowing them to be easily put into position: it is sufficient to roll the boiler from the pallet to its desired position (using the top of the packaging case placed in front of the pallet head, for example). C_Q005 The dimensions shown are the minimum recommended dimensions (in mm) for providing adequate access around the boiler. Note: for installations with several boilers in cascade, these same dimensions should be respected for each boiler. A (mm) (mm) C (mm) C -280 Eco C -50 Eco C -0 Eco C -500 Eco C -50 Eco C 6-00 Eco C Eco C 6-00 Eco C 6- Eco * 800 mm if mounting the control panel in the front position A C 00 00* ** 150 C_F000A As far as possible, the protective packaging around the boiler must only be removed once the boiler is in its definitive position. However, for practical reasons, such as negotiating doors and corridors, it may be necessary to remove the side casing panels and the front panel. A (mm) C -280, C -50 C A 185 C -0, C -500, C -50 C 6-860, C 6-00, C C_F000A
10 INFORMATION REQUIRED FOR INSTALLATION Minimum door (T) and corridor (K) widths necessary for clearance of the boiler (these are minimum calculated values) K K = T x L and Example: Calculation of the min. width of a corridor (K) necessary for the clearance of a C -50 boiler through a door width T = 00 mm K = x mm minimum T = In order to avoid damage to boilers, it is necessary to prevent the contamination of combustion air by chloride and/or fluoride compounds, which are particularly corrosive. These compounds are present, for example, in aerosol spray cans, paints, solvents, cleaning products, washing powders/liquids, detergents, glues, snow clearing salts, etc. It is therefore necessary: - To avoid sucking in air discharged from premises using such products: hairdressers, dry cleaners, industrial premises (solvents), premises containing refrigeration systems (risk of leaking refrigeration fluid), etc. - To avoid the storage of such products close to boilers. Please note that, if the boiler and/or its peripherals become corroded by chloride and/or fluoride compounds, our contractual warranty cannot be invoked. K x L L oiler room ventilation The cross-section of the boiler room ventilation (through which combustive air is taken in) must comply with the prevailing standard. T 150 GAS CONNECTION Compliance with prevailing instructions and regulations is mandatory. In all cases, a sectional valve is fitted as close as possible to the boiler. A filter should be fitted to the gas supply inlet immediately after the sectional valve. The pipe diameters must be defined in accordance with prevailing specifications. Gas supply pressure: - 20 mbar on natural gas H - 00 mbar on natural gas H with pressure regulator, available as optional equipment (see page ). ELECTRICAL CONNECTION This must comply with the prevailing standard. The boiler is protected by a A circuit breaker located behind the control panel. It must be powered by an electrical circuit comprising a omnipole switch with an opening distance > mm. Notes: - The sensor cables must be separated from the 20 V circuits by at least cm. - In order to protect the pump antifreeze and cleaning functions, we recommend not switching off the boiler at the mains switch.
11 INFORMATION REQUIRED FOR INSTALLATION HYDRAULIC CONNECTIONS Important: The principle of a condensation boiler is to recycle the energy contained in the water vapour in the combustion gases (latent vaporisation heat). Consequently, to achieve an annual operating efficiency in the order of %, it is necessary Connection to the heating circuit C /6-.. Eco boilers must only be used in closed circuit heating installations. The central heating systems must be cleaned to eliminate the debris (copper, strands, brazing flux) linked to the installation of the system and deposits that can cause malfunctions (noise in the system, chemical reaction between metals). More particularly, if fitting a boiler to an existing installation, it is strongly recommended that you clear sludge out of the system before installing the new boiler. After carrying out this work, particular monitoring of the installation may be necessary both in respect of the water in the network and the quality of the water used for topping it up in order to be in full control of the consequences. Suitable filters may be necessary in some cases. Requirements on heating water: - Total hardness: TH < 25 F - Mains ph: PH < Water treatment If the installation requires water treatment: consult us, particularly for: - water treatment which complies with the use of materials used in the construction of the boiler, the aluminium heating body, the ph of the water must not exceed. - the precautions to be taken to prevent the formation and localisation of oxygen in the water in the installation. - antifreeze products: ensure that these are compatible with aluminium and, if need be, with other components in the installation. Maximum/minimum water flow The maximum difference in temperature between flow water and return water, and the speed at which the flow temperature to size the