SECTION AIR COILS
|
|
- Dustin Clark
- 5 years ago
- Views:
Transcription
1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections: The following Sections contain requirements that relate to this Section: 1. Section "HVAC Instrumentation and Controls" for air coil, temperaturecontrol valve requirements. 1.2 SUMMARY A. This Section includes the following: 1. Integral face and bypass heating coils. 2. Chilled water cooling coils. 3. Direct expansion cooling coils. 4. Refrigerant condenser coil. 5. Hot (glycol) water coils. 6. Hot glycol coils. 7. Hot water reheat coils. 8. Heat recovery coils. 9. Electric duct heaters. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of the Contract and Specification Sections. B. No equipment shall be fabricated or delivered until receipt of approved shop drawings from the Architect. C. Prior to submittal, the equipment supplier shall coordinate with the Contractor to determine the quantity and arrangement of each type of equipment device provided for this project. Equipment furnished with improper arrangement shall be replaced by the Contractor at no additional cost to the Owner. D. Provide the following information with each shop drawing submission. 1. Complete specification of the equipment which will be provided including all optional equipment. All equipment shall be tagged. Refer to "Mechanical Identification" Section for further requirements. 2. Submittal data may include unpriced factory order forms indicating manufacturer's model number, cabinet type, materials of construction and what optional equipment will be furnished along with catalog information explaining the model number, standard features, and optional features. 3. Commodity items with fixed performance characteristics such as unit heaters, convectors, fan coil units, unit ventilators and reheat coils shall be listed Page 1 of 9
2 individually indicating performance equal to or superior to the standard product scheduled using identical air and water flow rates for each standard size. Generally, supply air temperatures and supply water temperatures will be considered fixed. It is optional for the manufacturer to submit a complete list of items which will be delivered. If submitted, tag numbers must correspond to the room numbers shown on the Architectural Drawings which the item will service. 4. Provide computerized selection data for each coil and heat exchanger provided. Data shall disclose all coil selection conditions including altitude. 5. Provide color charts for exposed equipment color selection. 6. Submittal data showing that all coils and terminal equipment bear the ARI Certified Performance Seal for performance at the capacities specified on the Drawings. 7. Arrangement drawings including physical dimensions, support locations, and weight of each terminal device, and the locations of access doors, pipe connections, and "left hand unit and right hand units". 8. Installation, operation and maintenance instructions in shop manual format including spare parts list. 1.4 QUALITY CONTROL A. Manufacturer Qualifications: Firm experienced in manufacturing air coils and duct heaters similar to those indicated for this Project and that have a record of successful inservice performance. B. All coils shall be rated in accordance with ARI Standard 410 and shall comply with the ARI Certified Ratings Program. C. Refrigerant coils shall meet the requirements of the latest edition of ASHRAE Standard 15. D. Comply with NFPA 70 "National Electrical Code" for components and installation. E. Listing and Labeling: Provide products specified in this Section that are listed and labeled. 1. The Terms "Listed" and "Labeled": As defined in the National Electrical Code, Article Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" (NRTL) as defined in OSHA Regulation F. Single-Source Responsibility: Obtain air coil components from one source and by a single manufacturer. 1.5 COORDINATION A. Coordinate layout and installation of air coils with duct, insulation, and with other installations. Revise locations and elevations from those indicated as required to suit field conditions, and as approved by the Architect. PART 2 - PRODUCTS Page 2 of 9
3 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Integral Face and Bypass Heating Coils: a. Aerofin b. Marlo c. Wing 2. Chilled Water Cooling Coils: 3. Direct Expansion Cooling Coils: 4. Refrigerant Condenser Coils: 5. Hot (Glycol) Water Coils and Hot Glycol Coils: Page 3 of 9
