Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Size: px
Start display at page:

Download "Public Comment No. 7-NFPA 30A-2013 [ Section No ]"

Transcription

1 Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No ] Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide an audible or visible indication restricts or shuts off the flow of product if the piping or a dispenser is leaking. Each leak-detecting device shall be checked and tested at least annually according to the manufacturer's specifications to ensure proper installation and operation. Exception : A leak detection device shall not be required if all piping is visible. File Name 30A_Ralston_6.4.2.docx Description Approved Cover Sheet The wording in this section of the code makes it impossible to comply with. No leak detector installed on the discharge side of the pump provides an audible or visible alarm. Line leak detectors used on remote submersible pumps are not capable of sounding an audible or visible alarm, they use a pressure differential in the piping to either restrict the flow of product to the dispenser (mechanical line leak detectors) or shut off the flow of product (electronic line leak detectors). Submitter Full Name: ALEX RALSTON Organization: PETCON INC Submittal Date: Tue Apr 23 08:30:19 EDT 2013 Committee Rejected but held Resolution: Public Comment No. 7 proposes a change to a paragraph in NFPA 30A that was not amended at the First Draft stage of this revision cycle. To accept this change would effect an amendment to the Code without its having undergone public review and comment. Therefore, in accordance with Paragraphs and of the Regulations Governing the Development of NFPA Standards, the Technical Committee has voted to reject Public Comment No. 7 and hold it for processing as a Public Input at the next document revision cycle.

2 Page 2 of 13 I, ALEX RALSTON, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of By checking this box I affirm that I am ALEX RALSTON, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

3 Page 3 of 13 Public Comment No. 4-NFPA 30A-2013 [ Sections 6.7.1, ] Sections 6.7.1, At attended motor fuel dispensing facilities, the devices or disconnects shall be readily accessible to the attendant and labeled with an approved sign stating EMERGENCY FUEL SHUTOFF At unattended motor fuel dispensing facilities, the devices or disconnects shall be readily accessible to patrons and at least one additional device or disconnect shall be readily accessible to each group of dispensing devices on an individual island. The device(s) or disconnect(s) shall be labeled with an approved sign stating EMERGENCY FUEL SHUTOFF. Shut-offs should be labeled as to their operation so they can be easily identified by attendants and/or patrons that may be required to use them. Submitter Full Name: Doug Hohbein Organization: Northcentral Fire Code Develop Submittal Date: Tue Apr 02 22:00:55 EDT 2013 Committee Rejected but held Resolution: Public Comment No. 4 proposes a change to a paragraph in NFPA 30A that was not amended at the First Draft stage of this revision cycle. To accept this change would effect an amendment to the Code without its having undergone public review and comment. Therefore, in accordance with Paragraphs and of the Regulations Governing the Development of NFPA Standards, the Technical Committee has voted to reject Public Comment No. 4 and hold it for processing as a Public Input at the next document revision cycle.

4 Page 4 of 13 I, Doug Hohbein, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of By checking this box I affirm that I am Doug Hohbein, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

5 Page 5 of 13 Public Comment No. 1-NFPA 30A-2013 [ Section No ] Fixed Fire Protection. Automatic sprinkler protection installed in accordance with the requirements of NFPA 13, Standard for the Installation of Sprinkler Systems, shall be provided in major repair garages, as herein defined, when any of the following conditions exist: (1) The building housing the major repair garage is two or more stories in height (1) levels, including basements, and any one of the floors exceeds 930 m 2 (10,000 ft 2 ) story (1) the aggregate area of all levels combined exceeds ft2. (2) The major repair garage is one (1) level and exceeds 1115 m 2 (12,000 ft 2 ). (2) The major repair garage is servicing vehicles parked in the basement of the building. Subsection 1 should clarify that the requirement applies to the entire building; the entire building does not have to be used as a repair garage to utilize this requirement. The current language of section 1 would allow a large area without sprinkler protection. (Example: 3 story building, 9,000 ft² per floor would not require sprinkler protection) Submitter Full Name: Doug Hohbein Organization: Northcentral Fire Code Develop Submittal Date: Tue Apr 02 21:54:45 EDT 2013

