ONTARIO BUILDING CODE AND SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION. Mechanical Designer Information*

Size: px
Start display at page:

Download "ONTARIO BUILDING CODE AND SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION. Mechanical Designer Information*"

Transcription

1 ONTARIO BUILDING CODE AND SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION Project: Building Permit Application No.: DETAILED FORMS Location: Date: Architectural Designer Information* Mechanical Designer Information* Electrical Designer Information* Name Name Name Address Address Address City Signature Province Date(YY/MM/DD) City Signature Province Date(YY/MM/DD) City Signature Province Date(YY/MM/DD) *IF MORE DESIGNERS ARE INVOLVED, PROVIDE ADDITIONAL COPIES OF THIS FORM. THIS CHECKLIST IS A CONVENIENCE DOCUMENT ONLY AND IS BASED ON THE ENERGY EFFICIENCY REQUIREMENTS DESCRIBED IN THE ONTARIO BUILDING CODE SUPPLEMENTARY STANDARD SB-10 DIVISION 3. THIS CHECKLIST IS NOT A SUBSTITUTE FOR COMPLYING WITH THE REQUIREMENTS OF THE ONTARIO BUILDING CODE. WHILE CARE HAS BEEN TAKEN TO ENSURE ACCURACY OF THIS CHECKLIST, DESIGNERS AND BUILDING OFFICIALS MUST REFER TO THE ACTUAL WORDING AND REQUIREMENTS OF THE ONTARIO BUILDING CODE (O.REG. 332/12 AND AMENDMENTS). NOTE: THESE FORMS HAVE BEEN UPDATED TO REFLECT THE REQUIREMENTS OF MMAH SUPPLEMENTARY STANDARD SB-10 (SEPTEMBER 14, 2012) FOR WHICH A PERMIT HAS BEEN APPLIED FOR AFTER DECEMBER 31, THESE FORMS ARE ONLY VALID FOR PERMITS APPLIED FOR BETWEEN JANUARY 1 AND DECEMBER 31, A NEW VERSION OF SB-10 (DECEMBER 22, 2016 UPDATE) CONTAINS COMPLIANCE PATH OPTIONS THAT ARE NOT INCLUDED IN THESE FORMS. PROJECTS FOLLOWING THE SB-10 DECEMBER 22, 2016 UPDATE MUST USE NEW FORMS PROVIDED BY THE MMA. PLEASE FILL IN THE ACTUAL VALUES INSTALLED AND CHECK BOXES AS THEY APPLY. OBC SB-10 COMPLIANCE SUMMARY Energy Efficiency Design: There are four energy compliance options to meet the requirements of OBC SB-10 Division ϯ. Please select the conformance option selected for this project. The energy efficiency of all buildings must be designed to: Compliance Path (A-1) Exceed by not less than 35% the energy efficiency levels attained by conforming to the CCBFC, Model National Energy Code for Buildings (MNECB). Note that this compliance path requires that the proposed building is shown to consume at least 35% less energy than the MNECB reference building when modelled according to the procedures outlined in Part 8 of the MNECB. (A-2) Exceed by not less than 17.5% the energy efficiency levels attained by conforming to the ANSI/ASHRAE/IESNA Energy Standard for Buildings Except Low-Rise Residential Buildings. Note that this compliance path requires that the proposed building is shown to consume at least 17.5% less energy than the ASHRAE reference building when modelled according to the procedures outlined in Chapter 11 of ASHRAE Note that this path cannot be used for a building with electric space heating. Refer to SB-10. (B) Achieve the energy efficiency levels attained by conforming to the ASHRAE , Energy Standard for Buildings Except Low-Rise Residential Buildings and Division 3 of SB-10. This compliance path includes both prescriptive and performance path options. Please proceed to Form B. (C) Exceed by not less than 13% the energy efficiency levels attained by conforming to the NECB-2011 National Energy Code of Canada for Buildings and Division 2 of SB 10. Only the performance path option will be accepted. Please proceed to NECB Forms Note: Numbering is based on SI edition of ASHRAE Forms to Complete FORM A FORM A FORM B NECB Forms DNovember 18, 2016

2 OBC SB 10 COMPLIANCE (1) EXCEED MNECB BY NOT LESS THAN ϯ5% (2) EXCEED ASHRAE BY NOT LESS THAN ϭϳ 5% FORM A Please select which of the two options pursued for compliance: PROPOSED BUILDING IS SHOWN TO CONSUME AT LEAST 35% LESS ENERGY (GJ or kwh) ANNUALLY THAN THE MNECB REFERENCE BUILDING. ENERGY CONSUMPTION VALUES ARE DETERMINED ACCORDING TO THE MODELLING PROCEDURES IDENTIFIED IN PART 8 OF THE MNECB. PROPOSED BUILDING IS SHOWN TO CONSUME AT LEAST 17.5% LESS ENERGY (GJ or kwh) ANNUALLY THAN THE ASHRAE REFERENCE BUILDING. ENERGY CONSUMPTION VALUES ARE DETERMINED ACCORDING TO THE MODELLING PROCEDURES OUTLINED IN CHAPTER 11 OF ASHRAE Project: Modeller Name: Annual Energy Summary Occupancies Floor Area Assembly Health/Institutional Hotel/Motel Light Manufacturing Multifamily Office Restaurant Retail School Warehouse Other Total Proposed Building Description (1) Annual Consumption Summary Reference Building Energy Proposed Building Energy Units Space Heating Space Cooling HVAC Auxiliary Misc. Electrical Service Hot Water Interior Lighting Other Other > Total Annual Energy Percentage less energy used by proposed building: Total Annual CO2e Emissions >.. Percentage less CO2e emissions by proposed building.. Peak Electric Demand.. > or Building components specified in Sentence (2) of Chapter 1 of Division 3 of SB 10 comply with the prescriptive requirements of ASHRAE Reference Building Energy and Proposed Building Energy Consumptions are calculated by: Please specify modelling software: HVAC System Descriptions Reference Building Design Energy Efficiency Features in Proposed Building Design (2) Proposed Building Design The reference building and proposed building design are modelled in accordance with the requirements of the SB 10 and the applicable standard specified above Yes The information submitted above is accurate to the best of my knowledge. Signature: Notes: Name/Title: (1) A full modelling report is required to be submitted. (2) Explain major energy saving features utilized to achieve modelled savings. Note: Numbering is based on SI edition of ASHRAE D November 18, 2016

3 OBC SB 10 AND ASHRAE COMPLIANCE SUMMARY Form B Project: Building Permit Application No.: Location of Project: Climate Zone: ASHRAE COMPLIANCE AS MODIFIED BY OBC SB 10 DIVISION The building design complies with the mandatory provisions of the following sections regardless of the compliance path: ASHRAE Standard Section Compliance Form Column 5.4 BUILDING ENVELOPE AND SB 10 DIVISION 3 FORM HEATING, VENTILATING AND AIR CONDITIONING AND SB 10 DIVISION 3 FORM 6.3 or FORM SERVICE WATER HEATING SYSTEMS AND EQUIPMENT AND SB 10 DIVISION 3 FORM POWER AND SB 10 DIVISION 3 FORM LIGHTING AND SB 10 DIVISION 3 FORM OTHER EQUIPMENT AND SB 10 DIVISION 3 YES FORM 10.4 METHOD OF COMPLIANCE Building Design must comply with either the Prescriptive Requirements or the Energy Cost Budget Method. Indicate which method was selected. Compliance Method Compliance Form Column PRESCRIPTIVE COMPLIANCE COMPLETE SECTION B 1 ENERGY COST BUDGET METHOD COMPLETE SECTION B 2 B 1: PRESCRIPTIVE COMPLIANCE ASHRAE AND OBC SB 10 The building design complies with the Prescriptive Compliance of the following sections: Standard Section Compliance Form Reference Column Sec 5 BUILDING ENVELOPE Prescriptive Requirements (5.5 of 90.1) Building Envelope Trade Off (5.6 of 90.1) FORM 5.5 or FORM 5.6 Sec 6 HVAC SYSTEMS Simplified Approach for HVAC Systems Mandatory + Prescriptive Path Option FORM 6.3 or FORM 6.4 Sec 7 SERVICE WATER HEATING Prescriptive Path Option FORM 7.4 Sec 9 LIGHTING Prescriptive Requirements FORM 9.5 B 2: ENERGY COST BUDGET METHOD ASHRAE AND OBC SB 10 Compliance The building design complies with the provisions of Section 11 of ASHRAE , based on the provisions of Division 3 of SB 10. Column Form FORM 11 Note: Numbering is based on SI edition of ASHRAE D November 18, 2016

