GARCIA GALUSKA DESOUSA Consulting Engineers

Size: px
Start display at page:

Download "GARCIA GALUSKA DESOUSA Consulting Engineers"

Transcription

1 L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design. While there are several different HVAC system options that are suitable for the proposed Renovation and Addition Option, the proposed HVAC system described below represents highly energy efficient, moderate first cost HVAC system options that provide a high level of thermal comfort and indoor air quality that has demonstrated to have a low overall life cycle cost in comparison to other system options and are compatible with the existing building s architectural and structural features. As part of the project s future design development, we recommend that a building energy model and life cycle cost analysis of a minimum of three HVAC system options should be performed. 1. CODES All work installed under Section shall comply with the all town, state, county, and federal codes, laws, statutes, and authorities having jurisdiction. 2. DESIGN INTENT The work of Section is shown on the drawings and specifications. All work is new and consists of furnishing all materials, equipment, labor, transportation, facilities, and all operations and adjustments required for the complete and operating installation of the Heating, Ventilating and Air Conditioning work and all items incidental thereto, including commissioning and testing. Mechanical systems shall function to deliver the performance levels to maintain space comfort within specifications set forth by ASHRAE Standard (note: Central AHU humidification system is not in the project scope, humidification control shall be accomplished through use of the energy recovery), ventilation requirements within ASHRAE , energy efficiency within ASHRAE and IECC Data center temperature and humidity levels shall be designed within ASHRAE TC recommended range (64.4 deg F to 80.4 deg F with a humidity level less than 60% RH) and Town record vaults shall be designed to maintain temperature and humidity conditions per the Owner s Design Criteria and/or Massachusetts Archives Performance Guidelines for Safes and Vaults. 3. BASIS OF DESIGN: (MASS CODE) Massachusetts Code values are listed herein based on local weather data values as determined from ASHRAE 2011 Handbook weather data. Outside: Winter 7 F, Summer 88 F DB 73 F WB Inside: 70 F +/- 2 (adj.) deg F for heating and 75 F +/-2 (adj.) deg F(55% RH) for cooling. Unoccupied temperature setback will be provided to maintain 60 F DB during heating season and 80 F DB during cooling season. Outside air is provided in accordance with ASHRAE Standard and IBC Mechanical Code (IMC 2015) requirements as a minimum. All occupied areas will be designed to maintain a level less than 850 PPM carbon dioxide. TEL FAX info@g-g-d.com

2 L#57295/Page 2/July 21, SYSTEM DESCRIPTION HVAC Option #1: Boiler/Chiller w/ Hot/Chilled Water/Energy Recovery Air Handling Units, Full Economizer, 4-Pipe Induction Unit System The existing Town Hall and Addition Renovation will be served by two (2) 500 MBH condensing boilers and a single 55 ton chiller. Each boiler will have a variable speed in-line pump feeding an insulated hot water supply and return piping system. The chiller will have a variable speed in-line pump feeding an insulated chilled water supply and return piping system. The piping from both the chilled water system and hot water system will be distributed to central station air handling units. Each AHU must have a full sized outside air duct connected to a large louver for the code required economizer cycle with a second similar duct and louver for relief air. Induction Units with hot/chilled water coils and ducted supply ventilation air will be used to zone individual rooms and groups of rooms to provide better temperature control. Return air ductwork will run from each room or zone back to the two air handler units. HVAC Option#1 System Summary: Requires a dedicated mechanical room with access to the exterior for louvers for AHUs Requires a mechanical room for boilers, expansion tanks, pumps, buffer tanks, air separators and glycol feed tank(s). A single 55 ton chiller will be located outside at grade Cooling System Chilled water pumps (primary/standby with VFDs), piping, associated insulation, valving and accessories. Two (2) 500 MBH condensing boilers Heating Hot water pumps (primary/standby with VFDs), piping, associated insulation, valving and accessories. Central station air handling units consisting of: o One (1) Chilled water/hot water air handling/ energy recovery/economizer unit at 2,500 CFM to serve the building office areas and o One (1) Chilled water/hot water/energy recovery/economizer air handling unit at 1,500 CFM to serve the Main meeting room o One (1) Chilled water/hot water/energy recovery/economizer air handling unit at 1,000 CFM to serve the Secondary meeting room o One (1) Chilled water/hot water/energy recovery/economizer air handling unit at 6,000 CFM to serve the Auditorium o Associated supply, return/exhaust ductwork, insulation, dampers, and air distribution devices. Louvers for AHU and EFs Induction Units will zone each office/room or group of rooms based on exposure and usage Induction Unit system requires about 24 of ceiling plenum space for ductwork and other mechanical equipment HVAC Option #2: Boiler/Chiller w/ Hot/Chilled Water/Energy Recovery Air Handling Units, 4-Pipe Full Economizer, Fancoil Unit System The new Town Hall will be served by two (2) 500 MBH condensing boilers and a single 40 ton chiller. Each boiler will have a variable speed in-line pump feeding an insulated hot water supply and return piping system. The chiller will have a variable speed in-line pump feeding an insulated chilled water supply and return piping system. The piping from both the chilled water system and hot water system will be distributed to central station air handling units. Each AHU shall have a full sized outside air duct connected to a large louver for the code required economizer cycle with a second similar duct and louver for relief air. Fancoils with a dual

