1 Silver Creek Subdivision Public Park Design Team: team80026 Munding Design Lead Consultant Gaia Designs Landscape Architect Wildrye Design Landscape Architect Akamai Design Civil Engineer
2 introduction An inclusive approach... Kurt Munding Lead Consultant Munding Design SILVER CREEK PARK SITE Jennifer Gee Landscape Architect Gaia Designs Christie Schneider Landscape Architect Wildrye Design David Heinrich Civil Engineer Akamai Design team 80026
3 project approach 1 Master Plan Process (December March 2017) 2 Construction Documentation (April - August 2017) 3 Bidding (September - October 2017) 4 Construction Administration (October May 2018) team
4 master plan process 1 Community Meeting #1: Codesign/Design Charette Encourage multi-generational participation by involving schools, senior center, Lafayette Youth Advisory Council, community groups, etc. Get the word out using social media, city website, post at spots around the community, and publish in school communications. Gather participants thoughts on their park vision by reviewing image boards and going through a design charette process. 2 3 Team drafts two plans and reviews with the city Community Meeting #2: Concept Plan Review Present two concept plans to community and review the process of getting to that point. Distribute electronic survey to gain input on plans. Post plans on city website and solicit input electronically. 4 Team drafts final master plan and presents to city and community team
5 context map What s in a name... Autumn Ash Park Blue Park BBQ Grill Pet Pick-Up Station Picnic Table Playground Sledding Hill Lindenwood Park Brown Slide Park Benches Paved Path Pet Pick-Up Station Picnic Table Playground SILVER CREEK PARK SITE Sunset Maple Park Benches Pet Pick-Up Station Picnic Table Playground Ofelia Miramonte Park Library Park Playground Romero Park Benches Pet Pick-Up Station Picnic Table Soft-Surface Paths 1/4 mile 1/2 mile 3/4 mile City Park, Skatepark and Outdoor Classroom Baseball Field In-Line Skate Rink Parking Pet Pick-Up Station Picnic Shelter Restrooms Skatepark Soccer Field Softball Field Trail Access Water Amphitheater Benches Wetlands Wildlife Habitat Simpson Mine Park Rock Park Benches Historical Mining References Interpretive Playground Paved Path Pet Pick-Up Station PIcnic Table team
6 site map team
7 vision Visioning for Silver Creek Park... physical cultural community team
8 vision physical cultural community team
9 vision physical NATIVE-LOW WATER PLANTS Nature Play-Connections Park Elements Trail/Community Connections team
10 vision physical Native-Low Water Plants NATURE PLAY-CONNECTIONS Park Elements Trail/Community Connections team
11 vision physical Native-Low Water Plants Nature Play-Connections PARK ELEMENTS Trail/Community Connections team
12 vision physical Native-Low Water Plants Nature Play-Connections Discover Lafayette Park Elements TRAIL/COMMUNITY CONNECTIONS team
13 vision physical cultural community team
14 vision cultural Silver Creek PUD SILVER CREEK PARK SITE team80026
15 vision physical cultural community team
16 vision community COMMUNITY FUNCTIONS Gathering Spaces Local Artists Multi-Generational team
17 vision community Community Functions GATHERING SPACES Local Artists Multi-Generational team
18 vision community Community Functions Gathering Spaces LOCAL ARTISTS Multi-Generational team
19 vision community Community Functions Gathering Spaces Local Artists MULTI-GENERATIONAL team
20 Silver Creek Neighborhood Park Public Meeting #2 February 27, 2017
21 project givens Incorporate restored historic grain mixer and plaque Informal turf area - no formal sports fields Picnic/shade shelter Benches Tables Gathering Areas Landforms Play area/s Walking paths Water conservation Native or naturalized landscaping Native grasses Trail connections to surrounding neighborhoods Park sign or signs No on-site parking No restrooms SILVER CREEK NEIGHBORHOOD PARK
