1 F Operating Manual ESS0460-H119 PV Module Solar Soaking Chamber 12/19/2008

2 Thank you for your purchase. We are confident you will be completely satisfied with your new system. If for any reason you need assistance, please contact us: EYE Lighting International / Iwasaki Electric 9150 Hendricks Road Mentor, OH support@eyeappliedoptics.com In order to operate this system properly and prevent potential problems, please read the following operation instructions. Table of Contents 1. System Components 2. Installation 3. Control Panel 4. System Operation 5. Solar Lamps 6. Irradiation Intensity Control 7. Troubleshooting

3 1. System Components: 1 Solar Lighting Array Housing (60) 400W solar lamp array 2 Solar Lamp Power / Inverter Cabinet includes (5) inverter units (12 modules per unit; one module per lamp) and solar lamp starters (60 units; one starter per lamp) 3 Operation Control Panel control and failure alert 4 Main Power Breaker 3 phase main power switch for system 5 Solar Light Chamber Shields roll down curtains to shield excess light from work area 6 Solar Irradiation Chamber 7 Cooling Air Ducts dual axial blowers direct air over PV panels under test 8 PV Panel Support Trays interchangeable; (4) separate frames for standard thin-film modules (60cm x 120cm) and (4) free-format frames for all other size PV modules; trays provide for easy insertion of PV panels and allow cooling air to flow above and below panels

4 2. Installation A. When installing this chamber, please avoid placing it in any area where corrosive gas or explosive gas is present. It is also highly recommended that the area be as dust free as possible with controlled humidity. B. The chamber should be placed as close to the mains power source (power transformer) and mains breaker as possible. C. Due to the heat generated by the solar array, keep flammable materials away from the top of the chamber. D. Please refer to the following diagrams to ensure proper clearance around the chamber for proper operation and maintenance / inspection 600mm (24 in) 600mm (24 in) Rear Top 600mm Side 600mm 600mm Side 600mm (24 i ) Overhead View (24 i ) (24 i ) Frontal View (24 i ) This spacing is required for proper operation and routine inspection / maintenance Electrical / Power Characteristics System Power: 3 Ø; 208V AC; 60Hz; 35kVA (approximately 100 A) Cooling Blower Fans: 0.75 kw 2 units Solar Lamps: 208V; 400W 60 lamps Irradiation Power Control: 1500W solar lamp control circuit (approximately 3 A) Mains Power Connection: 3 Ø; 4 wire; RED, WHITE, BLACK power phase connections and GREEN ground connection; single phase solar lamp circuits are equally divided to balance the power over all three phases. To protect against unbalanced or open phase power failures, the system uses a voltage detecting (APR-S) phase reversal power breaker. Red White Black Chamber Power Connections Mains Power Normal electrical connection. If system does not function it may be due to phase connection mismatch with (APR-S) breaker. Please reconnect mains power as illustrated below. Alternative connections Red White Black Green Red White Black Electrical safety is provided through a dedicated earth connection. It is vital to ensure that the system is connected to earth ground. Chamber Power Connections Mains Power Alternative mains power phase connections. Red White Black Green

5 3. Control Panel MAIN POWER INDICATOR LAMP Indicator lamp will illuminate when the Main Power Breaker is ON and power is supplied to the system 2 IRRADIATION AREA ZONE SWITCHES The solar array is arranged in 5 zones of 12 lamps each. Each zone is controlled independently and energized by its associated button. When a zone is energized, its switch is illuminated. NOTE: cooling fans must be turned on prior to switching solar zones on. The solar array zone switches will not function until the cooling fans are turned on. 3 CUMULATIVE OPERATION HOUR METERS A separate meter is assigned to each zone and records the cumulative operation hours for the lamps in that zone. Recording the lamp operating time is extremely beneficial for preventative maintenance. If less than all zones are often used for particular test applications, please try to periodically move the PV panels within the chamber to equalize the operating time across all zones. 4 TEST OPERATION HOUR CONTROLLER This counter timer provides the capability to program a desired test duration in hours and minutes. To initiate the test, press the TEST START button. At the conclusion of the test, the lamps will automatically turn off. The cooling fans will continue to run for ten (10) minutes after test shutdown, at which time the fans will automatically turn off.

6 5 TEST START SWITCH This button initiates the programmed test period. When initiated, this switch will be illuminated. At the conclusion of the programmed test time, the alarm buzzer will sound and the solar lamps will be turned off. The buzzer will turn off automatically after one (1) minute or you can turn the buzzer off manually by pressing the buzzer stop switch. 6 TROUBLE (SYSTEM FAILURE) INDICATOR LAMP If a system error occurs, the system will automatically shut down, the TROUBLE lamp will be illuminated and the alarm buzzer will sound. Under some error conditions the solar lamps will immediately shut off but the cooling fans will continue to operate for ten (10) minutes. Defined failure modes include: Power Failure phase / power abnormality; APR-S breaker may trip off; lamps and fans will shut down Fan (TH1, TH2) Failure cooling fan failure or thermal protection shutdown; fans and lamps will shut down System Overheat system chamber temperature exceeds default setting of 100 ºC; lamps will shut down, fans will continue to operate Irradiation Power Over-limit irradiation control circuit maximum voltage (10.4V) exceeded; lamps will shut down, fans will continue to operate Solar Lamp / Array Failure lamp or inverter failure; lamps will shut down, LAMP FAILURE light will be illuminated, fans will continue to operate 7 LAMP FAILURE INDICATOR LAMP When a solar lamp circuit failure is detected, this indicator lamp will be illuminated and the alarm buzzer will sound. Cause of failure could be the lamp, inverter, starter, or wiring defect. Solar lamps will shut down but fan will continue for 10 minutes. 8 COOLING FAN SWITCH This switch initiates the cooling fans and the switch will be illuminated. Pressing the switch again will turn the cooling fans off. At completion of a programmed test period, the switch indicator lamp will flash on and off and the fans will continue to operate for ten (10) minutes. The fans can be manually stopped at any time during this period by pressing this switch. NOTE: cooling fans must be turned on prior to switching solar zones on. The solar array zone switches will not function until the cooling fans are turned on. 9 BUZZER STOP SWITCH The system alarm buzzer will sound due to the completion of a programmed test period or because of a system error. This switch allows you to manually turn the buzzer off. 10 EMERGENCY STOP SWITCH Pressing this switch will immediately shut down the lamps and cooling fans. It will also initiate the system alarm buzzer. The switch will remain latched in the OFF position until manually released. After corrective measures have been performed, the emergency stop switch is released and reset by turning the switch clockwise. 11 IRRADIATION POWER (DIMMING) CONTROLLER This controller adjusts the solar array lamp power. The digital indicator displays the controller voltage (0 10V). It provides the capability to adjust the solar array output from 1000W/m 2 to 800W/m 2. Additionally, as the solar lamps age the lamp power can be increased, if required, to maintain an average 1000W/m 2. NOTE: controller voltage may not exceed 10.4V.

