LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

Size: px
Start display at page:

Download "LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES"

Transcription

1 LIGHT LEVEL REQUIREMENTS LOCATION Classrooms and instrumental areas- Study Halls, Lecture Rooms, Art Rooms, Offices, Libraries, Conference Rooms, Work Rooms, Shops, Laboratories and Secondary School Cafeterias. MINIMUM ACCEPTABLE FOOT CANDLES 50 Drafting, Typing and Sewing Rooms. 70 Reception Rooms, Gymnasiums, Auditoriums, Primary School Cafeterias, All-Purpose Rooms and Swimming 30 Pools. Locker Rooms, Washrooms, Toilet Rooms, Corridors containing lockers and Stairways. 10 Corridors without lockers and Storage Rooms. 5 Classrooms for the partially sighted. 70

2

3

4

5

6

7

8

9 MDP-GYM SERVICE LOAD CALC Peak Load kw Removed Load 0 kw kw * kw 93%PF kva New Load kva Combined Load kva Calculations Based on NEC PANEL SDP SERVICE LOAD CALCULATIONS CONNECTED LOAD: 'VA/SQFT = VA/4221 SF 25.5 % VA/SQFT SQFT VA First 3VA/SQFT at 100% 1 3 4,221 12, VA/SQFT at 75% ,221 53, Remaining VA/SQFT at 25% ,221 5, Total kva Total Amps PANEL PP4 LOAD CALCULATIONS CONNECTED LOAD: 'VA/SQFT = VA/12044 SF % VA/SQFT SQFT VA First 3VA/SQFT at 100% ,044 36, VA/SQFT at 75% , , Remaining VA/SQFT at 25% , Total kva Total Amps Calculations Based on NEC MECHANICAL EQUIPMENT - ELECTRICAL DATA SCHEDULE EQUIPMENT NAME V-Ф-Hz HP/WATTS/A WIRE AND CONDUIT CIRCUIT BREAKER PANEL;CKT #(S) STARTER/ DISCONNECT BY MC/PC INSTALLED BY EC STARTER/ DISCONNECT BY EC THERMAL MOTOR SWITCH BY EC SUPPLY SMOKE DETECTOR QUANTITY RETURN SMOKE DETECTOR QUANTITY AC FLA 3/4"C-3#12+1#12GND - - UNIT MOUNTED WIRED TO CU-1. PROVIDE WALL MOUNTED NEMA 5-20R RECEPTACLE FOR ASSOCIATED CONDENSATE PUMP. WIRE TO PP4;71 CU FLA 3/4"C-2#12+1#12GND 20/1 PP5;1 UNIT MOUNTED AHU FLA 3/4"C-3#12+1#12GND - - UNIT MOUNTED WIRED TO HP-1. SEE DETAIL 4. AHU FLA 3/4"C-3#12+1#12GND - - UNIT MOUNTED WIRED TO HP-2. SEE DETAIL 4. PROVIDED WITH CONDENSATE PUMP, WIRE TO PP4;71 AHU FLA 3/4"C-3#12+1#12GND - - UNIT MOUNTED WIRED TO HP-3. SEE DETAIL 4. PROVIDED WITH CONDENSATE PUMP, WIRE TO SDP;62 AHU FLA 3/4"C-3#12+1#12GND - - UNIT MOUNTED WIRED TO HP-4. SEE DETAIL 4. PROVIDED WITH CONDENSATE PUMP, WIRE TO SDP;62 AHU FLA 3/4"C-3#12+1#12GND - - UNIT MOUNTED WIRED TO HP-5. PROVIDED WITH CONDENSATE PUMP, WIRE TO SDP;62 HP FLA 3/4"C-2#12+1#12GND 20/1 PP4;43 UNIT MOUNTED PROVIDE AND INSTALL WP GFI RECEPTACLE AND LIGHT, UNIT MOUNTED, WIRE TO PANEL "PP4" CKT 30. REFER