1 HYDRAULIC DRAWINGS MATERIALS SERVICES TO BE CONSTRUCTED FROM MATERIAL AS LISTED BELOW UNLESS NOTED OTHER WISE SHOWN ON DRAWINGS. SERVICE MATERIAL REMARKS SEWER DRAINAGE upvc SOLVENT WELDED JOINTS SEWER PLUMBING upvc (CONCEALED) SOLVENT WELDED JOINTS GREASY DRAINAGE HDPE ELECTRO FUSION JOINTS GREASY PLUMBING HDPE ELECTRO FUSION JOINTS EXPOSED WASTES 70/30 BRASS CHROME PLATED EXCEPT FOR HIGH TEMP COLD WATER INTERNAL TYPE B COPPER TUBE SILVER SOLDERED JOINTS COLD WATER EXTERNAL DRAWING INDEX DRAWING NUMBER DRAWING TITLE H001 FACE SHEET AND DRAWING INDEX H002 GENERAL NOTES H003 SITE PLAN H004 SANITARY DRAINAGE PART PLAN 1 H005 SANITARY DRAINAGE PART PLAN 3 H006 WATER RETICULATION PART PLAN 1 H007 WATER RETICULATION PART PLAN 3 CLASS 16HDPE PE100 ABBREVIATIONS BASIN BABY BATH BUCKET TRAP CEILING SPACE COLD WATER CHILLED WATER DRINKING UNIT COPPER DRINKING TROUGH DISCONNECTOR GULLY NOMINAL PIPE SIZE DRAWING EXISTING FLOOR WASTE GULLY HOT WATER HOSE COCK INSPECTION OPENING TO SURFACE ISOLATION VALVE LAUNDARY TROUGH OVERFLOW RELIEF GULLY POLYETHYLENE SHOWER SINK STAINLESS STEEL STOP TAP THERMOSTATIC MIXING VALVE TEMPERED WATER TUNDISH UNPLASTICIZED POLYVINYL CHLORIDE UNDER GROUND VALVE BOX WASHING MACHINE WATER CLOSET BB BT CS CW CWDU Cu DT DG DN Drg Ex HW ISO.V Lt ORG PE Shr SS ST TW Td upvc U/G VB WM SYMBOLS EXISTING SEWER MAIN EXISTING WATER MAIN PROPOSED SEWER DRAIN PROPOSED WASTE PIPES PROPOSED COLD WATER SERVICE PROPOSED HOT WATER SERVICE PROPOSED TEMPERED WATER ISOLATION VALVE ISOLATION VALVE IN CI BOX FLOOR WASTE BUCKET TRAP INSPECTION OPENING TO SURFACE THERMOSTATIC MIXING VALVE TUNDISH HOSE COCK EX. S EX. W HOT/WARM WATER FLOW & RETURN TYPE B COPPER TUBE SILVER SOLDERED JOINTS LAGGED 13mm CLOSED CELL POLYMER TGN 0 05/11/2018 N.T.S NEIGHBOURHOOD FACE SHEET AND DRAWING INDEX 18DA0540 H :44:25 PM
2 GENERAL NOTES: 1. THE DRAWING/S DEPICT THE INSTALLATION DIAGRAATICALLY AND ARE NOT TO BE SCALED. SET OUT ALL WORK TO SUIT ACTUAL ON SITE DIMENSIONS. 2. ALL DRAINAGE AND WASTE PIPING SHALL BE EQUAL TO OR GREATER THAN THE NOMINATED OUTLET SIZE OF THE FIXTURE, APPLIANCE OR TUNDISH. 3. ALL WATER SUPPLY PIPING SHALL BE 20mm WITH 15mm BRANCHES TO INDIVIDUAL FIXTURES AND HOSE COCKS UNLESS NOTED OTHERWISE. MAXIMUM LENGTH OF 15mm BRANCHES SHALL BE 2.0m 4. ALL ISOLATION VALVES SHALL BE POSITIONED IN AN ACCESSIBLE LOCATION ADJACENT FIXTURES OR EQUIPMENT. VALVES LOCATED IN CEILINGS, DUCT OR WALLS TO BE LOCATED BEHIND ACCESS COVERS. 5. ALL PLUMBING APPLIANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. 6. HOT AND / OR COLD WATER SUPPLY BRANCHES CONNECTING TO APPLIANCES SHALL BE PROVIDED WITH PRESSURE LIMITING VALVES, STOP VALVES, STRAINERS / FILTERS AND ALL OTHER NECESSARY FITTINGS AS REQUIRED BY THE APPLIANCE MANUFACTURER. 7. SUPPLY AND INSTALL ALL FIXTURES AND TAPWARE AS SCHEDULED IN THE ARCHITECTS SPECIFICATION. 8. THOROUGHLY INSPECT THE SITE PRIOR TO TENDERING AND TAKE INTO ACCOUNT ANY CONDITION LIKELY TO AFFECT THE EXTENT OR PERFORMANCE OF THE CONTRACT. 9. ALL EXPOSED METAL PIPING, TUNDISHES AND FLOOR GRATES IN ROOMS OTHER THAN PLANT ROOMS SHALL BE CHROME PLATED METAL PIPES AND FITTINGS UNLESS NOTED OTHERWISE. 10. ALLOW FOR THE DISCONNECTION AND REMOVAL OF ALL REDUNDANT FIXTURES AND ASSOCIATED PIPE WORK AS REQUIRED BY THE CONTRACT WORKS. ALLOW TO CUT AND SEAL ALL REDUNDANT HYDRAULIC PIPING AT POINT OF ORIGIN. 11. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING: OBTAINING APPROVALS, PERMITS AND FINAL CERTIFICATION FROM CONTROLLING AUTHORITIES. PAYING APPLICABLE FEES AND CHARGES IN ACCORDANCE WITH CONTROLLING AUTHORITIES CURRENT FEE SCALES. PAYING ALL CHARGES FOR INSURANCE, SALES TAX AND STORAGE. PROVIDING TO THE BUILDER A COMPLETE SET OF 'AS CONSTRUCTED' DRAWINGS. 12. APPLICABLE REGULATIONS: BUILDING CODE OF AUSTRALIA LOCAL DEPARTMENT OF HEALTH REQUIREMENTS. NATIONAL PLUMBING CODE AS 3500 PART 0-4 INCLUSIVE. REQUIREMENTS FROM ALL CONTROLLING LOCAL AUTHORITIES. 