1 DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering, Inc. Project Number /18/2015

2 Carroll Single Family Residence Design Criteria Storm drainage calculations described in this document have been done in conformance with the Santa Clara County Drainage Manual Project Description The project consists of constructing a single family residence with driveway, garage, concrete patio and a pool on a hilltop lot in the Saratoga mountain area of Santa Clara County. The project will create approximately 7,205 square feet of impervious area. Existing Conditions The lot is currently undeveloped. There is no impervious area on the site. The Mean Annual Precipitation (M.A.P) for the area is 28 per Santa Clara County Drainage Manual Figure A-2. The soil type in the improvement area is Katykat-Sanikara complex for 8 to 30% slopes and Mouser- Katykat-Sanikara complex for 50 to 75% slopes. An infiltration rate for the existing soils has been determined to be 1.6 inches per hour (from USDA Web Soil Survey). The C factor for the site is 0.35 per Santa Clara Drainage Manual Table 3-1. Runoff sheet flows over the site toward the eastern property line. Based on the Rational Method, the peak predevelopment runoff rate for the site is 0.18 cubic feet per second (cfs) for a 10-year storm event and 0.26 cfs for a 100-year storm event (Table 1). Proposed Development The proposed improvements for the subject project are to construct an single family residence with a driveway, rear patio, and pool. Runoff from the roof downspouts will be captured in closed conduit stormdrains per the geotechnical report. Runoff from all other impervious surfaces will be captured in catch basins and stormdrains. The stormdrains will discharge to gravel filled level spreaders at the downslope edge of the site. The level spreaders will store water and serve as infiltration trenches before overtopping and discharging runoff to sheet flow downslope per existing conditions. The post-development runoff rate for a 10-year design storm event is 0.32 cfs and for a 100-year design storm event is 0.46 cfs (Table 1). The infiltration level spreaders have been sized to store and infiltrate the increase in stormwater. Peak runoff leaving the site has been maintained per predevelopment rates for the 10 and 100 year design storm (see table 2). 1

3 Carroll Single Family Residence Conclusion The proposed project is to construct a new single family residence that will create 7,205 square feet of impervious area. Runoff from the new impervious area will be collected in downspouts and drop inlets and conveyed to infiltration level spreaders which release the runoff to match pre-development rates. No adverse downstream effects are anticipated as part of this project, and the drainage patterns leaving the site have not be changed. Attachments Figure 1: M.A.P Table 1: Peak Runoff Calculations Table 2: Retention Storage Calculations 2

4 Drainage Manual 2007 County of Santa Clara, California Location of Map: C3_Handbook/Handbook_ May_2006-Oct_update.pdf Figure A 2: Mean Annual Precipitation, Santa Clara County 8/14/2007 A 4

5 Carroll Residence Saratoga, CA HYDROLOGY Drainage Basin: 10-year and 100-year storm event Total Basin Area 13,000 ± SF 0.30 ± AC Determine PRE Development Runoff Coefficient: C Feature Area Area C AxC (sf) (acres) Pervious 13, Impervious Totals: 13, Pre Development C AVERAGE = 0.35 Time of Concentration: Pre- Tc = 15 mins Determine Pre Developed Q for a 10-year and 100-year storm. 10-year 100-year Pre- I (in/hr)*= Q Pre Developed (cfs)= Determine POST Development Runoff Coefficient: C Feature Area Area C AxC (sf) (acres) Pervious 5, Impervious 7, Total 13, Post Development C AVERAGE = 0.63 Time of Concentration: Post- Tc = 15 mins Determine Post Developed Q for 10-year and 100-year storm. 10-year 100-year Post- I (in/hr)*= Q Post Developed (cfs)= Q (cfs)= * from Santa Clara County 2007 Drainage Manual (Fig. B-5: IDF for 28" M.A.P.) Table 1

6 Carroll Residence Saratoga, CA DESIGN STORM RETENTION CALCULATIONS Storage Volume for Retention Calculation Area= 13,000 sf Cpre= 0.35 Cpost= 0.63 Qpre10= cfs (10-year) Qpre100= cfs (100-year) Ksat= 1.6 in/hr Void Ratio 0.4 Infiltration Level Spreader Combined Length (ft)= 60 Width (ft)= 4 Depth of Storage (ft)= 2 Perimeter (ft)= 128 Surface Area (sf)= 496 Effective Area Factor= 75% TOTALS Effective Surface Area (sf)= Footprint Area (sf)= Excavated Volume (cf)= Storage Volume (cf)= Structure Infilration Rate (cfs)= Structure Drainage Time (hr)= Year Storm - Storage Volume Calculation Storm Duration Rainfall Intensity Qpost Infiltration Rate Soil Infiltration Rate Storage Volume min in/hr cfs cfs cfs cf Storage Volume= Provided Storage Volume= 128 cf 192 cf 100- Year Storm - Storage Volume Calculation Storm Duration Rainfall Intensity Qpost Infiltration Rate Soil Infiltration Rate Storage Volume min in/hr cfs cfs cfs cf Storage Volume= Provided Storage Volume= 191 cf 192 cf Table 2