7 4. System Operation Full Chamber Manual Operation a) Ensure main power breaker is ON (Main Power Lamp will be illuminated). b) Turn cooling fans ON (solar array lamps will not function until fans are turned on). c) Turn on solar array by pressing LIGHTING AREA ZONE switches 1-5 sequentially. Allow ten (10) minutes for solar lamps to reach full power and spectrum stabilization. d) At completion of test, turn off solar array by pressing LIGHTING AREA ZONE switches 1-5 sequentially. e) Turn cooling fan OFF f) Turn OFF Main Power Breaker if desired. Programmed Test Operation a) Follow steps a) c) above. b) Program desired test duration time in hours and minutes on the TEST OPERATION HOUR controller. c) Initiate test by pressing TEST START switch d) At completion of test, solar array will automatically shut down, alarm buzzer will sound, cooling fans will continue to operate for ten (10) minutes and cooling fan switch lamp will flash. e) Cooling fans may be turned OFF by pressing the COOLING FAN switch. f) Turn OFF Main Power Breaker if desired. Partial Chamber Operation a) Follow steps a) and b) from Full Chamber Manual Operation section above. b) Turn on solar array segment by pressing the desired LIGHTING AREA ZONE switches 1-5 sequentially. Allow ten (10) minutes for solar lamps to reach full power and spectrum stabilization. To ensure minimum IEC class C uniformity over entire target irradiation area please observe the following guidelines: For QUARTER chamber (650mm x 650mm) target irradiation area, place PV panel(s) in chamber at far left (facing chamber) side and turn on LIGHTING AREA ZONE switches 1-3 sequentially. For HALF chamber (650mm x 1300mm) target irradiation area, place PV panel(s) in chamber starting at far left (facing chamber) side and turn on LIGHTING AREA ZONE switches 1-4 sequentially. Refer to Irradiation Intensity Distribution profiles in Section 2 of this manual for specific details c) If programmed test is desired, follow steps b) f) from Programmed Test Operation section above. d) If manual test is desired, follow steps d) f) from Full Chamber Manual Operation section above. 5. Solar Lamps A. Please allow ten (10) minutes after initial startup for solar lamps to reach full power and spectrum stabilization. B. If solar array has been in operation and is shut down (hot re-start), please allow about 20 minutes to re-start lamps and for solar lamps to reach full power and spectrum stabilization. C. For preventative maintenance, the solar lamp life is specified at 3,000 hours of operation. Although the lamps will typically last much longer, the lamp life is specified to ensure irradiation output and spectrum remain within required IEC class C specifications.

8 6. Irradiation Intensity Control The system irradiation intensity was set to an average 1000W/m 2 (+/-15%; class C uniformity) at the time of installation. This intensity distribution test is included in Section 3 of this manual. We recommend that the irradiation intensity is verified approximately every 500 hours of operation or once per month. To adjust the irradiation intensity, please follow the steps below. a) Refer to initial installation irradiation intensity distribution diagram included in Section 3 of this manual. b) Select at least two (2) distributed test locations from distribution grid (these positions are marked by tape on the bottom of the chamber roller shelf). c) Turn on full solar array and allow at least ten (10) minutes for the lamps to stabilize. d) Place a full spectrum pyranometer on the first of these selected positions and measure irradiation intensity, then repeat at the second selected position. e) Compare these measurements against the initial installation irradiation intensity measurements, if the difference is more than five (5) percent it is recommended that a full 18 point irradiation intensity grid measurement is performed. This will provide the minimum irradiation intensity point and allow the calculation of the average irradiation intensity and full target uniformity. f) If the minimum irradiation intensity is below 850W/m 2 the irradiation intensity power should be adjusted using the DIMMING CONTROL calibrated dial. This circuit outputs a 0-10V signal that controls the power output (0V = Max power; 10V = Min power). A typical value for a new installation (set to 1000W/m 2 ) will be approximately 4.2V. g) Place the pyranometer at the minimum measured irradiation intensity grid point and ensure the reading is stable. Adjust the controller voltage lower while reading the intensity level from the pyranometer (allow sufficient time after any adjustment for the intensity level to stabilize). h) Adjust the power such that the intensity level is increased to a value between W/m 2. i) Re-measure the full 18 point grid irradiation intensity and re-calculate the Max, Min, and Average values to ensure they are within specification. If, for a particular application, you desire to reduce the average irradiation intensity to a value lower than 1000W/m2 (such as 850W/m2), please follow steps g) i) above and adjust the power output proportionally to the desired average irradiation intensity level. NOTE: To ensure solar lamp irradiation and spectrum stability, the average irradiation intensity (power output) should not be reduced below 800W/m 2.

9 7. Troubleshooting Cooling Problem Blower Lamp Probable Cause Action Phase Error X X Temporarily power phase interruption or wiring error. Check power connections and mains power breakers. Re-set breakers and power on system. If error still exists, ensure balanced Emergency Stop Cooling Fan Overload X X Emergency Stop switch has been activated and is still latched in the STOP position. X X Thermal relay or abnormal current error from cooling fan motor. 208V 3 phase power is being supplied to system. If power input and connections are correct, please contact EYE Lighting technical support. Reset the Emergency Stop switch by rotating switch clockwise. Power on system and ensure there are no system errors (power, lamps, fans, etc.). Troubleshoot any specific failures that are identified. If no failure mode is identified by control circuits, please contact EYE Lighting technical support. Ensure there are no obstructions restricting rotation of fan blowers. Rotate shaft and check for deformation, abnormal noise, or binding. If no problems are identified, please contact EYE Lighting technical support. Overheat Continues for 10 X Occurs when the chamber temperature Check the chamber temperature reading at the control panel to ensure minutes after exceeds the maximum allowable an overheat condition does not exist. If the temperature reading is occurrence of temperature (set at the factory to 100 below 100 ºC, troubleshoot the thermocouple controller. If the failure ºC). This is continuously measured by a temperature reading is above 100 ºC, ensure the cooling fans are type K thermocouple located near the operating correctly. If fans are operating properly, please contact EYE top of the chamber. Lighting technical support. Lamp Failure Continues for 10 X Lamp failure to start, or failure during From a cold start, a solar lamp should start within approximately 40 Detection minutes after operation. Starter failure at startup. seconds. If a lamp does not start within this timeframe, the LAMP occurrence of FAILURE indicator lamp will be illuminated and the system will shut failure down. Replace the affected lamp and try to re-start system. If lamp still doesn't start, troubleshoot the lamp starter (Power/Control cabinet) and wiring from starter to lamp socket. If no problems are identified, please contact EYE Lighting technical support. Abnormal Continues for 10 X Solar lamp output power (DIMMING Irradiation intensity modulated voltage control (DIMMING CONTROL) Voltage minutes after CONTROL) set beyond maximum limit. must be set between 0V - 10V. Re-set irradiation intensity and re-start Limit occurrence of system. If failure persists, please contact EYE Lighting technical failure support. NOTE: X = System component will cease operation immediately on failure