22 site map existing conditions WETLAND / DETENTION DETENTION VIEWS EXISTING WALK team
23 views SILVER CREEK NEIGHBORHOOD PARK
24
25
26
27 concepts public meeting #1 SILVER CREEK NEIGHBORHOOD PARK
28 concepts public meeting #1 SILVER CREEK NEIGHBORHOOD PARK
29 concepts public meeting #1 SILVER CREEK NEIGHBORHOOD PARK
30 concepts public meeting #1 SILVER CREEK NEIGHBORHOOD PARK
31 theming Silver Creek PUD SILVER CREEK PARK SITE SILVER CREEK NEIGHBORHOOD PARK
32 concept a PARK SIGN NATURE PLAY Log, Stump, Boulder Hoppers & Balance Features CENTRAL SHADE SHELTER Picnic Tables 2-5 PLAY AREA Wavywalk/Trike Path Composite Play Structure & Other Play Equipment PRIMARY ENTRY Historic Grain Mixer Gateway CONNECTION PATH Seat Boulders Plantings OPEN PLAY AREA/MULTI-PURPOSE FIELDS 5-12 PLAY AREA Hillside Play Feature Log Scramble Zip Line Other OBSERVATION AREA Shade Shelter Concrete Deck with Seat Boulders WATER PUMP PLAY AREA Pumps Boulders Tactile Paving Concrete Bridge NATURE PLAY Branch Tunnel Branch Huts Stump Tables & Seats SWINGS BIOSWALE Plantings PEAKVIEW GATHERING/STORYTIME AREA Swing Benches Seat Boulders DISCOVERY FEATURES Interpretive Plant Signage Flora & Fauna Interpretive Features SILVER CREEK NEIGHBORHOOD PARK
33 concept a character SILVER CREEK NEIGHBORHOOD PARK
34 concept b the chicken farm PRIMARY ENTRY/PARK SIGN Historic Grain Mixer Park Sign & Entry Feature THE EGG Sledding Hill Play Feature Park Overlook Front Lawn for Events CENTRAL SHADE SHELTER Picnic Tables Seat Boulders Adirondack Seating Swing Benches BOCCE SWINGS SECONDARY SHADE SHELTER Picnic Table Seat Boulders 2-5 PLAY AREA Bridges Tractor Tires Play Feature Tractor Play Feature Chicken Coop Wavywalk/Trike Path Other OBSERVATION AREA Seat Boulders WATER PUMP PLAY AREA Pumps Boulders Sluiceway NATURE PLAY Fort Building Silver Creek Log, Stump, Boulder Hoppers & Balance Features 5-12 PLAY AREA Treehouse Net Climber Zip Line Log Scramble Other MEADOW OUTDOOR FITNESS AREA Workout Equipment OPEN PLAY AREA/MULTI-PURPOSE FIELD Single Track Pathway Undulating Landform BIOSWALE Plantings PEAK/SUNSET VIEW Benches DISCOVERY FEATURES Chicken Scavenger Hunt Egg Scavenger Hunt SILVER CREEK NEIGHBORHOOD PARK
35 concept b character SILVER CREEK NEIGHBORHOOD PARK
36 comparison circulation LEGEND Primary Entry Secondary Access Primary Circulation Secondary Circulation Tertiary Circulation Existing Sidewalk Existing Bike Path SILVER CREEK NEIGHBORHOOD PARK
37 final master plan PRIMARY ENTRY/PARK SIGN Historic Grain Mixer Park Sign & Entry Feature 2-5 PLAY AREA THE EGG Sledding Hill Play Feature - Rolling Park Overlook Front Lawn for Events Tractor Tires Play Feature Tractor Play Feature Chicken Coop Trike Path/Wavywalk Digger Garden and Farm Tool Themed Play Features Crop Rows Sand Play OBSERVATION AREA CENTRAL SHADE SHELTER Picnic Tables Seat Boulders Adirondack Seating Workbench or Counter Space CORNHOLE Seat Boulders WATER PLAY The Spring Gathering Area with Water Jet Hand Pump Stream Bed (Paving Textures and Color, Cobble, Boulders) Sluiceway NATURE PLAY Log, Stump, Boulder Hoppers & Balance Features SWINGS WETLAND Nature Exploration 5-12 PLAY AREA SECONDARY SHADE SHELTER Picnic Table Seat Boulders PEAK/SUNSET VIEWING Seat Boulders PUMP TRACK Informal dirt banks, bumps and mounds OPEN PLAY AREA/MULTI-PURPOSE FIELD Treehouse Net Climber Zip Line Log Scramble See-Saw Spinner Poured-in-Place Slope Stacked Boulder Wall with Hill Slide MEADOW Crusher Fines Pathway Undulating Landform PEAK/SUNSET VIEW Benches DISCOVERY FEATURES Chicken Scavenger Hunt Egg Scavenger Hunt SILVER CREEK NEIGHBORHOOD PARK March 17, 2017
38 final master plan SILVER CREEK NEIGHBORHOOD PARK March 17, 2017
Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.