TO DETAIL 3 HP FLA 3/4"C-2#12+1#12GND 20/1 PP4;45 UNIT MOUNTED HP FLA 3/4"C-2#12+1#12GND 20/1 SDP;44 UNIT MOUNTED HP FLA 3/4"C-2#12+1#12GND 20/1 SDP;46 UNIT MOUNTED HP FLA 3/4"C-2#8+1#8GND 35/2 SDP;68,70 UNIT MOUNTED CU MCA 3/4"C-3#10+1#10GND 30/3 SDP;74,76,78 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 SDP;71 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 PP4;46 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 PP4;44 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 PP4;44 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 PP4;46 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 PP4;46 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 PP4;46 UNIT MOUNTED CHU MCA 3/4"C-2#12+1#12GND 20/1 PP4;44 UNIT MOUNTED EF /4 HP 3/4"C-2#10+1#12GND 25/1 PP4; UNIT MOUNTED EF /4 HP 3/4"C-2#10+1#12GND 25/1 SPD; UNIT MOUNTED EF /4 HP 3/4"C-2#10+1#12GND 25/1 SPD; UNIT MOUNTED EF /3 HP 3/4"C-2#12+1#12GND 20/2 SDP;64; UNIT MOUNTED - - CONTROLLED BY FUME HOOD SWITCHES REFER TO DETAIL 4/E2-1 EF /3 HP 3/4"C-2#12+1#12GND 20/2 SPD;54, UNIT MOUNTED EWH FLA 3/4"C-2#12+1#12GND 20/1 PP4;69 UNIT MOUNTED - HT FLA 3/4"C-3#10+1#10GND 30/1 PP5;7,9 ALTERNATE BID H-1. HT FLA 3/4"C-3#10+1#10GND 30/1 PP5;11,13 ALTERNATE BID H-1 HWH FLA 3/4"C-2#12+1#12GND 20/1 SDP; PROVIDE WALL MOUNTED NEMA 5-20R RECEPTACLE. WIRE ASSOCAITED PUMP TO SDP;36. HWH FLA 3/4"C-2#12+1#12GND 20/1 PP5; PROVIDE WALL MOUNTED NEMA 5-20R RECEPTACLE. WIRE ASSOCAITED PUMP TO PP5;5. RTU FLA 3"C-3#350kCM+1#4GND 300/3 PP4;79,81,83 UNIT MOUNTED PROVIDE AND INSTALL WP GFI RECEPTACLE AND LIGHT, UNIT MOUNTED, WIRE TO PANEL "PP4" CKT 30. REFER TO DETAIL 3 RTU MCA 1"C-3#6+1#8GND 60/3 PP4;73,75,77 UNIT MOUNTED RTU FLA 1-1/2"C-3#1+1#6GND 125/3 SDP;79,81,83 UNIT MOUNTED PROVIDE AND INSTALL WP GFI RECEPTACLE AND LIGHT, UNIT MOUNTED, WIRE TO PANEL "SDP" CKT 69. REFER TO DETAIL 3 RTU FLA 3/4"C-3#8+1#8GND 50/3 SPD;73,75,77 UNIT MOUNTED PROVIDE AND INSTALL WP GFI RECEPTACLE AND LIGHT, UNIT MOUNTED, WIRE TO PANEL "SDP" CKT 69. REFER TO DETAIL 3 UV MCA 3/4"C-2#12+1#12GND 20/1 SDP;43 UNIT MOUNTED PROVIDED WITH CONDENSATE PUMP CUT PLUG OFF CORD AND WIRE TO SDP;62 FLORAL COOLER FLA 3/4"C-3#12+1#12GND 20/3 SDP; 55,57,59 - UNIT MOUNTED CONDENSING UNIT ON ROOF FLA 3/4"C-3#10+1#10GND 30/3 SDP; 61,63,65 - UNIT MOUNTED ROOM CONTROL CONSOLE. PROVIDED WITH CONDENSATE PUMP, WIRE TO SDP;62 ATC CONTROL PANEL FLA (E)WIRING 20/1 MCC-2; LOCATED IN BOILER ROOM. REUSE EXISTING FEED FROM DEMOLISHED CONTROL PANEL

