1 BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

2 PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers BKF Job No.: November 2010 Page 1 of 8

3 INTRODUCTION Universal Paragon Corporation is proposing improvements to approximately 550-acres of land to create a 12 million square foot world class mixed-use development. Located in Brisbane, California, the project site is bounded by the Sunnydale Avenue and Sunset Scavengers to the north, Brisbane Lagoon to the south, Bayshore Boulevard to the west and US Highway 101 to the east. The project area west of the railroad tracks was formerly a railyard operated by Southern Pacific Railroad while the area east of the railroad tracks is a former landfill currently being used for soil recycling operations. This analysis documents that the proposed on-site infrastructure is capable of supporting the on-site 25-year design storm event without ponding, that the proposed Central Drainage Channel (CDC) is capable of conveying the 100-year peak storm event water elevation, and that off-site flooding on Bayshore Boulevard for the 100-year storm event is significantly reduced. STORM DRAIN MODEL PARAMETERS 1. HYDROLOGIC DESIGN CRITERIA The Rational Method Equation is used to compute the peak rate of runoff from the site. The proposed model computes the peak rate of runoff for the 25-year storm with the 100-year storm event Hydraulic Grade Line (HGL) water elevation in the channel. The Rational Method Equation is: Q = CIA Q = peak discharge (cfs) C = runoff coefficient (dimensionless) I = rainfall intensity for an event whose duration is equal to the time of concentration for the watershed (inches/hour) A = drainage area (acres). 2. COMPUTER PROGRAM As described in the November 2003 City of Brisbane Storm Drainage Master Plan, (SDMP) by RBF Consulting, the computer program XP-SWMM is used to evaluate the performance of the proposed system. For the purposes of storm drainage analysis, the program is divided into a runoff and a hydraulics module. The runoff module is used to calculate the runoff hydrographs at system nodes, while the hydraulics module defines the physical infrastructure of the system and routes the runoff module through the system. Per the SDMP, tidal conditions have been included in developing the storm drain model. BKF has used the storm drain model and runoff module assumptions developed by RBF as a baseline for this model. 3. DRAINAGE AREAS Drainage areas were developed based on the conceptual grading plan prepared by BKF Engineers, dated November For reference, the conceptual grading plan is included as Exhibit 4 in this analysis. Page 2 of 8

4 4. PRECIPITATION INTENSITY DATA As described in the SDMP, precipitation distributions and design rainfall intensities were developed in accordance with the Return Period-Duration Specific Regional Equation described in the Santa Clara Valley Water District Hydrology Procedures handbook. Rainfall distributions were taken over a 24-hour period and developed for 2-yr, 10-yr, 25-yr, and 100-yr storm events. 5. RUNOFF COEFFICIENT The runoff coefficient is a measure of the amount of rainfall that runs off from the site at the storm peak. The Soil Conservation Service (SCS) curve number method is used to determine the portion of rainfall that develops in the storm water runoff. The SCS method combines land use classifications and soil types to develop a curve number (CN). Since the project site infiltrates at a slow rate due to the presence of bay mud deposits, on-site soils are classified as either Type C or D per the SDMP. A CN of is used to classify impervious surfaces, whereas pervious surfaces are defined by a CN ranging from TIME OF CONCENTRATION As described in the SDMP, the SCS method is used to develop values for the time of concentration. The equation uses the longest runoff flow path, the slope of the watershed and the SCS curve number to develop the values for time of concentration. 7. TIDAL CONDITIONS Per the SDMP, recent studies has shown that high tidal levels can be expected during large storm events due to the presence of powerful off-shore winds and low atmospheric pressure. BKF has maintained the storm drain model tidal conditions developed by RBF, thus the model assumes a maximum stage tidal cycle elevation of 6.0-feet (NGVD 29). 8. HEADLOSS COEFFICIENT FOR JUNCTIONS Manhole losses (hl) are computed as hl=k V2/2g, where K is the standard head loss coefficient, V is the velocity leaving the junction structure and g is the gravitational constant. The head loss coefficient is based on the geometry of the junction structure and connecting pipes. The flow depths for the 25-year and 100- year flow rates are computed using the hydraulic grade line slope instead of the pipe slope. The hydraulic grade line slope is the slope between the pipe inlet water elevation (pipe invert elevation plus depth of flow) and the pipe outlet water elevation (pipe invert elevation plus downstream pipe flow depth plus manhole losses). 9. FREEBOARD The project freeboard criterion is based on the guidelines defined by the SDMP. These guidelines establish that projects design drainage facilities to provide a minimum of one-foot from the calculated 100-year peak stage where ponding may Page 3 of 8

