1 National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax: MEMORANDUM TO: FROM: NFPA Technical Committee on Gas Process Safety Kimberly Shea, Administrator, Technical Projects DATE: August 13, 2015 SUBJECT: NFPA 56 First Draft FINAL TC Ballot Results (F2016) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot with the exception of First Revision No Members Eligible to Vote 7 Not Returned (Bowdoin Jr., Cirone, Convery, Donsbach, Jr., Kovach, Levengood, Naper) 8 Affirmative on All Revisions 1 Affirmative with Comment on one or more Revision (Willse) 5 Negative on one or more Revision (Bethany, Danner, Swiecicki, Puskar, Rice) 1 Abstentions on one or more Revision (Switzer, Jr.) The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each first revision. There are two criteria necessary for each first revision to pass ballot: (1) simple majority and (2) affirmative 2 / 3 vote. First Revision No. 20 did not obtain the number of affirmative votes needed to meet the simple majority requirement. According to the Regulations, the FR has been redesignated as Committee Input No. 20 as shown on the last page of this report. The mock examples below show how the calculations are determined. (1) Simple Majority: 22 members eligible to vote 2 = = 12 (2) Affirmative 2 / 3 : Sample calculation: 22 members eligble to vote 7 not returned 1 abstentions = 14 x 0.66 = 9.24 = 10 As always please feel free to contact me if you have any questions.

2 First Revision No. 5-NFPA [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 2, Hydrogen Technologies Code, edition. NFPA 30, Flammable and Combustible Liquids Code, edition. NFPA 31, Standard for the Installation of Oil-Burning Equipment, edition. NFPA 51, Standard for the Design and Installation of Oxygen Fuel Gas Systems for Welding, Cutting, and Allied Processes, 2013 edition. NFPA 51A, Standard for Acetylene Cylinder Charging Plants, edition. NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, 2014 edition. NFPA 52, Vehicular Gaseous Fuel Systems Code, edition. NFPA 54, National Fuel Gas Code, edition. NFPA 55, Compressed Gases and Cryogenic Fluids Code, edition. NFPA 58, Liquefied Petroleum Gas Code, edition. NFPA 59, Utility LP-Gas Plant Code, edition. NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG), edition. NFPA 69, Standard on Explosion Prevention Systems, edition. NFPA 70, National Electrical Code, edition. NFPA 2113, Standard on Selection, Care, Use, and Maintenance of Flame-Resistant Garments for Protection of Industrial Personnel Against Short-Duration Thermal Exposures, 2015 edition. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue May 12 15:26:01 EDT 2015 Committee Statement Committee Statement: NFPA 2113 was added due to its inclusion in FR-4. Response Message: Public Input No. 17-NFPA [Section No. 2.2] Ballot Results This item has passed ballot 22 Eligible Voters of 38 8/11/ :13 AM

3 of 38 8/11/ :13 AM 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J.

4 of 38 8/11/ :13 AM First Revision No. 1-NFPA [ Section No ] ASME Publications. American Society of Mechanical Engineers, Three Two Park Avenue, New York, NY ASME B31.1, Power Piping, ASME B31.3, Process Piping, ASME B31.12, Hydrogen Piping and Pipelines, Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue May 12 11:09:36 EDT 2015 Committee Statement Committee Statement: Referenced current editions. Response Message: Public Input No. 4-NFPA [Section No ] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S.

5 Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J. of 38 8/11/ :13 AM

6 of 38 8/11/ :13 AM First Revision No. 28-NFPA [ Section No. 2.4 ] 2.4 References for Extracts in Mandatory Sections. NFPA 54, National Fuel Gas Code, edition. NFPA 55, Compressed Gases and Cryogenic Fluids Code, edition. Submitter Information Verification Submitter Full Name: DANIEL GORHAM Organization: NATIONAL FIRE PROTECTION ASSOC Street Address: City: State: Zip: Submittal Date: Thu Jun 11 15:20:16 EDT 2015 Committee Statement Committee Statement: Updated to most recent editions. Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan

7 of 38 8/11/ :13 AM Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J.

8 of 38 8/11/ :13 AM First Revision No. 15-NFPA [ Section No ] 3.3.4* Detection Equipment. Monitoring equipment necessary for detecting and/or measuring the volume concentration of flammable gas or oxygen present in air. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 10:31:31 EDT 2015 Committee Statement Committee Statement: Determination of safety is based on the concentration of gas as opposed to volume. Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P.

9 of 38 8/11/ :13 AM Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J.