4 5.4.1 Insulation ASHRAE AND OBC SB 10 DIVISION 3 MANDATORY PROVISIONS Detailed Form 5.4 Insulation materials are installed in accordance with the manufacturer s recommendations and in such a manner as to achieve the rated R value of insulation.11 Loose fill insulation is not used in attic roof spaces when the slope of the ceiling is more than three in twelve. Attic eave vents have baffling to deflect the incoming air above the surface of the insulation. Insulation is installed in a permanent manner in substantial contact with the inside surface. Batt insulation installed in floor cavities is supported in a permanent manner by supports no greater than 24 in. o.c. Lighting fixtures, HVAC, and other equipment are not recessed in ceilings in such a manner to affect the insulation thickness. Exception: The recessed area is less than 1%. Exception: The entire roof, wall, or floor is covered with insulation to the full depth required. Exception: The effects of reduced insulation are included in calculations using area weighted averages. Roof insulation is not installed over suspended ceiling with removable ceiling panels. Exterior insulation is covered with a protective material to prevent damage. Insulation is protected in attics and mechanical rooms where access is needed. Foundation vents do no interfere with the insulation. Insulation materials in ground contact have a water absorption rate no greater than 0.3%. N/A N/A Fenestration and Doors U factors have been determined in accordance with NFRC 100 or CAN/CSA A Exception: U factor has been taken from ASHRAE A.8.1 for skylights. Exception: U factor has been taken from ASHRAE A.8.2 for other fenestration products. Exception: U factor has been taken from ASHRAE A.7 for opaque doors. Exception: U factors are derived from DASMA 105 for garage doors. Solar heat gain coefficient (SHGC) has been determined in accordance with NFRC 200 or CAN/CSA A Exception: SHGC is determined by multiplying the shading coefficient by Shading coefficient is determined using spectral data file determined in accordance with CAN/CSA A Exception: SHGC for the centre of glass is used. SHGC is determined using a spectral data file determined in accordance with NFRC 300. Exception: SHGC is taken from ASHRAE Section A8.1 for skylights. Exception: SHGC is taken from ASHRAE Section A8.2 for vertical fenestration. 1 N/A N/A allowable exceptions noted N/A N/A N/A N/A N/A N/A N/A allowable exceptions noted N/A N/A N/A N/A allowable exceptions noted N/A N/A N/A N/A Exception: Where metal building roof or wall insulation compressed between roof or wall skim and the structure. 2 U-factors shall be determined for a slope of 20 degrees above the horizontal. Note: Numbering is based on SI edition of ASHRAE November 18, 2016

5 5.4.3 Air Leakage All conditioned spaces have been designed with a continuous air barrier meeting the requirements of Specified Fenestration and Doors have certified air leakage rates lower than the allowable under ASHRAE Section Exception: Field Fabricated windows and doors.* Exception: Metal coiling doors in semiheated spaces. Cargo doors and loading dock doors are equipped with weather seals. Building Entrances separating the conditioned space from the exterior include a vestibule. allowable exceptions noted N/A N/A allowable exceptions noted Exception: Revolving doors. Exception: Non entrance doors. Exception: Doors opening from dwelling unit. Exception: Entrances less than 90m² in area. Exception: Doors opening from a space less than 280 m² that is separate from the building entrance. N/A N/A N/A N/A N/A *Note that field fabricated fenestration does not include stick built curtain wall and storefront systems that are assembled on site. This exemption only applies when the frame is made on site of materials that were not previously designed to be used as part of a fenestration system such as using dimensional lumber to manually create a window or door frame.

6 ASHRAE & SB 10 SECTION 5.5 PRESCRIPTIVE ENVELOPE OPTION Detailed Form Overall Building Envelope Design Requirements The building design must comply with the following general requirements. If any of these requirements are not met, the prescriptive path cannot be pursued. Consider the building envelope trade off compliance or the Energy Cost Budget Method Described in Chapter 11 of ASHRAE : Identify SB 10 Table used for maximum U Factors or minimum RSI Values : Gross Wall Area: m² Vertical Fenestration Area: m² Vertical fenestration area is less than 40% of the gross wall area. Gross Roof Area: m² Skylight Area: m² Total skylight area does not exceed 5% of the gross roof area. Where the main entrance door is located on the south orientation and south wall area is larger than west wall area and also larger than east wall area, the total east vertical fenestration area is less than south vertical fenestration area and total west vertical fenestration area is less than south vertical fenestration area. South vertical fenestration area: m² East vertical fenestration area: m² West vertical fenestration area: m² Please specify if any exception is used: If electric space heating is used, Table SB5.5 7 has been used regardless of climatic location. For Climate Zone 5, minimum skylight fenestration area conforms to the requirements of ASHRAE N/A N/A N/A Complete the table on Form to show compliance for all envelope components. Attach as many copies of this form as required to ensure that all envelope components are represented. For all opaque surfaces, compliance must be demonstrated by meeting either: 1. The minimum R values of insulation added in framing cavities and continuous insulation as specified in Tables SB5.5 5 to SB The maximum U factor, C factor, or F factor for the entire assembly as specified in Tables SB5.5 5 to SB U factor is to be determined from tables in Appendix A of ASHRAE or through calculation methods described in ASHRAE Appendix Section A9. For all fenestration products, compliance with U factors and SHGC must be determined for the overall fenestration product. 1. Fenestration shall have a U factor and SHGC not greater than those specified in SB 10 Tables SB5.5 5 to SB U factor to be determined through CSA or NFRC ratings or by using ASHRAE Appendix A default values.