5 occur. Although the on-site portions of the project contain the 25-year design flow entirely within the proposed drainage channel area and piping system, the 100-year storm event overland release is provided through the public right-of-way with a minimum of 1-foot of freeboard to the proposed building finished floors. Throughout the majority of the site of the site, the provided freeboard exceeds the required minimum. EXISTING STORM DRAIN SYSTEM MODEL The results of the existing system model prepared by RBF as part of the SDMP are included in Appendix A with the Existing system model pipe and node layout is documented on Exhibit 1. Existing off-site conditions and flows that discharge through the site and used in the RBF model have been included in the proposed storm drain system model. PROPOSED STORM WATER DESIGN CRITERIA The proposed Baylands storm drainage collection system will be designed in compliance with the City of Brisbane requirements, the SDMP and supplemental project specific storm drainage reports. Existing on-site storm drainage pipes, structures, and pumps will be removed and/or replaced to allow for the installation of the proposed landfill clay cap and other measures required to complete landfill closure. Approximately 47-acres of the existing Beatty Avenue watershed have been re-routed to the Bayshore Drainage Area, resulting in a total Bayshore catchment area of 278-acres. A combination of pipes, culverts, and conveyance and catchment structures will direct the storm water runoff from the on-site streets and buildings, and the upper reach areas of the Bayshore Drainage Area to 10 outfalls discharging to the CDC. Storm Drain Pipe System Proposed storm drain pipes and structures are sized based on the calculated flows using Manning s equation. The pipes will be connected using fusion-welded High-Density Polyethylene (HDPE) pipe. Since refuse and bay mud soil conditions are susceptible to significant settlement, fusion-welded joints are designed to be flexible and are capable of withstanding tolerable levels of differential settlement. In combination with the rainfall intensity data for the project area, the rational equation is used to develop runoff volumes and flows. Storm Drain pipes and structures are then sized based on the calculated flows using Manning s equation. The preliminary line sizing and layout, shown on Exhibit 2, is based on the following criteria: Pipe Material: HDPE and Concrete Box Culverts Manning s Number: Collection System Design Storm: 25-year in pipe system and 100-year overland release thru streets Channel Design Storm: 100-year storm HGL Tidal Cycle: Mean High Higher Water Level of 6.0 feet (SDMP) Page 4 of 8

6 Minimum Pipe Slope 0.20% after settlement 3-feet minimum cover over the top of the pipes and culverts where feasible Flexible connections at storm drain structures and buildings Minimizing pipe depths to prevent trenching into the proposed Clay Cap RESULTS On-site storm drainage collection facilities are sized to convey the peak flow rate from a 25-year storm event entirely within the piping system. The 25-year peak storm hydraulic grade line for the on-site piping system is below the rim elevations of the storm drain structures. Since overland release is through the public street rights-of-way, minor surcharging of the on-site infrastructure is acceptable and anticipated during the 100-year peak storm event. To accommodate the 100-year peak storm event, building finished floors will be set to provide a minimum of 1-foot of freeboard above the 100-year storm event HGL. In addition, the proposed central open drainage channel is sized to handle the 100-year storm event HGL for both the upper and lower reach tributary areas with a minimum of 3-feet of freeboard under the current tidal conditions. The 100-year design storm event water elevations are 6.0-feet at the Highway 101 outfall, 8.4-feet at the downstream side of the railroad culvert, and 8.8-feet at the beginning of the drainage channel near the Roundhouse. As recommended by the SDMP, the 100-year flooding depth on Bayshore Boulevard has been reduced by up to 1.6-feet. With the addition of approximately 267,300 cubic feet of storage within the CDC, the duration of 100-year peak storm event flooding at Bayshore has been reduced from 173 minutes to 82 minutes. The model results for the proposed system are included in Appendix B and storm drain model layout is shown on Exhibit 3. CONCLUSIONS As a result of the modeled preliminary improvements, the proposed infrastructure and CDC is capable of supporting the on-site site 25-year design storm drain runoff without ponding and reduces off-site flooding on Bayshore Boulevard for the 100-year storm event. Infrastructure sizing and layout will be finalized during the Civil Improvement Plan process. Page 5 of 8

