MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

Size: px
Start display at page:

Download "MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)"

Transcription

1 National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax: MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies Kelly Carey, Project Administrator DATE: October 18, 2016 SUBJECT: NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 27 Members Eligible to Vote 4 Members Not Returned (Burrus, Donovan, Jacobs, Martin) 10 Members Voted Affirmative on All Revisions 4 Members Voted Affirmative with Comment on one or more Revisions (Bellamy, Bush, Gauvin, Smith) 8 Members Voted Negative on one or more Revisions (Bush, Derr, Frable, Freels, Gauvin, Humble, Rice, Smith) 1 Member Abstained on one or more Revisions (Aaby) The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each revision. To pass ballot, each revision requires: (1) a simple majority of those eligible to vote and (2) an affirmative vote of 2 /3 of ballots returned. See Sections (c) and of the Regulations Governing the Development of NFPA Standards.

2 NFPA 101 TC ON MERCANTILE AND BUSINESS OCCUPANCIES SECOND DRAFT BALLOT FINAL RESULTS For Simple majority and also two third majority election; the simple affirmative votes needed are 14 and the two third affirmative votes needed are 16 SR 6501, Detail, See SR 6501 Affirmative 20 Negative 3 David W. Frable I cannot support this public comment that requires a risk analysis be performed to determine the need for a mass notification system in all new business occupancies strictly based on when a fire alarm system is required to be installed. This comment goes well beyond the intent for determining which buildings and/or structures are deemed at a higher than normal risk of being subjected to acts characterized as terrorist threats that warrant a mass notification system. No technical justification or cited events have been provided to justify this threshold trigger for requiring a risk analysis. In addition, this public comment seems contrary to the direction the Technical Committee took on Second Revision No. SR 6502 which also requires a risk analysis to be completed in a business occupancy. Lastly, the public comment is contrary to the direction the Technical Committee on Fundamentals proposed in Chapter 11 regarding what threshold triggers a risk analysis for a mass notification system in a high rise building. The threshold used for a high rise building was based on NFPA 5000, Section and its annex material when it discusses associated events that have a comparable impact on a building and its occupancy and when a risk assessment may be appropriate for buildings at risk. To strictly base requiring a risk assessment based on when a fire alarm system is required is not reasonable, appropriate, or cost effective to determine a building at risk. Page 1 of 20

3 Kevin L. Derr The justification for the need of a risk assessment is based on emergency events other than fire. The primary events referenced were threats to homeland security, i.e. terrorism. The ability to provide occupants real time emergency communication during these types of events has been cited as a key benefit. However, the requirements, as written, do not provide definitive requirements and will be difficult to enforce. For example, what is the role of the AHJ? Are they required to review and approve a risk assessment? The requirement for mass notification systems should be definitive and/or more owner driven. An annex section would be more appropriate for this revision. Sarah A. Rice We are putting in a requirement for a risk analysis to be done that is more restrictive that what is required for a high rise building. SR 6502, Detail, See SR 6502 Affirmative 18 Negative 4 Kenneth E. Bush This provision could be interpreted to require a risk analysis to determine the need for a mass notification system without establishing the need for a building fire alarm system. There are no specifications on the nature, sizes, or intended uses of classrooms which would trigger this requirement. In addition, the ownership of a building is many times difficult to determine, particularly where there are multiple or temporary tenant spaces available. Page 2 of 20

4 David W. Frable Sarah A. Rice Kevin L. Derr Agree with negative comment submitted by Mr. Bush. In addition, the Technical Committee statement does not address the proposed comment appropriately. The points made in the negative ballots are valid. The justification for the need of a risk assessment is based on emergency events other than fire. The primary events referenced were threats to homeland security, i.e. terrorism. The ability to provide occupants real time emergency communication during these types of events has been cited as a key benefit. However, the requirements, as written, do not provide definitive requirements and will be difficult to enforce. For example, what is the role of the AHJ? Are they required to review and approve a risk assessment? The requirement for mass notification systems should be definitive and/or more owner driven. An annex section would be more appropriate for this revision. Abstain 1 Mark J. Aaby In accordance with the policy of the Standards Council, I have abstained from voting on the item. SR 5502, New Section after , See SR 5502 Affirmative 16 Negative 7 Page 3 of 20

