1 Page 1 of 46 Public Input No. 17-NFPA 13E-2013 [ New Section after ] New Pressure-Reducing Valve. A valve designed for the purpose of reducing the downstream water pressure under both flowing (residual) and non-flowing (static) conditions. Adding to definitions to help with understanding new sections added to this standard. Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 16:54:53 EST 2013 Resolution: FR-14-NFPA 13E-2013 Statement: The committee added the definition of Pressure Requlating Device and is making the term consistent in the document. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

2 Page 2 of 46 Public Input No. 22-NFPA 13E-2013 [ New Section after ] Pressure-Relief Device. A device designed to open to prevent a rise of internal fluid pressure in excess of a specified value due to exposure to emergency or abnormal conditions. Adding to definitions to help with understanding new sections added to this standard. Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:21:00 EST 2013 Resolution: See FR 14. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

3 Page 3 of 46 Public Input No. 24-NFPA 13E-2013 [ New Section after ] Pressure-Restricting Device. A valve or device designed for the purpose of reducing the downstream water pressure under flowing (residual) conditions only. Adding to definitions to help with understanding new sections added to this standard. Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:24:45 EST 2013 Resolution: See FR 14. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

4 Page 4 of 46 Public Input No. 25-NFPA 13E-2013 [ New Section after ] System Demand. The flow rate and residual pressure required from a water supply, measured at the point of connection of a water supply to a standpipe system, to deliver the total water flow rate and the minimum residual pressures required for a standpipe system at the hydraulically most remote hose, and the minimum water flow rate for sprinkler connections, on combined systems. Adding to definitions to help with understanding new sections added to this standard. Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:26:55 EST 2013 Resolution: The term system demand is not used in the body of the document. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

5 Page 5 of 46 Public Input No. 9-NFPA 13E-2012 [ Section No ] The fire department should correct these situations by implementing effective departmental pre-incident planning, inspections, and other appropriate actions and by performing an appropriate maintenance and testing program on the installed system. The use of sprinkler systems initially designed for a lowheat-release product or intended only to accommodate low storage when a change has been made to a high-heat commodity, a significantly increased storage height, or new storage configurations can result in unsuccessful sprinkler performance, so the fire department or authority having jurisdiction should take steps to correct such problems. NFPA 25 and model fire codes hold the owner responsible for the maintenance of fire protection systems. NFPA 25 also requires individuals who service these systems to have appropriate experience and expertise which fire department personnel often would not have. A fire department inspection would identify a system that is not being maintained, after which the owner should be required to have the appropriate service performed. Submitter Full Name: Bill Galloway Organization: Southern Regional Fire Code De Submittal Date: Tue Aug 28 15:49:47 EDT 2012 Resolution: FR-1-NFPA 13E-2013 Statement: NFPA 25 and model fire codes hold the owner responsible for the maintenance of fire protection systems. NFPA 25 also requires individuals who service these systems to have appropriate experience and expertise which fire department personnel often would not have. A fire department inspection would identify a system that is not being maintained, after which the owner should be required to have the appropriate service performed. I, Bill Galloway, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Bill Galloway, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

6 Page 6 of 46 Public Input No. 10-NFPA 13E-2012 [ Section No ] The company assigned primary responsibility for charging the sprinkler connection during pre-incident planning or annual inspections should hook up to the fire department connection to verify hose thread compatibility. The system should also be tested with air or water to verify integrity. Fire department personnel do not have the training, expertise, or equipment to provide this service. Additionally, such testing can have negative effects on a system. Introducing fresh air or water to a system on a regular basis can speed up corrosion. Air should never be used to test systems with plastic piping. Submitter Full Name: Bill Galloway Organization: Southern Regional Fire Code De Submittal Date: Tue Aug 28 15:51:35 EDT 2012 Resolution: FR-2-NFPA 13E-2013 Statement: Fire department personnel do not have the training, expertise, or equipment to provide this service. Additionally, such testing can have negative effects on a system. Introducing fresh air or water to a system on a regular basis can speed up corrosion. Air should never be used to test systems with plastic piping. I, Bill Galloway, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Bill Galloway, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

7 Page 7 of 46 Public Input No. 6-NFPA 13E-2012 [ Section No ] Where appropriate, the fire department should assist in restoring the sprinkler system. Because actions to restore a sprinkler system can present potential consequences for improper or negligent actions, each fire department should review its policy on this matter. Sprinklers that were exposed to high heat conditions during a fire should be examined by a qualified sprinkler installer and replaced as needed. This sentence gives direction to the local fire department. Local policy, liability, and other significant factors may prohibit local fire departments from assisting with putting the system back in service. Leaving this sentence out allows the direction to come from the second sentence that provides the option of assisting, depending upon local policies. Submitter Full Name: Kelly Nicolello Organization: Western Regional Fire Code Dev Submittal Date: Thu Aug 16 11:42:04 EDT 2012 Resolution: The existing text does not preclude or require anyone from restoring systems if the fire department wishes. I, Kelly Nicolello, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Kelly Nicolello, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

8 Page 8 of 46 Public Input No. 3-NFPA 13E-2012 [ New Section after ] When a sprinkler system is out of service for more than 4 hours in a 24 -hour period, the AHJ shall be permitted to require the building to be evacuated or an approved fire watch to be provided for all portions left unprotected by the fire protection systems shutdown until the fire protection system has been returned to service. This statement gives the AHJ the authority to require a fire watch after the activation of a sprinkler system if the system cannot be restored. This language mirrors the language in other NFPA documents concerning fire protection systems and fire watch procedures. Submitter Full Name: Doug Hohbein Organization: Northcentral Fire Code Develop Submittal Date: Thu Aug 16 09:41:36 EDT 2012 Resolution: This is a training document not an operations document. I, Doug Hohbein, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Doug Hohbein, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

9 Page 9 of 46 Public Input No. 7-NFPA 13E-2012 [ Section No ] If the sprinkler system cannot be restored to operating condition by the time the fire department leaves the premises, the code enforcement and fire prevention authorities should be promptly notified of the structure's noncompliance status. The fire department and code enfocement should consider a fire watch depending on conditions. The building owner or representative should also be notified. When the system is down, depending on conditions and circumstances, a fire watch may be necessary to maintain the level of risk and allow the business to continue to operate. Submitter Full Name: Kelly Nicolello Organization: Western Regional Fire Code Dev Submittal Date: Thu Aug 16 11:43:17 EDT 2012 Resolution: FR-4-NFPA 13E-2013 Statement: When the system is down, depending on conditions and circumstances, a fire watch may be necessary to maintain the level of risk and allow the business to continue to operate. I, Kelly Nicolello, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Kelly Nicolello, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

