Operating manual Incl. Manufacturer s declaration. Diffusion pump. with optional baffle DIF 320 BP BE (9906) 1

Size: px
Start display at page:

Download "Operating manual Incl. Manufacturer s declaration. Diffusion pump. with optional baffle DIF 320 BP BE (9906) 1"

Transcription

1 Operating manual Incl. Manufacturer s declaration Diffusion pump with optional baffle DIF 320 BP BE (9906) 1

2 Product identification In all communications with Pfeiffer Vacuum, please specify the information given on the product nameplate. For convenient reference transfer this information into the diagram below. Typ: DIF 320 No: PT D F-No: V VA Hz Validity This document applies to products with part number PT D The part number can be taken from the product nameplate. We reserve the right to make technical changes without prior notice. Intended use Diffusion pumps are used for generating high vacuum. 2 BP BE (9906) DIF320.om

3 Table of contents Product identification 2 Validity 2 Intended use 2 1 Description Overview Function Using a diffusion pump in a pumping station 5 2 Safety Symbols used Personnel qualifications Safety information Liability and warranty 7 3 Technical data 8 4 Installation Filling the pump fluid Vacuum connection Cooling water connection Power connection Mounting the thermostatic cut-out Mounting the thermal switch 22 5 Initial start up 23 6 Operation 24 7 Deinstallation 26 8 Troubleshooting Resetting the thermostatic cut-out (option) 33 9 Maintenance / Repair Checking the pump fluid level Replenishing the pump fluid Cleaning the diffusion pump, replacing the jet system Replacing the heating plate Options Cooling water flow monitor Thermostatic cut-out Thermal switch Baffle Pump fluid replenishing device Consumables / Spare parts Pump fluid Seal set Heating plate Heater contact paste Jet system Decommissioning Returning the product 50 Declaration of Contamination 51 Manufacturer s declaration 52 For cross references within this document, the symbol ( XY) is used. BP BE (9906) DIF320.om 3

4 1 Description 1.1 Overview High vacuum flange Cooling water connection (return) Housing Mounting base for thermostatic cut-out Connection for pump fluid replenishing device (see options) Terminal box Fore vacuum flange Sight glass for checking the pump fluid level Mounting base for thermal switch Cooling water connection (supply) Fore vacuum baffle reducing the pump fluid consumption at high gas throughput Cold cap reducing pump fluid backstreaming from the diffusion pump into the vacuum chamber Jet system accelerating and guiding the pump fluid vapor Heater for heating the pump fluid Thermostatic cut-out The thermostatic cut-out (option) prevents overheating of the diffusion pump. Thermal switch The thermal switch (option) is used in conjunction with a pumping station control. It signals to the pumping station control that the pump has attained normal operating temperature. Depending on the pump fluid the operating temperature on the mounting base is between 150 C and 180 C. 4 BP BE (9906) DIF320.om

5 1.2 Function Pump fluid circuit The pump fluid vapor stream is accelerated by the jet system and directed toward the cooled housing at a specific angle Flow direction of the gas molecules The pump fluid condenses at the cooled housing wall and flows as a thin oil film back to the evaporating chamber Purification zone The heater heats the pump fluid in the evaporating chamber up to the evaporation point Evaporating chamber Pumping principle The fore vacuum pressure ensures that the pump fluid vapor stream spreads within the diffusion pump. Gas molecules from the high vacuum flange area that enter the pump fluid stream receive an impulse in the direction of the vapor stream which results in a pump effect. In the process gas molecules can diffuse into the pump fluid. When flowing back to the evaporating chamber the pump fluid passes through a zone of elevated temperature, the purification zone, so that light contamination and the pumped out gases are separated from the pump fluid by a tempe - rature increase and are also conducted to the roughing pump. 1.3 Using a diffusion pump in a pumping station Example of a vacuum diagram: Vacuum chamber Vent valve Bypass valve High vacuum gauge Fore vacuum gauge High vacuum valve Baffle Bypass line Diffusion pump Fore vacuum valve Fore vacuum gauge Roughing pump Fore vacuum gauge BP BE (9906) DIF320.om 5

6 2 Safety 2.1 Symbols used DANGER Information on preventing any kind of physical injury. WARNING Information on preventing extensive equipment and environmental damage. Note Information on correct handling or use. Disregard can lead to malfunctions or minor equipment damage. 6.1 Dimensions in mm 2.2 Personnel qualifications Skilled personnel All work described in this document may only be carried out by persons who have suitable technical training and the necessary experience or who have been instructed by the custodian of the product. 6 BP BE (9906) DIF320.om

7 2.3 Safety information Adhere to the applicable regulations and take the necessary precautions for the process media used. Consider possible reactions between the materials ( 8) and the process media. Consider possible reactions of the process media due to the heat generated by the product. Adhere to the applicable regulations and take the necessary precautions for all work you are going to do and consider the safety information in this document. Before you begin to work, find out whether any vacuum components are contaminated. Adhere to the relevant regulations and take the necessary precautions when handling contaminated parts. Pass on the safety information to other users. 2.4 Liability and warranty Pfeiffer Vacuum assumes no liability and the warranty becomes null and void if the custodian or third parties disregard the information in this document use the product in a non-conforming manner make any kind of changes (modifications, alterations etc.) to the product use the product with accessories not listed in the corresponding product documentation. The custodian assumes the responsibility in conjunction with the process media used. BP BE (9906) DIF320.om 7

8 3 Technical data Diffusion pump DIF 320 Vacuum connection High vacuum flange Clamping flange Fore vacuum flange Clamping flange DN 320 ISO-K DN 63 ISO-K Power input Line voltage Frequency Power consumption / VAC 50 Hz 4.4 kw Characteristics Pumping speed for air 1) at mbar Pumping speed for air 1) at mbar Working range Fore vacuum stability 3500 l/s 10 mbar l/s mbar 0.5 mbar Pump fluid Pump fluid filling capacity minimum optimum maximum Pump fluid consumption 1200 cm cm cm g/mbar l Roughing pump Recommended pumping speed of the roughing pump 2) with intake pressures 3) above 10-4 mbar below 10-4 mbar 120 m 3 /h 60 m 3 /h General Heating time 17 min. Cooling time 50 min. Cooling water requirements 16 Materials Housing Jet system Weight stainless steel Al 55 kg 1) 2) 3) Values measured with synthetic oil 71 A according to Pneurop or DIN Two-stage rotary vane pumps or pump combinations of one- or two-stage rotary vane pumps and roots pumps are recommended as roughing pumps. In continuous operation. 8 BP BE (9906) DIF320.om

9 Dimensions DN 320 ISO-K DN 63 ISO-K ø 323 High vacuum connection Fore vacuum connection Sight glass Cooling water connection ø13 mm Power connection BP BE (9906) DIF320.om 9

10 4 Installation Visual check DANGER Caution: damaged product Putting a damaged product into operation can be extremely dangerous. Do not install the product if there is any visible damage. Protective screen DANGER Caution: hot surface In operation the diffusion pump is heated up to 220 C. Touching the lower housing section can cause burns. Install the diffusion pump in such a way that inadvertent contact with the pump is not possible (protective screen available on request). Transport DANGER 55 kg Caution: heavy product (55 kg) Physical injury can result if the product is lifted and transported by only one person. The product must be lifted and transported in accordance with the rules and guidelines applicable in the country of installation. 10 BP BE (9906) DIF320.om

11 Installation location WARNING Caution: fire hazard Due to the thermal radiation of the heater, parts in close proximity can ignite. If there is less than 150 mm of clearance between the bottom of the housing and the base plate, thermal insulation pads must be installed. >150 mm BP BE (9906) DIF320.om 11