3 L#57295/Page 3/July 21, 2017 temperature water coil will be used to zone individual rooms and groups of rooms to provide better temperature control. Supply and return air ductwork will run to each room or zone to provide code required ventilation. HVAC Option #2 System Summary: Requires a dedicated mechanical room with access to the exterior for large louvers for AHUs Requires a mechanical room for boilers, expansion tanks, pumps, buffer tanks, air separators and glycol feed tank(s). A single 55 ton chiller will be located outside at grade Cooling System Chilled water pumps (primary/standby with VFDs), piping, associated insulation, valving and accessories. Two (2) 500 MBH condensing boilers Heating Hot water pumps (primary/standby with VFDs), piping, associated insulation, valving and accessories. Central station air handling units consisting of: o One (1) Chilled water/hot water air handling/ energy recovery/economizer unit at 2,500 CFM to serve the building office areas and o One (1) Chilled water/hot water/energy recovery/economizer air handling unit at 1,500 CFM to serve the Main meeting room o One (1) Chilled water/hot water/energy recovery/economizer air handling unit at 1,000 CFM to serve the Secondary meeting room o One (1) Chilled water/hot water/energy recovery/economizer air handling unit at 6,000 CFM to serve the Auditorium o Associated supply, return/exhaust ductwork, insulation, dampers, and air distribution devices. Louvers for AHU and EFs Fancoils will zone each room or group of rooms based on exposure and usage Requires about 18 * of ceiling plenum space for ductwork and other mechanical equipment. *This assumes fan coil units shall be wall mounted or floor mounted console style units. Horizontal ceiling suspended fan coil units would require approx. 24 in. ceiling cavity space. Small boiler/pump room on ground floor Mechanical rooms on ground floor. HVAC Option #3: Boiler w/ Hot Water/DX/Energy Recovery Air Handling Units, Full Economizer, VRF System The new Town Hall will be served by (2) two 250 MBH condensing boilers. Each boiler will have a variable speed in-line pump feeding an insulated hot water supply and return piping system. The piping from the hot water system will be distributed to central station air handling units. Each AHU must have a full sized outside air duct connected to a large louver for the code required economizer cycle with a second similar duct and louver for relief air. Each of the AHUs shall have a dedicated split system condensing unit for cooling. Variable refrigerant flor (VRF) ductless cooling units (DCUs) with refrigerant piping and condensate piping will run throughout the building and connect to an outdoor 30 ton VRF air cooled heat pump unit. Supply and return air ductwork will run to each room or zone to provide code required ventilation. HVAC Option #3 System Summary: Requires a dedicated mechanical room with access to the exterior for large louvers for AHUs