heating surfaces in such a way as to obtain low return temperatures, below the dew point (e.g. underfloor heating, low temperature radiators, etc.) during the entire heating period. increases, are restricted by the boiler s microprocessor (ΔT = 5C); consequently, the boiler does not need a minimum flowrate provided that it operates at a maximum temperature of 5 C. If the maximum temperature exceeds 5 C, it is necessary to respect the following minimum flowrates: Minimum water flowrate: For the C -280 Eco Qmini =.0 m /h For the C -50 Eco Qmini = 5.0 m /h For the C -0 Eco Qmini = 6.1 m /h For the C -500 Eco Qmini =.1 m /h For the C -50 Eco Qmini = 8.2 m /h For the C 6 Eco, the minimum flowrate on each boiler will be equivalent to the minimum flowrate of a C Eco For the C 6-00 Eco Qmini = m /h For the C Eco Qmini = 12.2 m /h For the C 6-00 Eco Qmini = 1.2 m /h For the C 6-1 Eco Qmini = 16. m /h Maximum water flowrate: flow speeds in the heating body which are too high reduce the transfer of heat. Therefore, it is necessary to restrict the water flow to the value obtained using the following formula: Qmax (m /h) = Nominal useful output /. Condensates discharge It must be connected to the waste water discharge system. The connection must be removable and the flow of condensates visible. The connections and pipes must be in corrosion-resistant material. Condensates neutralisation stations are available as optional equipment (see page 8). 11
12 TS N L TS N L C C C C C C INFORMATION REQUIRED FOR INSTALLATION INSTALLATION DIAGRAMS The examples presented below cannot cover the full range of installation scenarios which may be encountered. Their purpose is to draw the attention to the basic rules to be followed. A certain number of control and safety devices are represented but, in the last resort, it is up to the experts, consultant engineers and design departments to make the final decision on the control and safety devices to be used in the boiler room, depending on its specificities. In all events, it is necessary to abide by the codes of practice and the local and national regulations in force. N : For the connection of domestic hot water, a sleeve made of steel, cast iron or any other insulating material must be interposed between the hot water outlet and this pipework to prevent any corrosion to the spot welds, if the distribution pipework is made of copper. Installation of a C - Eco with 1 underfloor heating circuit + 1 domestic hot water circuit V FM C_F00 Installation of a C - Eco with 1 direct radiator circuit + 1 circuit with mixing valve V 11a 11b FM C_F0011 Key 1 Heating flow 2 Heating return Safety valve bar (not delivered) Pressure gauge (delivered) Automatic air vent (not delivered) 8 Manual air vent Valve -way mixing valve 11 Heating pump 1 Flush valve 16 Expansion tank 1 Drainage valve 18 Heat circuit filling 21 Outside temperature sensor 22 oiler control system sensor 2 Flow temp. sensor downstream of mixing valve 2 Primary inlet on the DHW tank exchanger 25 Primary outlet on the DHW tank exchanger 12
13 TS N L TS N L TS N L TS N L AT I 0 D I E M T I CVM D I E M T I C INFORMATION REQUIRED FOR INSTALLATION Installation of 2 C - Eco boilers in cascade, with primary pump and decoupling tank, with 2 circuits with mixing valve + 1 domestic hot water circuit V 20 V x FM8 US b 11b 68 1 M 6 M C_F0016A This diagram is only valid for 2 boilers. Installation of 2 C -.. Eco boilers in cascade (type 1 primary circuit with injection pumps) with 2 circuits with mixing valve + 1 instant domestic hot water circuit with primary storage V 20 V V 2x FM8 US 68 1 M M b 11b M C_F DHW load pump Non-return valve 28 Domestic cold water inlet 2 Pressure reducer 0 Sealed safety unit calibrated to bar 2 DHW loop pump (optional) DHW temperature sensor 6 Motorised gate valve Injection pump Thermostat limiting the temperature to 65 C with manual reset for underfloor heating 50 Disconnector 51 Thermostatic valve 56 DHW circulation loop return 61 Thermometer 65 Low temperature circuit (radiator or underfloor heating) 12 Cascade flow sensor 1
14 TS N L TS N L INFORMATION REQUIRED FOR INSTALLATION Installation of a C 6-.. Eco with a direct underfloor heating circuit V 20 V 2 Installation of a C 6-.. Eco with primary pump and decoupling tank, with circuits with mixing valve + 1 domestic hot water circuit 21 2 x FM8 20 V 2 x FM8 20 V M 6 5 M b 11b 11b M 6 6 M b C_F001 C_F001A Legend: see p
