DRAINAGE CALCULATIONS
|
|
- Marilyn Black
- 5 years ago
- Views:
Transcription
1 DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering, Inc. Project Number /18/2015
2 Carroll Single Family Residence Design Criteria Storm drainage calculations described in this document have been done in conformance with the Santa Clara County Drainage Manual Project Description The project consists of constructing a single family residence with driveway, garage, concrete patio and a pool on a hilltop lot in the Saratoga mountain area of Santa Clara County. The project will create approximately 7,205 square feet of impervious area. Existing Conditions The lot is currently undeveloped. There is no impervious area on the site. The Mean Annual Precipitation (M.A.P) for the area is 28 per Santa Clara County Drainage Manual Figure A-2. The soil type in the improvement area is Katykat-Sanikara complex for 8 to 30% slopes and Mouser- Katykat-Sanikara complex for 50 to 75% slopes. An infiltration rate for the existing soils has been determined to be 1.6 inches per hour (from USDA Web Soil Survey). The C factor for the site is 0.35 per Santa Clara Drainage Manual Table 3-1. Runoff sheet flows over the site toward the eastern property line. Based on the Rational Method, the peak predevelopment runoff rate for the site is 0.18 cubic feet per second (cfs) for a 10-year storm event and 0.26 cfs for a 100-year storm event (Table 1). Proposed Development The proposed improvements for the subject project are to construct an single family residence with a driveway, rear patio, and pool. Runoff from the roof downspouts will be captured in closed conduit stormdrains per the geotechnical report. Runoff from all other impervious surfaces will be captured in catch basins and stormdrains. The stormdrains will discharge to gravel filled level spreaders at the downslope edge of the site. The level spreaders will store water and serve as infiltration trenches before overtopping and discharging runoff to sheet flow downslope per existing conditions. The post-development runoff rate for a 10-year design storm event is 0.32 cfs and for a 100-year design storm event is 0.46 cfs (Table 1). The infiltration level spreaders have been sized to store and infiltrate the increase in stormwater. Peak runoff leaving the site has been maintained per predevelopment rates for the 10 and 100 year design storm (see table 2). 1
3 Carroll Single Family Residence Conclusion The proposed project is to construct a new single family residence that will create 7,205 square feet of impervious area. Runoff from the new impervious area will be collected in downspouts and drop inlets and conveyed to infiltration level spreaders which release the runoff to match pre-development rates. No adverse downstream effects are anticipated as part of this project, and the drainage patterns leaving the site have not be changed. Attachments Figure 1: M.A.P Table 1: Peak Runoff Calculations Table 2: Retention Storage Calculations 2
4 Drainage Manual 2007 County of Santa Clara, California Location of Map: C3_Handbook/Handbook_ May_2006-Oct_update.pdf Figure A 2: Mean Annual Precipitation, Santa Clara County 8/14/2007 A 4
5 Carroll Residence Saratoga, CA HYDROLOGY Drainage Basin: 10-year and 100-year storm event Total Basin Area 13,000 ± SF 0.30 ± AC Determine PRE Development Runoff Coefficient: C Feature Area Area C AxC (sf) (acres) Pervious 13, Impervious Totals: 13, Pre Development C AVERAGE = 0.35 Time of Concentration: Pre- Tc = 15 mins Determine Pre Developed Q for a 10-year and 100-year storm. 10-year 100-year Pre- I (in/hr)*= Q Pre Developed (cfs)= Determine POST Development Runoff Coefficient: C Feature Area Area C AxC (sf) (acres) Pervious 5, Impervious 7, Total 13, Post Development C AVERAGE = 0.63 Time of Concentration: Post- Tc = 15 mins Determine Post Developed Q for 10-year and 100-year storm. 10-year 100-year Post- I (in/hr)*= Q Post Developed (cfs)= Q (cfs)= * from Santa Clara County 2007 Drainage Manual (Fig. B-5: IDF for 28" M.A.P.) Table 1
6 Carroll Residence Saratoga, CA DESIGN STORM RETENTION CALCULATIONS Storage Volume for Retention Calculation Area= 13,000 sf Cpre= 0.35 Cpost= 0.63 Qpre10= cfs (10-year) Qpre100= cfs (100-year) Ksat= 1.6 in/hr Void Ratio 0.4 Infiltration Level Spreader Combined Length (ft)= 60 Width (ft)= 4 Depth of Storage (ft)= 2 Perimeter (ft)= 128 Surface Area (sf)= 496 Effective Area Factor= 75% TOTALS Effective Surface Area (sf)= Footprint Area (sf)= Excavated Volume (cf)= Storage Volume (cf)= Structure Infilration Rate (cfs)= Structure Drainage Time (hr)= Year Storm - Storage Volume Calculation Storm Duration Rainfall Intensity Qpost Infiltration Rate Soil Infiltration Rate Storage Volume min in/hr cfs cfs cfs cf Storage Volume= Provided Storage Volume= 128 cf 192 cf 100- Year Storm - Storage Volume Calculation Storm Duration Rainfall Intensity Qpost Infiltration Rate Soil Infiltration Rate Storage Volume min in/hr cfs cfs cfs cf Storage Volume= Provided Storage Volume= 191 cf 192 cf Table 2
LID Permit Requirements. Lisa Austin. Geosyntec Consultants
LID Permit Requirements Lisa Austin Geosyntec Consultants Presentation Outline Types of LID Permit Requirements Specified site design Specified LID BMPs LID performance metrics Specified Site Design (San
More informationBRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT
BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers
More informationSTORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO
STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationStatus Update of Turf Work Order. January 18, 2013 MIDS Workgroup Meeting
Photo: http://en.wikipedia.org/wiki/file:seededfertilizedlawn.jpg Status Update of Turf Work Order January 18, 2013 MIDS Workgroup Meeting Categories of Turf Credits 1. Impervious Surface Disconnection-turf
More informationOctober 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and
More information6.1. INTRODUCTION 6.2. EXISTING CONDITIONS
Chapter 6: Stormwater Management 6.1. INTRODUCTION This Chapter describes the current drainage patterns on the Project Site, the stormwater management system that is proposed as part of the Proposed Project,
More informationARIZONA WATER COMPANY
ARIZONA WATER COMPANY East Sedona Water Storage Facility February 21, 2018 Community Meeting STORMWATER RUNOFF Issue: Runoff sometimes flows out of the wash at bottlenecks in front of several homes on
More informationAppendix D - Technical Design Criteria for BMPs
Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable
More informationStormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018
Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations
More information4. CONCEPT PLAN DEVELOPMENT
4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints
More informationHEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT
INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.
More informationWest Virginia Stormwater Management Manual: Methods.
West Virginia Stormwater Management Manual: Methods Created to deliver targeted training on new tools and practices to improve the quality of stormwater runoff. www.cbstp.org www.chesapeakestormwater.net
More informationPHASE III DRAINAGE REPORT
PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village
More informationWQ-23 MOUNTAINOUS AND STEEP SLOPE SITES
Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are
More informationA P P E N D I X D. Project Stormwater Plan Worksheets
A P P E N D I X D Worksheets for Section 1: Basic Project Information This worksheet must be filled out for all projects required to implement the 2015 Post- Construction Stormwater Standards Manual. A
More informationMy Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda
My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda Presentation Topics Background information Designing LID for cold and snow prone conditions Applying LID in Pullman s low
More informationGoing Green with the NYS Stormwater Design Standards
Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,
More informationUsing Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey
Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey This Presentation Ohio EPA Post-Construction Criteria/Guidance Runoff Reduction Accounting Green
More informationSelecting Appropriate Stormwater Control Measures for Your Development Project
Phase II Post-Construction Stormwater Requirements Workshop - February 10, 2014 Selecting Appropriate Stormwater Control Measures for Your Development Project Jill Bicknell, P.E., EOA, Inc. Outline of
More informationCHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment
CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design
More information26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA
(26, APPENDIX B) 26 Attachment 2 Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA TABLE B-1 DESIGN STORM RAINFALL AMOUNT Source: Field Manual of Pennsylvania Department of Transportation
More informationDRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK
DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More informationCommunity LID Workgroup Issue Paper #6
Community LID Workgroup Issue Paper #6 Topic: Hard and Impervious Surface Coverage Limits Objective: Minimize the amount of hard and impervious surfaces in developments to allow more stormwater to infiltrate
More informationPAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving
4.2-i PAVING PARKING AREAS AND ROADS Alternate Names: Pavement Practices, Impervious Paving DESCRIPTION All roads, driveways, and parking lots proposed for year-round use shall be paved with a hard plowable
More informationLincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013
Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site
More informationKeele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013
Keele Campus Storm Drainage Presented by Mark Hagesteijn September 24, 2013 1 Presentation Overview Urbanization Impact on the Hydrologic Cycle Why Do We Manage Stormwater? Typical Stormwater Management
More informationWhat Are We Inspecting? Stormwater Treatment Measure Type and Design
What Are We Inspecting? Stormwater Treatment Measure Type and Design Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program December 16, 2013 Outline of Presentation
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationSTAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE
1.0 INTRODUCTION 1.1 OBJECTIVE This report, prepared for submittal to TxDOT, analyzes existing and proposed detention facilities draining into the TxDOT US90A storm sewer system. The results of the detailed
More informationGeneral Technical Guidance for Treatment Measures
Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter will help you with proper sizing and design concepts for various types of stormwater treatment measures.
