1 SECTION _HYDRONIC PIPING SYSTEMS ABOVE GRADE PART 1 GENERAL 1.1 SUMMARY University Contact: Energy & Engineering Group (302) This standard includes hydronic piping requirements for both chilled water and heating hot water at buildings either served by district heating or standalone. The intent of these standards are to provide input to the design team on the University s preference of manufacturers, design, equipment options and quality assurance to maintain the longevity of its assets. 1.2 REFERENCES Common Work for HVAC Systems Common Requirements for HVAC Systems Identification of HVAC Piping & Equipment HVAC Insulation Hydronic Piping Systems Below Grade Hydronic Pumps DESIGN REQUIREMENTS All vents, air release valves, balancing valves and drains shall be shown on drawings. Drain valves shall be included at main shut off valves, at the branch shut-off valves, low points, bases of vertical risers and at all terminal equipment. Manual and auto air vents shall be included at all high points in the hydronic systems. All drain valves shall be full port ball valves with hose end connection Risers shall have isolation valves between each floor and at each floor branch. All take offs from mains shall have isolation valves All heating and cooling makeup systems shall include a bronze water meter with reporting capability to the BAS and energy Monitoring Systems. See domestic water piping systems standard (section ) for acceptable water meters HYDRONIC PIPING SYSTEMS ABOVE GRADE Page 1
2 1.3.4 Secondary chilled water systems shall be hydraulically decoupled from the primary system. All hydraulic decouplers shall include primary and secondary supply and return temperature sensors, RTD type. All hydraulic de-couplers shall have a flow meter in the primary chilled water return. Flow meter shall report through the BAS All branch take offs from piping mains are required to have shut off valves at the take offs so that repairs can be performed on the branch piping without shutting down the system All chilled water service shall include local BTU meters with outputs reporting to the BAS and totalized pulse reporting to energy monitoring system All manual balancing valves shall be standalone, not combination type, and have a memory setting feature All hydronic systems shall be variable flow. All hydronic pumps shall have variable frequency drives. Flow through hydronic coils shall be controlled by two way modulating control valves. Consulting engineer is responsible for maintaining pump minimum flow requirements Heating water systems shall have water treatment including a chemical bypass feeder. Chemical by-pass feeder piping shall include provisions to temporarily install a side stream media filter All hydronic piping utilities entering and exiting a building shall have a double block and bleed valve configuration Pipe routed exterior to the building and above grade shall be electrically heat traced with current monitoring through BAS University of Delaware requires that shell and tube heat exchangers shall be used in hydronic heating and cooling systems. The use of plate and frame heat require a variance from the University Energy and Engineering group. 1.4 SUBMITTALS Submit isometric piping fabrication drawings of the following: A. Air handling unit coil connections, including all related valves and instruments. B. Heat exchanger connections including all related valves and instruments HYDRONIC PIPING SYSTEMS ABOVE GRADE Page 2
3 1.5 CLOSE-OUT SUBMITTALS Balancing report Hydrostatic Test Report As-built drawings 1.6 QUALITY ASSURANCE Verify field measurements prior to fabrication Pressure test must comply with ASME B Pressure test must be witnessed by a representative designated by the University of Delaware After completion, flush all hydronic piping systems with clean water until all grease, weld slag and metal filings are removed from system. 1.7 DELIVERY, STORAGE AND HANDLING Furnish temporary end caps and closures on pipe and fittings. Maintain in place until installation Protect piping from entry of foreign materials by temporary covers, completing sections of the Work and isolating parts of the completed system. PART 2 PRODUCTS 2.1 The University of Delaware will entertain all relevant materials for hydronic piping systems. 2.2 If copper tubing is used it must be ASTM B280 Type K hard drawn. All copper fittings shall be wrought copper and comply with ASME B16. All joints larger than 2 shall be brazed If steel pipe is used it must be Schedule 40 or greater 2.4 All fittings shall be threaded, socket weld or butt weld type and Conform to ASME B31.9. All joints larger than 2 diameter shall be welded. All threaded steel pipe less than 2 shall be schedule HYDRONIC PIPING SYSTEMS ABOVE GRADE Page 3