4 6. Hot Water Reheat Coils: a. Carrier Corporation b. McQuay c. Trane d. York 7. Heat Recovery Coils: 8. Electric Duct Heaters a. Q-Mark 2.2 TYPE "VIFB" OR "HIFB" INTEGRAL FACE AND BYPASS HEATING COILS A. Provide integral face and bypass heating coils of the size, type, and capacity as shown and scheduled on the Drawings. Type VIFB coils shall have a vertical steam path; Type HIFB coils shall have a horizontal steam path. B. Each heating coil shall consist of a built-in series of finned heating elements and bypasses with interlocked dampers modulated by a damper motor. 1. Dampers shall be 16-gauge roll-formed cold-rolled steel with baked enamel finish. Damper motors shall be pneumatic type suitable for 3-15 psig modulating air signal and 18 to 20 psig main air motors shall be provided by the coil manufacturer and shall be similar to those specified for dampers in Section 15900/ Dampers shall fail to the full heating position when a 0 psig signal or 0 psig main air is applied. Motors shall be complete with pilot positioners. 2. Casing shall be 14-gauge steel, galvanized and painted, with rigid framework including structural steel pipe supports in all four corners on both entering and leaving air side. 3. Vertical (and/or horizontal) finned heating elements shall be fabricated of seamless copper tubes with aluminum fins spaced not closer than 10 fins per inch. Each tube shall be individually secured to the steam and return headers by a brazed joint with provision for individual tube expansion and contraction. Finned elements shall be suitable for 100 psig saturated steam and 330 deg. F temperature and shall be factory tested at 200 psig steam and with air pressure under water (hydrostatically) at 400 psig. Page 4 of 9
5 C. Dampers shall be arranged so as to completely enclose and isolate the heating coil passes when no heating is required. Each coil shall be capable of maintaining a constant discharge air temperature regardless of variations in entering air temperature with full steam pressure (or with full hot water flow). 1. Proportioning of the air shall be such that the temperature at any point in a plane parallel to the face of the coil three feet downstream form the leaving side will not vary more than 5 deg. F from the average discharge airstream temperature. Pressure drop of air passing through the coil shall not vary more than plus or minus 5 percent, regardless of the position of the internal dampers. D. The coil shop drawing submittal shall include data on all the coils and on the damper motors. The data shall be broken down for each application or installation. 2.3 CHILLED WATER COOLING COILS A. Provide chilled water cooling coils of the capacity and size as scheduled on the Drawings. Coil ratings shall be certified in accordance with ARI Standard 410. B. The primary surface shall be 5/8-inch O.D. copper tubes with inch nominal wall thickness. The tube joints shall be rolled for pressure tightness. The tube circuiting shall be completely drainable from a single location. 1. Bronze, spring type turbulators shall be provided in glycol coils only; use of turbulators in water coils will not be permitted. C. (Unless otherwise noted) the secondary surface shall be aluminum fins. Fins shall have belted collars and be bonded to tubes by mechanical expansion. A foam sealing strip shall be located between the casing bottom and fin ends to prevent air bypass and water carry-over. 1. The secondary surface for coil(s) CC- and CC- shall be copper fins. D. The coil shall have either cast iron, copper, or steel headers. Headers shall include air vent and drain plugs. E. Coil casing shall be the cartridge type, removable from the coil connection side of the casing and supported in tracks over the entire length of the coil. The coil casing shall be 304 stainless steel. F. Each coil shall be rated for working pressures up to 200 psig (300 psig) at 200 deg. F. G. Design Basis: Trane Type W. 2.4 DIRECT EXPANSION COOLING COILS A. Provide direct expansion cooling coils of the capacity and size as scheduled on the Drawings. Coil ratings shall be certified in accordance with ARI Standard 410 and shall meet the requirements of ASHRAE Standard Page 5 of 9
