1 CENTROMETAL d.o.o. Glavna Macinec Croatia tel: ; fax : TECHNICAL MANUAL USE AND MAINTENANCE Cm Pelet-set TUPS eng-E-N

2 CONTENT 1. Introduction.. 2. Delivery status Pellet burner CPPL 2.2. Lower boiler door CPDV Boiler regulation CPREG Feeder screw CPPT Pellet tank CPSP Technical data. 4. Cm Pelet-set assemblage Safety Fuel 7. Boiler regulation Description of buttons and symbols on the command panel Description of symbols Regulation of burner function parameters Regulation of burner function parameters (only for authorized persons). 8. Burner operation First firing procedure Fire extinction procedure Functioning of the regulation Firing phase Transition phase Operation phase Extinction phase Activating time operation Overheat protection Errors Connection to the electric power net Maintenance of the Cm Pelet-set

3 1. Introduction The Cm Pelet-set (rated thermal output of the burner 14 kw and 20 to 35 kw) produced by Centrometal d.o.o. is aimed to be connected to combined boilers or to boilers for biomass firing, EKO-CK and EKO-CKB boilers (nominal heat power from 20 to 40 kw). This technical manual contains basic information about the products, their technical characteristics and instructions for proper use and maintenance of single components. Integral parts of the Cm Pelet-set are constructed according to the modern technology and design, made out of proved and properly tested high quality materials. Assemblage and start up of the Cm Pelet-set has to be carried out by the person authorized on behalf of the manufacturer. 2. Delivery status 1. pellet burner CPPL-14 or CPPL lower boiler door CPDV 3. boiler regulation CPREG 4. feeder screw CPPT 5. pellet tank CPSP 2.1. Pellet burner CPPL Pellet burner CPPL-14 (rated thermal output 14 kw, for boilers EKO-CK 20, EKO-CKB 20) and CPPL-35 (rated thermal output kw, for boilers EKO-CK and EKO-CKB 25-40) contains high quality components and is made out of tested materials. Inside the burner there is a heavy duty fan which, with help of a particular formed burner grid, supplies a fire as any other classical burner. Besides the fan inside the burner, there is also an electric heater which, with help of the regulation system, automatically and according to the need, fires the wooden pellets. The build in photoelectric cell is used to detect the presence of fire inside the burner. Particular form of the combustion chamber of the burner enables good mixing of the air and the fuel, which results is a highly effective burning process. Burner CPPL-14 has additional ceramic extension which is used to improve the efficiency of the combustion. Depending of the burner functioning phase varies the fan circulation speed, which means the air supply to the burner. The burner is aimed to be connected to the lower boiler door CPDV, fixed to the prepared opening. The burner is previred, so it can be easily connected to the boiler regulation CPREG Lower boiler door CPDV Delivery of the pellet burner CPPL includes also the lower boiler door CPDV with an opening adapted to the burner (beside when is delivered boiler with Cm Pelet set, then the lower boiler door CPDV are already installed on the boiler). The standard boiler door has to be removed and replaced by the delivered one, i.e. CPDV to which the pellet burner can be connected Boiler regulation CPREG The sophisticated digital boiler regulation CPREG steers the burner according to the need of heating and sanitary water consumption. The characteristics of the boiler regulation CPREG are: microprocessor regulation, bimetal safety thermostat, safety pressure switch, fires and turns off the burner according to the set up temperature and functioning regime, regulates the pellet supply through the feeder screw, functioning according to the summer or winter regime, anti-condensation protection of the boiler, display of the boiler status, malfunction display, sensor for the boiler and sensor for the sanitary water are included. Hereafter there is a detailed description of the functioning and setting up of single parameters Feeder screw CPPT From the tank to the burner, the pellets are transported by means of the feeder screw CPPT. In the feeder screw tube there is a spiral, which with help of an electric motor with reductor transports the pellets from the tank to the burner through a flexible tube. The electric motor is previred, so that it can be easily connected to the socket on the right side of the boiler regulation CPREG. If the electric 3

4 power cable is damaged, the substitution is to be done on behalf of the authorized person, in order to avoid possible damaging of persons and technical equipment Pellet tank CPSP The pellet tank CPSP has to be situated on the right side next to the boiler. After laying the tank, the feeder screw has to be connected to it. Before loading the tank the door situated on its top has to be opened and it has to be checked if inside there are some solid objects or other material. The assemblage of the pellet tank is described in the pellet set assemblage manual. 3. Technical data Legend: 1. pellet burner CPPL supply tube for pellet loading 3. connections for burner to the regulation 4. bimetal safety thermostat 5. burner protection box 6. gum tube of the pressure switch 7. feeder screw for loading with electric motor CPPT 8. flexible tube for pellet loading 9. pellet tank CPSP 10. pellet tank door 11. cover of the tank s lower cleaning door and feeder screw insert opening 12. feeder screw supply opening 13. feeder screw tube insert opening 14. lower boiler door adjusted for pellet burner CPDV 15. boiler regulation CPREG 16. ceramic extension (only for CPPL-14) 17. pellet burner CPPL-35 Type Cm Pelet-set Pellet burner type CPPL-14 CPPL-35 CPPL-35 CPPL-35 CPPL-35 Heat output (kw) Boiler type EKO-CK/B 20 EKO-CK/B 25 EKO-CK/B 30 EKO-CK/B 35 EKO-CK/B 40 Volume of the pellet tank (l) Height of the pellet tank (mm) Depth of the pellet tank (mm) Width of the pellet tank (mm) Electrical power net tension (V/Hz) 230/50 230/50 230/50 230/50 230/50 Width of the boiler (mm)

5 4. Cm Pelet-set assemblage Assemblage and start up of the Cm Pelet-set has to be carried out by the person authorized on behalf of the manufacturer. a) remove the lower boiler door and mount the lower boiler door CPDV delivered together with the Cm Pelet-set (if lower boiler door is not already installed on the boiler). b) onto the already prepared screws on the boiler door setup the burner nozzle, then the pellet loader box and screw with M8 nut (attached). Place the seal onto the loader box and fix the loading tube (fix with M4x15 screws (attached)). Remove the cover of the bimetal safety thermostat which is situated on the loading tube, connect wires and put on the cover. The PVC and silicone made tube, which is connected to the pressure switch, is to be settled onto the prepared connection point, which is situated on the lower left side of the boiler door. At the end the protection box has to be put onto the prepared screws and fixed. Mount of the ceramic nozzle (only for CPPL-14) c) only for the burner CPPL-14: after the lower door is closed, through the upper door adjust the ceramic extension on the handle which is placed on the burner nozzle (right picture). d) on the upper boiler casing there has to be made two holes with an distance of 355mm. The boiler regulation CPREG has to be fixed with delivered screws 3,9 x 9,5mm. The safety thermostat sensor and the regulation sensor have to be inserted into the tube for sensors on the boiler. The cables have to be connected with connectors to the pellet burner. e) according to the technical instructions for the assemblage of the pellet tank and feeder screw establish the connection to the pellet tank CPSP and place it to the right side just next to the boiler in horizontal position. Flatten the bottom of the tank with the bottom of the boiler and flatten the front side of the tank with the front side of boiler casing. f) the feeder screw for loading pellets with electric motor CPPT is to be fixed to the prepared opening situated in lower right corner of the tank and connected to burner CPPL with the flexible feeder screw tube. One end of the flexible tube put on the burner (on the supply tube) to lid of the bimetal thermostat, and the other end on the transporter hand so the tube do not fall off. The flexible tube have to be as straight as possible between the transporter and the burner so the pellets can easily fall down from the transporter to the burner (in case that the pellets are retain in the flexible tube it is necessary to straight the tube or if it is possible reduce its length). g) the wire for electric power of the feeder screw CPPT connect to the socket situated on the right side of the boiler regulation CPREG. h) the boiler regulation has to be connected to the electric net, NOT THROUGH THE THERMOSTAT built into the boiler. 5. Safety The burner has three safety mechanisms: - Bimetal thermostat which is connected to the burner pellet supply tube. In case of overstepping the set up temperature (75 C), the pellet supply shall be blocked, the burner 5