5 Kenneth E. Bush Although the presence of grab bars at showers and tubs may be a reasonable requirement for overall occupant safety, and while it is understood that the Scope of the Life Safety Code has been expanded to address additional occupant safety measures, these requirements should not be a part of this document. It is beyond the scope of the responsibility of fire officials to inspect and approve the installation of this type of protection. In addition, the consideration of these spaces as part of the required means of egress introduces a number of issues; to include adequacy of headroom, the levelness and slip resistance of walking surfaces, the operation of tub and shower opening protectives to include swinging and sliding doors and curtains, latches and locking devices installed for security measures, and levels of illumination, that are not regulated by current Code provisions. These issues are of particular importance where curbs or sides are installed to control the spread of water during normal operations, and where the installation of grab bars or poles could be considered as an obstruction to egress travel or reduction to required egress capacity. The limited application to this occupancy precludes the introduction of these restrictions to the Code. David W. Frable While I acknowledge there may be a need for such protective devices, I am not convinced that these devices should be regulated by the fire code official who may be responsible for enforcing this Code. I am also concerned with the introduction of this material into the Chapter regarding Means of Egress and with associating these devices to a means of protection along the egress path since there are other requirements associated with this portion of the egress path, such as floor levels (including stepping over the edges of tubs and shower curbs), which is not addressed. Jonathan Humble James B. Smith Please see attached pdf file titled "NFPA MER Second Revision AISI Negative" Even though I understand the safety which is gained by the installation of these types of grab bars, I do not feel the provisions are best located in the mercantile egress section of a code which should be about fire safety. Page 4 of 20

6 Douglas R. Freels Kevin L. Derr The installation of grab bars for bath tubs and showers should not be a mandatory requirement of the LSC. The submitter has provided a substantial amount of information with regards to the accident rates of bathroom use. However, the installation of grab bars is not an issue that should be addressed in the Life Safety Code. Requirements for grab bars for bathrooms would more appropriate be located in Chapter 12 of NFPA 5000 and the referenced ADAAG and ANSI A Sarah A. Rice I agree with the comments made in the negative ballots, the requirement for the inclusion of grab bars are issues that belong in a plumbing code, not in a life safety code. SR 5503, New Section after , See SR 5503 Affirmative 17 Negative 6 Page 5 of 20

7 Kenneth E. Bush Although the presence of grab bars at showers and tubs may be a reasonable requirement for overall occupant safety, and while it is understood that the Scope of the Life Safety Code has been expanded to address additional occupant safety measures, these requirements should not be a part of this document. It is beyond the scope of the responsibility of fire officials to inspect and approve the installation of this type of protection. In addition, the consideration of these spaces as part of the required means of egress introduces a number of issues; to include adequacy of headroom, the levelness and slip resistance of walking surfaces, the operation of tub and shower opening protectives to include swinging and sliding doors and curtains, latches and locking devices installed for security measures, and levels of illumination, that are not regulated by current Code provisions. These issues are of particular importance where curbs or sides are installed to control the spread of water during normal operations, and where the installation of grab bars or poles could be considered as an obstruction to egress travel or reduction to required egress capacity. The limited application to this occupancy precludes the introduction of these restrictions to the Code. David W. Frable Jonathan Humble While I acknowledge there may be a need for such protective devices, I am not convinced that these devices should be regulated by the fire code official who may be responsible for enforcing this Code. I am also concerned with the introduction of this material into the Chapter regarding Means of Egress and with associating these devices to a means of protection along the egress path since there are other requirements associated with this portion of the egress path, such as floor levels (including stepping over the edges of tubs and shower curbs), which is not addressed. Please see attached pdf file titled "NFPA MER Second Revision AISI Negative" Page 6 of 20