4 2.4 For hydronic piping less than 200 degrees Fahrenheit (including chilled water), all isolation valves 6 and larger shall be resilient seat butterfly valves, tripled sealed, hard backed cartridge seat, wafer body, S.S. disc, EPDM seal, Cameron, DeZurick, ABZ. Gear operators are required for incoming service. 2.5 For hydronic piping less than 200 degrees Fahrenheit (including chilled water), all isolation valves 2-1/2 to 4 shall be flanged three piece bronze full port ball valves with Teflon seats and stainless steel ball and trim. 2.6 For hydronic hot water service over 200 degrees Fahrenheit use High Performance butterfly valves such as ABZ with Teflon seat/seal, 17/4PH stainless stem, 316SS disc, or equivalent by Dezurik and Milwaukee (same materials of Construction). 2.7 For all hydronic services, isolation valves 2 inches in diameter and smaller shall be two piece, Teflon seated, bronze, full port, w/ stainless steel trim, ball valves. American, Apollo, Milwaukee and Nibco are acceptable valve manufacturers. 2.8 Dirt/air eliminators, when applied, shall be manufactured by Spirotherm. All units(where applicable) shall include a full port ball valve at the bottom blow down connection and be piped to a Rosedale filter (see attachment 1). 2.9 In-line wye strainers shall be manufactured by spirax sarco with stainless steel baskets, bolted cover and plugged blow-off. 2.9 BTU meters to be Onicon System Flow meters to be Onicon insertion magnetic meter or full insertion mag meter depending on the metering run available All balancing valves shall be Tour Andersson, Armstrong and B&G 2.12 Pump check valves shall be silent type, stainless steel trim w/ viton seats By-pass chemical filter feeders shall be 5 gallon, filter feeder type, FTF-5DB equipped w/ 10 micron filter bags, qty ten (10) Thermometers to be liquid filled thermometer type, 90 degree angle, w/ well, equal to Trerice, Model HT 31, range code 41 for chilled water and range code 47 for hot heating water All pressure gages shall be liquid filled. Pressure gages shall be accurate to within plus or minus one percent of range span, stainless steel bourdon-tube system, bronze movement, a dial diameter of 4 to 5 is acceptable when installed 8 feet or less above finished floor, 8 dial diameter when installed higher than 8 feet above finished floor HYDRONIC PIPING SYSTEMS ABOVE GRADE Page 4
5 Each gage connection shall have a full port ball valve for isolation Differential Pressure Indicator, DPI, for by-chemical chemical filter feeder shall be Midwest Instrument, Model Expansion tanks shall be floor mounted diaphragm type (fluid in diaphragm), replaceable diaphragm, all welded steel, constructed, tested and stamped in accordance with ASME, and rated for a minimum working pressure of 125 psig. Only vertical expansion tanks with integral steel support stand are acceptable to the University of Delaware. Expansion tank shall be supplied with an air-charging fitting and tank drain. Connection to the unit shall have a valve and union for service replacement Heat exchangers for HVAC heating and cooling systems shall be shell and tube constructed, tested and stamped in accordance with ASME and rated for a minimum working pressure of 125 psig. Tubes shall be U-type with ¾ minimum cupro-nickel tubes. Shell shall be carbon steel with cast iron heads. PART 3 EXECUTION 3.1 All expansion loops shall be piped as hard type. 3.2 Install non-conducting dielectric connections wherever jointing dissimilar metals. All connections shall use dielectric nipples, couplings or insulating flanges. No dielectric unions allowed. 3.3 Install piping to allow for expansion and contraction without stressing pipe, joints and/or connected equipment wherever possible group piping at common elevations Provide clearance in hangers and from structure to allow for installation of insulation Provide flanged connections to all equipment. 3.7 Ensure, valve handles, test and balance ports are extended beyond the outside surface of the insulation for all chilled water services. 3.8 Primary bridge flow shall be balanced for peak building chilled water flow that equals the peak load. 3.9 Filter bags on by-pass chemical by-pass feeders will be in place and and maintained by 10 5 psid following cleaning and flushing of piping systems HYDRONIC PIPING SYSTEMS ABOVE GRADE Page 5
6 3.10 Set point for VFD shall be determined by the balancer placing all coils at peak flow that equals peak load and measuring the most remote coil s differential pressure w/ valves wide open. END OF SECTION ATTACHMENT 1: DIRT/AIR ELIMINATOR PIPING ARRANGEMENT HYDRONIC PIPING SYSTEMS ABOVE GRADE Page 6
7 ATTACHMENT 1 DIRT/AIR ELIMINATOR PIPING ARRANGEMENT HYDRONIC PIPING SYSTEMS ABOVE GRADE Page 7
SECTION SECTION DESIGN REQUIREMENTS
SECTION 26 09 SECTION 23 05 23 DESIGN REQUIREMENTS GENERAL DUTY VALVES GENERAL INFORMATION 1.1 This section applies to valves for hydronic and steam systems. DESIGN REQUIREMENTS 2.1 Design Criteria a.
More informationRESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES
SECTION 23 23 00 REFRIGERANT PIPING AND SPECIALITIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant piping. 2. Unions, flanges, and couplings. 3. Pipe hangers and supports. 4. Refrigerant
More informationB. Shop Drawings: Detail fabrication of pipe anchors, hangers, special pipe support assemblies, alignment guides, expansion joints and loops,
SECTION 23 21 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationHVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS
230500 HVAC BASIC MATERIAL AND METHODS PART 1 GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230000 Basic HVAC Requirements B. Section 230523 Valves C. Section 230510 Chilled
More informationD-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING
D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationEssex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL
Essex County College - West Essex Campus Addition And Renovations dib # 54292 / 11-14 SECTION 232116 - HYDRONIC PIPING SPECIALTIES PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions
More informationTECHNICAL. Series 18. Pump Packages
TECHNICAL S Y S T E M S Series 18 Pump Packages Series 18 Pump Packages Standard Features Close-coupled, end-suction, centrifugal pumps Mounted and wired pump starters Hand-Off-Auto switch for each pump
More informationDivision 23 - HVAC Switzerland Beallsville K-12. Section HYDRONIC PIPING SECTION HYDRONIC PIPING PART 1 - GENERAL
Division 23 - HVAC 090070 Switzerland Beallsville K-12 Section 23 21 13 HYDRONIC PIPING SECTION 23 21 13 HYDRONIC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the
More informationD. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationB. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSECTION HYDRONIC PIPING
SECTION 23 21 13 HYDRONIC PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes pipe and fitting materials, joining methods, special-duty valves, and specialties for the following: 1. Hot-water
More informationSECTION HYDRONIC PIPING AND SPECIALTIES
SECTION 15511 HYDRONIC PIPING AND SPECIALTIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe Materials. 2. Fittings. 3. Specialty Items. 4. Glycol Antifreeze Protection. 5. Process Cooling B.
More informationA. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSTEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationHYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS
More informationSECTION METERS AND GAGES FOR PLUMBING PIPING
SECTION 220519 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More information. ECTION METERS AND GAGES
. ECTION 230519 - METERS AND GAGES PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Divisions 00 thru 01 Specification
More informationUNIVERSITY OF MISSOURI Building Hydronic Piping and Pump Systems 2017 Q3
GENERAL: Hydronic systems included in this document are chilled water, heating hot water, dual temperature and glycol based systems. DESIGN GUIDELINES: Design General 1. Where campus steam is available,
More informationSECTION METERS AND GAGES FOR HVAC PIPING
SECTION 23 0519 METERS AND GAGES FOR HVAC PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Thermometers. 2. Gages. 3. Test plugs. 4. Thermowells. 1.2 SUBMITTALS A. Product Data: For each type
More informationSECTION DOMESTIC WATER PIPING SPECIALTIES
SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationPROJ. NO SECTION METERS AND GAGES FOR HVAC PIPING
SECTION 23 05 19 METERS AND GAGES FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 23 2113 - HYDRONIC PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes pipe and fitting materials, joining methods, special-duty valves, and certain specialties for the following: 1. Chilled
More informationA. This Section includes the following domestic water piping specialties:
SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationPROJ. NO SECTION REFRIGERANT PIPING
SECTION 23 23 00 REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationMLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN
DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE
More informationOKLAHOMA STATE UNIVERSITY - BUILDING DESIGN STANDARDS
Page 1 PART 1 GENERAL 1.1 SUMMARY A. Work of this section includes providing basic mechanical materials including, but not limited to, the following: 1. Valves. 2. Pipe expansion joints. 3. Supports and
More informationMercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.
