INSTALLATION AND OPERATING INSTRUCTIONS EKOHEAT 900/1500/2500/4000

Size: px
Start display at page:

Download "INSTALLATION AND OPERATING INSTRUCTIONS EKOHEAT 900/1500/2500/4000"

Transcription

1 INSTALLATION AND OPERATING INSTRUCTIONS EKOHEAT 900/1500/2500/4000

2 Thank you for choosing an EKOPOWER wood pellet boiler. You have chosen from a range of EKOPOWER products designed to provide efficient and sustainable heating for the ideal level of comfort for your home. This manual forms an essential part of the product and it must be given to the end user. We recommend you read the warnings and recommendations in the manual carefully, as they contain important information on the safety, use and maintenance of the installation. This boiler must be installed, commissioned and annually serviced only by authorised Ekopower personal in accordance with the local legislation and following the manufacturer s instructions. Incorrect installation of these boilers could result in damage to people, animals or property, and the manufacturer will hold no liability in such cases. Ekopower is an innovative new company specialising in producing Danish designed wood pellet boilers. We have developed a new technology to burn wood pellets, creating a range of boilers with the highest performances amongst European manufacturers (up to 95.5%), and the highest classification thanks to their low emissions of CO and NO_ contaminating gases (class A according to standard EN303-5). The innovative Ekoheat range, the result of several years of research, is designed to combine the highest performance in the use and maintenance of this type of device, with a purchase and installation cost that is much more accessible to the end user than any other of the options currently on the market. In other words, Ekopower adheres to a philosophy of innovation with common sense, and sets out with this range to bring consumers who are committed to renewable energies, an alternative that is much closer to the highest levels of biomass technology at a reasonable price for a more sustainable environment.

3

4 CONTENTS Page 0 LIST OF COMPONENTS CONTROL COMPONENTS INSTALLATION INSTRUCTIONS LOCATION HYDRAULIC INSTALLATION FUEL INSTALLING THE HOPPER ELECTRICAL CONNECTION EXAMPLE OF A RADIATOR HEATING INSTALLATION EXAMPLE OF A HEATING INSTALLATION WITH RADIATORS AND A DHW STORAGE TANK EXAMPLE OF A ZONED HEATING INSTALLATION EXAMPLE OF AN INSTALLATION WITH A BUFFER TANK FOR 2 UNDERFLOOR HEATING CIRCUITS AND A DHW TANK EXAMPLE OF INSTALLATION WITH THE MS HYDRAULIC KIT EXAMPLE OF INSTALLATION WITH THE DMS HYDRAULIC KIT EXAMPLE OF A HEATING INSTALLATION WITH RADIATORS AND BACK-UP FOR A SOLAR INSTALLATION FOR DHW PRODUCTION FLUE INSTALLATION FLUE DIAGRAM FLUE STRUCTURE CLEANING & MAINTAINCE FLUE TERMINATION NON LOAD BEARING COMPONENTS STARTING UP THE BOILER PRIOR WARNINGS FILLING THE INSTALLATION ELECTRICAL CONNECTION START-UP INSTALLATION DELIVERY DIGITAL DISPLAY: "INFO" DISPLAY CONFIGURATION MENU PROGRAM MAP USER MENU BOILER TEMPERATURE FUEL CLEANING SETTINGS SUMMER MODE DHW PRIORITY Minium pump temperature AUGER CALIBRATION & DATE & TIME SERVICE MENU FUEL FOR IGNITION ASH PLATE MOVEMENT & FAN FUNCTIONING MINIUM POWER EXTRA EQUIPMENT ON/OFF MODE RESTORE FACTORY SETTINGS NEW SOFTWARE CHANGE HOPPER CONTENT CLEAN NOW LANGUAGE SELF TEST MODEL SELECTION TEST NOW BOILER SENSOR READINGS TESTING BOILER COMPONENTS SAFETY PRECAUTIONS CARBON MONOXIDE VENTILATION CLEANING THE ASH DRAWER SAFFETY CUT-OUTS BURNER CUT-OUTS NO FLAME CUT-OUTS TEMPRATURE SAFTETY CUT-OUT SHUTTING DOWN THE BOILER BOILER MAINTENCE BOILER AND FLUE MAINTENANCE CLEANING THE BURNER DRAINING THE CONDENSATION WATER

5 18.4 BOILER WATER CHARACTERISTICS CLEANING THE HEAT EXCHANGER TECHNICAL CHARACTERISTICS DIAGRAMS AND MEASUREMENTS ELECTRICAL DIAGRAM BOILER ELECTRICAL DIAGRAM BURNER ELECTRICAL DIAGRAM CIRCULATING PUMP FLOW CURVES SENSOR SETTINGS ALARM CODES GUARANTEE CONDITIONS WARRENTY CARD NOTES LIST OF COMPONENTS Feed auger. 2. Heat exchanger. 3. Vent cleaning device. 4. Fan. 5. Burner. 6. Ash drawer. 2

6 1 CONTROL COMPONENTS 1. Menu: Touch this symbol to access Main Menu. In this is the boiler functioning display, where all the operating information, settings and values appear. This is used to access the appliance s configuration and technical settings. 2. INFO touch button: Touch this symbol to access boiler information. 3. Lux display: This shows when there is ignition 4. Fan display: This shows what percentage the fan is running at. 5. Burning: This shows what percentage fuel is being used. 6. Auger display: This shows when the feed auger is on/off. 9. Temperature display: This shows the temperature of the water leaving the boiler. 10. Fuel: This displays the weight in Kilograms of wood pellets left in the hopper. 11. START touch button: Touch this symbol to start up or switch off boiler functioning 3

7 2 INSTALLATION INSTRUCTIONS The boiler must be installed by personnel authorised by the relevant national authorities, in compliance with the applicable laws and regulations. This boiler is suitable for heating water to a temperature below boiling point at atmospheric pressure. It must be connected to a heating installation and/or a domestic hot water distribution network, which must always be compatible with its performance and power. This appliance must only be used for the purpose for which it has been expressly designed. Any other use is considered unsuitable and therefore hazardous. The manufacturer shall not be considered liable under any circumstances for damage caused by unsuitable, erroneous or irrational use. Remove all the packaging and check the contents are complete. In case of doubt, do not use the boiler. Contact your supplier. Keep the packaging elements out of reach of children, as they can be dangerous. When you no longer wish to use the boiler, disable the parts that could be a potential source of hazard. 2.1 Location The boiler must be installed in a sufficiently ventilated site, away from humidity. It must be located so that the air grilles on the premises are not obstructed and normal boiler maintenance is possible even if it is placed between items of furniture. One metre of free space must be left above the boiler for this purpose. The appliance should be located in a part of the installation where it cannot be struck by a vehicle. 2.2 Hydraulic installation The hydraulic installation must be made by qualified personnel. The applicable installation legislation is to be complied with, and the following recommendations should also be taken into account: - It is obligatory and essential to install an anti-condensation valve (shunt valve/load valve) with the boiler, to prevent any water condensation in the heat exchanger. If this requirement is not complied with, EKOPOWER s guarantee of the appliance will automatically be null and void. Make sure it is installed in the correct location and diverting the water in the correct direction. - The inside of the installation piping should be thoroughly cleaned (flushed) before switching on the boiler. A magnetic filter should also be fitted. - We recommend inserting cut-off valves between the installation piping and the boiler to simplify maintenance tasks. - Leave adequate free space around the boiler for carrying out any maintenance and repair operations. - Drain valves and suitable devices for correctly bleeding the air from the circuit during the boiler filling stage should be fitted. - Install all the necessary safety elements (expansion vessel/tank, safety valve, etc.) to comply with the applicable regulations for the installation. Make sure there is adequate expansion area in open vented systems tank. - If the boiler is installed at a lower height than the heating installation, it is recommendable to create a siphon at the boiler outlet, to prevent the installation from heating up due to natural convection when heating is not required. -Circulation pump is in the correct location and circulating the water in the correct direction. 4

8 2.3 Fuel The EkoHeat boilers must be fuelled by EN PLUS certified wood pellet. The EN PLUS certificate assures that the fuel s humidity levels and calorific value are ideal for optimum boiler functioning. If this requirement is not complied with EKOPOWER s guarantee of the appliance will automatically be null and void. The following points should be taken into account for correct fuel storage: - The stored pellets should be kept dry all year round. - The applicable legislation in each country for correct fuel storage must be complied with. Wood pellets are made from wood shavings and sawdust and are used in highly efficient and convenient automatic wood boilers. Because they have a low moisture and ash content wood pellets burn very efficiently. What s more they are compact and easy to store. Typically pellets come in bags (ideal for stoves or smaller boiler systems) or are delivered in bulk by truck (ideal for boiler systems with bulk stores). Wood pellets can be ordered from local fuel merchants. Pellets facts (Typical) Dry matter content 90-92% Ash content 0.5% Diameter 6-8mm Length 4 diameter, Density 650 kg/m3, Volume 1.54m3/tonne pellet, Energy 4.7 kwh/kg pellet Benefit 1kg wood pellet replaces 0.41kg of light fuel oil Wood pellets are upgraded or refined wood fuels which have been produced from sawdust, grinding dust, shavings, bark or cutter chips by drying and pressing. No additives are needed to produce them. Lignin released in the pressing process binds the wood material. They are compact and easy to store and use for fully automatic burning in wood pellet boilers or stoves. Good quality wood pellets with a moisture content of 8% will have a calorific value of approximately 4,700 kwh/tonne. 5