10 of 38 8/11/ :13 AM First Revision No. 4-NFPA [ Section No ]

11 0 of 38 8/11/ :13 AM 4.4.1*

12 1 of 38 8/11/ :13 AM The written procedure for each cleaning and purging activity shall address, as a minimum, the following items: (1) Scope of work and site-specific purge procedure development (a) Cleaning and purging method (b) Piping and instrument diagrams (PIDs) (c) Chemical and physical properties of flammable gas, cleaning media, purge media, and discharge gas (d) Determination of purge end point introducing flammable gas, inert gas, or air (e) Assessment and control of purge inlet and discharge locations (f) * Mitigation or capture strategies (g) Temporary piping system design Personal protective equipment (PPE) Training and qualifications (h) Management review and approval (i) Restoration of service (j) Target design, launcher/receiver venting review for pigging operations (k) Regulatory permits (l) Evaluation of engineering controls to limit potential unintended ignition of gases (controlled oxidation, flaring ) that allow gases from depressurization to be consumed in a controlled manner instead of vented (e.g., flaring or controlled combustion in process equipment). (m) Written stand-down instructions to stop activity in a controlled manner (n)* Precautions for gases that have toxic, highly toxic, unstable reactive, corrosive, or other deleterious properties beyond flammability (2)* Environmental conditions and work locations (a) (b) (c) (d) (e) (f) (g) (h) (i) Establishment and clear identification of exclusion zones where flammable gas air mixtures are likely to exist Limited access for personnel not directly involved with purge operations Assessment of potential for gas migration (e.g., building openings, adjacent structures) Prohibition of hot work within exclusion zones Lockout/tagout Impact of environmental conditions (e.g., wind speed and direction, temperature, barometric pressure) on purge operations Vehicular and air traffic, if applicable Topography Noise control/monitoring (3) Communication plans (a) Pre-job briefings (b) Work permits (c) Roles and responsibilities (d)* Emergency response plan (e) Facility alarm, alert and warning systems (f) General facility notification prior to start of purge operations (g) General facility notification at the conclusion of purge operations

13 2 of 38 8/11/ :13 AM (h) Notification of regulatory authorities as required (local emergency responders, utility operators, community officials, environmental authorities, etc.) (4) Control of ignition sources (a)* Bonding and grounding considerations (b) No smoking or spark-producing work within exclusion zones (c) Elimination of hot work within exclusion zone (d) Static electricity ignition sources at discharge point (e)* Non-conductive piping, hose, or fittings in temporary piping assemblies (5) Pre-purge piping system assessment (a) (b) (c) Assessment of piping system for trapped liquids, pyrophoric solids, and other flammable or combustible deposits within the piping system Ensuring that the piping system is properly isolated Limiting site conditions that impact the safety of the activity (6)* Purge monitoring and instrumentation (a) (b) (c) (d) (e) (f) Ensuring that monitoring instruments are appropriate for gas being purged Training Calibration Monitoring frequency and reporting Appropriate selection of sample point(s) General atmosphere checks in vicinity of purge gas release (7) Protection and Rescue of Personnel (a) (b) (c) (d) (e) (f) (g) Training requirements for personnel involved in the work efforts Personal protective equipment Selection of fire-resistant clothing (FRC) shall be based on a hazard analysis in accordance with NFPA 2113 Rescue equipment, including self-contained breathing apparatus and breathing air escape packs Standby rescue personnel Primary and secondary assembly areas Assignment of personnel for alerting and accounting of personnel Supplemental Information File Name 56_F2016_FR-4_A.4.4.1_4_e_.docx 56_F2016_FR-4.docx Description New Annex section A (4)(e) Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State:

14 Zip: Submittal Date: Tue May 12 11:42:55 EDT 2015 Committee Statement Committee Statement: Made editorial revisions for clarity. While the current text highlights control of static electricity at the discharge point, the inclusion of non-conductive components within a temporary piping system used for venting and purging can induce static charges that may not be accounted for if the focus is limited to the discharge point. Although primarily directed at non-conductive liquids, NFPA 77 provides the essential basis for control of this hazard and, while it is generically referenced in the annex for Section 4.4.1(4)(a), drawing the user to the specifics of Section 10.3 in NFPA 77 will promote a proper review of this detail. API RP 2003 provides a full discussion of protections for static electricity and can be of assistance in evaluating the risks from static electricity. Reorganized and updated to raise the awareness level of users to these issues. Response Message: Public Input No. 16-NFPA [Section No ] Public Input No. 23-NFPA [Section No ] Public Input No. 24-NFPA [New Section after A.4.4.1(4)(a)] Public Input No. 7-NFPA [Section No ] Public Input No. 6-NFPA [New Section after 4.4.1] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob 3 of 38 8/11/ :13 AM

15 4 of 38 8/11/ :13 AM Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J.

16 5 of 38 8/11/ :13 AM First Revision No. 12-NFPA [ Section No. 5.1 [Excluding any Sub-Sections] ] Persons whose duties fall within the scope of this standard shall be provided with training that is consistent with the scope of their job activities and assigned tasks for the cleaning or purging work to be performed. Evidence of knowledge transfer shall be included as part of the training program. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 09:29:24 EDT 2015 Committee Statement Committee Statement: Language added to help insure knowledge transfer is effective. Response Message: Public Input No. 8-NFPA [Section No. 5.1 [Excluding any Sub-Sections]] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 12 Affirmative All 1 Affirmative with Comments 2 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P.