7 ASHRAE & SB 10 SECTION 5.5 PRESCRIPTIVE ENVELOPE OPTION Form Please complete the following table to include information on all walls, roofs, doors, and floors used in the design. OPAQUE BUILDING ENVELOPE COMPONENTS Opaque Element (1) Description Space Conditioning (2) Category Class of (3) Construction (4) Criteria Max. U Value or Min RSI Value (4) Design U Value or RSI Value Area Weighted (5) Average Used? Please complete the following table to include information on all fenestration products used in the design. FENESTRATION ENVELOPE COMPONENTS Fenestration (1) Description Space Conditioning (2) Category Class of (3) Construction (4) U Value Criteria Design (6) SHGC Criteria Design Area Weighted (5) Average Used? (1) Indicate if Element is a Wall, Roof, Floor, Door, Window or Skylight and a Tag or Description (eg Wall W1). (2) Select from Non residential (NR), Residential (R), or Semiheated (SH). (3) Select from the subclasses of roofs, walls, floors, doors and fenestration provided in Tables SB5.5 5 to SB5.5 7 (eg. Steel Framed for walls). Note that curtain wall systems are considered a steel framed wall. (4) F Factors can be used for floors and C Factors for below Grade Walls as applicable. (5) Elements of the same type, space category, and class of construction can be averaged using area weighting to show compliance only if U Values are used. (6) Design SHGC may be higher than the criteria if the one of the exceptions from ASHRAE is applicable. Please use the space below to identify the fenestration elements (if any) which an exception for SHGC is being claimed: SHGC EXCEPTIONS Fenestration Element Note: Numbering is based on SI edition of ASHRAE SHGC Exception from ASHRAE November 18, 2016

8 ASHRAE & SB 10 SECTION 5.6 ENVELOPE TRADE OFF OPTION DETAILED Form 5.6 Note that this option may only be pursued if the procedure as described in ASHRAE section 5.6 has been modified with the requirements of Division 3 of SB 10. Complete only Section A or Section B Section A (Complete only where software report contains the percentage of difference between budget and design buildings) A software program incorporating the envelope requirements of ASHRAE as modified by SB 10 has been used to demonstrate compliance with SB 10 in accordance with rules set by Section 5.6 of ASHRAE State the percentage by which the envelope performance of the proposed building is better than the budget building. A report from this software is attached. Name of software: %, or Equal Section B (Complete only where software report contains envelope performance factors for the budget and design buildings) The compliance calculations are based on the envelope requirements of ASHRAE as modified by SB 10. Envelope performance factor (EPF) for proposed building is less than or equal to the envelope performance factor of the budget building. Calculated EPF for proposed building: Calculated EPF for budget building: The envelope performance factor considers only the building envelope components. Schedules of operation, lighting power, equipment power, occupant density, and mechanical systems are the same in both the proposed and budget building. Calculations from ASHRAE Appendix C have been attached, and include the modifications from SB 10.

9 ASHRAE 90.1 & SB 10 SECTION 6.3 HVAC SIMPLIFIED APPROACH Detailed Form 6.3 If simplified HVAC method is used complete this form, otherwise proceed to Form 6.4. Number of Stories: Gross floor area: m² SECTION 6.3 HVAC SIMPLIFIED APPROACH OPTION Detailed Form 6.3 Part I Reference Standard Compliance The building is 2 stories or less in height and has a gross floor area less than 2,323 m² All of the requirements in Form 6.3 Part II must be met by each HVAC system in the facility. Level 2 requires one form filled out per system. System Name Area Served System Name Area Served System Name Area Served System Name Area Served System Name Area Served System Name Area Served System Name Area Served System Name Area Served Building dimensions and all mechanical systems meet the Simplified Approach requirements.

10 SECTION 6.3 HVAC SIMPLIFIED APPROACH OPTION Detailed Form 6.3 Part II Reference Standard Compliance a System serves a single HVAC zone b The equipment meets the variable flow requirements of Section c If a cooling is installed, it is provided by a unitary packaged or split system air conditioner that is either air cooled or evaporatively cooled and meets the efficiency requirements shown in Tables 6.8.1A, 6.8.1B, and 6.8.1D d The system has an air economizer with outside airflow capacity and controls as required per Section Exception: The system cooling capacity is less than 16 kw for comfort cooling or 40 kw for computer room cooling. Exception: The cooling efficiency meets or exceeds the requirement in Table Exception: Condenser heat recovery capacity, residential and computer room sizing, operating hour limits, etc. listed in section e Heating is provided by a unitary packaged or split system heat pump, a fuel fired furnace, an electric resistance heater or a baseboard system connected to a boiler. All heating equipment meets the efficiency requirements shown in Table B, 6.8.1D, 6.8.1E, 6.8.1F and Table SB f System meets the exhaust air energy recovery requirements of Section Exception: Systems that provide less airflow than the values listed in Table based on climate zone and outside air fraction. Exception: Laboratory systems meeting , commercial kitchens, cooling energy recovery, spaces heated to less than 16 C, etc. listednin section g The system is controlled by a manual changeover or dual setpoint thermostat h Heat pumps equipped with auxiliary internal electric resistance heaters (if any) have controls to prevent supplemental heater operation when the heating load can be met by the heat pump alone i The system controls do not permit reheat or any other form of simultaneous heating and cooling for humidity control j Systems are provided with a time switch that (1) can start and stop the system under different schedules for seven different day types per week; (2) is capable of retaining programming and time setting during a loss of power for a period of at least 10 h; (3) includes an accessible manual override that allows temporary operation of the system for up to 2 h; (4) is capable of temperature setback down to 13 C during off hours; and (5) is capable of temperature setup to 32 C during off hours. Exception: System serves hotel/motel guest rooms. Exception: System operates continuously. Exception: System has both a cooling or heating capacity less than 4.4 kw and a supply fan motor power greater than 0.56 kw k Piping is insulated in accordance with values given in Table 6.8.3A and 6.8.3B. Insulation exposed to weather is suitable for outdoor service (i.e. protected by aluminum, sheet metal, etc. or painted with a coating that is water retardant and provides shielding from solar radiation.) l Ductwork and plenums are insulated in accordance with Tables 6.8.2A and 6.8.2B and sealed in accordance with Section m Specifications call for ducted air systems to be balanced n Outdoor air intake and exhaust systems meet the controls requirements of Section o Where separate heating and cooling equipment serve the same temperature zone, thermostats are interlocked to prevent simultaneous heating and cooling p Systems with a design supply air capacity greater than 5,000 L/s have optimum start controls q In spaces larger than 50m² and with design occupancy of more than 40 people per 100m², the system complies with the demand control ventilation requirements in Section Exception: Systems with exhaust air energy recovery as per Section Exception: Systems with design outdoor airflow less than 600 L/s. Exception: Spaces where the supply airflow minus any transfer air requirement is less than 600 L/s. All of the simplified requirements are met Note: Numbering is based on SI edition of ASHRAE November 18, 2016

11 SECTION 6.4 HVAC MANDATORY PROVISIONS Detailed Form 6.4 Part I Reference Standard Compliance Mandatory Provisions Complete only if simplified HVAC method is not used Equipment shown in Tables 6.8.1A through 6.8.1K meets minimum performance at the specified rating conditions in accordance with the test procedures in the tables or those referred to in Division 3 of SB of SB Load calculations for heating and cooling systems are done in accordance with ASHRAE Standard or other good design practices for selection of all equipment and systems Pressure drop through each hydronic device and pipe segment in the critical circuit at design conditions has been calculated in accordance with generally accepted engineering standards and handbooks Mandatory controls requirements are met by all the equipment in the building as outlined in Form 6.4 Part II and Part III Duct and plenum insulation meets or exceeds the requirements of Tables 6.8.2A and 6.8.2B with the exceptions noted in the standard. Piping insulation meets or exceeds the requirements of Tables 6.8.3A and 6.8.3B with the exceptions noted in the Standard All thermally ineffective radiant heating panel surfaces including U bends and headers are insulated with a minimum of RSI Construction documents require seal class A construction of ductwork and plenums with pressure class ratings to satisfy testing as outlined in Section All mandatory provisions are met