6 B. The primary surface shall be 5/8-inch O.D. seamless copper tubing with inch nominal wall thickness. 1. Tubes shall be fed with one piece low pressure drop venturi type refrigerant distributors arranged for downfeed with male sweat connections. Liquid lines shall be 1/4-inch Type S or 5/16-inch Type L copper. Each distributor shall feed a maximum of 12 refrigerant circuits. 2. The suction header shall be constructed of round seamless copper tubing. 3. All joints shall be silver soldered or brazed. 4. Where multiple refrigerant circuits are required by coil size (over approximately 18-inches tall) or application, the circuits shall be intertwined full face circuits. C. The secondary surface shall consist of aluminum fins. Fins shall have belted collars and shall be bonded to the tubes by mechanical expansion. A foam sealing strip shall be located between the casing bottom and fin ends to prevent air bypass and water carry-over. D. The coil casing shall be the cartridge type, removable from the coil connection side of the air handling unit casing and supported in tracks over the entire length of the coil. The coil casing shall be 304 stainless steel. E. Each coil shall be rated for working pressures up to 300 psig at 200 deg. F. The coil shall be suitable for use with refrigerant HCFC-22 (HFC-134a). Refer to "Condensing Units" Section for condensing unit requirements. 1. Each coil installed in air conditioning units or ductwork shall be constructed to withstand a temperature of 700 deg. F without refrigerant leakage into the airstream. F. Each coil shall be cleaned, dehydrated and sealed with dry nitrogen charge at the factory before shipment. G. Design Basis: Trane Type F. 2.5 REFRIGERANT CONDENSER COIL A. Provide refrigerant condenser coils of the capacity and size as scheduled on the Drawings. Coil ratings shall be certified in accordance with ARI Standard 410 and shall meet the requirements of ASHRAE Standard B. The primary surface shall be 5/8-inch O.D. seamless copper tubing with inch nominal wall thickness. 1. Suction and discharge headers shall be constructed of round seamless copper tubing arranged for draining the refrigerant condensate. Coils shall be arranged for air flow in the horizontal (vertical up) direction. 2. All joints shall be silver soldered or brazed. 3. Where multiple refrigerant circuits are required by application, the circuits shall be arranged to split the coil face into sections. C. The secondary surface shall consist of aluminum fins. Fins shall have belted collars and be bonded to the tubes by mechanical expansion. Page 6 of 9
7 D. The coil casing shall be the cartridge type, removable from either side of the air handling unit casing and supported by tracks over the entire length of the coil. (Unless otherwise noted) the coil casing shall be galvanized steel. 1. The casings for coils located directly downstream of cooling coils shall be 304 stainless steel. E. Each coil shall be rated for working pressures up to 300 psig at 250 deg. F. The coil shall be suitable for use with refrigerant HCFC-22 (or HFC-12) and for being located within close proximity of the refrigerant compressor discharge. Refer to Section for condensing unit requirements. 1. Each coil installed in air conditioning units or ductwork shall be constructed to withstand a temperature of 700 deg. F without refrigerant leakage into the airstream. F. Each coil shall be cleaned, dehydrated and sealed with a dry nitrogen charge at the factory before shipment. G. Design Basis: Trane Type H, 2.6 HOT (GLYCOL) WATER COILS A. Provide hot (glycol) water heating coils of the capacity and size as scheduled on the Drawings. Coil ratings shall be certified in accordance with ARI Standard 410 (and with proper modifications for use with ethylene glycol solutions). B. Primary surface shall be fabricated of 5/8-inch O.D. copper tubes with inch nominal wall thickness. The tube joints shall be rolled for pressure tightness. The tube circuiting shall be completely drainable from a single location. 1. Bronze, spring type, turbulators shall be provided in glycol coils only, use of turbulators in water coils will not be permitted. C. The secondary surface shall be aluminum fins. Fins shall have belted collars and be bonded to tubes by mechanical expansion. D. Coils shall have either cast iron, copper or steel headers. Headers shall include air vent and drain plugs. E. The coil casing shall be the cartridge type, removable from either the coil connection side or the opposite side of the air handling unit and supported in tracks over the entire length of the coil. (Unless otherwise noted) the coil casings shall be galvanized steel. 1. The casings for coils located directly downstream of cooling coils shall be 304 stainless steel. F. Each coil shall be rated for working pressures up to 200 psig at 250 deg. F. G. Design Basis: Trane Type W. 2.7 HOT GLYCOL COILS Page 7 of 9