17 Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Switzer, Jr., Franklin R. Affirmative with Comment Willse, Peter J. This section now has 2 requirements. Suggest breaking the second part into new section. Negative with Comment Bethany, Michael I am okay with the addition to the first part regarding assigned tasks, but looking back through my notes I did not see that we defined what is meant by "evidence of knowledge transfer". I believe we need to further clarify this term before we require it of end users of the code. Swiecicki, Bruce J. Wording is clumsy. The first read through I thought "assigned" was a directive to assign someone tasks to do. I suggest we adopt something more definitive, like the following, taken from NFPA 58 but adapted to NFPA 56: 5.1 Persons whose primary duties fall within the scope of this standard shall complete training that includes the following components: (1) Safe work practices (2) The health and safety hazards associated with the flammable gases utilized (3) Emergency response procedures (4) Supervised, on-the-job training (5) An assessment of the person s ability to perform the job duties assigned 6 of 38 8/11/ :13 AM

18 7 of 38 8/11/ :13 AM First Revision No. 13-NFPA [ Section No ] Training records, including dates of training, name of instructor(s), content or curriculum covered, and evidence of knowledge transfer, shall be maintained for a period not less than 5 years from the date of completion of the activity. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 09:45:56 EDT 2015 Committee Statement Committee Statement: Clarification to what records must be maintained. Response Message: Public Input No. 9-NFPA [Section No ] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 11 Affirmative All 1 Affirmative with Comments 3 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan

19 Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Sameth, Jerrold Switzer, Jr., Franklin R. Affirmative with Comment Willse, Peter J. Suggest adding this to the Annex rather than have it part of the requirement. Make it a list of items that should be part of the training record. Start it by stating here is a list of items that should be included int the training record, but not limited to. Some AHJ would require location of training be added. Negative with Comment Bethany, Michael Once again, "evidence of knowledge transfer" is too vague. We either allow the end users to keep their own records, or if we want to require them to document specific parts of training include an "NFPA 56 Training Record Form" in the annex for the user to fill out. Rice, Alan After review, I think terminology knowledge transfer is vague and agree in general with proposed wording from Bruce j. Swiecicki but add at end of sentence training and instruction activity: Training records, including dates of training, name of instructor(s), content of curriculum covered, and documentation of the person s ability to perform the job duties assigned, shall be maintained for a period of 5 years from the date of completion of the training and instruction activity. Swiecicki, Bruce J. Again, "evidence of knowledge transfer" is very vague. How much knowledge must be transferred? Suggest the following, which provides a more definitive evaluation component: Training records, including dates of training, name of instructor(s), content or curriculum covered and documentation of the person s ability to perform the job duties assigned, shall be maintained for a period not less than 5 years from the date of completion of the activity. 8 of 38 8/11/ :13 AM

20 First Revision No. 21-NFPA [ Section No ] 7.1.2* If the electric generating plant is owned or operated by the serving natural gas supplier, natural gas piping between the point of delivery or source valve and the plant shall be permitted to be purged into service in accordance with the serving natural gas supplier s written procedures The natural gas supplier s written procedures shall include a safety validation in accordance with Section The natural gas supplier s written procedures and process shall be coordinated with the plant operational personnel. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 12:34:47 EDT 2015 Committee Statement Committee Statement: Clarify that this is applicable explicitly to electrical generating plant. Response Message: Public Input No. 20-NFPA [Section No ] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 12 Affirmative All 0 Affirmative with Comments 3 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. 9 of 38 8/11/ :13 AM

21 Affirmative All Bairley, Donald W. Buehler, Christopher S. Cabot, Paul W. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Negative with Comment Bethany, Michael I am indifferent about clarifying that plant means electric generating plant, that is fine. Upon further reading and consideration, I would like to see this section (7.1.2) removed completely. The purpose of the NFPA codes is to provide minimum safety standards with the intent of preventing disasters. Section essentially exempts natural gas suppliers from NFPA 56 within the electric generating plant (not including the safety validation). If the natural gas supplier has clear and rigorous policies and procedures for cleaning and purging flammable gas piping inside electric generating facilities, complying with or exceeding NFPA 56 should be easily accomplished. If they do not, then NFPA 56 provides some basic protections for the facility and the personnel working there. Danner, Lawrence M. Explicitly stating electric generating plant suggests the Standard scope is limited to that type of facility. This is contrary to the stated applicability in Section shall apply to flammable gas piping found in electric generating plants and in industrial, institutional, and commercial applications. I would also remind the committee that the US Chemical Safety Board final report on the Kleen Energy power plant explosion (the event that resulted in the CSB recommendations to the NFPA triggering the development of NFPA 56) also cited the Con-Agra Foods explosion in 2009 as further evidence of the need for guidance applicable to the cleaning and purging activities in general, not specific to power plants. We should collectively develop either 1) an appropriate definition of a plant as it pertains to the NPFPA 56 subject matter or 2) specific language in place of the word plant to properly reflect the scope of the document. Willse, Peter J. We are now only limiting these requirements to electric generaqting plants, what about interrgrated chemical facilities? 0 of 38 8/11/ :13 AM

