1 Minutes of Meeting NFPA 3 & 4 Technical Committee (TC) on Commissioning and Integrated Testing of Fire and Life Safety Systems (CMI-AAA) Draft Document Development Meeting January 4-5, 2012 Orlando, FL Hilton Attendance, Principal Members/Staff/Alternates: See attachment A, scanned sign-in sheet. Guests (also shown on Attachment A): Day 1 &2 - Elena Carroll of NFPA, Michael DeVore of State Farm Insurance, David LeBlanc of RJA Day 2 only George W. Stanley and Ernie Rodriguez of Wiginton 1. Call to order. The meeting was called to order at 8:00 AM (Eastern time zone), Wednesday, January 4, 2012 by TC Chair Maurice Pilette 2. Introductions. Self-introductions were made. 3. Staff Notice. NFPA Staff Matt Klaus provided presentation to committee including items a-d below: a. Meeting Procedures. i. Standards Council provided unanimous support for integrated testing (existing documents for individual systems, nothing exists to identify integration of different standards/codes). ii. Standard vs. Recommended Practice iii. Technical Committee Reconstitution was required needed different perspectives from NFPA 70, 80, 1, etc. within committee iv. Lessons Learned from NFPA 3 differences from existing NFPA 3 for history of how we arrived at and what evolved as NFPA 3. v. Informal meeting, large task group meeting but will use Robert s Rules. b. A2014 Dates Cycle (Attachment B) i. Goal to create a draft document and balloted by First week in February, There will be Ballot issued approximately January 23, 2012 with 1 week to respond. Vote on entire document with comments allowed (no comments on individual sections, but overall concepts or major topic comments). c. NFPA 3 in A2014 Cycle i. Both NFPA 3 and NFPA 4 will be in the same cycle, A2014. Both issued by this committee. See associated dates in Attachment B. d. New NFPA document revision/release process i. Requests from industry for electronic version/on-line platform. ii. iii. Begins with Fall 2013 documents moving forward. Public will login to the NFPA website, pick document draft. User can delete and comment on several items at one time. Process will provide for public input on the living document. iv. Less NFPA entry required, all electronic. v. Simplified participation at committee meetings. vi. 1 st Draft meeting vs. ROP; 2 nd Draft meeting vs. ROC, see Agenda for A2014 Cycle Dates. This committee will be meeting 3 times after this meeting, before a final document issued (next draft meeting or pre-1 st draft, 1 st draft, 2 nd draft). Page 1 of 6

2 vii. Committee will focus on NFPA 4 development for now. Anticipated 4 day meeting for first draft meeting as we will address NFPA 3 in the next meetings. Sept. is first formal meeting. 4. General Discussion of NFPA 4 Document Direction a. Review of the Council Minute Items for NFPA 4 and NFPA 72. Staff Klaus reviewed NFPA Standards Council Minute Item, Attachment C and NFPA 72 Standards Council Minute Item, Attachment D. b. NFPA 3 and 4 TC Member and NFPA 72 Technical Correlating Committee (TCC) Chair Bob Schifiliti. i. Presentation Inspection Testing and Maintenance (ITM) Summit. Request to the Standards Council to allow NFPA 72 temporarily allowance for integrated testing items until NFPA 4 Standard is released. Standards Council voted against allowing this gap. ii. Definitions task group will work more towards committee voice on further direction. iii. System Definitions task group identified new definitions: Individual System and iv. Integrated System. Discussion regarding Authority Having Jurisdiction (AHJ) which could be governing authority including various entities such as Fire Official, Owner, Insurance Agency, etc. c. Former CMF-AAA(NFPA 3) and Current CMI-AAA (NFPA 3 and 4) TC Member Cecil Bilbo. Provided PowerPoint presentation on where NFPA 3 came from and where to take NFPA 4 d. Owner Perspective - TC Member Paul Dunphy, Jr., Harvard University. Discussed need for release of this Standard for owners. Example of actual test failures during site integrated testing/commissioning. e. Enforcer Perspective - TC Member Joe Noble, experience with Clark County Fire Department, Las Vegas, Nevada. Discussed need for standard to enforce testing of integrated items. Example provided of large facility with many integrated systems. f. TC Discussion Committee Scope and Direction of Document. i. Staff Klaus provided Council committee scope and Technical committee scope. ii. Committee added integrated system testing iii. Discussion about the word pertain, replaced with that specifically address iv. Addition of protection in fire protection v. Determined 31 voting TC members present, including Chair Pilette vi. Discussion about passive systems, whether to keep in this document vii. Voted on revised TC Scope displayed by Staff Klaus. Approved. Committee Scope: This Committee shall have primary responsibility for documents that address commissioning and integrated system testing activities and tasks for fire protection and life safety systems. This includes the requirements for planning, organization, coordination, responsibility, implementation, and documentation of commissioning and integrated system testing of active and passive systems and features that serve a fire protection or life safety purpose. g. TC Discussion Document Scope. i thru from TCC. ii. Discussion about removing AHJ from Put the requirements for the Integrated Testing in the relevant Code/Standard vs. providing ability for AHJ to simply mandate at will. iii. Call to question, failed vote. Page 2 of 6