8 A. Provide hot glycol water heating coils of the capacity and size as scheduled on the drawings. Coils shall be rated in accordance with ARI Standard 410 and with proper modifications for use with ethylene glycol water solutions. B. Hot glycol coils shall be the same as specified for hot water heating coils. C. Hot glycol coils shall be provided with bronze, spring type turbulators. 2.8 HOT WATER REHEAT COILS A. Provide as scheduled hot water heating coils with supply and return on same end of each coil. Coils shall be certified in accordance with ARI Standard 410. B. Primary surfaces shall be 5/8-inch O.D. tubes with inch nominal wall thickness. Tube joints shall be rolled for pressure tightness. The tubes shall form a single or double parallel continuous water circuit within the coil face. C. Secondary surface shall consist of aluminum fins. Fins shall have belted collars and shall be bonded to tubes by mechanical expansion. D. (Unless otherwise noted) The casing shall be constructed of galvanized sheet steel having provisions for bolting to ductwork on the top and bottom channels and on both ends. 1. The casing for coils located directly downstream of cooling coil shall be 304 stainless steel. E. Each coil shall be rated for working pressures up to 200 psig at 250 deg. F. F. Design Basis: Trane Type "T" or "TT". 2.9 HEAT RECOVERY COILS A. Provide heat recovery coils of the capacity and size as scheduled on the drawings. Coils shall be rated in accordance with ARI Standard 410 and with proper modifications for use with ethylene glycol/water solutions. B. Heat recovery coils in the outdoor air intake air stream shall be the same as specified for hot (glycol) water heating coils. C. Heat recovery coils in the exhaust air stream shall be the same as specified for chilled water cooling coils. D. Bronze, spring type turbulators shall be provided in glycol coils. PART 3 - EXECUTION 3.1 EXAMINATION Page 8 of 9
9 A. Examine ducts, plenums, and units to receive air coils for compliance with requirements for installation tolerances and other conditions affecting performance of the air coils. Verify piping rough-in dimensions. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Install air coils and duct heaters as indicated, level and plumb, and according to manufacturer's written instructions, rough-in drawings, the original design, and referenced standards. B. Install air coils and duct heaters in metal ducts and casings constructed according to SMACNA "HVAC Duct Construction Standards." C. Anchor air coils in position using suitable supports. D. Install piping connections, maintaining manufacturer's recommended clearances for service and maintenance of coils. E. Install moisture eliminators as indicated. F. Install shutoff valves at coil inlet and outlet connections. G. Install galvanized-steel drain pan under each chilled-water coil. 1. Install galvanized-steel gutter underneath each coil above the lowest coil in stacked assemblies. 2. Construct drain pans to extend beyond coil length and width. Provide condensate trap and drainage. 3. Extend drain pan 10 inches beyond moisture eliminator. 4. Extend drain pan 10 inches beyond coil. H. Connect duct heaters and components to wiring systems and to ground as indicated and instructed by manufacturer. Tighten connectors and terminals, including screws and bolts, according to equipment manufacturer's published torque-tightening values for equipment connectors. Where manufacturer's torquing requirements are not indicated, tighten connectors and terminals according to tightening torques specified in UL 486A. 3.3 ADJUSTING A. Comb bent fins on each air coil. 3.4 CLEANING A. After completing system installation, including duct and fittings, clean coils using materials and methods recommended by manufacturers, and clean inside of casings and enclosures to remove dust and debris. END OF SECTION Page 9 of 9
Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services
Page 238216-1 Copyright 2003 and 2005 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical
More informationSECTION FAN COIL UNITS
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More informationA. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.
15855 AIR HANDLING UNITS SPECIFIER: CSI MasterFormat 2004 number: 237313 PART 1 GENERAL 1.1 SUMMARY A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 82 16.00 40 (May 2016) ------------------------------ Preparing Activity: NASA Superseding UFGS-23 82 16.00 40 (May 2013) UFGS-23 82 16 (February 2011) UNIFIED FACILITIES
More informationBrown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS
SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett
More informationSECTION AIR COILS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 82 16 AIR COILS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section
More informationAIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork.