12 SECTION 6.4 HVAC MANDATORY PROVISIONS Detailed Form 6.4 Part II SECTION MANDATORY CONTROLS REQUIREMENTS FOR HVAC SYSTEM Reference Title Check Appropriate Box Reference Title Check Appropriate Box Zone Thermostatic Controls Zones controlled Individually by thermostats within the zone Ventilation Fan Controls Complying automatic controls provided. N/A Independent perimeter system. N/A Fan motor 0.56kW. N/A Continuous operation Dead Band Deadband at least 3 C for dual setpoint control. Manual change over control Setpoint Overlap Restriction Automatic Shutdown N/A Special occupancy (requires approval). N/A Heating or cooling only. Where heaɵng and cooling to a zone are controlled by separate thermostats, heating and cooling setpoint overlap is automatically prevented. Programmable 7 day schedule control with manual override. Residential 2 day schedule control with manual override. Occupant sensor up to 30 mins. Manually operated timer. Interlock to security system Enclosed Parking Garage Ventilation Heat Pump Auxiliary Heat Humidification Preheat Ventilation stages automatically when contaminants are low. Ventilation modulates down when contaminants are low. N/A Garage is less than 2,800m² and has no mechanical heating or cooling. N/A Garage area to ventilation motor kw ratio exceeds 187m²/kW and has no mechanical heating or cooling. Controls prevent resistance heating when heating load can be met by the heat pump alone. N/A System is not a heat pump. N/A Auxiliary is not electric or is not provided. N/A Heat pump covered by NAECA and meets efficiency rating in Table 6.8.1B. Automatic shutoff valve provided for humidifiers mounted in the airstream. Preheat is shut off when humidification is not needed. N/A No humidifier Setback Controls N/A Continuous operation. N/A Less than 4.4 kw. heat/cool capacity with manual on/off. Heating setback provided (down to 13 C). N/A Continuous operation. N/A Less than 4.4 kw. heat/cool capacity with manual on/off. N/A Radiant heating. N/A No heating Humidification and Dehumidification Controls prevent simultaneous humidification and dehumidification. N/A No humidification and/or dehumidification. N/A Desiccant dehumidifier and direct evaporative cooling in series. N/A Specific humidity levels required (museum, hospital, etc. approval required).

13 SECTION 6.4 HVAC MANDATORY PROVISIONS MANDATORY CONTROLS REQUIREMENTS FOR HVAC SYSTEM Optimum Optimum start provided. Start Controls N/A Continuous operation. N/A Less than 4.4 kw heat/cool capacity with manual on/off control. N/A Radiant heating no heating air. N/A Supply airflow less than 5,000 L/s Freeze Protection and Snow/Ice Melting Systems Detailed Form 6.4 Part III The following controls are provided: i) Heat tracing automatically shuts off above 4.4 C outside temp or when the fluid will not freeze. ii) Snow melt automatically shut off when pavement is above 10 C and automatic or manual shutoff above 4.4 C outside temp Zone Isolation Isolation zones provided with isolation device Stair and Shaft Vents Shutoff Damper Control N/A All zones on same schedule. N/A Continuous operation. N/A Less than 4.4 kw. heat/cool capacity with manual on/off. N/A Fan system supplies less than 2,400 L/s. Motorized dampers on stair and elevator shafts. Normally closed, open on fire alarm. Motorized shutoff dampers on all OA and EA shut off during preoccupancy and when system or space is not in use, except freecooling. Backdraft dampers on EA for buildings less than 3 stories. Backdraft dampers on system with design OA or EA 140L/s Ventilation in High Occupancy Area N/A No freeze protection systems. Demand control ventilation (DCV) provided. N/A Design occupancy is less than 40 people per 100m². N/A High occupancy space is smaller than 50m². N/A Design outdoor airflow is below 1,400L/s and system has no air side economizer or modulating control of outdoor air damper. N/A Exhaust air energy recovery as per Section N/A Multiple zone system without central control panel. N/A Outdoor airflow less than 600 L/s. N/A Supply airflow minus makeup or transfer air is less than 600 L/s Damper Leakage N/A Unconditioned space. N/A System serves type 1 Kitchen exhaust hood. OA, EA dampers meet leakage rates listed on Table Single Zone VAV Controls At cooling demands of less than 50% of design, supply airflow is reduced. Airflow is reduced to 50% for chilled water coils or 66% for direct expansion coils or to the minimum ASHRAE 62.1 ventilation amount through the use of: Supply fan two speed motor. Supply fan variable speed drive. N/A Supply fan less than 4kW for chilled water coils. N/A Less than 32kW capacity for direct expansion coils.

14 SECTION 6.5 HVAC PRESCRIPTIVE REQUIREMENTS Detailed Form 6.5 Part I Reference Item Standard Compliance Prescriptive Requirements Complete this section if not using Energy Cost Budget Method Economizers Each cooling system that has a fan employs either airside or waterside economizer unless exempt from the economizer requirements. Specify economizer exemptions if N/A (provide section reference to ASHRAE ): Economizer systems are integrated with the mechanical cooling systems and capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Controls are provided such that economizer operation does not increase the building heating energy use during normal operation. Exception: Economizers on VAV systems that cause zone level heating to increase due to reduction in supply air temperature. Airside Economizers All airside economizers are capable of modulating outdoor air dampers to provide up to 100% design airflow for cooling. Economizer dampers are sequenced with the mechanical cooling equipment and not by only mixed air temperature. Economizer high limit shutoff is activated when outdoor air intake will no longer reduce cooling energy usage. Controls are chosen from Tables A and B. Return, exhaust/relief, and outdoor air dampers meeting the requirements of Section System provides relief for up to 100% design airflow in outdoor air. The relief air outlet is located to avoid recirculation into the building. Waterside Economizers Waterside economizers are capable of cooling supply air up to 100% of the expected system cooling load at the conditions listed under Section Waterside economizer systems with pressure drop greater than 45kPa are isolated from main cooling loop to reduce pumping input in the normal cooling mode. Simultaneous Heating and Cooling Zone controls prevent a) reheating, b) recooling, c) mixing or simultaneously supplying heated air with cooled air, and d) other simultaneous operation of heating and cooling systems to the same zone. Specify controls exemptions if N/A (provide section reference to ASHRAE ): Where reheat is permitted, zones that have supply and return/exhaust air openings higher than 2m above floor are limited to supply heating air no more than 11 C above the space temperature setpoint. Simultaneous heating and cooling is limited in hydronic systems in accordance with Sections through Dehumidification controls prevent reheating, mixing of hot and cold airstreams, or other means of simultaneous heating and cooling of the same airstream. Systems that employ hydronic cooling and have humidification use a waterside economizer that complies with Section Air System Design and Control Fan systems exceeding 4kW nameplate power meet prescriptive fan power limitations as per Table A and Section Variable air volume (VAV) fan controls comply with the requirements of Section Static pressure sensors controlling VAV fans are placed such that the setpoint is less than one third of the total design fan static pressure. Systems with DDC of individual zone boxes and central control feature static pressure setpoint reset such that the setpoint is reset lower until one zone damper is nearly wide open. Multiple zone VAV systems with DDC of individual zone boxes and central control feature automatic reduction of outdoor air intake flow below design rates in response to changes in system ventilation efficiency as defined in ASHRAE Standard 62.1 Appendix A. Note: Numbering is based on SI edition of ASHRAE N/A N/A November 18, 2016