6 goes to fire extinction phase the boiler regulation display shows the error E3 (signal LED diode ). - Pressure switch built into the burner steers the excess pressure inside the combustion chamber of the boiler. In case of overstepping the set up pressure inside the combustion chamber the pressure switch stops the pellet supply and the burner goes to fire extinction phase the regulation display shows the error E1 (signal LED diode ). - In case there is no fire inside the combustion chamber the built in photoelectric cell sends the signal to the boiler regulation which stops the pellet supply and the display shows the error E6 (signal LED diode ). The safety thermostat, built into the boiler regulation turns off the electric power supply when the boiler temperature exceeds 115 C - 10 C. The flexible tube which connects the pellet burner with the feeder screw is made out of plastic materials strengthen by a metal wire which, in case the fire comes out of the burner, shall be burned and dissolved. This unable that the fire passes to the pellet tank. 6. Fuel The fuel used for firing the boilers with connected Cm pelet-set is wood pellets. Pellet is a kind of biologic fuel, produced out of wood scrap. It can be stocked in 15 kg sacks or in bulk (4-15 m³ tanks). Bulk pellet tanks can be situated under the ground or in the house cellar. Recommended characteristics of the pellet for firing in the Cm Pelet-set are: - heating value >= 5 kwh/kg (18 MJ/kg) - diameter = 6 mm - max. length = 35 mm - max. humidity = 8% - max. dust = 0,5% - 3 m 3 pellets matches the value of cca litres of fuel oil 2 kg pellets matches the value of cca. 1 litre of fuel oil 7. Boiler regulation Boiler regulation is delivered inside the plastic coated metal box for connecting to the boilers EKO-CK and EKO-CKB (nominal thermal output from 20 to 40 kw). O FF 08: Description of buttons and symbols on the command panel: Button symbol Safety thermostat button. Button function 6

7 1 Main switch for regulator supply turning on/off. 0 Start/stop button. - pressing the button for 3 sec. the burner turns on. - while the burner is operating, press the button for 3 sec. - burner turns off. - shortly pressed the menu exit button shall store setup parameters. Button for menu enter and set up parameters. Button for bringing the set up parameter onto the higher value. Button for reduction of the setup parameter onto the lower value. Winter regime setting button. In this regime the heating pump shall be activated and if the sensor is connected, as well as the water pump. Summer regime setting button. In this regime only the sanitary water pumps shall be activated (if sensor connected). Button for manual activating of feeder screw. It is used only during the first firing of the burner, while the feeder screw is still empty Description of symbols: Sanitary water pump activity indication. Heating circuit pump activity indication. Starting times activity indication. Feeder screw supply activity indication. Presence of the fire in the burner indication. Burner fan activity indication. Electric heater activity indication (for pellet firing). Bimetal safety thermostat activity indication in case of the temperature excess on the pellet supply tube. Security pressure switch activity indication in case of the exceed pressure inside the combustion chamber of the boiler Regulation of burner function parameters: O FF 08:42 Regulation of burner function parameters can be done only while the burner is not activated, i.e. when the upper display shows OFF. Pressing the ''SET'' button you enter the menu for parameter setting, so you can turn from one menu to the other. Exit the single menu and turning back to the initial display and memorizing of the changed values is achieved by pressing the ''SET'' button. 7

8 P o 2 O P o 1 80 C P o 2 o F F P o 3 08:42 P o 4 D a y 3 P o 2 50 C Pr01: Set up boiler temperature Factory setup: 80 C. Possible setup: min. 65 C; max. 90 C. Buttons ''+'' and ''-'' can change boiler temperature setup. By pressing the button you exit the menu and turn back to the initial display, while pressing the button ''SET'' you will turn to the other menu; Pr02. Pr02: Enabling the sanitary water heating Factory setup: ''OFF'' sanitary water heating deactivated. Possible setup: ''On'' (activated) and ''OFF'' (deactivated) In order to activate this function there has to be built in a sanitary water sensor (on I2). Pressing the button ''+'' and ''-'' it is possible to turn on (''On'') or to turn off (''OFF'') the possibility of the sanitary water heating. By setting of the Pr02 to ''On'' and by pressing the button ''SET'' we are turning to the subprogram Pr02. Subprogram Pr02: Sanitary water temperature setup: Factory setup: 50 C Possible setup: min. 40 C; max. 60 C If the sanitary water sensor is connected and Pr02 ''On'', the factory sanitary water temperature setup can be changed by pressing buttons ''+'' and ''-''. Pr03: Digital timer setup By entering the menu Pr03 the timer displayed number, which can be changed, starts to flutter. Change by pressing buttons ''+'' and ''-''. By pressing the button ''SET'' the number which shows minutes starts to flutter. The exact value can be setup by pressing the ''+'' and ''-'' and stored by pressing the button ''SET''. Pr04: Setting the day in the week Menu Pr04 enables the setting of the current day in the week (it is important for proper time functioning). DAY1 = Monday (signal LED diode ) DAY2 = Tuesday (signal LED diode ) DAY3 = Wednesday (signal LED diode ) DAY4 = Thursday (signal LED diode ) DAY5 = Friday (signal LED diode ) DAY6 = Saturday (signal LED diode ) DAY7 = Sunday (signal LED diode ) 8

9 P o 5 O f f P o 5 d a y 1 d a y 1 O O f f O O O6:00 O - - : - - O - - : - - d a y 2 O f f... P o 6 p - 3 O f f 22:00 O f f - - : - - O f f - - : - - Pr05: Starting times setup Factory setup: ''OFF'' (deactivated) Possible setup: ''On'' (activ.) and ''OFF'' (deactiv.) If activating times is set up it is enabled an independent operation of the burner according to the setup of activating time and days in the week. In each day of the week can be setup 3 activating and 3 deactivating times. Minimal distance between a deactivating time and the next activating time is 1 hour. Activating and deactivating times can not be identical. Subprogram Pr05: activating digital timer setup Factory setup: DAY1=OFF, DAY2=OFF, DAY3=OFF... (all days deactiv.). Possible setup: ''On'' (activ.) and ''OFF'' (deactiv.) of each day independently If the setup of activating time is activated (''On''), the day can be chosen on which we want to activate the activating times. If we want to deactivate this activating time for Monday, we have to change DAY1=OFF by pressing the buttons ''+'' or ''-'' to DAY1=On and press the button ''SET''. Subprogram Pr05: setting the 1 st activating time ''On'' stands for the first time of firing, factory preset on 06:00 hours, while ''OFF'' stands for the first deactivating of the burner, factory setup on 22:00 hours. Subprogram Pr05: Setting the 2 nd activating time The following menu ''On'' signs the second firing time, factory setup deactivated (- - : - -), while ''OFF'' signs the second burner deactivating time, factory setup deactivated (- - : - -). In order to enable the activation of the second activating time, first burner deactivation time has to be lower then the second burner activating time for minimum 1 hour. Subprogram Pr05: Setting the 3 rd activating time The following menu ''On'' signs the third activating time, factory setup deactivated (- - : - -), while ''OFF'' signs the third burner deactivating time, factory setup deactivated (- - : - -). In order to enable the activating of the third activating time, the first and second burner deactivating time has to be lower then the third burner activating time for minimum 1 hour. By pressing the button ''SET'' we shall turn to the next day DAY2=OFF. Pr06: Burner capacity setup Factory setup: P- 2 Meaning of the program: P-1- auxiliary program P-2 14 kw P-3 20 kw P-4 25 kw P-5 30 kw P-6 35 kw Setting the burner capacity in the menu Pr06 with help of the buttons ''+'' and ''-''. 9