4 L#57295/Page 4/July 21, 2017 Requires a mechanical room for boilers, expansion tank, pumps, air separator and glycol feed tank(s). Four (4) Condensing units (1@10 Ton, 1@3 ton, 1@5 ton, and 1@7.5 tons) will be located outside at grade. One (1) 30 ton (2 15 Ton Modules) condenser/vrf unit will be located outside at grade. Refrigerant liquid and refrigerant suction piping based on manufacturer s recommendations from VRF unit to DCUs Two (2) 250 MBH condensing boilers Heating Hot water pumps (primary/standby with VFDs), piping, associated insulation, valving and accessories. Central station air handling units systems consisting of: o One (1) Split DX(direct expansion)/hot water air handling/ energy recovery/economizer unit at 3,000 CFM to serve the building office areas o One (1) Split DX(direct expansion)/hot water/energy recovery/economizer air handling unit at 1,500 CFM to serve the Main meeting room o One (1) Split DX(direct expansion)/hot water/energy recovery/economizer air handling unit at 1,000 CFM to serve the Secondary meeting room o One (1) Split DX(direct expansion)/hot water/energy recovery/economizer air handling o unit at 3,500 CFM to serve the Auditorium Associated supply, return/exhaust ductwork, insulation, dampers, and air distribution devices. Louvers for AHU and EFs DCUs will zone each room or group of rooms based on exposure and usage Requires about 18 * of ceiling plenum space for ductwork and other mechanical equipment. *This assumes VRF fan coil units shall be wall mounted style units. Horizontal ceiling suspended fan coil units would require approx. 24 in. ceiling cavity space. HVAC Option #4: Geothermal System A high efficiency geothermal system could be paired with any of the three options listed above. The geothermal system would eliminate the requirement for Chiller and Condensing equipment described in the option above, and central indoor heat pump equipment would be provided. The geothermal system would require a well filed piping and pump distribution system to support the HVAC system cooling and heating plant requirements. Geothermal systems could be Open Vertical Standing Colum Wall or Closed Loop design. Closed loops typically require a larger quantity of wells but the wells have a reduced depth and have smaller diameter piping. Open loop well quantity sixteen (16) 500 ft deep each. Closed loop well quantity estimated at three (3) wells at depth of approx ft deep each Geothermal condensing water supply and return piping, pumps, valving and accessories are required. Refer to Pros/Cons list for all HVAC design options.

5 L#57295/Page 5/July 21, 2017 Building Management System: A new building energy management system (EMS) shall be installed for all HVAC system options. The EMS shall be an open protocol BACNet compatible building energy management system. The building EMS shall control building HVAC systems and shall store the information in a webaccessible database. The EMS will be capable to automatically distribute alarms and building information to support problem identification, maintenance and continued achievement of performance goals over the life of the systems. Typical components which the project shall require alarms, and monitoring include: would be Boilers, Air Handlers, Chillers, split system AC units, etc. Miscellaneous HVAC Systems: 5. DEMOLITION 1. In-line or roof exhaust fans shall be provided to serve the areas of the building that require separate dedicated exhaust systems utilizing exhaust air fans, ductwork and associated controls, i.e. Janitors Closets, Utility Rooms, etc. 2. All exterior stairways, entrances, and vestibules will be provided with hot water cabinet unit heaters. 3. Ancillary spaces will be heated by fin tube radiation, radiant heating panels, and/or convectors. 4. All corridors will be ventilated by the HVAC system that serves the adjacent area in which the corridor is located. Ventilation will be provided to ensure sufficient outdoor ventilation and make-up air is provided to offset the building exhaust air to maintain proper building pressurization. 5. Unit heaters will be provided to serve Mechanical and Utility Room areas. 6. Ductless high efficiency split system AC units shall be provided for the IT Server and Elevator Machine Room. All existing building HVAC systems shall be demolished, removed from the site and disposed of in a legal manner by the Contractor. Demolition activities shall be performed in a Phased manner as direct by the Project Architect. 6. TESTING REQUIREMENTS The mechanical contractor shall provide testing of the following systems with the Owner and Owner s representative present: Boiler plant system Air handling unit systems including all rooftop units, indoor air handling systems and exhaust air systems Terminal heating and cooling devices Automatic temperature control and building energy management system Testing reports shall be submitted to the engineer for review and approval before providing to the Owner.