SECTION 22 63 13 GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationCHILLED WATER SYSTEM 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods
230510 CHILLED WATER SYSTEM PART 1: GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230000 Basic HVAC Requirements B. Section 230500 HVAC Basic Materials and Methods C. Section
More informationHYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section
More information4. Provide brass valve tags marked for the service. See pertinent service specification for valve type.
Section includes various guidelines for valves, instrumentation for process systems, meters, thermometers, and gauges. This design guideline is written to the designer of record (DOR). This guideline is
More informationPipe: ASTM B88, hard drawn copper, Type K. Fittings: ASTM B16.22 Wrought copper and copper alloy.
Design Standard Hydronic Piping in Buildings Detailed specifications follow. PART 1 - GENERAL 1.01 Above ground hydronic piping 2 inches and less in diameter shall be as follows: Copper PEX-A Pipe: ASTM
More informationHYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section
More information1. Division 23 Section "Steam and Condensate Heating Piping" for steam and condensate meters.
Page 230519-1 SECTION 230519 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.
More informationDIVISION 23 HVAC Hydronic Piping Systems
General Information Programming/ Design Bidding/ Preconstruction Installation/ Construction Closeout/ Warranty QA/QC Checklist Construction Services DIVISION 23 HVAC 23 21 13 Hydronic Piping Systems 01
More informationSECTION HYDRONIC PIPING
SECTION 23 21 13 - HYDRONIC PIPING PART I - GENERAL 1.1 DEFINITION A. Hydronic System: Non-potable water-based heat transfer system, excluding steam. Hydronic systems include hot water heating, chilled
More informationPhiloWilke Partnership Addendum No. 2 A/E Project No April 2016
SECTION 23 21 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.
More informationREFRIGERANT PIPING
SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION HEATING BOILER FEEDWATER EQUIPMENT
SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American
More informationADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri
ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July
More informationSECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Codes and Standards: A. Plumbing Code Compliance: Comply with applicable portions of National Standard Plumbing Code pertaining to selection and installation of Plumbing materials
More informationC. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.
SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationRatio Architects, Inc. Section Refrigerant Piping
SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant pipes and fittings. 2. Refrigerant piping valves and specialties. 3. Refrigerants. 1.2 ACTION SUBMITTALS
More information1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.
Page 238239-1 SECTION 238239 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationWater Piping and Pumps
Technical Development Program DISTRIBUTION SYSTEMS Water Piping and Pumps PRESENTED BY: Michael Ho carriertdp@gmail.com 424-262-2144 Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section
More informationUNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS
UNDP - PAPP UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS Specifications July 2008 ENGINEERING UNIT SECTION 15105 HVAC PIPES AND TUBES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Pipe and pipe fittings
More informationB. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).