SECTION 15855 AIR HANDLING UNITS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15885 - Air Filtration Equipment. 3. 15890 - Ductwork. 1.02 REFERENCES A. Air Moving
More informationSECTION AIR HANDLING UNIT
SECTION 15800 - AIR HANDLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR
More informationSECTION SPLIT-SYSTEM AIR-CONDITIONERS
SECTION 238126 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to
More informationSECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS
SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the
More informationConstruction Standards Page
Construction Standards Page 236313-1 SECTION 236313 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION SPLIT-SYSTEM AIR-CONDITIONERS
SECTION 23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.
More informationA. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.
SECTION 238113 - PACKAGED TERMINAL AIR CONDITIONERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationA. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.
Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION
SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to
More information1.1 This section applies to air handling units for HVAC Systems.
AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationA. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.
Page 238126-1 SECTION 238126 - This Section includes requirements for the LEED Rating System. However, equipment specified in this Section may not qualify for LEED Rating System prerequisites and credits.
More information1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.
Page 238239-1 SECTION 238239 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION CONVECTION HEATING AND COOLING UNITS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Baseboard radiation. B. Finned tube radiation. C. Convectors. D. Unit heaters. E. Cabinet unit heaters. F. Fan-coil units. G. Unit ventilators. H. Blower-coil units.
More informationGuide Spec Summary. Option List. Date: 05/21/2001. EarthWise Modular Climate Changer Full Spec. Prepared by: Phone Number: Prepared for:
Date: 05/21/2001 Time: 08:50:16 AM Job Name: EarthWise Modular Climate Changer Full Spec Location: Any Town, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SUBMITTALS Submittals
More informationA. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.
SECTION 23 70 00- CENTRAL HVAC EQUIPMENT PART 1: GENERAL 1.1 PURPOSE: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationSECTION PACKAGED COMPRESSOR AND CONDENSER UNITS
SECTION 236200 - PACKAGED COMPRESSOR AND CONDENSER UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply
More informationGuide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:
Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT
More informationPROJ. NO SECTION REFRIGERANT PIPING
SECTION 23 23 00 REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION (15530) - REFRIGERANT PIPING
SECTION 23 23 00 (15530) - REFRIGERANT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. 3. Joining Materials. 4. Specialties. B. Related Sections: 1. Section 07 92 00 (07920)
More informationVIFB Coil Technical Guide
TGVIFB-4 VIFB Coil Technical Guide VERTICAL TUBE INTEGRAL FACE AND BY-PASS HEATING COILS FOR PREHEATING Since 1875, the L.J. Wing Company has been a leader in providing innovative solutions for diffi cult
More informationExclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
Page 236423-1 Copyright 2009 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical Plant
More informationSECTION WATER-SOURCE UNITARY HEAT PUMPS
SECTION 23 81 46 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.
More information1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section.
SECTION 15855 GAS FURNACE/DX COOLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of contract including General and Supplementary Conditions of Division 1 of Specification
More informationSECTION COMPUTER ROOM AIR CONDITIONING SYSTEMS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Specification Sections, apply to this Section. B. Related
More informationCity of Duluth Festival Center 04/25
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSECTION AIR COOLED WATER CHILLERS
PART 1 GENERAL 1.1 SECTION INCLUDES A. Chiller package B. Charge of refrigerant and oil C. Controls and control connections D. Chilled water connections E. Starters F. Electrical power connections 1.2
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More informationSECTION (15767) - UNIT HEATERS
SECTION 23 82 39 (15767) - UNIT HEATERS PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Unit Heaters. 2. Cabinet Unit Heaters. 3. Duct Heaters. 4. Baseboard Heaters. B. Related Sections: 1. Section
More informationSPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS
SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification
More informationDARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15856 MODULAR AIR HANDLING UNITS PART 1 DESIGN DIRECTIVES 1.1 QUALITY ASSURANCE A. NFPA Compliance: Modular air handling units and components shall be designed, fabricated, and installed in compliance
More informationREFRIGERANT PIPING SYSTEM
PART 1 GENERAL 1.01 DESCRIPTION A. The requirements of this section apply to the refrigerant piping system connecting refrigeration and HVAC equipment specified in other sections of these specifications.
More informationCOHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.
23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under
More informationSECTION WATER-SOURCE UNITARY HEAT PUMPS
SECTION 23 81 46 WATER-SOURCE UNITARY HEAT PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION (15530) - REFRIGERANT PIPING
PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. SECTION 23 23 00 (15530) - REFRIGERANT PIPING 3. Joining Materials. 4. Specialties. B. Related Sections: 1.02 REFERENCES 1. Section
More informationDARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES
SECTION 15830 HEATING & COOLING TERMINAL UNITS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All fan coil units shall be sized to meet design load while operating at medium speed. In extreme noise sensitive
More informationAIR HANDLER SPECIFICATION
AIR HANDLER SPECIFICATION Air Handlers AH-1 through 5 The following air handlers will be supplied: AH-1 FX15-4842 Series 5700 CFM AH-2 FX15-4236 Series 3990 CFM AH-3 FX15-3633 Series 2570 CFM AH-4 FX15-3330
More informationSAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER
SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section
More informationSECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS
SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof
More informationCB18/CBS18 Bulletin # September 1994 Supersedes August 1986
ENGINEERING DATA CB18 SERIES UP-FLOW CBS18 SERIES HORIZONTAL 2 To 5 Ton (7 To 18 kw) Nominal Cooling Capacity 7200 To 102 400 Btuh (2.1 To 30.0 kw) Optional Electrical Heat ENGINEERING DATA COILS MATCHED
More informationC. Samples for Initial Selection: For units with factory-applied color finishes.
SECTION 238126- SPLIT-SYSTEM AIR-CONDITIONERS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationVIFB Coil Technical Guide
TGVIFB-3 VIFB Coil Technical Guide VERTICAL TUBE INTEGRAL FACE AND BY-PASS HEATING COILS FOR PREHEATING Since 1875, the L.J. Wing Company has been a leader in providing innovative solutions for diffi cult
More informationSECTION AIR DUCT ACCESSORIES
SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control
More information.2 Section Waste Management and Disposal.
Issued 2005/06/01 Section 15624 Packaged Rotary Screw Water Chillers Page 1 of 5 PART 1 General 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3
More informationA. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories for each type of product indicated.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes 1. Hydronic baseboard radiators. 2. Hydronic finned-tube radiators. 3. Hydronic convectors. 1.2 SUBMITTALS A. Product Data: Include rated capacities,
More informationSECTION AIR COILS
SECTION 23 82 16 - AIR COILS PART I - GENERAL 1.1 SECTION INCLUDES A. Chilled water coils B. Hot water coils C. Steam coils D. Heat pipe coils 1.2 RELATED SECTIONS A. 23 73 23 Custom Air Handling Units
More informationSECTION AIR DOORS
SECTION 23 34 33 AIR DOORS Berner Series VSA air doors are designed for openings up to 12 ft for environmental separation and up to 10 ft for insect control. Berner Series VSB air doors are designed for
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 236426.11 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSECTION ROOFTOP REPLACEMENT AIR UNITS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Specification Sections, apply to this Section. B. Related
More informationA. This Section includes air-handling units with coils for indoor installations.
SECTION 237313 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes air-handling units with coils for indoor installations. 1.2 SUBMITTALS A. Product Data: For each type of indoor air-handling unit
More informationSECTION ROTARY-SCREW WATER CHILLERS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Factory-assembled packaged chiller. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Electrical power connections.
More informationSSL & SBS Engineering Guide
REDUCED-FOOTPRINT VERTICAL BLOWER COIL UNITS SSL & SBS Engineering Guide SO TOUGH, WE GUARANTEE IT. SSL SBS Table of Contents Features and Benefits... 3 Construction Features... 4 Features and Options...