15 SECTION 6.5 HVAC PRESCRIPTIVE REQUIREMENTS Detailed Form 6.5 Part II Reference Item Standard Compliance Multiple zone VAV systems include controls that automatically reset the supply air temperature in response to representative building loads, or to outdoor air temperature as per Section Hydronic System Design and Control Pumping systems greater than 7.5 kw employ variable flow controls, with differential pressure sensor located at the most remote heat exchanger, unless exempt Chilled water plants with more than one chiller and boiler plants with more than one boiler reduce loop water flow automatically whenever a chiller or boiler is shut down Hydronic systems exceeding design capacity of 88 kw include controls to reset supply water temperature based on building loads or outdoor air temperature. Exception: Variable flow systems as per Hydronic heat pumps and unitary air conditioners include automatic water shutoff when the compressor is off. Hydronic heat pumps and unitary air conditioners having total pump system power greater than 3.7 kw have variable speed control Chilled water and condenser water pipe is sized according to Table Heat Rejection Equipment All heat rejection equipment with fan motors > 5.6 kw is capable of operating the fan at two thirds of full speed or less and employs variable speed controls that comply with Section Unducted centrifugal fan open circuit cooling towers meet the energy efficiency requirement for axial fan open circuit cooling towers listed in Table 6.8.1G Energy Recovery Exhaust air energy recovery is provided for all fan systems that meet the design supply air flows listed on Table based on their climate zone and outside air fraction. These systems have at least 50% energy recovery effectiveness and are able to bypass recovery system to permit air economizer operation as per Section Specify exemptions if N/A (provide section reference to ASHRAE ): Condenser heat recovery system for heating or preheating service hot water is provided. Exception: Not a 24h facility. Exception: Total heat rejection capacity below 1,800kW. Exception: Service water heating load below 300kW. Exhaust Systems Replacement air introduced to kitchen hoods does not exceed 10% of the hood s exhaust capacity Conditioned supply air delivered to any space with a kitchen hood does not exceed the greater of a) supply flow required to meet space heating/cooling loads or b) hood exhaust flow minus the available transfer air from adjacent spaces. Kitchens with total exhaust flows > 2,360 L/S use hoods meeting exhaust rates listed on Table and have one of the following: At least 50% of all replacement air is transfer air. Demand ventilation system on at least 75% of the exhaust air. Listed energy recovery devices with sensible effectiveness over 40% on at least 50% of the exhaust airflow. Specifications call for performance testing of kitchen exhaust systems. Laboratory fume hoods with a total exhaust system flow > 2,360 L/S comply with the variable air volume control requirements of Heating of unenclosed spaces is done by radiant heating, except loading docks with air curtains. The cooling equipment with hot gas bypass controls is designed with multiple steps of unloading or continuous capacity modulation. The capacity of the hot gas bypass is limited as indicated in Table Exception: Unitary packaged systems with cooling capacities below 26 kw. All prescriptive requirements are met. Note: Numbering is based on SI edition of ASHRAE November 18, 2016

16 ASHRAE 90.1 & SB 10 SECTION 7 SERVICE WATER HEATING Detailed Form 7.4 SECTION 7 SERVICE WATER HEATING 7.4 MANDATORY PROVISIONS AND 7.5 PRESCRIPTIVE REQUIREMENTS Reference Item Load calculations for heating and cooling systems are done in accordance with manufacturer s published sizing guidelines or generally accepted engineering standards and handbooks for selection of all equipment and systems Equipment used solely for heating potable water, pool heaters, and hot water storage tanks meets or exceeds the efficiency requirements of Table 7.8. or those referred to in Division 3 of SB 10, Table SB Standard Compliance The following service hot water piping is insulated to levels shown in Table a. recirculating system piping, including piping of a circulating tank type water heater. b. the first 2.4m of outlet piping for a constant temperature non recirculating storage system. c. inlet pipe between storage tank and heat trap in a non recirculating storage system. d. pipes that are externally heated (e.g. heat tracing) All water heating systems have temperature controls that are adjustable down to 49 o C or lower. Exception: Equipment that must be protected from corrosion, as per manufacturer s installation instructions Systems designed with pipe heating systems such as heat trace have temperature or time controls to disable during extended periods without hot water demand Public lavatories have outlet temperature controls that limit the discharge temperature to 43 o C Tanks with remote heaters have circulation pump controls to limit operation of circulation pumps to a maximum of five minutes after the end of the heating cycle Pool heaters have readily accessible ON/OFF switch without adjusting the thermostat setting. Gas fired heaters do not have standing pilot lights Heated exterior public pools and public spas shall be equipped with insulated covers, unless heated by site recovered or solar energy Pool heaters and circulation pumps have time switches, unless exempt Heat traps are provided to all vertical risers serving storage water heaters and storage tanks. Prescriptive Requirement Complete this section if not using Energy Cost Budget Method 7.5 Boiler systems that provide space heating as well as service water heating meet the conditions of Sections and and Table SB in Division 3 of SB-10. All mandatory and prescriptive provisions are met.

17 ASHRAE 90.1 & SB 10 SECTION 8,9 &10 POWER, LIGHTING AND OTHER EQUIPMENT Detailed Forms SECTION 8 POWER MANDATORY PROVISIONS CHECKLIST Detailed Form 8.4 Reference Item Standard Compliance Low Voltage Dry Type Distribution Transformers meet nominal efficiencies shown in Table 8.1. Exception: Special purpose applications (see exceptions for list). Exception: Not likely to be used in general purpose applications. Exception: Transformers with multiple voltage taps where the highest tap is at least 20% more than the lowest tap. Exception: Relocation or reuse of existing equipment at the same site Feeder conductors are sized for a maximum voltage drop of 2% at design load. Branch circuit conductors are sized for a maximum voltage drop of 3% at design load Automatic receptacle controls are provided for at least 50% of all 125 volt 15 and 20 Ampere receptacles installed in computer classrooms as per Section Exception: Does not apply to private and open offices per Division 3 of SB-10 Exception: Receptacles designated for equipment requiring 24 hour operation. Exception: Spaces where an automatic shutoff would endanger safety or security. All mandatory provisions are met.

18 SECTION 9 LIGHTING MANDATORY PROVISIONS CHECKLIST Detailed Form 9.4 Reference Item Standard Compliance Any automatic control devices used are manual ON or multi level where the automatic ON function provides no more than 50% power unless exempt Automatic lighting shutoff controls are provided for all interior spaces based on either a scheduled basis or controlled by an occupant sensor unless exempt. Schedule based control devices are provided with independent schedules for areas of no more than 2,323m² but no more than one floor. Occupancy based control devices turn lights off within 30 minutes of all occupants leaving the space, or a signal from another control or alarm system that indicates the area is unoccupied Each space enclosed by ceiling height partitions has at least one readily accessible control device that independently operates general lighting within the space in such a way that occupants can see the controlled lighting a The controlled lighting has at least one control step between 30% and 70% of full lighting power in addition to 0% (all OFF) unless exempt b Occupant sensors or timer switches that automatically turn lighting off within 30 minutes of all occupants leaving the space are provided in variable occupancy spaces such as classrooms, conference rooms, and storage rooms. See spaces listed under section b c For spaces not included in b smaller than or equal to 929 m 2, a separate space control is provided for each 232 m 2 of area. For spaces not included in b larger than 929 m 2 a separate space control is provided for each 929 m 2 of area. Occupant controlled override of the time of day schedule is limited to no more than two hours Lighting for parking garages is controlled by automatic shutoff controls meeting the requirements outlined in Section Lighting for parking garages is controlled by one or more devices that reduce lighting power by at least 30% when there is no activity within a zone for at most 30 minutes. Each lighting zone for this requirement cannot exceed 334 m², unless exempt. Daylight transition zones in parking garages are controlled separately. These are automatically turned on during daylight hours and off at sunset. Parking garage luminaires within 6m of perimeter walls that have a net opening to wall ratio of at least 40% automatically reduce power in response to daylight, except daylight transition zones Automatic daylighting controls are provided for separate control of general lighting in primary sidelighted areas greater than 23m² in an enclosed space. Multilevel photocontrol device complies with c unless exempt Automatic daylighting controls are provided for separate control of general lighting in daylight areas where the total daylight area under skylights plus the total daylight area under rooftop monitors in an enclosed space exceeds 84m². Multilevel photocontrol device complies with c unless exempt Additional control is provided to the applications listed in Section and Division 3 of SB Exterior lights are shut off by an automatic photosensor when available daylight is sufficient, unless exempt. All building façade and landscape lighting is automatically shut off overnight as per b. Exterior lighting not for façade or landscape lighting or uncovered parking areas, including advertising signage, is automatically controlled to reduce lighting power by at least 30% overnight or during inactive periods Exit signs do not exceed 5 W per face Third party functional testing of all lighting control devices and systems is specified in the construction documents. All mandatory provisions are met.