8 Kevin L. Derr James B. Smith Sarah A. Rice The submitter has provided a substantial amount of information with regards to the accident rates of bathroom use. However, the installation of grab bars is not an issue that should be addressed in the Life Safety Code. Requirements for grab bars for bathrooms would more appropriate be located in Chapter 12 of NFPA 5000 and the referenced ADAAG and ANSI A Even though I understand the safety which is gained by the installation of these types of grab bars, I do not feel the provisions are best located in the business egress section of a code which should be about fire safety. I agree with the comments made in the negative ballots, the requirement for the inclusion of grab bars are issues that belong in a plumbing code, not in a life safety code. SR 5511, Section No , See SR 5511 Affirmative 22 Affirmative with Comment 1 Kenneth E. Bush Further explanation may be necessary to clarify the intent that the measurement of solid wall areas defining mall concourse perimeters could also include storefront openings to tenant spaces within the mall that are defined by gates or other devices that are not of solid construction. SR 5512, Section No , See SR 5512 Page 7 of 20

9 SR 5513, Section No , See SR 5513 SR 5514, Section No , See SR 5514 SR 5519, Section No , See SR 5519 Page 8 of 20

10 SR 5515, Section No , See SR 5515 Affirmative 22 Affirmative with Comment 1 Daniel J. Gauvin The term "Approved" should also be added to (2) for correlation and consistency. SR 5509, New Section after , See SR 5509 Affirmative 20 Negative 3 David W. Frable I agree with the negative comments submitted by Mr. Derr and Ms. Rice. Page 9 of 20

11 Kevin L. Derr Sarah A. Rice The justification for the need of a risk assessment is based on emergency events other than fire. The primary events referenced were threats to homeland security, i.e. terrorism. The ability to provide occupants real time emergency communication during these types of events has been cited as a key benefit. However, the requirements, as written, do not provide definitive requirements and will be difficult to enforce. For example, what is the role of the AHJ? Are they required to review and approve a risk assessment? The requirement for mass notification systems should be definitive and/or more owner driven. An annex section would be more appropriate for this revision. Consistent with my ballot to NFPA 5000, after consideration on this topic I do not believe that an acrossthe board requirement for a risk analysis is warranted for all mall structures. As there is no minimum size associated with a mall structure, this would be requirement for mall structures of any size big or small. I do not believe a risk analysis is warranted for small mall structures. SR 5516, Section No , See SR 5516 SR 5517, Section No , See SR 5517 Page 10 of 20

12 Affirmative 22 Affirmative with Comment 1 Daniel J. Gauvin Compliance with 8.6.7(6) should also be required. For correlation, this would also apply to NFPA 5000 Section SR 5518, Section No , See SR 5518 Affirmative 22 Affirmative with Comment 1 James B. Smith Although I am agreeing with the pointers to Section 9.7, I feel there will be less confusion if the provision said "... where required by Section 9.7" instead of "... in accordance with Section 9.7". SR 5520, Section No , See SR 5520 Affirmative 22 Affirmative with Comment 1 Page 11 of 20

13 Kenneth E. Bush Further explanation may be necessary to clarify the intent that the measurement of solid wall areas defining mall concourse perimeters could also include storefront openings to tenant spaces within the mall that are defined by gates or other devices that are not of solid construction. SR 5521, Section No , See SR 5521 SR 5522, Section No , See SR 5522 SR 5523, Section No , See SR 5523 Page 12 of 20

14 SR 5524, Section No , See SR 5524 SR 5525, Section No , See SR 5525 SR 5526, Section No , See SR 5526 Page 13 of 20

15 Affirmative 22 Affirmative with Comment 1 James B. Smith Although I am agreeing with the pointer to Section 9.7, I feel there will be less confusion if the provision said "... where required by Section 9.7" instead of "... in accordance with Section 9.7". SR 5507, New Section after , See SR 5507 Affirmative 19 Affirmative with Comment 1 Tracey D. Bellamy While I agree with the concept of allowing for use of a locking mechanism for protection of building occupants against an unwanted intruder, I see the provisions of the proposed section as possibly being misapplied to require that all doors be provided with a external key or other means to release the door. Many exterior doors on buildings are intentionally designed to have no external key to enhance the intrusion security of the building. Additionally internal doors are sometimes installed in the same manner to provide the occupant with a level of assurance that the space they are occupying is secure against unwanted entry by other who have a key. Such spaces might include a private restroom or other space where the occupant desires the additional level of security during use. I believe there is a benefit to allowing occupants to enhance their protection during situations that involve imminent danger but have concerns that this section will be misapplied to require entry provisions to all doors. Negative 3 Page 14 of 20