7 EXHIBITS Page 6 of 8

8 E / S / P

9

10 E / S / P

11

12 APPENDIX A Page 7 of 8

13

14

15

16

17 APPENDIX B Page 8 of 8

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE 1.0 INTRODUCTION 1.1 OBJECTIVE This report, prepared for submittal to TxDOT, analyzes existing and proposed detention facilities draining into the TxDOT US90A storm sewer system. The results of the detailed

More information

Figure 1 Cypress Street Study Area Location Map

Figure 1 Cypress Street Study Area Location Map July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

DRAINAGE CALCULATIONS

DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: 517-26-010 December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering,

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

PSLS Surveyors' Conference Workshop Information Form Workshop Number: (leave blank if unknown) Hours: Workshop Title: Workshop Description: Suggested Speaker(s), affiliation/contact information 1. 2. 3.

More information

ARIZONA WATER COMPANY

ARIZONA WATER COMPANY ARIZONA WATER COMPANY East Sedona Water Storage Facility February 21, 2018 Community Meeting STORMWATER RUNOFF Issue: Runoff sometimes flows out of the wash at bottlenecks in front of several homes on

More information

Appendix K. Stormwater Management Plan

Appendix K. Stormwater Management Plan Regional Municipality of Halton - Steeles Avenue (Regional Road 8) Class EA - Industrial Drive to Regional Road 25/Martin Street Appendix K Stormwater Management Plan PR226401.001 Rev. 2 PR.DOT, 00/01

More information

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA (26, APPENDIX B) 26 Attachment 2 Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA TABLE B-1 DESIGN STORM RAINFALL AMOUNT Source: Field Manual of Pennsylvania Department of Transportation

More information

PHASE III DRAINAGE REPORT

PHASE III DRAINAGE REPORT PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village

More information

Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change. Chris Jensen, AScT Master of Science Thesis

Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change. Chris Jensen, AScT Master of Science Thesis Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change Chris Jensen, AScT Master of Science Thesis Bowker Creek Initiative April 12, 2012 Outline 1. Future Impacts

More information

City of Richmond. Engineering Design Specifications

City of Richmond. Engineering Design Specifications City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

South Bismarck Watershed Model Update and Stormwater Improvement Project

South Bismarck Watershed Model Update and Stormwater Improvement Project Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

APPENDIX B. Hydrologic and Hydraulic Analysis

APPENDIX B. Hydrologic and Hydraulic Analysis APPENDIX B Hydrologic and Hydraulic Analysis HYDROLOGIC AND HYDRAULIC ANALYSIS PETERSBURG ROAD IMPROVEMENTS DOT&PF Project No. 67879 Prepared for: State of Alaska Department of Transportation and Public

More information

Washington County, Maryland Division of Public Works Policy Manual

Washington County, Maryland Division of Public Works Policy Manual Washington County, Maryland Division of Public Works Policy Manual Subject: Downstream Drainage Easement Category: Land Development Engineering Number: 7-4.1 Date: June 1, 2009 (effective) PURPOSE: The

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

GIS-Enabled Rain Garden Design: A Case Study in Austin, Texas. GIS in Water Resources (C E 394K-3) Clint Smith, E.I.T.

GIS-Enabled Rain Garden Design: A Case Study in Austin, Texas. GIS in Water Resources (C E 394K-3) Clint Smith, E.I.T. GIS-Enabled Rain Garden Design: A Case Study in Austin, Texas GIS in Water Resources (C E 394K-3), E.I.T., MSCE 12/07/2018 Table of Contents: 1. Abstract 3 2. Introduction 4 2.1 Background 4 2.2 Project

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter will help you with proper sizing and design concepts for various types of stormwater treatment measures.