10 ELECTRICAL 112 PANEL SCHEDULE FOR PANEL: "RP1" 208/120 V, 3PH, 4W, 225A BUS, 225A M.L.O., 22,000A RMS ELECTRICAL 112 PANEL SCHEDULE FOR RELOCATED PANEL: "PP3" 208/120 V, 3PH, 4W, 100A BUS, 100A M.L.O., SQUARE D NQOB ELECTRICAL 112 PANEL SCHEDULE FOR DOUBLE PANEL: "PP5" 208/120 V, 3PH, 4W, 100A BUS, 100A M.L.O., 22,000A RMS NO POLE AMP AMP POLE NO * (E) OVEN No.1 RECEPTACLE (E) OVEN RECEPTACLE * SPARE (E) FLOOR RECEPTACLES (LEFT) * * EXISTING LOAD (E) CLOSET RECEPTACLES * * (E) WASHROOM RECEPTACLES EXISTING LOAD * SPARE (E) RECEPTACLES NEAR REFRIGERATOR * * EXISTING LOAD EXISTING LOAD (E) WALL RECEPTACLES (LEFT) (E) EXHAUST FAN (E) WALL RECEPTACLES (BETWEEN) (E) EXHAUST FAN (E) WALL RECEPTACLES (RIGHT) SPARE (E) STORAGE LIGHTING (E) KITCHEN (FRONT) LIGHTING (E) CLOSET LIGHTING (E) KITCHEN (LEFT) EMERGENCY LIGHTING (E) EXHAUST FAN (RIGHT) EXISTING LOAD (E) EXHAUST FAN (RIGHT) (E) RANGE IN-HOOD LIGHTS (E) FLOOR RECEPTACLES (LEFT) (E) RANGE ON-HOOD LIGHTS (E) DRYER RECEPTACLES (E) WASHING MACHINE LIGHT (E) DRYER RECEPTACLES (E) UNIT HEATER (E) KITCHEN LIGHTING (RIGHT) SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE * DENOTES CIRCUITS THAT EXIT THE BOTTOM OF THE DEMOLISHED PANEL. THESE CIRCUITS SHALL BE DEMOLISHED AND REWIRED WITH 3/4"C-2#12+1#12GND. ASSUME 60 FEET OF CABLE AND CONDUIT FOR EACH CIRCUIT FROM NEW PANEL LOCATION TO EXISTING DEVICE. ALL OTHER EXISTING CIRCUITS SHALL BE SPLICED IN A JB ABOVE THE CEILING AND EXTENDED TO NEW PANEL LOCATION. EXISTING FEEDER SHALL BE DEMOLISHED. CONTRACTOR SHALL TRACE FEEDER TO CONFRIM PANEL IS WIRED TO (E)MCC-1 IN BOILER ROOM AND RELABEL BREAKER AS SPARE. EC SHALL TRACE ALL BRANCH CIRCUITS AND SHALL PROVIDE AS BUILT DRAWING AND PANEL SCHEDULE. SCIENCE LAB 115 PANEL SCHEDULE FOR PANEL: "SDP" 208/120 V, 3PH, 4W, 400A BUS, 300A M.C.B., 22,000A RMS SERVICE ENTRANCE RATED NO POLE AMP A B C A B C AMP POLE NO SCIENCE LAB RM. 115 LIGHTING SCIENCE LAB RM. 115 LIGHTING SCIENCE LAB RM. 116 LIGHTING PREP. ROOMS 117&118 LIGHTING CORRIDOR LIGHTING GAS RELAY PANELS SCIENCE LAB 116 TABLE RECEPTACLES SCIENCE LAB 116 TABLE RECEPTACLES SCIENCE LAB 116 TABLE RECEPTACLES SCIENCE LAB 115 TABLE RECEPTACLES SCIENCE LAB 115 TABLE RECEPTACLES SCIENCE LAB 115 TABLE RECEPTACLES SCIENCE LAB 116 RECEPTACLES SCIENCE LAB 116 RECEPTACLES SCIENCE LAB 116 RECEPTACLES SCIENCE LAB 116 RECEPTACLES SCIENCE LAB 116 GOGGLE CASE RECEPTACLE SCIENCE LAB 116 REFRIGERATOR RECEPTACLE SCIENCE LAB 116 DISHWASHER RECEPTACLE SCIENCE LAB 116 FUME HOOD RECEPTACLE SCIENCE LAB 116 RECEPTACLES CORRIDOR RECEPTACLES SCIENCE LAB 115 RECEPTACLES SCIENCE LAB 115 GOGGLE CASE RECEPTACLE SCIENCE LAB 115 RECEPTACLES SCIENCE LAB 115 RECEPTACLES SCIENCE LAB 115 DISHWASHER RECEPTACLE SCIENCE LAB 115 REFRIGERATOR RECEPTACLE SCIENCE LAB 115 FUME HOOD RECEPTACLE SCIENCE LAB 115 RECEPTACLES LIFT DISCONNECT HWH ELECTRICAL SHUT DOWN PANEL EXTERIOR BUILDING LIGHTING SMARTBOARD HWH-1 PUMP SMARTBOARD FIRE ALARM BOOSTER PUMP SPARE ROLLING DOOR SPARE UV AHU-3/HP SPARE AHU-3/HP SPARE 0 0 SPARE SPARE 0 0 SPARE SPARE 0 0 SPARE SPARE EF FLORAL COOLER CONDENSING UNIT EF EF CONDENSATE PUMPS FLORAL COOLER EF PHOTO CELL AHU-5/HP ROOF TOP RECEPTACLES AND LIGHTS