16 Kenneth E. Bush David W. Frable Kevin L. Derr This provision seems to be unnecessary for new construction. Adequate locking means are available and have been demonstrated to be capable of providing adequate security measures for new installations. The installation of additional locking hardware introduces an additional level of hazard to the use of required means of egress. I agree with negative comments submitted by Messrs. Bush and Derr. The requirements included in this revision are redundant to requirements currently contained in Chapter 7, specifically sections , , and Additionally, the need to be able to unlock the door from outside the room should not be mandated as part of the Life Safety Code. The Life Safety Code currently would permit this approach in a business occupancy and the business chapters should not restrict design options to security designers. SR 5510, New Section after , See SR 5510 Affirmative 19 Negative 3 Kenneth E. Bush David W. Frable Kevin L. Derr Abstain 1 Mark J. Aaby This Annex Note would not be needed if this paragraph is not accepted as a part of the Code requirements. See response to SR See response to SR 6502 In accordance with the policy of the Standards Council, I have abstained from voting on the item. Page 15 of 20

17 SR 5504, Section No , See SR 5504 Affirmative 22 Affirmative with Comment 1 Daniel J. Gauvin The requirement for Integrated System ("end to end") Testing should not be limited to High Rise buildings. Regardless of the building size, where integrated systems are required to provide life safety functions, periodic testing is required to verify these systems operate as intended. Not verifying the functionality and interoperability of integrated life safety systems is a catastrophe waiting to happen. SR 5508, New Section after , See SR 5508 Affirmative 18 Affirmative with Comment 2 Page 16 of 20

18 Tracey D. Bellamy Kenneth E. Bush Negative 3 David W. Frable Kevin L. Derr Sarah A. Rice While I agree with the concept of allowing for use of a locking mechanism for protection of building occupants against an unwanted intruder, I see the provisions of the proposed section as possibly being misapplied to require that all doors be provided with a external key or other means to release the door. Many exterior doors on buildings are intentionally designed to have no external key to enhance the intrusion security of the building. Additionally internal doors are sometimes installed in the same manner to provide the occupant with a level of assurance that the space they are occupying is secure against unwanted entry by other who have a key. Such spaces might include a private restroom or other space where the occupant desires the additional level of security during use. I believe there is a benefit to allowing occupants to enhance their protection during situations that involve imminent danger but have concerns that this section will be misapplied to require entry provisions to all doors. These provisions represent reasonable restrictions to secure adequate security measures for existing doors where conditions prevent modifications to existing doors and hardware. I have issues with item #4 in the list regarding existing doors hardware does exist, and could be used, that allows two locking mechanisms/devices with one releasing action. The requirements included in this revision are redundant to requirements currently contained in Chapter 7, specifically sections , , and Additionally, the need to be able to unlock the door from outside the room should not be mandated as part of the Life Safety Code. The Life Safety Code currently would permit this approach in a business occupancy and the business chapters should not restrict design options to security designers. As demonstrated by the negative ballots, the language proposed to regulate these devices is not fully developed and leaves too many items to interpretation. Page 17 of 20

19 SR 5506, New Section after , See SR 5506 SR 5505, New Section after , See SR 5505 Affirmative 21 Affirmative with Comment 1 Daniel J. Gauvin The requirement for Integrated System ("end to end") Testing should not be limited to High Rise buildings. Regardless of the building size, where integrated systems are required to provide life safety functions, periodic testing is required to verify these systems operate as intended. Not verifying the functionality and interoperability of integrated life safety systems is a catastrophe waiting to happen. Negative 1 Page 18 of 20