9 2.4 Installing the Hopper EKOPOWER supplies a reserve tank for storing the pellets with the boiler. The tank is reversible and can be mounted on either the left or right side of the boiler. There are 2 sizes, 320kg & 160kg. IMPORTANT: Ensure the height of the elliptical holes on the sides of the boiler and on the reserve tank coincide, for correct insertion of the feed auger. To do this, make the necessary adjustments for height and depth. 6

10 2.5 Electrical Connection The EkoHeat boiler is equipped to work on 230 V~ 50 Hz electrical supply. The boiler must be protected by 5 amp fuse unit with RCD or RCBO line protection. The electrical installation must be installed by a qualified electrician. This appliance MUST be earthed. The terminal strip J2 includes terminals for connecting a sensor for the optional DHW circuit. This sensor must be supplied by EKOPOWER. For correct connection of the burner, the burner connections should be made to terminal strips J3 and J4 (see "Electrical Diagram" page 54). IMPORTANT: Before carrying out any work on the boiler s electrical installation, always ensure it is disconnected from the mains. 2.6 Example of a radiator heating installation The EkoHeat boiler is equipped with an electronic control that can govern a radiator heating circuit, with an external circulation kit to prevent condensation in the heat exchanger. The external circulation kit consists of: - Circulating pump. - 55ºC 3-way anti-condensation valve. - Safety valve, calibrated to 3 bar. - Boiler blow-off valve. The figure below shows an example of a hydraulic diagram of a radiator heating installation: EkoHeat + External Kit SF: 3 Bar pressure relief valve. CP: Circulating pump. RV: Anti-condensation return valve. EV: Expansion vessel. DV: Air release valve. BV: Drain-off valve. IMPORTANT: Fit drain valves and devices for correctly bleeding the air from the heating circuit. 7

11 2.6 Example of a heating installation with radiators and a DHW storage tank. The EkoHeat boiler is equipped with an electronic control that can govern a radiator heating circuit, an external circulation kit to prevent condensation in the heat exchanger and, optionally, a DHW storage tank loading circuit. The external hydraulic kit consists of: - Circulating pump. - 55ºC 3-way anti-condensation valve. - Safety valve, calibrated to 3 bar. - Boiler blow-off valve. To control a DHW circuit, connect a DHW sensor from the hot water tank to the boiler (optionally supplied by EKOPOWER) and a 3-way diverter valve (see "Electrical Diagram page 54). The figure below shows an example of a hydraulic diagram for a heating installation with radiators and a DHW tank: EkoHeat + External Kit SF: 3 Bar pressure relief valve. CP: Circulating pump. RV: Anti-condensation return valve. EV: Expansion vessel. DV: Air release valve. BV: Drain-off valve. 3WV: 3-way diverter valve. HS: Hot water tank sensor. NV: Non-return valve. DSV: DHW safety valve. DEV: DHW expansion vessel. IMPORTANT: Fit drain valves and devices for correctly bleeding the air from the heating circuit. IMPORTANT: Before any servicing, disconnect the boiler from the mains. 8 IMPORTANT: The 3-way DHW valve should be fitted to enable the flow to the heating circuit when it is not activated.

12 2.7 Example of a zoned heating installation Apart from the examples described in the previous sections, the EkoHeat boiler can be fitted in an installation with several separate heating zones, by installing the suitable control devices for each zone, e.g. zone valves controlled by ambient thermostats fitted in each of the zones to be controlled. Two or more radiator zones can be controlled with any of the previous installation diagrams. The figure below shows an example of a hydraulic diagram for a heating installation with two radiator zones and a DHW tank: EkoHeat + External Kit SF: 3 Bar pressure relief valve. CP: Circulating pump. RV: Anti-condensation return valve. EV: Expansion vessel. DV: Air release valve. BV: Drain-off valve. 3WV: 3-way diverter valve. HS: Hot water tank sensor. NV: Non return valve. DSV: DHW safety valve. DEV: DHW expansion vessel. ZV: Zone valve with auxiliary switch. IMPORTANT: Fit drain valves and devices for correctly bleeding the air from the heating circuit. IMPORTANT: Before any servicing, disconnect the boiler from the mains. IMPORTANT: The 3-way DHW valve should be fitted to enable the flow to the heating circuit when it is not activated. 9

13 2.8 Example of an installation with a buffer tank for 2 under floor heating circuits and a DHW tank. The EkoHeat boiler is equipped with an electronic control that can govern a radiator heating circuit, an external circulation kit to prevent condensation in the heat exchanger and, optionally, a DHW storage tank loading circuit. In an installation with a buffer tank, the components installed after the buffer tank are not controlled by the boiler control panel. Suitable control devices for each installation need to be installed for them to function correctly. The external hydraulic kit consists of: - Circulating pump. - 55ºC 3-way anti-condensation valve. - Safety valve, calibrated to 3 bar. - Boiler blow-off valve. The figure below shows an example of an installation with a buffer tank for 2 under floor heating circuits and a DHW tank. EkoHeat + External Kit SF: 3 Bar pressure relief valve. CP: Circulating pump. RV: Anti-condensation return valve. EV: Expansion vessel. DV: Air release valve. BV: Drain-off valve. NV: Non-return valve. DSV: DHW safety valve. DEV: DHW expansion vessel. DP: DHW tank feed pump. IP: Under floor heating circuit impeller pump. MV: Under floor heating mixing valve. 10 IMPORTANT: Before any servicing, disconnect the boiler from the mains. IMPORTANT: The components installed after the buffer tank are not controlled by the boiler control panel.

14 2.9 Example of installation with the MS Hydraulic Kit The EkoHeat boiler is equipped with an electronic control able to govern a heating circuit via an external circulation kit to prevent condensation, for installation and control of an under floor heating circuit and a DHW storage circuit. The MS hydraulic kit includes a central electronic adjustment unit, to manage the functioning of the kit componyents independently from the boiler control panel. The external hydraulic kit consists of: - Circulating pump. - 55ºC 3-way anti-condensation valve. - Safety valve, calibrated to 3 bar. The figure below shows an example of installation with an MS hydraulic kit: EkoHeat + External Kit SF: 3 Bar pressure relief valve. CP: Circulating pump. RV: Anti-condensation return valve. EV: Expansion vessel. DV: Air release valve. BV: Drain-off valve. NV: Non-return valve. DSV: DHW safety valve. DEV: DHW expansion vessel. MSK: MS hydraulic kit. HS: MS hydraulic kit hot water tank sensor. ES: External sensor. IMPORTANT: Fit drain valves and devices for correctly bleeding the air from the heating circuit. IMPORTANT: Before any servicing, disconnect the boiler from the mains. 11

15 2.10 Example of installation with the DMS Hydraulic Kit The EkoHeat boiler is equipped with an electronic control able to govern a heating circuit via an external circulation kit to prevent condensation, and, optionally, a DMS hydraulic kit supplied by plumbing wholesaler may also be acquired and installed, to install and control a radiator heating circuit and a DHW storage circuit. The external hydraulic kit consists of: - Circulating pump. - 55ºC 3-way anti-condensation valve. - Safety valve, calibrated to 3 bar. - Boiler blow-off valve. The figure below shows an example of installation with a DMS hydraulic kit: EkoHeat + External Kit SF: 3 Bar pressure relief valve. CP: Circulating pump. RV: Anti-condensation return valve. EV: Expansion vessel. DV: Air release valve. BV: Drain valve. NV: Non-return valve. DSV: DHW safety valve. DEV: DHW expansion vessel. DMSK: DMS hydraulic kit. HS: MS hydraulic kit hot water tank sensor. ES: External sensor. IMPORTANT: Fit drain valves and devices for correctly bleeding the air from the heating circuit. IMPORTANT: Before any servicing, disconnect the boiler from the mains. 12

16 2.11 Example of a heating installation with radiators and back-up for a solar installation for DHW production. The EkoHeat boiler is equipped with an electronic control that can govern a radiator heating circuit, an external circulation kit to prevent condensation in the heat exchanger and, optionally, a back-up circuit for a solar installation for DHW production by storage. The solar circuit must be controlled by a specific device, separate from the boiler. The external hydraulic kit consists of: - Circulating pump. - 55ºC 3-way anti-condensation valve. - Safety valve, calibrated to 3 bar. - Boiler blow-off valve. To control the back-up circuit for the solar DHW circuit, connect a DHW sensor from the hot water tank to the boiler (optionally supplied by EKOPOWER) and a 3-way diverter valve (see "Electrical Diagram page 54). The figure below shows an example of a hydraulic diagram of a heating installation with radiators and a solar circuit back-up system: EkoHeat +External Kit SF: 3 Bar pressure relief valve. CP: Circulating pump. RV: Anti-condensation return valve. EV: Expansion vessel. DV: Air release valve. BV: Drain valve. NV: Non-return valve. DSV: DHW safety valve. DEV: DHW expansion vessel. 3WV: 3-way diverter valve. HS: Hot water tank sensor. SK: Solar circuit hydraulic kit. IMPORTANT: Fit drain valves and devices for correctly bleeding the air from the heating circuit. IMPORTANT: The 3-way DHW valve should be fitted to enable the flow to the heating circuit when it is not activated 13