10 1 0 O FF 08:42 Technical manual Cm Pelet-set Reset of the factory setup regulation For resetting the factory setup, the main switch of the regulation has to be turned off. In addition the buttons SUMMER and WINTER has to be pressed while contemporaneously the main switch has to be turned on. Both displays shows 4 times number 8, after that both displays turn to display the initial setup. The upper one OFF and the lower one the current time Regulation of the burner functioning parameters only for authorized persons If there is a need for fine regulation of the burner, there is a possibility to establish certain parameters, which influence its functioning. Fine tuning of the voltage on the fan for the wanted capacity of the burner can be done during the operation of the burner. When burner achieve the wanted capacity (after approximately 30 min from the fireing) it is able to fine tune the voltage of the burner fan by pushing the micro switches S2 = + and S3 = - (it is positioned below the lid of the boiler regulation). After the burner is tuned (according the analyses of the flue gases) it is necessary to remember the new tuned parameter. To save this new parameter it is necessary to turn off the burner and obligatory, this new fine tuned voltage, write down into the regulation on the way as it is described in the next paragraph. In order to approach these parameters it is necessary to turn off the burner, on regulation must be OFF and current time and then enter the menu entering code for protected parameters. First the cover of the regulation has to be opened and keep pressed the switch S1 together with following combination of buttons: (-), (winter), (screw), (+), (summer). Entering the menu of protected parameters through pressing the S1 button (numbers and meaning of each parameters see in table Fine regulation parameters overview ), we are choosing the desired parameter, while with the micro switches S2 and S3 we are changing the value of the chosen parameter (S2 = +, S3 = -). Position of the micro switch S1, S2, S3. Further on there is a table with single parameters with factory setup values and possible range of setting. Times are expressed in seconds (sec.) and tensions in Volts (V). 10

11 FINE REGULATION PARAMETERS OVERVIEW Param. Description Factory setup Setup range P1 Initial pellet filling time 80 sec P2 Out of use P3 Fan functioning time under the max. tension at 10 sec sec. the beginning of the burner s functioning period P4 Fire creating time, safety time 720 sec sec. P5 Electrical heater functioning time without the 1 sec sec. fan functioning P6 Electrical heater functioning time after the 60 sec sec. photo-cell has detected fire P7 Initial fire increasing period from the moment 240 sec 0-999sec. the first fire has appeared until the setting of the P1 regime P8 Out of use P9 Fan functioning time in extinction process on 180 sec sec. the chosen program tension level P10 Fan functioning time on the maximum tension 120 sec sec. level at the end of the burners activity period P11 Fan tension in the process of the fire creation 160 V V from the moment of initial filling until the setting of the P1 regime P12 Tension for the P1 program 158 V V P13 Feeder screw functioning time in P1 regime 6 sec sec. P14 Feeder screw stand-by time in the P1 regime 24 sec sec. P15 Feeder screw functioning time in the P2 regime 7 sec sec. P16 Feeder screw stand-by time in the P2 regime 13 sec sec. P17 Feeder screw functioning time in the P3 regime 6 sec sec. P18 Feeder screw stand-by time in P3 regime 9 sec sec. P19 Feeder screw functioning time in the P4 regime 9 sec sec. P20 Feeder screw stand-by time in the P4 regime 7 sec sec. P21 Feeder screw functioning time in P5 regime 9 sec sec. P22 Feeder screw stand-by time in the P5 regime 6 sec sec. P23 Feeder screw functioning time in P6 regime 14 sec sec. P24 Feeder screw stand-by time in the P6 regime 6 sec sec. P25 Tension for the P2 program 153 V V P26 Tension for the P3 program 154 V V P27 Tension for the P4 program 155 V V P28 Tension for the P5 program 160 V V P29 Tension for the P6 program 159V V P30 Tension for the additional fire creation in the set 10 V 0 50 V up program P31 Time for the additional fire creation in the set up 120 sec sec. program P32 Burner functioning time in the transition phase 240 sec sec. of the P1 regime P33 Burner functioning time in the transition phase 100 sec sec. of the P2 regime P34 Burner functioning time in the transition phase 90sec sec. of the P3 regime P35 Burner functioning time in the transition phase 72 sec sec. of the P4 regime P36 Burner functioning time in the transition phase of the P5 regime 75 sec sec. 11

12 8. Burner operation 8.1. First firing procedure: 1. Fill the tank with pellets. 2. Check if in the burner nozzle is placed the grill and if is on the burner (only for CPPL-14) installed the ceramic extension. 3. Switch on the boiler regulation to the el. power supply and turn on the main switch to the value 1. Check if the upper display shows OFF and the lower display the current time. 4. Disconnect the flexible tube for pellet supply from the burner and put a pot under the tube. Press the button for pellets supply and keep pressing it until the feeder screw is filled up, i.e. until the pellets start to come out from the tube (depending of the pellet size it can take 5 to 10 minutes). Instead of pressing the pellet supply button the electric motor can be activated by connecting the 230 V electric power supply until the pellets start to come out from the tube. 5. Connect the flexible tube for pellet supply back to the burner (connect the pellet supply electric motor wire to the socket on the boiler regulation - if it has previously been disconnected). 6. Select winter or summer firing regime, according to your needs. 7. Select burner operation parameters by pressing the SET button (meaning and selection of the parameters has been described in the previous chapter). 8. Exit the burner operation parameter setup mode by shortly pressing the button. 9. Keep the button ON/OFF pressed for 3 seconds until the On appears on the upper display. This means that the burner started the firing phase. 10. The fire shall appear after 3 to 10 minutes (depending on the burner temperature and on the quality of the pellet). 11. Depending of the selected operation regime on the factory preset temperature the pumps shall be activated: - winter regime: the heating pump and the sanitary water pump shall be activated at 65 C; - summer regime: sanitary water pump shall be activated at 65 C. 12. During the normal burner operation, the current water temperature is shown on the upper display, while the lower display shows the current time. 13. When the burner reaches its setup power (after about 8 to 12 minutes, according to the setup value) the analysis of the flue exhaust gases has to be done and, if necessary, the parameters of the burner have to be set up precisely. This can be done only on behalf of the authorized person Fire extinction procedure: Keep pressing the ON/OFF button for 3 seconds, until the upper display does not show the ''OFF''. In this moment the pellet supply is blocked, the upper display shows the current water temperature inside the boiler, the lower display shows OFF, the fan is still functioning so long the fire is completely extinct. After that the fan operates for some time and clean the grid. 12

13 9. Functioning of the regulation 9.1. Firing phase After pressing the ''ON/OFF'' button for 3 seconds the upper display shows shortly ''On'' and after that the current boiler temperature, while the lower display shows the current time. On the regulation is activated the LED diode which shows the fan activity which cleans the burner (30 sec.). After that time pellet supply is activated, as well as the el. heater. The starting pellet supply (independently of the setup boiler, i.e. burner capacity) takes 80 seconds. The heater continues to operate (from the beginning of the pellet supply the safety time is running, which takes 12 minutes. If in this period the fire does not appear, the firing process shall be interrupted and the display shows the error ''E2''.). After the pellet supply has been interrupted (after 80 sec.), the heater continues the operation and the regulation starts to follow the functioning of the photoelectric cell. If the photoelectric cell registers the fire inside the safety time period (12 minutes), the heater continues to operate for another 30 seconds and then cease its function. After the photoelectric cell has detected the fire, the regulation checks for 10 seconds if the fire is stable and then activate the indication about the fire presence in the burner. From this moment on the time of 3 minutes starts to run, i.e. the time which pellets needs to start burning properly Transition phase After the pellets started to burn properly (3 min.), starts the transition phase of the burner functioning in which its power increases until it reaches the setup power level. In this period the good quality base for further proper burning of the pellets has been prepared Operation phase After the transition phase of the burner has been accomplished, the regulation switches on the preset capacity functioning and it continues to operate according to the preset parameters (i.e. with the setup power). Winter regime operating : The regulation follows the boiler temperature and, if there is a need for heating and sanitary water and the boiler temperature has reached 65 C, the heating pumps and the sanitary water pumps shall be activated (if the sanitary water is enabled). If the boiler temperature falls under 65 C the pumps shall be deactivated. If the boiler reaches the temperature of T set 4 C, the regulation decreases power of the boiler for 2 degrees; if the temperature continues to increase and reach the T set 2 C, the regulation decreases the power of the boiler for another 2 degrees. When the boiler reaches the temperature T set the burner turns to the extinction phase. If the boiler has reached the temperature T set 4 C, and it can not reach the temperature T set 2 C in 3 minutes, the burner shall turn to the setup power. When the boiler reaches the temperature T set 2 C, the regulation decreases the power of the burner for 2 degrees. If in this regime the boiler does not reach the temperature T set 2 C in 3 minutes, the burner turns to the setup power and at the temperature of T set it turns to the extinction phase. The burner newly activates when the boiler temperature falls under T set 5 C. Summer regime operating : In order the regulation could properly operate in the summer regime, it has to be switched on the summer regime. The sanitary water sensor has to be connected on regulation panel to connector I2 and the program Pr02 has to be enabled. In the Pr02 program the desired sanitary water temperature has to be setup (40 C 60 C) and the setup boiler temperature T set shall be setup according to the T needed sanitary + 20 C (min. boiler temperature T set. is 65 C). The sanitary water pump shall be activated and deactivated always on min. 65 C of the boiler temperature. The burner operates according to the setup regime until it does not reach the temperature of T needed sanitary + 20 C 4 C temperature, when the regulation decreases the power of the burner for 2 degrees. If the temperature continues to grow and reaches T needed sanitary + 20 C 2 C, the regulation newly decreases power of the burner for 2 degrees. When the boiler reaches the temperature of T needed sanitary + 20 C, the burner turns to the extinction phase. If the boiler has reached the temperature T needed sanitary + 20 C 4 C, but it can not reach the T needed sanitary + 20 C 2 C in 3 minutes, the burner turns to the setup power. When the boiler 13