20 Kevin L. Derr The adoption of the proposed change will require unnecessary paperwork or approvals from the AHJ for the elimination of the requirement for an integrated test plan that is not needed for typical business occupancies. Acceptance testing, including documentation for complicated systems, is currently covered in other documents, including and not limited to, NFPA 10, NFPA 25, NFPA 72, NFPA 92, NFPA 101, NFPA 110 and the elevator code. The adoption of NFPA 4, if determined appropriate, would more appropriately be located in Chapter 9, Building Service and Fire Protection Equipment or Chapter 11, Special Structures and High Rise Buildings and not in the individual occupancy chapters. SR 5527, Section No , See SR 5527 Affirmative 22 Negative 1 Daniel J. Gauvin The requirement for Integrated System ("end to end") Testing should not be limited to High Rise buildings. Regardless of the building size, where integrated systems are required to provide life safety functions, periodic testing is required to verify these systems operate as intended. Not verifying the functionality and interoperability of integrated life safety systems is a catastrophe waiting to happen. Page 19 of 20

21 NFPA 101 MER (Mercantile and Business Occ.) Committee Input Nos. 175 and 176 Second Revision Nos and 5503 (Grab bars for showers and bath tubs) American Iron and Steel Institute 9/29/2016 Negative Ballot We are submitting a negative ballot for the following reasons: The purpose of NFPA 101 is limited The scope of the proposals is outside of the purpose The purpose of NFPA 101 is limited: Section 1.2 states: 1.2* Purpose. The purpose of this Code is to provide minimum requirements, with due regard to function, for the design, operation, and maintenance of buildings and structures for safety to life from fire. Its provisions will also aid life safety in similar emergencies. The Annex material for Section 1.2 further states: A.1.2 The Code endeavors to avoid requirements that might involve unreasonable hardships or unnecessary inconvenience or interference with the normal use and occupancy of a building but provides for fire safety consistent with the public interest. Protection of occupants is achieved by the combination of prevention, protection, egress, and other features, with due regard to the capabilities and reliability of the features involved. The level of life safety from fire is defined through requirements directed at the following: (1) Prevention of ignition (2) Detection of fire (3) Control of fire development (4) Confinement of the effects of fire (5) Extinguishment of fire (6) Provision of refuge or evacuation facilities, or both (7) Staff reaction (8) Provision of fire safety information to occupants The scope of the proposal is outside of the purpose: It is our view that the proposal to incorporate requirements for grab-bars in shower and bath tub areas is a safety issue, however we do not believe that this is part of life safety from fire principal of NFPA 101. (END) NFPA Second Revision 5502 and /29/2016 Page 1 Page 20 of 20

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Residential Occupancies Kelly

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Building Service and

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical self-closing device

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

MEMORANDUM. Technical Committee on Fundamentals of Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Fundamentals of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Fundamentals of Fire Alarm

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

Circulation Report for SIG-TMS Comments Document # 72

Circulation Report for SIG-TMS Comments Document # 72 1 72-12 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 209 ) 72-13 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 234 ) 72-15

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M (AMENDMENT) TO: FROM: Technical Committee on Mercantile

More information

MEMORANDUM. NFPA Technical Committee on Fundamentals of Fire Alarm and Signaling Systems (SIG- FUN)

MEMORANDUM. NFPA Technical Committee on Fundamentals of Fire Alarm and Signaling Systems (SIG- FUN) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fundamentals of Fire

More information

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Testing and Maintenance

More information

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Pumps Patti

More information

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Correlating Committee on Signaling Systems for

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Correlating Committee on Combustible Dusts Susan

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Portable Fire Extinguishers

More information

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Wood and Cellulosic

More information

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Residential Sprinkler Systems

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Residential Sprinkler Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Residential

More information

NFPA Technical Committee on Fire Tests

NFPA Technical Committee on Fire Tests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Tracy

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Road Tunnel and Highway

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 2 FROM: Kimberly Shea, Administrator,

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 43 10/20/2015 4:02 PM First Revision No. 2035-NFPA 101-2015 [ Global Input ] To 14.3.4.4.1, add an item (4) to read: (4) Carbon monoxide detectors shall be installed centrally located within occupiable

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR7040 SAF-MER (36.1.1.4) 36.1.1.4 The provisions of this chapter shall apply to life safety requirements for all new mercantile buildings. Specific requirements shall apply to suboccupancy groups,

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Technical Committee on Fundamentals of Fire

More information

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification First Correlating Revision No. 3-NFPA 101-2016 [ Section No. 6.1.8.1.1 ] 6.1.8.1.1* Definition One- and Two-Family Dwelling Unit. A building that contains not more than two dwelling units, with independent

More information

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases Committee on 51A M E M O R A N D U M To: From: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant Date: June 14, 2010 Subject: NFPA 51A ROC Letter Ballot Circulation

More information

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Emergency Power Supplies Kelly

More information

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Notification Appliances for

More information

Diane D. Matthews, Administrator, Technical Projects. The September 19, 2013 date for receipt of the NFPA 5000 Second Draft Ballot has passed.