LABORATORY OVENS MODELS INCLUDE: TO-152G & TOH-152G TO-152F & TO-235F DEHYDRATING OVENS MODELS INCLUDE: TD-150F TD-330F TD-500F

LABORATORY OVENS MODELS INCLUDE: TO-152G & TOH-152G TO-152F & TO-235F DEHYDRATING OVENS MODELS INCLUDE: TD-150F TD-330F TD-500F 0 LABORATORY OVENS MODELS INCLUDE: TO-152G & TOH-152G TO-152F & TO-235F DEHYDRATING OVENS MODELS INCLUDE: TD-150F TD-330F TD-500F WITH WEST 6100 CONTROL 1 IMPORTANT INFORMATION This manual contains operating

More information

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL EBAC MODEL CD425 (1018110) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL Ebac Industrial Products 704 Middle Ground Boulevard Newport News, VA 23606 Tel: 757 873 6800 Fax: 757 873 3632 Website: www.ebacusa.com

More information

VACUUM OVEN. Model: VPX9-2. Installation and Operation Manual

VACUUM OVEN. Model: VPX9-2. Installation and Operation Manual VACUUM OVEN Model: VPX9-2 Installation and Operation Manual Sheldon Manufacturing, Inc. P.O. Box 627, 300 N 26 th Avenue, Cornelius, Oregon 97113 EMAIL: tech @ Shellab.com; www.shellab.com 1-800-322-4897

More information

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL EBAC MODEL CD425 (1018110) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL Ebac Industrial Products, Inc. 700 Thimble Shoals Blvd, Suite 109 Newport News, VA. 23606-2575 Tel: (757) 873 6800 Fax: (757) 873 3632

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL MICROPROCESSOR CONTROLLED OVEN MODELS: CE3F & CE5F 11/11 4861579 INSTALLATION AND OPERATION MANUAL Sheldon Manufacturing Inc. P.O. Box 627 Cornelius, Oregon 97113 EMAIL: tech@shellab.com INTERNET: http://www.shellab.com/~shellab

More information

Equipment specifications (D6)

Equipment specifications (D6) Equipment specifications (D6) This report has been produced for the Cyprus Research Promotion Foundation in fulfilment of deliverable number D6 of the project Advanced Photovoltaics Research and Testing

More information

NOTICE . SAFE SERVICING PRACTICES. Electric Wall Oven with Electronic Oven Control

NOTICE . SAFE SERVICING PRACTICES. Electric Wall Oven with Electronic Oven Control SERVICE DATA SHEET 318047418 (0504) Rev. A Electric Wall Oven with Electronic Oven Control NOTICE This service data sheet is intended for use by persons having electrical and mechanical training and a

More information

FOR SERVICE TECHNICIAN S USE ONLY

FOR SERVICE TECHNICIAN S USE ONLY FOR SERVICE TECHNICIAN S USE ONLY NOTE: This sheet contains important Technical Service Data. Tech Sheet Do Not Remove Or Destroy DANGER Electrical Shock Hazard Only authorized technicians should perform

More information

HT-2 / 9600 Series Control Contents

HT-2 / 9600 Series Control Contents HT-2 / 9600 Series Control Contents Tools & Parts Tools Required Parts Required Error Messages 3 Flashing Dots Pressure or Flow Switch Not Activated Pressure or Flow Switch Activated Temperature Sensor

More information

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY Bousquet Technologies Inc. 2121, Nobel, Ste Julie, Quebec, Canada, J3E1Z9 SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL Oil-Fired air heater for industrial and commercial use. FOR YOUR SAFETY Do not

More information

INCUBATORS MODELS: 1525, 1535, 1545, 1555, 1565 GENERAL PURPOSE INCUBATORS INSTALLATION AND OPERATION MANUAL

INCUBATORS MODELS: 1525, 1535, 1545, 1555, 1565 GENERAL PURPOSE INCUBATORS INSTALLATION AND OPERATION MANUAL INCUBATORS MODELS: 1525, 1535, 1545, 1555, 1565 GENERAL PURPOSE INCUBATORS INSTALLATION AND OPERATION MANUAL These units are UL listed general purpose air incubators for professional, industrial or educational

More information

Figure 1-1 Furnace Front Elevation

Figure 1-1 Furnace Front Elevation FURNACE EQUIPMENT 1.1 Furnace Description The LA-306 is a compact, near-infrared, conveyor belt furnace for laboratory and general purpose thermal processing in the range of 100-980 ⁰C in a controlled

More information

Refrigerated Incubator Model and Operating Instructions

Refrigerated Incubator Model and Operating Instructions Refrigerated Incubator Model 165000 and 165000-2 Operating Instructions N2400379 - Rev. 1 08May2018 1 Contents 1. SAFETY...3 1.1. EMF INTERFERENCE...4 1. PRODUCT INFORMATION...5 1.1 INTRODUCTION...5 2.

More information

BUILT-IN OVEN MODEL: EBO-D7080D(SS) Owner s Manual Please read this manual carefully before operating your set. Retain it for future reference.