CUH SPARE RTU CU RTU NO POLE AMP AMP POLE NO 1 2 (E) ROOF TOP AC No (E) WALKIN BOX 4 5 SPACE (E) RECEPTACLES (E)FOOD WARMER (E) RECEPTACLES (E) RECEPTACLES THIS PANEL IS TO BE RELOCATED. ALL FEEDER AND BRANCH CIRCUITS FOR THIS PANEL ARE WIRED THROUGH (E)PANEL "PP2". PROVIDE A NEW WIRING TROUGH NEXT TO (E)PANEL "PP2" TO BE USED FOR SPLICING AND EXTENDING FEEDER AND BRANCH CIRCUITS. ASSUME 4#1+1#8GND FOR THE FEEDER, #12'S FOR ALL CIRCUITS ACCEPT FOR 2,4 WHICH SHALL BE #10. ELECTRICAL 112 NO POLE AMP A B C A B C AMP POLE NO REFRIGERATOR OVERHEAD WARMER HEATED PASS THRU CABINET REFRIGERATED SELF SERVE CASE DROP IN FREEZER ICE CREAM REFRIGERATED SELF SERVE CASE BACKSTOP BACKSTOP REFRIGERATED SELF SERVE CASE BACKSTOP BACKSTOP HOT, COLD, FREEZE DROP-IN BACKSTOP HEATED BLACK GLASS BACKSTOP OVERHEAD WARMER PROJECTION SCREEN PROJECTION SCREEN HOT, COLD, FREEZE DROP-IN GYM DIVIDER MOTOR COLD PAN PROJECTOR LIFT REFRIGERATED BASE ROOF TOP RECEPTACLES AND LIGHTS KITCHEN COUNTER RECEPTACLES CAFETERIA FLOOR RECEPTACLES CAFETERIA COUNTER RECEPTACLES HOT, COLD, FREEZE DROP-IN CASHIER RECEPTACLES CAFETERIA COUNTER RECEPTACLES HEATED BASE HOT, COLD, FREEZE DROP-IN HEATED BLACK GLASS ELECTRICAL 112 PANEL SCHEDULE FOR DOUBLE PANEL: "PP4 LEFT" 208/120 V, 3PH, 4W, 600A BUS, 600A M.L.O., 22,000A RMS PANEL SCHEDULE FOR DOUBLE PANEL: "PP4 RIGHT" 208/120 V, 3PH, 4W, 600A BUS, 600A M.L.O., 22,000A RMS NO POLE AMP A B C A B C AMP POLE NO AHU-1/HP CUH-3, CUH-4, CUH AHU-2/HP CUH-2, CUH-5, CUH-6, CUH PROJECTOR LIFT EF SCOREBOARD MULTI-PURPOSE ROOM 100 RECEPTACLES SCOREBOARD MULTI-PURPOSE ROOM 100 RECEPTACLES MULTI-PURPOSE RM. 100 LIGHTING WATER COOLER RECEPTACLE MULTI-PURPOSE RM. 100 LIGHTING TOILET RMS. 104&105, LOCKER RMS. 103&106 RECEPTACLES MULTI-PURPOSE RM. 100 LIGHTING OFFICES 102&107, CORRIDOR C-1A RECEPTACLES MULTI-PURPOSE RM. 100 LIGHTING STORAGE RMS. 101&108, CUST. CLOSET 109 RECEPTACLES CAFETERIA RM. 111 LIGHTING STORAGE RM. 111A, CORRIDOR C-1 RECEPTACLES HALL H-1 LIGHTING OUTSIDE BUILDING RECEPTACLES MULTIPLE ROOM LIGHTING-BELOW MULIT PURPOSE RM DATA CLOSET RECEPACLE MULTIPLE ROOM LIGHTING-BELOW MULIT PURPOSE RM DATA CLOSET RECEPACLE EWH DATA CLOSET RECEPACLE CONDENSATE PUMPS STORAGE 110 PA RACK RECEPTACLE RTU PANEL "PP5" RTU PHASE A: KVA PHASE B: KVA PHASE C: KVA TOTAL: KVA NO POLE AMP A B C A B C AMP POLE NO AC-2/CU SITE LIGHTING HWH EXTERIOR BUILDING LIGHTING HWH-2 PUMP FIRE ALARM BOOSTER DOOR ACCESS JB HT DOOR ACCESS JB DOOR ACCESS JB HT FIRE SHUTTER SMOKE DAMPERS SPARE 0 0 SPARE SPARE 0 0 SPARE SPARE 0 0 SPARE SPARE 0 0 SPARE SPARE 0 0 SPARE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE GIRLS LOCKER ROOM PANEL SCHEDULE FOR DOUBLE PANEL: "GL1" 208/120 V, 3PH, 4W, 100A BUS, 100A M.L.O., 65,000A RMS PHASE A: 6.67 KVA PHASE B: 4.12 KVA PHASE C: 2.71 KVA TOTAL: KVA NO POLE AMP A B C A B C AMP POLE NO (E) FIRE ALARM BOOSTER 0 0 SPARE SPARE 0 0 SPARE SPARE 0 0 SPARE SPARE 0 0 SPARE SPARE 0 0 SPARE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE SPACE 0 0 SPACE PHASE A: 0.00 KVA PHASE B: 0.00 KVA PHASE C: 0.00 KVA TOTAL: 0.00 KVA PHASE A: KVA PHASE B: KVA PHASE C: KVA TOTAL: KVA PHASE A: KVA PHASE B: KVA PHASE C: KVA TOTAL: KVA