10 Page 10 of 46 Public Input No. 8-NFPA 13E-2012 [ Section No ] Past incident analysis of the fire department operations and the performance of the automatic sprinkler system should be reported to improve future operations at sprinklered properties. The following information should be gathered to use in the analysis process: (1) Location of operating sprinklers (2) Number of sprinklers operating (3) Result of sprinkler operation (4) Reason for any unsatisfactory operation (5) Employee assigned to check control valve (6) Whether the fire department connected to the sprinkler system and, if not, the reason (7) Company and engine number that connected to the sprinkler system (8) Number of hose lines used (9) Size of hose lines used [Some departments now use large diameter hose (LDH) lines to supply fire department connections.] (10) Whether water was pumped into the system; if so, for how long and at what pressure, any issues with the backflow device or prv's (11) Whether the valve was closed after the fire, and which employee ordered that the valve be closed (12) Number of sprinklers replaced by the fire department (13) Type of sprinklers installed (14) Whether sprinkler protection was fully restored and by whom (15) Actions taken to restore service (16) Whether the private water supply to sprinklers operated satisfactorily (17) Whether the fire prevention bureau was notified (18) Whether the representative of management was notified as well as the names of the employee making notification and of those notified All devices and operating components of the system should be included in the report as to their function, whether the component operated correctly or failed. This will assure the reviewers of the report that those components were not overlooked. Submitter Full Name: Kelly Nicolello Organization: Western Regional Fire Code Dev Submittal Date: Thu Aug 16 11:45:58 EDT 2012

11 Page 11 of 46 Resolution: FR-5-NFPA 13E-2013 Statement: All devices and operating components of the system should be included in the report as to their function, whether the component operated correctly or failed. This will assure the reviewers of the report that those components were not overlooked. I, Kelly Nicolello, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Kelly Nicolello, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

12 Page 12 of 46 Public Input No. 2-NFPA 13E-2012 [ Section No ] Fire department personnel should study occupancies with a wide variety of configurations and a wide range of storage commodities to determine whether there is a need for special procedures, particularly where storage heights are in excess of 3.66 m (12 ft) because, in some cases, routine ventilation procedures in the early stages of a fire can hinder effective sprinkler operation. The fire department should discuss its pre-incident plan for these types of occupancies with the occupant, sprinkler sprinkler system designer, and insurance carrier to determine whether a modification in procedures is appropriate. Originally I was planning on inserting fire protection engineer but that may not be appropriate in all cases. The use of the phrase "sprinkler system designer" should include fire protection engineers where they are involved in the design. However, the phrase "sprinkler designer" is not correct in that it is the designer of the system not the sprinkler that should be consulted. Submitter Full Name: William Koffel Organization: Koffel Associates, Inc. Submittal Date: Wed Aug 08 22:50:33 EDT 2012 Resolution: FR-6-NFPA 13E-2013 Statement: The use of the phrase "sprinkler system designer" should include fire protection engineers where they are involved in the design. However, the phrase "sprinkler designer" is not correct in that it is the designer of the system not the sprinkler that should be consulted. The TC wants english units first within the documents. I, William Koffel, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am William Koffel, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

13 Page 13 of 46 Public Input No. 18-NFPA 13E-2013 [ Section No ] Pressure-regulation devices should 6* Standpipe hose outlets should be tested annually for proper operation by opening and closing. Pressure regulating devices would typically not be installed on manual standpipes. Clarifying the difference in testing requirements for manual standpipe outlets. Later sections being added define manual standpipe and automatic standpipes with fire pumps are completely different and need different information. Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 16:59:40 EST 2013 Resolution: FR-7-NFPA 13E-2013 Statement: Clarifying that valves should be checked to ensure they can be opened and closed. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

14 Page 14 of 46 Public Input No. 20-NFPA 13E-2013 [ Section No. 6.3 ] 6.3 Fireground Operations Involving Properties Protected by Manual Dry or Manual Wet Standpipe Systems * Fire department personnel should carefully plan operations in properties protected by standpipe systems designed to supply fire department hose streams. These procedures should be similar to operations in buildings protected by automatic sprinklers Standpipes should be utilized when fires occur on floors above the reach of ground or aerial ladders and when valuable time will be lost in stretching lines up stairways. Careful pre-incident and on-scene fireground planning should be performed to ensure successful operations * Where standpipe systems provide fire department connections, lines from a pumper supplied by a water main should be connected and charged to the pressure required to give the desired working pressure on the standpipe outlets being used. Where several independent standpipes are available for fire department use in the fire area, each standpipe should be charged. (See Figure ) Figure Standpipe Connection * Fire Department Standpipe Connections and Pump Discharge Pressure Pressures for Manual Dry or Manual Wet Standpipes

15 Page 15 of 46 When pumping to a fire department standpipe connection, the pump operator should consider the following factors in calculating pump discharge pressure: (1) Friction loss in the hose line between the pump and the standpipe connection (2) Friction loss in the standpipe system (3) Pressure loss due to elevation of the nozzle(s) (4) Number and size of attack lines operating from the standpipe (5) Pressure desired at the nozzle(s) Pump discharge pressure in excess of 14 bar (200 psi) should not be used unless the standpipe system has been designed to withstand higher pressures. Fire suppression personnel should be familiar with options and acceptable practices available to them in response to varying configurations and locations of standpipe outlets Hose or house lines attached to standpipe outlets should not be used except in the case of extreme emergency. Fire personnel should provide hose and nozzles of appropriate size and length along with proper accessory equipment for the anticipated fire conditions Limitations of communication devices, as well as the essential ability to maintain effective portable radio communications between the incident command post and officers on the upper floors, should be identified and resolved during pre-incident planning Where private water supplies serve the standpipe system, fire personnel should make certain that supply valves are open and private fire pumps, if any, are operating properly Before proceeding up stairs, fire personnel should ensure that all hose outlet valves on lower floors are closed. Clarifying that when a standpipe is "manual-wet, auto-sprinkler" the fire department still has to pump the standpipe to supply hoselines, even though it is wet just for sprinkler operation from residual water pressure. Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:15:59 EST 2013

16 Page 16 of 46 Resolution: FR-8-NFPA 13E-2013 Statement: Clarifying that when a standpipe is "manual-wet, auto-sprinkler" the fire department still has to pump the standpipe to supply hoselines, even though it is wet just for sprinkler operation from residual water pressure. Added section on deploying hoslines, selection of hose and nozzles, When to use standpipes and how to supply water to standpipe systems. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

17 Page 17 of 46 Public Input No. 14-NFPA 13E-2012 [ New Section after ] Fire departments should operate hoselines from standpipe hose valves on the floor below the fire in high rise, and in areas remote from the emergency in other standpipe-equipped structures. Firefighters should connect and deploy hoselines from standpipe hose valves outside of any immediately dangerous to life and health (IDLH) environment to ensure the safety and operational effectiveness of all fire department personnel whenever it is possible to do so. Additional Proposed Changes File Name Description Approved 13E_PI_Log1_F2014.pdf Supporting material Firefighters have been killed and injured when trying to utilize standpipe hose valves on the fire floor in high-rises due to the rapidly deteriorating conditions that may occur. It is a common operating practice taught in the majority of fire instructional texts to utilize the standpipe connection below the fire floor in high rises. This additional new text will help codify this common practice as the preferred use of standpipes for fire department operations. Note: Supporting material is available for review at NFPA Headquarters. Submitter Full Name: CHRISTOPHER WANKA Organization: College Park VFD Submittal Date: Fri Dec 07 09:56:11 EST 2012 Resolution: See FR8. I, CHRISTOPHER WANKA, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Input (including both the Proposed Change and the Statement of Problem and Substantiation). I understand and intend that I acquire no rights, including rights as a joint author, in any publication of the NFPA in which this Public Input in this or another similar or derivative form is used. I hereby warrant that I am the author of this Public Input and that I have full power and authority to enter into this By checking this box I affirm that I am CHRISTOPHER WANKA, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