22 First Revision No. 22-NFPA [ Section No ] 8.2.1* If the electric generating plant is owned or operated by the serving natural gas supplier, natural gas piping between the point of delivery or source valve and the plant shall be permitted to be purged out of service in accordance with the serving natural gas supplier s written procedures The natural gas supplier s written procedures shall include a safety validation in accordance with Section The natural gas supplier s written procedures and process shall be coordinated with the plant operational personnel. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 12:46:00 EDT 2015 Committee Statement Committee Statement: Clarify this is explicitly applicable to electric generating plants. Response Message: Public Input No. 21-NFPA [Section No ] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 12 Affirmative All 0 Affirmative with Comments 3 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. 1 of 38 8/11/ :13 AM

23 Affirmative All Bairley, Donald W. Buehler, Christopher S. Cabot, Paul W. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Negative with Comment Bethany, Michael I am indifferent about clarifying that plant means electric generating plant, that is fine. Upon further reading and consideration, I would like to see this section (8.2.1) removed completely. The purpose of the NFPA codes is to provide minimum safety standards with the intent of preventing disasters. Section essentially exempts natural gas suppliers from NFPA 56 within the electric generating plant (not including the safety validation). If the natural gas supplier has clear and rigorous policies and procedures for cleaning and purging flammable gas piping inside electric generating facilities, complying with or exceeding NFPA 56 should be easily accomplished. If they do not, then NFPA 56 provides some basic protections for the facility and the personnel working there. Danner, Lawrence M. See my comment on FR-21. Willse, Peter J. We are now only limiting these requirements to electric generaqting plants, what about interrgrated chemical facilities? 2 of 38 8/11/ :13 AM

24 3 of 38 8/11/ :13 AM First Revision No. 27-NFPA [ Section No. A.1.1.2(8) ] A.1.1.2(8) The scope of NFPA 59, Utility LP-Gas Plant Code, is included here for the convenience of the user: 1.1 Scope. [59:1.1] This code shall apply to the design, construction, location, installation, operation, and maintenance of refrigerated and nonrefrigerated utility gas plants including LP-gas containers, piping, ans associated process equipment, and controls and fire protection. Coverage of liquefied petroleum gas systems at utility gas plants shall extend to the point where LP-Gas or a mixture of LP-Gas and air is introduced into the utility distribution system. [ 59: 1.1.1] Converage begins at: (1) The point of transfer when delivery is by cargo tank vehicle or railcar (2) The liquid inlet isolation valve located downstream of hazardous liquid pipeline under the jurisdiction of 49 CFR Part 195 (3) Coverage shall extend to the point where LP-Gas vapor or mixture of LP-Gas vapor and air is introduced into the utility distribution system under the jurisdiction of 49 CFR Part 192. [ 59: 1.1.1] 1.1.2When operations that involve the liquid transfer of LP-Gas from the utility gas plant storage into cylinders or portable tanks (as defined by NFPA 58, Liquefied Petroleum Gas Code ) are carried out in the utility gas plant, these operations shall conform to NFPA 58, Liquefied Petroleum Gas Code Installations that have an aggregate water capacity of 4000 gal (15.14 m 3 ) or less shall conform to NFPA 58. [59:1.1.2] 1.1.3Installations that have an aggregate water capacity of 4000 gal (15.14 m 3 ) or less shall conform to NFPA 58, Liquefied Petroleum Gas Code. [ 59: 1.1.3] See Figure A.1.1.2(8) for a graphical representation of the scope of coverage of NFPA 59. [ 59: A ] Figure A.1.1.2(8) Typical Installation of an LP-Gas or an LP-Gas Air Facility. [59:Figure A.1.1.1] Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Fri May 29 09:55:17 EDT 2015 Committee Statement Committee Statement: Updated to 2015 edition text.

25 4 of 38 8/11/ :13 AM Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J.

26 5 of 38 8/11/ :13 AM First Revision No. 11-NFPA [ Section No. A ] A Inert Gas. Inert gases do not react readily with other materials under normal temperatures and pressures. For example, nitrogen combines with some of the more active metals such as lithium and magnesium to form nitrides, and at high temperatures it will also combine with hydrogen, oxygen, and other elements. The gases neon, krypton, and xenon are considered rare due to their scarcity. Although these gases are commonly referred to as inert gases, the formation of compounds is possible. For example, xenon combines with fluorine to form various fluorides and with oxygen to form oxides; the compounds formed are crystalline solids. Radon is inert under the definition provided, but because it is radioactive, it is not considered inert for the purposes of NFPA 55. [55,, ] Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 09:11:34 EDT 2015 Committee Statement Committee Statement: Response Message: Updated the reference to most current edition. This included language that radon is an inert but should not be use. Public Input No. 1-NFPA [Global Input] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C.