12 4.1 Filling the pump fluid Note Caution: vacuum component Dirt and damages impair the function of the vacuum component. When handling vacuum components, take appropriate measures to ensure cleanliness and prevent damages. Note Caution: dirt sensitive area Dirt prolongs the pumpdown process. Always wear clean, lint-free gloves and use clean tools when working in this area. Pump fluid Pump fluid change Selection criteria As the diffusion pump is supplied in cleaned condition, any of the pump fluids listed below can be chosen. The diffusion pump must be cleaned whenever the pump fluid is changed ( 36). The choice of pump fluid depends on the vacuum engineering application. The table below lists some of the relevant selection criteria. Preferred vacuum range Mineral oil Synthetic oil Silicone oil Pentaphenyl ether 61 A 71 A DC 704 AN 175 Santovac 5 mbar mbar mbar mbar mbar Resistance to chemicals good good superior superior excellent Resistance to oxidation good good superior superior excellent Resistance to thermal decomposition good good superior superior excellent Theor. vapor pressure at 20 C mbar mbar mbar mbar mbar Additional information can be found in the catalog. Ordering numbers 48. Filling Remove the protective cap and fore vacuum baffle Protective cap 12 BP BE (9906) DIF320.om

13 Fill in the pump fluid through the fore vacuum port until the optimum pump fluid level is attained. Note Make sure the diffusion pump is positioned upright when you fill in the fluid. The pump fluid spreads only slowly within the diffusion pump. For this reason the actual pump fluid level can be read only 3 min. after. Pump fluid filling capacities: maximum 1800 cm 3 optimum 1500 cm 3 minimum 1200 cm 3 Install the fore vacuum baffle and mount the protective cap. Protecive cap BP BE (9906) DIF320.om 13

14 4.2 Vacuum connection Note Caution: vacuum component Dirt and damages impair the function of the vacuum component. When handling vacuum components, take appropriate measures to ensure cleanliness and prevent damages. Note Caution: dirt sensitive area Dirt prolongs the pumpdown process. Always wear clean, lint-free gloves and use clean tools when working in this area. Note Keep the protective cover and put it in place again when the product is removed from the vacuum system. Mounting plane The diffusion must be installed perpendicularly. 14 BP BE (9906) DIF320.om

15 4.2.1 High vacuum connection The high vacuum connection is established via a DN 320 ISO-K clamping flange after the protective cap has been removed. SW19 Clamps: 2 sets of 4 pieces ordering number BP T DN 320 ISO-K O-ring, Viton AN 455 ø (included) Protective cap Additional information can be found in the catalog Fore vacuum connection The fore vacuum connection is established via a DN 63 ISO-K clamping flange after the protective cap has been removed. SW17 Clamps: 1 set of 4 pieces ordering number BP T DN 63 ISO-K O-ring, Viton AN 337 ø (included) Protective cap Additional information can be found in the catalog. BP BE (9906) DIF320.om 15

16 4.3 Cooling water connection To achieve optimum cooling of the diffusion pump the following parameters are relevant: Required cooling water pressure in the feeder line Cooling water temperature in the return line 30 C Connection for return line Connection for feeder line Cooling water requirements As the cooling water temperature in the return line can only be determined during operation we recommend a presetting based on the following diagram: Minimum water requirements with a cooling water temperature of 30 C in the return line [l/h] C 20 C 12 C [bar] Cooling water temperature in feeder line [ C] p pressure drop in cooling water circuit Note Also take into consideration the pressure drop in the feeder line and return line of the cooling water circuit. 16 BP BE (9906) DIF320.om

17 Cooling water requirements According to document BB BN Connection A shut-off valve must be installed in the feeder line; a flow monitor should be provided for the return line. Note Make sure that the cooling water hoses do not touch the housing. Flow monitor (see options on page 46) Return line Shut-off valve Feeder line BP BE (9906) DIF320.om 17

18 4.4 Power connection The power connection is established via the terminals in the terminal box. Before connection make sure that your local line voltage agrees with the ratings on the name plate ( 2). If your line voltage differs please contact your nearest Pfeiffer Vacuum Service Center. Personnel qualifications Skilled personnel The power connection may only be established by a skilled electrician. Connecting the diffusion pump Open the terminal box. Depending on the line voltage (3 400 VAC / VAC) the jumper wires must be connected VAC Star connection (factory setting) VAC Delta connection 18 BP BE (9906) DIF320.om

19 Select the cable type. The cable must withstand a temperature of 60 C and must be flexible. Line voltage Current Conductor cross-section *) Cable VAC 11 A 1.5 mm 2 (3P+PE) VAC 6.4 A 1 mm 2 (3P+PE) *) Conductor cross-section according to EN Prepare the cable. Skin jacket and cut to length. Strip insulation. ø 4.2 Twist strands, mount terminal sleeves and eyelet. Crimp terminal sleeves and eyelet. Pull the cable into the terminal box and clamp the conductors. L 3 L 1 L 2 BP BE (9906) DIF320.om 19

20 Tighten the cable gland so that it seals well. Tighten the cable strain relief. 20 BP BE (9906) DIF320.om

21 Close the terminal box. Connect the power cable to the control system. Note Install the power cable in accordance with the national regula - tions. BP BE (9906) DIF320.om 21

22 4.5 Mounting the thermostatic cut-out The thermostatic cut-out is fastened to the mounting base with two M4 screws. M4 39 Thermostatic cut-out (see options page 46) 4.6 Mounting the thermal switch The thermal switch is fastened to the mounting base with two M4 screws. M4 27 Thermal switch (see options page 46) 22 BP BE (9906) DIF320.om

23 5 Initial start up Preconditions Diffusion pump installed ( 10). Thermostatic cut-out connected to the pumping station control. Thermal switch connected to the pumping station control. Pumping station ready for operation. Procedure First time operation Check the pump fluid level ( 2 35). 0.1 mba r Pump down the vacuum system to 0.1 mbar. C + 30 C Diffusion pump ready for use Start the water cooling (open the shut-down valve). Start the heater. Wait for the pump to heat up ( 2 8). Depending on the pump fluid, the pump heats up to an operating temperature of 150 C C on the mounting base of the thermal switch. Set the thermal switch (option) in accordance with the separate instructions. Check the cooling water temperature in the return line. Increase the cooling water flow if the cooling water temperature in the return line exceeds 30 C. BP BE (9906) DIF320.om 23

24 6 Operation DANGER C Caution: hot surface Touching the hot surface (up to 220 C) can cause burns. Wear protective gloves. WARNING Caution: fire hazard Easily ignitable material located near the diffusion pump can catch fire. Do not store any easily ignitable material near the diffusion pump. WARNING Caution: fire hazard Hot pump fluid can ignite under atmospheric conditions. Never expose hot pump fluid to atmospheric pressure, that is, the diffusion pump may not be vented during operation. Overview Example of a vacuum diagram: Vacuum chamber Vent valve Bypass valve High vacuum gauge Fore vacuum gauge High vacuum valve Baffle Bypass line Diffusion pump Fore vacuum valve Fore vacuum gauge Roughing pump Fore vacuum gauge 24 BP BE (9906) DIF320.om

25 Switching on the diffusion pump Switch on Check the pump fluid level ( 2 35). 0.1 mbar Pump down the vacuum system to 0.1 mbar. Diffusion pump ready for use Start the water cooling (open the shut-off valve). Start the heater. After expiration of the heat-up time ( 2 8), the diffuision pump is ready for operation. Conditions for a ready diffusion pump together with a pumping station During the heating time the high vacuum valve must be closed. When the diffusion pump is ready for operation the high vacuum valve may be opened only when the vacuum chamber has been pumped down to 0.1 mbar. When the high vacuum valve and the fore vacuum valve are closed the diffu - sion pump can be kept in ready condition as long as the fore vacuum pressure in the diffusion pump does not increase above the fore vacuum stability of 0.5 mbar. Switching off the diffusion pump Switch off Switch off the heater. Wait for the pump to cool down ( 2 8). After expiration of the cooling time, switch off the water cooling (close the shut-off valve). Diffusion pump shut down Conditions for a shut down diffusion pump together with a pumping station After the heater has been switched off the high vacuum and fore vacuum valve should immediately be closed. Shutdown The entire vacuum system should preferably be shut down in evacuated condition. Unnecessary venting increases the desorption rate of the internal walls and the pump fluid. BP BE (9906) DIF320.om 25