6 Page 6 of 13 Committee Rejected but held Resolution: Public Comment No. 1 proposes a change to a paragraph in NFPA 30A that was not amended at the First Draft stage of this revision cycle. To accept this change would effect an amendment to the Code without its having undergone public review and comment. Therefore, in accordance with Paragraphs and of the Regulations Governing the Development of NFPA Standards, the Technical Committee has voted to reject Public Comment No. 1 and hold it for processing as a Public Input at the next document revision cycle. I, Doug Hohbein, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of By checking this box I affirm that I am Doug Hohbein, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

7 Page 7 of 13 Public Comment No. 2-NFPA 30A-2013 [ New Section after ] * Display of Materials. The storage or placement for display or sale of combustibles shall be prohibited within 20 feet of a fuel dispenser. Display material obstructs the view of the attendant and adds a fuel load that is not needed in the area of the fuel dispensers. Submitter Full Name: Doug Hohbein Organization: Northcentral Fire Code Develop Submittal Date: Tue Apr 02 21:58:08 EDT 2013 Committee Rejected but held Resolution: Public Comment No. 2 proposes a change to a paragraph in NFPA 30A that was not amended at the First Draft stage of this revision cycle. To accept this change would effect an amendment to the Code without its having undergone public review and comment. Therefore, in accordance with Paragraphs and of the Regulations Governing the Development of NFPA Standards, the Technical Committee has voted to reject Public Comment No. 2 and hold it for processing as a Public Input at the next document revision cycle. I, Doug Hohbein, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of By checking this box I affirm that I am Doug Hohbein, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

8 Page 8 of 13 Public Comment No. 6-NFPA 30A-2013 [ Section No ] The installation and use of CNG and hydrogen systems shall meet the requirements of NFPA 52, Vehicular Gaseous Fuel Systems Code, except as modified by this chapter. The installation and use of LNG systems shall meet the requirements of NFPA 52, Vehicular Gaseous Fuel Systems Code, except as modified by this chapter. The installation and use of LP-Gas systems shall meet the requirements of NFPA 58, Liquefied Petroleum Gas Code, except as modified by this chapter. The installation and use of hydrogen systems shall meet the requirements of NFPA 2, Hydrogen Technologies Code, except as modified by this chapter. Requirements for Hydrogen fueled vehicles in now in NFPA 2 not NFPA 52. Submitter Full Name: Douglas Horne Organization: DBHorne LLC Affilliation: Clean Vehicle Education Foundation Submittal Date: Thu Apr 04 08:34:31 EDT 2013 Committee Accepted Resolution: SR-1-NFPA 30A-2013 Statement: The Technical Committee agrees with the public comment. See also Second Revisions Nos. 2, 3, and 4.

9 Page 9 of 13 I, Douglas Horne, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of By checking this box I affirm that I am Douglas Horne, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

10 Page 10 of 13 Public Comment No. 5-NFPA 30A-2013 [ Section No ] Tanks that have top openings only shall be mounted and equipped as follows: (1) * Stationary tanks shall be mounted on concrete, steel, or masonry supports at least 150 mm (6 in.) in height so as to protect the bottom of the tank from corrosion due to contact with the ground and to maintain the tank in a stable position. (2) Movable tanks shall be equipped with attached metal legs that rest on shoes or runners designed so that the tank is supported in a stable position and so that the tank and its supports can be moved as a single unit. (3) Tanks shall be equipped with a tightly and permanently attached approved pumping device having an approved hose and nozzle. (4) Each component of dispensing systems for Class I liquids shall be listed. (5) The dispenser nozzle and hose shall be designed so they can be padlocked to the hanger to prevent tampering. (6) The pump discharge shall be equipped with an effective antisiphoning device, or the discharge hose shall be equipped with an approved self-closing nozzle. (7) Siphons or internal pressure discharge devices shall be prohibited. (8) Tanks shall have non-porous containment protection equal ½ of the total volume of the tank. Due to the lack of local enforcement on farms and remote areas, the requirement for capture of flammable liquids must be required to contain and prevent potential fires to humans, grass, equipment, buildings, and out structures that may be located adjacent to such tanks. Protection of the surrounding area and ground water from flammable liquids will increase overall safety. Submitter Full Name: Doug Hohbein Organization: Northcentral Fire Code Develop Submittal Date: Tue Apr 02 22:03:05 EDT 2013