TOWN OF NAGS HEAD NORTH CAROLINA Concept Plans Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc. Site Looking Southeast Dowdy Park Existing Conditions Nags Head Woods Sound Future
More informationANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition
ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition Park Name: Is Your Park an A or an F? Your Name: Contact Information Optional: Date: General Instructions: Phone: Email:
More informationWashington Park Playground PUBLIC MEETING #2
PUBLIC MEETING #2 March 3, 2016 Our Plan For Tonight... Re-cap the Initial Information Gathering Process Introduce 2 Concepts Context and Adjacency Circulation and General Layout Features and Experience
More informationSOUTHEAST SPORTS COMPLEX MASTER PLAN
REPORT TO SOUTHGATE NEIGHBORHOOD COUNCIL APRIL 13, 2016 Visioning Process April 30: Stakeholder Meeting with Sports Groups May 5: Stakeholder Meeting with Southgate Land Use Committee May 13: SNC Meeting
More informationWaterlily Playscape Committee Waterlily Playscape, Waterlily Park, Ocean Shores Draft Concept Plan. G Issue D 14/07/16
Waterlily Playscape Committee Waterlily Playscape, Waterlily Park, Ocean Shores Draft Concept Plan Issue D 14/07/16 New two level wharf for fishing and interacting with waters edge (exact location to be
More informationCharles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More informationMASTER PLAN IMPLEMENTATION COSTS. Appendix A
Appendix A MASTER PLAN IMPLEMENTATION COSTS Town of Bradford West Gwillimbury HENDERSON COMMUNITY PARK MASTER PLAN IMPLEMENTATION COSTS Draft Order of Magnitude Costing Revised 5/27/2014 ITEM DESCRIPTION
More informationCHAPPLES PARK MASTER PLAN
CHAPPLES PARK MASTER PLAN Presentation of Preliminary Development Options Public Open House #2 Wednesday November 2 nd, 2016 TONIGHT S AGENDA 1. Welcome & Introductions 2. Presentation by Sierra Planning
More informationmaster plan hodge park
KCMO Parks & Commissioners Recreation Board of Parks & Recreation Kansas City, Missouri Mark McHenry Director Heather Runkel Project Manager LAND3 Studio L.L.C. Bob G Bushyhead Principle Michael H Malyn
More informationWhat is happening? OPENING. Goals for Today WE ARE HERE. STEP 1 Online Questionnaire. STEP 2 Preliminary Design. STEP 3 Public.
PUBLIC INFORMATION SESSION WCOME What is happening? The Vancouver Board of Parks and Recreation is working to improve the quality of children s play experiences throughout the city. The Park Board is collaborating
More informationROBERTS FIELD BRANDING GOALS NEW BRANDING PROJECT
ROBERTS FIELD NEW BRANDING PROJECT Create branding and logos for Roberts Field and park areas including Friendship Park, The Wildlife Sanctuary and The Playing Fields. Best define use and expectations
More informationFair Oaks Ranch Homeowners Association Parks and Trails Master Plan & 2019 Budget Planning
Fair Oaks Ranch Homeowners Association Parks and Trails Master Plan & 2019 Budget Planning Sticky Dot Voting Priorities Community Survey Results Board Title Votes Parks, Open Spaces, and Trails 328 Emergency
More informationrussell+mills studios
S C H E M A T I C D E S I G N B O O K L E T O C T O B E R 2 2, 2 0 0 8 114 east oak st, fort col TABLE OF CONTENTS...ii SITE CONTEXT...1 BACKGROUND...2 PARK PROGRAM...3 SLOPE ANALYSIS...4 SPATIAL ANALYSIS...5
More informationFebruary 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax
February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax Master Planning Charge Van Dyck Park s first Master Plan will provide the City with a road map as to how best incorporate
More informationSF REC & PARK MOSCONE RECREATION CENTER: EAST SITE. Supervisor Mark Farrell District 2. Project Manager Dan Mauer Recreation and Parks Department
SF REC & PARK MOSCONE RECREATION CENTER: EAST SITE COMMUNITY WORKSHOP: MEETING #3 WEDNESDAY, FEBRUARY 10, 2016 Supervisor Mark Farrell District 2 Project Manager Dan Mauer Recreation and Parks Department
More informationAESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures
III. AESTHETIC APPEARANCE The aesthetic qualities of a grade-separated structure are as important as the specific design criteria. For example, a structure may be constructed to the exact criteria set
More informationHidden Pointe Landscape Master Plan. June, archi terra
Hidden Pointe Landscape Master Plan June, 2006 t h e archi terra g r o u p 1 Table of Contents Background Purpose and Goals of the Master Plan Master Plan Process Existing Conditions Entrance Hidden Pointe
More informationRPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St
RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, 2015 Duncan St Supervisorial District 8 Supervisor Scott Wiener 1 Agenda Welcome & Introductions Purpose of Meeting Ground Rules Project
More informationCommunity Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project
Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project Community Meeting #2 September 22, 2010 District Supervisor Eric Mar Paulina Araica, Project Manager Andy Maloney, Architect
More informationTWAIN HARTE COMMUNITY SERVICES DISTRICT
TWAIN HARTE COMMUNITY SERVICES DISTRICT April 7, 2018 Forum Overview I. PRESENTATION Background/Vision Survey Results New Ideas II. BRAINSTORMING III. MAPPING EXERCISE IV. BEST LAYOUT VOTE V. NEXT STEPS
More informationCity Council March 27, Parks, Recreation, and Trails Master Plan
City Council March 27, 2018 Parks, Recreation, and Trails Master Plan Planning Process Develop Goals and Objectives Inventory of Areas and Facilities Needs Assessment And Identification Public Participation
More informationMemo Preliminary. City of Miamisburg Parks Site Reconnaissance
Memo Preliminary To: From: Ms. Rebecca Benna Woolpert, Inc. Date: Subject: City of Miamisburg Parks Site Reconnaissance The consultant team toured the existing Miamisburg Parks to assess current levels
More informationAppendix A. Park Land Definitions
Appendix A Park Land Definitions Mini Park May serve specific function for any and all ages, depending on need of the user area. Size range 1-5 acres with optimum size being 3 acres. Service area is sub-neighborhood
More informationLong Branch-Wayne Local Park Renovation Project
Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)
More informationDraft Master Plan for Franklin Park
Draft Master Plan for Franklin Park Metro Parks Tacoma with SiteWorkshop November 2009 I. overview & background Process & History Master Plan Process The Master Plan is based on a community involvement
More informationNEIGHBOURHOOD DECISION MAKING SOUTHEAST LONDON
NEIGHBOURHOOD DECISION MAKING SOUTHEAST LONDON Thank you for voting! Please use the paper provided to mark down the numbers of the idea you would like to vote for, and bring it to the voting station. VOTE
More informationCanal Winchester Parks Master Plan. Public Meeting 2 Thursday, February 2 6:30pm
Canal Winchester Parks Master Plan Public Meeting 2 Thursday, February 2 6:30pm Meeting Agenda 1. Project overview 2. Project schedule 3. Public input results Survey Public Meeting #1 Stakeholder Interviews
More informationTAO S PARKS MASTER PLAN
TAO S PARKS MASTER PLAN December 2017 Kit Carson Park Fred aca Park Eco Park Youth + Family Center Eco Park TAOS PARKS MASTER PLAN December 2017 SCOPE OF WORK Town of Taos Parks + Recreation Master Plan
More informationPARKS & RECREATION SUBCOMMITTEE. Oct. 1, 2015
PARKS & RECREATION SUBCOMMITTEE Oct. 1, 2015 1999 Bond - $22,000,000 Land Acquisition Allen Station Phase II Neighborhood Parks PREVIOUS BOND ELECTIONS 1999 & 2007 2002 Bond - $4,000,000 Allen Senior Recreation
More informationForest Grove Park Master Plan
Workshop 03 Steering Committee Meeting 2:00 5:00 PM Public Open House 5:00 7:00 PM February 21, 2012 Agenda February 21, 2012 Schedule and planning process update. Preliminary Program review. Concept plan
More informationalum creek park public workshop January 16, 2014
alum creek park public workshop January 16, 2014 brief History Schneider Park Early 2000 s - Clean Ohio Fund - Acquisition & Invasive Species Removal SWBMP - Capital University agrees to assist with land
More informationMinto-Brown Island. November 18, City of Salem, Parks & Transportation Services
Minto-Brown Island Park Master Plan Public Meeting #1 November 18, 2014 City of Salem, Parks & Transportation Services Division, i i Public Works Welcome... and thanks for participating in the master planning
More informationCity Council Update October 24, 2017
City Council Update October 24, 2017 Master Planning Project Team City of Fairfax Cathy Salgado, Director of Parks and Recreation Brianne Baglini, Facilities Operation Manager Joanna Ormesher, Cultural
More informationVISION PLAN PRESENTATION - SEPTEMBER 28, 2013
AREAS OF IMPROVEMENT E A POOL HOUSE POOL DECK B B MAIN BUILDING UPPER PLAZAS A D F G C MAJOR BLEACHERS DUGOUTS FIELD MAIN COURTYARD D REGGIE PARK C E SPORT COURT ADA RAMP H F G H TENNIS COURTS KITCHENETTE
More informationChapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.