19 SECTION 9 LIGHTING INSTALLED LIGHTING POWER COMPLIANCE CHECKLIST* DETAILED Form 9.5 Reference Standard Compliance Exterior Lighting Zone (Table 9.4.3A) Total Installed Exterior Lighting Power exterior LPA W * List any exemptions that apply: W value of Prescriptive Requirements Complete if not using Energy Cost Budget Method 9.5, 9.6 METHOD OF INTERIOR LIGHTING ALLOWANCE CALCULATION Building Space 9.5 INTERIOR LIGHTING POWER ALLOWANCE BY BUILDING TYPE Calculation of Interior Lighting Power Allowance (ILPA) by Building Type based on Table SB * Building Type Gross Lighted Area m² Lighting Power Density W/m² Total Installed Interior Lighting Power interior LPA W * W value of 9.6 INTERIOR LIGHTING POWER ALLOWANCE BY SPACE FUNCTION Calculation of Interior Lighting Power Allowance (ILPA) for each space based on Table SB * Total Installed Interior Lighting Power Interior LPA W * List any exemptions that apply: W value of Total installed interior and exterior lighting power allowances are met. * Calculation worksheets (FORM and FORM 9.5.3) are required. Where a software program is used to calculate compliance with Sections 9.4, 9.5 and 9.6, the software report may be submitted in lieu of FORM 9.5 and worksheets. SECTION 10 OTHER EQUIPMENT MANDATORY PROVISIONS Detailed Form 10.4 Reference Item Standard Compliance Electric motors comply with Table A(a) and Table A(b) of Division 3 of SB Service water pressure booster pumps have pressure sensor to vary pump speed and/or start and stop pumps. N/A No devices are installed to reduce the pressure of all of the water supplied by any booster system or pump, except for safety devices. N/A Booster pumps shut off when there is no service water flow. N/A All elevator cab lighting systems have efficacy of not less than 35 lumens per Watt. N/A Elevator cab ventilation fans for elevators without air conditioning consume less than 0.7 W s/l at maximum speed. N/A Cab interior light and ventilation is disabled when elevators are stopped and unoccupied with doors closed for over 15 minutes. N/A All mandatory provisions are met.

20 ASHRAE 90.1 & SB 10 SECTION 9 LIGHTING COMPLIANCE WORKSHEET Project: FORM Designer Name: Interior Power Allowance (Building Area Method) Table ^ Building Type Lighting Power Density Allowance (W/m²) Gross Lighted Floor Area (m²) Lighting Power Allowance (W) (LPDxGLFA) Total Power Allowance Interior Lighting Power Allowance (Space by Space Method) Table SB Building Type Common/Specific Space Type Lighting Power Density Allowance (W/m²) Space Area (m²) Lighting Power Allowance (W) Total Power Allowance Interior Connected Lighting Power Space ID Luminaire Description (including number of lamps per fixture, watts per lamp, type of ballast, type of fixture) Number of Luminaires Watts/ Luminaire Total Watts Total Interior Lighting Power * If additional space is required to provide further information, please attach a separate sheet(s) of paper. ** If additional interior lighting power, trade offs or exceptions are used attach calculations. Note: Numbering is based on SI edition of ASHRAE November 18, 2016

21 ASHRAE 90.1 & SB 10 SECTION 9 LIGHTING COMPLIANCE WORKSHEET FORM Project: Designer Name: Exterior Building Lighting Power Allowance Location / Application Allowance Area or Length (m² or m) Tradable Power Allowance Exterior Lighting Zone Base Site Allowance Tradable Power Allowance ID Exterior Installed Lighting Power Luminaire description (including number of lamps per fixture, watts per lamp, type of ballast, type of fixture) Number of Luminaires Watts/ Luminaire Total Watts Total Exterior Lighting Power * If additional space is required to provide further information, please attach a separate sheet(s) of paper. ** If trade offs or exceptions are used attach calculations.

22 ASHRAE & SB 10 ENERGY COST BUDGET (ECB) COMPLIANCE REPORT FORM 11 Project: Occupancies Assembly Health/Institutional Hotel/Motel Light Manufacturing Multifamily Office Restaurant Retail School Warehouse Other Total Proposed Building Description Floor Area Designer Name: Annual Consumption Reference Building Proposed Units Summary (1) Energy Building Energy Space Heating Space Cooling HVAC Auxiliary Misc. Electrical Service Hot Water Interior Lighting Other Other Total Annual Energy Total Annual Energy Cost $ > $ Total Annual CO 2e Emissions >... Peak Electric Demand >.. or Building components specified in Sentence (2) of Chapter 1 of Division 3 of SB-10 comply with the prescriptive requirements of ASHRAE Reference Building Energy and Proposed Building Energy Consumptions are calculated by: Please specify modelling software: HVAC System Descriptions Energy Efficiency Features in Proposed Building Design (2) Reference Building Design Proposed Building Design Building is in compliance with mandatory requirements of sections 5.4, 6.4, 7.4, 8.4, 9.4, and 10.4 Compliance Result The design detailed in the above referenced plans complies with the mandatory requirements of the ASHRAE Standard and the additional requirements of Supplementary Standard SB-10. The calculated proposed building energy cost (design energy cost), CO 2 emissions and peak electric demand do not exceed the calculated reference building energy cost (energy cost budget) CO 2 emissions and peak electric demand. Therefore, this design DOES COMPLY with the ASHRAE ECB compliance methodology and the additional requirements of Supplementary Standard SB-10. The information submitted above is accurate to the best of my knowledge. Signature: Name/Title: Notes: (1) Verify with building official whether full modelling report is required to be submitted. (2) Explain major energy saving features utilized to achieve modelled savings. Note: Numbering is based on SI edition of ASHRAE November 18, 2016

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Buda, Texas 2a New Construction Construction

More information

Mechanical Compliance Certificate

Mechanical Compliance Certificate COMcheck Software Version 4.0.7.0 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Austin, Texas 2a (weather data: TBD) New

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:

More information

ASHRAE/IESNA Standard

ASHRAE/IESNA Standard ASHRAE/IESNA Standard 90.1-1999 An inside look at the requirements of Standard 90.1-1999 Energy Standard for Building Except Low-Rise Residential Building Mick Schwedler, PE Sr. Principal Applications

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

COMcheck Software Version Review Mechanical Compliance Certificate

COMcheck Software Version Review Mechanical Compliance Certificate COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project

More information

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members: SESSION 1-2015 Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE (90.1.2013) ASHRAE Detroit Members: AM Session is eligible for (X) Professional Development

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.6.2 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2007) Standard HALCYON Bldg. 400 Alpharetta, Georgia 3a

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.4. Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 205 IECC Dallas, Texas 3a New Construction Construction Site: 56

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

COMcheck Software Version Interior Lighting Compliance Certificate

COMcheck Software Version Interior Lighting Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Type: New Construction COMcheck Software Version 4.0.2.8 Interior Lighting Compliance Certificate Construction Site: Owner/Agent: Designer/Contractor:

More information

INDEX. ADDITIONS AND ALTERATIONS Defined Requirements ADMINISTRATION AND ENFORCEMENT... Chapter 1 AIR ECONOMIZERS

INDEX. ADDITIONS AND ALTERATIONS Defined Requirements ADMINISTRATION AND ENFORCEMENT... Chapter 1 AIR ECONOMIZERS A ADDITIONS AND ALTERATIONS Requirements........................ 101.4.3 ADMINISTRATION AND ENFORCEMENT..................... Chapter 1 AIR ECONOMIZERS Defined.................................202 Requirements........