15 INFORMATION REQUIRED FOR INSTALLATION EVACUATION OF COMUSTION PRODUCTS Proposed configurations Configuration C = Air/flue gas connection by means of separate air and flue gas pipes to a concentric vertical terminal (roof outlet) Configuration 2P = Connection to a chimney under pressure, the combustive air being taking from the boiler room Configuration 2P = for cascade installations. Compulsory flue dampers to be ordered separately (package GS 2) Configuration 2 = Connection of one boiler or several boilers in cascade to a chimney in depression, insensitive to humidity, the combustive air being taking from the boiler room L max (m) C - Eco C 6- Eco Configuration C consult us Configuration 2P 50 m (Ø 250 mm) 50 m (Ø 50 mm) L max. 2 8 L max. 6 2 C 2p 2p C_F0005 Installation - C /6- Eco boilers are C approved. The type of connection we propose (separate air and flues gas pipes on the boiler outlet) shows an installation in configuration C and ventilation of the boiler room is imperative.. - As the connections of the chimney flues (type 2P ) are pressurised, they must be installed either outdoors, or in an indoor ventilated brick sheath. Ventilation must be ensured: by an opening located in the lower section, taking air either from the ventilated common areas or directly from the outside, and by an opening located in the upper section coming out outside. The minimum cross-section of the air vacuum and the openings to be provided must be 0 cm 2 (free section). The removable parts of this sheath must enable the inspection of the flue gas pipe along its entire length. - The boiler must be connected pursuant to prevailing provisions, i.e. with pipes intended to evacuate pressurised flue gases. They must not allow any flue gas leakage and be resistant to corrosion. Appliances must be installed in such a way that their relative position in relation to the special evacuation device cannot be modified even after maintenance work. The appliance and its connection pipe must remain accessible with a view to maintenance and repair. 15
16 DE DIETRICH THERMIQUE S.A.S. with corporate capital of d 5, rue de la Gare - F Mertzwiller Tel Fax / A R.C.S Strasbourg Document non contractuel. Imprimé en France - OTT Imprimeurs 6 Wasselonne - 816
GT 220 CAST IRON FLOOR-STANDING FUEL OIL- / GAS-FIRED BOILERS
GT CAST RON FLOOR-STANDNG FUEL OL- / GAS-FRED BOLERS GT : for hot water central heating only GT : for hot water central heating and domestic hot water production with a 16- or 5-litre calorifier under
More informationZENA PLUS EASYLIFE WALL-HUNG GAS BOILERS
ZENA PLUS WALL-HUNG GAS BOILERS MSL FF: from. to 1 kw for heating only MSL FF + BMR 80 and MSL FF + SR 10: from. to 1 kw for heating and DHW produced by an 80-litre calorifier placed beside the boiler,
More informationGT 220 PROJECT CAST IRON FLOOR-STANDING FUEL OIL-/GAS-FIRED BOILERS
GT CAST RON FLOOR-STANDNG FUEL OL-/GAS-FRED BOLERS GT : for hot water central heating only GT : for hot water central heating and domestic hot water production with a 16- or 5-litre calorifier under the
More informationPMC-M WALL-HUNG GAS CONDENSING BOILERS
PMC-M WALL-HUNG GAS CONDENSING BOILERS PMC-M : from 6.1 to.8 kw, for heating and hot water preparation by associated DHW tank BMR 8 or SR 13 PMC-M MI: from 6.1 to 35.7 kw, for heating and instant domestic
More informationNANEO EMC-M WALL-HUNG GAS CONDENSING BOILERS
NANEO EMC-M WALL-HUNG GAS CONDENSING BOILERS EMC-M : from 6.1 to.8 kw, for heating only EMC-M /BS 8 and EMC-M /BS 13: from 6.1 to.8 kw, for heating and hot water preparation by associated DHW tank, 8 or
More informationGTU C 220 FUEL OIL CONDENSING BOILERS
GTU C FUEL OIL CONDENSING BOILERS GTU C : fuel oil condensing boilers from to 85 kw for hot water central heating only Heating only (DHW production by independent tank) Condensing boiler Domestic Fuel
More information4FLOOR-STANDING GAS CONDENSING BOILERS
EASYLIFE PROJECT / SOLNEO / ECODENS RESIDENTIAL DTG (E) 130-15/25 Eco. NOx Plus DTG (E) 1300-15/25 Eco. NOx Plus/B150 DTG (E) 1300-15/25 Eco. NOx Plus/H150 DTG 1300-15/25 Eco. NOx Plus/V130 4FLOOR-STANDING
More informationPRODUCT CATALOGUE
PRODUCT CATALOGUE 010- PROJECT INNOVENS PRO CA 5-115 from 8.9 to 11 (7.6-98.0 cal/h) Wall-hung gas condensing boilers P. PROJECT INNOVENS PRO CA 5-115 CASCADE SYSTES from 80 to 8 (68.8-368 cal/h) Complete
More informationWALL-HUNG GAS CONDENSING BOILERS MCR-P 24/28 BIC. HOMOLOGATION B 23P - C 13x - C 33x - C 93x -C 53 - C 43x - C 83x *
VIVADENS MCR-P WALL-HUNG GAS CONDENSING BOILERS MCR-P 24: from 6.3 to 25.0 kw, for heating only MCR-P 24/BS 80 and MCR-P 24/BS 130: from 6.3 to 25.0 kw, for heating and domestic hot water production by
More informationFLOOR STANDING GAS CONDENSING BOILERS HOMOLOGATION C 630- ECO: B 23 - B 23P - C 33 - C 53 - C 63 - C 83 - C 93
C 330/630- ECO FLOOR STANDING GAS CONDENSING BOILERS C 330-280 to 650 ECO: from 56 to 651 kw, gas condensing boilers simple body, for hot water central heating and DHW production with independent calorifier
More informationDIEMATIC VM isystem WALL-MOUNTED CONTROL SYSTEM. DIMENSIONS Length: 320 mm Height: 260 mm Depth: 130 mm. POWER SUPPLY 230 V, 50 Hz, 6 A
DIEMATIC WALL-MOUNTED CONTROL SYSTEM Electronic control system capable of controlling 2 heating circuits, a DHW circuit and an auxiliary circuit EC identification No.: 0085CM0178 Electronic microprocessor
More informationC ECO FLOOR STANDING GAS CONDENSING BOILER CONDITIONS OF USE HOMOLOGATION GAS CATEGORY
C 230-... ECO FOOR STADIG GAS CODESIG BOIER C 230-85 to 2 ECO: from 18 to 217 kw for hot water central heating and DHW production with independent calorifier This boiler can be fitted with one of following
More informationNANEO EMC-M EASYLIFE WALL-HUNG GAS CONDENSING BOILERS