17 3 FLUE INSTALLATION The EkoHeat boiler is a biomass boiler and it is essential for it to be connected to a flue, i.e. a smoke duct able to create a pressure drop, which in this case should be between Pascal s (Pa)or mbar, in compliance with the applicable laws to this regard. The com must be installed by qualified personnel and must comply with the regulations in force. The following recommendations should be taken into account: - It should have 25mm insulation. - It should be insulated from flue terminal of the boiler to the cowl. - It should have a draft stabilizer fitted. - It should be independently located, with a separate flue for each boiler. - It should be vertical, avoiding any angles greater than 45º. - It should always have the same diameter. It is recommendable for it to be circular, and never any narrower than the boiler outlet. - It is above the eaves line by about 1 metre or 600mm if coming out near the roof apex. - It should have a storm cowl fitted. IMPORTANT: It is obligatory to install a fume inspection plate with condensation collection, to remove the condensation generated in the flue. Otherwise, the condensation may reach the inside of the boiler and cause irreparable damage, which would not be covered by EKOPOWER s guarantee. The condensation pipe should lead to a drain outlet, as a large amount of water may be generated. This connection must be made in compliance with the regulations for draining off condensation water to the drain network. IMPORTANT: It is recommended to install a draught stabiliser to prevent any pressure drop variations in the flue due to atmospheric conditions, which could affect correct boiler combustion. This draught stabiliser must be installed below the fume inspection plate to prevent any leakage of combustion gases. IMPORTANT: It is recommended to install a storm cowl on the Flue. IMPORTANT: If the draft is below 10 Pascal s (Pa), some of the tabulators must be taken out or a 10mm hole drilled on the cap of the tabulator or both. This would be dependent the on flue gas temperature. 14

18 3.1 Flue Diagram From July 1st 2013 it will be mandatory for manufacturers to apply CE Marking to any of their products that are covered by a harmonised European Standard. Each Harmonised European Standard defines requirements for CE marking of that product and has two main components: * Initial Type Testing * Factory Production Control Both must be obtained to achieve CE Marking. 15

19 3.2 Flue structure The design having almost no thermal bridging between the chimney liner and body ensures a quick stabilization of flue gas temperatures and the existence of a strong draught. This enhances the performance of the appliance. It must be constructed from concentric cylinders commonly referred to as the chimney liner and body. The body is made from 304 grade stainless steel which carries the structural load. It has a bright polished finish and is completely weather proof due to its high quality continuously seam welded finish. The liner of the flue is made from 316 grade stainless steel and is designed to automatically cope with the thermal elongation due to changes in temperature. It also must offer excellent resistance against corrosion; this would be to its molybdenum alloy content structure. The chimney is insulated with a densely packed insulation (25mm) which results in a low heat conductivity to the walls of the chimney. All components have specially developed male and female formed ends. Together with a developed locking band system both strengthen the joints and ensure the excellent gas tight properties of the chimney. As stated there must be a minimum distance of 80mm from the outer body of the chimney to any combustible material. However if the chimney passes through a joist or slab then clearance at floor and ceiling joist must be established by the use of a Fire-stop arrangement. No combustible material should protrude beyond the 80mm safety lugs attached. If the chimney passes through a cupboard, attic or separate compartment area to the boiler it should be adequately protected by a non-combustible casing material which must be spaced from the chimney to satisfy the minimum distance stated. This is to ensure that accidental contact of any combustible material or human contact to the surface of the chimney will not occur. Protection in the attic can also be provided by a rigid mesh structure positioned at the relevant distance to the chimney. IMPORTANT: No joints in the chimney sections should be made in the joist area or where there is no access. The connection to the flue pipe or appliance must be sealed using an adaptor. This can be sealed with fire cement or suitable alternative, and this connection should be made in the same room as the appliance itself. The weight of the chimney should be adequately supported using the correct brackets. Where the building is to support the lateral and vertical load it should be inspected to ensure it is capable of supporting the extra load. If the chimney is installed internally it should be supported with the use of wall brackets and fire stops determined by the route chosen. Where a chimney protrudes 1.5M beyond its last support a guy wire bracket support system should be used. On completion of installation a chimney plate must be completed and positioned in an area close to the chimney base for future reference. 16

20 3.2 Cleaning / Maintenance The chimney should be inspected regularly and cleaned at least once a year. This should be carried out with the use of a brush which should not be made from black steel. The chimney should be maintained to ensure that the construction remains in good condition. Any components showing signs of deterioration which may affect performance should be replaced under professional advice, any evidence of leakage identified by smoke staining should be rectified immediately. For chimney information refer to the chimney plate. 3.3 Flue termination As a chimney protrudes through a roof structure it must be sealed with a lead flashing to suit the specific roof pitch. The lead flashing base should be worked into the roof structure to ensure rain water run off situation is achieved. The lead flashing up-stand section should then be trimmed back with a small amount of clearance to ensure the flue diameter being used passes through it snugly. The top of the lead flashing connected to the chimney body should be carefully sealed with a flashband mastic or denso tape. A storm collar should then be fitted to the flue body directly over the top of the flashing unit. To fit the storm collar place it around the flue body and tighten the nut and bolt arrangement. It is recommended that a small amount of flash band mastic or high temperature silicone is used to seal the immediate area around the top of the storm collar. The cowl is the last component to be fitted to the flue installation. For full detail of chimney termination heights see Part J of the building regulations. 3.4 Non load bearing components Wall Bracket: 1.5M intervals or centrally between base/intermediate wall supports for all diameters Guy wire bracket: 1.5 meter intervals beyond last support for all diameters. Roof centring Plate: Attached to chimney to centralise \ stabilise before passing through pitch roof for all diameters. On long external chimney runs a base wall support should be installed to support the tee piece to a total installed height of 3.5meters. An additional intermediate wall support must be used every 3.5meters beyond this point with a wall bracket situated centrally between both load bearing members. If an offset in a chimney run is necessary i.e. to avoid fascia and soffet, an additional wall bracket must be installed directly above the offset to provide extra lateral support. See installation drawings. 17

21 4 STARTING UP THE BOILER 4.0 Prior warnings Repair and maintenance of the boiler must be carried out by a qualified professional, authorised by EKOPOWER. For optimum functioning and conservation of the boiler, it should be serviced annually. Carefully read this instruction manual and keep it in a safe, easily-accessible place. EKOPOWER will not be liable for any damages caused by failure to follow these instructions. Before any servicing, disconnect the boiler from the mains. 4.1 Filling the installation The hydraulic installation must include a fill valve, a manometer, drain valves and the necessary hydraulic components for correctly filling the installation. To fill the installation, open the fill valve until the installation manometer shows a pressure of bars. The installation must be filled slowly, bleeding the air from the water circuit using the drain valves provided on the same. Close the fill valve after filling. IMPORTANT: Switching on the boiler with no water inside could result in serious damage. 4.2 Electrical Connection The EkoHeat boiler must be protected by 5 amp fuse unit and RCD or RCBO device be fitted on electrical supply. There is a 4 amp fuse located on main circuit board. It is important to disconnect electrical supply when doing any maintenance on the boiler. The appliance MUST be earthed. 4.3 Start-up In order for the guarantee to be valid, the boiler must be started up by personnel authorised by EKOPOWER. Before beginning start-up, the following must be complied with: - The boiler must have an electrical supply. - The installation must be filled with water (the pressure must be between 1 and 1.5 bar). - The hopper must be filled with fuel. The start-up sequence is as follows: - Check the flue is correctly installed using a draft gauge. - Check the external hydraulic anti-condensation kit is correctly installed. - Check the reserve tank and the feed auger are correctly installed. The feed auger must be calibrated for correct boiler functioning (See Feed Auger Calibration page 27). Check the right type of fuel is being used (it must be EN PLUS). - If the installation has flow and return valves, check they are open. 4.4 Installation delivery After the initial start-up, the Technical installer will explain to the user how the boiler functions, making any observations they consider relevant. The installer is responsible for clearly explaining to the user the functioning of any control or regulation device forming part of the installation but not supplied with the boiler. 18

22 5 DIGITAL DISPLAY: The EkoHeat boiler is equipped with a digital touch display for viewing and adjustment of the different boiler settings. The different settings shown on the initial display and the touch buttons for browsing and/or adjusting the different set-points are shown below: The different settings shown on the initial display are shown in the table below: 1 Touch button for accessing the Configuration menu display. 2 Touch button for accessing the Info display. 3 Flame level detected in the burner. 4 Percentage fan functioning. 5 Percentage boiler modulation. 6 Feed auger functioning. 7 DHW functioning. (Only with the DHW tank installed and enabled). 8 Circulating pump functioning. 9 Water outlet temperature 10 Amount of pellets in hopper (measurement in kg) 11 Touch button for Starting/Stopping boiler functioning. 19