BUILT-IN OVEN MODEL: EBO-D7080D(SS) Owner s Manual Please read this manual carefully before operating your set. Retain it for future reference. BUILT-IN OVEN MODEL: EBO-D7080D(SS) Owner s Manual Please read this manual carefully before operating your set. Retain it for future reference. Record model number and serial number of the set. See the

More information

User Manual 120/240/300 Outdoor Motion Detector

User Manual 120/240/300 Outdoor Motion Detector User Manual 120/240/300 Outdoor Motion Detector Swiss Garde 4000 Warning! - Any work on the main power supply must only be completed by trained specialists. - The product must be installed in accordance

More information

INSTRUCTIONS FOR THD-U SERIES HOT AIR MATERIAL DRYERS

INSTRUCTIONS FOR THD-U SERIES HOT AIR MATERIAL DRYERS INSTRUCTIONS FOR THD-U SERIES HOT AIR MATERIAL DRYERS Copyright Plastic Process Equipment, Inc 2015 Our PPE Material Dryers are a PPE exclusive only available from PPE. Do not confuse these with any other

More information

AHPO-6/18 GOLD PROOFER OVEN

AHPO-6/18 GOLD PROOFER OVEN AHPO-6/18 GOLD PROOFER OVEN For information or technical assistance, call: TOLL FREE 1(800) 735-DUKE (3853) or 1(314) 231-1130 PN 156081R 1 of 25 TABLE OF CONTENTS MANUFACTURER S INTRODUCTION...3 INSTALLATION...4

More information

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA 99336 www.jmcvr.com 1-509-586-9893 Table of Contents TABLE OF FIGURES...1 OVERVIEW OF THE HRC CAPABILITIES...2 INSTALLATION AND

More information

Operational Overview and Controls Guide

Operational Overview and Controls Guide DOCUMENT: ECSEQ2-2 EFFECTIVE: 02/26/10 SUPERSEDES: 02/14/07 Operational Overview and Controls Guide Standard Two or Three Pump Type VFD Booster Controls 6700 Best Friend Road. Norcross, GA 30071. (770)

More information

OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE)

OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE) OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE) Suitable for indoor or outdoor installation / Unvented / Unattended Type 26 Benfield

More information

FOR SERVICE TECHNICIAN S USE ONLY

FOR SERVICE TECHNICIAN S USE ONLY F SERVICE TECHNICIAN S USE ONLY NOTE: This sheet contains important Technical Service Data. Tech Sheet Do Not Remove Or Destroy DANGER Electrical Shock Hazard Only authorized technicians should perform

More information

Shaking Hot Tubs. Orbital / Reciprocating Shaking Water Bath Liter 115V S 28 Liter 115V Liter 230V

Shaking Hot Tubs. Orbital / Reciprocating Shaking Water Bath Liter 115V S 28 Liter 115V Liter 230V Shaking Hot Tubs Orbital / Reciprocating Shaking Water Bath 290400 28 Liter 115V 290400S 28 Liter 115V 290400-2 28 Liter 230V Operating Instructions 1 Table of Contents 1. Safety..3 2. Getting Started

More information

Indirect gas-fired air heater

Indirect gas-fired air heater Indirect gas-fired air heater SERIES HD INSTALLATION AND SERVICE MANUAL MANUFACTURED BY : BROTHERS LIMITED WARNING Improper installation, modification, adjustment or maintenance may cause damage, injury

More information

SERVICE MANUAL VC3ED FULL SIZE ELECTRIC CONVECTION OVEN - NOTICE -

SERVICE MANUAL VC3ED FULL SIZE ELECTRIC CONVECTION OVEN - NOTICE - SERVICE MANUAL VC3ED FULL SIZE ELECTRIC CONVECTION OVEN VC3ED ML-137013 - NOTICE - This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used by those not properly

More information

Installation and Operation Manual

Installation and Operation Manual SENTRY Protect Plus QUADPLEX PANEL Installation and Operation Manual For Hardwired Pumps Environment e Corporation Table of Contents 1 Overview...3 2 Sentry Protect Plus Quadplex Menu Flowchart...4 3 Wiring

More information

Chapter 8 Troubleshooting

Chapter 8 Troubleshooting Chapter 8 Troubleshooting This chapter explains equipment trouble and how to remedy it. When trouble is detected by one of the self-check features, the trouble is displayed on the instrumentation panel

More information

Chapter 8 Troubleshooting

Chapter 8 Troubleshooting Chapter 8 Troubleshooting This chapter explains equipment trouble and how to remedy it. When trouble is detected by one of the self-check features, the trouble is displayed on the instrumentation panel

More information

FOR SERVICE TECHNICIAN S USE ONLY

FOR SERVICE TECHNICIAN S USE ONLY F SERVICE TECHICIA S USE OY TE: This sheet contains important Technical Service Data. Tech Sheet Do ot Remove Or Destroy DAGER Electrical Shock Hazard Only authorized technicians should perform diagnostic

More information

E25 CONVECTION OVEN E25MS CONVECTION OVEN SERVICE MANUAL

E25 CONVECTION OVEN E25MS CONVECTION OVEN SERVICE MANUAL E25 CONVECTION OVEN E25MS CONVECTION OVEN SERVICE MANUAL E25 Convection Oven -- WARNING: ALL INSTALLATION AND SERVICE REPAIR WORK MUST BE CARRIED OUT BY QUALIFIED PERSONS ONLY. E25 Convection Oven -2-

More information

EBAC MODEL WM150 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

EBAC MODEL WM150 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL EBAC MODEL WM150 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL WM150 OWNERS MANUAL Page 1 of 9 INTRODUCTION Designed for a wide range of applications, the WM150 is a rugged, industrial unit, which utilizes an

More information

OPERATING INSTRUCTIONS MANUAL FLE-60 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE)

OPERATING INSTRUCTIONS MANUAL FLE-60 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE) OPERATING INSTRUCTIONS MANUAL FLE-60 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE) Suitable for indoor or outdoor installation / Unvented / Unattended Type 26 Benfield

More information

LABORATORY ILLUMINATED FLOTATION BATH

LABORATORY ILLUMINATED FLOTATION BATH LABORATORY ILLUMINATED FLOTATION BATH MODELS INCLUDE: TFB-1 Thermoline Scientific Equipment Pty. Ltd. ABN 80 000 859 129 10-12 Ross Place Wetherill Park NSW 2164. P.O. Box 6862 Wetherill Park DC NSW 1851

More information

Part 3 Troubleshooting

Part 3 Troubleshooting Part Troubleshooting What is in this part? This part contains the following chapters: Chapter See page Troubleshooting 2 Error Codes: Hydro-box 7 Error Codes: Outdoor Units Error Codes: System Malfunctions

More information

MD-MINI Dry Bath. Instruction Manual

MD-MINI Dry Bath. Instruction Manual MD-MINI Dry Bath Instruction Manual Catalog No. MD-MINI www.majorsci.com service@majorsci.com Version 01B Revision on: 2013.07.15 Packing list MD-MINI: 1x MD-MINI Dry Bath 1x MD-MINI Lid 1x Power Cord