NANEO EMC-M WALL-HUNG GAS CONDENSING BOILERS EMC-M : from 6.1 to.8 kw, for heating only EMC-M /BS 8 and EMC-M /BS 13: from 6.1 to.8 kw, for heating and hot water preparation by associated DHW tank, 8 or
More informationFLOOR-STANDING GAS CONDENSING BOILERS FROM 3.4 TO 35.9KW. by 160 litre enamelled calorifier with coil placed CONDITIONS OF USE HOMOLOGATION
FLOOR-STANDING GAS CONDENSING BOILERS FROM.4 TO 5.KW AGC 15-25-5: for heating only AGC /V 100 HL: for heating and DHW production by 100 litre stratification calorifier placed under the boiler AGC /V 0
More informationRange GT GTU C GT 220
Range GT 120 - GTU C 120 - GT 220 Low temperature fuel oil boiler Oil-fired condensation boiler English 21/09/06 Instructions for use Contents Important recommendations...................................................................3
More information8FUEL OIL CONDENSING BOILERS
EASYLIFE PROJET GTU (FF) / WINGO SF (FF) GTU 0 GTU 0 FF GTU 00/V GTU 00 FF/V POWER RANGES GTU 0....-. kw... p. 9 GTU 00/V....-. kw... p. 9 GTU 00....-. kw... p. 9 GTU 0 FF....-. kw... p. 9 RESIDENTIAL
More informationHPI REVERSIBLE AIR/WATER HEAT PUMPS SPLIT INVERTER
REVERSIBLE AIR/WATER HEAT PUMPS SPLIT INVERTER /E: from to kw with additional heating by integrated electrical resistance /H: from to kw with additional hydraulic heating by boiler (or without additional
More informationRemeha. Fuel oil/gas boilers P 520. Installation and Service Manual A
Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It
More information<< >> Condensing technology at the service of oil. Controlling energy to save money
SOLAR SOLI D FUE L H EAT PUMPS CON DE NSI NG OI L/GAS GTU C 120 O I L - F I R E D C O N D E N S I N G B O I L E R S ADVANCE Condensing technology at the service of oil >
More informationADVANCE EASYLIFE PROJECT
ADVANCE EASYLIFE PROJECT DIEMATIC 3 and -m 3 control panels... p. 232 DIEMATIC isystem control panel... p. 234 DIEMATIC 3 DIEMATIC VM isystem wall-hung control unit... p. 235 Room thermostats and miscellaneous...
More informationGT 120 >> >> >> << >> Sustainable Comfort. Longlasting comfort
SOLAR SOLID FUEL HEAT PUMPS CONDENSING OIL/GAS GAS FLOOR STANDING BOILER ADVANCE Longlasting comfort >> >> >> Silence and durability Customized solutions and comfort Provides the quality of an integrated
More informationWHE 2.24 / WHE 2.24 FF
EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3
More informationSuperior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw
Superior A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler Outputs 120, 160, 200, 240, 280 kw 1 The Superior is a, pre-assembled floor standing, gas fired high efficiency
More informationMPX 24/28 MI Compact MPX 28/33 MI Compact CONDITIONS OF USE HOMOLOGATION. B 23 - C 13x - C 33x - C 53x - C 93x - C 83x* B 23p - B 33 - C 43x
MPX WLL-HUNG GS CONDENSING BOILERS MPX 24 Compact: from 3.7 to 26.1 kw, for heating only M PX 28/33 BIC: from 5.1 to 30.6 kw, for heating and domestic hot water production by integrated calorifier M PX
More informationOil-fired condensing boiler GTU C 330. User Guide B
EN Oil-fired condensing boiler GTU C 330 User Guide 300017846-001-B . Contents 1 Introduction.............................................................................3 1.1 Symbols and abbreviations................................................................................3
More information>> >> >> High technology with oil. High performance modulating burner Compact boiler design. Compatible with renewable energies. Sustainable Comfort
Ecodesign by FLOOR-STANDING OIL CONDENSING BOILER ADVANCE High technology with oil >> >> >> High performance modulating burner Compact boiler design Compatible with renewable energies SOLAR SOLID FUEL
More informationWood-burning boiler CBB. User Guide E
EN Wood-burning boiler User Guide 300008541-001-E . Contents 1 Symbols used...........................................................................3 2 Important recommendations...............................................................3
More informationMCR 24 MCR 24/28 MI MCR 30/35 MI MCR 34/39 MI
Vivadens EN Wall-hung gas condensing boilers MCR 24 MCR 24/28 MI MCR 30/35 MI MCR 34/39 MI User Guide 300015874-001-B Contents 1 Introduction...4 1.1 Used symbols...4 1.2 Abbreviations...4 1.3 General...4
More informationDTG Eco / V130
ECODENS Gas fired condensing boiler EN User Guide 300010111-001-B Contents 1 Introduction.............................................................................3 1.1 Symbols and abbreviations................................................................................3
More informationRemeha. Fuel oil/gas boilers P 420. Installation and Service Manual
Remeha Fuel oil/gas boilers P 420 en Installation and Service Manual 300016839-02 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It is
More informationQuinta Pro Range. The New Remeha. Condensing Boilers REMEHA QUINTA PRO RANGE. High efficiency wall hung condensing boiler with ultra low NOx emission