6 L#57295/Page 6/July 21, OPERATION AND MAINTENANCE MANUALS AND OWNER TRAINING: When the project is completed, the Mechanical Contractor shall provide operation and maintenance manuals to the Owner. Operator training and users project documents are required for O&M staff to properly maintain the facility. These documents include the O&M Manual, As-built Drawings, and a Systems Manual (System Manual shall be developed by the CxA). Outside service providers and qualified, licensed and trained town staff will provide preventative maintenance and necessary repairs. Maintenance supervision and some actions will be performed by town staff, and require detailed training on the HVAC systems. Training will include the education of multiple members of staff, as chosen by the owner, in the proper use of the monitoring system. The project mechanical specifications will outline this requirement and will require the video recording of M/E/P systems training sessions. Basic level of maintenance typically includes changing of filters and visual inspection of equipment. Advanced level of maintenance typically includes seasonal changing between heating and cooling systems, visual inspection of the equipment, checking refrigerant levels in the chiller, and cleaning the boiler etc. The above is a sample of typical maintenance items. The end user shall decide what will be done in house and what will be contacted out. The end user should also review all maintenance contracts to verify the bill of goods. 8. RECORD DRAWINGS AND CONTROL DOCUMENTS: When the project is completed, an as-built set of drawings, showing all mechanical system requirements from contract and addendum items, will be provided to the Owner. 9. COMMISSIONING The project s HVAC systems shall be fully commissioned in accordance with project Commissioning specifications. 10. ENERGY EFFICIENCY GOALS: The project design shall meet and exceed the following minimum requirements: 1) LEED v4 - Minimum Efficiency Guidelines 2) MA 780CMR 8th Edition Ch.13 Energy Efficiency IECC ) ASHRAE Standard

7 L#57295/Page 7/July 21, 2017 COHASSETT TOWNHALL RENOVATION/ADDITION HVAC SYSTEM OPTION COMPARISON OPTION 1 PROS CONS ACTIVE CHILLED BEAM/ INDUCTION UNITS Superior thermal comfort conditions. Superior thermal comfort control as individual unit with associated controls will be provided for each zone. Low maintenance costs. Primary maintenance done at air handling unit. Fewer systems for heating/cooling Relatively quiet: No fans within space. Higher first cost. Moderate automatic temperature controls cost. Condensate drain maintenance (for AC). Maintenance of equipment is in occupied area. Distribution ductwork system is required resulting in additional architectural features (e.g. ceiling space, soffits, etc.). Chilled water pumps and associated VFD s required increase capital investment, maintenance, and operating costs. OPTION 2 PROS CONS VARIABLE WATER FLOW SYSTEM (CHILLED WATER) Superior thermal comfort conditions. Superior thermal comfort control as individual unit with associated controls will be provided for each zone. Lower operating costs than VRF system. All new equipment results in increased system life expectancy. Does not require distribution ductwork system. Refrigerant is self-contained in outdoor equipment. Lower ceiling plenum height required than induction units. Moderate first cost. High maintenance costs for quantity of units and factory authorized service is required for VRW system. Higher noise levels than induction due to fan motor located within occupied zone. High automatic temperature controls cost. Quarterly filter changes per unit. Condensate drain maintenance (for AC). Maintenance of equipment is in occupied area. Wall mounted evaporators do not provide direct ventilation to the space. Space humidity monitoring is critical to avoid condensation at the evaporator units (natural ventilation). Chilled water pumps and associated VFD s required increase capital investment, maintenance, and operating costs.

8 L#57295/Page 8/July 21, 2017 OPTION 3 PROS CONS VARIABLE REFRIGERANT FLOW (VRF) AIR CONDITIONING OPTION 4 GEOTHERMAL SYSTEM Superior thermal comfort conditions. Superior thermal comfort control as individual unit with associated controls will be provided for each zone. All new equipment results in increased system life expectancy. Distribution ductwork system only required for ventilation. Lower ceiling plenum height required than induction units. PROS Geothermal systems could be designed to serve as the heating and cooling plants for Option 1,2 and/or 3 listed above. Geothermal systems have very high operating efficiencies and lower operational costs. Geothermal system reduces carbon footprint of building. Extended system service life, due to lack of outdoor chiller/condensing equipment. Greatly reduced outdoor sound levels from HVAC equipment, due to elimination of large chiller/condensing unit(s) Moderate first cost. High operating costs due to air conditioning, ventilation fans, and electric heat (VRF units). High maintenance costs for quantity of units and factory authorized service is required for VRF system. Highest noise levels of 3 options due to compressor and fan motor located within occupied zone. High automatic temperature controls cost. Quarterly filter changes per unit. Condensate drain maintenance (for AC). Maintenance of equipment is in occupied area. Wall mounted evaporators do not provide direct ventilation to the space. Space humidity monitoring is critical to avoid condensation at the evaporator units (particularly when used with natural ventilation). Refrigerant piping is located inside building with potential of leaks. ASHRAE 15 provisions must be met. Manufacturer provided equipment controls to integrate to the Building Management System (BMS). CONS Highest First Cost - Geothermal systems have a higher first installed cost, primarily due to well field drilling, excavation and piping costs. Geothermal systems require some additional maintenance and system monitoring. Open loop type wells typically have higher maintenance costs than closed loop systems. Potentially higher electricity costs due to heating via electricity in winter. However, a supplemental high efficiency hot water boiler plant can be integrated into the system design for heating system redundancy and flexible fuel pricing. Higher automatic temperature controls cost.