11

Kitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI.

Kitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI. UNIT # NOTES Receptacle in living room, south wall not working properly; 1 kitchen east, north, west wall receptacles have no power. Living room north wall outlet not working properly; kitchen 2 south

More information

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater TABLE 9.4.5 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE 90.1 Uncovered Parking Areas Parking Lots and drives Building Grounds Walkways less that 10 feet wide Walkways 10 feet wide or greater

More information

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608) Ho-Chunk Gaming POWER SYMBOLS X ELECTRICAL PANEL - REFER TO DRAWINGS FOR WIDTH AND PANEL SCHEDULES PANEL NAMING: XXP-#X: DENOTES PANEL FUNCTION: L = LIGHTING P = GENERAL POWER E = EMERGENCY S = OPTIONAL

More information

Electrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING

Electrical System (N) PANELBOARD L1 VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board

More information

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 135 - QUEENS, 207-11 89TH AVENUE, New York, 11427 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 16 - BROOKLYN, 157 WILSON STREET, New York, 11211 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-30

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 314 - BROOKLYN, 330 59 STREET, New York, 11220 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-23

More information

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2 Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 174 - QUEENS, 65-10 DIETERLE CRESCENT, New York, 11374 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-01-25

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 56 - STATEN ISLAND, 250 KRAMER AVE., New York, 10309 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-20

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED

More information

2009 ELECTRICAL CODE REQUIREMENTS

2009 ELECTRICAL CODE REQUIREMENTS 2009 ELECTRICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Inspection Request Line (231) 533-3510 Electrical requirements

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

White Bear Lake Area Schools District 624 ENERGY GUIDELINES White Bear Lake Area Schools District 624 ENERGY GUIDELINES Developed by: White Bear Lake Area Schools Energy Steering Committee as part of the Schools for Energy Efficiency (SEE) Program ISD 624 Energy