Diane D. Matthews, Administrator, Technical Projects. The September 19, 2013 date for receipt of the NFPA 5000 Second Draft Ballot has passed. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: Technical Committee on Fire Protection Features Diane D. Matthews,

More information

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333 Paul Cabot Administrator National Fuel Gas Ms. Gabriella Davis Recording Secretary, IAPMO Standards Council International Association of Plumbing and Mechanical Officials (IAPMO) IAPMO Group World Headquarters

More information

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Alternative Approaches to

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

January 1, 2014 Mandatory Effective Date

January 1, 2014 Mandatory Effective Date 2013 Kentucky Building Code Highlights Winnie Blythe, Technical Advisor Dept. of Housing, Buildings, and Construction winnie.blythe@ky.gov www.dhbc.ky.gov 502-573-0373 January 1, 2014 Mandatory Effective

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

1. Revise , from what was done by Second Revision SR-95 (Annual 2014 revision cycle NFPA 101 Second Draft), to read as follows:

1. Revise , from what was done by Second Revision SR-95 (Annual 2014 revision cycle NFPA 101 Second Draft), to read as follows: NFPA 101 -Proposed 2015 Edition Life Safety Code TIA Log No. 1130 Reference: 12.4.1, 13.4.1, A.12.4.1, and A.13.4.1 Comment Closing Date: April 18, 2014 Submitter: Jeffrey Tubbs, Arup and Michael DiMascio,

More information

Narrative Reports As Regulated by 780 CMR, Section 903.0

Narrative Reports As Regulated by 780 CMR, Section 903.0 EXHIBIT 20 Narrative Reports As Regulated by 780 CMR, Section 903.0 903.1.1 - FIRE PROTECTION CONSTRUCTION DOCUMENTS a. Basis (methodology) of design for the protection of the occupancy and hazard for

More information

Center for Life Safety Education

Center for Life Safety Education Center for Life Safety Education Fire Sprinklers 101 Introduction, Building Codes, and Water Supplies Reprinted with permission from NFPA 13, Installation of Sprinkler Systems, Copyright 2007, National

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

Report to Adhoc Health Code change proposal regarding locking arrangements From John Woestman, BMHA

Report to Adhoc Health Code change proposal regarding locking arrangements From John Woestman, BMHA Report to Adhoc Health Code change proposal regarding locking arrangements From John Woestman, BMHA This report is provided for information only. BMHA is not asking for Adhoc Health Care to sponser as

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda]) FINAL MINUTES Healthcare Interpretations Task Force Tuesday, June 15, 2016 Mandalay Bay Convention Center South Convention Center, Level 2 Room Surf F Las Vegas, NV 1. Call to Order. The meeting was called

More information

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Pyrotechnics Elena Carroll,

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 47 10/21/2015 9:37 AM First Revision No. 5041-NFPA 101-2015 [ Global Input ] Throughout the document, change electrically controlled egress door assemblies to door hardware-release of electrically locked

More information

Why Selective Coordination is Mandatory -- It Fills the Reliability Hole --

Why Selective Coordination is Mandatory -- It Fills the Reliability Hole -- Why Selective Coordination is Mandatory -- It Fills the Reliability Hole -- The NEC has mandatory selective coordination requirements for the following systems. Emergency Systems- Article 700 700.27 Legally

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Technical Committee on Testing and Maintenance

More information

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting.