3 iv. Discussion on removal of design documents discussion with possible annex. v. Chair Pilette identified possible need for Task group for A Volunteers noted by Klaus. vi. TC voted on less the A for the task group to address. Motion carried. vii. Discussion of A and egress/evacuation relevance to this document. viii. TC then worked on wording for A Dan O Connor volunteered to provide additional annex. ix. TC voted on A and passed. Mr. O Connor to bring back further annex later. x. Staff Klaus discussed need for Task Group for the rest of Chapter 1. Task group was created, leader Art Black Doug Fisher, Mike DeVore, Terry Victor, Bob Tabet, Norbert Makowka, Dave Frable, Dave Lowrey. See Attachment E for final assignment. h. NFPA 4 Outline. i. Staff Klaus provided Outline from the draft as it is currently structured. ii. Bob Schifiliti discussed alternate structure recommendation. Committee preferred alternate structure with modifications identified by TC. iii. TC voted and approved amended suggested structure displayed by Staff Klaus. 5. Task Group Reports a. Chapter 4 Test Methodologies and Chapter 8 Documentation. Task Group leader Bill Koffel. i. Mr. Koffel discussed Task group work. ii. Committee provided feedback. Discussion regarding the lists. b. Chapter 5 Integrated System Testing and Chapter 6 Qualifications and Responsibilities. Task Group leader Cecil Bilbo. i. Mr. Bilbo discussed Task group work. ii. TC discussion about removing excess qualification requirements and move to annex. ITa is the only one required. Removing the AHJ. iii. Discussion on Retro-Integrated testing (similar to acceptance testing). Identified need for appendix examples. c. Chapter 7 Integrated System Testing Frequency. Task Group leader Joe Noble. i. Mr. Noble discussed Task group report work. ii. Chair requested vote to determine whether the draft to public should include a time limit number (such as task group s recommendation of 5 years). 22 people approved including a time limit - vote passed. Additional vote for the task group selection of 5 years- 7 approved. d. Chapter 3 Definitions. Task Group leader Bob Schifiliti discussed Task Group work. 6. Task Group Work. a. Task groups displayed members present but assigned in prior task groups volunteered to join task groups. Staff Klaus documented additions. See Attachment E. b. Committee broke into task groups at approximately 3:30PM to work on items identified. c. Staff Klaus ed TC approved new structure and NFPA 4 Draft updates to all TC members. 7. Next meeting and remaining meeting agenda. a. Discussed next meeting for additional draft work. 2 days required. Location will be Quincy, MA at NFPA Headquarters. April and May were discussed. NFPA Staff Elena Carroll will send an requesting TC ability to attend specific dates. Page 3 of 6