11 Page 11 of 13 Committee Rejected but held Resolution: Public Comment No. 5 proposes a change to a paragraph in NFPA 30A that was not amended at the First Draft stage of this revision cycle. To accept this change would effect an amendment to the Code without its having undergone public review and comment. Therefore, in accordance with Paragraphs and of the Regulations Governing the Development of NFPA Standards, the Technical Committee has voted to reject Public Comment No. 5 and hold it for processing as a Public Input at the next document revision cycle. I, Doug Hohbein, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of By checking this box I affirm that I am Doug Hohbein, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

12 Page 12 of 13 Public Comment No. 3-NFPA 30A-2013 [ New Section after A ] A Many self-service stations display items such as wood, bagged ground cover, cartons of consumable products and other combustibles that create vision obstructions, excessive fire load and other hazards in and around dispensing islands and pumps. Display material obstructs the view of the attendant and adds a fuel load that is not needed in the area of the fuel dispensers. Submitter Full Name: Doug Hohbein Organization: Northcentral Fire Code Develop Submittal Date: Tue Apr 02 21:59:28 EDT 2013 Committee Rejected but held Resolution: Public Comment No. 3 proposes a change to a paragraph in NFPA 30A that was not amended at the First Draft stage of this revision cycle. To accept this change would effect an amendment to the Code without its having undergone public review and comment. Therefore, in accordance with Paragraphs and of the Regulations Governing the Development of NFPA Standards, the Technical Committee has voted to reject Public Comment No. 3 and hold it for processing as a Public Input at the next document revision cycle. The Technical Committee also points out that, as submitted, this Public Comment would add an annex statement to a paragraph that does not exist. The Technical Committee suggests that the submitter resubmit this change as a Public Input during the next document revision cycle and to either resubmit it in the form a code requirement or identify an appropriate code section to which the annex statement can be connected. I, Doug Hohbein, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of

13 Page 13 of 13 By checking this box I affirm that I am Doug Hohbein, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 105 1/21/2016 7:49 AM Public Input No. 2-NFPA 30A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

NFPA 101 SAF-RES PUBLIC COMMENTS

NFPA 101 SAF-RES PUBLIC COMMENTS Page 134 of 195 Public Comment No. 3-NFPA 101-2013 [ Section No. 28.7.6.1 ] 28.7.6.1 New draperies, curtains, and other similar loosely hanging furnishings and decorations shall be flame resistant as demonstrated

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement of 35 1/21/2016 7:56 AM First Revision No. 1-NFPA 30A-2015 [ Section No. 1.1.3 ] 1.1.3* This code shall not apply to those motor fuel dispensing facilities where only liquefied petroleum gas (LP-Gas),

More information

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures Please note this is not an all-inclusive list. The type and complexity of your project

More information

Page 1 of 46 Public Input No. 17-NFPA 13E-2013 [ New Section after 3.2.4 ] New 3.2.5 Pressure-Reducing Valve. A valve designed for the purpose of reducing the downstream water pressure under both flowing

More information

Changes for the New Edition. Senior Engineer, NFPA NFPA

Changes for the New Edition. Senior Engineer, NFPA NFPA Changes for the New Edition Denise Beach Senior Engineer, NFPA NFPA Overview NFPA 58-2014 Substantive Changes TIAs 2017 Edition NFPA 58-2014 Substantive Changes Bulk and Industrial Plants 3.3.10 Bulk Plant.

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 2-NFPA 73-2014 [ Section No. 4.1.3 ] 4.1.3 Unused Openings. 4.1.3.1 Unused openings, other than those intended for the operation of equipment, those intended for mounting purposes, or

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

Committee on NFPA 30A

Committee on NFPA 30A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Automotive and Marine Service Stations Patti Mucci, Administrative Assistant DATE: February 5, 00 SUBJECT: ROP Letter Ballot The ROP

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Page 1 of 13 Public Comment No. 2-NFPA 703-2013 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, P.O. Box C700, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. ASTM D 2898, Standard

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical self-closing device

More information

ARTICLE 25. FUEL GAS CODE

ARTICLE 25. FUEL GAS CODE ARTICLE 25. Rule 1. Indiana Fuel Gas Code, 2003 Edition (Repealed) (Repealed by Fire Prevention and Building Safety Commission; filed Mar 18, 2008, 2:32 p.m.: 20080423-IR-675070479FRA, eff 90 days after