Guide Specifications PART 1 GENERAL 1.01 SYSTEM DESCRIPTION Microprocessor controlled, air-cooled liquid chiller utilizing scroll compressors, low sound fans, hydronic pump system and optional fluid storage
More informationSECTION PACKAGED HEAT TRANSFER SYSTEM
PACKAGED HEAT TRANSFER SYSTEM Page 1 of 6 SECTION PACKAGED HEAT TRANSFER SYSTEM 1 GENERAL 1.1 SUMMARY A. Packaged steam-to-water heat transfer system 1.2 REFERENCES A. ASHRAE American Society of Heating,
More informationADDENDUM NO. 3 March 19, 2018
ADDENDUM NO. 3 March 19, 2018 PROJECT: MT. VIEW ELEMENTARY CASSIA SCHOOL DISTRICT NO 151 BURLEY, IDAHO The following addenda apply to the Project Manual and / or Drawings for this project and shall be
More informationA. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.
Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationYALE Site Specifications AIR VENT SCHEDULE
SECTION 23 21 16 01 PIPING SPECIALTIES APPENDIX Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 AIR VENT SCHEDULE Tag AV-1 AV-2 AV-3 Type Automatic Float Low Pressure
More informationPROJECT NAME: DPW Idaho State University Liberal Arts Building Chiller Replacement
ADDENDUM NO.2 April 6, 2018 PROJECT NAME: DPW 18 223 Idaho State University Liberal Arts Building Chiller Replacement The data included hereinafter is issued by the Engineer (Engineered Systems Associates,
More informationSECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED
More informationSECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY
SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where
More informationPROJ. NO SECTION HYDRONIC PIPING
SECTION 23 21 13 HYDRONIC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION DRY-PIPE SPRINKLER SYSTEMS
Ul611-0l SECTION 211316- DRY-PIPE SPRINKLER SYSTEMS PARTl-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification
More informationNATURAL GAS PIPING
SECTION 15496 - NATURAL GAS PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationREFRIGERANT PIPING SYSTEM
PART 1 GENERAL 1.01 DESCRIPTION A. The requirements of this section apply to the refrigerant piping system connecting refrigeration and HVAC equipment specified in other sections of these specifications.
More informationB. Product Certificates: For each type of meter and gage, from manufacturer.
Page 220519-1 SECTION 220519 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationDENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS
PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate
More informationSECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.
SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More informationDesign and Construction Standards SECTION PLUMBING EQUIPMENT
SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product
More informationSECTION (15530) - REFRIGERANT PIPING
SECTION 23 23 00 (15530) - REFRIGERANT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. 3. Joining Materials. 4. Specialties. B. Related Sections: 1. Section 07 92 00 (07920)
More informationLee s Summit West High School Boiler #3 Replacement SECTION CONDENSING BOILERS
SECTION 235216 - CONDENSING BOILERS PART 1 - GENERAL REQUIREMENTS 1.1 SCOPE A. The work to be performed includes all new equipment, labor and materials required to furnish and install a replacement boiler
More informationDUKE UNIVERSITY DESIGN GUIDELINES
1 15480 Domestic Hot Water Systems 22 11 00 1. Introduction A. Domestic hot water systems are critical to all building types on the University campus: residential, administrative, laboratory/research,
More informationSECTION HEATING AND AIR CONDITIONING PIPING SYSTEMS. A. Provisions of Division 01 apply to this section. 1. Chilled Water System.