More information

2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems

2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems 2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems Dieter Bartel, Manitoba Hydro September 17 th, 2014 Outline Scope and compliance Prescriptive path

More information

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC

More information

COMcheck Software Version Interior Lighting Compliance Certificate

COMcheck Software Version Interior Lighting Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Title: Berry Farms Animal Hospital Project Type: New Construction COMcheck Software Version 4.0.3.0 Interior Lighting Compliance Certificate

More information

1 - This title will copy onto other forms Date

1 - This title will copy onto other forms Date 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.3.0 Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: AHSC (Asian Heal Service Center

More information

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC 2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter

More information

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical Summary 2006 Washington State nresidential Energy Code Compliance Form MECH-SUM 2006 Washington State nresidential Energy Code Compliance Forms Revised July 2007 Project Info Project Address

More information

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. 2018 NC Energy Conservation Code Commercial Mechanical Module 7 CHAPTER 5 [CE] WORKSHEET 1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the

More information

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503 Inspection Phase Three Mechanical, Electrical & Plumbing Section 503 COMCheck Mechanical Field Inspection Checklist Mechanical Mechanical, Electrical & Plumbing Equipment Efficiencies But a lot ore too

More information

COMcheck Software Version

COMcheck Software Version COMcheck Software Version 4.0.4. Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 205 IECC Salt Lake City,Utah 5b New Construction Construction Site:

More information

August 27, Section 3.2 Definitions. On page 11 delete the following definition:

August 27, Section 3.2 Definitions. On page 11 delete the following definition: ERRATA SHEET FOR THE FIRST PRINTING OF ANSI/ASHRAE/IESNA STANDARD 90.1-2004 (SI edition) Energy Standard for Buildings Except Low-Rise Residential Buildings August 27, 2009 The corrections listed in this

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.9.4 Mechanical Compliance Certificate 01 IECC Section 1: Information Type: Addition Title : Construction Site: Owner/Agent: Designer/Contractor: 3030 North Industrial Way Castle

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD (I-P Edition) Energy Standard for Buildings Except Low-Rise Residential Buildings.

ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD (I-P Edition) Energy Standard for Buildings Except Low-Rise Residential Buildings. ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD 90.1-2013 (I-P Edition) Energy Standard for Buildings Except Low-Rise Residential Buildings July 7, 2017 The corrections listed in this errata sheet apply to ANSI/ASHRAE/IES

More information

Energy-Efficiency Measures List

Energy-Efficiency Measures List Guidelines for Public Agencies Energy-Efficiency Measures List 1.0 Envelope 1.1 Reduce Heat Losses-Ceiling/roof 1.11 Additional Ceiling/Roof Insulation 1.12 Exhaust Attics 1.13 Use Light-Colored Roof Surfaces

More information

Application of the 2012 North Carolina Energy Conservation Code

Application of the 2012 North Carolina Energy Conservation Code Application of the 2012 North Carolina Energy Conservation Code Commercial Mechanical Presented By: NC Code Officials Qualification Board Office of State Fire Marshal NC Department of Insurance 2012 Modules

More information

ENERGY EFFICIENCY AFTER DECEMBER 31, 2016

ENERGY EFFICIENCY AFTER DECEMBER 31, 2016 MODULE 2 Energy Efficiency INTRODUCTION In this module the requirements for energy efficiency in buildings is examined with particular attention to the Supplementary Standard to the OBC, SB-10, Energy

More information

COMMERCIAL ENERGY EFFICIENCY

COMMERCIAL ENERGY EFFICIENCY CHAPTER 5 COMMERCIAL ENERGY EFFICIENCY SECTION 501 GENERAL 501.1 Scope. The requirements contained in this chapter are applicable to commercial buildings, or portions of commercial buildings and to multiple-family

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017

SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017 SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017 The Residential Energy Code Worksheet is a tool to help you plan your energy code needs for new or remodeled homes,

More information

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

EADQUARTERS. Technical Report One. Stephanie Kunkel   Mechanical Option EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

COMMERCIAL ENERGY EFFICIENCY

COMMERCIAL ENERGY EFFICIENCY CHAPTER 5 COMMERCIAL ENERGY EFFICIENCY This chapter has been reformatted; some deletions are not marked. SECTION 501 GENERAL 501.1 Scope. The requirements contained in this chapter are applicable to commercial

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

PRE-PRINT APPENDIX E GREEN MECHANICAL CODE SUPPLEMENT

PRE-PRINT APPENDIX E GREEN MECHANICAL CODE SUPPLEMENT GREEN MECHANICAL CODE SUPPLEMENT E 101.0 General. E 101.1 Scope Applicability. The purpose of this appendix is to provide a comprehensive set of technically sound provisions that encourage sustainable

More information

C.E.P., C.E.M, C.I.P.E.

C.E.P., C.E.M, C.I.P.E. Subject What everyone needs to know about ASHRAE 90.1 J. Christopher Larry, P.E., C.E.P., C.E.M, C.I.P.E. Thursday, Joint ASHRAE AEE Meeting Cleveland, Ohio Introduction J. Christopher Larry P.E., C.E.P.,

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. Energy Conservation Code Commercial Electric CHAPTER 5 WORKSHEET 1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. a.

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

Strategies for Building Energy Efficiency

Strategies for Building Energy Efficiency Strategies for Building Energy Efficiency Ben Sliwinski Technical Director SEDAC University of Illinois at Urbana-Champaign How Buildings Use Energy Building Envelope (Walls, Roof, Windows, Floors) Lighting

More information

Summary Comparison of Simulation Program Features

Summary Comparison of Simulation Program Features Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours

More information

WSA120: New Energy Codes and Lighting Controls

WSA120: New Energy Codes and Lighting Controls WSA120: New Energy Codes and Lighting Controls Member Since 2003 1.0 AIA/CES Learning Units (HSW) Partner Since 1998 Brought to you by WattStopper Today s Presenter: Joe McGrath www.wattstopper.com Learning

More information

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance Table of Contents 3 Executive Summary 4 Building Overview 5 Mechanical Systems Overview 6 ASHRAE Standard 62.1 2013 Evaluation 6 Section 5: Systems and Equipment 6 5.1: Ventilation Air Distribution 6 5.2:

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below) CALIFORNIA MECHANICAL CODE MATRIX ADOPTION TABLE APPENDIX E SUSTAINABLE PRACTICES (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

High Performance Building Guide 1

High Performance Building Guide 1 Description This Guide is intended to be used for projects with a Vermont Certified: High Performance energy efficiency goal. This High Performance goal is a whole-building efficiency approach rather than

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

Energy Recovery with Cooling and Heating Model ERCH

Energy Recovery with Cooling and Heating Model ERCH Energy Recovery with Cooling and Heating Model ERCH 100% Outdoor Air System Dedicated Outdoor Air System 1,000-10,000 cfm 1.75 in. wg External Static Pressure Indirect Gas, Hot Water, Electric Heating,