23 6 "INFO" DISPLAY The "Info" display shows a numbered series of information settings for the particular features of the boiler supplied. This data can be very useful for identifying the boiler. These settings are described in the table below: Settings Operating hours Number of ignitions Software version Controller ID Boiler Type Description Counter showing the hours the boiler has been operating. Counter showing the number of times boiler ignition has taken place. Identification number for the software version the electronic control is working with. Identification serial number of the electronic control. Selected boiler model. 20

24 7 CONFIGURATION MENU This menu is used to adjust the settings connected with boiler functioning. It is the recommended menu for both the installer & boiler user. The table below shows the settings on the "Configuration" menu. Settings User setting Service settings Change hopper content Clean now Language Self-test Exit Description Enter User settings Enter Service settings Enter weight (kg) currently in hopper Chose the number of cleanings Select desired language Run self-tests on components Return to main display 21

25 22

26 8 USER MENU The following sections describe the functioning of each of the menu options in detail. This menu is used to adjust the settings connected with boiler functioning. It is the recommended menu for the boiler user. The table below shows the settings on the "User" menu. Setting Boiler temp (40-80) degrees Celsius Fuel ( kg) Cleaning Summer mode DHW priority Pump Stop (0-80ºC) Auger calibration Date and time Description Maximum boiler temperature. Fuel consumed at full power, in kilograms. Functioning options for the burner and fan cleaning devices. Time clock/summer mode settings. DHW temperature settings. The circulating pump will start up when the boiler temperature exceeds this value. Procedure for calibrating the feed auger. This calibration is required for the boiler to function correctly. Date and time adjustment. The following sections describe the functioning of each of the menu options in detail. 8.1 Boiler Temperature (40-80ºC) This is the set point temperature the boiler will reach. The boilers default setting is 60º. To change this figures, select the desired temperature. 23

27 8.2 Fuel ( kg) This setting is used to adjust the amount of pellets, in kilograms, consumed by the boiler at full power in one hour. This setting is connected with the boiler model (power) and the calorific power of the pellet used. The table below shows the default values for each boiler model: EkoHeat Fuel (Kg.) Cleaning settings All the operating settings for the different automatic boiler cleaning devices can be adjusted from this display. The table below provides a description of these settings, the boiler components controlled by each one and their defect values: Setting Air clean interval (0-120 min.) Air clean time (0-60 sec.) Description Minutes elapsing between each fan cycle for cleaning the boiler fumes. Time in seconds during which the fan is started up for fume cleaning. Default value Ash plate interval ( Kg.) Kilograms of fuel burned before the burner cleaning device & heat exchanger cleaning device start up IMPORTANT: Incorrect modification of these settings can cause boiler malfunctioning. Ensure the setting to be changed has been set to the correct value before changing it. 24

28 7.4 Summer mode/time-clock The EkoHeat has a daily time programmer to control the times at which the boiler switches on and off. 5 different periods during the day can be enabled. The steps for configuring the programmer are as follows: - Enable the time programmer operating mode by selecting YES for the Time programmer (Yes/No) setting. The boiler will start up and stop according to the times programmed. No time periods are programmed and the boiler will function continuously throughout the day. - Select the hour and minutes for the start of the period and the hour and minutes for the end of this period (there must be a minimum of 01:30 hours between boiler start-up and switch-off). - Adjust the periods required, to a maximum of five periods (it is recommended 2 periods to be sufficient as this will increase the life of the ignition element in the boiler). - Touch the Save and restart button to complete the operation. - Touch the "Reset" button to set all the periods to zero and disable the time programmer operating mode. When the time programmer mode is enabled, the symbol " " will appear at the top right of the initial display to indicate the boiler is functioning in this mode. With the boiler in this operating mode, touch the "Start/Stop" button to disable the time programmer. IMPORTANT: Each of the boiler switch-on/switch-off periods must last at least 01:30 hours. 25

29 7.5 DHW Priority The EkoHeat boiler can control a DHW circuit, using a 3-way diverter valve and a DHW sensor. After making the hydraulic installation required, the following settings should be adjusted on the DHW circuit display: Setting DHW circuit activation (Yes/No) DHW differential (0-20 C) Description Setting for enabling the 3-way DHW diverter valve. To correctly install a DHW tank, carefully follow the detailed instructions given in the section "Installing a hot water tank". The lowest temperature gradient with respect to the DHW setpoint temperature at which the hot water tank requires heating again. Default value No 10 Installing a Divert valve (Optional) The hydraulic installation for the 3-way DHW diverter valve should be made so that the heating circuit can flow through the valve when it is in rest position (not energised): HEATING NA / NO BOILER V3V NC D.H.W. For correct hydraulic installation of the hot water tank, carefully follow the assembly and connection instructions enclosed with the same. 7.6 Pump Stop (0-85ºC) The circulating pump installed in the heating circuit is controlled by this setting. The circulating pump is wired to the main controller. The circulating pump will stop if the boiler temperature drops below the value selected for this setting. This temperature is set to 45ºC by default. To prevent any condensation from reaching the heat exchanger which would cause irreparable damage, a load valve is fitted. 26

30 7.7 Auger calibration This display is used to calibrate the fuel feed auger required for correct boiler functioning. It is essential for the boiler feed auger to be calibrated on start-up and whenever the fuel supplier is changed (not all suppliers provide granules of the same density and size). Calibrating the boiler feed auger adjusts the optimum amount of pellets required to supply the burner and produce the correct power and combustion. If the fuel in the hopper runs out, fill the feed auger with pellets again. To do this, follow the calibration instructions up to point 8. In this case it will not be necessary to calibrate the feed auger again, unless you change your pellet supplier. A weighing scales and a suitable pellet collection container are required for this calibration procedure. The steps for correctly calibrating the feed auger are as follows: 27

31 This process must be carried out twice to ensure the correct amount of pellets have been added. IMPORTANT: Calibrate the feed auger before starting up the boiler for the first time. IMPORTANT: Calibrate it again whenever you change your fuel supplier. 28

32 8.8 Date and time This display is used to change the date and time shown on the boiler. To use this function simple press on the digit you wish to change and enter the digit. When time & date is entered, then press exit. IMPORTANT: These settings need to be entered if you wish to use the time programmer. 29

33 9 SERVICE MENU This menu is used to adjust the technical settings for boiler functioning. As the settings on this menu are technical and can affect boiler safety, we highly recommend that they are only adjusted by sufficiently technically qualified personnel. The table below shows the settings on the "Service" menu. Setting Start-up Fuel (0-200 gr.) Ash plate movement ( sec) Fan Performance Minimum performance Extra equipment On/Off mode Restore factory settings New Software Description Amount of fuel required for boiler ignition, in grams. Time required for the burner cleaning device to close, in seconds. Percentage fan functioning for each of the boiler modulation percentages. Minimum performance required for burner functioning. This setting is to add extra equipment. Performance settings of the boiler in this mode. For resetting the boiler s default settings. For updating the electronic control software version. The following sections provide a detailed description of the functioning of each of the menu options. IMPORTANT: We recommend that only authorised technical personnel access this menu. Unsuitable modification of these settings can cause malfunctioning and even damage to the boiler. 9.1 Fuel for ignition (0-200 grams.) This setting is used to specify the amount of pellets required for correct burner ignition. The table below shows the default values for each boiler model: EkoHeat Fuel for ignition (gr.)

34 9.2 Ash plate movement (0-100 sec.) This setting adjusts the time required by the burner cleaning device, in seconds, to return to its closed position after having been in open position. Warning: Never exceed the recommend manufactures time, as this will result in damage to spindle block, which could result in the boiler breakdown. 31

35 IMPORTANT: After carrying out any repair or maintenance operations on the boiler, ensure the burner cleaning device is correctly positioned to its standard default value when it is in closed position. Also put aluminium grease on the shaft for lubrication. 32

36 9.3 Fan functioning This display is used to adjust the fan speed percentages, to ensure correct combustion values at each boiler power modulation percentage. For example, for the EkoHeat 1500 boiler, it is established that for a power percentage of 100% the fan must run at 96% for ideal combustion. The settings can be adjusted separately or the General panel can be used to change all of them at once. If this setting is changed from 100 to 120, all the fan values will increase by 20%. The same operation can be used to reduce all the fan values by 120%, by changing the value to 90 on the General panel. It is recommended to modify the General" panel to adjust the fan values, only if required. 9.4 Minimum power (%) This setting is used to select the minimum boiler operating power, expressed as a percentage of its nominal power. This is pre-set as 10%. 9.5 Extra Equipment 33 This setting is used to select and switch on different external sensors. Simply connect the sensor into the main control board and select the sensor required by selecting the Yes key. The extra equipment that can be added are: Oxygen sensor, Communication box, Smoke temperature sensor, Return temperature sensor, Flow-sensor, DHW temperature sensor, Outdoor temperature sensor, Indoor temperature sensor & Logger.