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

Public Comment No. 13-NFPA [ Section No ]

Public Comment No. 13-NFPA [ Section No ] Public Comment No. 13-NFPA 30-2013 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A 395/A395M, Standard

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content Based on the 2018 International Fire Code, (IFC ) The International Fire Code (IFC ), establishes minimum regulations for fire safety. This handout will identify important changes in the IFC from 2015

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

Second Revision No. 3 implements the text of Committee Input No. 36 as proposed in the First Draft Report, along with the following amendments:

Second Revision No. 3 implements the text of Committee Input No. 36 as proposed in the First Draft Report, along with the following amendments: Second Revision No. 3-NFPA 31-2015 [ Section No. 10.5.1 ] 10.5.1* Oil burners, other than oil stoves with integral tanks, shall be provided with some means for manually stopping the flow of oil to the

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

"Spray area" is the term that is used throughout the document. This change is for consistency.

Spray area is the term that is used throughout the document. This change is for consistency. of 78 5/30/2014 2:08 PM Public Comment No. 39-NFPA 33-2013 [ Global Input ] For Chapter 18, replace "spray paint area" with "spray area". "Spray area" is the term that is used throughout the document.

More information

Technical Committee on Fundamentals of Combustion Systems Hazards

Technical Committee on Fundamentals of Combustion Systems Hazards Technical Committee on Fundamentals of Combustion Systems Hazards AGENDA Dec 4-6, 2013 Georgia Power Company Headquarters Banquet Room 241 Ralph McGill Blvd Atlanta, GA 1. Chair s welcome, call to order,

More information

GASEOUS HYDROGEN SYSTEMS

GASEOUS HYDROGEN SYSTEMS CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall

More information

Page 1 of 12 Input No. 62-NFPA 409-2013 [ Section No. 3.3.9 ] 3.3.9 Hangar Building Cluster. A group of buildings with more than one area for the storage and servicing of aircraft and all attached or contiguous

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

NFPA 101 SAF-AXM PUBLIC COMMENTS

NFPA 101 SAF-AXM PUBLIC COMMENTS Page 74 of 195 Public Comment No. 53-NFPA 101-2013 [ New Section after 12.1.4.2 ] TITLE OF NEW CONTENT Type your content here... Aisle Stair. A stair within a seating area of an assembly occupancy that

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Errata ANSI Z223.1 National Fuel Gas Code 2015 Edition

Errata ANSI Z223.1 National Fuel Gas Code 2015 Edition Errata ANSI Z223.1 National Fuel Gas Code 2015 Edition Reference: Various Errata Z223.1-2015-1 Issue Date: 3/10/16 National Fuel Gas Code user: The American Gas Association (AGA) notes the following errors

More information

Oklahoma. 265: Incorporated national codes and standards The following national codes and standards are incorporated by reference:

Oklahoma. 265: Incorporated national codes and standards The following national codes and standards are incorporated by reference: Oklahoma 310:451-1-3. Adopted references The Board of Health hereby incorporates by reference the International Code Council (ICC) 2006 (IBC) Edition International Building Code; the 2007 Edition Standard

More information

Amendment A International Fire Code

Amendment A International Fire Code Amendment A-3 2015 International Fire Code Part 5 BUILDING REGULATIONS AND CODES International Fire Code, 2015 Edition (IFC, 2015) Part 5, Chapter 3 International Fire Code The following sections, paragraphs,

More information

IFC Significant Changes from the 2009 to the 2015 Edition Tier 1

IFC Significant Changes from the 2009 to the 2015 Edition Tier 1 IFC Significant Changes from the 2009 to the 2015 Edition Tier 1 Several medical care definitions were created and revised in Chapter 2 of the 2012 IBC, as well as through the occupancy descriptions, and

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

NFPA 79 - Second Draft Meeting July 8-10, DoubleTree Hotel, Portland, ME

NFPA 79 - Second Draft Meeting July 8-10, DoubleTree Hotel, Portland, ME National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org AGENDA NFPA TECHNICAL COMMITTEE ON ELECTRICAL EQUIPMENT OF INDUSTRIAL

More information

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate,

More information

Public Input No. 48-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 48-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 62 8/4/17, 2:42 PM Public Input No. 48-NFPA 45-2017 [ Section No. 1.1.2 ] 1.1.2 This standard shall apply to all educational laboratory units and instructional laboratory units in which any quantity

More information

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION CHAPTER 23.45 Sections LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION 23.45.100 Local amendments to the International Fire Code, 2006 Edition... 2 23.45.102.1 Construction and design provisions...