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: DIV. COMPUTER INFO-DATA CENTER-K, 2 METROTECH CENTER, New York, 11211 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 5 - BROOKLYN, 820 HANCOCK STREET, New York, 11233 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-05-25 8:54 AM 2018-06-04 10:18 AM Asset Data Type of Service Does Interactive

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 184 - QUEENS, 163-15 21 ROAD, New York, 11357 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-05 11:46

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

CT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 152 - MANHATTAN, 93 NAGLE AVENUE, New York, 10040 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-05

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Building Electrical System Overview

Building Electrical System Overview Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power

More information

Heat Recovery Units. EXTERNAL STATIC REQUIRED (in.h2o) (Pa) MOTOR (Bhp/Hp) (bkw/kw) SPEED (rpm)

Heat Recovery Units. EXTERNAL STATIC REQUIRED (in.h2o) (Pa) MOTOR (Bhp/Hp) (bkw/kw) SPEED (rpm) Heat Recovery Units AIR HANDLING UNIT No. SERVICE AREA MANUFACTURER MODEL HRU-3 & HRU-4 B-Section Low Rate Ventilation Tempeff RG 16000 (9500) SUPPLY FAN - SIZE/TYPE AIRFLOW RATE (cfm) (l/s) TOTAL STATIC

More information

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. #

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. # ELECTRICAL ELECTRIC SERVICE EVALUATIONS / BOILER REPLACEMENTS Clarkstown Central School District June 2015 CSArch Arch Proj. # 151-1501.00 151 Table of Contents SECTION 1 Executive Summary... 1 SECTION

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 86 - BROOKLYN, 220 IRVING AVENUE, New York, 11237 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-14

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 371 (OLD 615) - BROOKLYN, 355 37 STREET, New York, 11232 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-23

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

Technical II Report Electrical Systems

Technical II Report Electrical Systems Technical II Report Electrical Systems Kelly Chan Consultant: Prof T. Dannerth, P.E. Part A Drawings Drawings needed for single-line diagram EE1.01 title sheet (electrical drawings) EE2.09 penthouse/roof

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: PS 152 ANNEX -BROOKLYN, 1087 OCEAN AVENUE, New York, 11210 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE)

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE) HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE) Administrative and General Building Requirements Safety reference plans (1) Fire alarm audibility (10) Alcohol hand-rub-dispensers (19) School safety

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: I.S. 260 - MANHATTAN, 425 WEST 33RD STREET, New York, 10001 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-16

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 131 - QUEENS, 170-45 84TH AVENUE, New York, 11432 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-18

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

Exhibit A. Mechnical, Plumbing, and Electrical Plan Check and Inspection Fees. Total Cost Per Unit FEE TYPES MECHANICAL PERMIT FEES

Exhibit A. Mechnical, Plumbing, and Electrical Plan Check and Inspection Fees. Total Cost Per Unit FEE TYPES MECHANICAL PERMIT FEES Mechnical, Plumbing, and Electrical Plan Check and Inspection Fees MECHANICAL PERMIT FEES FEE TYPES Total Cost Per Unit $ 180.36 Stand Alone Mechanical Plan Check (hourly rate) $ 180 UNIT FEES: Install/Relocate

More information

I.C. Thomasson Associates, Inc. CONSULTING ENGINEERS 2950 KRAFT DRIVE, SUITE 500 NASHVILLE, TN. 37204 PHONE (615) 346-3400 FAX (615) 346-3550 www.icthomasson.com ICT PROJECT # 170647 HODGSON DOUGLAS landscape

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 47 - QUEENS, 9 POWER ROAD, New York, 11693 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-20 12:40

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: TERS PREP HS(OL REDIRECTION)-K, 226 BRISTOL STREET, New York, 11212 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

ll. Consistency Questions

ll. Consistency Questions Our Goal is FOR ALL STAKEHOLDERS TO HAVE A SUCCESSFUL PROJECT with us and that together we keep people and structures safe and buildings economically viable to serve the needs of our community. We strive

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

GRILLE, REGISTER AND DIFFUSER SCHEDULE

GRILLE, REGISTER AND DIFFUSER SCHEDULE ROOFTOP UNIT SCHEDULE (NATURAL GAS HEAT) MARK MANUFACTURER MODEL SUPPLY FAN COOLING COIL HEAT EXCHANGER MIN. MIN. MCA MOCP V/PH WEIGHT NOTES FAN CFM MIN ESP REFR. TH SH EAT LAT MIN. OUTPUT MIN. EFF. NOM.