More information

HORIZONTAL MULTISTAGE CENTRIFUGAL PUMP

HORIZONTAL MULTISTAGE CENTRIFUGAL PUMP HORIZONTAL MULTISTAGE CENTRIFUGAL PUMP WWPPCHLFT260 Instructions WWPPCHLFT260_Horizontal Multistage Centrifugal Pump_IB.indd 1 READ THIS MANUAL CAREFULL BEFORE INSTALL, START THE PUMP 1. Suction 2. Plug

More information

Bench Series Ovens Models 21 / 31 / 51 Operating Manual

Bench Series Ovens Models 21 / 31 / 51 Operating Manual Heat cycle HEATER SWITCH RECIRC. FAN Quincy Lab, Inc. Bench Series Ovens Models 21 / 31 / 51 Operating Manual Standard Contents (1) Bench Series Oven (2) Adjustable chrome wire shelf (4) Shelf brackets

More information

SERVICE INSTRUCTION. DYNAMIC COOLING with 0 zone REFRIGERATION. Fridge/freezer with. Publication number

SERVICE INSTRUCTION. DYNAMIC COOLING with 0 zone REFRIGERATION. Fridge/freezer with. Publication number SERVICE INSTRUCTION REFRIGERATION DISTRIPARTS AB BOX 501 S-562 80 NORRAHAMMAR Phone 036-31 80 00 Telefax 036-31 81 10 Telefax 036-31 80 88 Publication number 599 51 96-71 Rev. 04-04-20 SV/SERVICE DT/MA/AN

More information

Reacti-Therm I and III Heating Modules

Reacti-Therm I and III Heating Modules INSTRUCTIONS Reacti-Therm I and III Heating Modules TS-18822 TS-18824 Number TS-18822 TS-18824 Description Reacti-Therm I Heating Module (single block) Reacti-Therm III Heating Module (triple block) 2101.1

More information

Fisher Scientific Isotemp Muffle Furnace 550 Series. Instruction Manual

Fisher Scientific Isotemp Muffle Furnace 550 Series. Instruction Manual Fisher Scientific Isotemp Muffle Furnace 550 Series Instruction Manual Model 14 Catalog No: 10-550-14 & 14A Model 58 Catalog No: 10-550-58 Model 126 Catalog No: 10-550-126 Service Division (Repairs):

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL REACH-IN DRY CO 2 INCUBATOR SCO31 SCO31-2 SCO40 SCO41-2 PREVIOUSLY DESIGNATED AS 2428 2428-2 2440 2440-2 Revised 12/2013 4861504 INSTALLATION AND OPERATION MANUAL Sheldon Manufacturing Inc. P.O. Box 627

More information

SSV-DC user manual. Phason

SSV-DC user manual. Phason Phason SSV-DC user manual The SSV-DC has a 0 to 10 VDC signal output and a disconnect relay that allows you to easily and effectively control up to 10 variable frequency drives, slave units, modulating

More information

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION AIR SERIES SYSTEM INSTALLATION MANUAL CONTENTS CONSIDERATIONS General Plumbing Component Connection 2 2 2 ILLUSTRATION Control System 3 CONFIGURATION Voltage Verification 4 CONNECTION Component Connection

More information

BUILT-IN OVEN MODEL: EBO-E7081D(SS) Owner s Manual Please read this manual carefully before operating your set. Retain it for future reference.

BUILT-IN OVEN MODEL: EBO-E7081D(SS) Owner s Manual Please read this manual carefully before operating your set. Retain it for future reference. BUILT-IN OVEN MODEL: EBO-E7081D(SS) Owner s Manual Please read this manual carefully before operating your set. Retain it for future reference. Record model number and serial number of the set. See the

More information

DRI-AIR INDUSTRIES, INC. HA750B B HOT AIR DRYER OPERATING MANUAL

DRI-AIR INDUSTRIES, INC. HA750B B HOT AIR DRYER OPERATING MANUAL HA750B - 1500B HOT AIR DRYER OPERATING MANUAL Page 1 DRI-AIR INDUSTRIES, INC. 16 THOMPSON ROAD P.O. BOX 1020 EAST WINDSOR, CT 06088-1020 Tel. (860) 627-5110 FAX (860) 623-4477 Internet http://www.dri-air.com

More information

OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE)

OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE) OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE) Suitable for indoor or outdoor installation / Unvented / Unattended Type 26 Benfield

More information

Motion Sensor Oscillating Heater with Digital Control

Motion Sensor Oscillating Heater with Digital Control Motion Sensor Oscillating Heater with Digital Control 33553 Part# NFE20C INSTRUCTION MANUAL Please Read And Save These Instructions 1 IMPORTANT SAFETY INSTRUCTIONS Please read these instructions carefully

More information

Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro

Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro 2006/01 Content Important Information 1. Notes... 3 1.1 CE - Labeling... 3 1.2

More information

Reacti-Therm I and III Heating/Stirring Modules

Reacti-Therm I and III Heating/Stirring Modules INSTRUCTIONS Reacti-Therm I and III Heating/Stirring Modules TS-18821 TS-18823 Number TS-18821 TS-18823 Description Reacti-Therm I Heating/Stirring Module (single block) Reacti-Therm III Heating/Stirring

More information

User Manual HEAT RECOVERY VENTILATORS 1000 HE HE HE HE HE HE COMPACT 5585 COMPACT READ AND SAVE THESE INSTRUCTIONS.

User Manual HEAT RECOVERY VENTILATORS 1000 HE HE HE HE HE HE COMPACT 5585 COMPACT READ AND SAVE THESE INSTRUCTIONS. User Manual HEAT RECOVERY VENTILATORS MODELS: 1000 HE HE 1.3 2000 HE HE 1.8 3000 HE HE 2.6 3055 COMPACT 5585 COMPACT VB0021 READ AND SAVE THESE INSTRUCTIONS. VVI, 550 Lemire Blvd., Drummondville, QC, Canada

More information

TTT Digital Incubator

TTT Digital Incubator TTT Digital Incubator 135000 135000-2 Operating Instructions N2400342 Rev. 1 08/13 Table of Contents 1.0 Safety... 3 2.0 Intended Use of Product... 4 3.0 Installation... 4 3.1 Unpacking the Unit... 4 3.2

More information

smart mounting Induction Heater IH 070/090 Bedienungsanleitung Instructions for use Mode d emploi Manuale d istruzioni Manual de instrucciones

smart mounting Induction Heater IH 070/090 Bedienungsanleitung Instructions for use Mode d emploi Manuale d istruzioni Manual de instrucciones Induction Heater IH 070/090 Bedienungsanleitung Instructions for use Mode d emploi Manuale d istruzioni Manual de instrucciones 2 Induktionsheizgerät IH 070/090 simatec ag Table of contents EU Declaration