More informationFAS Fresh Air Supply Units
TGFAS-2 FAS Fresh Air Supply Units TECHNICAL GUIDE STEAM AND HOT WATER MAKE-UP AIR HEATERS WITH INTEGRAL FACE AND BYPASS COILS FOR EFFECTIVE TEMPERATURE CONTROL Since 1875, the L.J. Wing Company has been
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 23 73 00_AIR HANDLING UNITS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Modular custom & semi-custom built indoor air handling
More informationComplete HVAC Capability. Central Station Air Handling Units. Publication No. WT-CSX-0616A
Publication No. WT-CSX-0616A Central Station Air Handling Units Complete HVAC Capability Horizontal Draw-Thru to Size 65 Vertical Draw-Thru to Size 50 1000 to 60,000 CFM Forward Curved or Airfoil Wheels
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating
More informationMERIT SERIES Up Flow / Horizontal
A I R H A N D L E R S CB26UH / CBX26UH MERIT SERIES Up Flow / Horizontal E N G I N E E R I N G D A T A Bulletin No. 210429 December 2006 Supersedes November 2006 Nominal Capacity 1.5 to 5 Tons Optional
More informationPRODUCT CATALOG BLOWER COILS.
2016 PRODUCT CATALOG BLOWER COILS www.superiorrex.com SBH / SBV Series Design Features DESIGNED FOR MAXIMUM FLEXIBILITY Both Horizontal and Vertical Belt Drive Blower Coils are designed to maximize flexibility
More informationSECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM
SECTION 23 81 06 - PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. This Section includes equipment types that contain all the components of the refrigeration process within
More informationC. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.
Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED
More informationMERIT Series R-410A - Upflow / Horizontal
PRODUCT SPECIFICATIONS AIR HANDLERS CBX5UH (-0) MERIT Series R-0A - Upflow / Horizontal Bulletin No. 0770 January 07 Supersedes August 06 Nominal Capacity -.5 to 5 Tons Optional Electric Heat -.5 to 0
More informationCOMMERCIAL HVAC EQUIPMENT Coils: Direct Expansion, Chilled Water, and Heating
COMMERCIAL HVAC EQUIPMENT Coils: Direct Expansion, Chilled Water, and Heating Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system
More informationUNIVERSITY OF MISSOURI Central Station Air-Handling Units March
GENERAL: 1. This section provides criteria for the design and installation of air handling units. DESIGN GUIDELINES: Design General 1. Location 1.1. For new construction, and existing buildings where possible,
More informationTESTING, ADJUSTING AND BALANCING
PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components
More informationSECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES
Page 226119-1 SECTION 226119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationA. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.
15684 ROTARY SCREW WATER CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236423 An optional
More informationSECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS
SECTION 237339 - DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More information1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.
September 2012, rev. 00 26 2416 Panelboards PART 1. GENERAL 1.01 Summary A. Section includes: 1.02 Definitions 1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load
More informationSECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the Specifier in correctly specifying Mechanical System Testing Adjusting
More informationDIVISION 23 - HVAC HVAC Air Distribution
PART 1 - GENERAL 1.01 GENERAL CRITERIA A. General Design Criteria 1. System standards require that buildings be fully ducted (supply, exhaust and return air). 2. Provide positive exhaust ventilation for
More informationTECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED EVAPORATOR BLOWER 25, 30, 40 & 50 TON LA300, LB360, 480 & 600 (50 Hz) PROVEN PERFORMANCE GENERAL FEATURING
TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED EVAPORATOR BLOWER 25, 30, 40 & 50 TON LA300, LB360, 480 & 600 (50 Hz) PROVEN PERFORMANCE GENERAL The LA/LB line is a flexible performer. LA300, LB360 & 480 can be
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018
SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION (15833) - HVAC POWER VENTILATORS
PART 1 GENERAL 1.01 SUMMARY SECTION 23 34 23 (15833) - HVAC POWER VENTILATORS A. Section Includes: 1. Centrifugal Roof Ventilators. 2. Up-blast Roof Exhaust Fans (Kitchen Hood Exhaust). 3. Ceiling-Mounted
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT
More informationWayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No
SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION CUSTOM INDOOR CENTRAL-STATION AIR-HANDLING UNITS For large systems, 50,000 cfm or more.