13. LIAISE AND CO ORDINATE WITH ALL OTHER SERVICES CONTRACTORS PRIOR TO ANY INSTALLATION. 14. ALL MATERIAL, FIXTURES AND FITTINGS SHALL BE IN ACCORDANCE WITH THE RELEVANT CURRENT AUSTRALIAN STANDARDS. 15. VERIFY ALL CRITICAL LOCATIONS AND LEVELS OF EXISTING SERVICES PRIOR TO COENCING ANY WORKS. 16. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS, AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF THE CONTRACT. 17. INSPECTION OPENINGS RISERS SHALL BE PROVIDED AS SHOWN OR IN ACCORDANCE WITH AS AND P STANDARD DRAWING W (AMEND. 5) FOR ALL GRASSED / LANDSCAPED AREAS - HEAVY DUTY COVER. ALL INSPECTION OPENINGS TO SURFACE SHALL INCLUDE RISER SHAFT TERMINATING WITH BOLTED TRAP SCREW (BRASS INSERT) AT SURFACE / FLOOR LEVEL OR MOWING STRIP. upvc INSERTS ARE NOT ACCEPTABLE. 18. ALL THERMOSTATIC MIXING VALVES SHALL BE PROVIDED TO ALL FIXTURES USED FOR PERSONAL HYGIENE, IE. BASINS, SCRUB SINKS, ETC. ALL ISOLATION VALVES SHALL BE POSITIONED IN AN ACCESSIBLE LOCATION ADJACENT FIXTURES OR EQUIPMENT. INSTALLATION SHALL INCLUDE STOP TAPS TO HOT AND COLD WATER INLETS. LENGTH OF TEMPERED WATER SERVICE PIPE SHALL NOT EXCEED 6.0m. THERMOSTATIC MIXING VALVES SHALL BE LOCATED IN A POSITION READILY AVAILABLE FOR ADJUSTMENT, SERVICING AND REPLACEMENT. 19. ALL HOSE COCKS SHALL BE PROVIDED WITH PERMANENTLY FIXED HOSE CONNECTION VACUUM BREAKERS AND BE VANDAL PROOF. (KEY OPERATED) 20. ALL FIXTURES AND ITEMS OF EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. 21. FLOOR WASTES SHALL BE OF SUITABLE TYPE (PUDDLE FLANGE) TO BE INSTALLED WITH THE FLOOR FINISHED SHOWN ON THE ARCHITECTURAL DRAWINGS PROVIDING A WATER TIGHT SEAL WITH TILES, VINYL, CONCRETE ETC. WHERE THE FLOOR WASTE IS NOT CHARGED BY A FIXTURE OR TAP, A TRAP SEAL PRIMER VALVE SHALL BE INSTALLED IN ACCESSIBLE LOCATION WITH BLEED LINE CONNECTED TO THE FLOOR WASTE RISER. 22. a) ALL WATER CLOSETS () TO DISCHARGE VIA 100mm WASTE AND TO BE SUPPLIED WITH 15mm STOP TAP TO CISTERNS. b) ALL BASINS () TO DISCHARGE VIA 40mm TRAP AND WASTE TO FLOOR WASTE GULLY AND BE SUPPLIED WITH TEMPERED AND COLD WATER VIA THERMOSTATIC MIXING VALVE AND BE SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) c) ALL SHOWERS (Shr) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x 90 deg BEND OR FLOOR WASTE GULLY AND BE SUPPLIED WITH TEMPERED AND COLD WATER VIA THERMOSTATIC MIXING VALVE. DISABLE SHOWERS, INSTALL BACK FLOW PREVENTION DEVICE AT WALL OUTLET BEFORE FLEXIBLE HOSE CONNECTION. (ENWARE ZBD002 DUAL CHECK VALVE) d) ALL SINKS () TO DISCHARGE VIA 50 mm TRAP AND WASTE TO 100 x 90 deg. BEND AND BE SUPPLIED WITH HOT AND COLD WATER AND TO BE SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) e) ALL CLEANERS SINK (CL. ) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x 90 deg BEND OR FLOOR WASTE GULLY AND TO BE SUPPLIED WITH HOT AND COLD WATER AND SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) f) ALL BABY BATH (BB) TO DISCHARGE VIA 50mm TRAP AND WASTE TO FLOOR WASTE GULLY AND BE SUPPLIED WITH TEMPERED AND COLD WATER VIA THERMOSTATIC MIXING VALVE AND BE SUPPLIED WITH 15mm MINI STOP COCKS. (BALL VALVE) g) ALL CHILLED WATER DRINKING UNITS (CWDU) TO DISCHARGE VIA 40mm TRAP AND WASTE TO 100 x 90 deg BEND AND TO BE SUPPLIED WITH COLD WATER ONLY. h) ALL LAUNDRY TROUGHS (Lt) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x 90 deg BEND AND BE SUPPLIED WITH HOT AND COLD WATER AND WITH DN15 MINI STOP COCKS. (BALL VALVE) j) ALL WASHING MACHINES (WM) TO DISCHARGE VIA 50mm TRAPPED UPSTAND AND BE SUPPLIED WITH HOT AND COLD WATER AND WITH DN15 MINI STOP COCKS. (BALL VALVE) k) ALL DISHWASHERS (DW) TO DISCHARGE VIA 50mm TRAP AND WASTE TO 100 x90 deg BEND AND BE SUPPLIED WITH COLD WATER AND WITH DN15 MINI STOP COCK. (BALL VALVE) m) ALL TUNDISHES (Td) PROVIDED FOR MECHANICAL AND HYDRAULIC SERVICES DRAINAGE AND ARE TO BE IN WALL (WINDOWED) TYPE UNITS M.A.GRIFFITH MODEL UNO. WITH 50mm BUILT INTO WALL TO FLOOR WASTE GULLYS / DISCONNECTOR GULLY OR ABOVE FIXTURE TRAPS AS SHOWN ON THE PROJECT DRAWINGS. 