More information

SERVICE MANUAL REFRIGERATION

SERVICE MANUAL REFRIGERATION SERVICE MANUAL REFRIGERATION ELECTROLUX HOME PRODUCTS S.p.A. Publication no. Spares Operations Italy 599 37 75-07 Corso Lino Zanussi, 30 060824 I - 33080 PORCIA / PN (ITALY) ITZ/SERVICE/AA Fax +39 0434

More information

3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL

3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL 3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL EFFECTIVE JULY 30, 2014 Superseding All Previous Parts Lists. The Company reserves the right to make substitution in the event that items specified

More information

RFD OVEN SERIES WITH PROTOCOL 3 TM CONTROLLER OWNER S MANUAL C-250 PN VERSION 1 11/2012

RFD OVEN SERIES WITH PROTOCOL 3 TM CONTROLLER OWNER S MANUAL C-250 PN VERSION 1 11/2012 RFD OVEN SERIES WITH PROTOCOL 3 TM CONTROLLER OWNER S MANUAL C-250 PN 320253 VERSION 1 11/2012 PREFACE RFD Oven Series Owner s Manual 2 Version 1 Revision History Revision Date Author Description 1 11/2012

More information

Operation Manual. (Version 1.5.1)

Operation Manual. (Version 1.5.1) VWR symphony TM Gravity Convection General Incubator Operation Manual (Version 1.5.1) VWR symphony Gravity Convection General Incubator 414004-610, 414004-612, 414004-614, 414004-616 414004-611, 414004-613,

More information

Induction Fryer. Instruction manual. Model Modèle Modell Modello Modelo Malli: CP793

Induction Fryer. Instruction manual. Model Modèle Modell Modello Modelo Malli: CP793 Induction Fryer Instruction manual Model Modèle Modell Modello Modelo Malli: CP793 UK Safety Tips Position on a flat, stable surface. A service agent/qualified technician should carry out installation

More information

SERVICE MANUAL MULTI DECK 60 HOT MERCHANDISER MULTI DECK 100 HOT MERCHANDISER MULTI DECK 120 HOT MERCHANDISER CLASSIC DECK HOT MERCHANDISER

SERVICE MANUAL MULTI DECK 60 HOT MERCHANDISER MULTI DECK 100 HOT MERCHANDISER MULTI DECK 120 HOT MERCHANDISER CLASSIC DECK HOT MERCHANDISER SERVICE MANUAL MULTI DECK 60 HOT MERCHANDISER MULTI DECK 100 HOT MERCHANDISER MULTI DECK 120 HOT MERCHANDISER CLASSIC DECK HOT MERCHANDISER Classic Deck Hot Multi Deck 60 Multi Deck 100 Multi Deck 120

More information

Freeze Protection Thermostat TRACON MODEL GPT 3 Installation and Operation Manual

Freeze Protection Thermostat TRACON MODEL GPT 3 Installation and Operation Manual MANUAL We manage heat Freeze Protection Thermostat TRACON MODEL GPT 3 Installation and Operation Manual Environmental Technology, Inc. 1850 N Sheridan Street South Bend, Indiana 46628 http://www.networketi.com/

More information

YCIV Hz & Hz

YCIV Hz & Hz YCIV 0590-1500 50Hz & 0157-0397 60Hz Start-up Checklist SERVICE POLICY & PROCEDURES Supersedes: Nothing Form 201.23-CL1 (309) Commissioning PREPARATION Commissioning of this unit should only be carried

More information

Products documentation (REVISION DATE: 03/10/2011) OMFP6010 (60cm PIROLITIC OVEN)

Products documentation (REVISION DATE: 03/10/2011) OMFP6010 (60cm PIROLITIC OVEN) Products documentation (REVISION DATE: 03/10/2011) OMFP6010 (60cm PIROLITIC OVEN) Ovens Service Manual Models OMFP6010 CONTENTS This document has been published to be used for service only. The contents

More information

E32M CONVECTION OVEN SERVICE MANUAL. Revision 1/F

E32M CONVECTION OVEN SERVICE MANUAL. Revision 1/F E32M CONVECTION OVEN SERVICE MANUAL -- WARNING: ALL INSTALLATION AND SERVICE REPAIR WORK MUST BE CARRIED OUT BY QUALIFIED PERSONS ONLY. -2- CONTENTS This manual is designed to take a more in depth look

More information

REACH-IN INCUBATOR MODEL: RI28/RI40 2/ INSTALLATION AND OPERATIONAL MANUAL

REACH-IN INCUBATOR MODEL: RI28/RI40 2/ INSTALLATION AND OPERATIONAL MANUAL REACH-IN INCUBATOR MODEL: RI28/RI40 2/13 4861573-1 INSTALLATION AND OPERATIONAL MANUAL Sheldon Manufacturing Inc. P.O. Box 627 Cornelius, Oregon 97113 EMAIL: tech@shellab.com INTERNET: http://www.shellab.com/~shellab

More information

FS Series Forced Air Ovens. Operation and Service Manual

FS Series Forced Air Ovens. Operation and Service Manual FS Series Forced Air Ovens Operation and Service Manual TestEquity LLC 6100 Condor Drive Moorpark, CA 93021 Support: 877-512-3457 Toll Free 805-480-0638 Corporate: 800-732-3457 805-498-9933 http://www.testequity.com

More information

Spa Touch Control Panel with BP2100, BP6013 spa controllers. (Spa Owner s Manual insert)

Spa Touch Control Panel with BP2100, BP6013 spa controllers. (Spa Owner s Manual insert) Spa Touch Control Panel with BP2100, BP6013 spa controllers. (Spa Owner s Manual insert) P.N. 7876C (export) February 12, 2015 For Spas equipped with BP2100, BP6013 controllers and Spa Touch panel. Spa

More information

U-CLASS SPA SYSTEMS. Dealer TechBook by Gecko Alliance. Technical Specifications, Programming, Installation & User's Instructions!