27 Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J. 6 of 38 8/11/ :13 AM

28 7 of 38 8/11/ :13 AM First Revision No. 16-NFPA [ Section No. D.1.1 ] D.1.1 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 1, Fire Code, edition. NFPA 2, Hydrogen Technologies Code, edition. NFPA 30, Flammable and Combustible Liquids Code, edition. NFPA 30A, Code for Motor Fuel Dispensing Facilities and Repair Garages, edition. NFPA 37, Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines, edition. NFPA 45, Standard on Fire Protection for Laboratories Using Chemicals, edition. NFPA 51, Standard for the Design and Installation of Oxygen Fuel Gas Systems for Welding, Cutting, and Allied Processes, 2013 edition. NFPA 51A, Standard for Acetylene Cylinder Charging Plants, edition. NFPA 52, Vehicular Gaseous Fuel Systems Code, edition. NFPA 54, National Fuel Gas Code, edition. NFPA 55, Compressed Gases and Cryogenic Fluids Code, edition. NFPA 55, Compressed Gases and Cryogenic Fluids Code, edition. NFPA 58, Liquefied Petroleum Gas Code, edition. NFPA 59, Utility LP-Gas Plant Code, edition. NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG), edition. NFPA 69, Standard on Explosion Prevention Systems, edition. NFPA 70, National Electrical Code, edition. NFPA 77, Recommended Practice on Static Electricity, 2014 edition. NFPA 85, Boiler and Combustion Systems Hazards Code, edition. NFPA 86, Standard for Ovens and Furnaces, edition. NFPA 87, Recommended Practice for Fluid Heaters, edition. NFPA 99, Health Care Facilities Code, edition. NFPA 400, Hazardous Materials Code, edition. NFPA 801, Standard for Fire Protection for Facilities Handling Radioactive Materials, 2014 edition. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 10:44:38 EDT 2015

29 8 of 38 8/11/ :13 AM Committee Statement Committee Statement: Update to current editions. Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J.

30 9 of 38 8/11/ :13 AM First Revision No. 17-NFPA [ Section No. D ] D AGA Publications. American Gas Association, 400 N. Capitol Street, N W, Washington, DC AGA XK0101, Purging Principles and Practices, Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 10:45:21 EDT 2015 Committee Statement Committee Statement: Update to new edition of AGA document which is currently being revised. See Committee Input to revise Annex B based on new edition of AGA document. Response Message: Public Input No. 5-NFPA [Chapter D] Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W.

31 Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J. 0 of 38 8/11/ :13 AM

32 1 of 38 8/11/ :13 AM First Revision No. 18-NFPA [ Section No. D ] D AIChE Publications. American Institute of Chemical Engineers, Center for Chemical Process Safety, Three Park Avenue, New York, NY Crowl, D. A., Understanding Explosions, Guidelines for Hazard Evaluation Procedures, 2nd 3rd edition, Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 10:47:12 EDT 2015 Committee Statement Committee Statement: Update to current edition of AIChE document. Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W.

33 Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J. 2 of 38 8/11/ :13 AM

34 3 of 38 8/11/ :13 AM First Revision No. 19-NFPA [ Section No. D ] D ASME Publications. American Society of Mechanical Engineers, Three Two Park Avenue, New York, NY ASME B31.1, Power Piping, ASME B31.3, Process Piping, Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 10:48:59 EDT 2015 Committee Statement Committee Statement: Updated references to current editions. Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M.

35 Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J. 4 of 38 8/11/ :13 AM

36 5 of 38 8/11/ :13 AM First Revision No. 24-NFPA [ Section No. D ] D ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM E2079, Standard Test Method for Limiting Oxygen (Oxidant) Concentration for Gases and Vapors, Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 12:54:40 EDT 2015 Committee Statement Committee Statement: Updated to most current edition of ASTM document. Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M.

37 Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J. 6 of 38 8/11/ :13 AM

38 7 of 38 8/11/ :13 AM First Revision No. 6-NFPA [ Section No. D.3 ] D.3 References for Extracts in Informational Sections. NFPA 2, Hydrogen Technologies Code, edition. NFPA 51, Standard for the Design and Installation of Oxygen Fuel Gas Systems for Welding, Cutting, and Allied Processes, 2013 edition. NFPA 51A, Standard for Acetylene Cylinder Charging Plants, edition. NFPA 54, National Fuel Gas Code, edition. NFPA 55, Compressed Gases and Cryogenic Fluids Code, edition. NFPA 58, Liquefied Petroleum Gas Code, edition. NFPA 59, Utility LP-Gas Plant Code, edition. NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG), edition. NFPA 69, Standard on Explosion Prevention Systems, edition. NFPA 77, Recommended Practice on Static Electricity, 2014 edition. Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue May 12 15:34:58 EDT 2015 Committee Statement Committee Statement: Added NFPA 77. Response Message: Ballot Results This item has passed ballot 22 Eligible Voters 7 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat

39 Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Danner, Lawrence M. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott Puskar, John R. Rice, Alan Sameth, Jerrold Swiecicki, Bruce J. Switzer, Jr., Franklin R. Willse, Peter J. 8 of 38 8/11/ :13 AM