The New Remeha Quinta Pro Range Condensing Boilers REMEHA QUINTA PRO RANGE HIGH EFFICIENCY 110% NCV AT 40/30 C FULLY MODULATING BOILER CONTROL PREMIX BURNER CLEAN COMBUSTION ULTRA LOW NOx BREEAM EXCELLENT
More informationVICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power
VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power VICTRIX 90 is the new wall-hung condensing boiler for room heating only, set-up for independent functioning and for that in cascade mode
More informationWALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) MODELS 34,8 kw (depotenziata) 50 C
ALKON 50 C ALKON 70 C WALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) OUTPUT RANGE from 50 to 560 kw (in battery) WORKING TEMPERATURE no limit on
More informationGas-fired boilers DTG 230. User Guide D
EN Gas-fired boilers DTG 230 User Guide 300011506-001-D . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3
More informationwall-mounted boilers, water heaters and pool heaters floor standing boilers, water heaters and pool heaters
MADE IN ITALY THE EXPERT of stainless steel condensing heating systems ECO FRIENDLY wall-mounted boilers, water heaters and pool heaters floor standing boilers, water heaters and pool heaters AISI 6Ti
More informationClyde Alkon 90. Floor standing condensing boilers. Natural Gas. 90 kw. LP Gas. 90 kw
90 kw Clyde Alkon 90 LP Gas Floor standing condensing boilers Natural Gas 90 kw Contents General information Dimensions and Data Installation requirements Boiler wiring diagram Hydraulic systems Page Fully
More informationGas fired condensing boiler C 230 ECO. User Guide C
EN Gas fired condensing boiler C 230 ECO User Guide 300015144-001-C Contents 1 Introduction.............................................................................3 1.1 Used symbols...........................................................................................3
More informationModulens G >> >> >> Condensing in excellence mode
Modulens G FLOOR-STNDING GS CONDENSING BOILER Ecodesign by DVNCE Condensing in excellence mode >> >> >> Environmental friendliness and energy savings Maximum domestic hot water comfort Compatible with
More informationVivadens. Wall-hung gas condensing boilers MCR 24/28 BIC. User Guide B
Vivadens EN Wall-hung gas condensing boilers MCR 24/28 BIC User Guide 300024112-001-B Contents 1 Introduction...4 1.1 Symbols used...4 1.2 Abbreviations...4 1.3 General...4 1.3.1 Manufacturer's liability...4
More informationC 310 ECO - C 610 ECO
EN Gas fired condensing boiler C 310 ECO - C 610 ECO User Guide 300015183-001-A Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3
More informationPower X High Power Condensing Wall-Hung Boilers
Power X High Power Condensing Wall-Hung Boilers NEW Residential Heating/Light Commercial compliant POWER X / High Power Condensing Condensing Wall-Hung Wall-Hung Boilers Boilers Power X: the new high power
More informationC 230 ECO. Control panel. DIEMATIC-m3 (GV6) Installation and Service Manual E
C 230 ECO Control panel DIEMATIC-m3 (GV6) EN Installation and Service Manual 300015243-001-E Contents 1 Introduction.............................................................................3 1.1 Used
More informationBORA BORA. BORA gas: the best suns THE MODELS BORA GAS ALL INNOVATION STRENGTHS
Gas boilers BORA BORA gas: the best suns BORA BORA GAS IS THE NEW GENERATION OF GAS BOILERS. IT REPEATS "THE BEST SUNSHINE" THAT MADE THE BORA FAMILY A SUCCESS: THE SINGLE BLOCK BOILER CONCEPT AND ABOVE
More information1 VICTRIX ZEUS Superior kw I features
Wall-hung condensing VICTRIX ZEUS Superior kw I is the new range of wall-hung condensing boilers with 54 litre stainless steel storage tank available in two versions with nominal heat output of 26 kw and
More informationSOLNEO SGC 24 SOL. User Guide. Gas fired condensing boiler C
SOLNEO EN Gas fired condensing boiler SGC 24 SOL User Guide 300017555-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols and abbreviations................................................................................3
More informationAGUAdens TM 100% residential condensing D.H.W. wall-mounted water heaters ( litres) AISI 316 D.H.W. WORKING PRESSURE TITANIUM CONDENSING
MADE IN ITALY residential condensing D.H.W. up to 10 bar WORKING PRESSURE AISI 316 Ti TITANIUM D.H.W. 100% CONDENSING AGUAdens TM wall-mounted water heaters (16-22 -37 litres) AGUAdensTM INSTANTANEOUS
More informationC 330 ECO - C 630 ECO
EN Gas fired floor-standing condensing boiler C 330 ECO - C 630 ECO Installation, User and Service Manual 760053-01 EG declaration of conformity The device complies with the standard type described in
More informationALKON CARGO. A precise and fast delivery rate. A very high specific flow rate (20 litres per minute with Dt 25)
ALKON CARGO ALKON CARGO model Max/min nominal output Heat input condensing Non-condensing η condensation at 30 part load 35 7,4 35,1 6,7 33,5 34,8 106,3 Efficiency class (directive 92/42) ALKON CARGO is
More informationINDEPENDENT DOMESTIC CALORIFIERS
BPB-BLC /BEPC /B /FWS INDEPENDENT DOMESTIC CALORIFIERS BPB : Performance, independent calorifiers, capacity to litres BLC : Comfort, independent calorifiers, capacity to litres BEPC : DHW calorifier litres