More information

DIVISION 23 - HVAC HVAC

DIVISION 23 - HVAC HVAC DIVISION 23-23 00 00 PART 1 - GENERAL 1.01 GENERAL CRITERIA A. The heating system typical set point shall be 70 F inside. 1. The winter outdoor design temperature for most systems shall be -6 F. 2. The

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled

More information

Performance Rating of Computer and Data Processing Room Air Conditioners

Performance Rating of Computer and Data Processing Room Air Conditioners ANSI/AHRI Standard 1360 (I-P) with Addendum 1 2013 Standard for Performance Rating of Computer and Data Processing Room Air Conditioners Approved by ANSI on November 8, 2013 WITH ADDENDUM 1, PERFORMANCE

More information

INSPECTION REQUIREMENTS: ENERGY CODE LIGHTING & ELECTRICAL NON-RESIDENTIAL

INSPECTION REQUIREMENTS: ENERGY CODE LIGHTING & ELECTRICAL NON-RESIDENTIAL Energy Code Lighting & Electrical Non-Residential Page 1 of 14 Revision Date: 2/12/2018 INSPECTION REQUIREMENTS: ENERGY CODE LIGHTING & ELECTRICAL NON-RESIDENTIAL INSPECTION CODE: N/A SCOPE: NON-RESIDENTIAL,

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

AHRI Certification Program Scopes - COOLING

AHRI Certification Program Scopes - COOLING Air-to-Air Energy Recovery Ventilators (AHRI Std. 1060) Automatic Commercial Ice-Cube Machines and Ice Storage Bins (AHRI Stds. 810 & 820) Central Station Air-Handling Units (AHRI Std. 430) Commercial

More information

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces

More information

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. 2018 NC Energy Conservation Code Commercial Electrical Module 5 CHAPTER 4 [CE] WORKSHEET 1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

Heat pump and energy recovery systems

Heat pump and energy recovery systems SBS5311 HVACR II http://ibse.hk/sbs5311/ Heat pump and energy recovery systems Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2017 Contents Basic concepts Air-to-air

More information

Equipment Specifications and Required Information Quantity Rebate

Equipment Specifications and Required Information Quantity Rebate Rebate not to exceed 50% of the cost of equipment. Recycling rebates qualify for the entire rebate, regardless of the recycling cost. Equipment must be purchased or recycled in 2016. Installed equipment

More information

TITLE 24 ICONOGRAPHY. Iconography System

TITLE 24 ICONOGRAPHY. Iconography System TITLE 24 ICONOGRAPHY Iconography System The icons symbolize specific language found in the code requirements. They represent product and space characteristics. Icons not only represent the requirements

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

Building Division WSEC & IRC Ventilation (Effective July 1, 2016) Residential Buildings Prescriptive Compliance Form

Building Division WSEC & IRC Ventilation (Effective July 1, 2016) Residential Buildings Prescriptive Compliance Form Residential Please Energy & Submit IRC Ventilation two (2) Prescriptive copies Compliance Fm Effective 7-1-2016 (F hardcopy submittals: please submit 2 copies) Building Division 801 228 th Ave SE Sammamish,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

2009 Washington State Energy Code Residential Sections

2009 Washington State Energy Code Residential Sections 2009 Washington State Energy Code Residential Sections Gary Nordeen, Luke Howard, Emily Salzberg (360) 956-2042 energycode@energy.wsu.edu Produced with funding from: 1 WSEC text Washington State University

More information

HVAC Trajectories toward Zero

HVAC Trajectories toward Zero HVAC Trajectories toward Zero Jon McHugh, McHugh Energy at WCEC Affiliate Forum Western Cooling Efficiency Center Davis, CA May 7, 2013 jon@mchughenergy.com McHugh Energy Consultants CPUC Big Bold EE Strategies

More information

UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM

UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM Page 1 UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM Each of the 38 points of requested information is discussed, and references to the supporting manual are given to substantiate the requirement.

More information

Safety & Installation Instructions

Safety & Installation Instructions Model 8800 Universal Communicating Thermostat Safety & Installation Instructions READ AND SAVE THESE INSTRUCTIONS Table of contents Installation Installation location recommendations... 2 Thermostat mounting...

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA CITY OF DANA POINT COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248 3594 www.danapoint.org INDOOR AIR QUALITY B011 AIR 2013 CALIFORNIA CODES CODE

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

Lighting Summary - Interior

Lighting Summary - Interior Lighting Summary - Interior LTG-SUM Project Info Date: For Building Department Use Applicant Name: Applicant Address: Applicant Phone: Project Description F New building Addition Alteration Compliance

More information

b.) Technical Information:

b.) Technical Information: Section VI- Strategies a.) Summary: It is important for new construction designers to consider the heating, ventilation, and air conditioning needs within a building. There are many different systems,

More information

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee Gil Rossmiller In the construction industry for over 30 years ICC IRC Plumbing & Mechanical Code Development Committee ICC- IECC Commercial Energy Code Development Committee Building Official Parker, Colorado

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 Carrier Software Systems Carrier Corporation Syracuse, New York rev October 10, 2013 Copyright 2013 Carrier Corporation, All Rights Reserved Page

More information

Dissecting Lighting Control Requirements ANSI/ASHRAE/IES Standard & 2013

Dissecting Lighting Control Requirements ANSI/ASHRAE/IES Standard & 2013 WHITE PAPER Dissecting Lighting Control Requirements ANSI/ASHRAE/IES Standard 90.1-2010 & 2013 JUNE 2016 DT213 (Rev.10.2.17) Executive Summary ASHRAE Standard 90.1 is developed with the Illuminating Engineering

More information

COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units

COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection

More information

Massachusetts Energy Code Compliance Support Commercial Energy Code Building Mechanical & Service Water Heating Provisions

Massachusetts Energy Code Compliance Support Commercial Energy Code Building Mechanical & Service Water Heating Provisions Massachusetts Energy Code Compliance Support 2015 Commercial Energy Code Building Mechanical & Service Water Heating Provisions Codes and Standards Initiative - Sponsors Your Instructor Stephen Turner

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

2015 MECHANICAL CODE REQUIREMENTS

2015 MECHANICAL CODE REQUIREMENTS 2015 MECHANICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Mechanical requirements for residential buildings per

More information

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1 Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9

More information

COMMERCIAL HVAC EQUIPMENT Coils: Direct Expansion, Chilled Water, and Heating

COMMERCIAL HVAC EQUIPMENT Coils: Direct Expansion, Chilled Water, and Heating COMMERCIAL HVAC EQUIPMENT Coils: Direct Expansion, Chilled Water, and Heating Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system

More information

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances Rebate not to exceed cost of high efficiency equipment. Equipment must be purchased or recycled in 2015. Installed equipment must be on cooperative's lines. Submit the documentation listed below no later

More information

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: , Purpose 355 West Queens Road Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: 604-990-2480, building@dnv.org The purpose of this document is to provide

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from

More information

Table of Contents. List of Figures and Tables. Executive Summary: 3 ASHRAE Standard 62.1 Section 6 Analysis 7

Table of Contents. List of Figures and Tables. Executive Summary: 3 ASHRAE Standard 62.1 Section 6 Analysis 7 Army Reserve Center Newport, Rhode Island Technical Report One: ASHRAE Standard 62.1 Ventilat tion and Standard 90.1 Energy Design Evaluations October 4, 2010 2 Table of Contents Executive Summary: 3 ASHRAE

More information