23. ALL EXPOSED WASTE TRAPS, VERTICAL WASTE PIPES AND HOT / COLD WATER TAILS TO WALL HUNG BASINS SHALL BE CHROME PLATED METAL PIPE. 24. NO FLEXIBLE HOSES TO BE USED ON FITTINGS OR FOR CONNECTING FIXTURES TO WATER SUPPLY POINTS. ALL EXPOSED PIPE WORK SHALL BE CHROME PLATED COPPER. 25. SUPPLY AND INSTALL 'SOLAHART LITRE JBA CLOSED CIRCUIT' SOLAR HOT WATER UNITS AT LOCATIONS SHOWN ON PLANS. FIX UNITS TO ROOF IN ACCORDANCE WITH DEEMED TO COMPLY STANDARDS AND MANUFACTURERS REQUIREMENTS. TGN 0 05/11/2018 N.T.S NEIGHBOURHOOD GENERAL NOTES 18DA0540 H :21:44 PM
3 DN40 Cu CW DN100 HDPE DN40 Cu CW ABLUTIONS CRECHE DN25 Cu CW LOT 507 DN32 Cu CW AREA FOOD ADMIN MEETING ROOM OP-SHOP DN25 Cu CW 1000 LITRE GREASE TRAP NEIGHBOURHOOD SHED TOY AND PUZZLE LIBRARY CONTRACTOR TO CONSTRUCT NEW DN40 WATER METER ARRANGEMENT / SERVICE IN ACCORDANCE WITH LOCAL AUTHORITY REQUIREMENTS INCLUDING BACK FLOW PREVENTION DEVICES. CONTRACTOR TO LOCATE EXISTING SEWER STUB AND CONNECT TO NEW DRAINAGE IN ACCORDANCE WITH LOCAL AUTHORITY REQUIREMENTS SITE PLAN SCALE: 1 : 200 TGN m 1:200 05/11/2018 1:200 NEIGHBOURHOOD SITE PLAN 18DA0540 H :27:43 AM
4 DN50 VENT TO ABOVE ROOF ORG LAUNDRY Lt WM DN50 UPSTAND WITH TRAP FOR WM. AREA CWDU FOOD ADMIN OP-SHOP DN50 VENT TO ABOVE ROOF REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF SANITARY DRAINAGE SERVICE MEETING ROOM DG SANITARY DRAINAGE PART PLAN 1 TGN 0 05/11/2018 NEIGHBOURHOOD SANITARY DRAINAGE PART PLAN 1 18DA0540 H :31:13 AM
5 DN50 VENT TO ABOVE ROOF DG Shr ABLUTIONS TUNDISH FOR RPZ BACK FLOW UNIT. REFER DETAIL ON SHEET H007 CL. Td BB DT CRECHE ORG DN100 HDPE DN100 VENT TO ABOVE ROOF KITCHEN BT SANITARY DRAINS TO BE CAPPED OFF AT FLOOR LEVEL FOR FUTURE STAGE 2 FIT-OUT WORKS 1000 LITRE GREASE TRAP, TOP OF CHAMBER TO BE SET 100mm ABOVE FINISHED GROUND LEVEL. REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE NEIGHBOURHOOD SHED REFER DRAWING H004 FOR CONTINUATION OF SANITARY DRAINAGE SERVICE SANITARY DRAINAGE PART PLAN 3 TGN 0 05/11/2018 NEIGHBOURHOOD SANITARY DRAINAGE PART PLAN 3 18DA0540 H :39:28 AM
6 REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE DN32 Cu CW IN U/G REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE DN25 Cu CW IN U/G DN20 STOP TAP, EXPANSION CONTROL NON-RETURN AND PRESSURE LIMITING VALVE WITH LINE STRAINER AT 1.8m ABOVE F.F.L FOR SHWU. DN20 CW RISER AND DN15 HW DROPPER TV FOOD OP-SHOP DN20 CW IN CS LAUNDRY Lt WM DN15 HW IN CS AREA 300 LITRE SOLAR HOT WATER UNIT FIXED TO ROOF REFER GENERAL NOTES CWDU DN20 CW IN CS ADMIN STIEBEL ELTRON 'SNU 5' NON PRESSURIZED HOT WATER UNIT UNDER BENCH COMPLETE WITH 'MES' SINGLE LEVER MIXER, AND DN15 ISO.V DN20 ISO.V IN VALVE BOX MEETING ROOM REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE DN20 UPSTAND SUPPORTED ON 40 x 40 SHS 600mm ABOVE F.S.L, 300dia x 400 DEEP FOOTING WATER RETICULATION PART PLAN 1 TGN 0 05/11/2018 DESIGNER: CHECKED: DRAWN: APPROVED: NEIGHBOURHOOD WATER RETICULATION PART PLAN 1 18DA0540 H :27:47 AM
7 REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE Shr CL PURPOSE MADE STAINLESS STEEL CABINET / DRAIN TRAY WITH REMOVABLE ACCESS PANEL WALL MOUNTED IN CUPBOARD DN40 Cu CW IN U/G DN20 Cu CW IN CS CRECHE ABLUTIONS DN20 STOP TAP, EXPANSION CONTROL NON-RETURN AND PRESSURE LIMITING VALVE WITH LINE STRAINER AT 1.8m ABOVE F.F.L FOR SHWU. SOLAR HOT WATER UNIT FIXED TO ROOF REFER GENERAL NOTES DN15 Cu HW IN CS RPZ DN15 Cu HW IN CS BB 2 DT 150mm RPZ VALVE CABINET - DRAIN TRAY NOT TO SCALE NOTE 2 OFF MIXED & COLD WATER RPZ VALVES WITHIN STAINLESS STEEL CABINET DN50 OUTLET IN BASE BASE OF CABINET / DRAIN TRAY TUNDISH DIRECTLY UNDER OUTLET WITH AIR GAP. OVER ALL SIZE AND DEPTH OF S.S. CABINET IS TO SUIT RPZ VALVE DIMENSIONS. MANUFACTURE UNIT FROM 312 GRADE 1.2mm SHEET STAINLESS STEEL. CONTRACTOR TO PROVIDE DETAILED SHOP DRAWINGS OF UNIT FOR APPROVAL BY SUPERINTENDENT, PRIOR TO MANUFACTURE. 