14 reaches the temperature T needed sanitary + 20 C 2 C, the regulation decreases the power of the burner for 2 degrees. If in this regime the boiler does not reach the T needed sanitary + 20 C temperature, the burner turns to the setup power and at temperature of T needed sanitary + 20 C, the burner turns to the extinction phase. The burner shall be newly activated when the temperature in the boiler falls under T needed sanitary + 20 C 5 C Extinction phase The burner goes into the extinction phase when the setup boiler temperature has been reached, when manually extinction of the burner by pressing the button ON/OFF has been done and when automatic extinction according to the activating times has been done, as well as if the error appears. At the beginning of the extinction phase, the pellet supply shall be stopped, the display shows OFF, the fan operates as long as the photoelectric cell registers the fire inside the burner. When the fire has been extinct, the fan operates for another 2 minutes, in order to clean the grid and prepare it for next firing Activating time operation The regulation has the possibility to switch on and off the burner automatically, according to the preset weekly and daily program. The postulate for the proper burner operation with activating times is exactly setup current time and exactly setup current day of the week. The burner operation can be planned in every day of the week with three firing and three extinctions per day. By factory setup all activating times are deactivated. Activating of each activating time is described in the chapter Regulation of burner function parameters. In order to achieve regular and proper burner operating the minimum stand by time between two activating times is 1 hour Overheat protection The regulation has the build in overheat protection function, which protects the boiler against the overheating. Depending on operating regime (switched on winter or summer regime), independently on needs, the regulation activates the pumps which starts to cool down the boiler. In the winter regime, when the boiler exceeds the T set + 5 C temperature, independently on the heating need, the boiler pump shall be activated until the boiler temperature does not reach the level below T set + 5 C. In the summer regime, when the boiler exceeds the T needed sanitary + 20 C + 5 C temperature, independently on sanitary water need, the sanitary water pump shall be activated until the boiler temperature does not reach the level below T needed sanitary + 20 C + 5 C. 10. Errors Independently on the burner operating regime, due to appearing of the error, the regulation immediately stops the burner activity. If the regulation is in the firing phase and the fire has not appeared yet, the pellet supply immediately stops, the fan and heater as well. If the regulation is in the phase of normal operating, the process of burner extinction phase shall be initiated. On the upper display there is the signal Err, while on the lower one appears the error description. Error description: - E1 safety pressure switch (signal LED diode ) - E2 safety firing time run out - E3 bimetal thermostat (signal LED diode ) - E4 boiler temperature sensor - E5 sanitary water temperature sensor - E6 fire disappearance in the photoelectric cell 14

15 E e 4 In order to enable the regulation to operate normally, the error has to be removed and the same has to be reset on the regulation. The error reset is done by the contemporaneously pressing the buttons winter and summer together with contemporaneous pressing the button ''+''. If the cause of the error has not been removed, the error itself can not be reset. 11. Connection to the electric power net The condition for the disconnection of poles has to be installed according to the local law regulation. The fuses 3,15A, 1,35A and 125A are mounted on to the regulation box. The fuse 1A is mounted on the electronic regulation panel. After connection of the regulation connector to the burner connector, screw the connector to the burner body. ELECTRICAL REGULATION SHEME ELECTRICAL SHEME OF THE BURNER 15

16 12. Maintenance of the Cm Pelet-set It is recommended to clean the burner together with the combustion chamber of the boiler after 25 to 50 operating hours. According to the needs the cleaning intervals can be prolonged and reduced, which depends on the pellet quality and firing frequency of the burner. Every 5 to 10 days check: - the quantity of ashes in the ashtray and clean it; - sediments in the boiler combustion chamber and clean it if necessary; - sediments on the burner grid and clean it if necessary Two times in one year accurately check/clean following components: - clean well the burner and grid; - clean well the photoelectric cell; - clean the fan; - empty and clean the pellet set; - check the flexible connection tube and if necessary tighten it; - check the electrical wires and connections and if necessary exchange them. The annual check has to be performed by the person authorized on behalf of the producer. Centrometal d.o.o. company does not take over the responsibility for errors in this manual, which might occur during the printing procedure. In any case the company Centrometal reserves the right to perform changes in its products' manuals if it is considered necessary without previous announcement v.3.0 E-N Macinec, March

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40)

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40) TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set (14-35 kw) For boilers: EKO-CK P 20-40 (EKO-CK 20-40) EKO-CKB P 20-40 (EKO-CKB 20-40) TUPS-K-02-2011-E-N-ENG CONTENTS 1. Introduction....... 2. Status

More information

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set (60-90 kw) For boilers: EKO-CK P 70-110 TUPS-90K-09-2015-E-N-eng

More information

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set For boilers CentroPlus 25/35 and CentroPlus-B 25/35 (solid fuel and wood pellets fuel firing) TUPSCP-K-11-2016-ENG CONTENTS 1.Introduction 2. Status

More information

Cm Pelet-set (60-90 kw)

Cm Pelet-set (60-90 kw) CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet-set (60-90 kw) For boilers: EKO-CK P

More information

Cm Pelet-set - touch TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT

Cm Pelet-set - touch TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet-set - touch (60-90 kw) For boilers: EKO-CK

More information

Cm Pelet-set TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT. (14-35 kw) For boilers: EKO-CKB P (EKO-CKB 20-40)

Cm Pelet-set TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT. (14-35 kw) For boilers: EKO-CKB P (EKO-CKB 20-40) TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet-set (14-35 kw) For boilers: EKO-CK P 20-40 (EKO-CK 20-40) EKO-CKB P 20-40 (EKO-CKB 20-40) TUPS-M-11-2015-E-N-ENG CONTENTS 1. Introduction.....

More information

- 12, , TECHNICAL INSTRUCTIONS

- 12, , TECHNICAL INSTRUCTIONS HEATING TECHNIQUE Centrometal d.o.o. - Glavna, Macinec, Croatia, tel: +8 7, fax: +8 7 TECHNICAL INSTRUCTIONS for installation, use and maintenance of hot water boiler and installation of additional equipment

More information

Centrometal d.o.o. - Glavna 12, Macinec, Hrvatska, tel: , fax: THE BOILER PelTec 12 WITH SPARE PARTS LIST

Centrometal d.o.o. - Glavna 12, Macinec, Hrvatska, tel: , fax: THE BOILER PelTec 12 WITH SPARE PARTS LIST HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Hrvatska, tel: 040 372 600, fax: 040 372 611 DISPOSITIONAL (EXPANDED) VIEW OF THE BOILER PelTec 12 WITH SPARE PARTS LIST PelTec12 EPKRD-PelTec-12-01/20-ENG-euro

More information

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611 TECHNICAL INSTRUCTIONS for regulation, use and maintenance of pellet stove CentroPelet

More information

WOOD PELLET BURNER WITH BOILER CONTROL UNIT FOR MONTING ON BOILER CPPL-200 inv, CPPL-300 inv, CPPL-350 inv

WOOD PELLET BURNER WITH BOILER CONTROL UNIT FOR MONTING ON BOILER CPPL-200 inv, CPPL-300 inv, CPPL-350 inv TECHNICAL INSTRUCTIONS FOR USE, COMMISSIONING AND ADJUSTMENT WOOD PELLET BURNER WITH BOILER CONTROL UNIT FOR MONTING ON BOILER CPPL-200 inv, CPPL-300 inv, CPPL-350 inv TUPST-M-10-2014-ENG CONTENTS 1. Introduction.