More informationInnovens Pro. Wall-hung gas condensing boilers MCA Installation and Service Manual A
Innovens Pro EN Wall-hung gas condensing boilers MCA 45-65 - 90-5 Installation and Service Manual 3000487-00-A EG declaration of conformity The device complies with the standard type described in the EG
More informationENERGY TOP. Condensing boiler solutions
ENERGY TOP Condensing boiler solutions 1 ENERGY TOP > ENERGY TOP RANGE A wide array of flexible solutions both for centralised residential application and big commercial plants The increasing need for
More informationWOLF GAS CONDENSING BOILERS COMFORTLINE
WOLF GAS CONDENSING BOILERS COMFORTLINE CGB-35/50 / CGB-75/100 30m 3 /h THE EXTENSIVE EQUIPMENT RANGE from system supplier WOLF offers the ideal solution for commercial and industrial buildings, new build
More informationMynute Green k. Condensing Wall-Hung Boilers. Residential Heating
Mynute Green k Condensing Wall-Hung Boilers Residential Heating Mynute Green k The right choice for any installation requirements The high flexibility of installation makes MYNUTE GREEN K the condensing
More informationCALORA TOWER GAS 15S EX CALORA TOWER GAS 25S EX CALORA TOWER GAS 35S EX
EN Floor-standing high efficiency gas boiler CALORA TOWER GAS 15S EX CALORA TOWER GAS 25S EX Installation and Service Manual C003589-A 300026141-001-07 Declaration of conformity The device complies with
More informationHOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance
Installation Operation Commissioning Maintenance HOT AIR GENERATOR WITH GAS BURNER GGS NA11.45 A 06-2011 04-2011 CONTENTS 1. DESCRIPTION OF THE UNIT 2. INSTALLATION & CONNECTION 3. COMMISSIONING 4. CARE
More informationwall-mounted boilers, water heaters and pool heaters from 15 kw to 140 kw
MADE IN ITALY THE EXPERT of stainless steel condensing heating systems ECO FRIENDLY wallmounted boilers, water heaters and pool heaters from 15 kw to 140 kw floor standing boilers, water heaters and pool
More informationPower X High Power Condensing Wall-Hung Boilers
Power X High Power Condensing Wall-Hung Boilers NEW Residential Heating/Light Commercial compliant POWER X / High Power Condensing Condensing Wall-Hung Wall-Hung Boilers Boilers Power X: the new high power
More informationCondensing Heat Exchanger Suitable Gas Fired Ideal GT & GTE boiler ranges
Condensing Heat Exchanger Suitable Gas Fired Ideal GT & GTE boiler ranges 2 The new GT Condenser provides higher efficiencies and low running costs from the Ideal range of pressurised gas boilers. Extracting
More informationWELCOME TO REMEHA, THE EXPERT CHOICE INTRODUCING THE REMEHA GAS 110 ECO RANGE FEATURES AND BENEFITS
GAS 110 ECO WHAT S INSIDE 03 WELCOME TO REMEHA 03 INTRODUCING THE REMEHA GAS 110 ECO RANGE 04 BOILER CONSTRUCTION 07 OPERATING PRINCIPLE 08 TECHNICAL INFORMATION 10 ENGINEERING SPECIFICATION 11 DIMENSIONS
More informationAfter Sales Service Guide
After Sales Service Guide Control panel DIEMATIC isystem For INNOVENS MCA wall-hung gas condensing boilers 300022803-00-B /02/200 Use of this guide is reserved for qualified professionals Any intervention
More information5 YEAR ADVANCE PLUS WARRANTY. High efficiency condensing combi and system boilers
5 YEAR WARRANTY ADVANCE PLUS High efficiency condensing combi and system boilers Android Apple WALL HUNG BOILERS Advance Plus ADVANCE PLUS HIGH EFFICIENCY BOILER RANGE The Advance Plus range is the latest
More informationHT V2 HT Split
Scroll compressor Refrigerant R07C Aqu@Scop HT V Aqu@Scop HT Split High Temperature Air-to-Water Heat Pumps Models -, -7 and 8-9.0 to 7.9kW Aqu@Scop HT V / Aqu@Scop HT Split Installation examples - Single
More information24/31-28/35-33/40 kw Premix System Condensing - ErP Combi Gas Boilers. Enerwa / EnerwaPlus.
24/31-28/35-33/40 kw Premix System Condensing - ErP Combi Gas Boilers Enerwa / EnerwaPlus www.warmhaus.com Condensing-ErP Premix System Boilers 24/31-28/35-33/40 kw Warmhaus wall-hung gas combi boilers
More informationExclusive Green E Condensing Wall-Hung Boilers
Exclusive Green E Condensing Wall-Hung Boilers BERETTA HIGH-EFFICIENCY Residential Heating compliant XL Exclusive Green E Energy efficiency at its best EXCLUSIVE GREEN E is Beretta top of the range condensing
More informationVICTRIX 50 1 SPECIFICATIONS. Wall mounted condensing boilers
Wall mounted condensing boilers VICTRIX 50 is the new wall-mounted central heating condensing boiler. It is pre-arranged for single and cascade operation (up to 3 appliances connected), with the advantage
More informationVICTRIX Superior kw Export VICTRIX Superior kw X Export
Wall-hung condensing VICTRIX Superior kw is the instantaneous sealed chamber wallhung boiler with power of 32 kw which, thanks to condensation technology, is characterised for its high efficiency and guarantees
More informationBSC...E - BSP...E - BESC...E
INISOL DUO E DIETRISOL DUO E Solar hot water calorifer BSC...E - BSP...E - BESC...E EN User Guide 0007781-001-01 Contents 1 Introduction.............................................................................