SECTION 15180 PART 1 - GENERAL 1.01 SUMMARY A. Provisions of Division 01 apply to this section B. Section Includes: Providing complete piping systems for heating, ventilating, and air conditioning systems
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationTHE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION
SECTION 21 1301- FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY: A. This Section includes fire-suppression piping and equipment for the following building systems: 1. Wet-pipe, fire-suppression
More information15900 HVAC INSTRUMENTATION AND CONTROLS
15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and
More informationDENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION WATER TREATMENT
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Open Cooling Towers: a treatment system utilizing chemicals and biocides that contain no heavy metals and are non-carconigenic to prevent corrosion,
More informationCONTENTS. A. Summary. Yale University Design Standards. Valves. Change History
Change History Change Date Description of Change Pages / Sections Modified Approver Initials 3/26/13 Add next item; do not use mechanical coupling components. 3/26/13 Add next item; do not use mechanical
More informationCommercial, Residential & Institutional Pumps, Tanks, & Accessories
Taco International Commercial, Residential & Institutional Pumps, Tanks, & Accessories Taco Catalog # : 300-6.0 Supersedes: 300-3.5 9/11/06 Effective Date: 03/21/07 Printed in USA Pumps FI Frame Mounted
More informationHigh Capacity Instantaneous Steam Fired Water Heater
MODEL F High Capacity Instantaneous Steam Fired Water Heater Features Compact High Capacity Design Packaged System Water heater is factory assembled on an all welded steel mounting frame to save time and
More information007100S01 - PROGRAM DESIGN CRITERIA
Related Division Contents: 00 PROGRAM DESIGN 01 GENERAL INFORMATION 33 CENTRAL STEAM PIPING AND EQUIPMENT 21 FIRE PROTECTION PIPING AND EQUIPMENT 33 MAIN CAMPUS CENTRAL CHILLED WATER SYSTEM 07 ROOFING
More informationD-8 OUTLINE SPECIFICATION FOR HTHW HEAT EXCHANGERS
D-8 OUTLINE SPECIFICATION FOR HTHW HEAT EXCHANGERS GENERAL: This document provides performance requirements and guideline information for Heat Exchanger equipment for Colorado College only, and is not
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT
More informationB. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum.
Page 211200-1 SECTION 211200 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationBuildingName The Description of the Project P DOCUMENTS
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
More informationSPRINKLERS TABLE OF CONTENTS
SPRINKLERS TABLE OF CONTENTS SECTION 21 13 13 WET PIPE SPRINKLER SYSTEMS SECTION 211313 - WET PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,
More informationEngineering Specifications
BRONZE BALL VALVES Model 2970 and Model 2970.10 PART 1: GENERAL 1.1 SUMMARY A. General duty press end type bronze ball valve 1.2 DEFINITIONS A. The following are standard abbreviations for valves: 1. WOG:
More informationNITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM
NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. This section outlines the requirements for the nitrogen-generating sprinkler corrosion inhibiting system. The work
More informationACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO
SECTION 210523 - GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationA. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.
SECTION 23 21 23 - HYDRONIC PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationBrown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS
SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett
More informationA. Detail drawing M1 Standard Chilled Water Schematic 1.03 DESCRIPTION OF THE PULLMAN CAMPUS CENTRAL CHILLED WATER LOOP SYSTEM:
33 60 00 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. These standards and procedures apply to the use and interface requirements of the Washington State University Central Chilled Water (CCW) system.
More informationA. Section includes wet-pipe sprinkler system, system design, installation, and certification.
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes wet-pipe sprinkler system, system design, installation, and certification. 1.2 REFERENCES A. General: Comply
More informationSECTION (15530) - REFRIGERANT PIPING
PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. SECTION 23 23 00 (15530) - REFRIGERANT PIPING 3. Joining Materials. 4. Specialties. B. Related Sections: 1.02 REFERENCES 1. Section
More informationWayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No
SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationB. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.
(816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the
More informationB. Related Sections: The following Sections contain requirements that relate to this Section.
SECTION 211313- FIRE-SUPPRESSION PIPING PART1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationC. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.
Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED
More informationPeerless Pump Company
Peerless Pump Company HVAC & Hydronics Equipment Triple Duty Valves & Suction Diffusers Diaphragm Type Hydro-pneumatic Tanks Air Separators Automatic Air Eliminators Grundfos Inline Circulator Pumps Peerless
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationWET-PIPE SPRINKLER SYSTEMS
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationDESIGN STANDARDS SECTION 15600
PART 1 - GENERAL 1.1 Work included: A. Piping, tubing and fittings. B. Piping specialties. C. Special duty valves. D. Refrigerants. E. Chillers. F. Refrigerant monitors. 1.2 General requirements: A. Reciprocating
More informationSECTION METERS AND GAGES
Buchtel/PerIcins Community Learning.Center GPD - 2007271.15 SECTION 15122 METERS AND GAGES PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and
More information