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

PELET SUCTION SYSTEM CVT. Technical manual HEATING TECHNIQUE. CentroPlus(-B) + Cm Pelet set, BioTec Plus. for the installation, use and maintenance

PELET SUCTION SYSTEM CVT. Technical manual HEATING TECHNIQUE. CentroPlus(-B) + Cm Pelet set, BioTec Plus. for the installation, use and maintenance HEATING TECHNIQUE Centrometal d.o.o. - Glavna 2, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 6 Technical manual for the installation, use and maintenance PELET SUCTION SYSTEM CVT configuration:

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK FD PELLET yattack

More information

Electronic Pellet Burner Controller NPBC-V3M

Electronic Pellet Burner Controller NPBC-V3M Electronic Pellet Burner Controller NPBC-V3M SOFTWARE VERSION 3.3a/3.2 page of 27 CHANGES IN THE USER MANUAL OR IN THE CONTROLLER'S SOFTWARE Version of the user manual Changes Page 2.2. The software version

More information

Electronic Pellet Burner Controller NPBC-V3-1

Electronic Pellet Burner Controller NPBC-V3-1 Electronic Pellet Burner Controller NPBC-V3- SOFTWARE VERSION 3.2/3. page of 3 CHANGES IN THE TECHNICAL AND USER GUIDE OR IN THE SOFTWARE VERSION Technical and User Guide's version Changes Page 2.8. The

More information

BIX B-One 100 kw INSTALLATION GUIDE

BIX B-One 100 kw INSTALLATION GUIDE BIX B-One 100 kw INSTALLATION GUIDE Dear Customer, We thank you for choosing our product. The Bix B-One 100 Kw is a burner of advanced concept and technology, with a high reliability and construction quality.

More information

TERMO-Blok TERMO-Extra TERMO-Blok PTV

TERMO-Blok TERMO-Extra TERMO-Blok PTV ELECTRIC BOILERS FOR CENTRAL HEATING TERMO-Blok TERMO-Extra TERMO-Blok PTV Contents 1. Introduction... 1 1.1. Applicable documents... 1 1.2. Retention of documents... 1 1.3. Introduction... 1 1.4. Heating

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400 INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400 Content 1. Delivery......................................................................... 3 2. Installation and assembly.........................................................

More information

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens Main components The bigger the need of heat output is. the bigger the components (storage. boiler. chimney etc.) In private houses the output need of the boiler is about 25 40 kw and in farms from 60 kw-

More information

Operating manual. Pellet boiler. Orlan Pellet ISO 9001

Operating manual. Pellet boiler. Orlan Pellet ISO 9001 Operating manual Pellet boiler Orlan Pellet ISO 9001 Contens 1. Boiler s use...................................................................... 3 2. Boiler s way of working...........................................................

More information

.it AQ USER OPERATING INSTRUCTIONS

.it AQ USER OPERATING INSTRUCTIONS .it AQ 15 USER OPERATING INSTRUCTIONS Dear Customer, In congratulating you for purchasing one of our heat stoves, we would like to remind you that pellet heat stoves are the most innovative heating solution,

More information

Janfire Pellet Burner Boiler. for single / double burner management (Version 1.1)

Janfire Pellet Burner Boiler. for single / double burner management (Version 1.1) SY325 Janfire Pellet Burner Boiler for single / double burner management (Version 1.1) TECHNICAL DATA SHEET V1.1 rev.12/2007 Contents INTRODUCTION...3 1 THE CONTROL PANEL...4 2 THE KEYS...4 3 THE LEDS...4

More information

KTX 1, KTX 2, KTX 3, KTX 4. User Manual Electric Heating KTX 1, KTX 2, KTX 3, KTX 4.

KTX 1, KTX 2, KTX 3, KTX 4. User Manual Electric Heating KTX 1, KTX 2, KTX 3, KTX 4. KTX 1, KTX 2, KTX 3, KTX 4. User Manual Electric Heating KTX 1, KTX 2, KTX 3, KTX 4. en Our products have been designed and manufactured in such a way to ensure that all the quality, functionality and

More information

User Manual. PO Box 11 Ashton Under Lyne OL6 7TR +44. (0) Fax +44. (0)

User Manual. PO Box 11 Ashton Under Lyne OL6 7TR +44. (0) Fax +44. (0) User Manual PO Box 11 Ashton Under Lyne OL6 7TR +44. (0) 161 621 5960 Fax +44. (0) 161 621 5966 info@atlantic2000.co.uk www.atlanticboilers.com 1 CONTENTS CONTROL STRATEGY GENERAL RULES.. P3 Variable temperature...

More information

OPERATING INSTRUCTIONS with safety features

OPERATING INSTRUCTIONS with safety features Solid fuel boiler TKK3 with wood pellet burner TERMEC 70-90 KW OPERATING INSTRUCTIONS with safety features Prhova ka bb 22310 imanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs

More information

INSTRUCTION MANUAL OF THE SIEMENS CLIMATIX 2 CONTROL EQUIPMENT

INSTRUCTION MANUAL OF THE SIEMENS CLIMATIX 2 CONTROL EQUIPMENT Instruction manual of the control equipment Program version: 2014-01-17 Benekov 04.00 C L I M A T I X 2-1 - CONTENTS 1. Introduction... 3 1.1. TERMINOLOGY AND ABBREVIATIONS... 3 1.2. NUMBER OF HEATING

More information

VERSO-P, VERSO-R Series Air Handling Units with C3 Control System Electrical Installation and Operation Manual

VERSO-P, VERSO-R Series Air Handling Units with C3 Control System Electrical Installation and Operation Manual VERSO-P, VERSO-R Series Air Handling Units with C3 Control System Electrical Installation and Operation Manual EN Table of Contents 1. INSTALLATION MANUAL...3 1.1. Air Handling Units Sections Connection...3

More information

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19 OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER Version DC19 1. Application. Controller RK-2006LPP is designed for temperature control of solid fuel fired water boilers

More information

USER MANUAL S203. Controller for three circuits. - control for 2 heating circuits - 1 domestic hot water control. Saving energy, creating comfort

USER MANUAL S203. Controller for three circuits. - control for 2 heating circuits - 1 domestic hot water control. Saving energy, creating comfort USER MANUAL S203 Controller for three circuits - control for 2 heating circuits - 1 domestic hot water control Saving energy, creating comfort This user manual consists of two parts. Issues that are intended

More information

KitchenAid Food Stream Solutions Classic and Integrated Series

KitchenAid Food Stream Solutions Classic and Integrated Series KitchenAid Food Stream Solutions Classic and Integrated Series KitchenAid Chapter list Installation Range overview Installation General Information Function Compressor Power Control Board Defrosting Heating

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass HM model. With a suitable

More information

Pellet burner PV 180a. User manual

Pellet burner PV 180a. User manual Pellet burner User manual Table of content Table of content...2 Description...5 Fuel...7 Installation...7 Boiler requirements...8 Pellet container...11 Burner...12 External auger...20 Electrical connections...21

More information

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty. ARREDO E BENESSERE So old fashioned... An intelligent choice When on a cold winters night the warm glowing flames of the KALDUS boiler are there to welcome you back home, you will be pleased that you decided

More information

1. COMMISSIONING OF THE BOILER en DESCRIPTION FUNCTION BUTTON DESCRIPTION SYMBOL DISPLAY

1. COMMISSIONING OF THE BOILER en DESCRIPTION FUNCTION BUTTON DESCRIPTION SYMBOL DISPLAY RC 06 0712_1403 it - Istruzioni TELECONTROLLO en - Remote controller instruction hu - Utasítás TÁVVEZÉRLÉS ru - Руководство по эксплуатации pl - Instrukcja obsługi { 1. Commissioning of the boiler 26 2.