26 7 Deinstallation Mains voltage DANGER Caution: mains voltage Working on live parts is extremely hazardous. The control must be switched off and protected against inadvertent power on before the terminal box is opened. Contamination DANGER Caution: contaminated parts Contaminated parts can be detrimental to health. Before you begin to work, find out whether any parts are contami - nated. Adhere to the relevant regulations and take the necessary precautions when handling contaminated parts. Transport DANGER 55 kg Caution: heavy product (55 kg) Physical injury can result if the product is lifted and transported by only one person. The product must be lifted and transported in accordance with the rules and guidelines applicable in the country of installation. Pump fluid DANGER Caution: pump fluid Skin contact with the pump fluid can cause allergic reactions. Wear synthetic gloves. Skilled electrician Skilled personnel The power connection must be detached by a skilled electrician. Note Caution: vacuum component Dirt and damages impair the function of the vacuum component. When handling vacuum components, take appropriate measures to ensure cleanliness and prevent damages. 26 BP BE (9906) DIF320.om

27 Preconditions Diffusion pump switched off ( 25) and cooled down to room temperature Vacuum system vented Control system switched off Procedure Open the terminal box. Unfasten the cable strain relief. BP BE (9906) DIF320.om 27

28 Unfasten the cable gland. Detach the conductors and remove the cable. 28 BP BE (9906) DIF320.om

29 Close the terminal box. - Close the shut-off valve in the feeder line. - Detach the hoses and drain the cooling water circuit. Cooling water circuit Return line Close Residual water drains Shut-off valve Feeder line BP BE (9906) DIF320.om 29

30 Detach the vacuum connections. SW19 SW17 Remove the fore vacuum baffle. 30 BP BE (9906) DIF320.om

31 Remove the cold cap. Allen wrench size 5 Pull out the jet system. Note Caution: deformation of parts The thin-walled aluminum parts are susceptible to deformation. The aluminum parts must be treated with special care. BP BE (9906) DIF320.om 31

32 Drain the operating fluid. WARNING N Caution: substances detrimental to the environment Products, operating materials etc. may have to be specially decommissioned. For environmentally compatible disposal, please contact your nearest Pfeiffer Vacuum Service Center. Reinstall the jet system, cold cap and fore vacuum baffle. Mount the protective cap and cover. 32 BP BE (9906) DIF320.om

33 8 Troubleshooting Troubleshooting Pumping speed inadequate Ultimate pressure inadequate Heater does not function Insufficient or excessive pump fluid Pump fluid contaminated Pump fluid contaminated Cooling water insufficient or too warm Leak in vacuum system Heating plate defective Thermostatic cut-out tripped Poor heater support Cooling water requirements 2 16 Remedy the leak Check the pump fluid level Clean the diffusion pump Clean the diffusion pump Replace the heating plate Reset the thermostatic cut-out Maintenance / Repair 2 34 Section Resetting the thermostatic cut-out (option) If the heating has been switched off by the thermostatic cut-out (option) proceed as follows: Increase the cooling water flow Allow the diff pump to cool off for 2 min. Press the reset button BP BE (9906) DIF320.om 33

34 9 Maintenance / Repair Maintenance / Repair Checking the pump fluid level Cleaning the diffusion pump Replacing the heating plate Switch off the diffusion pump 2 25 Remove the pump 2 26 Check the pump fluid level and replenish, if necessary Clean the diffusion pump Replace the heating plate DANGER Caution: contaminated parts Contaminated parts can be detrimental to health. Before you begin to work, find out whether any parts are contami - nated. Adhere to the relevant regulations and take the necessary precautions when handling contaminated parts. DANGER Caution: pump fluid Skin contact with the pump fluid can cause allergic reactions. Wear synthetic gloves. Note Caution: vacuum component Dirt and damages impair the function of the vacuum component. When handling vacuum components, take appropriate measures to ensure cleanliness and prevent damages. 34 BP BE (9906) DIF320.om

35 9.1 Checking the pump fluid level Depending on the process conditions each diffusion pump has a pump fluid consumption, which is proportional to the pumped gas flow. Note The pump fluid level can only be checked when the diffusion pump is cold. Pump fluid filling capacities: maximum 1800 cm 3 optimum 1500 cm 3 too low < 1200 cm 3 see section Replenishing the pump fluid, The pump fluid should only be replenished if processes are performed in which the evolution of products that impair the quality of the pump fluid does not exceed the purification ability of the diffusion pump. In all other cases the pump fluid should be changed. The diffusion pump should always be cleaned before the pump fluid is changed. Precondition Diffusion pump switched off ( 25) and cooled down to room temperature Vacuum system vented Procedure Detach the fore vacuum connection. Fill in the pump fluid ( 12). Reestablish the fore vacuum connection. BP BE (9906) DIF320.om 35

36 9.3 Cleaning the diffusion pump, replacing the jet system As the cleaning intervals depend strongly on the implemented vacuum process, no generally valid maintenance schedules can be prepared. Under clean vacuum conditions and at operating pressures of <10-4 mbar, diffusion pumps can be operated several 1000 hours without cleaning. When the diffusion pump is cleaned, the related components (valves, lines, etc.) should also be cleaned. Precondition Diffusion pump removed and pump fluid drained ( 26). Disassembling the jet system Unfasten the lock nut. counterhold SW 13 Unfasten the hexagon nut. SW BP BE (9906) DIF320.om

37 Disassemble the jet system. Do not adjust the nozzle gap setting screws ( 2 38). Do not adjust the nozzle gap setting screws ( 2 38). 10 cup springs ø20 / mm BP BE (9906) DIF320.om 37

38 Cleaning Clean the jet system, fore vacuum baffle, cold cap and the inside of the diffusion pump. DANGER Caution: cleaning agents Cleaning agents can be detrimental to health and environment. Adhere to the relevant regulations and take the necessary pre - cautions when handling and disposing of cleaning agents. Consider possible reactions with the product materials ( 8). Clean the parts with a grease-cutting, non-scouring household cleaner. For removing resistant contamination (crack products) on the jet system also very fine steel wool can be used. The parts should preferably be rinsed with alcohol and subsequently be heated to 50 C in an oven or with an industrial hot-air blower. Clean the sealing surfaces with a lint-free piece of cloth slightly moistened with alcohol. Allow them to dry. Wipe the sealing rings with a lint-free piece of cloth slightly moistened with vacuum oil. Reassembly Reassemble the diffusion pump by performing the above steps in reverse order. Note Be careful to insert the sealing rings into the lining grooves without twisting them. Make sure the prescribed nozzle gaps exist. Adjusting screws secured with counter nuts 1.2±0.1 mm adjustable with 3 adjusting screws 2.5±0.1 mm adjustable with 3 adjusting screws Adjusting screws secured with counter nuts 38 BP BE (9906) DIF320.om

39 9.4 Replacing the heating plate Personnel qualifications Skilled personnel The heating plate may be replaced only by a skilled electrician. Precondition Diffusion pump removed and pump fluid drained ( 26). Procedure Turn the diffusion pump upside down. DANGER 55 kg Caution: heavy product (55 kg) Physical injury can result if the product is lifted and transported by only one person. The product must be lifted and transported in accordance with the rules and guidelines applicable in the country of installation. Mount the protective cover. BP BE (9906) DIF320.om 39

40 Removing the cover Unfasten the hexagon socket screw. Size 5 Remove the hexagon socket screw, washer, and cover. 40 BP BE (9906) DIF320.om

41 Detaching the power connection Open the terminal box. Detach the electrical connections. Heating plate with 3 heating windings BP BE (9906) DIF320.om 41