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. Input No. 7-NFPA 80-2013 [ Section No. 3.3.8 ] 3.3.8 Automatic Fire Detector. A device designed to detect the presence of a fire signature and to initiate action. For the purpose of this standard, automatic

More information

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018) M EM O RA N D UM TO: FROM: DATE: SUBJECT: Correlating Committee on Combustible Dusts Yiu Lee, Project Administrator January 27, 2017 NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

More information

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Supervising Station

More information

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Code Kelly Carey,

More information

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED MEETING MINUTES NFPA Correlating Committee on Safety to Life (SAF-AAC) November 7, 2013 Second Draft Meeting Embassy Suites Atlanta Hartsfield Airport Hotel Atlanta, GA 1. Call to Order. The meeting was

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

MNEC NFPA 72 WHITE PAPER

MNEC NFPA 72 WHITE PAPER MNEC NFPA 72 WHITE PAPER In 2010, the National Fire Protection Assocation (NFPA), significantly changed their code # 72 (National Fire Alarm Code) and has forever improved the importance of communicating

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Construction

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

The Technical Committee on Commissioning and Integrated Testing

The Technical Committee on Commissioning and Integrated Testing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: The Technical Committee on Commissioning and Integrated Testing

More information

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Residential

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: March 18, 2010 SUBJECT: NFPA 1 A2011 ROP Letter Ballot

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT The interaction of fire protection systems can be extremely complex. The detection of a fire in a building by an automatic device

More information

This was a Second Revision that has been modified or deleted as the result of Second Correlating Revision: SCR-60-NFPA

This was a Second Revision that has been modified or deleted as the result of Second Correlating Revision: SCR-60-NFPA of 78 12/9/2016 11:32 AM Committee Comment No. 6501-NFPA 101-2016 [ Detail ] This was a Second Revision that has been modified or deleted as the result of Second Correlating Revision: SCR-60-NFPA 101-2016

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY, AND ENVIRONMENT-RELATED CONVENTIONS

UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY, AND ENVIRONMENT-RELATED CONVENTIONS E SUB-COMMITTEE ON SHIP SYSTEMS AND EQUIPMENT 5th session Agenda item 12 SSE 5/12/4 4 January 2018 Original: ENGLISH UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY, AND ENVIRONMENT-RELATED

More information

Technical Committee on Electrical Equipment Evaluation. ROC Meeting Agenda September 28-29, 2010 Providence, RI

Technical Committee on Electrical Equipment Evaluation. ROC Meeting Agenda September 28-29, 2010 Providence, RI Technical Committee on Electrical Equipment Evaluation ROC Meeting Agenda September 28-29, 2010 Providence, RI Item 10-09-1 Call to Order Item 10-09-2 Introductions Item 10-09-3 Staff Remarks Item 10-09-4

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION STATE OF LOUISIANA Department of Public Safety and Corrections Office of State Fire Marshal Code Enforcement and Building Safety 8181 Independence Boulevard Baton Rouge, Louisiana 70806 225-925-4920 H

More information

The Technical Committee on Fire Service Training

The Technical Committee on Fire Service Training National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: The Technical Committee on Fire Service Training Stacey Van

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

MEMORANDUM. NFPA Technical Correlating Committee on Building Code. NFPA 5000 TCC Report on Proposals Letter Ballot (A2011)

MEMORANDUM. NFPA Technical Correlating Committee on Building Code. NFPA 5000 TCC Report on Proposals Letter Ballot (A2011) MEMORANDUM TO: FROM: NFPA Technical Correlating Committee on Building Code Robert Solomon DATE: April 1, 2010 SUBJ: NFPA 5000 TCC Report on Proposals Letter Ballot (A2011) In accordance with the NFPA Regulations

More information

TECHNICAL COMMITTEE ON STANDPIPES

TECHNICAL COMMITTEE ON STANDPIPES TECHNICAL COMMITTEE ON STANDPIPES MEMORANDUM TO: FROM: Technical Committee on Standpipes Elena Carroll, Administrator, Technical Projects DATE: February 28, 2012 SUBJECT: Letter Ballot on NITMAM to NFPA

More information

SPRINKLER PROTECTION OF COMBUSTIBLE CONCEALLED SPACES WITH LESS THAN 6 BETWEEN OPPOSITE FACES IN CAVITY.