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

Public Comment No. 3-NFPA [ Chapter 7 ]

Public Comment No. 3-NFPA [ Chapter 7 ] Page 1 of 8 Public Comment No. 3-NFPA 405-2013 [ Chapter 7 ] Chapter 7 ARFF Personnel Safety and Safety Management 7.1 Scope. This chapter identifies the knowledge and skills necessary to ensure ARFF personnel

More information

Page 1 of 73 Print Reload Page Close Show Cart Public Input No. 13-NFPA 170-2012 [ Global Input ] 3.3.3 Photoluminescent. A type of sign that is self-energized with respect to luminosity and requires no

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Committee Input No. 28-NFPA 13R-2013 [ Global Input ]

Committee Input No. 28-NFPA 13R-2013 [ Global Input ] Page 1 of 6 Committee Input No. 28-NFPA 13R-2013 [ Global Input ] 6.2.2 Outside Dwelling Units. 6.2.2.1 All sprinklers used outside of the dwelling units shall be in accordance with 6.2.2 7.2 and 7.3.

More information

Second Revision No. 2-NFPA [ Section No ]

Second Revision No. 2-NFPA [ Section No ] Page 1 of 8 Second Revision No. 2-NFPA 410-2014 [ Section No. 10.2 ] 10.2* Fire Extinguishers. In addition to extinguishers required by NFPA 409, extinguishers shall be provided for aircraft maintenance

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

Technical Committee on Multiple Burner Boilers

Technical Committee on Multiple Burner Boilers Technical Committee on Multiple Burner Boilers AGENDA Salt River Project PERA Club 1 Continential Drive Tempe, AZ January 14-15, 2014 1. Chair s welcome, call to order, and opening remarks at 8:00 a.m.

More information

Technical Committee on Electric Generating Plants (ECG-AAA)

Technical Committee on Electric Generating Plants (ECG-AAA) Technical Committee on Electric Generating Plants () DATE: May 2, 2013 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Electric Generating Plants () Chad Duffy,

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 79 1/27/2016 2:09 PM Public Input No. 1-NFPA 59-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/API and replace with API. (2) ANSI/UL

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

NFPA Technical Committee on Garages and Parking Structures. NFPA 88A Second Draft Web/Teleconference Meeting

NFPA Technical Committee on Garages and Parking Structures. NFPA 88A Second Draft Web/Teleconference Meeting NFPA Technical Committee on Garages and Parking Structures NFPA 88A Second Draft Web/Teleconference Meeting September 30, 2013 2:00 p.m. 3:30 p.m. EDT AGENDA 1. Call to Order: Call meeting to order by

More information

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call vember 20, 2012 2-4 PM EDT (1-3 PM CT; 12-2 PM MT; 11-1 PM PT) 1. Welcome-Glenn McGinley, Committee Chair

More information

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment of 25 5/14/2015 2:32 PM Public Comment No. 22-NFPA 14-2014 [ New Section after 1.4 ] A.1.4 A.1.4 It is the intent of the Commi ee to recognize that future edi ons of this standard are a further refinement

More information

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951) Riverside County Fire Department Office of the Fire Marshal 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4777 Fax (951) 955-4886 Technical Policy Title: Plant Processing and Extraction

More information

Plant Processing and Extraction Facilities

Plant Processing and Extraction Facilities Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA. 92602 www.ocfa.org 714-573-6180 Plant Processing and Extraction Facilities Guideline G-16 Serving the

More information

Iowa (2) Delete section and insert in lieu thereof the following new section:

Iowa (2) Delete section and insert in lieu thereof the following new section: Iowa Iowa Admin. Code 661-301.3(103A) Iowa Administrative Code Agency 661 Public Safety Department Chapter 301 State Building Code-General Provisions 661-301.3(103A) General provisions. The provisions

More information

Pismo Beach, CA Municipal Code. Chapter 8.08 FIRE PREVENTION REGULATIONS

Pismo Beach, CA Municipal Code. Chapter 8.08 FIRE PREVENTION REGULATIONS Pismo Beach, CA Municipal Code 8.08.010 Amendments; California Fire Code. Chapter 8.08 FIRE PREVENTION REGULATIONS The California Fire Code adopted in Section 8.04.010 is modified, amended and/or supplemented