42 Pull the cable out of the tube. Removing the insulation plate Unfasten the insulation plate. Remove the insulation plate. 42 BP BE (9906) DIF320.om

43 Removing the pressure plate Turn in the screws for pulling out the pressure plate. M5 Unfasten the nut. Tightening torque = 100 Nm 24 Remove the nut and washer. Grip the screws and pull out the pressure plate. BP BE (9906) DIF320.om 43

44 Replacing the heating plate Remove the heating plate and the spacer sleeves. ÃÃÃ9ÃÃÃ: Ãë Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã Ã ÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃ ÃÃ ÃÃÃÃÃ Ordering number 48 Remove the encrusted heater contact paste. 44 BP BE (9906) DIF320.om

45 Reassemble the product by performing the above steps in reverse order. Note Coat the bottom of the housing with heater contact paste and immediately mount the heating plate. Ordering number 48 Make sure that the heating plate and pressure plate are seated absolutely flat. Coat the thread with heat-resistant grease. BP BE (9906) DIF320.om 45

46 10 Options 10.1 Cooling water flow monitor The flow monitor protects the diffusion pump from overheating by monitoring the flow rate of the cooling water. Flow monitor Orifice, 4-8 l/min Ordering number B SE B SE Return line Feeder line 10.2 Thermostatic cut-out The thermostatic cut-out prevents overheating of the diffusion pump. Ordering number PT T 10.3 Thermal switch The thermal switch signals to the pumping station control that the diffusion pump has attained normal operating temperature. Ordering number PT U 46 BP BE (9906) DIF320.om

47 10.4 Baffle Baffles are used to reduce pump fluid backstreaming from the diffusion pump into the process chamber. Water baffle BFA 320 W Ordering number: PT B Combi baffle BFA 320 MF Ordering number: PT B Additional information can be found in the catalog Pump fluid replenishing device The pump fluid replenishing device TN 101 is used for checking the pump fluid level and for replenishing the pump fluid without stopping the diffusion pump. Ordering number PT T Oil BP BE (9906) DIF320.om 47

48 11 Consumables / Spare parts When ordering spare parts, always indicate: all information on the product nameplate description and ordering number 11.1 Pump fluid Mineral oil Container size 500 cm 3 = ½ l 2000 cm 3 = 2 l 5000 cm 3 = 5 l Oil 61 A BD T BD T BD T Synthetic oil Container size 500 cm 3 = ½ l 2000 cm 3 = 2 l 5000 cm 3 = 5 l Oil 71 A BD T BD T BD T Silicone oil Container size Oil DC 704 Oil AN cm cm cm 3 = ½ l 2000 cm 3 = 2 l 5000 cm 3 = 5 l BD T BD T BD T BD T BD T BD T BD T BD T BD T Pentaphenyl ether Container size Santovac cm cm 3 = ½ l BD T BD T 48 BP BE (9906) DIF320.om

49 11.2 Seal set Ordering number BN T comprising: O-ring, Viton AN 455 ø O-ring, Viton AN 337 ø Lock washer seal O-ring, Viton AN 007 ø Tightening torque = 80 Nm 11.3 Heating plate Ordering number BP T (Replacing the heating plate 39) ÃÃÃ9ÃÃÃ: Ãë Ã Ã Ã Ã Ã Ã Ã Ã ÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃÃ ÃÃÃ 11.4 Heater contact paste Ordering number BN T 20 g 11.5 Jet system Ordering number BP T (Replacing the jet system 36) BP BE (9906) DIF320.om 49

50 12 Decommissioning WARNING N Caution: substances detrimental to the environment Products, operating materials etc. may have to be specially de - commissioned. For environmentally compatible disposal, please contact your nearest Pfeiffer Vacuum Service Center. 13 Returning the product WARNING Caution: forwarding contaminated products Products returned to Pfeiffer Vacuum for service or repair should, if possible, be free of harmful substances (e.g. radioactive, toxic, caustic or microbiological). Otherwise, the type of contamination must be de - clared. Adhere to the forwarding regulations of all involved countries and forwarding companies and enclose a completed contamination de - claration. Products that are not clearly declared as "free of harmful substances" are de - contaminated at the expense of the customer. 50 BP BE (9906) DIF320.om

51 Declaration of Contamination The repair and/or service of vacuum equipment and components will only be carried out if a correctly completed declaration has been submitted. Non-completion will result in delay. This declaration can only be completed and signed by authorised and qualified staff. Description of product Type Article No. Serial No. Reason for return Operating fluid(s) used Process related contamination of product: toxic no q yes q corrosive no q yes q biological hazard no q yes q *) explosive no q yes q *) radioactive no q yes q *) other harmful substances no q yes q *) Products thus contaminated will not be accepted without written evidence of decontamination! Harmful substances, gases and/or by-products Please list all substances, gases and by-products which may have come into contact with the product: Trade/Product name Manufacturer Chemical name (or symbol) Dangerous material class Measures if spillage First aid in case of human contact Legally binding declaration: I hereby declare that the information supplied on this form is complete and accurate. The dispatch of the contaminated product will be in accordance with the appropriate regulations covering packaging, transportation and labelling of dangerous substances. Name of organisation or company Address Phone Name Date and legally binding signature Post code Telex Company stamp Copies: Original to manufacturer or representative - 1 copy attach to consignment packaging - 1 copy for file of sender BP BE (9906) DIF320.om 51

52 Manufacturer s declaration Product Diffusion pump with optional baffle DIF 320 EU manufacturer s declaration as defined by the listed Guidelines We herewith declare that the above product is intended for installation into a machine and that the commissioning of said machine is not allowed until it has been ascertained that the machine into which this product is to be installed con - forms to the specifications of the listed EU guidelines. Guidelines, harmonised standards, national standards in languages and speci - fications which have been applied: 89/392/EEC version 93/68/EEC... EN EN / EN / /23/EEC / Signature Asslar, Wolfgang Dondorf Managing director Original: German BP BD (9906) Pfeiffer Vacuum GmbH Emmeliusstrasse 33 D Asslar Deutschland Tel +49 (0) Fax +49 (0) info@pfeiffer-vacuum.de

Operating Instructions incl. Manufacturer's Declaration. Diffusion pump. with optional baffle DIF 501 BP BE (0003) 1

Operating Instructions incl. Manufacturer's Declaration. Diffusion pump. with optional baffle DIF 501 BP BE (0003) 1 Operating Instructions incl. Manufacturer's Declaration Diffusion pump with optional baffle DIF 501 BP 805 178 BE (0003) 1 Product identification In all communications with Pfeiffer Vacuum, please specify

More information

Operating manual Incl. Manufacturer s declaration. Diffusion pump. with optional baffle DIF 630 BP BE (9803) 1

Operating manual Incl. Manufacturer s declaration. Diffusion pump. with optional baffle DIF 630 BP BE (9803) 1 Operating manual Incl. Manufacturer s declaration Diffusion pump with optional baffle DIF 630 BP 803 079 BE (9803) 1 Product identification In all communications with Balzers, please specify the information

More information

All-Metal Control Valve

All-Metal Control Valve Operating Instructions All-Metal Control Valve Thermomechanically and manually actuated UDV 146 BP 805 281 BE (0203) 1 Product Identification In all communications with Pfeiffer Vacuum, please specify

More information

Vacuum Switch, Differential Pressure Adapter, Switching Amplifier

Vacuum Switch, Differential Pressure Adapter, Switching Amplifier Operating Manual Incl. EU Declaration of Conformity Vacuum Switch, Differential Pressure Adapter, Switching Amplifier VSC150, SV tina42e1-b (2017-03) 1 Product Identification In all communications with

More information

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

Steam Trap BK 45 BK 45-U BK 45-LT BK 46 Steam Trap BK 45 BK 45-U BK 45-LT BK 46 Original Installation Instructions 810437-08 Contents Foreword... 3 Availability... 3 Formatting features in the document... 3 Safety... 3 Use for the intended purpose...