More informationALEZIO REVERSIBLE AIR/WATER HEAT PUMPS SPLIT INVERTER CONDITIONS OF USE
ALEZIO REVERSIBLE AIR/WATER HEAT PUMPS SPLIT INVERTER AWHP -II/E.: from to kw with additional heating by integrated electrical resistance AWHP -II/H: from to kw with additional hydraulic heating by boiler
More informationLow temperature gas boiler DTG 330 S. User Guide
en Low temperature gas boiler DTG 330 S User Guide 300011852-02 . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3
More informationRemeha. Fuel oil/gas boilers P 320. Installation and Service Manual
Remeha Fuel oil/gas boilers P 320 en Installation and Service Manual 300016243-02 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It is
More informationDTG X.. N. Low temperature gas furnace. Instructions for use. English 14/11/2005
DTG X.. N Low temperature gas furnace English 14/11/2005 Instructions for use Contents Important recommendations...................................................................3 1 Aeration.................................................................................................3
More informationALKON 90 ALKON 90 MODEL 24,0 93,6 21,1 87, nominal heat output. conventional. max/min heat input. efficiency class (Directive 92/42)
ALKON 90 ALKON 90 MODEL max/min condensing nominal heat output conventional max/min heat input efficiency class (Directive 92/42) kw kw kw ALKON 90 24,0 93,6 21,1 87,5 22-90 Moving in the present with
More informationBWA. CONDENSING WALL HUNG BOILER FROM 50 kw TO 140 kw
BWA CONDENSING WALL HUNG BOILER FROM 50 kw TO 140 kw Professional From 50 kw to 70 kw EFFICIENCY CLASS (CE DIR. 92 / 42). Seasonal efficiencies up to 109% CLASS 5 Low NO x (EN 483) thanks to the pre-mixed
More informationCAST IRON PREMIX HIGH EFFICIENCY GAS FIRED BOILER kw BRILEY DESIGN MANUAL
BRILEY CAST IRON PREMIX HIGH EFFICIENCY GAS FIRED BOILER 60 140 kw 0604.2 Beeston Briley cast-iron premix gas-fired boiler 60-140kW Contents 1 Boiler specifications Page 3 2 Appliance general dimensions
More informationC Tahiti. condensing
C 227-01 m a d e i n I ta ly Tahiti condensing Condensing, pre-mixed, wall-hung boilers KC 24 KC 28 - KC 32 indoor, instantaneous, combination boilers KR 24 KR 38 - KR 32 indoor, central heating only boilers
More information24-28 kw Conventional Combi Gas Boiler. Lawa / LawaPlus
24-28 kw Conventional Combi Gas Boiler Lawa / LawaPlus Conventional Combi Gas Boilers Warmhaus wall-hung gas combi boilers Lawa and LawaPlus, with the advantage of its width as 288mm, are easily fit to
More informationDivacondens D Plus Atmospheric condensation wall-mounted boilers, with instant domestic hot water production
Divacondens D Plus Atmospheric condensation wall-mounted boilers, with instant domestic hot water production THE SIMPLEST SOLUTION FOR A CONDENSING BOILER DIVACONDENS D PLUS is the generator of condensation
More informationPCH/new Series. High performance, total flexibility
PCH/new Series High performance, total flexibility PCH/new Installation in Air Handling Unit Very Low Emissions NOx lower than 30 ppm : Class 5 Capacity Range 14 models from 5 kw to 400kW Automatic Control
More informationAqua Balance. User s Information Manual. WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water
Aqua Balance WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water User s Information Manual * Low Lead Content If the information in this manual is not followed exactly, a fire
More informationTABLE OF CONTENTS TECHNICAL DOCUMENTATION 03. Technical Data
INSPIRED EF F ICIENCY CONDENSING BOILERS ETHOS 350 & 550 FLO O R ST AN D I N G CO N DE N SI N G BOI L E R S T ECHN I CAL DO CUME N TA T I O N I SSUE 0 3 /1 6 R e v. 0 1 TABLE OF CONTENTS 1. 2. 3. 4. 5.
More informationTechnical documentation. ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW
Technical documentation ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW ComfortLine gas condensing boilers Benefits of the WOLF gas condensing boilers up to 24 kw CGB-2(K) / CGW-2 / CGS-2
More informationFloorstanding Gas Condensing Boilers VITOCROSSAL 100
Floorstanding Gas Condensing Boilers VITOCROSSAL 00 Heating systems Industrial systems Refrigeration systems Floorstanding Gas Condensing Boilers Vitocrossal 80 to 8 kw Cascade up to 66 kw / VITOCROSSAL
More informationRoom sealed circuit appliance sold without the terminal or the combustion air supply and exhausted gas ducts. TYPE C 63 TYPE B TYPE B 23
Room sealed circuit appliance sold without the terminal or the combustion air supply and exhausted gas ducts. TYPE C 63 TYPE B Type B 23 on the wall Ø 80 duct, available in the following lengths: 1000,
More informationATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL
STREBEL GENEVA CE ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL INDEX TABLE 1 TECHNICAL DATA SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION
More informationHIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler
HIGH POWER VICTRIX PRO 2 ErP High power, wall-hung condensation boiler MAIN INDEX INDEX 1 VICTRIX PRO 35-55 2 ErP SPECIFICATIONS...5 2 VICTRIX PRO 80-100-120 2 ErP SPECIFICATIONS...6 3 VICTRIX PRO 35-55
More informationAluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support
Aluminium range of condensing boilers Outputs from 30kW to 600kW Designed to meet carbon reduction targets Lifetime service and support Works every time. www.pottertoncommercial.co.uk Aluminium range of
More informationAVIO kw Export 1 FEATURES. Wall-mounted with storage tank
1 FEATURES Wall-mounted with storage tank Compact wall-mounted open chamber boiler with conventional flue and 45 litre stainless steel storage tank and nominal heat output of 23.7 kw (20,382 kcal/h). AVIO
More informationGas fired condensing boiler C 230 ECO. User Guide
en Gas fired condensing boiler C 230 ECO User Guide 300015144-02 Contents 1 Safety instructions.......................................................................3 1.1 General safety instructions.................................................................................3
More informationGAS 610 ECO PRO. The new Remeha. Condensing Boiler Range REMEHA GAS 310/610 ECO PRO
The new Remeha GAS 310/610 ECO PRO Condensing Boiler Range REMEHA GAS 310/610 ECO PRO HIGH EFFICIENCY 109.6% NCV FULLY MODULATING BOILER CONTROL PREMIX BURNER CLEAN COMBUSTION ULTRA LOW NOx BREEAM EXCELLENT
More informationHigh temperature air-to-water heat pumps
Designed to replace conventional boilers and produce domestic hot water 4 High temperature hot water (+65 C) 4 Winter operation (-20 C) 4 High energy efficiency (CP) 4 Compact and quiet 4 Scroll compressors
More informationWall-hung gas boilers. Instructions for use. English 31/08/05
City 1.24/II Chimney and VMC - City 1.24/II FF City 2.24/II Chimney and VMC - City 2.24/II FF - City 2.28 FF City 3.24/II Chimney - City 3.24/II FF City 24 BIC/II - City 24 BIC/II FF City Condens 1.24,
More informationCAST IRON ATMOSPHERIC BOILERS
CST IRON TMOSPHERIC OILERS 006 gas-fired, central heating only, electronic ignition High efficiency boilers designed heating large domestic application. Ideal for installation in any boiler room. Cast-iron
More informationCiao Green Condensing Wall-Hung Boilers
Ciao Green Condensing Wall-Hung Boilers Residential Heating Ciao Green A cost-consciuos condensing boiler CIAO GREEN is one of the condensing boilers with the best price-quality ratio on the matket. Kitchen
More informationEMC-M 24 EMC-M 24/28 MI EMC-M 30/35 MI EMC-M 34/39 MI
Ireland EN Wall-hung gas condensing boilers EMC-M 24 EMC-M 24/28 MI EMC-M 30/35 MI EMC-M 34/39 MI Installation and Service Manual 7602023-02 EG declaration of conformity The device complies with the standard
More informationSPECIFICATIONS - NIKE
Wall-mounted instant boilers NIKE Mini kw Special is the ideal Immergas solution for modern building and wherever space is limited and has to be made the most of. Simple to use and easy to install, thanks
More informationCondensing, pre-mixed, wall-hung gas boilers with water tank
C 271-01 made in Italy Nias condensing Condensing, pre-mixed, wall-hung gas boilers with water tank Life-enhancing heat GB Condensing, pre-mixed, wall-hung boilers with water tank Nias CONDENSING HIGH
More informationAGEO CALEO. Water-to-water high temperature heat pumps USE RANGE DESCRIPTION. Designed to replace a conventional boiler and produce domestic hot water
Designed to replace a conventional boiler and produce domestic hot water Heating capacity : 16 to 25 Heating Hydraulic module ENVIRONMENTALLY HFC R4A PROTECTION DE FRIENDLY L'ENVIRONNEMENT USE CIAT is
More informationALFÉA EXCELLIA DUO. more. less AIR TO WATER HEAT PUMP
AIR TO WATER HEAT PUMP ALFÉA EXCELLIA DUO Five models: 11 to 16 kw (single and -phase) Heating and domestic hot water integrated COP up to 4. Suitable for new build and renovation Integrated domestic hot
More information5 YEAR GUARANTEE. Inovia. High efficiency condensing combi and system boilers
* 5 YEAR GUARANTEE Inovia High efficiency condensing combi and system boilers WALL HUNG BOILERS Inovia INOVIA HIGH EFFICIENCY BOILER RANGE The Inovia range is the latest in intelligent gas boiler technology
More informationSirius FS. Working towards a cleaner future
Sirius FS Floor Standing Stainless Steel Condensing Boilers Single Boiler Applications: 50 to 160kW Modular Boiler Applications: up to 640kW Working towards a cleaner future heating specialists 1. Product
More information