40 1 of 3 8/13/2015 1:46 PM Committee Input No. 20-NFPA [ Section No ] This was a First Revision that failed ballot Nonapplication of Standard. This standard shall not apply to the following items: (1) * Piping systems covered by NFPA 2, Hydrogen Technologies Code (2) * Piping systems covered by NFPA 51, Standard for the Design and Installation of Oxygen Fuel Gas Systems for Welding, Cutting, and Allied Processes (3) * Piping systems covered by NFPA 51A, Standard for Acetylene Cylinder Charging Plants (4) Fuel-dispensing facilities covered by NFPA 52, Vehicular Gaseous Fuel Systems Code. (5) * Piping systems covered by NFPA 54, National Fuel Gas Code (6) * Piping systems covered by NFPA 55, Compressed Gases and Cryogenic Fluids Code (7) * Piping systems covered by NFPA 58, Liquefied Petroleum Gas Code (8) (9) * LP-Gas (including refrigerated storage) at utility gas plants (seenfpa 59, Utility LP-Gas Plant Code NFPA 59 ) * LNG facilities covered by NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) (10)* Vehicle fuel dispensers (11) Commissioning and maintenance of equipment (12) Vent lines from pressure relief valves or devices unless such vent lines are also used for purging of flammable gas piping systems (13)* Systems regulated by U.S. Department of Transportation (DOT) 49 CFR (14) * Natural gas gathering lines and other upstream piping not regulated by U.S. Department of Transportation (DOT) 49 CFR 192 Supplemental Information File Name 56_F2016_FR-20_A.1.1.2_14_.docx Description Submitter Information Verification Submitter Full Name: Dan Gorham Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed May 13 11:17:37 EDT 2015 Committee Statement and Meeting Notes Committee Statement: Clarify that gathering lines and upstream piping are not in the scope of this document. Response Message:

41 Public Input No. 14-NFPA [New Section after A.1.1.2(6)] Public Input No. 12-NFPA [Section No ] Public Input No. 13-NFPA [Section No ] Ballot Results This item has failed ballot 22 Eligible Voters 7 Not Returned 4 Negative with Comments 9 Affirmative All 1 Affirmative with Comments 1 Abstention Not Returned Bowdoin, Jr., Leon A. Cirone, Therese Convery, Pat Donsbach, Jr., Louis A. Kovach, Dennis M. Levengood, Kreg J. Naper, Robert C. Negative with Comment Danner, Lawrence M. Having now had the opportunity to review the Task Force report referenced by John Puskar, I concur there is a gap in the published guidance for gathering line piping systems between oil field well heads and the first downstream processing plant. While such piping may be considered as technically equivalent to those piping systems downstream of the processing plant and that 49 CFR 191 and 192 CAN be applied, that application is not obligatory. NFPA 56 is an appropriate forum for filling this gap and I agree with the modification proposed in Public Inputs 12 and 14 to clearly specify when NFPA 56 can be applied to such gathering lines so as to fill the gap in the published guidance. Puskar, John R. I strongly disagree with this item. It is contrary to what the appointed task force on this subject recommended. It is not clear that many of the committee members read the task force report. This change is also contrary to the stated purpose of this standard. There is no document in the oil and gas industry that today protects workers from well head related gas piping issues. This change prohibits the application of this standard to something that the oil and gas industry and the world desperately needs given that nearly almost 2 people die from fires and explosions in this industry every month. Rice, Alan I vote affirmative to addition of #14 but negative to the deletion of NFPA Titles which were struck and not included. Swiecicki, Bruce J. I do not agree with deleting the titles of the standards. It's OK that the specific editions are referenced in Section 2.2, but the reader should not have to search for the titles of each of those standards. Affirmative All Bairley, Donald W. Bethany, Michael W. Buehler, Christopher S. Cabot, Paul W. Dorran, Dan Doucette, John P. Early, Rob Neil, Scott 2 of 3 8/13/2015 1:46 PM

42 3 of 3 8/13/2015 1:46 PM Sameth, Jerrold Affirmative with Comment Willse, Peter J. I vote affirmative to the addition of #14, but negitive on deleting the titles of the NFPA documents. Check the Manual fo Style and other NFPA doecuments such as NFPA 1 Fire Code, NFPA 30 Flammable and Combustible Liquids Code, and NFPA 101 Life Safety Code Abstention Switzer, Jr., Franklin R. At this time I am uncertain of how I feel about this topic, further investigation on my part is required. Editorial Comment Click here

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

Compliance Guidance for non-technical managers

Compliance Guidance for non-technical managers 11699 Brookpark Road Cleveland, OH 44130 USA P: 888-826-3473 F: 216-398-8403 www.combustionsafety.com -WHITEPAPER- NFPA 56 (2012 Ed.) Standard for Fire and Explosion Prevention During Cleaning and Purging