SPRINKLER PROTECTION OF COMBUSTIBLE CONCEALLED SPACES WITH LESS THAN 6 BETWEEN OPPOSITE FACES IN CAVITY. STATE OF LOUISIANA DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS OFFICE OF STATE FIRE MARSHAL CODE ENFORCEMENT AND BUILDING SAFETY 8181 INDEPENDENCE BOULEVARD, BATON ROUGE, LA 70806 800-256-5452 225-925-4920

More information

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities Fire Alarm and Signaling Code Overview NFPA 72-2010 usa.siemens.com/infrastructure-cities Siemens Building Technologies, Inc. is a Registered Provider with The American Institute of Architects Continuing

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

MEMORANDUM. NFPA 99 Second Draft Correlating Committee FINAL Ballot Results (A2017)

MEMORANDUM. NFPA 99 Second Draft Correlating Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Correlating Committee on Health Care Facilities Elena

More information

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL RULES AND REGULATIONS CONCERNING 8 CCR 1507-57 BUILDING AND FIRE CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR LIMITED GAMING

More information

M E M O R A N D U M. All Licensed Assisted Living Facilities. Felicia Cooper, Deputy State Fire Marshal Administrator Don Zeringue, Chief Architect

M E M O R A N D U M. All Licensed Assisted Living Facilities. Felicia Cooper, Deputy State Fire Marshal Administrator Don Zeringue, Chief Architect M E M O R A N D U M To: From: Approved: All Licensed Assisted Living Facilities Felicia Cooper, Deputy State Fire Marshal Administrator Don Zeringue, Chief Architect Henry Fry, Deputy Assistant Secretary

More information

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle)

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Telecommunications

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21

SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21 SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21 ARTICLE I FIRE PREVENTION CODE 21-1. Statutory authority 21-2. Adoption of standards 21-3. Definitions 21-4. Exceptions to Fire Prevention Code

More information

TAC: Fire. Total Mods for Fire in Approved as Submitted: 1. Total Mods for report: Glitch. Fire. Page 2 of 8. 27/06/2013 Page 2 of 8

TAC: Fire. Total Mods for Fire in Approved as Submitted: 1. Total Mods for report: Glitch. Fire. Page 2 of 8. 27/06/2013 Page 2 of 8 Page 1 of 8 Proposed Code Modifications Glitch Modifications This document created by the Florida Department of Business and Professional Regulation - 850-487-1824 27/06/2013 Page 1 of 8 Total Mods for

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Sprinkler System

More information

Field Guide for Healthcare Facilities

Field Guide for Healthcare Facilities Field Guide for Healthcare Facilities Jennifer L. Frecker James K. Lathrop Written by industry experts Jennifer L. Frecker and James K. Lathrop and using an easy-to-digest format, The New Life Safety Code

More information

Amend Base Code. Amend Base Code. Amend Base Code. Disposition. (Statute, Rule, FBC, Industry) Y/N

Amend Base Code. Amend Base Code. Amend Base Code. Disposition. (Statute, Rule, FBC, Industry) Y/N Code Reference NFPA 101 1.1.1.2 (2009 1.1.1.1 (2012 1.1.7 (New) 1.3.1.1 Florida Specific Amendment Anytime a reference is made to NFPA 1 or NFPA 101 within this Code, it shall be the Florida specific version

More information

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE California Society for Healthcare Engineering SOUTHERN CALIFORNIA SEMINAR LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE 1 PROGRAM AGENDA Adoption of 2012 LSC CMS Final Rule / Amendments

More information

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER 0780-02-14 FIRE EXTINGUISHERS TABLE OF CONTENTS 0780-02-14-.01 Definitions 0780-02-14-.09 Restrictions 0780-02-14-.02 Standards

More information

Standards Council Meeting AGENDA. Hotel Mazarin 730 Bienville Street New Orleans, LA (504) April 10-11, 2018

Standards Council Meeting AGENDA. Hotel Mazarin 730 Bienville Street New Orleans, LA (504) April 10-11, 2018 Standards Council Meeting AGENDA Hotel Mazarin 730 Bienville Street New Orleans, LA 70130 (504) 581-7300 April 10-11, 2018 18-4-1 Act on the issuance of proposed Tentative Interim Amendment (TIA) to revise

More information