Overall Vision More Trail and Trail Connections Equal Access to Park Facilities and Programs Water Access Environment Variety Chapter 6 RECOMMENDATIONS Chapter 6 The following recommendations for park,
More informationBurrus Old Mill Park
Burrus Old Mill Park Park Location: 112 NW Woods Chapel Rd. Park Land Established: 1969 Park Size: 14 acres Developed Acres: 14 acres Undeveloped Acres: 0 acres Park Type: Neighborhood Park Amenities:
More informationREPORT TO COUNCIL City of Sacramento
REPORT TO COUNCIL City of Sacramento 915 I Street, Sacramento, CA 95814-2604' www.cityofsacramento.org CONSENT August 25, 2009 Honorable Mayor and Members of the City Council Title: Contract: Valley Hi
More informationSouth East Sports Complex Phase I
South East Sports Complex Phase I City of Spokane Design Review Board August 29, 2018 (Revised) Objectives 1. Early discussion and collaboration. 2. Provide framework / catalyst for future improvements
More informationLowe Park Master Plan Update Marion, IA August 25 th, 2011
Lowe Park Master Plan Update Marion, IA August 25 th, 2011 Lowe Park Master Plan Update Concept Plan - June 1 st, 2011 Agenda 1 - INTRODUCTION Vision Statement Aerial of Existing Condition 2 MASTER PLAN
More informationThe Campaign for North Pond
ADOPT A NATURAL PLAYSCAPE COMPONENT Welcome to the new world of playgrounds! Well, it isn t really new, in fact, our Natural Playscape at the North Pond Nature Sanctuary is all about getting back to basics.
More informationSUFFOLK PARK COMMUNITY PARK MASTERPLAN a place for the community
SUFFOLK PARK COMMUNITY PARK MASTERPLAN a place for the counity March 218 PARK & CONTEXT critical public open space for the counity BROKEN HEAD RD LAKE PARK ESCARPMENT BEECH DR SUFFOLK PARK VILLAGE CENTER
More informationBISCUIT RUN PARK MASTER PLAN
BOARD OF SUPERVISORS November 14, 2018 BISCUIT RUN PARK MASTER PLAN COUNTY OF ALBEMARLE ANHOLD ASSOCIATES Contents Project Introduction Property Background County Park Planning Process Existing Site &
More informationPark Map, Species Guide & General Information
Park Map, Species Guide & General Information Programs: Public Programs All ages can explore nature related topics; wildlife, gardening, insects, art, astronomy and more! Find a program brochure at the
More informationWARM SPRINGS PARK MASTER PLAN
TABLE OF CONTENTS page 1.0 Introduction and Overview 1 2.0 Information Gathering 2 3.0 Conceptual Alternative Development 8 4.0 Master Plan Development 14 5.0 Construction Cost Estimates 19 LIST OF FIGURES
More information03 HIGH PRIORITY SITES
03 HIGH PRIORITY SITES HOWARD PARK Howard Park is one of South Bend s largest riverfront parks, hosting nearly acres. Howard Park has a very passive landscape with a recreation building, ice skating rink,
More informationDESIGN CONCEPTS. Option C: Seasons
DESIGN CONCEPTS Option C: Seasons Colorado is known for its snowy active winters, hot fun summers, brilliant spring blooms, and dramatic fall color. This design highlights all of these elements in order
More informationProject Team. 2M Associates. City of Saratoga. HT Harvey Biology. PlaceWorks. NV5 Infrastructure. Tom Origer Associates History/Archeology
Project Team City of Saratoga John Cherbone, Director of Public Works Iveta Harvancik, Senior Engineer PlaceWorks Isabelle Minn, Principal-in-Charge Isby Fleischmann, Project Manager Kyle Simpson, CEQA
More informationEstimated Quantity. Description and Price. Estimated Cost. Item No General Conditions at the unit price of $ per LUMP SUM.
11 00-11 00-41 00-56 39-57 13-30 00-30 00-30 00-30 00-30 00-30 00-30 00-08 General Conditions Mobilization & Survey Demolition Tree Retention and Protection Erosion and Sedimentation Control Concrete Seat
More informationDesign Considerations
Essential to the development of a successful Master Plan for the Park Complex is input from the community that the park will serve. The community outreach component of the planning process included numerous
More informationPHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK
PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK Sheet List L1.0 L2.0 L3.0 L4.0 L5.0 L6.0 L7.0 L8.0 L9.0 L10.0 L11.0 L12.0 L13.0 L14.0 L15.0 L16.0 L17.0 L18.0 L19.0 L20.0 L21.0 L22.0 Cover Open Space Context
More informationPOPS Advisory Committee Meeting May 31, 2018
POPS Advisory Committee Meeting May 31, 2018 NOTE: This presentation is a working document, and some recommendations or ideas may have evolved or changed based on continued discussions and additional analyses.
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationPITKIN COUNTY AIRPORT LANDSCAPE MASTERPLAN
WELCOMING VIEW OF AIRPORT CAMPUS AND AN IM- PORTANT SECTION OF THE EXPERIENCE INTO ASPEN. SOUTH MEADOW IS PART OF THE NATIVE GRASS, SAGE, AND WILDFLOWER MEADOW EXTENDING FROM BUTTERMILK MOUNTAIN DOWN TO
More informationMcConnell Park Renovation
McConnell Park Renovation New Assessment April 6, 2016 Property Owners approve new Assessment $133.42 Zone A & $136.08 Zone B New Assessment allows Maintenance of existing amenities Renovation of the browned
More informationPARK DATA THEMES SUMMARY:
area and identified key themes that should be addressed in the upcoming design process. The following is a compilation of the themes identified (organized by park). Not every park was addressed in this
More informationDesign Alternatives Workshop. Hilfiker Park Master Plan Workshop #2
Design Alternatives Workshop Hilfiker Park Master Plan Workshop #2 Agenda for Tonight Staff Presentation (40 min) Introduction Master Plan Process Planning Context What We ve Heard So Far Design Alternatives
More informationCARMODY PARK MASTER PLAN
the site Smith Reservoir Cottonwood Lake Kendrick Lake Carmody Rec Center Carmody Middle School Pool Court Play Carmody Pond Sanderson Ditch Sports Fields Foothills Ice Arena Open Field why a master plan?
More informationBenedict Fountain Park Meeting Notes Wednesday, February 15, 2012
Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012 ALTERNATIVE #1 Like the big open lawn space in alternative 1. Like cohesiveness of sidewalk walk and play areas shown on alternative 1
More informationREVISED & PROPOSED MASTER PLAN NEW MEADOWS PARK. A revised design for your neighborhood park 5:30-7:00 PM. Wednesday
NEW MEADOWS PARK REVISED & PROPOSED MASTER PLAN A revised design for your neighborhood park Wednesday April th, 207 5:0-7:00 PM Community & Planning Services 2nd Floor Conference Rm. 2 W. Alder Street
More informationPlay areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.
City of Thornton Parks & Open Space Cherrywood Park Thornton, CO Architect: Design Concepts Construction of this seven-acre City park, located adjacent to Adams Twelve Five Star Prairie Hills Elementary
More informationBrains and Archibald park concept plan
Brains and Archibald park concept plan The Brains and Archibald park concept plan has been commissioned by the Whau Local Board for the purpose of providing a vision to guide improvements to Brains Park
More informationL-1 LEGEND HOMES AT DEER HILL LAFAYETTE, CALIFORNIA
LEGEND Soccer Field 100 Yards (300 ft) x 60 Yards (180 ft) 6 Vinyl-Coated Chainlink Fence 15 Vinyl-Coated Chainlink Fence DE See Sheet L-2 for Filed North Enlargement Plan ER Park Boundary HIL LR OA D
More informationMASTER PLAN for the EARL NEWHOUSE WATERFRONT
MASTER PLAN for the EARL NEWHOUSE WATERFRONT on RESERVOIR POND - CANTON, MA Community Meeting #2 - Thursday, January 11 th PROJECT INTRODUCTION Project Goals: To prepare a MASTER PLAN which develops the
More informationthe village at market creek
the village at market creek executive summary october 2012 i ii introduction The Village at Market Creek is primed to grow into one of San Diego s most lively, multi-cultural arts destinations. Our community
More informationMartin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services
Information Item Date: August 11, 2015 To: From: Subject: Mayor and City Council Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services Reed Park Improvement
More information1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails
Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space
More informationEastcreek Farm. Planned Development Standards September, 2014
Eastcreek Farm Planned Development Standards September, 2014 ekfarm Contents 01. General Standards 02. Residential Development Standards 03. Architectural Design Standards 04. Landscape Design Standards
More informationMER BLEUE URBAN EXPANSION AREA
MER BLEUE PARKS MER BLEUE URBAN EXPANSION AREA August 207 INTRODUCTION The objective of the Area Parks Plan (APP) is to outline the overall distribution of parks, amenities and greenspace connections within
More informationPlanning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park
Planning Stage Long Term Project Planning Stage Project Underway Mosaic Park Restoration of 4 Mile Run Herndon and 13 th Clarendon Central Park Arlington County Parks, Recreation and Cultural Resources
More informationTA B L E O F C ON T EN T S
TA B L E O F C ON T EN T S Introduction 1 Site Analysis 2 EXISTING TREE ANALYSIS 3 Community Outreach 5 PUBLIC WORK SHOP #1 GENERAL PUBLIC 6 PUBLIC WORKSHOP #2 4 TH OF JULY CELEBRATION 9 PUBLIC WORKSHOP
More informationMore than 30 adults and 19 children were involved in these community workshops.
Linwood Workshops held at Household of Faith Deliverance Church 3.29.08 and 4.05.08 What is a Design Workshop? We use the term workshop (often called charrette among design professionals) to describe a
More informationThe following principles guide the development of goals and strategies to protect and promote these amenities:
OPEN SPACE/PARKS/TRAILS/RECREATION GOALS/STRATEGIES Cherry Hills Village is a living environment that offers low density development, open areas, public scenic vistas, public trails and public parks. This
More information29 Bella Fontaine Park
29 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master Plan Planning Zone 2 Visit Date: July 2016 Page 1 129 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master
More informationEASTSIDE REGIONAL PARK MASTER PLAN
EASTSIDE REGIONAL PARK MASTER PLAN Goal 3: Promote the visual image of El Paso Goal 4: Enhance El Paso s Quality of Life through Recreational, Cultural and Educational Environments Goal 4.1: Deliver bond
More informationPreliminary Sketch Plan for Fort Hunter Park
Preliminary Sketch Plan for Fort Hunter Park Public Presentation November 19, 2009 Dauphin County Parks and Recreation 100 Fort Hunter Road Harrisburg, PA 17110 (717) 599-5188 www.dauphinc.org THOMAS COMITTA
More informationSaratoga Quarry Park Master Plan
Project Team City of Saratoga John Cherbone, Director of Public Works Iveta Harvancik, Senior Engineer PlaceWorks Isabelle Minn, Principal-in-Charge Isby Fleischmann, Project Manager Kyle Simpson, CEQA
More information2011 ASLA Design Awards. Centennial Park Merit Award Design Concepts CLA, Inc. Design over $500,000 Construction Budget
2011 ASLA Design Awards Centennial Park Merit Award Design Concepts CLA, Inc. Design over $500,000 Construction Budget 2011 ASLA Colorado Professional Design Awards Project Name: Category: Location: Const.
More informationParks & Recreation. Michael Versen & Associates Landscape Architecture Land Planning
Michael Versen & Associates Landscape Architecture Land Planning 299 N. Weisgarber Road Suite 201 Knoxville, TN. 37919 website: www.versenassociates.com telephone: 865-588 588-1331 fax: 865-251 251-4086
More informationWelcome to the Neighborhood! COPPERLEAF NEIGHBORHOOD GUIDE
Welcome to the Neighborhood! COPPERLEAF NEIGHBORHOOD GUIDE 2017 At Copperleaf, feeling at home just comes naturally. Not surprising when you take a look around at the abundance of resources we offer to
More informationlakeway mixed use tract open space plan
LEGEND:. UNDISTURBED NATURAL AREA. ENTRY STATEMENT BUILT INTO HILLSIDE. R.O.W. PLANTING (STREET TREES/LIGHTS). HEB ENTRY DRIVE 5. BIO-FILTRATION IN MEDIAN 6. MAIN ENTRY @ MAIN STREET. EXISTING TREES TO
More informationSOUTH COMMUNITY PARK MASTER PLAN
CORTEZ SOUTH COMMUNITY PARK MASTER PLAN PROCESS SUMMARY During the summer and fall of 2018, the City of Cortez, together with landscape architecture studio Connect One Design, developed a master plan for
More informationCHAPPLES PARK MASTER PLAN. Presentation to Council April 10, 2017
CHAPPLES PARK MASTER PLAN Presentation to Council April 10, 2017 1 PRESENTATION AGENDA 1. Project Background, Aim and Process 2. The Site Issues and Opportunities 3. Community Engagement 4. Vision and
More informationGeorgeson Botanical Garden Master Plan
Georgeson Botanical Garden Master Plan Alaska Chapter 2018-03-12 This Master Plan was developed by volunteers representing the Alaska Chapter of the American Society of Landscape Architects. Eliza Bober
More informationCall for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT
Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT Seeking artists to design, fabricate and install art elements in the nature sanctuary
More informationCampus Master Plan Description Section 6 Storm water management and people places at campus buildings. Section 6 Campus MP Description
Campus Master Plan Description Section 6 Storm water management and people places at campus buildings Section 6 Campus MP Description THIS PAGE INTENTIONALLY LEFT BLANK. appendix The following provides