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

LID Permit Requirements. Lisa Austin. Geosyntec Consultants LID Permit Requirements Lisa Austin Geosyntec Consultants Presentation Outline Types of LID Permit Requirements Specified site design Specified LID BMPs LID performance metrics Specified Site Design (San

More information

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Status Update of Turf Work Order. January 18, 2013 MIDS Workgroup Meeting

Status Update of Turf Work Order. January 18, 2013 MIDS Workgroup Meeting Photo: http://en.wikipedia.org/wiki/file:seededfertilizedlawn.jpg Status Update of Turf Work Order January 18, 2013 MIDS Workgroup Meeting Categories of Turf Credits 1. Impervious Surface Disconnection-turf

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS Chapter 6: Stormwater Management 6.1. INTRODUCTION This Chapter describes the current drainage patterns on the Project Site, the stormwater management system that is proposed as part of the Proposed Project,

More information

ARIZONA WATER COMPANY

ARIZONA WATER COMPANY ARIZONA WATER COMPANY East Sedona Water Storage Facility February 21, 2018 Community Meeting STORMWATER RUNOFF Issue: Runoff sometimes flows out of the wash at bottlenecks in front of several homes on

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

West Virginia Stormwater Management Manual: Methods.

West Virginia Stormwater Management Manual: Methods. West Virginia Stormwater Management Manual: Methods Created to deliver targeted training on new tools and practices to improve the quality of stormwater runoff. www.cbstp.org www.chesapeakestormwater.net

More information

PHASE III DRAINAGE REPORT

PHASE III DRAINAGE REPORT PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

A P P E N D I X D. Project Stormwater Plan Worksheets

A P P E N D I X D. Project Stormwater Plan Worksheets A P P E N D I X D Worksheets for Section 1: Basic Project Information This worksheet must be filled out for all projects required to implement the 2015 Post- Construction Stormwater Standards Manual. A

More information

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda Presentation Topics Background information Designing LID for cold and snow prone conditions Applying LID in Pullman s low

More information

Going Green with the NYS Stormwater Design Standards

Going Green with the NYS Stormwater Design Standards Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,

More information

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey This Presentation Ohio EPA Post-Construction Criteria/Guidance Runoff Reduction Accounting Green

More information

Selecting Appropriate Stormwater Control Measures for Your Development Project

Selecting Appropriate Stormwater Control Measures for Your Development Project Phase II Post-Construction Stormwater Requirements Workshop - February 10, 2014 Selecting Appropriate Stormwater Control Measures for Your Development Project Jill Bicknell, P.E., EOA, Inc. Outline of

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA (26, APPENDIX B) 26 Attachment 2 Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA TABLE B-1 DESIGN STORM RAINFALL AMOUNT Source: Field Manual of Pennsylvania Department of Transportation

More information

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

Community LID Workgroup Issue Paper #6

Community LID Workgroup Issue Paper #6 Community LID Workgroup Issue Paper #6 Topic: Hard and Impervious Surface Coverage Limits Objective: Minimize the amount of hard and impervious surfaces in developments to allow more stormwater to infiltrate

More information

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving 4.2-i PAVING PARKING AREAS AND ROADS Alternate Names: Pavement Practices, Impervious Paving DESCRIPTION All roads, driveways, and parking lots proposed for year-round use shall be paved with a hard plowable

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013 Keele Campus Storm Drainage Presented by Mark Hagesteijn September 24, 2013 1 Presentation Overview Urbanization Impact on the Hydrologic Cycle Why Do We Manage Stormwater? Typical Stormwater Management

More information

What Are We Inspecting? Stormwater Treatment Measure Type and Design

What Are We Inspecting? Stormwater Treatment Measure Type and Design What Are We Inspecting? Stormwater Treatment Measure Type and Design Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program December 16, 2013 Outline of Presentation

More information

City of Richmond. Engineering Design Specifications

City of Richmond. Engineering Design Specifications City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS

More information

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE 1.0 INTRODUCTION 1.1 OBJECTIVE This report, prepared for submittal to TxDOT, analyzes existing and proposed detention facilities draining into the TxDOT US90A storm sewer system. The results of the detailed

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter will help you with proper sizing and design concepts for various types of stormwater treatment measures.