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 39 7/15/2015 8:29 AM Public Input No. 1-NFPA 56-2014 [ Global Input ] NOTE: The following Public Input appeared as Rejected but held (Hold) in Public Comment No. 56PS-12 of the A2013 Second Draft Report

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

Technical Committee on Gas Process Safety AGENDA NFPA 56 Second Draft Meeting February 3, AM-5 PM Web/Teleconference

Technical Committee on Gas Process Safety AGENDA NFPA 56 Second Draft Meeting February 3, AM-5 PM Web/Teleconference Technical Committee on Gas Process Safety AGENDA NFPA 56 Second Draft Meeting February 3, 2016 10 AM-5 PM Web/Teleconference 1. Call to order. Franklin Switzer, Chair. 2. Introductions and Update of Committee

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Technical Committee on Gas Process Safety

Technical Committee on Gas Process Safety Technical Committee on Gas Process Safety MEMORANDUM TO: FROM: Technical Committee on Gas Process Safety Denise Beach, Senior Engineer/Staff Liaison DATE: May 12, 2011 RE: NFPA GPS-AAA Meeting Minutes

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical on Laser Fire Protection Kimberly

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

Technical Committee on Gas Process Safety

Technical Committee on Gas Process Safety Technical Committee on Gas Process Safety AGENDA Web/Teleconference Dec. 13, 2013 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introductions of Members and Guests 3. Staff

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 14 From: Kimberly Shea, Project Administrator

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Notification Appliances for

More information

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

Change all instances of flame resistant (hypobaric) to Limited-Combustible (material) in all instances in the document. 1 of 9 10/21/2015 1:22 PM First Revision No. 3-NFPA 99B-2015 [ Global Input ] Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Portable Fire Extinguishers

More information

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Wood and Cellulosic

More information

Page 1 of 13 Second Revision No. 1-NFPA 326-2014 [ Section No. 2.3.1 ] 2.3.1 ACGIH Publications. American Conference of Governmental Industrial Hygienists, 1330 Kemper Meadow Drive, Cincinnati, OH 45240-1634.

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

ARTICLE 25. FUEL GAS CODE

ARTICLE 25. FUEL GAS CODE ARTICLE 25. Rule 1. Indiana Fuel Gas Code, 2003 Edition (Repealed) (Repealed by Fire Prevention and Building Safety Commission; filed Mar 18, 2008, 2:32 p.m.: 20080423-IR-675070479FRA, eff 90 days after

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM of 66 5/18/2015 1:01 PM Second Revision No. 36-NFPA 32-2015 [ Detail ] 6.5 Solvents (See Annex C for additional information on solvents) Submittal Date: Tue Mar 17 17:20:03 EDT 2015 Committee Statement:

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018) M EM O RA N D UM TO: FROM: DATE: SUBJECT: Correlating Committee on Combustible Dusts Yiu Lee, Project Administrator January 27, 2017 NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Building Service and

More information

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Code Kelly Carey,

More information

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Construction

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Emergency Power Supplies Kelly

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12.

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12. 2/18/2016 National Fire Protection Association Report Committee Input No. 70 NFPA 54 2015 [ Section No. 12.5 ] This was a First Revision that failed ballot. 12.5 Type of Venting System to Be Used. 12.5.1

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement of 35 1/21/2016 7:56 AM First Revision No. 1-NFPA 30A-2015 [ Section No. 1.1.3 ] 1.1.3* This code shall not apply to those motor fuel dispensing facilities where only liquefied petroleum gas (LP-Gas),

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

Page 1 of 126 First Revision No. 113-NFPA 45-2013 [ Global Input ] Change all references to Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS) Submittal Date: Thu May 09 11:40:44 EDT 2013 Response

More information

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

Committee on NFPA 51A

Committee on NFPA 51A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant DATE: May 6, 2010 SUBJECT: ROC Letter Ballot The ROC letter ballot

More information

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Changes to the Florida Building Code, Fuel-Gas This Analysis of Changes for the 5 th Edition (2014) of the Florida Codes is intended

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Water Additives

More information

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Protected Premises Fire Alarm

More information

M E M O R A N D U M. NFPA Technical Committee on Telecommunications. Elena Carroll, Administrator, Technical Projects. Date: July 8, 2014

M E M O R A N D U M. NFPA Technical Committee on Telecommunications. Elena Carroll, Administrator, Technical Projects. Date: July 8, 2014 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Telecommunications

More information

Technical Committee on Gas Process Safety

Technical Committee on Gas Process Safety Technical Committee on Gas Process Safety MEMORANDUM TO: FROM: Technical Committee on Gas Process Safety Denise Beach, Senior Engineer/Staff Liaison DATE: April 7, 2011 RE: NFPA GPS-AAA Meeting Minutes

More information

MEMORANDUM. Technical Committee on Fundamentals of Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Fundamentals of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Fundamentals of Fire Alarm

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Supervising Station

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

MEMORANDUM. NFPA Technical Committee on Liquefied Natural Gas. NFPA 59A Second Draft TC FINAL Ballot Results (F2015)