More information

Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California

Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California Presented to: FMA Annual 2015 Conference September 8-11, 2015 Presented by: Jim O Brien, Ph.D., P.E. Noemi Gonzalez,

More information

Village of Forest Park. July 27, Sewer Separation Evaluation

Village of Forest Park. July 27, Sewer Separation Evaluation Village of Forest Park July 27, 2015 Sewer Separation Evaluation Presentation Overview Study Background Historic Nature of Forest Park Drainage Scale of Flooding Problem Forest Park Sewer System Background

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

City of Troutdale South Troutdale Road Storm Drainage Plan

City of Troutdale South Troutdale Road Storm Drainage Plan City of Troutdale South Troutdale Road Storm Plan January 29 City of Troutdale SOUTH TROUTDALE ROAD STORM DRAINAGE PLAN January 29 Prepared for: City of Troutdale 342 SW 4th Street Troutdale, OR 976 Prepared

More information

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures This Chapter contains guidance on: Hydraulic sizing criteria, Applicability of non-landscape based treatment measures, Using Manufactured Treatment

More information

THE PLANNING AREA 2.1 PLANNING AREA LOCATION

THE PLANNING AREA 2.1 PLANNING AREA LOCATION 2. The Planning Area Brisbane Baylands Specific Plan 21 2 THE PLANNING AREA 2.1 PLANNING AREA LOCATION The Baylands is located approximately midway between San Francisco s central business district and

More information

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal

Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal DRAFT REPORT Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal Prepared for: City of Lake Oswego, Oregon Prepared by: Pacific Water Resources, Inc. January 31, 2008 We Think the World of

More information

User s Guide for the BMP Sizing Tool. Revised December 2017

User s Guide for the BMP Sizing Tool. Revised December 2017 User s Guide for the BMP Sizing Tool Revised December 2017 Table of Contents Section 1.0 Introduction... 1 Section 2.0 Intended Audience... 2 Section 3.0 Installing and Starting the Application... 2 Section

More information

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014 City of Elmhurst City of Elmhurst Comprehensive Flood Plan City Council Meeting September 15, 2014 City of Elmhurst Presentation Overview Study Background Study Methodology Analysis of Three Additional

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 4 - Preparation of Stormwater Site Plans Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed

More information

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket). 6 Rain Gardens Rain Gardens 6.1 Introduction A rain garden is used to attenuate peak flows and to provide stormwater treatment. Rain gardens use the concept of bioretention, a water quality practice in

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter applies to all types of stormwater treatment measures. This chapter contains general technical information

More information

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

ARTICLE III COMBINED SEWERS

ARTICLE III COMBINED SEWERS I ' j I' ARTICLE III COMBINED SEWERS COM'RS MIN.. VOL.281 JAN 2 2001 IMAGE Section 301 Construction; Extension of Sewers The construction of and/or extension to combined sewers are hereby prohibited, unless

More information

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future. The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional

More information

There is an ongoing regulatory concern that

There is an ongoing regulatory concern that FWRJ Alternatives for Beach Stormwater Outfalls: Preliminary Assessment for City of Naples Reshma Thummadi, Ronald Cavalieri, Andy Holland, and Gregg Strakaluse There is an ongoing regulatory concern that

More information

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT ECHO BAY NEW ROCHELLE, NEW YORK STORMWATER MANAGEMENT REPORT Prepared for: Forest City Residential Group 1 Metro Tech Center North Brooklyn, NY 11201 Prepared

More information

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration Rocky Powell Clear Creeks Consulting, LLC Keith D. Tate, P.E. BayLand Consultants & Designers, Inc.

More information

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013 Keele Campus Storm Drainage Presented by Mark Hagesteijn September 24, 2013 1 Presentation Overview Urbanization Impact on the Hydrologic Cycle Why Do We Manage Stormwater? Typical Stormwater Management

More information

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Dennis S. Painter, Tennessee Valley Authority, Nashville, Tennessee Donald Becker, Tennessee Valley

More information

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling Green Infrastructure Modeling in Cincinnati Ohio Small Scale Green Infrastructure Design Using Computer Modeling Presenters Jason Abbott is a Design Engineer with over 17 years of experience. Jason is

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill Steven C. Lamb 1,

More information

2I-5 Bioswales (Numbering pending)

2I-5 Bioswales (Numbering pending) Iowa Stormwater Management Manual 2I-3 2I-5 Bioswales (Numbering pending) Source: Steve Anderson, 2011 BENEFITS Low =

More information

Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls

Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls Richard Warner, Ph.D. Biosystems and Agricultural Engineering Department University of Kentucky

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013 City of Norfolk Coastal Flood Mitigation Program March 13, 2013 Topics Brief overview of Norfolk s Coastal Flood Program Data-driven analysis and decision making City-wide vulnerability, project concepts,

More information

Article 20 Stormwater Management

Article 20 Stormwater Management Article 20 Section 20.01 Intent Article 20 The purpose of this Article is to protect the health, safety, and general welfare of the citizens by requiring compliance with accepted standards and practices

More information

DFH JOINT VENTURE. Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno

DFH JOINT VENTURE. Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno DFH JOINT VENTURE Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno DOCUMENT CONTROL RECORD Document: DFH Joint Venture Graham Block Stormwater Management Report

More information

Status Update of Turf Work Order. January 18, 2013 MIDS Workgroup Meeting

Status Update of Turf Work Order. January 18, 2013 MIDS Workgroup Meeting Photo: http://en.wikipedia.org/wiki/file:seededfertilizedlawn.jpg Status Update of Turf Work Order January 18, 2013 MIDS Workgroup Meeting Categories of Turf Credits 1. Impervious Surface Disconnection-turf

More information

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE MDOT Stormwater BMPs: The Challenge of Design Janeen McDermott, PE Dan DeVaun, PE June 25, 2018 Outline Water Quality Treatment Water Quality Treatment Volume Guidelines Example Project BMP Design Challenges

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

Beyond Runoff Reduction: Thorough Green Infrastructure Design. Zach Sample, PE Innovyze

Beyond Runoff Reduction: Thorough Green Infrastructure Design. Zach Sample, PE Innovyze Beyond Runoff Reduction: Thorough Green Infrastructure Design Zach Sample, PE Innovyze Presenter Zach Sample, PE Stormwater Products Manager Innovyze Agenda Modern stormwater design (HINT: Runoff Reduction)

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES INDEX EXECUTIVE SUMMARY...1 INTRODUCTION...2 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS... 4-5 EXISTING UTILITIES... 6-7 MEDIAN BREAKS AND TURN LANE STORAGE REQUIREMENTS...8 PRELIMINARY DESIGN

More information

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015) ANSWER KEY MGSFlood v. 4.35 --- WWHM2012 (released 5/15/2015) Name: Date: Module 6.0: Advanced Topics in LID Design: Hydrologic Modeling General instructions: You may model facility dimensions to the nearest

More information

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development

More information

Green Roofs and Stormwater Management Virginia Stovin

Green Roofs and Stormwater Management Virginia Stovin Green Roofs and Stormwater Management Virginia Stovin Department of Civil and Structural Engineering Pennine Water Group University of Sheffield Outline Urban stormwater management Conventional solutions,

More information

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No. September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements

More information

Modeling Rain Garden LID Impacts on Sewer Overflows

Modeling Rain Garden LID Impacts on Sewer Overflows 7 Modeling Rain Garden LID Impacts on Sewer Overflows Uzair (Sam) M. Shamsi In September 2010, the U.S. Environmental Protection Agency (USEPA) released a new version (5.0.021) of Storm Water Management

More information

6.1 Bioretention Areas

6.1 Bioretention Areas SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas

More information

South Campus Stormwater Master Plan. University of Illinois. June Clark Dietz, Inc S. Neil Street, Suite 100 Champaign, Illinois 61820

South Campus Stormwater Master Plan. University of Illinois. June Clark Dietz, Inc S. Neil Street, Suite 100 Champaign, Illinois 61820 South Campus Stormwater Master Plan University of Illinois June 2007 Submitted by Clark Dietz, Inc. 1817 S. Neil Street, Suite 100 Champaign, Illinois 61820 Table of Contents Executive Summary Section

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

New Tools/Resources for

New Tools/Resources for New Tools/Resources for C.3 Stormwater Compliance Laura Prickett, AICP, EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Outline of Presentation Updated C.3 Handbook Handbook outline

More information

A. Regional Detention Requirements

A. Regional Detention Requirements I. GENERAL DESIGN GUIDELINES A. Full-spectrum detention is provided for all new development, redevelopment or expansion of a site to provide for water quality and flood control detention. B. Detention

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

Going Green with the NYS Stormwater Design Standards

Going Green with the NYS Stormwater Design Standards Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,

More information

STORMWATER DEVELOPMENT MANUAL CITY OF HUNTINGTON

STORMWATER DEVELOPMENT MANUAL CITY OF HUNTINGTON STORMWATER DEVELOPMENT MANUAL PREPARED FOR: CITY OF HUNTINGTON September 2005 X:\Fort Wayne Projects\2400\2454.00\Part C\MCM\Construction Site Run off\stormwater Development Manual\Huntington Stormwater

More information

TABLE OF CONTENTS 1 INTRODUCTION...

TABLE OF CONTENTS 1 INTRODUCTION... Drainage Report & Impact Analysis TABLE OF CONTENTS 1 INTRODUCTION.... 1 1.1 PROJECT DESCRIPTION AND LOCATION... 1 1.2 REPORT OBJECTIVES... 2 1.3 DRAINAGE DESIGN CRITERIA... 3 1.4 DRAINAGE DESIGN ASSUMPTIONS...

More information

Attachment 2: Permeable Pavement Design Guidelines

Attachment 2: Permeable Pavement Design Guidelines Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

CRYSTAL LAKE FLOODING STUDY

CRYSTAL LAKE FLOODING STUDY Project #08223 CRYSTAL LAKE FLOODING STUDY PREPARED FOR: City of Crystal Lake 100 W. Municipal Complex Crystal Lake, Illinois 60039-0597 REVISED MARCH 19, 2009 26575 W. COMMERCE DRIVE, SUITE 601, VOLO,

More information

Assessing Directly Connected Impervious Areas in Residential Subdivisions in Western Sydney, NSW

Assessing Directly Connected Impervious Areas in Residential Subdivisions in Western Sydney, NSW Assessing Directly Connected Impervious Areas in Residential Subdivisions in Western Sydney, NSW 1, 1 Cardno (APAC South), 203 Pacific Highway St Leonards, 2065. Email: Stephen.Gribble@cardno.com.au Key

More information

Baltimore, MD Lt. Gov. Boyd Rutherford

Baltimore, MD Lt. Gov. Boyd Rutherford MODEL STANDARD PLAN FOR POULTRY HOUSE SITE DEVELOPMENT ON MARYLAND S EASTERN SHORE MARCH 2011 1800 Washington Boulevard 410-537-3000 Gov. Larry Hogan Baltimore, MD 21230-1718 800-633-6101 Lt. Gov. Boyd

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT.

GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT. GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT Submitted to: Kuwabara Payne McKenna Blumberg Architects 322 King Street West,

More information

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook C.3 STORMWATER TECHNICAL GUIDANCE Table of Contents Glossary... viii Chapter 1 Introduction/How to Use this Handbook... 1-1 1.1 Purpose of this Handbook... 1-1 1.2 What is the Countywide Program?... 1-2

More information

CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS

CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS SECTION 10 STREETS CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS 10.1 INTRODUCTION The criteria presented in this section shall be used in the evaluation of the allowable

More information

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT 4.1 Overview Description: Requirements and standards for controlling runoff from development are critical to addressing water quantity and

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

URWH at various scales

URWH at various scales URWH at various scales Training programme on Mainstreaming Sustainable Urban Water Management March 23-26, 2015 Structure of Presentation Surface runoff/ flood management practices to ensure runoff quantity

More information

Three Rivers Park District Administration Center Rain Garden

Three Rivers Park District Administration Center Rain Garden Three Rivers Park District Administration Center Rain Garden Introduction There are significant changes to the hydrologic regime and nutrient loading following urban and industrial development. The post-development

More information

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL Neighborhood Drainage Infrastructure Improvements Using Green Initiatives Village of Hinsdale, IL Presentation Agenda Project Overview Goals and Objectives Design Approach Public Coordination Recap Questions

More information

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number: SECTION 1: GENERAL INFORMATION Plan Submission Date: Total Disturbed Acreage: _ Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number: email: SECTION

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Appendix B.1. Storm Servicing and Stormwater Management Memorandum

Appendix B.1. Storm Servicing and Stormwater Management Memorandum Appendix B.1 Storm Servicing and Stormwater Management AECOM 410 York Street, Citi Plaza 519 673 0510 tel London, ON, Canada N6A 6K2 519 673 5975 fax www.aecom.com DRAFT To Doug Law (City of London) Page

More information

GREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA

GREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA 1 GREATER NEW HAVEN WPCA GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN Tom Sgroi, P.E. Director of Engineering, GNHWPCA Bruce Kirkland, P.E. Senior Engineer, GNHWPCA 2 1975 GREEN INFRASTRUCTURE BACKGROUND

More information

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration

More information