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your

More information

Green Infrastructure and Low-Impact Development Technologies

Green Infrastructure and Low-Impact Development Technologies Green Infrastructure and Low-Impact Development Technologies The guiding principles of these technologies is to manage stormwater at their sources using natural means, and establish conditions so that

More information

03/10/2015 PROGRAM OVERVIEW OVERVIEW OF PROGRAM

03/10/2015 PROGRAM OVERVIEW OVERVIEW OF PROGRAM 1 PROGRAM OVERVIEW 2012: Public and private partners engage state legislature to fund program June 2012: LID Training Steering Committee convened 2012 2013: Washington State LID Training Plan developed:

More information

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

6.1. INTRODUCTION AND SUMMARY OF FINDINGS Chapter 6: Stormwater Management 6.1. INTRODUCTION AND SUMMARY OF FINDINGS A Stormwater Pollution Prevention Plan (SWPPP) has been prepared for the Proposed Project in accordance with the requirements

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015) ANSWER KEY MGSFlood v. 4.35 --- WWHM2012 (released 5/15/2015) Name: Date: Module 6.0: Advanced Topics in LID Design: Hydrologic Modeling General instructions: You may model facility dimensions to the nearest

More information

Three Rivers Park District Administration Center Rain Garden

Three Rivers Park District Administration Center Rain Garden Three Rivers Park District Administration Center Rain Garden Introduction There are significant changes to the hydrologic regime and nutrient loading following urban and industrial development. The post-development

More information

Attachment 2: Permeable Pavement Design Guidelines

Attachment 2: Permeable Pavement Design Guidelines Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter applies to all types of stormwater treatment measures. This chapter contains general technical information

More information

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook 67 67 General Terms Specific Terms 66 Low Impact Development Approaches Handbook The vocabulary of low impact development is evolving, and many terms are used interchangeably and to describe the same or

More information

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures. Chapter 4 Site Design Measures This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures. Site design measures for water quality protection are

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro State Water Board s Post Construction Stormwater Calculator Instructions for El Centro Important: This workbook must be completed for each Drainage Management Area (DMA) in the project site. For example,

More information

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) For: (Insert Project Name) (Site Address or Tract/Lot Number) Prepared for: (Insert Owner/Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

Stormwater Drainage Assessment For Single Family Residence

Stormwater Drainage Assessment For Single Family Residence Stormwater Drainage Assessment For Single Family Residence Project Name: SEADER SFD Project Address: 2301 NE Perkins Way, Lake Forest Park, King County WA. Parcel Number(s): Tax Parcel No. 86659-00181

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. Numerous ecosystem-based functional stormwater quantity and quality design alternatives are possible within the street ROW. Several

More information

Permeable Pavement Systems

Permeable Pavement Systems Permeable Pavement Systems EGRA Stone ECO Stone CONSERVATION DESIGN FORUM Permeable Pavement Presentation Outline Case Studies Benefits Hydrologic Design Engineering Design Construction Considerations

More information

Structural Stormwater Best Management Practices

Structural Stormwater Best Management Practices Structural Stormwater Best Management Practices for Small Commercial and Residential Applications Timothy Bruno Watershed Manager PA Department of Environmental Protection What are STRUCTURAL BMPs? Physical

More information

PSLS Surveyors' Conference Workshop Information Form Workshop Number: (leave blank if unknown) Hours: Workshop Title: Workshop Description: Suggested Speaker(s), affiliation/contact information 1. 2. 3.

More information

SEAL ISLAND ESTATES SUBDIVISION 8745 CONTRA COSTA COUNTY, CALIFORNIA. May 25, 2005

SEAL ISLAND ESTATES SUBDIVISION 8745 CONTRA COSTA COUNTY, CALIFORNIA. May 25, 2005 SEAL ISLAND ESTATES SUBDIVISION 8745 CONTRA COSTA COUNTY, CALIFORNIA STORMWATER CONTROL PLAN May 25, 2005 PREPARED FOR: DISCOVERY BUILDERS, INC. 4061 PORT CHICAGO HIGHWAY, SUITE H CONCORD, CALIFORNIA 94520

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated

More information

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014 Low Impact Development (LID) Techniques Associate BD Presentation, October 7, 2014 Low Impact Development (LID) Techniques What are LIDs? Why are they used? Where are they used? How are they designed or

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

STORMWATER PERMIT SUBMITTAL REQUIREMENTS STORMWATER PERMIT SUBMITTAL REQUIREMENTS Most development within the City of Bellingham that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater

More information

Green Infrastructure & Low Impact Development

Green Infrastructure & Low Impact Development Green Infrastructure & Low Impact Development CITY OF COVINGTON STORMWATER MANAGEMENT WHAT IS GREEN INFRASTRUCTURE? Green infrastructure uses vegetation, soils and natural processes to manage water and

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures This Chapter contains guidance on: Hydraulic sizing criteria, Applicability of non-landscape based treatment measures, Using Manufactured Treatment

More information

Green Infrastructure Implementation Planning for Multiple Objectives

Green Infrastructure Implementation Planning for Multiple Objectives Green Infrastructure Implementation Planning for Multiple Objectives Hazem Gheith, ARCADIS September 10, 2014 Imagine the result Integrated Plan for Stormwater Control Integrated Plan Objective Sanitary

More information

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Presenter: Stacy Luell, Geosyntec Consultants Co-Authors: R. Batchelder, W. Tam, M. Hanna, M. Sadeghi

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20 What is stormwater runoff? Stormwater is any form of natural precipitation (including ice and snow melt) that flows across undeveloped or developed land. In a natural setting, a majority of the water seeps

More information

LID Retrofit of a Sloped, Impervious Parking Lot:

LID Retrofit of a Sloped, Impervious Parking Lot: Spring 2013 Presentation Oklahoma City, OK April 22, 2013 Sponsor: ODEQ Instructor: Team Advisor: Dr. Paul Weckler Associate Professor Dr. Jason Vogel Assistant Professor Senior Design II BAE 4023 Urban

More information

1/31/2017 INSTRUCTORS AGENDA. introduction. hydrologic modeling basics. performance standards. BMP modeling specifics. wrap up

1/31/2017 INSTRUCTORS AGENDA. introduction. hydrologic modeling basics. performance standards. BMP modeling specifics. wrap up 1 REBECCA DUGOPOLSKI, PE Senior Engineer Key project experience: Stormwater monitoring, design, hydrologic modeling and NPDES Permit compliance INSTRUCTORS MEGHAN FELLER, PE Project Engineer Key project

More information

Hydrologic Impacts of Bioswale Porous Media on Parking Lot Drainage

Hydrologic Impacts of Bioswale Porous Media on Parking Lot Drainage Hydrologic Impacts of Bioswale Porous Media on Parking Lot Drainage Jungseok Ho 1, Ji-Hoon Kang 2 1 Department of Civil Engineering, The University of Texas Rio Grande Valley, 1201 West University Dr.,

More information

Session 1E Non-Structural BMPs. Chesapeake Bay Stormwater Training Partnership 1

Session 1E Non-Structural BMPs. Chesapeake Bay Stormwater Training Partnership 1 Session 1E Non-Structural BMPs Chesapeake Bay Stormwater Training Partnership 1 Agenda Site Design (self-crediting) Soil Amendments Simple l Disconnection Sheet Flow Grass Channels Site Plan courtesy of

More information

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019 Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019 Article 2 General Provisions Section 2.2 Definitions Definitions- FIRE LANE The aisle immediately adjacent to a building

More information

APPENDIX C: STORMWATER CONTROL PLAN

APPENDIX C: STORMWATER CONTROL PLAN APPENDIX C: STORMWATER CONTROL PLAN STORM WATER MANAGEMENT PLAN FOR PLEASANT HILL, CALIFORNIA Prepared for Compliance with the Clean Water Program (C.3) and the San Francisco Bay Regional Water Quality

More information

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan County of Prince Edward Stormwater Management Program Date: E-Permitting Number: This stormwater management plan (Agreement) is hereby submitted by the Owner to specify the methods that will be implemented

More information

ENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS CE 394K FALL 2011 PROF.

ENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS CE 394K FALL 2011 PROF. ENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS BY KIERSTEN TYSSELAND DUBE CE 394K FALL 2011 PROF. MAIDMENT INTRODUCTION With the advent

More information

West Norriton Township

West Norriton Township West Norriton Township Earth Disturbance and Drainage Permit Application 1630 W. Marshall Street Norristown, PA 19403 Phone: (610) 631-0450 Fax: (610) 630-0304 www.westnorritontwp.org A stormwater permit

More information

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Draft Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Prepared for Dunellen Borough by the Rutgers Cooperative Extension Water Resources Program September 22,

More information

TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017

TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017 TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017 In order to help the residential developments (single family units) the Town has developed a worksheet to aid applicants

More information

Using the Source Loading and Management Model (WinSLAMM)

Using the Source Loading and Management Model (WinSLAMM) Using the Source Loading and Management Model (WinSLAMM) Robert Pitt The University of Alabama, Tuscaloosa, AL 35487 John Voorhees and Caroline Burger PV& Assoc., Madison, WI 53704 Presented by: Shirley

More information

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook C.3 STORMWATER TECHNICAL GUIDANCE Table of Contents Glossary... viii Chapter 1 Introduction/How to Use this Handbook... 1-1 1.1 Purpose of this Handbook... 1-1 1.2 What is the Countywide Program?... 1-2

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018 Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental

More information

Green Street BMP Matrix

Green Street BMP Matrix Bioswale Can be planted with either grass or native vegetation, bioswales are best served in residential, industrial, and commercial www.duluthstreams.ogr landuse with smaller tributary drainage areas.

More information

Stormwater Control Plan: Small (Tier 1) Land Development Project

Stormwater Control Plan: Small (Tier 1) Land Development Project Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Preparing a Stormwater Control Plan for a Small Land Development Project

Preparing a Stormwater Control Plan for a Small Land Development Project Preparing a Stormwater Control Plan for a Small Land Development Project Addendum to the Stormwater C.3 Guidebook December 1, 2012 Introduction As of December 1, 2012, development projects that create

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

Monitoring Flow and Quality for Stormwater Control Measures

Monitoring Flow and Quality for Stormwater Control Measures Monitoring Flow and Quality for Stormwater Control Measures Robert Traver, Ph.D., PE, D.WRE. Andrea L. Welker, PhD, PE Bridget Wadzuk, PhD, John Komlos, PhD The mission of the Villanova Urban Stormwater

More information

Introduction Post-Construction Stormwater Management Performance Requirements

Introduction Post-Construction Stormwater Management Performance Requirements EZ MANUAL Introduction Post-Construction Stormwater Management Performance Requirements The primary objective of these Post-Construction Stormwater Management Performance Requirements is to minimize the

More information

Subsurface Infiltration Bed

Subsurface Infiltration Bed Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater

More information

Rain Gardens Water Quality the Way Mother Nature Intended

Rain Gardens Water Quality the Way Mother Nature Intended Rain Gardens Water Quality the Way Mother Nature Intended Maintenance Discussion Design Discussion Susan Morgan, Ph.D, PE Southern Illinois University Edwardsville smorgan@siue.edu (618) 650 5014 Michael

More information

Low Impact Development Site Design

Low Impact Development Site Design Chapter 4 Low Impact Development Site Design In this Chapter: How site design measures can reduce stormwater treatment measure size Tree preservation and planting Self-treating and self-retaining areas

More information

Appendix K. Stormwater Management Plan

Appendix K. Stormwater Management Plan Regional Municipality of Halton - Steeles Avenue (Regional Road 8) Class EA - Industrial Drive to Regional Road 25/Martin Street Appendix K Stormwater Management Plan PR226401.001 Rev. 2 PR.DOT, 00/01

More information

The Engineer/Developer s Perspective on Storm Water Management

The Engineer/Developer s Perspective on Storm Water Management The Engineer/Developer s Perspective on Storm Water Management CASE STUDY: An Innovative Approach to Storm Water Management for Small Parcel Site Development Presented by: James B. Leedom, P.E. The Sigma

More information

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Dennis S. Painter, Tennessee Valley Authority, Nashville, Tennessee Donald Becker, Tennessee Valley

More information

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards High Point Community Site Drainage Technical Standards Prepared by SvR Design Company for High Point Community Seattle, Washington 5/2004 Revised 12/2006 101 Acknowledgements: for innovative development

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT.

GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT. GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT Submitted to: Kuwabara Payne McKenna Blumberg Architects 322 King Street West,

More information

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS Introduction As required by federal and state law, the Borough of Swarthmore has adopted regulations that affect stormwater runoff and surface

More information

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration

More information

Stormwater Prevention and Control

Stormwater Prevention and Control Stormwater Prevention and Control Principles of Stormwater Management Stormwater Fact Sheet No. 4 This fact sheet is No. 4 of a eight-part series focused on stormwater runoff problems and control strategies.

More information