11:27:49 AM DN20 Cu CW IN CS REFER DRAWING H003 (SITE PLAN) FOR CONTINUATION OF WATER SERVICE KITCHEN DN32 PE WATER RETICULATION PART PLAN 3 TGN 0 WATER RETICULATION PIPEWORK TO BE INSTALLED AND CAPPED OFF FOR FUTURE STAGE 2 FIT-OUT OF KITCHEN DESIGNER: CHECKED: 05/11/2018 DRAWN: APPROVED: NOTES 1. ALL HOT, TEMPERED AND COLD WATER DROPPERS IN WALLS TO SINGLE OUTLETS SHALL BE DN15 Cu. (UNLESS NOTED OTHERWISE) DN20 Cu FOR MULTIPLE OUTLETS. 2. ALL COLD WATER PIPES IN ROOF OR CEILING SPACE SHALL BE DN32 Cu. (UNLESS NOTED OTHERWISE) 3. ALL TEMPERED WATER PIPES IN ROOF OR CEILING SPACE SHALL BE DN15 Cu. (UNLESS NOTED OTHERWISE) 4. ALL HOT WATER PIPES IN ROOF OR CEILING SPACE SHALL BE DN20 Cu. (UNLESS NOTED OTHER WISE) 5. ALL 's SHALL BE INSTALLED IN RECESSED STAINLESS STEEL WALL BOX AT 1.5m ABOVE F.F.L. (UNLESS NOTED OTHER WISE) 6. ALL 2 SHALL BE INSTALLED UNDER BABY BATH, TEMPERATURE SET AT 32 deg C MAX. NEIGHBOURHOOD WATER RETICULATION PART PLAN 3 PROJECT NUMBER : DRAWING No. 18DA0540 H007 0 REVISION
LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS
LABOUR RATES FOR PLUMBING CONTRACTORS A guide to the labour costs of plumbing works MORE MONEY IN YOUR POCKET September 06-1 - Increasers Labour Time Required In Hours DURAVENT STYLE INCREASER 75-100MM
More informationCRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING ANSWER SCHEDULE
No. 9195 CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2007. All rights reserved. No part of this publication may be reproduced by any means without
More informationHOME INSPECTION CHECKLIST
HOME INSPECTION CHECKLIST Date: Page 1 of 9 Client Name: Address: Tel No: Surname: Email: A WATER METER 1 Is the water meter visible YES NO 2 Water meter registers when water is drawn YES NO 3 Water meter
More information2. Sanitary Plumbing General Installation Requirements
2. Sanitary Plumbing General Installation Requirements On completion of this section, students should be able to: Identify and describe sanitary plumbing installations requirements in accordance with the
More informationREGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER ANSWER SCHEDULE
No. 9192 REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2015. All rights reserved. No part of this publication may be reproduced by any
More informationREGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE
No. 9192 REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2017. All rights reserved. No part of this publication may be reproduced by
More informationREGISTRATION EXAMINATION, NOVEMBER 2014 LICENSED PLUMBER ANSWER SCHEDULE
No. 9192 REGISTRATION EXAMINATION, NOVEMBER 2014 LICENSED PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2014. All rights reserved. No part of this publication may be reproduced by
More informationREGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 99 REGISTRATION EXAMINATION, JUNE 05 LICENSED PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed
More information1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications
1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications Product type Application Specification Appliances Bedpan
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 22 40 00 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Faucets for lavatories, bathtubs, bathtub/showers, showers and sinks. 2. Flushometers. 3. Toilet
More informationREGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 99 REGISTRATION EXAMINATION, NOVEMBER 07 TRADESMAN PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed
More informationSTUDENT NOTES Plan, size and layout sanitary pipe work and fixtures
4. SANITARY PLUMBING FULLY VENTED SYSTEM On completion of this module, the student should be able to: Design, install and develop bills of quantities for a fully vented modified system for commercial and
More informationCRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 995 CRAFTSMAN EXAMINATION, JUNE 007 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE hours
More informationREGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER ANSWER SCHEDULE
No. 9195 REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2011. All rights reserved. No part of this publication may be reproduced
More informationInstalling, modifying and maintaining domestic plumbing systems. Water Supply (Water Fittings) Regulations 1999
Installing, modifying and maintaining domestic plumbing systems Water Supply (Water Fittings) Regulations 1999 Page 2 On 1 July 1999 Southern Water and all other water suppliers in England and Wales began
More informationLUDMILLA PRIMARY SCHOOL REDEVELOPMENT STAGE 1 SANITARY SCHEDULE. Hodgkison Architecture. Project No: Tender Issue Rev 0 23/3/18
LUDMILLA PRIMARY SCHOOL REDEVELOPMENT STAGE 1 SANITARY SCHEDULE Hodgkison Architecture Project No: 17107 Revision Date Tender Issue Rev 0 23/3/18 Issue: Contract Issue GROUND FLOOR ZONE 3 BOYS AND GIRLS
More informationDESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.
PART 1 - GENERAL 1.1 Toilet rooms and utility rooms to have floor drains at lowest point. 1.2 Utilize Exposed Flushometers. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.
More informationC. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.
SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationPLUMBING INSTALLATIONS
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT PLUMBING INSTALLATIONS A homeowner guide to plumbing requirements for single-family dwellings November 2017 contents Permit Requirements... 3 Inspection Requirements...
More informationWater Supply (Water Fittings) Regulations 1999
Water Supply (Water Fittings) Regulations 1999 Information for anyone installing, modifying or maintaining domestic plumbing systems Guidance notes for domestic plumbing system Independent Water Networks
More informationDUKE UNIVERSITY CONSTRUCTION STANDARDS
1 22 40 00 Plumbing Fixtures 1. General A. Definitions 1. Section includes a. Water closets and urinals b. Lavatories, sinks, and service sinks c. Electric water coolers, drinking fountains, d. Showers
More informationPLUMBING REQUIREMENTS
PLUMBING REQUIREMENTS This handout is a compilation of the standard requirements based on the State Plumbing Code and City Ordinance for projects of this type. This information sheet does not contain all
More informationPLUMBING FIXTURES CHAPTER 27
CHAPTER 27 PLUMBING FIXTURES SECTION P2701 FIXTURES, FAUCETS AND FIXTURE FITTINGS P2701.1 Quality of fixtures. Plumbing fixtures, faucets and fixture fittings shall be constructed of approved materials,
More informationA. This Section includes the following domestic water piping specialties:
SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationModular Grease Trap MGTA
Modular Grease Trap MGTA and MGTA) Installation Requirements Installation Water Requirements Corporation Water Corporation 22 Ethel Ave Brookvale NSW 2100 Postal: PO Box 255 Collaroy NSW 2097 Freecall
More informationNIGHTCLIFF RENAL UNIT SANITARY SCHEDULE. Hodgkison Architecture. Project No: CONTRACT ISSUE 29/06/2018
NIGHTCLIFF RENAL UNIT SANITARY SCHEDULE Hodgkison Architecture Project No: 17125 Revision Date 0 CONTRACT ISSUE 29/06/2018 TOILET SUITES WC2 RM 2: Ensuite RM 5: Ensuite RM 7: Ensuite RM 8 Male WC RM 10:
More informationAIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015
1.1 GOALS The goal of this section is to provide guidance in the design of Plumbing and Fire Protection systems to LAWA standards. The LAWA Plumbing Design Standards are a compilation of general design
More informationDESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.
PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.
More informationCRAFTSMAN EXAMINATION, NOVEMBER 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9195 CRAFTSMAN EXAMINATION, NOVEMBER 2009 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE
More informationLAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.