More information

GUIDE BOOK MAINTENANCE

GUIDE BOOK MAINTENANCE 1 di 12 10/10/29 10.48 Thermostoves PELLET Edition February 24 Page 1 of 12 GUIDE BOOK MAINTENANCE 2 di 12 10/10/29 10.48 Dear Customer, thanks for the confidence concessaci purchasing a pellet stoves

More information

THESE INSTRUCTIONS SHOULD BE READ CAREFULLY AND RETAINED FOR FUTURE REFERENCE.

THESE INSTRUCTIONS SHOULD BE READ CAREFULLY AND RETAINED FOR FUTURE REFERENCE. TE-700I Installation and Operating Instructions Haverland TOWELS THESE INSTRUCTIONS SHOULD BE READ CAREFULLY AND RETAINED FOR FUTURE REFERENCE. GENERAL RECOMMENDATIONS: * Please read these installation

More information

SWEBO Bioenergy Manual pellet burner PB50 Rev no. Date Page PBM1: (37) Installation and maintenance instructions

SWEBO Bioenergy Manual pellet burner PB50 Rev no. Date Page PBM1: (37) Installation and maintenance instructions PBM1:12 2008-10-16 1 (37) Installation and maintenance instructions PBM1:12 2008-10-16 2 (37) TABLE OF CONTENTS 1 GENERAL INFORMATION... 5 1.1 PELLET STORAGE... 6 1.2 CONSTRUCTION AND FUNCTION... 7 1.2.1

More information

GH10PA USER MANUAL. Program version 01 MANUAL FOR CONTROLLER FOR CONTROLLING CENTRAL HEATING BOILERS FIRED WITH PELLETS AND OATS

GH10PA USER MANUAL. Program version 01 MANUAL FOR CONTROLLER FOR CONTROLLING CENTRAL HEATING BOILERS FIRED WITH PELLETS AND OATS MANUAL FOR CONTROLLER GH10PA FOR CONTROLLING CENTRAL HEATING BOILERS FIRED WITH PELLETS AND OATS Program version 01 USER MANUAL We request that users carefully study applicable Instructions before connecting

More information

CEM-24 Series. Owner's Manual - Installation and Operating Instructions

CEM-24 Series. Owner's Manual - Installation and Operating Instructions CEM-24 Series Owner's Manual - Installation and Operating Instructions Rev. 6.4 01.10 Pipersville, PA 18947 USA Phone: (215) 766-1487 - Fax: (215) 766-1493 Email: support@scillc.com - www.scillc.com Please

More information

USER'S OPERATING INSTRUCTIONS

USER'S OPERATING INSTRUCTIONS SAT-2 Thermostat COOL FAN DRY HEAT AUTO SLEEP SWING AUTO ZONE SUN MON TUE WED THU FRI SAT HEATER ON OFF ERR UNIT USER'S OPERATING INSTRUCTIONS CONTENTS Page Introduction 3 Features Summary 3 Display 4

More information

HEATING TECHNIQUE. Centrometal d.o.o. - Glavna 12, Macinec, Hrvatska, tel: , fax:

HEATING TECHNIQUE. Centrometal d.o.o. - Glavna 12, Macinec, Hrvatska, tel: , fax: HEATING TECHNIQUE Centrometal d.o.o. - Glavna, 006 Macinec, Hrvatska, tel: +8 0 7 600, fax: +8 0 7 6 TECHNICAL INSTRUCTIONS for installation, use and maintenance of hot water boiler and installation of

More information

Combined boiler. for solid fuel and pellets

Combined boiler. for solid fuel and pellets Combined boiler ATTACK WOOD&PELLET for solid fuel and pellets W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK

More information

HEATING TECHNIQUE. Centrometal d.o.o. - Glavna 12, Macinec, Croatia, tel: , fax: C O2=8% 80 C.

HEATING TECHNIQUE. Centrometal d.o.o. - Glavna 12, Macinec, Croatia, tel: , fax: C O2=8% 80 C. HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611 Technical instructions using of REGULATION hot water boiler PelTec / PelTec-lambda 120

More information

Funnel Casing -- ZENON, I M NOT SURE WHAT THIS IS. I CAN DELETE REF- ERENCE TO IT OR PROVIDE SOME DETAIL IF YOU CAN HELP ME UNDER- STAND IT.

Funnel Casing -- ZENON, I M NOT SURE WHAT THIS IS. I CAN DELETE REF- ERENCE TO IT OR PROVIDE SOME DETAIL IF YOU CAN HELP ME UNDER- STAND IT. Table of Contents Boiler Application...3 Installation...3 Understanding the Controller...4 Operating the Boiler for the First Time...4 Controller Menu Hierarchy...6 Controller Power Connections...7 Controller

More information

Eco Angus Wood Pellet Boilers

Eco Angus Wood Pellet Boilers Eco Angus Wood Pellet Boilers ISO 9001 ISO 14001 1 Contents 3 Our product philosophy 3 Our approach 3 Manufacturing credentials 4 Orligno 400 4 Boiler construction 5 Boiler description 5 Burner 6 Technical

More information

2 OPERATION WITH PELLETS AND SPECIAL KIT... 9

2 OPERATION WITH PELLETS AND SPECIAL KIT... 9 INDEX 1 OPERATION WOOD AND CARBON... 4 2 OPERATION WITH PELLETS AND SPECIAL KIT... 9 3 USE AND MAINTENANCE... 23 This manual is intended to assist engineers in the installation and maintenance of the Solida

More information

AVIO kw Export 1 FEATURES. Wall-mounted with storage tank

AVIO kw Export 1 FEATURES. Wall-mounted with storage tank 1 FEATURES Wall-mounted with storage tank Compact wall-mounted open chamber boiler with conventional flue and 45 litre stainless steel storage tank and nominal heat output of 23.7 kw (20,382 kcal/h). AVIO

More information

1 DOCUMENT REVISION CONTROL ELEMENTS... 9

1 DOCUMENT REVISION CONTROL ELEMENTS... 9 CONTENTS Contents 1 DOCUMENT REVISION... 8 2 SOFTWARE VERSION... 8 3 BASIC DESCRIPTION... 8 4 CONTROL ELEMENTS... 9 4.1 BASIC DISPLAYS...10 4.2 CONTROL KEYS...11 4.2.1 Rotary button (Press / Turn)...11

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE)

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass

More information

INSTRUCTIONS MANUAL CONTROLS. Description Power Rating Remarks Steamer. Description Power Rating Remarks Control

INSTRUCTIONS MANUAL CONTROLS.   Description Power Rating Remarks Steamer. Description Power Rating Remarks Control Description Power Rating Remarks Control Rated Power 3 Phases Rated Voltage 3 Phases Rated Power Single Phase Rated Voltage Single Phase Frequency Switching capacity per phase Sauna temperature range Maximum

More information

ISO 9001 TUV CERT CE

ISO 9001 TUV CERT CE ISO 9001 TUV CERT CE INSTRUCTION MANUAL CONTENT 2 1. Boiler application 2. Principle of work 3. Description of the controller 3.1. Front panel of EKOSTER 2 3.2. Main functions of EKOSTER 2 4. Gasification

More information

Elektros montavimo ir eksploatavimo instrukcija 2 Electrical installation and Operation Manual 18 Инструкция по электромонтажу и эксплуатации 34

Elektros montavimo ir eksploatavimo instrukcija 2 Electrical installation and Operation Manual 18 Инструкция по электромонтажу и эксплуатации 34 domekt rego / recu LT RU Elektros montavimo ir eksploatavimo instrukcija 2 Electrical installation and Operation Manual 18 Инструкция по электромонтажу и эксплуатации 34 Content 1. ELECTRICAL INSTALLATION

More information

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS INSTALLATION AND OPERATING INSTRUCTIONS HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS INDEX 1. Technical information... page 3 2. Dimensional and technical characteristics... page 3 3. Packing

More information

INSTRUCTION MANUAL REMOTE CONTROL DEVICE EASYREMOTE

INSTRUCTION MANUAL REMOTE CONTROL DEVICE EASYREMOTE INSTRUCTION MANUAL REMOTE CONTROL DEVICE EASYREMOTE Technical features Guide to LCD symbols Guide to keys Technical features Supply by communication bus Number of temperature levels 2 (DAY / NIGHT) Temperature

More information

SD2. Differential Controller. Operating and Installation Instructions F2 72.3

SD2. Differential Controller. Operating and Installation Instructions F2 72.3 SD2 Differential Controller Operating and Installation Instructions F2 72.3 i Please follow the safety information and read these Instructions carefully before putting the system into operation. Safety

More information

FIREWOOD HOT WATER CENTRAL HEATING BOILERS MODEL: STADLER TR

FIREWOOD HOT WATER CENTRAL HEATING BOILERS MODEL: STADLER TR FIREWOOD HOT WATER CENTRAL HEATING BOILERS MODEL: STADLER TR STADLER TR firewood hot water central heating boilers provide comfortable and energy saving heating. Such heating is enabled with integration

More information

EasyTech.One Temperature Controller for Pellet Burner

EasyTech.One Temperature Controller for Pellet Burner EasyTech.One Temperature Controller for Pellet Burner Burner 1 INTRODUCTION... 3 2 ELECTRICAL CONNECTIONS... 3 3 CONTROL PANEL: USE AND FUNCTIONS... 5 3.1 LED... 5 3.2 BUTTONS... 5 3.3 ALARMS... 5 3.1

More information

PELLETS BURNER 15-60kW MOC

PELLETS BURNER 15-60kW MOC PELLETS BURNER 15-60kW MOC. Please read those documentation before first start up the unit. Improper burner start may lead to its damage and may create a danger for end user! Table of Contents: 1. Admission

More information

HEATING TECHNIQUE PRODUCT CATALOGUE

HEATING TECHNIQUE PRODUCT CATALOGUE HEATING TECHNIQUE PRODUCT CATALOGUE about us Dear Colleagues, dear present and future users of our products A high quality product, effective use of the energy, protection of the environment and very satisfied

More information

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL Heating, Air Conditioning, Ventilation Отопление-Кондиционеры-Вентиляция MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL 1. Usage MTM 8-30 universal oil heater is designed for heating commercial rooms

More information

Electronic pellet burner controller - NPBC-V3M. Electronic Pellet Burner Controller NPBC-V3M

Electronic pellet burner controller - NPBC-V3M. Electronic Pellet Burner Controller NPBC-V3M Electronic Pellet Burner Controller NPBC-V3M page 1 of 11 INTRODUCTION NPBC-V3M is an advanced, functionally completed controller for pellet burners. All the mechanisms and sensors of the burner, as well

More information

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders Operation and maintenance manual for the KSP Spark series boilers equipped with feeders Thank you for purchasing PEREKO heating boiler. This documentation applies to the KSP Pelet boilers with fuel feeder

More information

GAS AND PELLET BURNERS

GAS AND PELLET BURNERS GAS AND PELLET BURNERS PIZZA OVENS BREAD OVENS - BOILERS HOT AIR GENERATOR WWW.FORNOLEGNAMATIC.IT WWW.CASADELBRUCIATORE.IT WWW.FORNIPIZZERIA.COM INDEX PELLET GRANVULCANO B-H SQUARE & B-H ROUND SUPERTERMICO

More information

Operating Instructions Manual Janfire NH/Integral Pellets Burner with External Auger

Operating Instructions Manual Janfire NH/Integral Pellets Burner with External Auger Operating Instructions Manual Janfire NH/Integral Pellets Burner with External Auger 11899008 R1 EN Janfire 2008 Due to constant development, Janfire AB reserves the right to change part or parts of this

More information

SPECIFICATIONS - NIKE

SPECIFICATIONS - NIKE Wall-mounted instant boilers NIKE Mini kw Special is the ideal Immergas solution for modern building and wherever space is limited and has to be made the most of. Simple to use and easy to install, thanks

More information

Elegance. SMT-700 User manual. Ver

Elegance. SMT-700 User manual. Ver Elegance SMT-700 User manual Ver 3.0. 0807 Congratulations on the purchase of your new Thermostat! Your new air conditioning system thermostat has been built using the best components and design philosophy

More information

Installation and user manual

Installation and user manual Installation and user manual Please read carefully and retain for future reference Models EcoHeat: C3, C5, C6, C8, C9, C11, C12 Rev.1_09-07-15 Page 1 Table of Contents 1 IMPORTANT: WARNINGS 1.1 GENERAL

More information

Daikin Altherma high temperature remote controller guide for schedule timers and operation functions

Daikin Altherma high temperature remote controller guide for schedule timers and operation functions Daikin Altherma high temperature remote controller guide for schedule timers and operation functions 13 14 15 16 17 1 12 2 11 10 9 3 4 8 7 6 5 1. Space heating on/off 2. Target flow water temperature /

More information

h is ngl E ASSISTANCE CENTRE AUTHORIZED RETAILER

h is ngl E ASSISTANCE CENTRE AUTHORIZED RETAILER Softcooker_03 Ed. 09/2015 Roner R FOREWORD - This manual was drawn up to provide the Customer with information concerning the machine and applicable standards, as well as instructions on operation and

More information

Modbus RTU RS485 Manual

Modbus RTU RS485 Manual Modbus RTU RS485 Manual AUTOMATED FUEL MAINTENANCE SYSTEMS FTI-5A, FTI-10A, FTI-20A FUEL TECHNOLOGIES INTERNATIONAL 06/10/2014 Rev B - Fuel Technologies - Modbus The Modbus Communications Setup Button

More information

TERMOPELLET TP30. PELLET BOILERS User manual

TERMOPELLET TP30. PELLET BOILERS User manual TERMOPELLET TP30 PELLET BOILERS User manual Read the instructions carefully before installation, use and maintenance. The instruction book is an integral part of the product. 2 Congratulations! You are

More information

EBC20. Instructions for fitting, installation and operation. Read and save these instructions!

EBC20. Instructions for fitting, installation and operation. Read and save these instructions! EBC20 UK Instructions for fitting, installation and operation Read and save these instructions! 2 3002878 EBC20 UK 290415 1. Product information............................................... 4 1.1 Delivery.............................................................

More information

OWNER S MANUAL. Rev. C

OWNER S MANUAL. Rev. C OWNER S MANUAL AIR HEATER A2/A4 Rev. C Table of Contents 1 Introduction... 1 1.2 Components and Basic Operation... 1 1.3 Start Sequence of Operation... 2 1.4 Shut Down Sequence of Operation... 3 2 Safety

More information

BIOPLEX MCL-BIO INSTALLATION AND SERVICE MANUAL

BIOPLEX MCL-BIO INSTALLATION AND SERVICE MANUAL BIOMASS-SOLID FUEL RETORT BOILER BIOPLEX MCL-BIO INSTALLATION AND SERVICE MANUAL VERSION: 2.1 UPDATE: 10.10.2013 Contents 1. GENERAL INFORMATION... 3 1.1. Proper use of the appliance... 3 1.2. Safety warnings...

More information

Electronic Pellet Burner Controller NPBC-V3C-K NPBC-V4C-K

Electronic Pellet Burner Controller NPBC-V3C-K NPBC-V4C-K Electronic Pellet Burner Controller FOR DRY PELLET STOVE NPBC-V3C-K NPBC-V4C-K SOFTWARE VERSION 46/2 CHANGES IN MANUAL FOR THE WORK AND THE SOFTWARE OF THE CONTROLLER User Manual version 3.2 Changes 3.3

More information

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS Before using the heater, read and understand all instructions and follow them carefully. The manufacturer is not responsible for damages to goods

More information

Dryer Controller M720

Dryer Controller M720 User Manual Dryer Controller M720 Hardware version 2.00 Software version 2.00 Manual M720 Dryer controller Page 1 of 60 Document history Preliminary version: - Created in April, 2009 Hardware Version 2.00,

More information

TF1800 Thermofan Installation Guide YOUR STEP-BY-STEP GUIDE TO THE PERFECT INSTALLATION

TF1800 Thermofan Installation Guide YOUR STEP-BY-STEP GUIDE TO THE PERFECT INSTALLATION ! PLEASE ENSURE YOU HAVE READ AND FULLY UNDERSTOOD THIS GUIDE BEFORE INSTALLATION! TF1800 Thermofan Installation Guide YOUR STEP-BY-STEP GUIDE TO THE PERFECT INSTALLATION BATHROOM FAN HEATERS Introduction

More information

WOOD CHIP HEATING HPK-RA

WOOD CHIP HEATING HPK-RA HPK-RA -60 HPK-RA -60 TÜV certified 8 0 9 7 Efficiency of all boilers on full and part load operation more than 90%. 6 WOOD CHIP BOILER HPK-RA DESCRIPTION Cell wheel Wood chip burner in high-quality heat-resistant

More information

Installation & User s Instructions

Installation & User s Instructions Installation & User s Instructions 8 080 shown Part No. 00 day Wired Digital Programmer & Room Sensor Part No. 080 day Wireless Digital Programmer & Room Sensor Part No. 00 hr Wireless Digital Programmer

More information

STILE BEAUTY AND TECHNOLOGY

STILE BEAUTY AND TECHNOLOGY STILE BEAUTY AND TECHNOLOGY STILE, in line with your style Designer White Bordeaux Silver Grey MODEL Nominal input kw Nominal output kw Output to the water min. / max. kw HYDRONIC PELLET FIRE SPACE HEATING

More information

Thermo 230 / 231 / 300 / 301 / Troubleshooting

Thermo 230 / 231 / 300 / 301 / Troubleshooting Thermo 230 / 231 / 300 / 301 / 350 5 Troubleshooting 5 Troubleshooting 5.1 General This section describes troubleshooting procedures for the heaters Thermo 230, 231, 300, 301 and 350. CAUTION Troubleshooting

More information

Corn Flame Energy Corn Stove Model 3000

Corn Flame Energy Corn Stove Model 3000 Corn Flame Energy Corn Stove Model 3000 Installation and Operation Guide Read thoroughly before starting installation Save this manual for future reference SAFETY NOTICE If this stove is not properly installed,

More information

Operation manual. Daikin Altherma Low temperature split EHBH04CBV EHBH08CBV EHBH11CBV EHBH16CBV

Operation manual. Daikin Altherma Low temperature split EHBH04CBV EHBH08CBV EHBH11CBV EHBH16CBV EHBH04CBV EHBH08CBV EHBH11CBV EHBH16CBV EHVH04S18CBV EHVH08S18CBV EHVH08S26CBV EHVH11S26CBV EHVH16S26CBV English Table of contents Table of contents 1 About this document 2 2 About the system 2 2.1 Components

More information

OPERATION MANUAL. Indoor unit for air to water heat pump and sanitary warm water tank for air to water heat pump system EKHBH007A EKHBX007A

OPERATION MANUAL. Indoor unit for air to water heat pump and sanitary warm water tank for air to water heat pump system EKHBH007A EKHBX007A OPERATION MANUAL Indoor unit for air to water heat pump and sanitary warm water tank for air to water heat pump system EKHBH007A EKHBX007A EKHBH007A*** EKHBX007A*** Indoor unit for air to water heat pump

More information

SWEBO Bioenergy Manual pellet burner PB20 Rev no. Date Page PBM1: (36) Installation and maintenance instructions

SWEBO Bioenergy Manual pellet burner PB20 Rev no. Date Page PBM1: (36) Installation and maintenance instructions PBM1:12 2018-01-22 1 (36) Installation and maintenance instructions PBM1:12 2018-01-22 2 (36) TABLE OF CONTENTS 1 GENERAL INFORMATION... 5 1.1 PELLET STORAGE... 5 1.2 CONSTRUCTION AND FUNCTION... 6 1.2.1

More information

100 step modulated Wood Pellet Boiler

100 step modulated Wood Pellet Boiler 100 step modulated Wood Pellet Boiler EN 303-5 approved by DTI (Danish Technological Institute) Approved for pressure expansion Energy class AA Approved www.kedco.ie Kedco Boiler Manual Version 1.3 Page

More information

Optional Optional. Min 20W, max 100W. Only resistive load or dimmable (phase control compatible) light bulb. Dimmer optional

Optional Optional. Min 20W, max 100W. Only resistive load or dimmable (phase control compatible) light bulb. Dimmer optional Description Power Rating Remarks Control Rated Power 3 Phases Rated Voltage 3 Phases Rated Power Single Phase Rated Voltage Single Phase Frequency Switching capacity per phase Sauna temperature range Maximum

More information

natural warmth of the house A compact boiler designed to combust ecological fuel- pellet ORLIGNO 500 Compliant with EN norm

natural warmth of the house A compact boiler designed to combust ecological fuel- pellet ORLIGNO 500 Compliant with EN norm natural warmth of the house A compact boiler designed to combust ecological fuel- pellet ORLIGNO 500 Compliant with EN 330-5 norm Biomass - the curse of energetics or the only fuel of the future? The real

More information

TERMO-Blok TERMO-Extra TERMO-Blok PTV

TERMO-Blok TERMO-Extra TERMO-Blok PTV TRGOVINA TERMOSTROJ d.o.o. 10250 Lučko, F. Puškarića 1d Tel/Fax +385 1 6531-008, 6531-015, 6531-016 Eurposka unija e-mail: info@termostroj.com web: http://www.termostroj.com European Union ELECTRIC BOILERS

More information

Instruction manual. Aluminium radiator with ceramic heart. Smart Electric Heaters

Instruction manual. Aluminium radiator with ceramic heart. Smart Electric Heaters Instruction manual Aluminium radiator with ceramic heart Smart Electric Heaters READ THIS CAREFULLY BEFORE USING THIS DEVICE FOR THE FIRST TIME. PAY ATTENTION: to avoid overheating, do not cover the appliance.

More information

Installation & Operating Manual ZM kW Universal Oil Heater. ZMH Ltd t/a Z M Heaters T (0)

Installation & Operating Manual ZM kW Universal Oil Heater. ZMH Ltd t/a Z M Heaters  T (0) Installation & Operating Manual ZM-130 16 32kW Universal Oil Heater OVERVIEW Dfdfdfdsfd Dfdfffdfdf Dfdfdf 4 1. Overheat thermostat 2. Combustion chamber lid 3. Oil feed line 4. Activation thermostat 5.

More information

Description... 2 Construction... 2 Size and weight... 3 Installation and placement... 4

Description... 2 Construction... 2 Size and weight... 3 Installation and placement... 4 These technical conditions will specify produced sizes and solution of the "Ventilating VBM-V box". This applies to production, design, ordering, supplies, assembly, operation and maintenance. Description...

More information

/2010 US/CA

/2010 US/CA 6 720 646 148-11/2010 US/CA (en) For the user User s Instructions Condensing gas boiler Logamax plus GB162-L.B. 80 kw/100 kw Please read thoroughly before operating This manual is available in the English

More information

PELLET BOILER USER AND MAINTENANCE MAN

PELLET BOILER USER AND MAINTENANCE MAN d.o.o., Bage br. 3, 70101 Jajce, Bosna i Hercegovina, Tel/Fax: 030 657-100 www.thermoflux.ba tfinfo@thermoflux.ba PELLET BOILER USER AND MAINTENANCE MAN 2 Content: Content:... 3 1 Notes on the manual...

More information

Type UCG/UDG. English...1 Français...7 Español Up button. OK button. Down button

Type UCG/UDG. English...1 Français...7 Español Up button. OK button. Down button USER MANUAL Type UCG/UDG 57116D 06/12 (MBC) 1.10 2012 OJ Electronics A/S...1 Français...7 Español... 14 Type UCG/UDG Contents Introduction...1 First Time Settings...1 Ground Fault Circuit Interrupter (GFCI)...1

More information

WOOD CHIP HEATING HPK-RA

WOOD CHIP HEATING HPK-RA WOOD CHIP HEATING HPK-RA -60 Wood Chip Heating HPK-RA -60 TÜV certified 8 0 9 7 Efficiency of all boilers on full and part load operation more than 90%. 6 WOOD CHIP BOILER HPK-RA Description Cell wheel

More information

TABLE OF CONTENTS. IMPORTANT Please read this manual carefully.

TABLE OF CONTENTS. IMPORTANT Please read this manual carefully. User s Manual TABLE OF CONTENTS 1) GENERAL INFORMATION page 5 2) OPERATING INSTRUCTIONS page 8 3) TIME CLOCK page 11 4) USEFUL INFORMATION AND TROUBLESHOOTING page 13 B003 IMPORTANT Please read this manual

More information