9 L#57295/Page 9/July 21, 2017 Refrigerant piping is located inside building with potential of leaks. ASHRAE 15 provisions must be met. Requires sufficient site for wells

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#56566/Page 1/May 23, 2017 HVAC Heating Plant The original Town Hall building and Addition building are primarily heated by a gas fired hot water plant that is located in the basement. The boiler plant

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

Air Conditioning Options Winnetka Public School District 36 Winnetka, Illinois November 4, 2016

Air Conditioning Options Winnetka Public School District 36 Winnetka, Illinois November 4, 2016 Air Conditioning Options Winnetka Public School District 36 Winnetka, Illinois November 4, 2016 COMPREHENSIVE AIR CONDITIONING OPTIONS The following are system options to provide a completely air conditioned

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

General HVAC Recommendations

General HVAC Recommendations General HVAC Recommendations DESIGN GUIDELINES FOR ENERGY EFFICIENT HVAC SYSTEMS Thank you for your interest in energy efficiency! Energy efficient heating, ventilation, and air conditioning (HVAC) equipment

More information

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012) Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015 Martha a s Vineyard Regional High School Vineyard Haven, MA 2 2015 HVAC Syste ems Evaluation Prepared For: Martha s Vineyard Regional School District Box 1385 Oaks Bluff, MA 02557 Prepared By: BLW Engineers,

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

MF Mechanical Systems. Doug McCleery, PE, CEM March 2, 2016

MF Mechanical Systems. Doug McCleery, PE, CEM March 2, 2016 MF Mechanical Systems Doug McCleery, PE, CEM March 2, 2016 Overview RESNET MF Guideline Highlights Factors impacting HVAC Decisions o Building Construction o Space Configuration o Program/Rating Requirements

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

HVAC PROPOSED SYSTEMS SOUTHBOROUGH PUBLIC SAFTEY BUILDING. September 12, 2017

HVAC PROPOSED SYSTEMS SOUTHBOROUGH PUBLIC SAFTEY BUILDING. September 12, 2017 HVAC PROPOSED SYSTEMS for SOUTHBOROUGH PUBLIC SAFTEY BUILDING September 12, 2017 PREPARED BY: GARCIA GALUSKA DESOUSA CONSULTING ENGINEERS INC 370 FAUNCE CORNER ROAD, DARTMOUTH, MA 02747 TEL 508-998-5700

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces

More information

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

b.) Technical Information:

b.) Technical Information: Section VI- Strategies a.) Summary: It is important for new construction designers to consider the heating, ventilation, and air conditioning needs within a building. There are many different systems,

More information

Series. Chillers and. Features: Application Flexibility Minimizes Installation Time and Reduces Cost

Series. Chillers and. Features: Application Flexibility Minimizes Installation Time and Reduces Cost LL Chillers and Outdoor Mechanical Rooms Air-Cooled Features: Air-cooled condenser chillers with capacities from 35-345 tons Evaporative-cooled condenser chillers with capacities from 35-540 tons Variable

More information

AHRI Certification Program Scopes - COOLING

AHRI Certification Program Scopes - COOLING Air-to-Air Energy Recovery Ventilators (AHRI Std. 1060) Automatic Commercial Ice-Cube Machines and Ice Storage Bins (AHRI Stds. 810 & 820) Central Station Air-Handling Units (AHRI Std. 430) Commercial

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

CB/CF. Series CONDENSERS AND CONDENSING UNITS. Features:

CB/CF. Series CONDENSERS AND CONDENSING UNITS. Features: CB/CF CONDENSERS AND CONDENSING UNITS CF CB Features: 2-70 ton air-cooled condensing units and remote air-cooled condensers Air-source heat pump configurations for energy efficient heating Variable capacity

More information

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements ADDENDUM 1 CLIENT: PROJECT: TO: FROM: Guilford County Schools (GCS) Southeast High School Auditorium & Gymnasium HVAC Improvements All Prospective Bidders Derrick Giles, SAMR, PLLC. DATE: 6/6/2018 The

More information

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.