More information

Betriebsanleitung Operating Instructions

Betriebsanleitung Operating Instructions Betriebsanleitung Operating Instructions Oil mist filter idealvac.com (505)872-0037 idealvac.com ONF 16 PK 0213 BE/G (0811) ONF 25/25L/25XL Table of contents Table of contents 1 About this manual......................................

More information

Operating Instructions TSF 010. Power Failure Venting Unit PM BNE/L (0007)

Operating Instructions TSF 010. Power Failure Venting Unit PM BNE/L (0007) Operating Instructions TSF 010 Power Failure Venting Unit PM 800 032 BNE/L (0007) Index Page 1. Safety Instructions... 2 1.1. Pictogram Definitions... 2 2. Understanding The Power Failure Venting Unit...

More information

General. Applications and Accessories for Oil Diffusion Pumps. leybold. Application. Accessories LEYBOJET 630 DIP DIP DIP DIP 30000

General. Applications and Accessories for Oil Diffusion Pumps. leybold. Application. Accessories LEYBOJET 630 DIP DIP DIP DIP 30000 General Applications and Accessories for Oil Diffusion Pumps Pumps Application DIP 3000 DIP 8000 DIP 12000 DIP 20000 DIP 30000 DIP 50000 Vacuum coating Research and development Metallurgy/furnaces Mechanical

More information

Betriebsanleitung Operating Instructions. Diaphragm Pumps

Betriebsanleitung Operating Instructions. Diaphragm Pumps Betriebsanleitung Operating Instructions Diaphragm Pumps MVP 035-2 MVP 055-3 MVP 055-3C PU 0011 BE/K (0708) Table of contents Table of contents 1 About this manual.....................................

More information

Operating Instructions

Operating Instructions Translation of the original instructions Hena 60/100 Rotary Vane Pump Operating Instructions PD 0040 BEN/D (1108) EN Table of contents Table of contents 1 About this manual...............................................

More information

Installation manual plugs and connectors QUICK-CONNECT (63 A)

Installation manual plugs and connectors QUICK-CONNECT (63 A) EN Installation manual plugs and connectors QUICK-CONNECT (63 A) 60003217 Issue 04.2016 2016-04-01 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal

More information

TMH 260 / TMU 260 TMH 260 P / TMU 260 P

TMH 260 / TMU 260 TMH 260 P / TMU 260 P Operating Instructions TMH 260 / TMU 260 TMH 260 P / TMU 260 P Turbomolecular Drag Pumps PM 800 361 BE/H (0008) INDEX Page 1. Safety Instructions... 3 1.1. For Your Orientation... 3 1.2. Pictogram Definitions...

More information

Operating Instructions

Operating Instructions Translation of the original instructions Hena 400/630 Rotary Vane Pump Operating Instructions PD 0043 BEN/D (1108) EN Table of contents Table of contents 1 About this manual...............................................

More information

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2 I&M NUMBER: 316-42-15-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

Installation and Operating Instructions

Installation and Operating Instructions Installation and Operating Instructions Models: Verso 4G Hob As part of Parmco Appliances commitment to improving and updating product ranges, we reserve the right to alter, change and update technical

More information

Operating Instructions

Operating Instructions Translation of the original instructions Hena 200/300 Rotary Vane Pump Operating Instructions PD 0042 BEN/D (1108) EN Table of contents Table of contents 1 About this manual...............................................

More information

Operating Instructions

Operating Instructions Translation of the original instructions HiCube 80 Eco Turbo pumping station Operating Instructions PT 0263 BEN/E (1211) EN Table of contents Table of contents 1 About this manual...............................................

More information

Installation manual surface mounting plugs and socket outlets, panel mounting plugs and socket outlets with screw connection (16/32 A)

Installation manual surface mounting plugs and socket outlets, panel mounting plugs and socket outlets with screw connection (16/32 A) EN Installation manual surface mounting plugs and socket outlets, panel 60003214 Issue 04.2016 2016-04-01 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3

More information

Aluminum Heating Mantles

Aluminum Heating Mantles Aluminum Heating Mantles ON/OFF HOT User Guide Version 1.3 ON/OFF IEC power inlet socket Power supply switch (large-volume models). Power to either the lower part of the element or the upper and lower

More information

Installation manual extra-low-voltage socket outlets for panel- and surface-mounting

Installation manual extra-low-voltage socket outlets for panel- and surface-mounting EN Installation manual extra-low-voltage socket outlets for panel- and 60003221 Issue 04.2016 2016-04-01 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS INDEECO Circulation Heaters are designed to provide years of trouble free operation if properly installed and maintained. Please read and follow these instructions for installing and maintaining the heater.

More information

Operating Instructions

Operating Instructions Translation of the original instructions Hena 25 Rotary Vane Pump Operating Instructions PD 0039 BEN/E (1107) EN Table of contents Table of contents 1 About this manual...............................................

More information

Operation Manual R205BV, R209BV

Operation Manual R205BV, R209BV Operation Manual R205BV, R209BV 1 Safety Instruction The rotary evaporator is manufactured according to current methods and accepted safety regulations. However, risks still exist during the installation,

More information

OPERATING INSTRUCTIONS HICUBE PRO. Turbo pumping station. Translation of the original instructions PT 0265 BEN/E (1602)

OPERATING INSTRUCTIONS HICUBE PRO. Turbo pumping station. Translation of the original instructions PT 0265 BEN/E (1602) OPERATING INSTRUCTIONS EN HICUBE PRO Turbo pumping station Translation of the original instructions PT 0265 BEN/E (1602) Table of contents Table of contents 1 About this manual...............................................

More information

Betriebsanleitung Operating Instructions

Betriebsanleitung Operating Instructions Betriebsanleitung Operating Instructions Translation of the Original Operating Instructions Diaphragm Pumps MVP 040-2, MVP 070-3/3C PU 0050 BE/A (0809) Table of contents Table of contents 1 About this

More information

UV I UNIT030W / UV I UNIT055W

UV I UNIT030W / UV I UNIT055W 016W 030W / 055W 110W 220W UV Systems Assembly and Operating Instructions Water we re in our Element www.intewa.de Table of Contents 1. General Information... 2 2. Safety Precautions... 2 3. Dimensioning...

More information

R Series B & T2 Model

R Series B & T2 Model FRONT R Series B & T2 Model Fan Forced Wall Heaters 4-1/4 (108mm) NOTE: Knockouts in top same dimensions 3-1/4 3-1/4 (108mm) (108mm) as bottom 16-7/8 (429mm) 13-7/8 (352mm) BOTTOM 13-7/8 (352mm) 7-3/4

More information

BK 45 BK 45-U BK 45-LT BK 46

BK 45 BK 45-U BK 45-LT BK 46 Steam Trap BK 45 BK 45-U BK 45-LT BK 46 Original Installation Instructions 810437-07 Contents Preface...3 Availability...3 Text layout...3 Safety...3 Usage for the intended purpose...3 Basic safety notes...4

More information

Waste water ejection unit

Waste water ejection unit Waste water ejection unit Over ground box SWH 500/50-80 SWH 500/50-80 Operation manual Table of contents: Page Declaration of conformity... 3 1. General... 4 1.1 Introduction... 4 1.2 Enquiries and orders...