More informationNotice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project
of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your
More informationGreen Infrastructure and Low-Impact Development Technologies
Green Infrastructure and Low-Impact Development Technologies The guiding principles of these technologies is to manage stormwater at their sources using natural means, and establish conditions so that
More information03/10/2015 PROGRAM OVERVIEW OVERVIEW OF PROGRAM
1 PROGRAM OVERVIEW 2012: Public and private partners engage state legislature to fund program June 2012: LID Training Steering Committee convened 2012 2013: Washington State LID Training Plan developed:
More information6.1. INTRODUCTION AND SUMMARY OF FINDINGS
Chapter 6: Stormwater Management 6.1. INTRODUCTION AND SUMMARY OF FINDINGS A Stormwater Pollution Prevention Plan (SWPPP) has been prepared for the Proposed Project in accordance with the requirements
More informationTable of Contents G.1.a Water Resources - Surface Water - Drainage
Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...
More informationANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)
ANSWER KEY MGSFlood v. 4.35 --- WWHM2012 (released 5/15/2015) Name: Date: Module 6.0: Advanced Topics in LID Design: Hydrologic Modeling General instructions: You may model facility dimensions to the nearest
More informationThree Rivers Park District Administration Center Rain Garden
Three Rivers Park District Administration Center Rain Garden Introduction There are significant changes to the hydrologic regime and nutrient loading following urban and industrial development. The post-development
More informationAttachment 2: Permeable Pavement Design Guidelines
Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,
More informationGeneral Technical Guidance for Treatment Measures
Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter applies to all types of stormwater treatment measures. This chapter contains general technical information
More informationAppendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook
67 67 General Terms Specific Terms 66 Low Impact Development Approaches Handbook The vocabulary of low impact development is evolving, and many terms are used interchangeably and to describe the same or
More informationSite design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.
Chapter 4 Site Design Measures This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures. Site design measures for water quality protection are
More informationPost Construction BMPs
Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases
More informationState Water Board s Post Construction Stormwater Calculator. Instructions for El Centro
State Water Board s Post Construction Stormwater Calculator Instructions for El Centro Important: This workbook must be completed for each Drainage Management Area (DMA) in the project site. For example,
More informationNON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)
NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) For: (Insert Project Name) (Site Address or Tract/Lot Number) Prepared for: (Insert Owner/Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert
More informationPRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT
PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL
More informationStormwater Drainage Assessment For Single Family Residence
Stormwater Drainage Assessment For Single Family Residence Project Name: SEADER SFD Project Address: 2301 NE Perkins Way, Lake Forest Park, King County WA. Parcel Number(s): Tax Parcel No. 86659-00181
More informationMANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS
MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information
More informationSEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.
SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. Numerous ecosystem-based functional stormwater quantity and quality design alternatives are possible within the street ROW. Several
More informationPermeable Pavement Systems
Permeable Pavement Systems EGRA Stone ECO Stone CONSERVATION DESIGN FORUM Permeable Pavement Presentation Outline Case Studies Benefits Hydrologic Design Engineering Design Construction Considerations
More informationStructural Stormwater Best Management Practices
Structural Stormwater Best Management Practices for Small Commercial and Residential Applications Timothy Bruno Watershed Manager PA Department of Environmental Protection What are STRUCTURAL BMPs? Physical
More informationPSLS Surveyors' Conference Workshop Information Form Workshop Number: (leave blank if unknown) Hours: Workshop Title: Workshop Description: Suggested Speaker(s), affiliation/contact information 1. 2. 3.