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE SCHEDULE OF S Penalty Fees. The fee for construction work performed before securing permit(s), where required, may be charged a fee of TWO TIMES THE COST OF THE PERMIT (S). Building Fee Schedule Residential

More information

Executive Summary. CNBC Global Headquarters Christine Cajilig

Executive Summary. CNBC Global Headquarters Christine Cajilig Executive Summary This report contains an analysis and description of the existing electrical distribution of the including the distribution type, emergency power, uninterruptible power system, over current

More information

The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall.

The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall. The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall. Demolition: The area of work shall be a complete gut ; removing all

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 80 AX(PETR COMPL-BLDG E)-S.I., 715 OCEAN TERRACE, New York, 10301 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016) Cheboygan County Department of Building Safety 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 TX: (231) 627-8813 FX: (231) 627-8454 www.cheboygancounty.net Service Entrance ONE- AND TWO-FAMILY

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

3520 A Energy Conservation Standards

3520 A Energy Conservation Standards 3520 A Energy Conservation Standards Regulation Original Adoption: 04/14/2009 Effective Date: 08/06/2009 Revision Dates: 08/05/2009 I. PURPOSE The purpose of this regulation is to establish the energy

More information

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE 1. BUILDING FEES: 1 AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE ESTABLISHMENT OF FEES PURSUANT TO N.J.A.C.

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?

More information

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan PBA Project No. 2014.0137.00 Prepared By: Wayne Kerbelis Terry Cleis September

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 127 - BROOKLYN, 7805 7 AVENUE, New York, 11209 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-30

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: NEW SCH FOR ARTS AND SCIENCE - X, 965 LONGWOOD AVENUE, New York, 10459 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-01 8:13 AM 2017-12-01

More information

NYC Department of Education

NYC Department of Education Asset: I.S. 45 - BRONX, 2502 LORILLARD PLACE, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-05 9:14 AM 2017-12-20 11:42 AM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS OF AMERICAN STUDIES - BRONX, 2925 GOULDEN AVENUE, New York, 10468 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: I.S. 364 - BROOKLYN, 1426 FREEPORT LOOP, New York, 11239 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-16

More information

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis 204-205 YEAR-TO-DATE Custodial Supplies 88.00 9.50 $,643. $26,39.60 $27,782.7 Preventive Maintenance 67.00,74.00 $20,372.68

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Mechanical Systems Information The mechanical system at Reed Middle School is comprised of seventy six Trane DX/Gas rooftop units (RTUs). The recommended useful life for DX equipment is 15 years. Seventy

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

Chandler City Hall Chandler, Arizona

Chandler City Hall Chandler, Arizona Chandler City Hall Chandler, Arizona AE481W: Architectural Engineering Senior Thesis Wednesday October 27 th, 2010 Stephanie Romanias Lighting/Electrical Faculty Consultant Dr. Kevin Houser/Professor Dannerth

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting PROJECT MANAGEMENT AGENDA Project: George Keverian School Feasibility Study Project No.: 16049 Re: School Building Committee Meeting Meeting Date: 3/22/2017 Meeting Location: Mayor s Conference Room, City

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

Schedule of Approved Fees

Schedule of Approved Fees Schedule of BUILDINGMISCELLANEOUS Inspection not otherwise covered by a fee and is regulated by LA County Oridnance OCCUPANCY INSPECTIONS Group R or Group M Other Groups other than R or M (Floor Area)

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 81 ANNEX (OLD 75) - QUEENS, 511 SENECA AVENUE, New York, 11385 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

Building Automation System (BAS) Design Criteria

Building Automation System (BAS) Design Criteria 25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate

More information

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.

More information

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary

Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary William H. Gates Hall Seattle, WA Katherine Jenkins Lighting/Electrical Option October 27, 2006 Faculty Advisor: Ted

More information