More information

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil 60. Item no: Z-3285

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil 60. Item no: Z-3285 Operating manual BlueMobil 60 Item no: Z-3285 Original operating manual Illustration shows item no Z-3285 Important Copyright It is essential that you read this manual thoroughly before the initial operation

More information

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50 -30 Installer manual Air/air heat pump -40/50 IHB GB 1516-1 331554 Table of Contents 1 Important information 2 5 Installation 7 Safety information 2 Model combinations 7 Read before starting the installation

More information

Consignes d installation

Consignes d installation PBS-200-A Single entry power junction box Installation Instructions PBS-200-A Single entry power junction box with cold applied connection technology for use with BARTEC PSB / HSB trace heaters Consignes

More information

TTK 75 ECO OPERATING MANUAL DEHUMIDIFIER TRT-BA-TTK75ECO-TC-002-EN

TTK 75 ECO OPERATING MANUAL DEHUMIDIFIER TRT-BA-TTK75ECO-TC-002-EN TTK 75 ECO EN OPERATING MANUAL DEHUMIDIFIER TRT-BA-TTK75ECO-TC-002-EN Table of contents Notes regarding the operating manual... 01 Information about the device... 02 Safety... 04 Transport...05 Start-up...05

More information

USER S MANUAL NKP. Duct heater for supply air pre-heating with external control

USER S MANUAL NKP. Duct heater for supply air pre-heating with external control USER S MANUAL Duct heater for supply air pre-heating with external control CONTENTS Contents... 2 Safety requirements... 2 Purpose... 4 Delivery set... 4 Designation key... 4 Technical data... 5 Design

More information

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil eco. Item no: Z-3278

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil eco. Item no: Z-3278 Illustration shows item no Z-3278 Operating manual BlueMobil eco Item no: Z-3278 Original operating manual Important Copyright It is essential that you read this manual thoroughly before the initial operation

More information

Installation Instructions U-RAD-LT Electric Radiant Heaters

Installation Instructions U-RAD-LT Electric Radiant Heaters Installation Instructions U-RAD-LT Electric Radiant Heaters 1 PG421-2 161-058006-001 May 2016 2 U-RAD-LT Electric Radiant Heaters The Safety Alert Symbol is used to indicate a risk of personal injury.

More information

CTA15-2 warming drawer. operating and installation instructions

CTA15-2 warming drawer. operating and installation instructions CTA15-2 warming drawer operating and installation instructions Table of Contents GB-IE 1 PRECAUTIONS FOR USE...4 2 DISPOSAL INSTRUCTIONS - OUR ENVIRONMENT POLICY...5 3 SAFETY PRECAUTIONS...6 4 GET TO KNOW

More information

Operating Instructions

Operating Instructions Translation of the original instructions HiPace 80 Turbopump Operating Instructions PT 0208 BEN/H (1307) EN Table of contents Table of contents 1 About this manual...............................................

More information

Water level controller and limiter

Water level controller and limiter Water level controller and limiter RBA 25 RBA 35 D-07-B-16634-EN-0 Edition 10/09 -i Table of contents- 1. Health and safety instructions 4-5 1.1 General health and safety instructions...4 1.2 Unit-specific

More information

Fisher Scientific Model 281A Vacuum Oven. Installation and Operating Manual Rev. 0

Fisher Scientific Model 281A Vacuum Oven. Installation and Operating Manual Rev. 0 Fisher Scientific Model 281A Vacuum Oven Installation and Operating Manual 30979 Rev. 0 Preface Models covered in this manual: Catalog numbers Models numbers Voltage 13-262-50 6288 120V 13-262-51 6289

More information

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL T Edition 0 HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 88 STRATFORD, CT 0665

More information

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS APPLICATION INDEECO Explosion proof Electric Immersion Heaters for Hazardous Locations are ccsaus Certified for use in areas (external

More information

transport handle gas ballast valve robust design for long life easy to clean integrated oil level window quiet running, minimized vibrations

transport handle gas ballast valve robust design for long life easy to clean integrated oil level window quiet running, minimized vibrations Vacuum Generation - Rotary Vane Pumps Rotary Vane Pumps ILMVAC has been developing and producing rotary vane pumps for 60 years. You can rely on our competence and experience. Our superior material selection

More information

Instructions for Use Warming Drawer. Bedienungsanweisung Wärmeschublade. Notice d'utilisation Chauffe-vaisselle. Gebruiksaanwijzing Servieswarmer

Instructions for Use Warming Drawer. Bedienungsanweisung Wärmeschublade. Notice d'utilisation Chauffe-vaisselle. Gebruiksaanwijzing Servieswarmer Instructions for Use Warming Drawer Bedienungsanweisung Wärmeschublade Notice d'utilisation Chauffe-vaisselle Gebruiksaanwijzing Servieswarmer Table of Contents GB-IE 1 PRECAUTIONS FOR USE...4 2 DISPOSAL

More information

VETO CLEANER 500 FLUE GAS CLEANER

VETO CLEANER 500 FLUE GAS CLEANER As of serial number 3100 0001 VETO CLEANER 500 FLUE GAS CLEANER USER MANUAL SPARE PARTS LIST Manufacturer: ALA TALKKARI Veljekset Ala-Talkkari Oy FI-62130 HELLANMAA TEL. +358 6 433 6333 FAX +358 6 437

More information

SCHMIDT Flow Sensor SS Ex - Supplementary instructions for use in explosive atmospheres ATEX

SCHMIDT Flow Sensor SS Ex - Supplementary instructions for use in explosive atmospheres ATEX SCHMIDT Flow Sensor SS 20.600 Ex - Supplementary instructions for use in explosive atmospheres ATEX SCHMIDT Flow Sensor SS 20.600 Ex ATEX version Table of Contents 1 Important information... 3 2 Storage

More information

Chemical Motor Pump Unit BN

Chemical Motor Pump Unit BN Operating & Maintenance Instructions BW 5 02 01 / 1 The operating instructions of the centrifugal pump and the accessories should be located close to the pump. These instructions should be read carefully

More information

Installation manual surface mounting plugs and socket outlets, panel mounting plugs and socket outlets QUICK-CONNECT (63 A)

Installation manual surface mounting plugs and socket outlets, panel mounting plugs and socket outlets QUICK-CONNECT (63 A) EN Installation manual surface mounting plugs and socket outlets, panel 60003506 Issue 04.2016 2016-04-01 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3

More information

TDS 20 R / TDS 30 R / TDS 50 R

TDS 20 R / TDS 30 R / TDS 50 R TDS 20 R / TDS 30 R / TDS 50 R EN OPERATING MANUAL ELECTRICAL FAN HEATER TRT-BA-TDS20R-30R-50R-TC-001-EN Table of contents Notes regarding the operating manual... 1 Safety... 1 Information about the device...

More information

PUREPOWER SERIES CENTRAL VACUUM POWER UNITS PP500, PP600 & PP650

PUREPOWER SERIES CENTRAL VACUUM POWER UNITS PP500, PP600 & PP650 USER GUIDE PUREPOWER SERIES CENTRAL VACUUM POWER UNITS PP500, PP600 & PP650 AB0039 FOR RESIDENTIAL USE ONLY!! MODELS SFDB-DQ, SFDB-DR AND SFDB-DS 30042509E IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS

More information

Installation and Maintenance Manual Forbes Marshall Tracer Line Trap FMMST63

Installation and Maintenance Manual Forbes Marshall Tracer Line Trap FMMST63 Installation and Maintenance Manual Forbes Marshall Tracer Line Trap Energy Conservation Environment Process Efficiency www.forbesmarshall.com Table of Contents 1. Preface...1 2. Important Safety Notes...1

More information

Mechanical seals external, single or double, to DIN EN 12756

Mechanical seals external, single or double, to DIN EN 12756 INSTALLATION AND OPERATING MANUAL Translation of the original manual Series SCK Bearing pedestal group: 0 Mechanical seals external, single or Keep for future use! This operating manual must be strictly

More information

Operating Instructions. Accessory Units Melitta Cafina XT Series. Melitta Professional Coffee Solutions

Operating Instructions. Accessory Units Melitta Cafina XT Series. Melitta Professional Coffee Solutions Operating Instructions Accessory Units Melitta Cafina XT Series Melitta Professional Coffee Solutions Contents General... 4. Manufacturer information... 4.2 About these instructions... 4.3 Explanation

More information

MODEL: 1407, , 1408, & INSTALLATION AND INSTRUCTION MANUAL

MODEL: 1407, , 1408, & INSTALLATION AND INSTRUCTION MANUAL ECONOMY VACUUM OVEN MODEL: 1407, 1407-2, 1408, & 1408-2 INSTALLATION AND INSTRUCTION MANUAL Sheldon Manufacturing Inc. P.O. Box 627, Cornelius, Oregon 97113 EMAIL: tech@shellab.com INTERNET: http://www.shellab.com/~shellab

More information

Diaphragm pump 4 - headed

Diaphragm pump 4 - headed Operation Manual (EN) Translation of the german original manual Diaphragm pump 4 - headed Model: 67000062 412743-23 2016-10-17 Gardner Denver Thomas GmbH Am Vogelherd 20 98693 Ilmenau Germany T +49 3677

More information

OPERATING INSTRUCTIONS HIPACE 700. Turbopump. Translation of the original instructions PT 0209 BEN/I (1604)

OPERATING INSTRUCTIONS HIPACE 700. Turbopump. Translation of the original instructions PT 0209 BEN/I (1604) OPERATING INSTRUCTIONS EN HIPACE 700 Turbopump Translation of the original instructions PT 0209 BEN/I (1604) Table of contents Table of contents 1 About this manual...............................................

More information

Operator s Manual. Histology Bath

Operator s Manual. Histology Bath Operator s Manual Histology Bath 110-827 05.09.12 Table of Contents Introduction... 2 General Safety Information... 2 Safety Recommendations... 3 Unpacking Your Histology Bath...4 Contents...4 Components

More information

Oil-Sealed Rotary Vane Pumps

Oil-Sealed Rotary Vane Pumps Oil-Sealed Rotary Vane Pumps P 4 Z 322002 Advantages high water vapour tolerance for chemical applications compact, robust and functional construction low noise emission no oil contamination of the chamber

More information

USER MANUAL. 60cm, 3 burners, Hob AKC 630

USER MANUAL. 60cm, 3 burners, Hob AKC 630 USER MANUAL 60cm, 3 burners, Hob AKC 630 For your safety These instructions have been drawn up for your safety and that of others. You are therefore requested to read them carefully before installing

More information

NHS VERTICAL AGITATOR

NHS VERTICAL AGITATOR INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS NHS VERTICAL AGITATOR INOXPA, S.A. c/telers, 54 Aptdo. 174 E-17820 Banyoles Girona (Spain) Tel. : (34) 972-57 52 00 Fax. : (34) 972-57 55 02 Email: inoxpa@inoxpa.com

More information

User Manual GV25 GV35 GV702. Company information: Original instructions GV12066 (1)

User Manual GV25 GV35 GV702. Company information:   Original instructions GV12066 (1) User Manual Original instructions GV25 GV35 GV702 Company information: www.vipercleaning.eu info-eu@vipercleaning.com GV12066 (1) 2012-04-10 USER MANUAL ENGLISH TABLE OF CONTENTS Introduction... 4 Manual

More information

Index I. INSTALLATION DIAGRAM... WIRING DIAGRAMS...

Index I. INSTALLATION DIAGRAM... WIRING DIAGRAMS... Index I. INSTALLATION DIAGRAM... 4 II. III. WIRING DIAGRAMS...... 1. Wiring diagram AC 3-N-400 50/60 Hz... 2. Wiring diagram AC 3-230 50/60 Hz...... 3. Wiring diagram AC 230 50/60 Hz... 4. Series 30 electrical

More information

TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S

TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S EN OPERATING MANUAL INFRARED HEATING PANEL TRT-BA-TIH300S-TIH400S-TIH500S-TIH700S-TIH900S-TIH1100S-TC-002-EN Table of contents Notes

More information

Original Operating Instructions V-VTE

Original Operating Instructions V-VTE Edition: 2.2.2012 BA 187-EN Original Operating Instructions V-VTE V-VTE 3 6 8 10 V-Serie V-Series Drehschieber Rotary Vane Table of contents Table of contents 1 Foreword...................................................................

More information

JASOPELS ROTATING FLESHING MACHINE 1-BEAM

JASOPELS ROTATING FLESHING MACHINE 1-BEAM USER MANUAL JASOPELS ROTATING FLESHING MACHINE 1-BEAM ITEM NO. 32200067 Our quality Your choice 2 www.jasopels.com TABLE OF CONTENTS About this document... 3 Declaration of Conformity... 6 Safety... 6

More information

Betriebsanleitung Operating Instructions

Betriebsanleitung Operating Instructions Betriebsanleitung Operating Instructions Economy Pumping Station Turbo-Drag Pumping Station TSH 07 E TSU 07 E PT 007 BE/B (00) Index Page. Safety Instructions..... For Your Orientation..... Pictogram Definitions....

More information

Operating and Maintenance Instructions

Operating and Maintenance Instructions EATON Germany GmbH Werk Lohmar D-53797 Lohmar Operating and Maintenance Instructions WALFORM Machine Electronically controlled - Conforms to CE MEG-WF385X Status: Sept 2011 MEG-WF385X_Stand Sept 2011 SUITABILITY

More information

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS DLCLRA INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 Fig. 1 - Size 36 TABLE OF CONTENTS PAGE SAFETY CONSIDERATIONS... 2 PARTS LIST... 3 SYSTEM REQUIREMENTS... 4 WIRING...

More information

CE Unit is suitable for material transport. The transported gas may be up to 80 C.

CE Unit is suitable for material transport. The transported gas may be up to 80 C. The manual contains: 1 Safety regulations 1.1 Electrical 1.2 Crush risk 1.3 Hazardous dust 1.4 Suction injuries 1.5 Noise 1.6 Pneumatic 1.7 Other equipment 2 Machine Operation 3 Installation Directions

More information

USER MANUAL UN-200V / UN-200VH

USER MANUAL UN-200V / UN-200VH USER MANUAL UN-200V / UN-200VH CONTACT US PHONE/FAX Toll Free: 800.465.1004 Phone: 801.486.1004 Fax: 801.486.1007 ADDRESS LACO Technologies, Inc. 3085 West Directors Row Salt Lake City, UT 84104 WEB www.lacotech.com

More information

USER MANUAL. 80 cm 2 burners, glass hob AKC 820C/BLM

USER MANUAL. 80 cm 2 burners, glass hob AKC 820C/BLM USER MANUAL 80 cm 2 burners, glass hob AKC 820C/BLM For your safety These instructions have been drawn up for your safety and that of others. You are therefore requested to read them carefully before installing

More information

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...

More information

OPERATING INSTRUCTIONS HIPACE Turbopump. Translation of the original instructions PT 0240 BEN/H (1603)

OPERATING INSTRUCTIONS HIPACE Turbopump. Translation of the original instructions PT 0240 BEN/H (1603) OPERATING INSTRUCTIONS EN HIPACE 1200 Turbopump Translation of the original instructions PT 0240 BEN/H (1603) Table of contents Table of contents 1 About this manual...............................................

More information

Montageanleitung RLO (Original) Mounting Instructions RLO (Translation of the original)

Montageanleitung RLO (Original) Mounting Instructions RLO (Translation of the original) Montageanleitung (Original) (Translation of the original) DE MA_ 1.0 06/2014 Taperlock Clamping-bush system _0 _1 Fixed hub Inlet nozzle with IMV 1. Revision index Revision Date MA_ 1.0 06/2014 2. Safety

More information

HKF 8180 Operating instructions

HKF 8180 Operating instructions Operating instructions EN Version 1.0en /Edition 05/2013 Contents 1 Important basic information... 3 1.1 Limitation of liability... 3 1.2 Operator's responsibilities... 3 1.3 Documentation... 3 1.3.1 Content

More information

13-1. Temperature Regulator

13-1. Temperature Regulator -1 Step 0 Type/Structure/Features Please refer to this for type, structure and features of. Step 1 Selection Please look at the ID chart to choose the right products depending on the intended uses. Details

More information

SAN RAPHAEL PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET

SAN RAPHAEL PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET SAN RAPHAEL PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials,

More information

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS Page 1 of 10 THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS Purpose of Manual The purpose of this manual is to provide operating, servicing and repair instructions for the Summit standard models ThermaPhase

More information

Operation Manual. Diaphragm pumps 2-headed. Types MP 101 Zp, MP 201 Ep MPC 101 Zp, MPC 201 Ep

Operation Manual. Diaphragm pumps 2-headed. Types MP 101 Zp, MP 201 Ep MPC 101 Zp, MPC 201 Ep Operation Manual Diaphragm pumps 2-headed Types MP 101 Zp, MP 201 Ep MPC 101 Zp, MPC 201 Ep 400170 2007-11-16 We are constantly working on the further development of all our product types. Reprinting or

More information

OK, OKA, OKAF; ELD; ELDM; ELH; OKC; SC; SCA; SCAF; OK-LN; OKA-LN; OKAF-LN.

OK, OKA, OKAF; ELD; ELDM; ELH; OKC; SC; SCA; SCAF; OK-LN; OKA-LN; OKAF-LN. INSTALLATION, OPERATION & SERVICE MANUAL FOR COOLER TYPES OK, OKA, OKAF; ELD; ELDM; ELH; OKC; SC; SCA; SCAF; OK-LN; OKA-LN; OKAF-LN. 1. Introduction This manual is a guide for the installation, maintenance

More information

REMKO CLK Mobile automatic heater

REMKO CLK Mobile automatic heater REMKO CLK Mobile automatic heater Operation Technology Spare Parts Edition GB M04 REMKO - powerful like a bear. Operating Instructions Read these instructions carefully before setting up/operating the

More information

2016 Ideal Vacuum (505) V 1.1

2016 Ideal Vacuum (505) V 1.1 Doc. Ref. IdealCUBE-6x121416 pg. 1 User Manual Table of Contents 6x6x6 Vacuum Cube Specification Sheet...3 Assembling a Vacuum Cube system...3 Vacuum Cube Frame...3 Plate Installation...4 Mounting for

More information

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-5-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Watlow heaters are built to comply with UL and CSA dielectric requirements, it may be

More information

Friwa Compact. Operating instructions EN

Friwa Compact. Operating instructions EN Operating instructions EN Version 1.1 / Edition 09/2013 Contents 1 Key background information... 3 1.1 Limitation of liability... 3 1.2 Responsibilities of the operator... 3 1.3 Documentation... 3 1.3.1

More information

Vacuum System Troubleshooting Author: Keith Webb, P.E. Application Engineering Manager

Vacuum System Troubleshooting Author: Keith Webb, P.E. Application Engineering Manager INTRODUCTION The science of creating vacuum is often misunderstood and when the desired vacuum condition is not being achieved in a manufacturing setting this usually means production comes to a halt and

More information

Light oil / kerosene burner

Light oil / kerosene burner Installation, use and maintenance instructions Light oil / kerosene burner One stage operation CODE MODEL TYPE 374445 G5 444T50 290238 (5) - 05/20 TECHNICAL DATA Thermal power output 28 60 kw 2.3 5 kg/h

More information

Operating Instructions

Operating Instructions Operating Instructions BA-003 Read and understand this manual before use. Keep this manual for future reference. CONFORMS TO UL STD.No.1017 Certified to CSA STD C22.2 No.243-10 For questions or concerns

More information

Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro

Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro 2006/01 Content Important Information 1. Notes... 3 1.1 CE - Labeling... 3 1.2

More information

Installation Instructions. Mira LED Light System

Installation Instructions. Mira LED Light System Installation Instructions Mira LED Light System w w w. a m i c o. c o m Contents Symbols Used in This Manual 4 Safety Instructions 5 Variants 7 Scope Of Delivery 8 Installing Mira LED Ceiling Mounted Installing

More information

UL U TR LTRASONIC S ONIC SCALE ALER PIEZO MINI

UL U TR LTRASONIC S ONIC SCALE ALER PIEZO MINI ULTRASONIC SCALER PIEZO MINI CONTENTS XI - SYMBOLS 1. INTRODUCTION 1 Alternating current Type BF device 2. WARNINGS 1 3. PRESENTATION 1 3.1 Presentation 1 3.2 Technical description 2! Warning, please refer

More information

MD-MINI Dry Bath. Instruction Manual

MD-MINI Dry Bath. Instruction Manual MD-MINI Dry Bath Instruction Manual Catalog No. MD-MINI www.majorsci.com service@majorsci.com Version 01B Revision on: 2013.07.15 Packing list MD-MINI: 1x MD-MINI Dry Bath 1x MD-MINI Lid 1x Power Cord

More information

USE and MAINTENANCE INSTRUCTION MANUAL GRAVITY. WS-400 EVO LS-400 Entech. SPRAY GUN Series. en it fr es pt de se

USE and MAINTENANCE INSTRUCTION MANUAL GRAVITY. WS-400 EVO LS-400 Entech. SPRAY GUN Series. en it fr es pt de se USE and MAINTANCE INSTRUCTION MANUAL WS-400 EVO LS-400 Entech GRAVITY SPRAY GUN Series en it fr es pt de se TECHNICAL DATA WS-400 WS-400 EVO WS-400 Clear WS-400 Base WS-400-1301 EVO 1.3 170 365 260 WS-400-1401

More information

1. Description INSTRUCTION FOR AIR BLAST COOLER TYPE COOL 450

1. Description INSTRUCTION FOR AIR BLAST COOLER TYPE COOL 450 1. Description General The cooler is used for cooling of water, oil or other liquid by use of air. The liquid is passing in the tubes where it transfere the energy to the air via the fins on the outside

More information

Avensys Avensys FIN EST SLO RUS UAE

Avensys Avensys FIN EST SLO RUS UAE 34 039 Avensys Avensys GB D...1...5 I...5 N...9 GR...13 TR...17 BG...21 RO...25 GB...2 NL...6 FIN...10 CZ...14 SK...18 EST...22 CN...26 F...3 S...7 PL...11 H...15 SLO...19 LV...23 RUS...27 E...4 DK...8

More information

Inverted Bucket Steam Traps

Inverted Bucket Steam Traps INSTALLATION AND MAINTENANCE INSTRUCTIONS IM-2-00-US December 201 Inverted Bucket Steam Traps Safety Information Safe operation of these products can only be guaranteed if they are properly installed,

More information

VACUUM OVEN. Model: VPX9-2. Installation and Operation Manual

VACUUM OVEN. Model: VPX9-2. Installation and Operation Manual VACUUM OVEN Model: VPX9-2 Installation and Operation Manual Sheldon Manufacturing, Inc. P.O. Box 627, 300 N 26 th Avenue, Cornelius, Oregon 97113 EMAIL: tech @ Shellab.com; www.shellab.com 1-800-322-4897

More information

WATLOW ELECTRIC MFG CO. WATROD Duct Heater (module only) I& M Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.00

WATLOW ELECTRIC MFG CO. WATROD Duct Heater (module only) I& M Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.00 I&M NUMBER: 316-42-16-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

Installation instructions

Installation instructions Immersion Heater ROTKAPPE Angular Immersion Heater ROTKAPPE Installation instructions E-MA 10/19 04.13/1 Please supplement the following information from the model plate For the immersion heater ROTKAPPE

More information

Decentralised ventilation units

Decentralised ventilation units Notes on installation Decentralised ventilation units FSL / SCHOOLAIR GB/en TROX GmbH Heinrich-Trox-Platz 47504 Neukirchen-Vluyn Germany Phone: +49 (0) 2845 2020 Fax: +49 (0) 2845 202265 E-mail: trox@trox.de

More information

Installation Instructions

Installation Instructions 38MHR Outdoor Unit Single Zone Ductless System Sizes 09 to 24 Installation Instructions NOTE: Read the entire instruction manual before starting the installation. NOTE: Images are for illustration purposes

More information