18 Page 18 of 46 Public Input No. 15-NFPA 13E-2012 [ New Section after ] Fire departments operating in standpipe equipped buildings shall utilize appropriate sized hoselines based upon their required pre-incident planning for these structures. Firefighters should base this decision upon necessary fire flows for the hazard of the building, conditions at the time of the incident, and operational capabilities of the system. Fire departments must be cognizant of the possibility of low operating pressures, and possible debris obstructions as just some of the hazards that may warrant the choosing of a larger hoseline of 2-1/2 in. for initial fire department operations from a standpipe system. The AHJ has the ultimate decision in regards to fire department hoseline selection for use when operating from standpipes. Firefighters have been killed and injured in multiple fires throughout American history due to improper hoseline use at high-rise fires. Fires such as occurred at One Meridian Plaza demonstrate the importance of choosing the proper hoselines and nozzles to ensure adequate fire flows are obtained from a standpipe hose valve. The use of PRV's is previously discussed in this chapter, but the actual size of the hoseline, and type of nozzle used are not discussed anywhere else in this document. In addition, this topic is discussed in NFPA 14, in the explanatory material. Submitter Full Name: CHRISTOPHER WANKA Organization: College Park VFD Submittal Date: Fri Dec 07 09:57:56 EST 2012 Resolution: See FR8. I, CHRISTOPHER WANKA, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Input (including both the Proposed Change and the Statement of Problem and Substantiation). I understand and intend that I acquire no rights, including rights as a joint author, in any publication of the NFPA in which this Public Input in this or another similar or derivative form is used. I hereby warrant that I am the author of this Public Input and that I have full power and authority to enter into this By checking this box I affirm that I am CHRISTOPHER WANKA, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

19 Page 19 of 46 Public Input No. 16-NFPA 13E-2012 [ New Section after ] Fire departments operating in standpipe equipped buildings shall utilize the appropriate nozzles for their hoselines to be used when operating off. Consideration should be taken to the required fire flows, fire hose & nozzles to be used with the standpipe system, and fire department staffing resources available for standpipe operations. Smooth-bore nozzles are the preferred style of nozzle to be utilized when operating hoselines from standpipe systems. Smooth-bore nozzles allow for the passage of small pieces of debris that may be present in a standpipe system, and allow for greater fire flows (gpm) at lower operating pressures which may be present when operating from a fire department standpipe. Firefighters have been killed and injured in multiple fires throughout American history due to improper hoseline use at high-rise fires. Fires such as occurred at One Meridian Plaza demonstrate the importance of choosing the proper hoselines and nozzles to ensure adequate fire flows are obtained from a standpipe hose valve. The use of PRV's is previously discussed in this chapter, but the actual size of the hoseline, and type of nozzle used are not discussed anywhere else in this document. NFPA 14 only requires a minimum discharge pressure from the most remote outlet to be 100 psi, which almost guarantees a low operating pressure from a standpipe system. Therefore, fire departments must adequately pre-plan their hazards and standpipe system to allow them to make an educated and informed choice for their hoselines to be used from these systems. Submitter Full Name: CHRISTOPHER WANKA Organization: College Park VFD Submittal Date: Fri Dec 07 09:59:19 EST 2012 Resolution: SEE FR?? I, CHRISTOPHER WANKA, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Input (including both the Proposed Change and the Statement of Problem and Substantiation). I understand and intend that I acquire no rights, including rights as a joint author, in any publication of the NFPA in which this Public Input in this or another similar or derivative form is used. I hereby warrant that I am the author of this Public Input and that I have full power and authority to enter into this By checking this box I affirm that I am CHRISTOPHER WANKA, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

20 Page 20 of 46 Public Input No. 27-NFPA 13E-2013 [ New Section after ] 6.4 Fireground Operations Involving Properties Protected by Automatic Standpipe Systems with Fire Pumps * Fire department personnel should carefully plan operations in properties protected by automatic standpipe systems designed to supply fire department hose streams and combined sprinkler systems. These procedures should be specific to automatic standpipes with fire pumps * Fire departments should utilize automatic standpipes whenever possible to provide the fastest and most efficient method of getting water on the fire Fire suppression operations will be limited to the pressure and flow design of the standpipe. Fire departments should plan interior fire suppression operations to function within the pressure and flow parameters specific to each automatic standpipe system. Section 6.4 through 6.7 were created to differentiate operations specific to automatic standpipe systems with fire pumps. Planning operations, selecting the proper equipment to function from automatic standpipes, and considerations to the limitations of these systems are included in 6.4. Related Public Inputs for This Document Related Input Public Input No. 18-NFPA 13E-2013 [Section No ] Public Input No. 20-NFPA 13E-2013 [Section No. 6.3] Public Input No. 26-NFPA 13E-2013 [New Section after A.6.3.1] Relationship Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:43:54 EST 2013 Resolution: See FR8. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and

21 Page 21 of 46 By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

22 Page 22 of 46 Public Input No. 28-NFPA 13E-2013 [ New Section after ] 6.5 Nozzle and Hose Selection for use with Automatic Standpipe Systems 6.5.1* Fire departments should utilize nozzle and hose line configurations that can be supplied by the lowest pressure automatic standpipe systems in their jurisdictions Fire departments should be aware of the potential for reduced flow and fire stream reach when operating hose lines that cannot be properly supplied by the system demand design * When working from an automatic standpipe, the combined flow rate of operating hose lines and flowing sprinkler heads should not exceed the capacity of the fire pump. Section 6.4 through 6.7 were created to differentiate operations specific to automatic standpipe systems with fire pumps. This section is to clarify how the automatic systems have limitations, what those standard limitations are and how they affect fire fighting operations specific to equipment compatability. Manual standpipes are pumped to the pressures needed to match the nozzles and hose lines attached to the outlets, whereas automatic standpipes with fire pumps dictate the nozzle and hose line selection that "should" be used in order for compatability and functionality. Related Public Inputs for This Document Related Input Public Input No. 27-NFPA 13E-2013 [New Section after 6.3.8] Relationship Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:45:59 EST 2013 Resolution: See FR?

23 Page 23 of 46 I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

24 Page 24 of 46 Public Input No. 29-NFPA 13E-2013 [ New Section after ] 6.6 Automatic Standpipe Water Supply Considerations 6.6.1* Fire departments should plan water supply operations to support all automatic standpipe systems in their jurisdictions The fire departments initial water supply action should be to support the automatic standpipe as a secondary water supply * Fire department pumpers should pump the system demand pressure and flow into the fire department connection when taking over any automatic standpipe or standpipe zone * Fire departments should not pump to the fire floor when a standpipe utilizes pressure-reducing valves on outlets for hose connections or sprinkler connections to the standpipe. Section 6.4 through 6.7 were created to differentiate operations specific to automatic standpipe systems with fire pumps. Water supply operations are a very misunderstood element of automatic standpipes. This section illustrates the function and components that dictate how these systems can and should be supported. Related Public Inputs for This Document Related Input Public Input No. 28-NFPA 13E-2013 [New Section after 6.3.8] Public Input No. 27-NFPA 13E-2013 [New Section after 6.3.8] Relationship Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:47:48 EST 2013 Resolution: See FR8.

25 Page 25 of 46 I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

26 Page 26 of 46 Public Input No. 30-NFPA 13E-2013 [ New Section after ] 6.7 Pressure Regulating Components used in Automatic Standpipe Systems 6.7.1* Fire department personnel should be thoroughly familiar with the design and function of the various types of pressure regulating components used in automatic standpipe systems in their jurisdictions Pressure-reducing valves for hose connections shall be inspected annually and flow tested at 5-year intervals for proper operation. Pressure-regulation valves for sprinklers shall be inspected quarterly and flow tested at 5-year intervals. Section 6.4 through 6.7 were created to differentiate operations specific to automatic standpipe systems with fire pumps. This section is to explain in detail how pressure regulating components affect the automatic standpipe operation, it's ability to be pumped from a secondary water supply source, and the importance of understanding how the components work and limit fire department options when needing to add additional pressure to the system demand when the fire pump is not working and the fire department is pumping water into the FDC. Related Public Inputs for This Document Related Input Public Input No. 27-NFPA 13E-2013 [New Section after 6.3.8] Public Input No. 28-NFPA 13E-2013 [New Section after 6.3.8] Public Input No. 29-NFPA 13E-2013 [New Section after 6.3.8] Relationship Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:49:06 EST 2013 Resolution: See FR8.

27 Page 27 of 46 I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

28 Page 28 of 46 Public Input No. 4-NFPA 13E-2012 [ Section No ] When an impairment occurs, the following procedure should be performed by the impairment coordinator: (1) Determine the extent and expected duration of the impairment (2) Determine the increased risk in the areas of the building affected (3) Submit recommendations to the owner or manager of the building for dealing with the risk (4) Notify the fire department and the dispatch center for emergency services (5) Notify the insurance carrier, the alarm company, the building owner or manager, and other involved authorities having jurisdiction (6) Notify the supervisors in the area being affected (7) Install an impairment tag on the affected control valve and fire department connection (8) Assemble the necessary tools and materials to make the repair as quickly as possible (9) Discontinue all welding, cutting, and others forms of hot work. Too often hot work presents an unwanted source of ignition and is too risky to allow when fire protection systems are impaired. Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Thu Aug 16 11:00:08 EDT 2012 Resolution: FR-10-NFPA 13E-2013 Statement: Too often hot work presents an unwanted source of ignition and is too risky to allow when fire protection systems are impaired. Added consideration of a fire watch. I, John Chartier, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and

29 Page 29 of 46 By checking this box I affirm that I am John Chartier, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

30 Page 30 of 46 Public Input No. 5-NFPA 13E-2012 [ Section No ] When an impairment occurs, the following procedure should be performed by the impairment coordinator: (1) Determine the extent and expected duration of the impairment (2) Determine the increased risk in the areas of the building affected (3) Submit recommendations to the owner or manager of the building for dealing with the risk (4) Notify the fire department and the dispatch center for emergency services (5) Notify the insurance carrier, the alarm company, the building owner or manager, and other involved authorities having jurisdiction (6) Notify the supervisors in the area being affected (7) Install an impairment tag on the affected control valve and fire department connection (8) Assemble the necessary tools and materials to make the repair as quickly as possible (9) Consider establishing a fire watch When the system is down, depending on conditions and circumstances, a fire watch may be necessary to maintain the level of risk and allow the business to continue to operate. Submitter Full Name: Kelly Nicolello Organization: Western Regional Fire Code Dev Submittal Date: Thu Aug 16 11:40:11 EDT 2012 Resolution: See FR 10.

31 Page 31 of 46 I, Kelly Nicolello, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Kelly Nicolello, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

32 Page 32 of 46 Public Input No. 11-NFPA 13E-2012 [ Chapter 10 ] Chapter 10 Inspection and Testing Requirements 10.1 Inspection, Testing, and Maintenance for Sprinkler and Standpipe Systems. Existing building systems should be evaluated by fire department or other appropriate building personnel in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. The requirement is extremely vague and open ended (should they be coming out weekly, monthly, annually etc.?). It is asking the FD to evaluate, this is the responsibility of the owner. Submitter Full Name: Bill Galloway Organization: Southern Regional Fire Code De Submittal Date: Tue Aug 28 15:52:41 EDT 2012 Resolution: FR-11-NFPA 13E-2013 Statement: The committee believes that a reference to NFPA 25 is needed to guide the user. I, Bill Galloway, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Bill Galloway, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

33 Page 33 of 46 Public Input No. 19-NFPA 13E-2013 [ New Section after A ] A6.1.6 Hose outlets on manual standpipes should be tested annually by opening and closing the valve, checking for proper operation and good working condition. Note that pressure-restricting devices (PRD) and pressure-reducing valves (PRV) are generally used only on automatic standpipe systems and are typically not installed on manual standpipe outlets. I created the annex to go with wording change for this section...per NFPA 25, manual standpipe outlets are tested differently than pressure regulating devices which are typically not found on manual standpipes. Clarification only. We've added sections to differential between manul standpipes and automatic standpipes with fire pumps. Related Public Inputs for This Document Related Input Public Input No. 18-NFPA 13E-2013 [Section No ] Relationship Section and Annex change Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:04:26 EST 2013 Resolution: FR-12-NFPA 13E-2013 Statement: The annex to go with wording change for this section...per NFPA 25, manual standpipe outlets are tested differently than pressure regulating devices which are typically not found on manual standpipes. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

34 Page 34 of 46 Public Input No. 26-NFPA 13E-2013 [ New Section after A ] A6.3.3 Manual dry standpipes may be combined with automatic sprinkler systems when the residual pressure from the municipal water mains provides adequate pressure and flow to the sprinkler systems. The manual dry standpipe now becomes a manual wet standpipe with automatic sprinklers. Fire departments will still need to charge the standpipe to the pressure required to give the desired working pressure at the standpipe outlets being used for hose line operations. Clarifying that when a standpipe is "manual-wet, auto-sprinkler" the fire department still has to pump the standpipe to supply hoselines, even though it is wet just for sprinkler operation from residual water pressure. Related Public Inputs for This Document Related Input Public Input No. 20-NFPA 13E-2013 [Section No. 6.3] Relationship section and created annex info Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:28:21 EST 2013 Resolution: FR-13-NFPA 13E-2013 Statement: Clarifying that when a standpipe is "manual-wet, auto-sprinkler" the fire department still has to pump the standpipe to supply hoselines, even though it is wet. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

35 Page 35 of 46 Public Input No. 31-NFPA 13E-2013 [ New Section after A ] A6.4.1 Automatic standpipes with fire pumps are very different from manual standpipes in many ways. NPFA 14, Standard for the Installation of Standpipe and Hose Systems, requires automatic standpipe systems to contain water at all times and be attached to a water supply capable of supplying the system demand at all times and that requires no action other than opening a hose valve to provide water at hose connections. This means automatic standpipe systems are designed to supply water, on-demand, without any assistance from the department pumpers. Section 6.4 through 6.7 were created to differentiate operations specific to automatic standpipe systems with fire pumps. Planning operations, selecting the proper equipment to function from automatic standpipes, and considerations to the limitations of these systems are included in 6.4. Related Public Inputs for This Document Related Input Public Input No. 27-NFPA 13E-2013 [New Section after 6.3.8] Relationship section and annex info Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:51:14 EST 2013 Resolution: FR-15-NFPA 13E-2013 Statement: Section 6.4 was created to differentiate operations specific to automatic standpipe systems with fire pumps. Planning operations, selecting the proper equipment to function from automatic standpipes, and considerations to the limitations of these systems are included in 6.4.

36 Page 36 of 46 I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

37 Page 37 of 46 Public Input No. 33-NFPA 13E-2013 [ New Section after A ] A6.5.1 NFPA 14, Standard for the Installation of Standpipe and Hose Systems, 2010, requires a minimum residual pressure of 100 psi at any 2-1/2 standpipe outlet and also requires pressure-reducing valves to be used anytime an outlet pressure to a hose connection is greater than 175 psi. Normal expected outlet pressure ranges on these systems could be from 100 to 175 psi. Connecting an inline pressure gauge between the hose line and the standpipe outlet on the floor below the fire floor allows a firefighter stationed at the standpipe to accurately set and maintain the correct pressure to a flowing hose line by gating down a higher outlet pressure. A 100 psi residual outlet pressure would support approximately 500 of 2-1/2 hose line with a 50 psi nozzle flowing 250 gpm. This would place a maximum of 475 of working hose line on the fire floor when connected to the standpipe outlet one floor below the fire floor. Prior to 1993, NFPA 14, Standard for the Installation of Standpipe and Hose Systems, required a minimum residual pressure of 65 psi at 2-1/2 standpipe outlets and required pressure-reducing valves when standpipe outlet pressures at hose connections were greater than 100 psi. Normal expected outlet pressures on systems built to pre-1993 standards could be from 65 to 100 psi. A 65 psi residual outlet pressure would support 150 of 2-1/2 hose line with a 50 psi nozzle flowing 250 gpm. When connected to the standpipe outlet one floor below the fire floor, this places a maximum of 125 of hose line onto the fire floor. Connecting additional lengths of 2-1/2 hose line will increase the friction loss of the hose line and reduce the flow and reach of the nozzle. A 65 psi residual outlet pressure will not support traditional hotel bundles or highrise bundles utilizing 1-3/4 hose line and 75 or 100 psi nozzles. A 100 psi residual outlet pressure would be able to support only 100 of 1-3/4 hose line with a 75 psi nozzle flowing 150 gpm. This would place a maximum of 75 of working hose line on the fire floor. A 100 psi residual outlet pressure would not support the use of 100 psi nozzles. Automatic or constant-pressure nozzles are not recommended for use on automatic standpipes. Potential low system pressures insufficient to supply the required nozzle pressure will cause the nozzle orifice to restrict, which greatly reduces the flow and reach of the hose line. Combination nozzles with adjustable patterns are easily fouled by standpipe debris which can result in a partial or complete blockage. Smooth-bore nozzles are less prone to blockage from standpipe debris and will generally function in a predictable manner when under pressurized. Attaching a 2-1/2 by 2-1/2 gated wye to a standpipe outlet to allow the connection of two 2-1/2, or large diameter hose lines, is not always a recommended practice because 2-1/2 standpipe outlets are only required to flow 250 gpm and may not support flowing two hand lines simultaneously. Pressure-reducing valves (PRV) connected to 2-1/2 standpipe outlets are generally sized for gpm and will generally not provide adequate flow for two large diameter hose lines. Initial actions should be to connect a single large diameter hose line to each standpipe hose connection. Additional hose lines can be connected to standpipe hose connections on lower floors.

38 Page 38 of 46 This section is to clarify that automatic standpipes will deliver set outlet pressures and the pressure and volume of water than can be delivered has limitations. Gave examples of what kind of hose line operations could be expected from a couple minimum standard outlet pressure ranges. Related Public Inputs for This Document Related Input Public Input No. 27-NFPA 13E-2013 [New Section after 6.3.8] Public Input No. 28-NFPA 13E-2013 [New Section after 6.3.8] Public Input No. 29-NFPA 13E-2013 [New Section after 6.3.8] Public Input No. 30-NFPA 13E-2013 [New Section after 6.3.8] Relationship Submitter Full Name: Ryan Rossing Organization: Portland Fire & Rescue Submittal Date: Wed Jan 02 17:53:47 EST 2013 Resolution: FR-17-NFPA 13E-2013 Statement: This section is to clarify that automatic standpipes will deliver set outlet pressures and the pressure and volume of water than can be delivered has limitations. Examples of what kind of hose line operations could be expected from a couple of minimum standard outlet pressure ranges. I, Ryan Rossing, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and By checking this box I affirm that I am Ryan Rossing, and I agree to be legally bound by the above and the terms and conditions contained therein. I understand and intend that, by

39 Page 39 of 46 Public Input No. 35-NFPA 13E-2013 [ New Section after A ] A6.6.1 NFPA 14, Standard for the Installation of Standpipe and Hose Systems, requires signage at the fire department connection to indicate the pressure required to be pumped into the fire department connection to supply the automatic standpipe system demand. Signage is also required to identify the type of standpipe, whether it is part of a combined sprinkler system and also the location the standpipe services. Fire departments should have knowledge of all system demand pressures required to support all of the automatic standpipe systems in their jurisdictions. Hose lines used to connect a hydrant to the intake of a pumper must have a working pressure rating equal to or greater than the available hydrant pressure. Hose lines used to connect the discharge of a pumper to the fire department connection on an automatic standpipe must have a working pressure rating equal to or greater than the system demand pressure of the automatic standpipe system. NFPA 14, Standard for the Installation of Standpipe and Hose Systems, limits automatic standpipe pressures to no more than 350 psi. Fire department pumpers should be configured to provide the highest system demand pressure for automatic standpipes in their jurisdictions. An accepted rule of thumb is one pumper per 150 psi of system demand pressure required. The configuration of pumpers must also provide the required flow into the fire department connection. A fire department pumper with a two-stage pump in volume-mode, connected to a hydrant with 50 psi residual pressure can deliver 200 psi into an automatic standpipe while maximizing the pumps flow capacity. 150 psi + 50 psi = 200 psi. At a net discharge pressure of 150 psi, the pump impeller can deliver its maximum flow capacity plus additional flow from the incoming hydrant pressure. Using a single pumper to supply pressure into systems requiring pressures greater than 200 psi will reduce the flow capacity of the pump when the pumps net discharge pressure exceeds 150 psi. Operating a two-stage pump in pressure-mode allows the pump to generate higher discharge pressures at lower engine speeds but limits the pump to half its rated flow capacity. Configuring two pumpers in series on a hydrant with 50 psi residual pressure will allow the pumpers to split the work load and deliver 350 psi into the standpipe = 350. In a series configuration, both pumps can remain in volumemode and operate at the optimum net discharge pressure to maximize the flow capacity of both engines into the standpipe. Standpipes that are part of a combined system are required to be at least 6 in size. When taking over and supplying water at the system demand pressure into the fire department connection, fire department pumpers with a higher flow capacity than the standpipe fire pump may potentially increase the flow capacity of the standpipe. This section is to clarify how water supply operations need to support the system demand pressure and the designed flow rate of the automatic standpipe system. Fire departments should configure the pumper or several pumpers to deliver the needed pressure and flow, but only in a back up capacity as long as the fire pump is working. Related Public Inputs for This Document

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS Section 400.000 Suppression Systems The purpose of this guide is to assist the Incident Commander (IC), Fire Officers and Firefighters with the planning of effective operations for supporting water-based

More information

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS 901.6 Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective.

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

NFPA 101 SAF-RES PUBLIC COMMENTS

NFPA 101 SAF-RES PUBLIC COMMENTS Page 134 of 195 Public Comment No. 3-NFPA 101-2013 [ Section No. 28.7.6.1 ] 28.7.6.1 New draperies, curtains, and other similar loosely hanging furnishings and decorations shall be flame resistant as demonstrated

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

INCIPIENT FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

INCIPIENT FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL INCIPIENT FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL 1- Initiate a response to a reported emergency and transmit and receive messages via the facility communications system so that all necessary

More information

Center for Life Safety Education

Center for Life Safety Education Center for Life Safety Education Fire Sprinklers 101 Introduction, Building Codes, and Water Supplies Reprinted with permission from NFPA 13, Installation of Sprinkler Systems, Copyright 2007, National

More information

Public Input No. 11-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 11-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 159 6/10/2014 8:52 AM Public Input No. 11-NFPA 14-2013 [ Global Input ] Include the provision of new design proposal in the code for Fire water system. Additional Proposed Changes File Name NFPA_Public_Input_Form.pdf

More information

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment of 25 5/14/2015 2:32 PM Public Comment No. 22-NFPA 14-2014 [ New Section after 1.4 ] A.1.4 A.1.4 It is the intent of the Commi ee to recognize that future edi ons of this standard are a further refinement

More information

Page 1 of 73 Print Reload Page Close Show Cart Public Input No. 13-NFPA 170-2012 [ Global Input ] 3.3.3 Photoluminescent. A type of sign that is self-energized with respect to luminosity and requires no

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

Public Comment No. 3-NFPA [ Chapter 7 ]

Public Comment No. 3-NFPA [ Chapter 7 ] Page 1 of 8 Public Comment No. 3-NFPA 405-2013 [ Chapter 7 ] Chapter 7 ARFF Personnel Safety and Safety Management 7.1 Scope. This chapter identifies the knowledge and skills necessary to ensure ARFF personnel

More information

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit) DUQUESNE UNIVERSITY Fire Protection System Impairment Program (Red etag Permit) Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Exceptions 2 Definitions

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 11 Page 1 of 12 I. PURPOSE This procedure establishes a tool to help maintain a safe environment for all patients, visitors and staff by evaluating the loss of a life safety feature during

More information

The 2012 Fire Suppression Rating Schedule (FSRS)

The 2012 Fire Suppression Rating Schedule (FSRS) The 2012 Fire Suppression Rating Schedule (FSRS) Summary of Changes March 21, 2017 How to Get a Copy of the FSRS Only FIRE CHIEFS may request a free copy of the FSRS. Submit (via e-mail only) an ATTACHED

More information

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Date Issued: December 14, 2017 Revision: 2.1

Date Issued: December 14, 2017 Revision: 2.1 2.1 1. Introduction A is implemented to ensure the fire safety of building occupants or a building area when the Fire Alarm System or a Fire Protection System has been temporarily disabled due to malfunction,

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS Introduction When properly installed and maintained, automatic fire sprinkler systems have proven to be the most effective means for protecting life and

More information

Structural Firefighting Policy

Structural Firefighting Policy Section Policy Number Effective Date C C1 09/01/2015 Policy Issued As Reference Policy # B1-B4, B6, C2-C10, C12, D1, and TBD Subject Approval: Policy Donald Norman, Fire Chief PURPOSE The purpose of this

More information

Risk Management Services

Risk Management Services Risk Management Services FIRE PROTECTION IMPAIRMENT PROGRAM Introduction Fire protection systems represent a significant capital investment for organizations. Companies want to make sure that they are

More information

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees Purpose: To establish procedures to be followed when a fire

More information

I. It shall be the responsibility of the department officers to implement this operating guideline.

I. It shall be the responsibility of the department officers to implement this operating guideline. Procedure Effective Date Rescinds HIGH RISE INCIDENTS New Reference FIRE CHIEFS ASSOCIATION OF CENTRAL OHIO Page 1 of 11 NORWICH TOWNSHIP FIRE DEPARTMENT SOG# 8 Purpose: The purpose of this procedure is

More information

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT The interaction of fire protection systems can be extremely complex. The detection of a fire in a building by an automatic device

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1 Interim Life Safety Measures Purpose of Interim Life Safety Management BASIC SAFETY: During renovations projects in healthcare occupancies, the basic level of protection for the occupants must be maintained

More information

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why

More information

Fire System Impairment Policy

Fire System Impairment Policy Fire System Impairment Policy Purpose: To establish procedures to be followed, when a fire protection or suppression system is taken out of service, due to construction, alteration, power outage, repair,

More information

Chapter 4: Fire Protection Systems

Chapter 4: Fire Protection Systems Chapter 4: Fire Protection Systems Automatic Extinguishing Systems (Fire Sprinklers) One of the most important aspects of a storage warehouse inspection is ensuring that the automatic extinguishing system

More information

NFPA 13E Recommended Practice for Fire Department Operations in Properties Protected by Sprinkler and Standpipe Systems

NFPA 13E Recommended Practice for Fire Department Operations in Properties Protected by Sprinkler and Standpipe Systems NFPA 13E Recommended Practice for Fire Department Operations in Properties Protected by Sprinkler and Standpipe Systems National Fire Protection Association, 1 Batterymarch Park, PO Box 9101, Quincy, MA

More information

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON WATER-COOLING TOWERS First Draft Meeting Agenda February 7, 2014 10:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions and Update of

More information

Narrative Reports As Regulated by 780 CMR, Section 903.0

Narrative Reports As Regulated by 780 CMR, Section 903.0 EXHIBIT 20 Narrative Reports As Regulated by 780 CMR, Section 903.0 903.1.1 - FIRE PROTECTION CONSTRUCTION DOCUMENTS a. Basis (methodology) of design for the protection of the occupancy and hazard for

More information

Page 1 of 10 Second Revision No. 8-NFPA 600-2014 [ Section No. 3.3.17 ] 3.3.17* Incident Management System (IMS). A system that defines the roles and responsibilities to be assumed by responders and the

More information

Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition.

Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition. Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition. Revised 02/10/2017 Alabama Fire College Firefighter II Instructional JPR Verification Sheet Full Name: Fire Department:

More information

Additional Materials: Instructor s PowerPoint, Question Files

Additional Materials: Instructor s PowerPoint, Question Files Course Delivery Formats: Online Interactive Course Online Streamed Video DVD Additional Materials: Instructor s PowerPoint, Question Files When it comes to mastering the basics for certification or refresher

More information

JEFFERSON COUNTY PUBLIC SCHOOLS FIRE WATCH PROGRAM

JEFFERSON COUNTY PUBLIC SCHOOLS FIRE WATCH PROGRAM 1 JEFFERSON COUNTY PUBLIC SCHOOLS FIRE WATCH PROGRAM PURPOSE: To minimize potential structural damages and to protect the life safety of all building occupants during periods when the automatic fire alarm

More information

Public Comment No. 3-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 3-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 3-NFPA 1408-2013 [ Global Input ] Type your content here... NFPA 1408, Standard for Training Fire Service Personnel in the Operation, Care, Use and Maintenance of Thermal Imagers Revise

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION SECTION: UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION INITIATOR: DALE SAUNDERS REVISION DATE: September 2015 1. Program Description 2. Scope 3. Definitions

More information

Cumru Township Fire Department 4/27/10 Standard Operating Guidelines Page: 1 of 6 Section 15.07

Cumru Township Fire Department 4/27/10 Standard Operating Guidelines Page: 1 of 6 Section 15.07 Standard Operating Guidelines Page: 1 of 6 15.07 Scope: Commercial properties shall include businesses, schools and shops with very limited special hazards. 15.0701 First engine placement: Positioning

More information

Safety Manual: Emergency Response

Safety Manual: Emergency Response Safety Manual: Emergency Response January, 2017 6.0 Emergency Preparedness Introduction This Chapter provides guidelines for dealing with Emergencies. Fires, no matter how small, must be reported to management

More information

NFPA Self Assessment Manual

NFPA Self Assessment Manual NFPA 1720 Self Assessment Manual Standard for the Organization and Deployment of Fire Suppression, Emergency Medical Operations, and Special Operations to the Public by Volunteer Fire Departments 2014

More information

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN) 4 of 326 11/21/2013 1:03 PM First Revision No. 161-NFPA 72-2013 [ Section No. 3.3.11 ] 3.3.11 Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

More information

CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY

CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY Origination Date: July 1 st 2009 1. PURPOSE The purpose of this policy is to create a safe environment for faculty, staff, students and visitors by applying

More information

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805) Oxnard Fire Department 360 W. Second Street Oxnard, CA 93030 (805) 385-7722 Fax (805) 385-8009 FIVE YEAR CERTIFICATION REPORT Service and maintenance report for automatic fire extinguishing systems, including

More information

Talking about NFPA History of NFPA NFPA Standard 1710: Organization and Deployment of Fire Suppression Operations, EMS

Talking about NFPA History of NFPA NFPA Standard 1710: Organization and Deployment of Fire Suppression Operations, EMS NFPA Standard 1710: Organization and Deployment of Fire Suppression Operations, EMS and Special Ops The History The Right Description and The 2015 Revision Recognized early aggressive and offensive primary

More information

UNIVERSITY OF TOLEDO

UNIVERSITY OF TOLEDO UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect

More information

FIREFIGHTER II: FIRE DEPARTMENT COMMUNICATIONS COMMUNICATIONS: SKILL SHEET #2 Define and Demonstrate Fire Department Radio Procedure

FIREFIGHTER II: FIRE DEPARTMENT COMMUNICATIONS COMMUNICATIONS: SKILL SHEET #2 Define and Demonstrate Fire Department Radio Procedure NFPA 1001: 6.2.2 FIREFIGHTER II: FIRE DEPARTMENT COMMUNICATIONS COMMUNICATIONS: SKILL SHEET #2 Define and Demonstrate Fire Department Radio Procedure OBJECTIVE Trainee shall define and demonstrate prescribed

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

I. Welcome and call to order by Chairman Kann. Review and accept minutes from the October 2012 meeting. V. Task Group report on NFPA 1003 work

I. Welcome and call to order by Chairman Kann. Review and accept minutes from the October 2012 meeting. V. Task Group report on NFPA 1003 work Meeting Agenda First Draft Meeting NFPA 405, NFPA 408, and NFPA 422 Technical Committee on Aircraft Rescue and Fire Fighting May 8 th and May 9 th, 2013 Miami, Fl. I. Welcome and call to order by Chairman

More information

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087 SOG Name: Multi Family Dwelling SOG Number: 403.15 Effective Date: February 2, 2015 Approved: Joey Cooper, Director Reviewed: Scope This procedure has been developed to provide WEMA with a set of guidelines

More information

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Alabama Fire College Airport Firefighter Instructional JPR Verification Sheet Full Name: Fire Department: This Instructional

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review Minooka Fire Protection District Maintaining Your Fire Safety Systems Fire continues to be a major threat

More information

Fire Service Considerations A Primer for Building and System Designers. Society of Fire Protection Engineers Fire Service Committee

Fire Service Considerations A Primer for Building and System Designers. Society of Fire Protection Engineers Fire Service Committee Fire Service Considerations A Primer for Building and System Designers Society of Fire Protection Engineers Fire Service Committee Version 1 October 15, 2012 Target Audience Any of these designers without

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION CHAPTER 14 FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION SECTION FC 1401 GENERAL 1401.1 Scope. This chapter shall govern fire safety measures during the construction, alteration, or demolition

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

FIREFIGHTER II MANIPULATIVE SKILL OBJECTIVES

FIREFIGHTER II MANIPULATIVE SKILL OBJECTIVES 10 FIREFIGHTER II MANIPULATIVE SKILL OBJECTIVES GENERAL 1- Demonstrate procedures for assuming and transferring command at an emergency scene, utilizing an incident management system. REFERENCE: NFPA 1001,

More information

Impairments to Fire Protection Equipment

Impairments to Fire Protection Equipment Impairments to Fire Protection Equipment INTRODUCTION Buildings and equipment are provided with fire protection and/or detection systems to reduce property damage and interruption to business in the event

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD STANDPIPE SYSTEMS PURPOSE This standard outlines the general requirements for the installation of standpipe systems. CODE REFERENCES

More information

OXNARD FIRE DEPARTMENT Fire Watch Guidelines

OXNARD FIRE DEPARTMENT Fire Watch Guidelines OXNARD FIRE DEPARTMENT Fire Watch Guidelines What is a Fire Watch? A Fire Watch is a temporary measure intended to ensure continuous and systematic surveillance of an activity, building or portion thereof

More information

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS 61G15-32.001 61G15-32.002 61G15-32.003 61G15-32.004 61G15-32.005 61G15-32.006 61G15-32.007

More information

Technical Committee on Standpipes (SPI-AAA)

Technical Committee on Standpipes (SPI-AAA) Technical Committee on Standpipes (SPI-AAA) M E M O R A N D U M DATE: February 13, 2014 TO: FROM: Principal and Alternate Members of the Technical Committee on Standpipes (SPI-AAA) Chad Duffy, NFPA Staff

More information

This policy may also be used for routine work orders that are Life Safety in nature and cannot be completed within 45-days.

This policy may also be used for routine work orders that are Life Safety in nature and cannot be completed within 45-days. Policy: It is the policy of the St. Joseph Mercy Health System (SJMHS- Ann Arbor, Oakland, Livingston, Brighton, Chelsea and St. Mary Mercy Hospital- Livonia) and associated satellite facilities to assure

More information

Cedar Hammock Fire Rescue Standard Operational Guidelines FIRE WATCH. General. Requirements for a Fire Watch

Cedar Hammock Fire Rescue Standard Operational Guidelines FIRE WATCH. General. Requirements for a Fire Watch Cedar Hammock Fire Rescue Standard Operational Guidelines FIRE WATCH General This information is provided to clarify the requirements for a fire watch. A fire watch is the action of a person or persons

More information

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e 5.07 Air Replenishment Systems (2016) Reference: SFFC, Section 511.2. Purpose: The purpose of this bulletin is to describe the requirements for air replenishment systems intended to be used to fill firefighters'

More information

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS 11 NCAC 05A.0901 DEFINITIONS As used in this Subchapter: (1)

More information

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification First Correlating Revision No. 3-NFPA 101-2016 [ Section No. 6.1.8.1.1 ] 6.1.8.1.1* Definition One- and Two-Family Dwelling Unit. A building that contains not more than two dwelling units, with independent

More information

5.07 Air Replenishment Systems

5.07 Air Replenishment Systems 5.07 Air Replenishment Systems Reference: 2010 SFFC, Section 511.2 Definitions: CERTIFIED COMPRESSOR. A compressor used by a contractor for maintenance and testing of air replenishment systems that is

More information

DCN: ENGINE COMPANY OPERATIONS CHAPTER 4 March 15, 1997 FIRE SCENE OPERATIONS

DCN: ENGINE COMPANY OPERATIONS CHAPTER 4 March 15, 1997 FIRE SCENE OPERATIONS DCN: 4.05.01 ENGINE COMPANY OPERATIONS CHAPTER 4 March 15, 1997 FIRE SCENE OPERATIONS 4. FIRE SCENE OPERATIONS 4.1 FIREFIGHTING OBJECTIVES 4.1.1 The objectives of firefighting are to protect life and property

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Plot # 33-36 Sector # 07, Chittagong Chittagong Chittagong 08 Jun 2014 The Alliance for Worker Safety Page 1/18 08 Jun 2014 Introduction to the Report

More information

Builders Risk - Fire Prevention Inspection Checklist

Builders Risk - Fire Prevention Inspection Checklist Builders Risk - Fire Prevention Inspection Checklist Use our inspection checklist tool to help you identify and monitor risk related to builders risk of fire on the job site. Inspection Details: Inspector

More information

4/13/2015. Everything a firefighter wants to tell a design professional or building code official, in one hour.

4/13/2015. Everything a firefighter wants to tell a design professional or building code official, in one hour. Everything a firefighter wants to tell a design professional or building code official, in one hour. 1 2 3 1 4 The job of the fire department is to put the wet stuff on the red stuff. 5 Job #1. of the

More information

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS TEN STEP PROCESS PREPARING FIRE SAFETY PLANS STEP 1 CONDUCT FIRE SAFETY AUDIT IDENTIFY BUILDING FEATURES AND HUMAN RESOURCES. STEP 2 APPOINTMENT OF SUPERVISORY STAFF IDENTIFY TRAINED SUPERVISORY STAFF

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

CONTRACT FOR USE OF FIRE PROTECTION SYSTEM

CONTRACT FOR USE OF FIRE PROTECTION SYSTEM CONTRACT FOR USE OF FIRE PROTECTION SYSTEM THIS AGREEMENT made and entered on this the day of, 20 by and between its successors and assigns, hereinafter referred to as Customer and the Jessamine County

More information

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance It is ordained by the Town Council of the Town of New Shoreham

More information

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS Department of Fire Rescue & Emergency Services Fire Marshal s Office Dania Beach District 103 West Dania Beach Blvd. Dania Beach, Florida 33004 Office: (954)342-4262 Fax: (954)342-4265 FIRE SPRINKLER SHOP

More information

WASHINGTON SURVEYING AND RATING BUREAU

WASHINGTON SURVEYING AND RATING BUREAU WASHINGTON SURVEYING AND RATING BUREAU AGENDA Who we are What we do Why we do it How PC gradings are developed Grading topics How PC gradings are published WHO WE ARE Rating Bureau Starting our 102 th

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

Smoke Management in High-Rise Structures

Smoke Management in High-Rise Structures Smoke Management in High-Rise Structures Most modern building codes define a high-rise structure as a building greater than 75 feet in height from the lowest level of fire department vehicle access to

More information

M E M O R A N D U M. Technical Committee on Fire Fighter Professional Qualifications

M E M O R A N D U M. Technical Committee on Fire Fighter Professional Qualifications National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Fighter Professional

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety

Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety 2017 Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety First

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

Vacant Building Loss Prevention Best Practices

Vacant Building Loss Prevention Best Practices Vacant Building Loss Prevention Best Practices Vacant properties are susceptible to a unique set of hazards that should be considered and addressed to avoid losses. Occupants are often the eyes and ears

More information

FIRE FIGHTER II APPLICATION PENNSYLVANIA VOLUNTARY FIRE SERVICE CERTIFICATION PROGRAM NFPA Edition

FIRE FIGHTER II APPLICATION PENNSYLVANIA VOLUNTARY FIRE SERVICE CERTIFICATION PROGRAM NFPA Edition FIRE FIGHTER II APPLICATION PENNSYLVANIA VOLUNTARY FIRE SERVICE CERTIFICATION PROGRAM NFPA 1001 2008 Edition SECTION I Last Name First Name M.I. SSN (last four digits required) Street Address City State

More information

UNIVERSITY. Facilities Management

UNIVERSITY. Facilities Management EAST TENNESSEE STATE UNIVERSITY Facilities Management Policy Number: 700.10 Title: Fire Protection Impairment Program Implementation Date: April, 2008 Last Revised: August 4th, 2014 Introduction The probability

More information

1 Pre-Burn Plan Mandatory. 2 Pre-Burn Inspection Mandatory. 3 Pre-Burn Briefing Mandatory. 4 Instructor In Charge Mandatory

1 Pre-Burn Plan Mandatory. 2 Pre-Burn Inspection Mandatory. 3 Pre-Burn Briefing Mandatory. 4 Instructor In Charge Mandatory Colorado Division of Fire Prevention & Control Live Fire Training Evolutions Fixed Facility Instructor I Job Performance Requirements ( JPRs ) ( Edition) JPR # Task Initial Certification JPR Requirement:

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Plot No -246-249, Adamjee EPZ, Siddhirganj, Narayanganj Narayanganj 17 Jul 2016 The Alliance for Bangladesh Worker Safety Page 1/17 Factory 17 Jul 2016 Introduction

More information

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems Adam Olomon, P.E. Associate Consultant Fire & Life Safety and Fire Protection Introduction Adam Olomon Licensed Professional Engineer

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Page 1 of 13 Public Comment No. 2-NFPA 703-2013 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, P.O. Box C700, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. ASTM D 2898, Standard

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information