37 9.6 On/Off mode Boiler set point settings and boiler performance settings. Set-point temperature can be selected (60ºC- 80ºC). Max performance settings can also be adjusted here (50%-100%). When set to Yes Summer-mode/Time-clock will be disabled. 9.7 Restore factory settings Touch the Reset default values button to reset the electronic control to default values. Attention: This should only be done as a last resort. The main feed auger will have to be recalibrated if the controller is reset. Depending on the variation of software an Ekopower technician will have to reload the latest edition of software, which the customer will be liable to pay a call-out charge. 9.8 New software The electronic control software version can be updated using a USB storage device. This setting is to be used by authorised personnel only. 10 CHANGE HOPPER CONTENT This is used for display purposes only and does not affect any other component in the boiler. An example of how it works: If the hopper is empty and you put ten 10KG bags of pellets into it, you would have 100KGs of pellets in the hopper. You would then press CHANGE HOPPER CONTENT on the configuration menu, then enter 100 and accept. You would then see 100KG displayed on the main front display screen (see no.10 on page 19). As the boiler consumes the fuel the hopper content weight would reduce and so would the figure on the display screen. 11 CLEAN NOW This display is used to manually enable a number of ash cleaning device & cleaning springs in the heat exchanger functioning cycles. 1 5 cycles can be set from this display. 12 LANGUAGE In this menu you can select the desired languages. Simply select on the screen which language you require and exit menu. 34

38 13 SELF-TEST 13.1 Model selection This display is used to select the boiler model. The boiler model should only be changed when the boiler s original electronic control is replaced during a repair operation. In the INFO display you can see what the selected boiler is. WARNING: Never select different boilers software as this will lead to the boiler running poorly or the boiler could break down Test now This option is used to view the values for all the electronic control inputs being read at any time, and to manually enable each of the boiler powering systems. This facilitates the various maintenance operations, and error detection. Before accessing the test now, stop the boiler functioning and/or disable the time programmer operating mode, if it is enabled. Test now should only be accessed by qualified technical personnel authorised by EKOPOWER, as incorrect manual activation of the boiler powering systems can cause personal injury and damage to the boiler. You can change the PID & Combustion values. We recommend NOT changing these settings. IMPORTANT: The Test now can only be run when the boiler is switched off and the time programmer disabled Boiler sensor readings This option provides information from the following sensors: Lux sensor, End-stop ash plate, Thermal switch, Boiler temperature, Indoor temperature, Outdoor temperature, Boiling, Hopper, Flow sensor, Smoke temperature, DHW temperature & Return water temperature Testing Boiler components This option is useful in fault finding because it lets you send power to an individual component to see of it is functioning. You can test the following: Internal feeder, Ignition, Ash plate opening, Ash plate closing, Fan, Cleaning springs, External feeder, Circulating pump & DHW pump. 35

39 14 SAFETY PRECAUTIONS 14.1 Carbon monoxide detector Many people are killed each year, and many more suffer ill health from carbon monoxide (CO) poisoning. CO is an invisible, odourless, tasteless and extremely toxic gas. It is produced by appliances and vehicles burning fuels, such as coal, oil, natural gas, wood, etc. CO is absorbed by red blood cells in the lungs in preference to oxygen this result in rapid damage to the heart and brain from oxygen starvation. High levels of CO in a house can be caused by: * Incorrectly or poorly installed fuel-burning appliances * Blocked or cracked chimneys/flues * No ventilation, blocked vents or draught-proofing which makes areas with fuel burning appliances airtight. Suitable locations: * A carbon monoxide detector should be located in the room with the boiler * It should be installed on the ceiling 300mm from walls or light fittings. * Between 1M to 3M horizontally from appliance * If it is mounted on a wall, it should be located at a height greater than the height of any door or window but still be at least 150mm from the ceiling. * If there is a partition in the room, the CO alarm should be located on the same side of the partition as the boiler. * In rooms with sloped ceilings, the CO alarms should be located at the high side of the room. Unsuitable locations: * Next to a door, window, air vent or anywhere that it would be affected by draughts. * Next to a extractor fan * Over heat sources such as radiators or hot air vents. * Where dirt or dust could block the sensor * Near paint, thinners, solvent fumes or air fresheners. * Do not fit alarm until all building work is complete to avoid contamination This information is only precaution information; it does not state that CO emissions will leak from an EKOPOWER boiler. EKOPOWER does not take any responsibility from damages caused from poor installation due to an installer. Good ventilation is extremely important. NEVER IGNORE THE ALARM. Attention: It is recommended that the installer preform a 10 minute CO room test with their analyser when installation is complete and working. 36

40 14.2 Ventilation Part J of the Second Schedule to the Building Regulations, 1997, provides as follows: A heat producing appliance shall be so installed that there is an adequate supply of air to it for combustion and for the efficient working of any flue pipe or chimney. If an air extract fan is fitted in a building containing the boiler (other than a room-sealed appliance), the appliance and flue should be able to operate effectively when the fan is running. A permanent air entry or opening with a total free area of at least 550 mm2 per kw of rated output above 5 kw shall be provided but in no case less than 6500 mm2. Where a flue draught stabiliser is used the total free area should be increased by 300 mm2 for each kw of rated output. Attention: If the boiler is installed in an air tightness premises, ventilation should be piped into the room from outside to where the boiler is installed. If there are other oxygen consuming appliances in the room with the boiler, provisional air should be taken into account. If one vent is inadequate to service the needs of all the appliances place a second vent at a lower level behind the boiler. All air vents should be piped direct from the boiler room to outside air source, not from room to room (internal air). Make adequate provision that air vents cannot be blocked both inside and outside the building. Place necessary warning signage. Warning: Inadequate ventilation can result in carbon monoxide being produced which in return could result in health damage or loss of life. 37

41 15 CLEANING THE ASH DRAWER The EkoHeat boiler is equipped with an ash drawer, where the solid residues from the burnt fuel are collected on cleaning the burner and heat exchanger. This drawer must be regularly cleaned to prevent ash from accumulating and obstructing the bottom of the heat exchanger, which would cause the boiler to switch off. It is recommended to regularly check the drawer and remove the ash that has accumulated. EKOPOWER supplies an optional ash compacting system for incorporation to the boiler, so that the ash does not need to be removed as frequently. Safety warnings: For safe handling of the ash drawer, you should take the necessary safety precautions and wear suitable clothing to protect against possible injury. The following advice should be particularly taken into account: - Switch off the boiler before taking out the ash drawer. If you take out the ash drawer with the boiler on pause, make sure you have replaced it before switching on the boiler again. It is recommended to wait before taking out the ash drawer until no flame is detected in the burner. - It is recommended to wear insulating thermal gloves to protect your hands from any burns from hot parts of the drawer. - It is recommended you wear a protective mask to avoid breathing in any ash particles, particularly in the case of people with allergies or any type of respiratory trouble, who should always wear a mask when carrying out ash removal. - As the ash to be removed from the drawer may be burning or glowing, special precautions should be taken with regard to the type of container it is emptied into. A metal container is recommended, or the ash should be totally put out on handling, using water or another extinguishing agent. EKOPOWER shall not be liable for any damage caused to people, animals or property as a result of incorrect handling of the ash drawer or the ash itself. IMPORTANT: The ash drawer must only be cleaned when the boiler is switched off or on pause. 38

42 16 SAFETY CUT-OUTS The boiler s electronic control system may activate the following safety cut-outs to stop the boiler functioning. When any of these cut-outs occur, the boiler will switch off and a description of the cut-out will appear on the display. IMPORTANT: If any of the safety cut-outs described below should occur repeatedly, switch off the boiler and call your nearest official Technical Assistance Service Burner cut-out When this cut-out occurs, the message "E05: Burner error" will appear on the digital display. The burner and its fuel supply will be cut off. This occurs due to burner anomaly or excessive temperature in the burner fuel supply circuit. To unblock it, press the OK button No flame cut-out When this cut-out occurs, the message "E06: Flame defect" will appear on the digital display. The burner and its fuel supply will be cut off. This occurs when an insufficient flame lux level is detected by the photocell during a certain time lapse. To unblock it, press the OK button Temperature safety cut-out When this cut-out occurs, the boiler digital display will switch off and the electrical supply to the electronic control will be cut off. All the boiler devices will switch off. This occurs whenever the water in the boiler reaches a temperature of 110 ºC. To unblock it, wait until the boiler temperature drops to below 90ºC and press the reset button on the safety thermostat located on the underside of the electrical panel (see Control components page 5). 39

43 17 SHUTTING DOWN THE BOILER To shut down the boiler, touch the Start/Stop button (see "Digital display functioning" page 5). In shutdown mode, the boiler will switch off. To shut down boiler functioning completely, Disconnect it from the mains before carrying out any maintenance. 18 BOILER MAINTENANCE Various maintenance operations should be carried out at different intervals to keep the boiler in perfect working order. The yearly maintenance operations should be carried out by personnel authorised by EKOPOWER Boiler and flue maintenance frequencies The most important aspects to be checked are as follows: Nº Operation of the boiler Frequency 1. Check the pellet storage. weekly 2. Clean the ash in the ash drawer. (Dependant on usage) Monthly 3. Check the boiler visually. weekly 4. Lubricate the burner cleaning device. (Dependant on usage) yearly 5. Check the feed auger is correctly calibrated. quarterly 6. Check and clean the boiler fume circuit and combustion chamber quarterly 7. Check and clean the flue. The flue must be free of any obstacles and have no leaks. yearly 8. Clean the burner. (Dependant on usage) quarterly 9. Check the expansion vessel. It must be full, according to its reference plate. yearly 10. Check the seal between the burner and the boiler. yearly 11. Vacuum the dust out from around the auger in the hopper when emptied quarterly 12. Check the water pressure in the heating installation. In cool mode, it should be between 1 and 1.5 bar. (if a sealed system) quarterly 40

44 18.2 Cleaning the burner. The following procedure is recommended for correctly cleaning the burner: 41

45 IMPORTANT: Always make sure the burner is switch off for a period of time and disconnected from the electrical supply before carrying any maintenance on the burner or boiler. IMPORTANT: The burner cleaning device can only be lubricated when the boiler is switched off, system cooled and the time programmer disabled. IMPORTANT: The burner cleaning device should be lubricated if an unpleasant noise is heard. It should be done each year on the annual overhaul, at the least Draining the condensation water Draining of condensation water from the flue should not be altered in any way and it must be kept free of obstructions. It should be flushed out regular to prevent deposit build up Boiler water characteristics In areas with water hardness of over 25-30ºfH, treated water or inhibitor must be used in the heating installation to avoid any scale deposits on the boiler. It should be noted that even a few millimetres of scale will greatly reduce the boiler s heat conductivity, causing a major drop in performance. Treated water or inhibitor must be used in the heating circuit in the following cases: - Very large circuits (containing a large amount of water). - Frequent filling of the installation. If repeated partial or total draining of the installation is necessary, we recommend filling it with treated water. 42

46 18.5 Cleaning the Heat exchanger The following procedure is recommended for correctly cleaning the heat exchanger: Place cover correctly when reassembling 43

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass HM model. With a suitable

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE)

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass

More information

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating Pellet Boilers High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW Future of Ecological Heating Why choose an Ekoheat boiler? Ekopower is an innovative

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611 TECHNICAL INSTRUCTIONS for regulation, use and maintenance of pellet stove CentroPelet

More information

Annex 5a Solid fuel (Domestic) Annex 5a Common Minimum Technical Competency Requirements for Solid fuel burning appliance installation (domestic)

Annex 5a Solid fuel (Domestic) Annex 5a Common Minimum Technical Competency Requirements for Solid fuel burning appliance installation (domestic) Annex 5a Solid fuel (Domestic) Annex 5a Common Minimum Technical Competency Requirements for Solid fuel burning appliance installation (domestic) Routes to demonstrating required competence Inspection

More information

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A cod. 6272262A GENERAL DATA Heating Data Heat Output Input (Adjustable) (Adjustable) Format 34i 11.2 34KW 45 145MJ/hr Format 34e 11.2 34KW 45 145MJ/hr General Specifications FORMAT 34i 34e Main burner injectors

More information

Twin Wall Installation Instructions And Maintenance Guide

Twin Wall Installation Instructions And Maintenance Guide Twin Wall Installation Instructions And Maintenance Guide Please read all instructions before beginning your installation. Failure to install this system in accordance with these instructions will invalidate

More information

INSTALLATION AND OPERATING INSTRUCTIONS KLIMA

INSTALLATION AND OPERATING INSTRUCTIONS KLIMA INSTALLATION AND OPERATING INSTRUCTIONS KLIMA - 1 - CONTENTS 1.- PRESENTATION... 2 2.- LIST OF COMPONENTS... 3 3.- CONTROL ELEMENTS... 4 4.- INSTALLATION INSTRUCTIONS... 5 4.1 LOCATION... 5 4.2 FLUE...

More information

Model No: Little Devil II (inc ss)

Model No: Little Devil II (inc ss) GAS HEATER Model No: Little Devil II (inc ss) PART NO: 6926020, 6926025 (SS) OPERATION & MAINTENANCE INSTRUCTIONS LS1213 INTRODUCTION Thank you for purchasing this CLARKE Gas Heater. Before attempting

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

INSTALLATION & COMMISSIONING INSTRUCTIONS Model: 990 CH

INSTALLATION & COMMISSIONING INSTRUCTIONS Model: 990 CH INSTALLATION & COMMISSIONING INSTRUCTIONS Model: 990 CH TABLE OF CONTENTS General Safety Information Page 2 Chimney and Flue Information Page 3 Installing the Appliance Page 4 Flue Draught Page 5 Chimney

More information

100 step modulated Wood Pellet Boiler

100 step modulated Wood Pellet Boiler 100 step modulated Wood Pellet Boiler EN 303-5 approved by DTI (Danish Technological Institute) Approved for pressure expansion Energy class AA Approved www.kedco.ie Kedco Boiler Manual Version 1.3 Page

More information

ELECTRIC BOILERS FOR CENTRAL HEATING

ELECTRIC BOILERS FOR CENTRAL HEATING ELECTRIC BOILERS FOR CENTRAL HEATING TermoMax INSTRUCTIONS FOR INSTALLATION INSTRUCTIONS FOR INSTALLATION We reserve the right of alternations WE ARE NOT LIABLE FOR DAMAGES RESULTING FROM NON- OBSERVING

More information

Owner s Manual for. PennStoker

Owner s Manual for. PennStoker Owner s Manual for PennStoker Table of Contents 1. Installation Placement ---------------------------------------------------------------------------------------- pg.3 Chimney Hook-up ---------------------------------------------------------------------------

More information

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS Before using the heater, read and understand all instructions and follow them carefully. The manufacturer is not responsible for damages to goods

More information

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART # INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #238-39387-00 THIS INSTRUCTION SUPPLEMENT IS ONLY INTENDED TO GIVE INSTALLATION INSTRUCTIONS AND INFORMATION RELATED TO THE INDUCED

More information

infrared paraffin / kerosene / diesel heater

infrared paraffin / kerosene / diesel heater instructions for infrared paraffin / kerosene / diesel heater model no: IR20.V3 Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used according to these

More information

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set For boilers CentroPlus 25/35 and CentroPlus-B 25/35 (solid fuel and wood pellets fuel firing) TUPSCP-K-11-2016-ENG CONTENTS 1.Introduction 2. Status

More information

Operating Manual PELLEMATIC PES CMP06 TO_VA6.39 Pelletronic TOUCH ENGLISH. PE 1491 EN_TO 1.0 Europe s specialist in pellet heating

Operating Manual PELLEMATIC PES CMP06 TO_VA6.39 Pelletronic TOUCH ENGLISH. PE 1491 EN_TO 1.0 Europe s specialist in pellet heating Operating Manual PELLEMATIC PES 12 56 CMP06 TO_VA6.39 Pelletronic TOUCH ENGLISH PE 1491 EN_TO 1.0 Europe s specialist in pellet heating Title: Operating manual PES 12-56 Article number: PE 1491 EN_TO 1.0

More information

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40 USER GUIDE VOGUE COMBI GEN2 C26 C32 C40 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not

More information

USERS MANUAL FOR GAS BOILERS

USERS MANUAL FOR GAS BOILERS USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600 I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d Model code: BORA600 Contact Caple on 0844 8003830 or for spare parts www.4caple.co.uk 1 Y O U R A P P L I A N C E Thank you for buying your

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

BIX B-One 100 kw INSTALLATION GUIDE

BIX B-One 100 kw INSTALLATION GUIDE BIX B-One 100 kw INSTALLATION GUIDE Dear Customer, We thank you for choosing our product. The Bix B-One 100 Kw is a burner of advanced concept and technology, with a high reliability and construction quality.

More information

Operating instructions

Operating instructions Operating instructions Gas condensing boiler WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

INSTRUCTION FOR THE USER THC V E OIL BLU

INSTRUCTION FOR THE USER THC V E OIL BLU INSTRUCTION FOR THE THC V E OIL BLU CONTENTS General safety information 4 Precautions 4 Control panel 5 Mode selection 8 User levels 10 Start-up 12 Temporary shutdown 15 Preparing for extended periods

More information

Operating instructions

Operating instructions Operating instructions Gas-fired condensing boiler Logano plus GB312 For the user Please read carefully before use 7 747 009 296-01/2007 EN Contents 1 For your safety..............................................

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

VETO CLEANER 500 FLUE GAS CLEANER

VETO CLEANER 500 FLUE GAS CLEANER As of serial number 3100 0001 VETO CLEANER 500 FLUE GAS CLEANER USER MANUAL SPARE PARTS LIST Manufacturer: ALA TALKKARI Veljekset Ala-Talkkari Oy FI-62130 HELLANMAA TEL. +358 6 433 6333 FAX +358 6 437

More information

EBC20. Instructions for fitting, installation and operation. Read and save these instructions!

EBC20. Instructions for fitting, installation and operation. Read and save these instructions! EBC20 UK Instructions for fitting, installation and operation Read and save these instructions! 2 3002878 EBC20 UK 290415 1. Product information............................................... 4 1.1 Delivery.............................................................

More information

Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 10, 16, 25, 43 kw

Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 10, 16, 25, 43 kw Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 0, 6, 5, 4 kw CLASS IN EN 0/5 Innovation with meaning BioClass NG IN EN 0/5 CLASS DOMUSA has managed

More information

Biomass. Biomass solid fuel boiler range

Biomass. Biomass solid fuel boiler range Biomass Biomass solid fuel boiler range Biomass Fuelling positive change For more than150 years, Baxi has been at the forefront of heating technology Baxi leads the way with new and pioneering heating

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL UPFLOW & DOWNFLOW/HORIZONTAL CONDENSING GAS FURNACES SAFETY Recognize this symbol as an indication of Important Safety Information If not installed, operated and maintained in

More information

User instructions DHP-AT

User instructions DHP-AT User instructions DHP-AT VUGFC202 If these instructions are not followed during installation and service, Danfoss A/S liability according to the applicable warranty is not binding. Danfoss A/S retains

More information

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw GAS FIRED ATMOSPHERIC ELECTRONIC VERSION 51-102 kw GENERAL DESCRIPTION 900 D a3 1000 762 672 E 222 The PEGASUS F2 range of atmospheric natural gas-fired boilers are constructed of cast iron finned sections

More information

model No: ir20.v2 FUSE

model No: ir20.v2 FUSE InstructioNS for: model No: ir20.v2 INFRARED PARAFfIN / KEROSENE / diesel HEATER 70000Btu 230V Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according

More information

MODEL CF CEILING SUPPORTED CHIMNEY

MODEL CF CEILING SUPPORTED CHIMNEY Manufactured by Selkirk Canada Corp. - Hamilton, Ontario Installation Instructions for MODEL CF CEILING SUPPORTED CHIMNEY Round Top Storm Collar Flashing Attic Insulation Shield/Firestop Spacer Intermediate

More information

User's Instructions. Alpha CB50

User's Instructions. Alpha CB50 User's Instructions Alpha CB50 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boiler with Unvented Hot Water Storage (From Boiler Serial No. 27B32500001) For Technical help or for Service

More information

Installation, operating and servicing instructions

Installation, operating and servicing instructions English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1 ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes

More information

INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA

INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA CGM-04/392 ER-0170/1996 Thank you for choosing a DOMUSA TEKNIK heating boiler. From the range of DOMUSA TEKNIK products you have chosen the Avanttia model.

More information

USER GUIDE LOGIC HEAT H

USER GUIDE LOGIC HEAT H USER GUIDE LOGIC HEAT H 12 15 18 24 30 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not

More information

100 FLUEBOOST

100 FLUEBOOST 100 FLUEBOOST f l u e b o o s t 1 0 0 The flueboost is a box shaped centrifugal fan unit with in line spigots for the flue connection, a pressure switch to ensure safe operation, all within a compact package.

More information

Installation Instructions Horizon Natural Draft Electronic Ignition Gas Fireplaces

Installation Instructions Horizon Natural Draft Electronic Ignition Gas Fireplaces Installation Instructions Horizon Natural Draft Electronic Ignition Gas Fireplaces Installation Instructions Horizon Natural Draft Electronic Ignition 3 Sided Gas Fireplaces Natural Draft Electronic Ignition

More information

Electronic Pellet Burner Controller NPBC-V3M

Electronic Pellet Burner Controller NPBC-V3M Electronic Pellet Burner Controller NPBC-V3M SOFTWARE VERSION 3.3a/3.2 page of 27 CHANGES IN THE USER MANUAL OR IN THE CONTROLLER'S SOFTWARE Version of the user manual Changes Page 2.2. The software version

More information

Installation & Operating Manual ZM kW Universal Oil Heater. ZMH Ltd t/a Z M Heaters T (0)

Installation & Operating Manual ZM kW Universal Oil Heater. ZMH Ltd t/a Z M Heaters  T (0) Installation & Operating Manual ZM-130 16 32kW Universal Oil Heater OVERVIEW Dfdfdfdsfd Dfdfffdfdf Dfdfdf 4 1. Overheat thermostat 2. Combustion chamber lid 3. Oil feed line 4. Activation thermostat 5.

More information

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN To respected customer, We are very pleased for your trust and your decision to buy our product. You made a good choice,

More information

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14 Przedsiębiorstwo Produkcyjno-Wdrożeniowe ARAJ sp. z o.o. 55-080 Kąty Wrocławskie, ul. Mireckiego 30 POLAND USER S MANUAL AIR HEATER TermEfekt Model PGA 14 Kąty Wrocławskie, 2004 Product identification

More information

INSTALLATION AND OPERATING INSTRUCTIONS EVOLUTION EV HFM

INSTALLATION AND OPERATING INSTRUCTIONS EVOLUTION EV HFM INSTALLATION AND OPERATING INSTRUCTIONS EVOLUTION EV HFM Thank you for choosing a DOMUSA TEKNIK heating boiler. From the range of DOMUSA TEKNIK products you have chosen the Evolution EV HFM model. This

More information

User and maintenance manual

User and maintenance manual GB User and maintenance manual IMPORTANT SAFETY INSTRUCTIONS These instructions shall also be available on website: docs.whirlpool.eu. YOUR SAFETY AND THAT OF OTHERS IS HIGHLY IMPORTANT. This manual and

More information

ELIX 1003 IPX4. Energy Efficient Centrifugal Fan with EC Motor Installation and Operating Instructions

ELIX 1003 IPX4. Energy Efficient Centrifugal Fan with EC Motor Installation and Operating Instructions ELIX 1003 Energy Efficient Centrifugal Fan with EC Motor Installation and Operating Instructions 3 speed continuous running SAP Appendix Q Eligible 3 models: - standard - timer - humidity control for all

More information

Operating instructions

Operating instructions Operating instructions Capriz 2 24c 28c GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information... 4 2 Notes on the documentation...

More information

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY Bousquet Technologies Inc. 2121, Nobel, Ste Julie, Quebec, Canada, J3E1Z9 SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL Oil-Fired air heater for industrial and commercial use. FOR YOUR SAFETY Do not

More information

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. 1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803

More information

USER GUIDE VOGUE MAX SYSTEM

USER GUIDE VOGUE MAX SYSTEM USER GUIDE VOGUE MAX SYSTEM 15 18 26 32 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not

More information

VENTING CLEARANCES. BBT NORTH AMERICA Bosch Group. Bosch Water Heating 340 Mad River Park, Waitsfield, VT TWH-V-26 page 1 of 6 rev 01/06

VENTING CLEARANCES. BBT NORTH AMERICA Bosch Group. Bosch Water Heating 340 Mad River Park, Waitsfield, VT TWH-V-26 page 1 of 6 rev 01/06 page 1 of 6 VENTING CLEARANCES The vents should not be obstructed and all joints properly fitted. Floors, ceilings and walls must be cut or framed to provide necessary clearance to vents. Metal strippings

More information

WARNING FIRE OR EXPLOSION HAZARD.

WARNING FIRE OR EXPLOSION HAZARD. 2017 Lennox Industries Inc. Dallas, Texas, USA 506897-01 04/2017 Supersedes 10/2015 EL280DF SERIES GAS FURNACE Improper installation, adjustment, alteration, service or maintenance can cause property damage,

More information

Logic+ Combi

Logic+ Combi USER GUIDE Logic+ Combi 24 30 35 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use

More information

i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book UIN A05 October 2017

i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book UIN A05 October 2017 24 1 2 23 3 4 5 20 6 I 19 7 18 8 9 15 14 11 13 12 i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book i 24 OFF MAX E STATUS BURNER RESET MIN PRE MIN MAX HEAT PREHEAT

More information

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28 INSTALLATION, OPERATION AND MAINTENANCE ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18-1/28 CONTENTS IMPORTANT INFORMATION 4 4 5 Notification to building authority Inspection Sweeping

More information

Electronic Pellet Burner Controller NPBC-V3-1

Electronic Pellet Burner Controller NPBC-V3-1 Electronic Pellet Burner Controller NPBC-V3- SOFTWARE VERSION 3.2/3. page of 3 CHANGES IN THE TECHNICAL AND USER GUIDE OR IN THE SOFTWARE VERSION Technical and User Guide's version Changes Page 2.8. The

More information

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set (60-90 kw) For boilers: EKO-CK P 70-110 TUPS-90K-09-2015-E-N-eng

More information

DIGITAL MODULATING BOILERS

DIGITAL MODULATING BOILERS DIGITAL MODULATING BOILERS FOR HEATING AND SANITARY HOT WATER CMX15 CMX18 CM15 CM18 INSTALLATI INSTRUCTIS AND USER GUIDE Please read these instructions before installing or using this appliance for the

More information

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES 24-28Si II SERIES G.C. NUMBERS APPLIANCE NATURAL GAS L.P.G. 24Si II 47 311 65 47 311 66 28Si II 47 311 67 47 311 68 USER INSTRUCTIONS & CUSTOMER CARE GUIDE EXCELLENCE COMES AS STANDARD CONTENTS Page No.

More information

Fully-automatic Gas tankless Water Heater USER'S MANUAL FOR MODEL EZ-101 ISO9001 certified

Fully-automatic Gas tankless Water Heater USER'S MANUAL FOR MODEL EZ-101 ISO9001 certified Fully-automatic Gas tankless Water Heater USER'S MANUAL FOR MODEL EZ-101 ISO9001 certified Thank you for purchasing our fully-automatic gas-fired tankless water heater. Please completely read this Manual

More information

Synergy Grill User & Engineer Installation & Conversion Guide

Synergy Grill User & Engineer Installation & Conversion Guide Synergy Grill 1300 User & Engineer Installation & Conversion Guide 1 Index: Description Page Number/Section Important Information 3 Installation 4-6 / Section 1 Commissioning 6 / Section 2 Converting Gas

More information

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+ INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 60+ CONTENTS General.... 2 Installation.... 4-5 Installation of temperature limit valve... 6 Measurements and connections... 7 Technical specifications and

More information

Operating instructions

Operating instructions Operating instructions For the operator Operating instructions HOME SYSTEM GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18 0 Fax +49 21 91 18 28 10 info@vaillant.de

More information

Combi C30 & C35. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS COMBINATION BOILER

Combi C30 & C35. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS COMBINATION BOILER Combi C30 & C35 User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS COMBINATION BOILER When replacing any part on this appliance, use only spare parts that you can be assured confirm

More information

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit Operating instructions for the system user VIESMANN With constant temperature or weather-compensated control unit VITODENS 050-W 9/2014 Please keep safe. Safety instructions For your safety Please follow

More information

Operating instructions

Operating instructions The energy you need Operating instructions Betacom 3 24c -A (H-GB) 30c -A (H-GB) GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information...

More information

Please read this booklet, for the safe installation of your MULTI FUEL FIRE

Please read this booklet, for the safe installation of your MULTI FUEL FIRE Please read this booklet, for the safe installation of your MULTI FUEL FIRE The Appliance and Flue System must be installed in accordance with AS/NZS2918. Consult with the building authority having jurisdiction

More information

Mikrofill Ethos Condensing combination boiler

Mikrofill Ethos Condensing combination boiler Mikrofill Ethos Condensing combination boiler User Instructions 24cc CE Mark Mikrofill gas appliances comply with the requirements contained in CE Mark documents contained with European directives applicable

More information

MURELLE EV HE 25/55-30/55

MURELLE EV HE 25/55-30/55 UK ENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION OF THE BENCHMARK SECTION MURELLE EV HE 25/55-30/55 User instructions 199838 Please read the Important Notice within this guide regarding

More information

SWEBO Bioenergy Manual pellet burner PB50 Rev no. Date Page PBM1: (37) Installation and maintenance instructions

SWEBO Bioenergy Manual pellet burner PB50 Rev no. Date Page PBM1: (37) Installation and maintenance instructions PBM1:12 2008-10-16 1 (37) Installation and maintenance instructions PBM1:12 2008-10-16 2 (37) TABLE OF CONTENTS 1 GENERAL INFORMATION... 5 1.1 PELLET STORAGE... 6 1.2 CONSTRUCTION AND FUNCTION... 7 1.2.1

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL UPFLOW/HORIZONTAL & DOWNFLOW TWO STAGE INDUCED DRAFT GAS FURNACES Recognize this symbol as an indication of Important Safety Information If the information in this manual is not

More information

EL195DFE SERIES GAS FURNACE WARNING

EL195DFE SERIES GAS FURNACE WARNING 2011 Lennox Industries Inc. Dallas, Texas, USA 506739 01 06/2011 EL195DFE SERIES GAS FURNACE Litho U.S.A. FIRE OR EXPLOSION HAZARD. Failure to follow safety warnings exactly could result in serious injury,

More information

USER GUIDE. IMAX XTRA EL kW. For Installation Guide see reverse of book

USER GUIDE. IMAX XTRA EL kW. For Installation Guide see reverse of book USER GUIDE IMAX XTRA EL 320-620kW For Installation Guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance

More information

Corn Flame Energy Corn Stove Model 3000

Corn Flame Energy Corn Stove Model 3000 Corn Flame Energy Corn Stove Model 3000 Installation and Operation Guide Read thoroughly before starting installation Save this manual for future reference SAFETY NOTICE If this stove is not properly installed,

More information

USERS GUIDE. LOGIC+ Combi 24, 30, 35

USERS GUIDE. LOGIC+ Combi 24, 30, 35 USERS GUIDE LOGIC+ Combi 24, 30, 35 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use

More information

ARITERM OY. Arimatic 500. User manual

ARITERM OY. Arimatic 500. User manual ARITERM OY Arimatic 500 User manual Table of contents 1. General information... 3 2. Transport, storage and package opening... 3 3. Warranty... 3 4. Installation and commissioning... 4 5. System description...

More information

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Installation, operation and care. Pellmax UB. Burner not included Replaces: Installation, operation and care Burner not included 2011-11-11 ver: Replaces: Contents 11.11 otes...3 General...4 Function...4 Technical data...5 System principle Pellmax with radiator and tank-in-tank

More information

System s30. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS SYSTEM BOILER

System s30. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS SYSTEM BOILER System s30 User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS SYSTEM BOILER When replacing any part on this appliance, use only spare parts that you can be assured conform to the

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL HOT WATER HEATING BOILERS DOMESTIC WATER HEATERS 150,000-300,000 Btu/hr MODELS EB-EWU-02 IMPORTANT INSTALLER - AFFIX INSTALLATION MANUAL ADJACENT TO THE BOILER CONSUMER - RETAIN

More information

USERS GUIDE 24, 30. For installation guide see reverse of book

USERS GUIDE 24, 30. For installation guide see reverse of book USERS GUIDE 24, 30 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification

More information

heat interface units A BOILER WITHOUT A FLAME

heat interface units A BOILER WITHOUT A FLAME A BOILER WITHOUT A FLAME heat interface units Communal Heat Networks A central boiler house will generate heat which is distributed through a network of pipe to each home or apartment in the building.

More information

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

B.C.S. Shop Heaters 26, 30 & 36 (36 shown) BIOMASS COMBUSTION SYSTEMS, INC. 67 MILLBROOK ST., SUITE 502 WORCESTER, MA 01606 508-798-5970 - FAX 508-798-5971 B.C.S. Shop Heaters 26, 30 & 36 (36 shown) INSTALLATION MANUAL HAND FIRED SYSTEMS 8-09 Biomass

More information

EL195UH SERIES GAS FURNACE WARNING

EL195UH SERIES GAS FURNACE WARNING 2010 Lennox Industries Inc. Dallas, Texas, USA 506597 01 11/2010 EL195UH SERIES GAS FURNACE Litho U.S.A. FIRE OR EXPLOSION HAZARD. Failure to follow safety warnings exactly could result in serious injury,

More information

P.O. Box , Dallas, TX USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces

P.O. Box , Dallas, TX USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces P.O. Box 799900, Dallas, TX 75379-9900 USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces This is a safety alert symbol and should never be ignored. When you see this symbol on labels or in manuals,

More information

ML180UH SERIES GAS FURNACE WARNING WARNING

ML180UH SERIES GAS FURNACE WARNING WARNING 2017 Lennox Industries Inc. Dallas, Texas, USA 506525-01 04/2017 Supersedes 10/2015 ML180UH SERIES GAS FURNACE Improper installation, adjustment, alteration, service or maintenance can cause property damage,

More information

PARAFFIN/DIESEL HEATER

PARAFFIN/DIESEL HEATER PARAFFIN/DIESEL HEATER MODEL NO: XR60 PART NO: 6931002 OPERATION & MAINTENANCE INSTRUCTIONS LS0813 INTRODUCTION Thank you for purchasing this CLARKE product. Before attempting to use this product, please

More information

MHG201 Gas Hob Manual for Installation, Use and Maintenance

MHG201 Gas Hob Manual for Installation, Use and Maintenance MHG201 Gas Hob Manual for Installation, Use and Maintenance 1 Customer Care Department The Group Ltd. Harby Road Langar Nottinghamshire NG13 9HY T : 01949 862 012 F : 01949 862 003 E : customer.care@cda.eu

More information

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL STREBEL GENEVA CE ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL INDEX TABLE 1 TECHNICAL DATA SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION

More information

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO Great Britain en Installation, user and service manual Control panel HMI Gas 310/610 ECO PRO Dear Customer, Thank you very much for buying this appliance. Please read through the manual carefully before

More information

USER'S INFORMATION MANUAL

USER'S INFORMATION MANUAL USER'S INFORMATION MANUAL : If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. Do not store or use gasoline

More information

Single Wall Flue system. Installation manual WARNING. Installation Manual CoxDENS PPs MC-CG-105 EN_892054

Single Wall Flue system. Installation manual WARNING. Installation Manual CoxDENS PPs MC-CG-105 EN_892054 MC-CG-105 EN_892054 WARNING Installation Manual CoxDENS PPs Incorrect installation of Flue System and Components, or failure to follow installation instructions, can result in property damage or serious

More information

OPERATING INSTRUCTIONS with safety features

OPERATING INSTRUCTIONS with safety features Solid fuel boiler TKK3 with wood pellet burner TERMEC 70-90 KW OPERATING INSTRUCTIONS with safety features Prhova ka bb 22310 imanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs

More information

1. GENERAL SAFETY RULES

1. GENERAL SAFETY RULES ID180 & ID290 Indirect-Fired Diesel/Oil Construction Heaters Sure Flame Products Lethbridge, Alberta, Canada Telephone: (403)328-5353 Fax: (403)328-9956 www.sureflame.ca July 12, 2006 Service and Maintenance

More information