More informationFresh Kills Park in Regional Context
Fresh Kills Park in Regional Context Fresh Kills Location On Staten Island Community District 1 THE SITE TODAY TRAVIS William T. Davis Wildlife Refuge New Jersey NEW SPRINGVILLE MOUND 3/4 Little Fresh
More informationPCAL Case Study Open Spaces: Blayney Heritage Park
PCAL Case Study Open Spaces: Blayney Heritage Park Introduction Blayney Heritage Park is an area of high quality open space that offers a range of active and passive recreation facilities. The multi-purpose
More informationWELCOME PG&E HUNTERS POINT COMMUNITY OPEN HOUSE THANK YOU FOR COMING PG&E
WELCOME PG&E HUNTERS POINT COMMUNITY OPEN HOUSE THANK YOU FOR COMING NEWHALL ST JENNINGS ST B SHORELINE I SHORELINE EVANS AVE J C/D MIDDLE POINT ROAD OPERATING SUBSTATION A SHORELINE H Remediation Complete
More information7-PARKS, OPEN SPACE & PUBLIC ART
7-s, Open Space & Public Art 7-PARKS, OPEN SPACE & PUBLIC ART This chapter provides recommendations for the expansion of new parks, plazas and open space that serve the many user groups targeted for downtown.
More informationRECREATION AND OPEN SPACE ELEMENT
RECREATION AND OPEN SPACE ELEMENT Last amended August 19, 2008 Table of Contents Objective Page 5.1 Park system defined... 5-1 5.2 Access to parks and recreational facilities... 5-2 5.3 Recreation and
More informationHOOVER-UNION TRIANGLE
HOOVER-UNION TRIANGLE TABLE OF CONTENTS INTRODUCTION Who? What? Why? MEETING #1 RECAP [3/25] Presentation Activities Post-it Boards Photos Generated Schemes MEETING #2 RECAP [4/8] Presentation Schematic
More informationGrand River Ravines Georgetown Township
Grand River Ravines Georgetown Township Project Description: The Grand River Ravines County Park property is composed of the 68-acre former Fillmore at the Bend Open Space purchased in 1999 and two more
More informationMASTERPLAN AND PARK IMPROVEMENTS
ST.JAMES PARK MASTERPLAN AND PARK IMPROVEMENTS Stakeholder Meeting 3 April 26, 2016 Team: PMA Landscape Architects Ltd. Lead Landscape Architects MASS LBP Public Facilitation Consultant RAW Design Architectural
More informationFORT MISSOULA REGIONAL PARK
FORT MISSOULA REGIONAL PARK Master Plan Refinement/ Design Development www.missoulaparks.org DHM Design/WGM Group December 3, 2008 Master Plan Report Fort Missoula Regional Park Guiding Principals i 6/14/01
More informationA larger version of this map is located on the last page of this PDF.
MAP Committee Input McLoughlin Area Draft Vision Map A larger version of this map is located on the last page of this PDF. 1. The map above is intended to portray a vision for the McLoughlin area. It highlights
More informationATTACHMENT A AERIAL PHOTO OF McINTIRE PARK EAST
ATTACHMENT A AERIAL PHOTO OF McINTIRE PARK EAST McIntire Botanical Garden Request for Proposals Attachments Page 1 of 33 ATTACHMENT B - MEMORANDUM OF AGREEMENT WITH THE CITY OF CHARLOTTESVILLE McIntire
More informationOPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN
OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION
More informationNew Park / Entry Court & Plaza Concept Design
New Park / Entry Court & Plaza Concept Design The SECC Public realm is proposed to have a focus on health, wellness, and community and that site users will include patrons of the neighbourhood. The block
More informationUNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014
5.2 ECO-CORRIDOR 37 ECO-CORRIDOR EXISTING CONDITIONS & VISION NEIGHBOURHOOD VISION Investment in the Eco-corridor Neighbourhood will signify the University s commitment to supporting local ecology and
More informationCity of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design
City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access Welcome Thank you for coming this evening. Agenda PART I - Project Context The Downtown Revitalization Program Our DRI Projects Other
More information