U-CLASS SPA SYSTEMS. Dealer TechBook by Gecko Alliance. Technical Specifications, Programming, Installation & User's Instructions! U-CLASS SPA SYSTEMS Dealer TechBook by Gecko Alliance Technical Specifications, Programming, Installation & User's Instructions! UC-CF TABLE OF CONTENTS Specifications 2 Description System features Electrical

More information

KQ Series. Multistage Booster Pump System. Installation Manual. ISO 9001 Certified KQ200/400 KQ800

KQ Series. Multistage Booster Pump System. Installation Manual. ISO 9001 Certified KQ200/400 KQ800 KQ Series Multistage Booster Pump System Installation Manual KQ200/400 KQ800 ISO 9001 Certified Description The KQ series booster pump is an all-in-one compact and reliable automatic multistage centrifugal

More information

DRI-AIR INDUSTRIES, INC. ARID-X10C FLOOR MOUNT DRYER OPERATING MANUAL

DRI-AIR INDUSTRIES, INC. ARID-X10C FLOOR MOUNT DRYER OPERATING MANUAL ARID-X10C FLOOR MOUNT DRYER OPERATING MANUAL Page 1 DRI-AIR INDUSTRIES, INC. 16 THOMPSON ROAD P.O. BOX 1020 EAST WINDSOR, CT 06088-1020 Tel. (860) 627-5110 FAX (860) 623-4477 Internet http://www.dri-air.com

More information

Ceramic Oscillating Heater. Instruction Booklet KCE95

Ceramic Oscillating Heater. Instruction Booklet KCE95 Kambrook - Australia Building 2, Port Air Industrial Estate 1A Hale Street Botany NSW 2019 Australia Customer Service Line 1300 139 798 Customer Service Fax 1800 621 337 www.kambrook.com.au Kambrook -

More information

Service Manual Model 3163

Service Manual Model 3163 Service Manual Model 3163 Contents Important Safety Information.......... 1 Specifications.................. 2 General Information.............. 2 Direct Vent Requirements........... 2 Propane System................

More information

Package Contents. Dry Block Heater Power Cord Instruction manual Warranty Card. Serial Number: Date of Purchase: Supplier: Table of Contents

Package Contents. Dry Block Heater Power Cord Instruction manual Warranty Card. Serial Number: Date of Purchase: Supplier: Table of Contents - English... 1 Instruction Manual Analog, Dry Block Heater, 1 Block, HB1AL Analog, Dry Block Heater, 2 Block, HB2AL Analog, Dry Block Heater, 4 Block, HB4AL Analog, Dry Block Heater, 6 Block, HB6AL Digital,

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

LXG-300 Series. Models with LXG-300 Series Instruments

LXG-300 Series. Models with LXG-300 Series Instruments I.O.M. #147 updated : 08/16/2018 INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE LXG-300 Series Models with LXG-300 Series Instruments Model: Serial Number : 525 East Stop 18 Road Greenwood, IN 46142

More information

OWNER S MANUAL HIGH WALL INVERTER. (English) (BSHVD1S SERIES)

OWNER S MANUAL HIGH WALL INVERTER. (English) (BSHVD1S SERIES) OWNER S MANUAL HIGH WALL INVERTER (English) (BSHVD1S SERIES) IMPORTANT As with any product that has moving parts or is subject to wear and tear, it is VERY IMPORTANT that you maintain your air conditioner

More information

Spa Touch Control Panel with 2000, 2100 controllers. (Spa Owner s Manual insert)

Spa Touch Control Panel with 2000, 2100 controllers. (Spa Owner s Manual insert) Spa Touch Control Panel with 2000, 2100 controllers (Spa Owner s Manual insert) P.N. 7876B February 11, 2015 For Spas equipped with BP2000, BP2100 controllers and Spa Touch panel. Spa Touch Control Panel

More information

Speed and Frequency Seite 1 von 7

Speed and Frequency Seite 1 von 7 Speed and Frequency Seite 1 von 7 E16 Systems for High Safety Speed ing, all with Triple Modular Redundancy. A choice of versions to meet various demands. Compliant with SIL3 / IEC 61508 and/or API 670.

More information

SPECIFICATIONS Power Requirements: V, 9.5A, 60Hz V, 5.8A, 50Hz Including 2A for internal convenience outlet.

SPECIFICATIONS Power Requirements: V, 9.5A, 60Hz V, 5.8A, 50Hz Including 2A for internal convenience outlet. StableTemp Low Temperature Incubator Model 146E Catalog Number 39063-00(115VAC) 39063-05(230VAC StableTemp Low Temperature Incubator offers laboratories precise temperature control over the -10 C to 60

More information

Pioneer-R16 Gas Monitor Operator s Manual

Pioneer-R16 Gas Monitor Operator s Manual Pioneer-R16 Gas Monitor Operator s Manual Edition 7/2/97 RKI INSTRUMENTS, INC RKI Instruments, Inc. 33248 Central Ave, Union City, CA 94587 (510) 441-5656 Chapter 1: Description About the Pioneer-R16 Gas

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS GENERAL INDEECO Industrial Control Panels are designed to provide years of trouble free operation if properly

More information

SERVICE MANUAL MULTI DECK 35 HOT MERCHANDISER. Multi Deck 35 Pret a Manger

SERVICE MANUAL MULTI DECK 35 HOT MERCHANDISER. Multi Deck 35 Pret a Manger SERVICE MANUAL MULTI DECK 35 HOT MERCHANDISER Multi Deck 35 Pret a Manger - NOTICE - This manual is prepared for the use of trained Service Technicians and should not be used by those not properly qualified.

More information

Split Portable Air Conditioner

Split Portable Air Conditioner SP-IOM-1 Please read and save this manual. Read carefully before attempting to assemble, install, operate or maintain the product described. Protect yourself and others by observing all safety information.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Loop Alarm Model SC1290 and SCL1290 INSTALLATION INSTRUCTIONS LOVE LOVE CONTROLS a Division of Dwyer Instruments, Incorporated PO Box 338 Michigan City, IN 46361-0338 (800) 828-4588 (219) 879-8000 FAX

More information

ARUBA SUN SERIES - LIGHTING SYSTEM USER MANUAL

ARUBA SUN SERIES - LIGHTING SYSTEM USER MANUAL ARUBA SUN SERIES - LIGHTING SYSTEM USER MANUAL 1 INTRODUCTION Thank you and congratulations for choosing Hamilton products. For over 20 years Hamilton has been providing aquarium lighting and leads the

More information

SERVICE DATA SHEET (9704) Rev. D

SERVICE DATA SHEET (9704) Rev. D SERVICE DATA SHEET 318047401 (9704) Rev. D Electric Wall Ovens with Electronic Oven Control (ERC III - 318010700 & 318010900) NOTICE This service data sheet is intended for use by persons having electrical

More information

OPERATING MANUAL AIR CONDITIONER DUCT TYPE. ART Series KEEP THIS MANUAL FOR FUTURE REFERENCE FUJITSU GENERAL LIMITED P/N

OPERATING MANUAL AIR CONDITIONER DUCT TYPE. ART Series KEEP THIS MANUAL FOR FUTURE REFERENCE FUJITSU GENERAL LIMITED P/N OPERATING MANUAL AIR CONDITIONER DUCT TYPE ART Series KEEP THIS MANUAL FOR FUTURE REFERENCE FUJITSU GENERAL LIMITED P/N9374379293-02 CONTENTS SAFETY PRECAUTIONS... 1 NAME OF PARTS... 2 PREPARATORY OPERATION...