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

Technical Committee on Standpipes (SPI-AAA)

Technical Committee on Standpipes (SPI-AAA) Technical Committee on Standpipes (SPI-AAA) M E M O R A N D U M DATE: February 13, 2014 TO: FROM: Principal and Alternate Members of the Technical Committee on Standpipes (SPI-AAA) Chad Duffy, NFPA Staff

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

North Liberty Fire Department Permit Application Temporary Storage & Use of LPG

North Liberty Fire Department Permit Application Temporary Storage & Use of LPG Application Fee: $50.00 Application Date: Permit Information Have you previously applied for this type of permit? Date of previous application: Owner/Applicant Information Applicant s Last Name: Applicant

More information

SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21

SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21 SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21 ARTICLE I FIRE PREVENTION CODE 21-1. Statutory authority 21-2. Adoption of standards 21-3. Definitions 21-4. Exceptions to Fire Prevention Code

More information

Department of Public Safety

Department of Public Safety Terry E. Branstad Governor Kim Reynolds Lt. Governor Department of Public Safety Roxann M. Ryan Commissioner Liquid Propane Informational guide to submitting plans Plans are to be submitted to: State Fire

More information

ORDINANCE NO

ORDINANCE NO Req. #16-0451 ORDINANCE NO. 283 64 1 2 3 4 5 6 7 8 9 10 11 12 AN ORDINANCE relating to the Fire Code of the City of Tacoma, regulating hazards to life and property from fire and explosion; amending the

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting.

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. Input No. 7-NFPA 80-2013 [ Section No. 3.3.8 ] 3.3.8 Automatic Fire Detector. A device designed to detect the presence of a fire signature and to initiate action. For the purpose of this standard, automatic

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Changes to the Florida Building Code, Fuel-Gas This Analysis of Changes for the 5 th Edition (2014) of the Florida Codes is intended

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

ICC Update - Laboratory Issues Code Changes / Proposals / Trends of Interest 10/2005

ICC Update - Laboratory Issues Code Changes / Proposals / Trends of Interest 10/2005 ICC Update - Laboratory Issues Code Changes / Proposals / Trends of Interest 10/2005 Kenneth Kretchman, CIH, CSP Mgr, Industrial Hygiene NC State University Ken_Kretchman@ncsu.edu International Building

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM of 66 5/18/2015 1:01 PM Second Revision No. 36-NFPA 32-2015 [ Detail ] 6.5 Solvents (See Annex C for additional information on solvents) Submittal Date: Tue Mar 17 17:20:03 EDT 2015 Committee Statement:

More information

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ]

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ] of 46 11/6/2015 9:21 AM First Revision No. 208-NFPA 30-2015 [ Section No. 9.3.3.1 ] 9.3.3.1 Storage of liquids shall not physically obstruct a means of egress. Submittal Date: Wed Sep 09 18:24:20 EDT 2015

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Building Service and

More information

CARBON MONOXIDE ALARM STANDARDS ACT - ENACTMENT Act of Dec. 18, 2013, P.L. 1229, No. 121 Cl. 35 An Act

CARBON MONOXIDE ALARM STANDARDS ACT - ENACTMENT Act of Dec. 18, 2013, P.L. 1229, No. 121 Cl. 35 An Act CARBON MONOXIDE ALARM STANDARDS ACT - ENACTMENT Act of Dec. 18, 2013, P.L. 1229, No. 121 Cl. 35 An Act Providing standards for carbon monoxide alarms; and imposing penalties. The General Assembly of the

More information

Temporary LPG Heat for Construction Sites Information Packet

Temporary LPG Heat for Construction Sites Information Packet Temporary LPG Heat for Construction Sites Information Packet Colorado Springs Fire Department Division of the Fire Marshal February 2014 W:\Packets\Haz Mat\IFC2009_Temp_LPG_Heat_For_Construction.doc TEMPORARY

More information

Public Comment No. 16-NFPA 13D-2014 [ Section No ]

Public Comment No. 16-NFPA 13D-2014 [ Section No ] of 52 9/22/2014 9:20 AM Public Comment No. 16-NFPA 13D-2014 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information