More informationSEAL ISLAND ESTATES SUBDIVISION 8745 CONTRA COSTA COUNTY, CALIFORNIA. May 25, 2005
SEAL ISLAND ESTATES SUBDIVISION 8745 CONTRA COSTA COUNTY, CALIFORNIA STORMWATER CONTROL PLAN May 25, 2005 PREPARED FOR: DISCOVERY BUILDERS, INC. 4061 PORT CHICAGO HIGHWAY, SUITE H CONCORD, CALIFORNIA 94520
More informationCity of Waco Stormwater Management Regulations
1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial
More informationManaging Stormwater within the Road Right-of-Way: An Urban NAI Approach
Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated
More informationLow Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014
Low Impact Development (LID) Techniques Associate BD Presentation, October 7, 2014 Low Impact Development (LID) Techniques What are LIDs? Why are they used? Where are they used? How are they designed or
More informationHomeowners Guide to Stormwater BMP Maintenance
Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management
More informationSTORMWATER PERMIT SUBMITTAL REQUIREMENTS
STORMWATER PERMIT SUBMITTAL REQUIREMENTS Most development within the City of Bellingham that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater
More informationGreen Infrastructure & Low Impact Development
Green Infrastructure & Low Impact Development CITY OF COVINGTON STORMWATER MANAGEMENT WHAT IS GREEN INFRASTRUCTURE? Green infrastructure uses vegetation, soils and natural processes to manage water and
More informationGeneral Technical Guidance for Treatment Measures
Chapter 5 General Technical Guidance for Treatment Measures This Chapter contains guidance on: Hydraulic sizing criteria, Applicability of non-landscape based treatment measures, Using Manufactured Treatment
More informationGreen Infrastructure Implementation Planning for Multiple Objectives
Green Infrastructure Implementation Planning for Multiple Objectives Hazem Gheith, ARCADIS September 10, 2014 Imagine the result Integrated Plan for Stormwater Control Integrated Plan Objective Sanitary
More informationNeighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project
Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Presenter: Stacy Luell, Geosyntec Consultants Co-Authors: R. Batchelder, W. Tam, M. Hanna, M. Sadeghi
More informationBioretention cell schematic key
Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout
More informationWhat is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20
What is stormwater runoff? Stormwater is any form of natural precipitation (including ice and snow melt) that flows across undeveloped or developed land. In a natural setting, a majority of the water seeps
More informationLID Retrofit of a Sloped, Impervious Parking Lot:
Spring 2013 Presentation Oklahoma City, OK April 22, 2013 Sponsor: ODEQ Instructor: Team Advisor: Dr. Paul Weckler Associate Professor Dr. Jason Vogel Assistant Professor Senior Design II BAE 4023 Urban
More information1/31/2017 INSTRUCTORS AGENDA. introduction. hydrologic modeling basics. performance standards. BMP modeling specifics. wrap up
1 REBECCA DUGOPOLSKI, PE Senior Engineer Key project experience: Stormwater monitoring, design, hydrologic modeling and NPDES Permit compliance INSTRUCTORS MEGHAN FELLER, PE Project Engineer Key project
More informationHydrologic Impacts of Bioswale Porous Media on Parking Lot Drainage
Hydrologic Impacts of Bioswale Porous Media on Parking Lot Drainage Jungseok Ho 1, Ji-Hoon Kang 2 1 Department of Civil Engineering, The University of Texas Rio Grande Valley, 1201 West University Dr.,
More informationSession 1E Non-Structural BMPs. Chesapeake Bay Stormwater Training Partnership 1
Session 1E Non-Structural BMPs Chesapeake Bay Stormwater Training Partnership 1 Agenda Site Design (self-crediting) Soil Amendments Simple l Disconnection Sheet Flow Grass Channels Site Plan courtesy of
More informationZoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019
Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019 Article 2 General Provisions Section 2.2 Definitions Definitions- FIRE LANE The aisle immediately adjacent to a building
More informationAPPENDIX C: STORMWATER CONTROL PLAN
APPENDIX C: STORMWATER CONTROL PLAN STORM WATER MANAGEMENT PLAN FOR PLEASANT HILL, CALIFORNIA Prepared for Compliance with the Clean Water Program (C.3) and the San Francisco Bay Regional Water Quality
More informationCounty of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan
County of Prince Edward Stormwater Management Program Date: E-Permitting Number: This stormwater management plan (Agreement) is hereby submitted by the Owner to specify the methods that will be implemented
More informationENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS CE 394K FALL 2011 PROF.
ENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS BY KIERSTEN TYSSELAND DUBE CE 394K FALL 2011 PROF. MAIDMENT INTRODUCTION With the advent
More informationWest Norriton Township
West Norriton Township Earth Disturbance and Drainage Permit Application 1630 W. Marshall Street Norristown, PA 19403 Phone: (610) 631-0450 Fax: (610) 630-0304 www.westnorritontwp.org A stormwater permit
More informationDraft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey
Draft Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Prepared for Dunellen Borough by the Rutgers Cooperative Extension Water Resources Program September 22,
More informationTOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017
TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017 In order to help the residential developments (single family units) the Town has developed a worksheet to aid applicants
More informationUsing the Source Loading and Management Model (WinSLAMM)
Using the Source Loading and Management Model (WinSLAMM) Robert Pitt The University of Alabama, Tuscaloosa, AL 35487 John Voorhees and Caroline Burger PV& Assoc., Madison, WI 53704 Presented by: Shirley
More informationC.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook
C.3 STORMWATER TECHNICAL GUIDANCE Table of Contents Glossary... viii Chapter 1 Introduction/How to Use this Handbook... 1-1 1.1 Purpose of this Handbook... 1-1 1.2 What is the Countywide Program?... 1-2
More informationExample Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018
Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental
More informationGreen Street BMP Matrix
Bioswale Can be planted with either grass or native vegetation, bioswales are best served in residential, industrial, and commercial www.duluthstreams.ogr landuse with smaller tributary drainage areas.
More informationStormwater Control Plan: Small (Tier 1) Land Development Project
Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)
More informationAppendix I. Checklists
Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747
More informationPreparing a Stormwater Control Plan for a Small Land Development Project
Preparing a Stormwater Control Plan for a Small Land Development Project Addendum to the Stormwater C.3 Guidebook December 1, 2012 Introduction As of December 1, 2012, development projects that create
More informationProject Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM
Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600
More informationMonitoring Flow and Quality for Stormwater Control Measures
Monitoring Flow and Quality for Stormwater Control Measures Robert Traver, Ph.D., PE, D.WRE. Andrea L. Welker, PhD, PE Bridget Wadzuk, PhD, John Komlos, PhD The mission of the Villanova Urban Stormwater
More informationIntroduction Post-Construction Stormwater Management Performance Requirements
EZ MANUAL Introduction Post-Construction Stormwater Management Performance Requirements The primary objective of these Post-Construction Stormwater Management Performance Requirements is to minimize the
More informationSubsurface Infiltration Bed
Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater
More informationRain Gardens Water Quality the Way Mother Nature Intended
Rain Gardens Water Quality the Way Mother Nature Intended Maintenance Discussion Design Discussion Susan Morgan, Ph.D, PE Southern Illinois University Edwardsville smorgan@siue.edu (618) 650 5014 Michael
More informationLow Impact Development Site Design
Chapter 4 Low Impact Development Site Design In this Chapter: How site design measures can reduce stormwater treatment measure size Tree preservation and planting Self-treating and self-retaining areas
More informationAppendix K. Stormwater Management Plan
Regional Municipality of Halton - Steeles Avenue (Regional Road 8) Class EA - Industrial Drive to Regional Road 25/Martin Street Appendix K Stormwater Management Plan PR226401.001 Rev. 2 PR.DOT, 00/01
More informationThe Engineer/Developer s Perspective on Storm Water Management
The Engineer/Developer s Perspective on Storm Water Management CASE STUDY: An Innovative Approach to Storm Water Management for Small Parcel Site Development Presented by: James B. Leedom, P.E. The Sigma
More informationEvaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi
Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Dennis S. Painter, Tennessee Valley Authority, Nashville, Tennessee Donald Becker, Tennessee Valley
More informationHigh Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards
High Point Community Site Drainage Technical Standards Prepared by SvR Design Company for High Point Community Seattle, Washington 5/2004 Revised 12/2006 101 Acknowledgements: for innovative development
More informationCity of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010
City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area
More informationAPPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania
APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management
More informationNEORSD Green Infrastructure Grant (GIG) Program Opening Remarks
NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant
More informationGLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT.
GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT Submitted to: Kuwabara Payne McKenna Blumberg Architects 322 King Street West,
More informationSIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS
SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS Introduction As required by federal and state law, the Borough of Swarthmore has adopted regulations that affect stormwater runoff and surface
More informationGrass Buffer T-1. Description. Site Selection. Designing for Maintenance
Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration
More informationStormwater Prevention and Control
Stormwater Prevention and Control Principles of Stormwater Management Stormwater Fact Sheet No. 4 This fact sheet is No. 4 of a eight-part series focused on stormwater runoff problems and control strategies.
More information