More information

40KMC KMQ

40KMC KMQ 40KMC------301 40KMQ------301 OWNER S MANUAL Split system Global cassette indoor unit IR Remote Control Room Controller Zone Manager The unit can be used with infrared Remote Control, with the Carrier

More information

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps. Issued 2006/08/01 Section 13920 Packaged Fire Pumps and Controllers Page 1 of 7 PART 1 GENERAL 1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1

More information

User Operation Manual

User Operation Manual APPROVED BY: JBJ PRESCIENT III FIRE ALARM & GAS EXTINGUISHING CONTROL PANEL User Operation Manual PAGE 1 of 6 1 CONTENTS 1. FIRE - GENERAL... 3 2. FIRE - ZONES 1 OR 2 - AUTOMATIC MODE... 3 3. FIRE - ZONES

More information

SERVICE Manual FREE JOINT MULTI AIR CONDITIONER

SERVICE Manual FREE JOINT MULTI AIR CONDITIONER FREE JOINT MULTI AIR CONDITIONER INDOOR UNIT MH020FPEA MH023FPEA MH026FPEA MH035FPEA MH052FPEA MH8VP2-09 MH9VP2-07 MH9VP2-2 MH026FKEA MH035FKEA MH052FDEA OUTDOOR UNIT MH8VP2X MH9VP2X MH052FXEA2 MH068FXEA4

More information

Fire Risks and Safety Standards

Fire Risks and Safety Standards Fire Risks and Safety Standards Florian Reil TÜV Rheinland Group Renewable Energies 51105 Cologne, Germany Phone: + 49 221 806 27 94 Email: Florian.Reil@de.tuv.com Workshop BIPV The Increasing Role of

More information

INSTRUCTION MANUAL. Laboratory Equipment Pty Ltd Ph: Fax:

INSTRUCTION MANUAL. Laboratory Equipment Pty Ltd   Ph: Fax: INSTRUCTION MANUAL Laboratory Equipment Pty Ltd email: sales@labec.com.au Ph: 02 9560 2811 Fax: 02 9560 6131 www.labec.com.au 2014 Shaking Water Bath Instruction Manual Model : J-SWB19, J-SWB35, J-SWB60

More information

Compact Ultra Low Temperature Chamber

Compact Ultra Low Temperature Chamber Compact Ultra Low Temperature Chamber MC-712R 812R CAT.NO.E14140-Z1804 High performance and reliability come in a compact package, covers wide range of temperature testing needs, from ultra-low temperature

More information

PR-L2466W- PA. Operating Instructions. High Performance Refrigerator PR-L2466W-PA

PR-L2466W- PA. Operating Instructions. High Performance Refrigerator PR-L2466W-PA Operating Instructions High Performance Refrigerator PR-L2466W- PA PR-L2466W-PA Please read these instructions carefully before using this product, and save this manual for future use. See page 11 for

More information

SUPER HIGH EFFICIENCY WATER HEATERS SUPPLEMENT TO INSTRUCTION MANUAL P/N (Replaces pg. 2 in instruction manual.) CONGRATULATIONS!

SUPER HIGH EFFICIENCY WATER HEATERS SUPPLEMENT TO INSTRUCTION MANUAL P/N (Replaces pg. 2 in instruction manual.) CONGRATULATIONS! SUPER HIGH EFFICIENCY WATER HEATERS SUPPLEMENT TO INSTRUCTION MANUAL P/N 238-44219-00 (Replaces pg. 2 in instruction manual.) CONGRATULATIONS! You have just purchased one of the finest water heaters on

More information

UPRIGHT FREEZER WHS-502FWEW1(E) WHS-502FWEB1(E) WHS-502FWESS1(E)

UPRIGHT FREEZER WHS-502FWEW1(E) WHS-502FWEB1(E) WHS-502FWESS1(E) UPRIGHT FREEZER WHS-502FWEW1(E) WHS-502FWEB1(E) WHS-502FWESS1(E) TABLE OF CONTENTS NAMES OF THE PARTS.2 IMPORTANT SAFETY INSTRUCTIONS..3 INSTALLATION INSTRUCTION BEFORE USING YOUR FREEZER...3 INSTALLING

More information

Operation & Maintenance Manual

Operation & Maintenance Manual Operation & Maintenance Manual for Model 2100 Fire+Smoke systems from Smoke Guard, Inc. 287 N. Maple Grove - Boise, ID 83704 Phone: (800) 574-0330 Fax: (208) 639-7851 E-Mail: info@smokeguard.com Website:

More information

ELECTRIC CONVECTION HEATER WITH FAN AND TIMER

ELECTRIC CONVECTION HEATER WITH FAN AND TIMER ELECTRIC CONVECTION HEATER WITH FAN AND TIMER FOR THE FOLLOWING MODELS: EE-8068 EE-8068R EE-8068W If you have any questions about the operation of your convection heater, please contact Crane Customer

More information

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART # INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #238-39387-00 THIS INSTRUCTION SUPPLEMENT IS ONLY INTENDED TO GIVE INSTALLATION INSTRUCTIONS AND INFORMATION RELATED TO THE INDUCED

More information

Emerson Inspire 1HDEZ Installation Instructions. Thermostat/Interface Equipment Control TROUBLESHOOTING

Emerson Inspire 1HDEZ Installation Instructions. Thermostat/Interface Equipment Control TROUBLESHOOTING Emerson Inspire 1HDEZ-1521 Installation Instructions Thermostat/Interface Equipment Control TROUBLESHOOTING FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL

More information

Operation Manual SCT14B and SCT18B. Inspection. 3 General Description. 3 General Requirements. 3 Standard Features.

Operation Manual SCT14B and SCT18B. Inspection. 3 General Description. 3 General Requirements. 3 Standard Features. Spot Cooling Systems, Inc. 120 Century Drive Suite 00 Carrollton, TX 7006 00-6-776 Operation Manual SCT1B and SCT1B Warning! Improper installation, adjustment, alteration, service, or maintenance can cause

More information

Installation & Operating Guide

Installation & Operating Guide 5-036 HOT WATER TANK Installation & Operating Guide Read all instructions thoroughly. Keep this guide for future reference. Proof of purchase is required for Warranty. Staple receipt or proof of purchase