ELECTRIC WATER HEATER SCHEDULE DESIGNATION MODEL MANUFACTURER STORAGE RECOVERY TEMPERATURE LEAVING ELECTRICAL CHARACTERISTICS REMARKS/SPECIAL INSTRUCTIONS NUMBER GALLONS RATE RISE WATER K.W. VOLTAGE PHASE
More informationLevel 1. Certificate of Conformity. Australian Certification Services Pty Ltd grants to the WaterMark User: Logi Dezign. Trading as Logi Dezign
Level 1 Certificate of Conformity Australian Certification Services Pty Ltd grants to the WaterMark User: Logi Dezign Trading as Logi Dezign the right to use the WaterMark as shown above in conjunction
More informationSEALED THERMAL STORE
ISSUE 3 0717 INSTALLATION AND USER GUIDE ENERGYMANAGER SEALED THERMAL STORE ADVANCE APPLIANCES LTD PLEASE RETAIN AND ENSURE SERVICE RECORDS ARE KEPT UP TO DATE. SCHEMATIC DIAGRAM OF ENERYMANAGER THERMAL
More informationSECTION PLUMBING
SECTION 22 10 00 PLUMBING PART 1 GENERAL 1.1 WORK INCLUDED A. Furnish all labor, material and equipment necessary for the complete installation of the sanitary sewer system (including soil and vent piping),
More informationA. This Section includes the following emergency plumbing fixtures:
Page 224500-1 SECTION 224500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMechanical System Description
1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure
More informationTRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION
SECTION 224100 - RESIDENTIAL PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationSECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Codes and Standards: A. Plumbing Code Compliance: Comply with applicable portions of National Standard Plumbing Code pertaining to selection and installation of Plumbing materials
More informationUnvented Calorifier Range. Operating and Maintenance Manual. For Models & 500
Unvented Calorifier Range. Operating and Maintenance Manual. For Models 125 300 & 500 Telephone 08456 448802 Fax 08456 448803 Emial info@mhgheating.co.uk Web www.mhgheating.co.uk TABLE OF CONTENTS. Section
More informationPLUMBING FIXTURES Reserved
CHAPTER 27 PLUMBING FIXTURES Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 395R This page left intentionally blank. 396R 2003 INTERNATIONAL RESIDENTIAL CODE SECTION P2708 SHOWERS P2708.1 General. Shower
More informationSummary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016
Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Ohio Administrative Code Rule Number OPC Section IPC origin Reason for proposed 4101:3-2-01 Alternate on-site 2015 Added definition
More informationICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.
ICP Plumbing Exam Name: Date: Score: Carefully read each question and then circle the letter of the best answer. 1. A 1 inch diameter faucet, where the inside edge of the spout opening is 2.5 inches away
More informationDeluxe Inclusions. Harrington Homes reserves the right to change designs and inclusions without notice.
Deluxe Inclusions Harrington Homes reserves the right to change designs and inclusions without notice. EXTERNAL FEATURES Preliminaries Plans, Fees and Building Permit Soil test, Foundation Design and Site
More informationSECTION DOMESTIC WATER PIPING SPECIALTIES
SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationMATERIALS Traps TRAPS. No. IPC IRC Description
MATERIALS Traps TRAPS MAX " MAX 0" No. IPC IRC Description 00. P0.6 00. P0.6 00. P0. 00. () P0.6 Exc. Vertical distance from fixture to the trap weir can not exceed ". Horizontal distance from the fixture
More informationUniversity of Wollongong
University of Wollongong Hydraulic Services Design Version 5 7 July 2014 FMD-MAI-STA-018 Page 1 of 38 VERSION CONTROL SYSTEM Section Modified Description of Modification Version Organisation Representative
More informationINSTALL AN ELECTRIC SHOWER
INSTALL AN ELECTRIC SHOWER The plumbing and wiring involved in installing an electric shower requires sound basic skills in both areas of expertise. Ensure that wiring and plumbing are properly installed.
More informationRead Only Document Not For Distribution
Chapter 14 Special Requirements For Health Care Facilities 14.1 GENERAL This Chapter applies to special fixtures and systems that occur in health care facilities and to the special plumbing requirements
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:
SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following sanitary drainage piping specialties: 1. Backwater valves. 2. Cleanouts. 3. Floor
More informationRead Only Document Not For Distribution
Chapter 5 Traps, Cleanouts and Backwater Valves 5.1 SEPARATE TRAPS FOR EACH FIXTURE a. Plumbing fixtures shall be separately trapped by a water seal trap placed as close as possible to the fixture outlet.
More informationManual / Handbuch Spare parts list / Ersatzteilliste
Manual / Handbuch Spare parts list / Ersatzteilliste Equipment Imp.-Exp. GmbH Zitterpappelweg 9 D - 22391 Hamburg Tel.: + 49 40 60009468-0 Fax: + 49 40 536 75 01 E - M a i l : i n f o @ w e s c o - n a
More informationFlue Installation Manual
Flue Installation Manual Rinnai FFSS (Stainless Steel) flue systems Rinnai FFSS (Stainless Steel) coaxial flue system, suitable for use with the following Rinnai internal continuous flow water heater models:
More informationPlumbing Products & Tapware
www.crh.com.au Solutions For TRADE Plumbing Products & Tapware www.crh.com.au Solutions For TRADE Contents Page 3 5 Page 6 8 Page 9 12 Page 13 14 Page 15 17 Page 18 Page 19 22 Page 23 Page 24 Page 25 26
More informationMini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation
Mini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation BOILER ONLY INSTALLATION ALL ITEMS BLEOW SHOULD BE INCLUDED WITHIN TENDER COST OR CONSIDER WITHIN BIDDERS SUBMISSION
More informationHWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.
ELECTRIC WATER HEATER SCHEDULE DESIGNATION MODEL MANUFACTURER STORAGE RECOVERY TEMPERATURE LEAVING ELECTRICAL CHARACTERISTICS REMARKS/SPECIAL INSTRUCTIONS NUMBER GALLONS RATE RISE WATER K.W. VOLTAGE PHASE
More informationAIRPORT PLUMBING DESIGN STANDARDS REV. 3 3/18/2016
1.1 GOALS The goal of this section is to provide guidance in the design of Plumbing and Fire Protection systems to LAWA standards. The LAWA Plumbing Design Standards are a compilation of general design
More informationAPPENDIX L ALTERNATE PLUMBING SYSTEMS
ALTERNATE PLUMBING SYSTEMS L 1.0 General. L 1.1 Applicability. The intent of this appendix is to provide clarification of procedures for the design and approval of engineered plumbing systems, alternate
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More information2018 RETAIL PRICELIST
2018 RETAIL PRICELIST General Information Finishes Perrin & Rowe Classical, Deco & Contemporary products are available in a range of finishes: Chrome, Nickel, Pewter, Gold, English Bronze, Polished Brass
More informationGulfport, Mississippi 21 May 2007
G PLUMBING GENERAL REQUIREMENTS The D-BC shall design the plumbing system to comply with this criteria and the Plumbing Code. Piping shall be shown on the same plan as the fixtures being served. Pipe size
More informationAPPENDIX J ILLUSTRATIONS
The following figures have been included in the 1994 edition of the Standard Plumbing Code to aid in interpreting this code. The figures are not to be construed as superseding the written text, but merely
More informationREGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
ffix label with andidate ode Number here. If no label, enter candidate Number if known No. 9195 RGISTRTION XMINTION, NOVMR 2011 RTIFYING PLUMR INSTRUTIONS QUSTION N NSWR OOKLT Time allowed THR hours heck
More informationSTEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSINKS AND HYGIENE EQUIPMENT
SINKS AND HYGIENE EQUIPMENT Unitech manufacture a wide range of quality stainless steel equipment to fulfil all your cleaning, washing and hygiene needs. These can either be standard or bespoke items.
More informationSpecial Requirements For Health Care Facilities
Chapter 14 Special Requirements For Health Care Facilities 14.1 GENERAL This Chapter applies to special fixtures and systems that occur in health care facilities and to the special plumbing requirements
More informationOwner s Manual. Installation Details Owner s Information Warranty. 25L and 50L Electric Storage Water Heater
Owner s Manual & Installation guide 25L and 50L Electric Storage Water Heater MODELS 25W124, 25W136, 25W124P, 50W124, 50W136, 50W124P Installation Details Owner s Information Warranty For advice, repairs
More informationSanitary & Hospital Equipment
Sanitary & Hospital Equipment Introduction With 40 years experience, M&G Olympic Products has maintained its position as a leading specialist in the design, manufacture and installation of custom built
More informationWATER HAMMER ARRESTORS & MISC. SPECIALTIES
TABLE OF CONTENTS Pictorial Index Water Hammer Arrestors Certification Sizing & Placement Backwater Valves Typical Installations Trap Seal Primers Compliance Pressure & Flow Characteristics Typical Installations
More informationAIR ADMITTANCE VALVES FOR DOMESTIC PROPERTIES Guidance Notes
AIR ADMITTANCE VALVES FOR DOMESTIC PROPERTIES Guidance Notes 02 AIR ADMITTANCE VALVES FOR DOMESTIC PROPERTIES Introduction For any system which drains waste water from a property to function correctly,
More informationFIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.
15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.
More informationMechanical Inspection Plumbing
0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,
More informationB E ROUTE DUCT BEHIND BOOKSHELF. GRILLE MOUNTED ON TOP OF BENCH. BOOK CASE WALL 12x8 8x5 I 8"Ø 7"Ø 125 CFM I D M FLOOR SIDE WALL VENT 6x5 160 CFM 6"Ø 6"Ø 8x10 J C G 1 Section M-1 NOT TO SCALE Project No
More informationSCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING
SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm
More informationSTORAGE HOT WATER SERVICES
products & services STORAGE HOT WATER SERVICES AQUAMAX 390 155 LTR Storage Gas 5 Star Unit 390 Litre First Hour Delivery 5 Star Energy Rating 10 Year Cylinder Warranty Mains pressure to multiple fixtures
More informationWater Supply and Sanitation 16. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management
Water Supply and Sanitation 16 Dr Nabil El-Sawalhi Associate professor Engineering Projects Management Cold water supply and distribution Functional requirements The functions of water supply are to: Deliver
More informationAN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE
1. BUILDING FEES: 1 AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE ESTABLISHMENT OF FEES PURSUANT TO N.J.A.C.
More informationDOMESTIC & COMMERCIAL PLUMBING SYSTEMS FURTHER INFOMATION
DOMESTIC & COMMERCIAL PLUMBING SYSTEMS FURTHER INFOMATION Hot and Cold water distribution pipework Sizing of pipework For everyday plumbing in an average sized building a rule of thumb can be used when
More information900 N. Via Piemonte Ontario, CA
2 3 L 8 5'-0" 6'-1" 5'-0" 4'-0" 2'-0" D.5 6" 9'-9" K 2 1 2 " 5'-0" 2'-0" 1'-2" 8" 4 4.3 7'-0" C.6 1'-8 1 2 " 7'-0" 8" 10'-6" 5'-0" 8" 6" 6'-6" 6'-3" PLUMBING SCOPE OF WORK - DRAINS 7'-3" 6'-8" KEC TO PROVIDE:
More informationBuilding Utilities 1 Plumbing and Sanitary Systems
Building Utilities 1 Plumbing and Sanitary Systems Taken from UST Architecture exams by Arch. Rafael Alli Recommended review material for UST Preboard Exam Prepared by: arkireviewph.multiply.com Types
More informationModern Exteriors Stylish Kitchens Designer Bathrooms Comtemporary Living Fixtures & Finishes Schedule Inclusions Brochure
Modern Exteriors Stylish Kitchens Designer Bathrooms Comtemporary Living Inclusions Brochure Fixtures & Finishes Schedule WELL APPOINTED Modern Exteriors Brick veneer Powder coated aluminium windows with
More informationNEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS
NEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS WATER DISTRICT NO. 1 of MIDLAND COUNTY Office Location: 246 E. Price Rd. Midland, MI 48642 Mailing Address: PO Box 320 Sanford,
More informationFEATURES. Other Fed-Flush Arrangements
Brochure # 0710 TYPE TYPE... VSAF SEWAGE EJECTOR SYSTEM Flows to 600 gpm, Heads to 120, 1 thru 40 HP. Discharge size 4, 1750 and 1150 RPM, strainer in discharge pipe. HIGHLIGHTS Installations where rags
More informationFood Premises - Structural Specifications
Food Premises - Structural Specifications Floors, Walls and Ceilings Floors Provide a floor surface with a material suited to the process: easily cleanable a light colour Floor to wall join in the food
More informationDESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES
2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.