More information

Daikin Blueprint: Delivering Hot Water with a Chiller

Daikin Blueprint: Delivering Hot Water with a Chiller Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications

More information

Efficiency Vermont The American Institute of Architects Continuing Education Systems (AIA/CES) AIA/CES AIA/CES

Efficiency Vermont The American Institute of Architects Continuing Education Systems (AIA/CES) AIA/CES AIA/CES Efficiency Vermont is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the

More information

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM # ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM DETAIL Labor Material FURNACE COMPONENTS 1 Furnish & Install Sight-Impaired Thermostat For Heating and Cooling

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members: SESSION 1-2015 Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE (90.1.2013) ASHRAE Detroit Members: AM Session is eligible for (X) Professional Development

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx Case Study: Furman University Charles H. Townes Center for Science Michael K. Mantai, PE, CCP President System WorCx AIA Quality Assurance Learning Objectives 1. Case study example of Chilled Beam technology

More information

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,

More information

The ultimate fresh air solution.

The ultimate fresh air solution. Fresh Access The ultimate fresh air solution. Introducing Fresh Access TM. Expertly designed, our innovative energy recovery ventilator (ERV) unit, split dedicated outside air system (DOAS), and packaged

More information

Temperature. In the HVAC area, we talk about two kinds of temperatures.

Temperature. In the HVAC area, we talk about two kinds of temperatures. HEATING and COOLING HEATING and COOLING PSYCHROMETRIC CHART Temperature In the HVAC area, we talk about two kinds of temperatures. One is called dry bulb (DB) temperature, a fancy name for the reading

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. 23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

Shippensburg University

Shippensburg University Shippensburg University Horton Hall HVAC Feasibility Study PREPARED FOR: Shippensburg University 1871 Old Main Dr. Shippensburg, PA 17257 SHIPPENSBURG PROJECT: SU-2017/25 RPA PROJECT: 17118.001 DATE: December

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

Technical Assignment 3

Technical Assignment 3 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative

More information

COMcheck Software Version Review Mechanical Compliance Certificate

COMcheck Software Version Review Mechanical Compliance Certificate COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project

More information

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania

More information

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A Nicholas Thornton, CEM 1 Overview Today s Goals Introductions HVAC Electrical Technology Q&A 2 1 Today s Goals An overview, a crash course Maybe a few tangents (ASK QUESTIONS!) Show typical arrangements

More information

Applying VRF? Don t Overlook Standard 15

Applying VRF? Don t Overlook Standard 15 This article was published in ASHRAE Journal, July 2012. Copyright 2012 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1 Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

Applying VRF? Don t Overlook Standard 15

Applying VRF? Don t Overlook Standard 15 This article was published in ASHRAE Journal, July 2012. Copyright 2012 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE,

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

DADANCO Technical Paper

DADANCO Technical Paper DADANCO Technical Paper 260 North Elm Street Westfield, MA 01085 Phone: (413) 564-5657 Fax: (413) 568-2969 March 2013 CLASSROOM SOLUTION USING ACTIVE CHILLED BEAMS (Note: This technical paper assumes the

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS

SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS Original Design: Traditional Central Heating and Cooling Heating and Cooling System Schematic Original Design Ventilation Schematic: Existing system summary:

More information

2. CURRICULUM. Sl. No.

2. CURRICULUM. Sl. No. . CURRICULUM Sl. No. Code Title No. of Lecture Hours 1 RAC 001 Fundamentals of Refrigeration and Air 60 conditioning RAC 00 Psychrometry, Heat load Estimation for 70 Air conditioning and Refrigeration