Page 237323-1 SECTION 237323 - For large systems, 50,000 cfm or more. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationMERIT Series R-410A - Upflow / Horizontal
PRODUCT SPECIFICATIONS AIR HANDLERS CBX5UH (-0) MERIT Series R-0A - Upflow / Horizontal Bulletin No. 060 March 05 Supersedes November 0 Nominal Capacity -.5 to 5 Tons Optional Electric Heat -.5 to 0 kw
More informationSECTION AIR HANDLING UNITS WITH COILS. 1. Central Station Air Handling Units. 1. Section Basic Mechanical Requirements.
SECTION 15855 AIR HANDLING UNITS WITH COILS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Central Station Air Handling Units. B. Related Sections: 1.02 REFERENCES 1. Section 15010 - Basic Mechanical
More informationSECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationLABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS
SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",
More informationSECTION REFRIGERATION EQUIPMENT. A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories.
SECTION 15650 REFRIGERATION EQUIPMENT PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories. B. Related Section: 1. 11400
More informationSECTION WATER-TUBE BOILERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections
More informationPITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS
PITTSBURG STATE UNIVERSITY HVAC and BUILDING AUTOMATION SYSTEM STANDARDS CHILLERS In new construction, liquid-cooled models are preferred for systems larger than 100 ton. o Trane, York and McQuay brands
More informationMercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.
SECTION 22 63 13 GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationA. Section includes factory-packaged units capable of supplying up to 100 percent outdoor air and providing cooling and heating.
SECTION 15850 PACKAGED DEDICATED OUTDOOR-AIR UNITS SPECIFIER: CSI MasterFormat 2004 number: 23 74 33. PART 1 GENERAL 1.1 RELATED SECTIONS A. 15960 Variable Frequency Drives. 1.2 SUMMARY A. Section includes
More informationSSL / SBS Sales Guide BLOWER-COILS REDUCED-FOOTPRINT, VERTICAL
SO TOUGH, WE GUARANTEE IT. SSL / SBS Sales Guide BLOWER-COILS REDUCED-FOOTPRINT, VERTICAL SSL SBS www.superiorrex.com SSL / SBS Series: BIG ON FEATURES; SMALL IN SIZE Contractors All SSL/SBS model blower-coil
More informationGreenheck Coils. A Complete Line of Custom Coils to Meet Your Needs. 3/8, 1/2 and 5/8 inch OD Tubing
Greenheck Coils A Complete Line of Custom Coils to Meet Your Needs 3/8, 1/2 and 5/8 inch OD Tubing March 2010 Custom Coils Custom Coils Configured to Meet Your Needs Greenheck is proud to offer a complete
More informationWhen You Need a Replacement Coil, Precision Matters.
When You Need a Replacement Coil, Precision Matters. precision-coils.com We re Passionate About the Right Fit, Right Now. To many replacement coil providers, a coil is a coil. We see things differently.
More informationCHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L2EU NOMINAL TONS
550.23-TG5Y (893) CHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER L2EU240 20 NOMINAL TONS DESCRIPTION This 20 ton evaporator blower is designed with two distinct modules to provide maximum application flexibility.
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationDESIGN STANDARDS SECTION 15600
PART 1 - GENERAL 1.1 Work included: A. Piping, tubing and fittings. B. Piping specialties. C. Special duty valves. D. Refrigerants. E. Chillers. F. Refrigerant monitors. 1.2 General requirements: A. Reciprocating
More informationSPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L4EU NOMINAL TONS
036-21096-001 (0101) SPLIT-SYSTEM EVAPORATOR BLOWER L4EU240 20 NOMINAL TONS DESCRIPTION This 20 ton evaporator blower is designed with two distinct modules to provide maximum application flexibility. The
More information