More informationOwner s Guide and Installation Instructions Electric Domestic Water Heater
Owner s Guide and Installation Instructions Electric Domestic Water Heater This water heater must be installed and serviced by a qualified person. Please leave this guide with the householder. PATENTS
More information1 Exam Prep Plumbing State Contractors Practice Exam 2
1 Exam Prep Plumbing State Contractors Practice Exam 2 1 According to Chapter 64E-6, when sizing a grease interceptor used in a restaurant, the correct formula is. A. (S) x (EW 12) x (LF) B. (S) x (GS)
More informationStainless Steel Sanitaryware
Stainless Steel Sanitaryware www.purusinternational.com Stainless Steel Sanitaryware At Purus you can find stainless steel sanitary products for your home as well as for public buildings. You can choose
More informationsouth-west the bourke H O M E S your home, your choice
the bourke south-west H O M E S the bourke 297m 2 total area Packed with quality inclusions and created to take advantage of our Mediterranean climate, the family homes in our Ocean Series are designed
More informationCOMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:
Planning/Building Department 115 Ramsdell Street Fircrest WA 98466 (253) 564-8902 COMMERCIAL PERMIT APPLICATION AND CHECKLIST Depending on the scope of your project, the following submittal requirements
More informationFRESH FROM THE KITCHEN FRESH FROM THE KITCHEN
PLUMBING SCOPE OF WORK - DRAINS KEC TO PROVIDE: - ALL TWIST WASTE VALVES & BASKET DRAINS, AS REFLECTED ON EQUIPMENT SCHEDULE, - PIPE CONDENSATE DRAIN FOR WALK IN COOLER WITH 3/4" COPPER TUBING, WITH NECESSARY
More informationIssue 4 Oct Panamatic Top loading Maxi & Optima 3 Installation
Issue 4 Oct 2005 Panamatic Top loading Maxi & Optima 3 Installation Please Do handle the unit with care, to avoid scuffs and scratches during installation. Do not over-tighten plumbing or any other mechanical
More informationLand Use and Environmental Service Agency (Code Enforcement) Plumbing 2010
General: 1) (Q) Who enforces the cutting and notching requirements found in the plumbing code? (A) The plumbing inspector would question the contractor initially. A building inspector would either take
More informationtime flow tapware and showers
time flow tapware and showers SELF CLOSING SOLUTIONS SAVE WATER AND IMPROVE HYGIENE VANDAL RESISTANT WWW.ENWARE.COM.AU A joint government and industry program Licence No. 0058 Water Consumption litres
More information1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.
FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment
More informationtime flow tapware and showers
time flow tapware and showers SELF CLOSING SOLUTIONS SAVE WATER AND IMPROVE HYGIENE VANDAL RESISTANT WWW.ENWARE.COM.AU A joint government and industry program Licence No. 0058 Water Consumption litres
More informationHouse Drainage System. Building Utility & Services
House Drainage System Building Utility & Services Syllabus House Drainage: principles of house drainage, pipes and traps, Classification of traps: nahni trap, interception trap, grease-trap, sanitary fittings,
More informationA. Standards: Except where modified or exceeded by the requirements of this Specification, conform to the following standards:
SECTION 11 53 53 BIOLOGICAL SAFETY CABINETS PART 1 - GENERAL 1.1 QUALITY ASSURANCE A. Standards: Except where modified or exceeded by the requirements of this Specification, conform to the following standards:
More informationBUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS
BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used by
More informationOwner s Manual. Installation Details Owner s Information. 80L to 400L Electric Storage Water Heaters
Models: RIN80E24 RIN80E36 RIN125E24 RIN125E36 RIN160E24 RIN160E36 RIN250E36 RIN315E36 RIN400E36 Installation Details Owner s Information For advice, repairs and service, call: 1300 555 545 Carefully remove
More information1 Exam Prep Plumber s Handbook Tabs and Highlights
1 Exam Prep Plumber s Handbook Tabs and Highlights These 1 Exam Prep Tabs are based on the Plumber s Handbook Revised 2006. Each Tabs sheet has five rows of tabs. Start with the first tab at the first
More informationCHAPTER 10 TRAPS AND INTERCEPTORS
CHAPTER 10 TRAPS AND INTERCEPTORS 1001.0 Traps Required. 1001.1 Each plumbing fixture, excepting those having integral traps or as permitted in Section 1001.2, shall be separately trapped by an approved