More information

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

EXHAUST FAN SCHEDULE

EXHAUST FAN SCHEDULE DUCTWORK SCHEDULE CONCEALED SUPPLY AIR RECTANGULAR, RTU CONCEALED SUPPLY AIR RECTANGULAR, ERV CONCEALED SUPPLY AIR ROUND, RTU CONCEALED SUPPLY AIR ROUND, ERV EXPOSED SUPPLY AIR ROUND RUNOUTS RETURN AIR

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

Energy Recovery with Cooling and Heating Model ERCH

Energy Recovery with Cooling and Heating Model ERCH Energy Recovery with Cooling and Heating Model ERCH 100% Outdoor Air System Dedicated Outdoor Air System 1,000-10,000 cfm 1.75 in. wg External Static Pressure Indirect Gas, Hot Water, Electric Heating,

More information

HVAC DISTRIBUTION and DELIVERY SYSTEMS

HVAC DISTRIBUTION and DELIVERY SYSTEMS HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 1) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 REMINDER HVAC = Heating, Ventilating, Air-Conditioning The AC part of HVAC implies a system that

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Small Building Program Design Phase Assistance

Small Building Program Design Phase Assistance Small Building Program Design Phase Assistance Customer s Facility/Project Location XXXX/YYY, MA Project Team (if selected) Contact Firm Phone Email Customer: Electric PA: Gas PA: PAs s Technical Consultant:

More information

Summary Comparison of Simulation Program Features

Summary Comparison of Simulation Program Features Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours

More information

NFZP Variable Refrigerant Flow Guide Specification

NFZP Variable Refrigerant Flow Guide Specification PART 1 - GENERAL 1.01 SECTION INCLUDES SECTION 23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEM A. (VRF) HVAC system includes: 1. Outdoor/Condensing unit(s): a. Size Range: 14 Tons Nominal b. YANMAR VRF

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

Challenges and Methods of Estimating a Conceptual HVAC Design

Challenges and Methods of Estimating a Conceptual HVAC Design Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.

More information

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series PRODUCT SERIES VPR Series VPRX Series VPRE Series VPRP Series VPRC Series Valent Air Management Products Valent Air Management Systems designs and manufactures reliable, high-outdoor-air ventilators. Our

More information

Technical Assignment 3. Mechanical Systems Existing Conditions Evaluation

Technical Assignment 3. Mechanical Systems Existing Conditions Evaluation Technical Assignment 3 Mechanical Systems Existing Conditions Evaluation The Milton Hershey School New Supply Center Prepared for: William P. Bahnfleth, Ph.D., P.E., Professor Department of Architectural

More information

Variable Refrigeration Flow Systems Overview 10/11/2016

Variable Refrigeration Flow Systems Overview 10/11/2016 Variable Refrigeration Flow Systems Overview 10/11/2016 Executed by Data Power Technology Illinois Aggressively, relentlessly anticipating and exceeding our customer s and client s expectations every day,

More information

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013 Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...

More information

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC 2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter

More information

THE ULTIMATE ROOFTOP SOLUTION

THE ULTIMATE ROOFTOP SOLUTION Configured Packaged Rooftop Solutions Specializing in Dedicated Outdoor Air Systems (DOAS) Capacities from 6 to 90 Tons Available in 208, 230, 460 and 575 Volts THE ULTIMATE ROOFTOP SOLUTION Service Friendly

More information

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

Description of All Alternatives Considered-

Description of All Alternatives Considered- Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142

More information

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb

More information

TESTING, ADJUSTING AND BALANCING

TESTING, ADJUSTING AND BALANCING PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components

More information

ENGINEERING. Edition No. 13 October 2002

ENGINEERING. Edition No. 13 October 2002 Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more

More information

VariCool VAV. (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water. Unique Solutions for All-Indoor HVAC Projects

VariCool VAV. (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water. Unique Solutions for All-Indoor HVAC Projects VariCool VAV (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water Unique Solutions for All-Indoor HVAC Projects Water Source Heat Pump Water-Cooled Chilled Water Modular

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

Variable refrigerant flow (VRF) systems

Variable refrigerant flow (VRF) systems SBS5311 HVACR II http://ibse.hk/sbs5311/ Variable refrigerant flow (VRF) systems Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2017 Contents System Overview Components

More information

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare

More information

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have

More information

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0593 TESTING, ADJUSTING, AND A. Testing, adjustment, and balancing of air systems. B. Testing, adjustment, and balancing of hydronic, steam, and refrigerating