MEMORANDUM. NFPA Technical Committee on Liquefied Natural Gas. NFPA 59A Second Draft TC FINAL Ballot Results (F2015) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Liquefied Natural Gas

More information

MEMORANDUM. NFPA 99 Second Draft Correlating Committee FINAL Ballot Results (A2017)

MEMORANDUM. NFPA 99 Second Draft Correlating Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Correlating Committee on Health Care Facilities Elena

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

Page 1 of 19 Committee Input No. 14-NFPA 33-2013 [ Global Input ] Type your content here... Supplemental Information File Name IndoorDraftforCI.docx Description This committee input would be added to new

More information

M E M O R A N D U M. NFPA 1911 Second Draft Technical Committee FINAL Ballot Results (F2016 Cycle)

M E M O R A N D U M. NFPA 1911 Second Draft Technical Committee FINAL Ballot Results (F2016 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Department Apparatus

More information

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951) Riverside County Fire Department Office of the Fire Marshal 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4777 Fax (951) 955-4886 Technical Policy Title: Plant Processing and Extraction

More information

GASEOUS HYDROGEN SYSTEMS

GASEOUS HYDROGEN SYSTEMS CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall

More information

Public Safety [661] Chapter 226, Liquefied Petroleum Gas, Amended for Application within the State of Iowa

Public Safety [661] Chapter 226, Liquefied Petroleum Gas, Amended for Application within the State of Iowa Public Safety [661] Chapter 226, Liquefied Petroleum Gas, Pursuant to the authority of Iowa Code section 101.1, the State Fire Marshal hereby adopts new Chapter 226, Liquefied Petroleum Gas, Iowa Administrative

More information

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN) 4 of 326 11/21/2013 1:03 PM First Revision No. 161-NFPA 72-2013 [ Section No. 3.3.11 ] 3.3.11 Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

MEMORANDUM. NFPA Technical Committee on Hazard and Risk of Contents and Furnishings. NFPA 556 First Draft TC FINAL Ballot Results (A2015)

MEMORANDUM. NFPA Technical Committee on Hazard and Risk of Contents and Furnishings. NFPA 556 First Draft TC FINAL Ballot Results (A2015) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Hazard and Risk of Contents

More information

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333 Paul Cabot Administrator National Fuel Gas Ms. Gabriella Davis Recording Secretary, IAPMO Standards Council International Association of Plumbing and Mechanical Officials (IAPMO) IAPMO Group World Headquarters

More information

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Correlating Committee on Signaling Systems for

More information

MEMORANDUM. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Initiating Devices for Fire

More information

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 106-NFPA 86-2012 [ Chapter NFPA ] 7.4.10.2* The number of safety shutoff valve cycles shall be determined by one of the following ways: (1) Counting of actual safety shutoff valve open-closed

More information

Public Comment No. 1-NFPA [ Section No ]

Public Comment No. 1-NFPA [ Section No ] Page 1 of 7 Public Comment No. 1-NFPA 556-2014 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA, 19428-2959. ASTM D2859, Standard

More information

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US Rivkin, C. 1, Blake, C. 1, Burgess, R. 1, Buttner, W. 1, and Post, M. 1 1 Hydrogen Technologies and Systems Center, National Renewable Energy Laboratory,

More information

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content Based on the 2018 International Fire Code, (IFC ) The International Fire Code (IFC ), establishes minimum regulations for fire safety. This handout will identify important changes in the IFC from 2015

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

Page 1 of 10 Second Revision No. 8-NFPA 600-2014 [ Section No. 3.3.17 ] 3.3.17* Incident Management System (IMS). A system that defines the roles and responsibilities to be assumed by responders and the

More information

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Alternative Approaches to

More information

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle)

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Telecommunications

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

M E M O R A N D U M. Please do not vote negatively because of editorial errors. However, please bring such errors to my attention for action.

M E M O R A N D U M. Please do not vote negatively because of editorial errors. However, please bring such errors to my attention for action. M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Marshal Professional Qualifications Stacey Van Zandt DATE: July 13, 2010 SUBJECT: NFPA 1037 ROP TC Letter Ballot (F2011) The ROP letter ballot

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems M E M O R A N D U M DATE: May 14, 2014 TO: FROM: Principal and Alternate Members of the Correlating Committee on Automatic Sprinkler Systems Matt Klaus,

More information

MEMORANDUM. Technical Committee on Fundamentals of Combustible Dusts. NFPA 652 First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Fundamentals of Combustible Dusts. NFPA 652 First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Fundamentals of Combustible

More information

MEMORANDUM. NFPA Technical Committee on Handling and Conveying of Dusts, Vapors, and Gases. NFPA 654 Second Draft TC FINAL Ballot Results (A2016)

MEMORANDUM. NFPA Technical Committee on Handling and Conveying of Dusts, Vapors, and Gases. NFPA 654 Second Draft TC FINAL Ballot Results (A2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Handling and Conveying

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure