1 BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT
2 PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers BKF Job No.: November 2010 Page 1 of 8
3 INTRODUCTION Universal Paragon Corporation is proposing improvements to approximately 550-acres of land to create a 12 million square foot world class mixed-use development. Located in Brisbane, California, the project site is bounded by the Sunnydale Avenue and Sunset Scavengers to the north, Brisbane Lagoon to the south, Bayshore Boulevard to the west and US Highway 101 to the east. The project area west of the railroad tracks was formerly a railyard operated by Southern Pacific Railroad while the area east of the railroad tracks is a former landfill currently being used for soil recycling operations. This analysis documents that the proposed on-site infrastructure is capable of supporting the on-site 25-year design storm event without ponding, that the proposed Central Drainage Channel (CDC) is capable of conveying the 100-year peak storm event water elevation, and that off-site flooding on Bayshore Boulevard for the 100-year storm event is significantly reduced. STORM DRAIN MODEL PARAMETERS 1. HYDROLOGIC DESIGN CRITERIA The Rational Method Equation is used to compute the peak rate of runoff from the site. The proposed model computes the peak rate of runoff for the 25-year storm with the 100-year storm event Hydraulic Grade Line (HGL) water elevation in the channel. The Rational Method Equation is: Q = CIA Q = peak discharge (cfs) C = runoff coefficient (dimensionless) I = rainfall intensity for an event whose duration is equal to the time of concentration for the watershed (inches/hour) A = drainage area (acres). 2. COMPUTER PROGRAM As described in the November 2003 City of Brisbane Storm Drainage Master Plan, (SDMP) by RBF Consulting, the computer program XP-SWMM is used to evaluate the performance of the proposed system. For the purposes of storm drainage analysis, the program is divided into a runoff and a hydraulics module. The runoff module is used to calculate the runoff hydrographs at system nodes, while the hydraulics module defines the physical infrastructure of the system and routes the runoff module through the system. Per the SDMP, tidal conditions have been included in developing the storm drain model. BKF has used the storm drain model and runoff module assumptions developed by RBF as a baseline for this model. 3. DRAINAGE AREAS Drainage areas were developed based on the conceptual grading plan prepared by BKF Engineers, dated November For reference, the conceptual grading plan is included as Exhibit 4 in this analysis. Page 2 of 8
4 4. PRECIPITATION INTENSITY DATA As described in the SDMP, precipitation distributions and design rainfall intensities were developed in accordance with the Return Period-Duration Specific Regional Equation described in the Santa Clara Valley Water District Hydrology Procedures handbook. Rainfall distributions were taken over a 24-hour period and developed for 2-yr, 10-yr, 25-yr, and 100-yr storm events. 5. RUNOFF COEFFICIENT The runoff coefficient is a measure of the amount of rainfall that runs off from the site at the storm peak. The Soil Conservation Service (SCS) curve number method is used to determine the portion of rainfall that develops in the storm water runoff. The SCS method combines land use classifications and soil types to develop a curve number (CN). Since the project site infiltrates at a slow rate due to the presence of bay mud deposits, on-site soils are classified as either Type C or D per the SDMP. A CN of is used to classify impervious surfaces, whereas pervious surfaces are defined by a CN ranging from TIME OF CONCENTRATION As described in the SDMP, the SCS method is used to develop values for the time of concentration. The equation uses the longest runoff flow path, the slope of the watershed and the SCS curve number to develop the values for time of concentration. 7. TIDAL CONDITIONS Per the SDMP, recent studies has shown that high tidal levels can be expected during large storm events due to the presence of powerful off-shore winds and low atmospheric pressure. BKF has maintained the storm drain model tidal conditions developed by RBF, thus the model assumes a maximum stage tidal cycle elevation of 6.0-feet (NGVD 29). 8. HEADLOSS COEFFICIENT FOR JUNCTIONS Manhole losses (hl) are computed as hl=k V2/2g, where K is the standard head loss coefficient, V is the velocity leaving the junction structure and g is the gravitational constant. The head loss coefficient is based on the geometry of the junction structure and connecting pipes. The flow depths for the 25-year and 100- year flow rates are computed using the hydraulic grade line slope instead of the pipe slope. The hydraulic grade line slope is the slope between the pipe inlet water elevation (pipe invert elevation plus depth of flow) and the pipe outlet water elevation (pipe invert elevation plus downstream pipe flow depth plus manhole losses). 9. FREEBOARD The project freeboard criterion is based on the guidelines defined by the SDMP. These guidelines establish that projects design drainage facilities to provide a minimum of one-foot from the calculated 100-year peak stage where ponding may Page 3 of 8
5 occur. Although the on-site portions of the project contain the 25-year design flow entirely within the proposed drainage channel area and piping system, the 100-year storm event overland release is provided through the public right-of-way with a minimum of 1-foot of freeboard to the proposed building finished floors. Throughout the majority of the site of the site, the provided freeboard exceeds the required minimum. EXISTING STORM DRAIN SYSTEM MODEL The results of the existing system model prepared by RBF as part of the SDMP are included in Appendix A with the Existing system model pipe and node layout is documented on Exhibit 1. Existing off-site conditions and flows that discharge through the site and used in the RBF model have been included in the proposed storm drain system model. PROPOSED STORM WATER DESIGN CRITERIA The proposed Baylands storm drainage collection system will be designed in compliance with the City of Brisbane requirements, the SDMP and supplemental project specific storm drainage reports. Existing on-site storm drainage pipes, structures, and pumps will be removed and/or replaced to allow for the installation of the proposed landfill clay cap and other measures required to complete landfill closure. Approximately 47-acres of the existing Beatty Avenue watershed have been re-routed to the Bayshore Drainage Area, resulting in a total Bayshore catchment area of 278-acres. A combination of pipes, culverts, and conveyance and catchment structures will direct the storm water runoff from the on-site streets and buildings, and the upper reach areas of the Bayshore Drainage Area to 10 outfalls discharging to the CDC. Storm Drain Pipe System Proposed storm drain pipes and structures are sized based on the calculated flows using Manning s equation. The pipes will be connected using fusion-welded High-Density Polyethylene (HDPE) pipe. Since refuse and bay mud soil conditions are susceptible to significant settlement, fusion-welded joints are designed to be flexible and are capable of withstanding tolerable levels of differential settlement. In combination with the rainfall intensity data for the project area, the rational equation is used to develop runoff volumes and flows. Storm Drain pipes and structures are then sized based on the calculated flows using Manning s equation. The preliminary line sizing and layout, shown on Exhibit 2, is based on the following criteria: Pipe Material: HDPE and Concrete Box Culverts Manning s Number: Collection System Design Storm: 25-year in pipe system and 100-year overland release thru streets Channel Design Storm: 100-year storm HGL Tidal Cycle: Mean High Higher Water Level of 6.0 feet (SDMP) Page 4 of 8
6 Minimum Pipe Slope 0.20% after settlement 3-feet minimum cover over the top of the pipes and culverts where feasible Flexible connections at storm drain structures and buildings Minimizing pipe depths to prevent trenching into the proposed Clay Cap RESULTS On-site storm drainage collection facilities are sized to convey the peak flow rate from a 25-year storm event entirely within the piping system. The 25-year peak storm hydraulic grade line for the on-site piping system is below the rim elevations of the storm drain structures. Since overland release is through the public street rights-of-way, minor surcharging of the on-site infrastructure is acceptable and anticipated during the 100-year peak storm event. To accommodate the 100-year peak storm event, building finished floors will be set to provide a minimum of 1-foot of freeboard above the 100-year storm event HGL. In addition, the proposed central open drainage channel is sized to handle the 100-year storm event HGL for both the upper and lower reach tributary areas with a minimum of 3-feet of freeboard under the current tidal conditions. The 100-year design storm event water elevations are 6.0-feet at the Highway 101 outfall, 8.4-feet at the downstream side of the railroad culvert, and 8.8-feet at the beginning of the drainage channel near the Roundhouse. As recommended by the SDMP, the 100-year flooding depth on Bayshore Boulevard has been reduced by up to 1.6-feet. With the addition of approximately 267,300 cubic feet of storage within the CDC, the duration of 100-year peak storm event flooding at Bayshore has been reduced from 173 minutes to 82 minutes. The model results for the proposed system are included in Appendix B and storm drain model layout is shown on Exhibit 3. CONCLUSIONS As a result of the modeled preliminary improvements, the proposed infrastructure and CDC is capable of supporting the on-site site 25-year design storm drain runoff without ponding and reduces off-site flooding on Bayshore Boulevard for the 100-year storm event. Infrastructure sizing and layout will be finalized during the Civil Improvement Plan process. Page 5 of 8
7 EXHIBITS Page 6 of 8
8 E / S / P
9
10 E / S / P
11
12 APPENDIX A Page 7 of 8
13
14
15
16
17 APPENDIX B Page 8 of 8
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationSTAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE
1.0 INTRODUCTION 1.1 OBJECTIVE This report, prepared for submittal to TxDOT, analyzes existing and proposed detention facilities draining into the TxDOT US90A storm sewer system. The results of the detailed
More informationFigure 1 Cypress Street Study Area Location Map
July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of
More informationSTORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO
STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me
More informationPollutant Removal Benefits
Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration
More informationDRAINAGE CALCULATIONS
DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: 517-26-010 December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering,
More informationTable of Contents G.1.a Water Resources - Surface Water - Drainage
Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...
More informationCHECKLIST FOR PHASE II DRAINAGE REPORT
I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION
More informationPSLS Surveyors' Conference Workshop Information Form Workshop Number: (leave blank if unknown) Hours: Workshop Title: Workshop Description: Suggested Speaker(s), affiliation/contact information 1. 2. 3.
More informationARIZONA WATER COMPANY
ARIZONA WATER COMPANY East Sedona Water Storage Facility February 21, 2018 Community Meeting STORMWATER RUNOFF Issue: Runoff sometimes flows out of the wash at bottlenecks in front of several homes on
More informationAppendix K. Stormwater Management Plan
Regional Municipality of Halton - Steeles Avenue (Regional Road 8) Class EA - Industrial Drive to Regional Road 25/Martin Street Appendix K Stormwater Management Plan PR226401.001 Rev. 2 PR.DOT, 00/01
More information26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA
(26, APPENDIX B) 26 Attachment 2 Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA TABLE B-1 DESIGN STORM RAINFALL AMOUNT Source: Field Manual of Pennsylvania Department of Transportation
More informationPHASE III DRAINAGE REPORT
PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village
More informationHydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change. Chris Jensen, AScT Master of Science Thesis
Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change Chris Jensen, AScT Master of Science Thesis Bowker Creek Initiative April 12, 2012 Outline 1. Future Impacts
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationMANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS
MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information
More informationSouth Bismarck Watershed Model Update and Stormwater Improvement Project
Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of
More informationLincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013
Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site
More informationHEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT
INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.
More informationWhen planning stormwater management facilities, the following principles shall be applied where possible.
2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between
More informationAPPENDIX B. Hydrologic and Hydraulic Analysis
APPENDIX B Hydrologic and Hydraulic Analysis HYDROLOGIC AND HYDRAULIC ANALYSIS PETERSBURG ROAD IMPROVEMENTS DOT&PF Project No. 67879 Prepared for: State of Alaska Department of Transportation and Public
More informationWashington County, Maryland Division of Public Works Policy Manual
Washington County, Maryland Division of Public Works Policy Manual Subject: Downstream Drainage Easement Category: Land Development Engineering Number: 7-4.1 Date: June 1, 2009 (effective) PURPOSE: The
More informationOctober 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and
More informationGIS-Enabled Rain Garden Design: A Case Study in Austin, Texas. GIS in Water Resources (C E 394K-3) Clint Smith, E.I.T.
GIS-Enabled Rain Garden Design: A Case Study in Austin, Texas GIS in Water Resources (C E 394K-3), E.I.T., MSCE 12/07/2018 Table of Contents: 1. Abstract 3 2. Introduction 4 2.1 Background 4 2.2 Project
More informationGeneral Technical Guidance for Treatment Measures
Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter will help you with proper sizing and design concepts for various types of stormwater treatment measures.
More informationImpact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California
Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California Presented to: FMA Annual 2015 Conference September 8-11, 2015 Presented by: Jim O Brien, Ph.D., P.E. Noemi Gonzalez,
More informationVillage of Forest Park. July 27, Sewer Separation Evaluation
Village of Forest Park July 27, 2015 Sewer Separation Evaluation Presentation Overview Study Background Historic Nature of Forest Park Drainage Scale of Flooding Problem Forest Park Sewer System Background
More informationPCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK
PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM
More informationCity of Troutdale South Troutdale Road Storm Drainage Plan
City of Troutdale South Troutdale Road Storm Plan January 29 City of Troutdale SOUTH TROUTDALE ROAD STORM DRAINAGE PLAN January 29 Prepared for: City of Troutdale 342 SW 4th Street Troutdale, OR 976 Prepared
More informationStormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection
Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban
More informationGeneral Technical Guidance for Treatment Measures
Chapter 5 General Technical Guidance for Treatment Measures This Chapter contains guidance on: Hydraulic sizing criteria, Applicability of non-landscape based treatment measures, Using Manufactured Treatment
More informationTHE PLANNING AREA 2.1 PLANNING AREA LOCATION
2. The Planning Area Brisbane Baylands Specific Plan 21 2 THE PLANNING AREA 2.1 PLANNING AREA LOCATION The Baylands is located approximately midway between San Francisco s central business district and
More informationNAPA COUNTY PUBLIC WORKS Standards & Specifications
Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6
More informationCHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment
CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design
More informationOutfall Flow Analysis for the Oswego Canal and Blue Heron Canal
DRAFT REPORT Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal Prepared for: City of Lake Oswego, Oregon Prepared by: Pacific Water Resources, Inc. January 31, 2008 We Think the World of
More informationUser s Guide for the BMP Sizing Tool. Revised December 2017
User s Guide for the BMP Sizing Tool Revised December 2017 Table of Contents Section 1.0 Introduction... 1 Section 2.0 Intended Audience... 2 Section 3.0 Installing and Starting the Application... 2 Section
More informationCity of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014
City of Elmhurst City of Elmhurst Comprehensive Flood Plan City Council Meeting September 15, 2014 City of Elmhurst Presentation Overview Study Background Study Methodology Analysis of Three Additional
More informationDraft Rhode Island Stormwater Design and Installation Standards Manual
Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately
More informationChapter 4 - Preparation of Stormwater Site Plans
Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed
More informationPlacement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).
6 Rain Gardens Rain Gardens 6.1 Introduction A rain garden is used to attenuate peak flows and to provide stormwater treatment. Rain gardens use the concept of bioretention, a water quality practice in
More informationGeneral Technical Guidance for Treatment Measures
Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter applies to all types of stormwater treatment measures. This chapter contains general technical information
More informationC. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water
C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the
More informationBioretention cell schematic key
Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout
More informationARTICLE III COMBINED SEWERS
I ' j I' ARTICLE III COMBINED SEWERS COM'RS MIN.. VOL.281 JAN 2 2001 IMAGE Section 301 Construction; Extension of Sewers The construction of and/or extension to combined sewers are hereby prohibited, unless
More informationcontinues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.
The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional
More informationThere is an ongoing regulatory concern that
FWRJ Alternatives for Beach Stormwater Outfalls: Preliminary Assessment for City of Naples Reshma Thummadi, Ronald Cavalieri, Andy Holland, and Gregg Strakaluse There is an ongoing regulatory concern that
More informationAPPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT
APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT ECHO BAY NEW ROCHELLE, NEW YORK STORMWATER MANAGEMENT REPORT Prepared for: Forest City Residential Group 1 Metro Tech Center North Brooklyn, NY 11201 Prepared
More informationNorth Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration
North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration Rocky Powell Clear Creeks Consulting, LLC Keith D. Tate, P.E. BayLand Consultants & Designers, Inc.
More informationKeele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013
Keele Campus Storm Drainage Presented by Mark Hagesteijn September 24, 2013 1 Presentation Overview Urbanization Impact on the Hydrologic Cycle Why Do We Manage Stormwater? Typical Stormwater Management
More informationEvaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi
Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Dennis S. Painter, Tennessee Valley Authority, Nashville, Tennessee Donald Becker, Tennessee Valley
More informationGreen Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling
Green Infrastructure Modeling in Cincinnati Ohio Small Scale Green Infrastructure Design Using Computer Modeling Presenters Jason Abbott is a Design Engineer with over 17 years of experience. Jason is
More informationPRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT
PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL
More informationSelecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill
2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill Steven C. Lamb 1,
More information2I-5 Bioswales (Numbering pending)
Iowa Stormwater Management Manual 2I-3 2I-5 Bioswales (Numbering pending) Source: Steve Anderson, 2011 BENEFITS Low =
More informationDevelopment and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls
Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls Richard Warner, Ph.D. Biosystems and Agricultural Engineering Department University of Kentucky
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More information3. Are there any projects exempt from the definition of Regulated Projects?
STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)
More informationCity of Norfolk Coastal Flood Mitigation Program. March 13, 2013
City of Norfolk Coastal Flood Mitigation Program March 13, 2013 Topics Brief overview of Norfolk s Coastal Flood Program Data-driven analysis and decision making City-wide vulnerability, project concepts,
More informationArticle 20 Stormwater Management
Article 20 Section 20.01 Intent Article 20 The purpose of this Article is to protect the health, safety, and general welfare of the citizens by requiring compliance with accepted standards and practices
More informationDFH JOINT VENTURE. Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno
DFH JOINT VENTURE Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno DOCUMENT CONTROL RECORD Document: DFH Joint Venture Graham Block Stormwater Management Report
More informationStatus Update of Turf Work Order. January 18, 2013 MIDS Workgroup Meeting
Photo: http://en.wikipedia.org/wiki/file:seededfertilizedlawn.jpg Status Update of Turf Work Order January 18, 2013 MIDS Workgroup Meeting Categories of Turf Credits 1. Impervious Surface Disconnection-turf
More informationMDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE
MDOT Stormwater BMPs: The Challenge of Design Janeen McDermott, PE Dan DeVaun, PE June 25, 2018 Outline Water Quality Treatment Water Quality Treatment Volume Guidelines Example Project BMP Design Challenges
More informationNEORSD Green Infrastructure Grant (GIG) Program Opening Remarks
NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant
More informationBeyond Runoff Reduction: Thorough Green Infrastructure Design. Zach Sample, PE Innovyze
Beyond Runoff Reduction: Thorough Green Infrastructure Design Zach Sample, PE Innovyze Presenter Zach Sample, PE Stormwater Products Manager Innovyze Agenda Modern stormwater design (HINT: Runoff Reduction)
More informationCity of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010
City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area
More informationINDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES
INDEX EXECUTIVE SUMMARY...1 INTRODUCTION...2 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS... 4-5 EXISTING UTILITIES... 6-7 MEDIAN BREAKS AND TURN LANE STORAGE REQUIREMENTS...8 PRELIMINARY DESIGN
More informationANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)
ANSWER KEY MGSFlood v. 4.35 --- WWHM2012 (released 5/15/2015) Name: Date: Module 6.0: Advanced Topics in LID Design: Hydrologic Modeling General instructions: You may model facility dimensions to the nearest
More informationDRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK
DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development
More informationGreen Roofs and Stormwater Management Virginia Stovin
Green Roofs and Stormwater Management Virginia Stovin Department of Civil and Structural Engineering Pennine Water Group University of Sheffield Outline Urban stormwater management Conventional solutions,
More informationStorm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.
September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements
More informationModeling Rain Garden LID Impacts on Sewer Overflows
7 Modeling Rain Garden LID Impacts on Sewer Overflows Uzair (Sam) M. Shamsi In September 2010, the U.S. Environmental Protection Agency (USEPA) released a new version (5.0.021) of Storm Water Management
More information6.1 Bioretention Areas
SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas
More informationSouth Campus Stormwater Master Plan. University of Illinois. June Clark Dietz, Inc S. Neil Street, Suite 100 Champaign, Illinois 61820
South Campus Stormwater Master Plan University of Illinois June 2007 Submitted by Clark Dietz, Inc. 1817 S. Neil Street, Suite 100 Champaign, Illinois 61820 Table of Contents Executive Summary Section
More informationMASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS
MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct
More informationNew Tools/Resources for
New Tools/Resources for C.3 Stormwater Compliance Laura Prickett, AICP, EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Outline of Presentation Updated C.3 Handbook Handbook outline
More informationA. Regional Detention Requirements
I. GENERAL DESIGN GUIDELINES A. Full-spectrum detention is provided for all new development, redevelopment or expansion of a site to provide for water quality and flood control detention. B. Detention
More informationErosion & Sediment Control Plan Application Form & Checklist
Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:
More informationGoing Green with the NYS Stormwater Design Standards
Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,
More informationSTORMWATER DEVELOPMENT MANUAL CITY OF HUNTINGTON
STORMWATER DEVELOPMENT MANUAL PREPARED FOR: CITY OF HUNTINGTON September 2005 X:\Fort Wayne Projects\2400\2454.00\Part C\MCM\Construction Site Run off\stormwater Development Manual\Huntington Stormwater
More informationTABLE OF CONTENTS 1 INTRODUCTION...
Drainage Report & Impact Analysis TABLE OF CONTENTS 1 INTRODUCTION.... 1 1.1 PROJECT DESCRIPTION AND LOCATION... 1 1.2 REPORT OBJECTIVES... 2 1.3 DRAINAGE DESIGN CRITERIA... 3 1.4 DRAINAGE DESIGN ASSUMPTIONS...
More informationAttachment 2: Permeable Pavement Design Guidelines
Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,
More information4. CONCEPT PLAN DEVELOPMENT
4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints
More informationPost Construction BMPs
Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases
More informationCRYSTAL LAKE FLOODING STUDY
Project #08223 CRYSTAL LAKE FLOODING STUDY PREPARED FOR: City of Crystal Lake 100 W. Municipal Complex Crystal Lake, Illinois 60039-0597 REVISED MARCH 19, 2009 26575 W. COMMERCE DRIVE, SUITE 601, VOLO,
More informationAssessing Directly Connected Impervious Areas in Residential Subdivisions in Western Sydney, NSW
Assessing Directly Connected Impervious Areas in Residential Subdivisions in Western Sydney, NSW 1, 1 Cardno (APAC South), 203 Pacific Highway St Leonards, 2065. Email: Stephen.Gribble@cardno.com.au Key
More informationBaltimore, MD Lt. Gov. Boyd Rutherford
MODEL STANDARD PLAN FOR POULTRY HOUSE SITE DEVELOPMENT ON MARYLAND S EASTERN SHORE MARCH 2011 1800 Washington Boulevard 410-537-3000 Gov. Larry Hogan Baltimore, MD 21230-1718 800-633-6101 Lt. Gov. Boyd
More informationSITE PLAN REVIEW APPLICATION AND CHECKLIST
SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description
More informationGLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT.
GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT Submitted to: Kuwabara Payne McKenna Blumberg Architects 322 King Street West,
More informationC.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook
C.3 STORMWATER TECHNICAL GUIDANCE Table of Contents Glossary... viii Chapter 1 Introduction/How to Use this Handbook... 1-1 1.1 Purpose of this Handbook... 1-1 1.2 What is the Countywide Program?... 1-2
More informationCITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS
SECTION 10 STREETS CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS 10.1 INTRODUCTION The criteria presented in this section shall be used in the evaluation of the allowable
More informationIMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT
IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT 4.1 Overview Description: Requirements and standards for controlling runoff from development are critical to addressing water quantity and
More informationA. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains
Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure
More informationURWH at various scales
URWH at various scales Training programme on Mainstreaming Sustainable Urban Water Management March 23-26, 2015 Structure of Presentation Surface runoff/ flood management practices to ensure runoff quantity
More informationThree Rivers Park District Administration Center Rain Garden
Three Rivers Park District Administration Center Rain Garden Introduction There are significant changes to the hydrologic regime and nutrient loading following urban and industrial development. The post-development
More informationNeighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL
Neighborhood Drainage Infrastructure Improvements Using Green Initiatives Village of Hinsdale, IL Presentation Agenda Project Overview Goals and Objectives Design Approach Public Coordination Recap Questions
More informationProject Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:
SECTION 1: GENERAL INFORMATION Plan Submission Date: Total Disturbed Acreage: _ Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number: email: SECTION
More informationAppendix I. Checklists
Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747
More informationAppendix B.1. Storm Servicing and Stormwater Management Memorandum
Appendix B.1 Storm Servicing and Stormwater Management AECOM 410 York Street, Citi Plaza 519 673 0510 tel London, ON, Canada N6A 6K2 519 673 5975 fax www.aecom.com DRAFT To Doug Law (City of London) Page
More informationGREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA
1 GREATER NEW HAVEN WPCA GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN Tom Sgroi, P.E. Director of Engineering, GNHWPCA Bruce Kirkland, P.E. Senior Engineer, GNHWPCA 2 1975 GREEN INFRASTRUCTURE BACKGROUND
More informationGrass Buffer T-1. Description. Site Selection. Designing for Maintenance
Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration
More information