4 b. Chair Pilette requested 7:30am start for day 2 of this meeting. 8. Day 2 - Call to order. The meeting was called to order at 7:35 AM (Eastern time zone),thursday, January 5, 2012 by TC Chair Maurice Pilette. 9. TC Member Pascal Pfeiffer offered Paris, France location and his coordination of the meeting at that location for the 2 nd draft meeting, August Task group report, Chapter 1 Administration Art Black a. Changed title of document to Standard for Integrated Fire Protection and Life Safety System Testing b. Scope changed the words around to be consistent with the title change c. Struck and moved up to annex d. Reworded/simplified and supporting annex. e. Purpose f. Application Moved list to Annex. TC discussed wording of the list moved to annex. Standby power, Smoke control edits made. Motion to strike suggested add for legally required emergency power standby to correlate with NFPA 110, 70. Motion carried. g. Discussion of passive devices to prevent destruction, voted to remove item (9) h. Firestopping as it was already included in (8) motion passed. i. New Technology did not apply to a testing document and removed it. j. Added Retroactivity and Equivalency from NFPA 72. TC discussion about removing 1.4 Retroactivity. Call to Question, failed. Move application of new and existing systems to scope. Voted and passed. Struck retroactivity. 11. Task group report, Chapter 8 Documentation - Bill Koffel. a. Viewed work from Bob Schifiliti and Bill Koffel b. Discussion on Acronyms. Commissioning industry uses terms that need to be learned. NFPA 4 is new document and terms are new and unknown. Requested staff to include both word and acronym; however Staff Klaus noted that this may be an issue with NFPA Staff. If an acronym is used it is defined first use then acronym used thereafter. Voted on removing the use of acronyms vote passed to remove them. Also discussed annex for acronyms. Voted to remove acronyms for first draft- passed. c. Replaced BOD references and replaced as intended. d. Discussion about requesting public input when draft is issued, we identify specific sections. Noted this section with a RESERVED ANNEX NOTE to indicate such request for both additional task group work and public input request. e. Chair requested forms and test plan examples for several task groups. Task group identified and added. Doug Fisher task group leader. Members David Hague, David Frable, Paul Dunphy, Dave Leblanc, Warren Olsen, Bob Tabet, John Kampmeyer, Roger Reiswig. See Attachment E for final task group. 12. Task group report, Chapter 4 ( thru 5) - Cecil Bilbo. a. Identified need for task group should work to provide examples for qualification of an Integrated Testing Agent on a more complex system vs. smaller project b. Moved ITa Independence to the Appendix. Discussed need for project members to be able to be the ITa, including AHJ, especially on smaller installations. c. Some TC AHJ s preferred not to be the ITa, NFPA1 has language to provide for ITa. TC member provided background that existing text came from NFPA 3 and from existing NFPA standards. Voted to move through 4 to the annex vote passed. d. TC member identified section is for TESTING qualifications, but some of the ITa items are for coordination responsibility, not just testing. Page 4 of 6

5 e. TC discussion regarding rewording of 4.4.4(3) idea to separate that the plan identify that this is completed prior to testing. f. Identified that the Test Plan section was not completed by the task group. Mr. Bilbo discussed how the task group identified that there should be an end-to-end but not every single device need be verified. Bob Schifiliti identified that he sent task group leaders for Chapter 4 and 5 a Control Group Testing idea with 6 or so items to allow a reduced test. Mr. Bilbo agreed to come back to committee with Test Plan documentation after lunch. 13. Task group report, Chapter 5 General Cecil Bilbo. a. Identified simulation events be documented. TC commented use NFPA 72 language suggested. Identified need for more language about simulation allowance, particularly in the Periodic Integrated System Test. b. Chair requested TC comment about whether this integrated testing should affect building occupancy. Comment made that some systems may be completed after occupancy. It depends on project. Discussion whether integrated testing is completed with the particular Acceptance test(s). TC identified that the Plan needs to identify critical points for different testing stages. 14. Task Group Report, Chapter 4 General - Joe Noble a. Revised b. TC identified that Commissioning plan/integrated testing plan needs to be defined WHEN the plan is created c. A vote was taken again to keep the 5 year time frame in the document and passed. d. Discussion regarding failure and need for define such as impairment and critical impairment. Motion and second to remove item 4.3.4(4) due to the broadness and lack of definition of failure and the strictness. Motion failed and it remained. 15. Task Group Report, Chapter 3 Definitions - Bob Schifiliti a. No changes from comments yesterday, incorporated the TC comments and moved some items to the annex b. Requested italics of all defined terms used throughout document, TC voted and passed to petition council for this request. 16. Next steps a. Ballot will be a single item ballot on the entire document which will require a 2/3 vote. 2 week window required and encouraged all to vote acceptance or we will slip cycle. Identify major items or concepts if comments are desired with vote. Public will not be viewing any work between ballot and 1 st draft meeting. b. Any comments regarding specific section wording, encourage TC members to send to relevant Task Group leader and next meeting. Task Group leaders encouraged to obtain feedback from others that are not in each task group and from general public. c. Chair requested show of hands to identify any that will not be in acceptance of the document for the 2/3 vote requirement and only 1 in opposition. 17. Section 4.5 report - Cecil Bilbo. a. Mr. Bilbo identified use of Mr. Schifiliti recommendations with removal of software based systems. b. TC and Mr. Schifiliti identified not all intent was provided with the elimination software based items. c. TC discussion regarding outputs being grouped in addition to the inputs. d. TC discussion regarding how to identify grouping to define intent that not every single input to output is not required to be tested in integrated testing. Page 5 of 6

6 e. Committee voted to keep Mr. Bilbo s work, but TC identified need to bring the 2 concepts into a common document. Need good annex material on how this can be applied in software and non-software based systems. f. Identified that Mr. Bilbo has requested reduced responsibilities and Kim Gruner agreed to be task group leader going forward. g. Moved Test Plan task responsibility to Doug Fisher s group. Also require Annex D Sample Test Plan from Mr. Fisher s task group. TC identified that the prior task group information was not included in the revised day 2 draft, only the grouping concepts were presented. h. Discussion regarding task group work. See Task group assignment sheet and revised associated outline, Attachment F. i. Review of task group assignments. Staff Klaus will send out final task group assignments next week. j. TC First Draft meeting, Fall meeting week of September 10-14, 2012 for West coast, possible San Diego, CA. k. TC Second Draft meeting, Week of August 5-9, 2013 for Paris, France with backup as Denver, CO l. Chair commented that the Research Foundation responded that there is no documentation available for prior task group request on frequency of integrated testing. m. Request for TC members that are in favor and able to support travel to the Paris, France trip to send and/or letters to NFPA staff, Matt Klaus in support trip to Paris, France. A motion made to vote for the meeting in Paris, France. Voting resulted in 14 members in favor of meeting in Paris,France;1 opposed (some did not vote). 18. Adjournment. Meeting adjourned 2:22PM (Eastern time zone), Thursday January 5, Page 6 of 6

7

8

9

10

11 2014 ANNUAL REVISION CYCLE *Public Input Dates may vary according to documents and schedules for Revision Cycles may change. Please check the NFPA Website for the most up to date information on Public Input Closing Dates and schedules at # (i.e. and click on the Next Edition tab Process Stage Process Step Dates for TC Dates for TC with CC Public Input Closing Date* 6/22/2012 6/22/2012 Final Date for TC First Draft Meeting 11/30/2012 8/31/2012 Public Input Posting of First Draft and TC Ballot 1/18/ /12/2012 Stage Final date for Receipt of TC First Draft ballot 2/8/ /2/2012 (First Draft) Final date for Receipt of TC First Draft ballot recirc 2/15/ /9/2012 Posting of First Draft for CC Meeting 11/16/2012 Final date for CC First Draft Meeting 12/28/2012 Posting of First Draft and CC Ballot 1/18/2013 Final date for Receipt of CC First Draft ballot 2/8/2013 Final date for Receipt of CC First Draft ballot recirc 2/15/2013 Post Final First Draft for Public Comment 2/22/2013 2/22/2013 Public Comment closing date 5/3/2013 5/3/2013 Final Date to Publish Notice of Consent Documents (Documents that 5/10/2013 5/10/2013 received no Comments) Appeal Closing Date for Consent Documents (Documents that 5/24/2013 5/24/2013 received no Comments) Final date for TC Second Draft Meeting 10/18/2013 7/12/2013 Comment Posting of Second Draft and TC Ballot 11/29/2013 8/23/2013 Stage Final date for Receipt of TC Second Draft ballot 12/20/2013 9/13/2013 (Second Final date for receipt of TC Second Draft ballot recirc 12/27/2013 9/20/2013 Draft) Posting of Second Draft for CC Meeting 9/27/2013 Final date for CC Second Draft Meeting 11/8/2013 Posting of Second Draft for CC Ballot 11/29/2013 Final date for Receipt of CC Second Draft ballot 12/20/2013 Final date for Receipt of CC Second Draft ballot recirc 12/27/2013 Post Final Second Draft for NITMAM Review 1/3/2014 1/3/2014 Tech Session Notice of Intent to Make a Motion (NITMAM) Closing Date 2/7/2014 2/7/2014 Preparation Posting of Certified Amending Motions (CAMs) and Consent 4/4/2014 4/4/2014 Documents (& Issuance) Appeal Closing Date for Consent Documents 4/18/2014 4/18/2014 SC Issuance Date for Consent Documents 5/9/2014 5/9/2014 Tech Session Association Meeting for Documents with CAMs 6/9 12/2014 6/9 12/2014 Appeals and Appeal Closing Date for Documents with CAMs 6/24/2014 6/24/2014 Issuance Council Issuance Date for Documents with CAMs 8/14/2014 8/14/2014

12 TO: FROM: Technical Committee on Commissioning Fire Protection Systems Linda Fuller DATE: August 11, 2011 SUBJECT: Proposed New Document NFPA 4, Standard for Integrated Testing of Fire Protection Systems I am transmitting to you herewith the following action of the Standards Council (August 8-11, 2011): At the February/March 2011 meeting, the Council reviewed the request of the Technical Committee (TC) on Commissioning Fire Protection Systems to develop a new document, NFPA 4, Standard for Integrated Testing of Fire Protection Systems. At that time, the Council voted to solicit public comments on the need for the project, information on resources on the subject matter, those interested in participating if established, and other organizations actively involved with the subject. The Council received 20 public comments. After review of all the information before it, the Council has voted to approve the development of NFPA 4, Standard for Integrated Testing of Fire Protection Systems. The Council believes that a single Technical Committee ought to be responsible for developing both NFPA 3, Recommended Practice on Commissioning and Integrated Testing of Fire Protection and Life Safety Systems, and the new NFPA 4. The new NFPA 4, however, calls for a review of the committee structure of the current TC and a fresh consideration of the interests and balance appropriate to a technical committee responsible for both NFPA 3 and NFPA 4. In particular, the new NFPA 4 will need a technical committee makeup that maximizes the ability to provide the coordination among the many documents and responsible committees that will be necessary to make this complex effort a success. Accordingly, the Council intends to reconstitute the TC under a new name and updated committee scope, and it will do so after conducting a full review of the structure and membership of the TC to ensure the expertise and the representation of the membership is appropriate to the expanded tasks before the Committee. The Council is requesting staff to provide it with recommendations concerning the name and scope of the reconstituted TC and to issue a call for members for the TC. All current members of the TC on Commissioning Fire Protection Systems members who are interested are encouraged to submit a committee application so that they can be considered for membership on the newly constituted committee. Anyone wishing to be considered for committee membership should send their application to NFPA no later than September 1, The Council will review all candidates for the new TC at the October 2011 Council meeting. So as to provide guidance as to the scope of the new NFPA 4 integrated testing document that the Council will be assigning to the new committee to develop, the Council is providing the following draft document scope as follows:

13 The standard shall provide the minimum requirements for integrated testing of fire protection and life safety systems. These requirements include protocol for testing procedures, responsibilities for various parties, methods and documentation for verifying the operational readiness and sequence of integrated systems. The standard is designed to ensure that interconnected active and passive fire protection and life safety systems operate as intended. The standard shall not require integrated testing but shall provide minimum requirements for integrating testing where such testing is required by another code, standard, or design document or by an Authority Having Jurisdiction. The standard shall not provide testing requirements, including test procedures or test frequencies, for individual systems. c: M. Brodoff, A. Cronin, C. Dubay, R. Bielen, M. Klaus, D. Baio, C. Cronin, J. Goyette, E. Carroll Standards Council Interested Committees: FCC-AAA, CMF-AAA, PFE-AAA, FOM-AAA, GFE-AAA, AUT, SPI-AAA, WAS-AAA, DRY-AAA, FIM-AAA, WAT-AAA, INM-AAA, FLC, LAB-AAA, NFG-AAA, LPG-AAA, EXL-AAA, NEC, SIG, FDW-AAA, AIC-AAA, SMO-AAA, VEN-AAA, HEA, SAF, EPS-AAA, FKT-AAA, AIS-AAA, ROA-AAA, WAM-AAA GFE-AAA, AEG-AAA, BLD

14 TO: FROM: Technical Committees on Signaling Systems Linda Fuller DATE: September 20, 2011 SUBJECT: Report of the Summit Task Group on Inspection Testing and Maintenance I am transmitting to you herewith the following action of the Standards Council (August 8-11, 2011): The Council heard a report from the Inspection, Testing and Maintenance Summit Task Group. This Task Group was made up of various NFPA Committee members that participated in the Inspection, Testing and Maintenance Summit held in May of The Report that was received by the Council requested the Council review and consider the following three areas: 1. A request for the Council to revise the scope of the NFPA 72 Technical Committee on Testing and Maintenance of Fire Alarm Systems (SIG-TMS) to include the authority to require limited testing of other interconnected fire protection or life safety systems in accordance with the requirements of standard(s) that have primary jurisdiction of these other systems in order to ensure the integrity of the systems interface. 2. A request for the Council to allow the Technical Committee on Testing and Maintenance of Fire Alarm Systems (SIG-TMS) to temporarily revise their scope to include the authority to require complete end-to-end testing of other interconnected fire protection or life safety systems, at the initial acceptance test, in accordance with the requirements of standard(s) that have primary jurisdiction of these other systems. This temporary scope shall be in force only until such time as a standard is available addressing mandatory requirements for complete testing of interconnected systems. 3. A request for the Council to issue a general directive for all committees that are involved with systems or components that interconnect with fire alarm and signaling systems to coordinate requirements for both limited and complete end-to-end integrated testing of interconnected systems. This coordination needs to specifically identify and address the interfaces between systems and provide a degree of consistency and overlap between standards sufficient to ensure that system interfaces are operational and remain intact.

15 In reviewing this Report, the Council acknowledges that integrated systems and maintenance is an important issue and should be addressed. After review of all the material before them, the Council voted not to take the actions requested in the Report. The Council determined that NFPA 72 Committees (TCs) should stay focused on their individual systems relating to fire alarms and signaling systems. The Council has approved the development of NFPA 4, Standard for Integrated Testing of Fire Protection Systems, which is intended to cover all testing of interconnected systems, including interface testing, integrated testing and end-to-end testing. The Council directs the NFPA 72 Committees to address issues of integrated testing related to its systems by providing input on the content of NFPA 4 through the submission of proposals and comments and through TC member representation that is anticipated will be appointed to the NFPA 4 Committee. During the Proposals stage of the A2012 cycle, the NFPA 72 TC s accepted proposals addressing testing of interconnected systems, including testing at the interface with other systems. These revisions should be rejected by the NFPA 72 TCs during the Comment stage, as they address concepts outside of their scope. This proposed language, along with all of the supporting material, should then be submitted to the NFPA 4 TC, as appropriate, as proposals (public input) during the A2014 cycle. The Council understands and appreciates the efforts that are being made to consider and address integrated testing. The Council believes, however, that the best and most effective approach to developing requirements on integrated testing is to work, through the process that is now beginning, to develop the new NFPA 4 as a dedicated document on the subject. To that end, the NFPA 4 Committee will require cooperation and input from the related systems Committees and the Council encourages all relevant Committees to participate to the fullest. c: L. Richardson, A. Cronin, W. Burke, K. Shea, M. Earley, R. Roux, M. Klaus, K. Collette, R. Solomon, R. Bielen SIG-AAC, SIG-CAR, SIG-ECS, SIG-FUN, SIG-HOU, SIG- IDS, SIG-NAS, SIGPRO, SIG-PRS, SIG-SSS, SIG-TMS, CMF-AAA

16 NFPA 4 TASK GROUP (TG) ORGANIZATION AS OF January 5, 2012 Maurice Pilette CHAIRPERSON Kimberly Gruner SECRETARY Task Group NFPA 4 Development Task Group (Extract 3) Task Group Test Methodology/Test Documentation TG Leader Kim Gruner TG Leader Bill Koffel Terry Victor Larry Forshner Paul Dunphy Bob Tabet Ken Schneider Dave Hague Roland Huggins Ed Ledoux Cecil Bilbo George Church Pascal Pfeiffer Peter Willse Frank van Overmeiren John Hulett Warren Olsen Mark Rochholz Richard Roberts Dan O Connor Bruce Clarke Shawn Thompson Coy Hill Mark Buschman Eli Howard Dave Leblanc Tanya Glumac Task Group Definitions of Testing Task Group Periodic Testing (Test Frequency) TG Leader Bob Schifiliti TG Leader Joe Noble Bruce Campbell John Bender Dave Frable Brad Cronin Dave Lowrey Bob Caputo Shane Clary Bob Kasiski Russ Leavitt Bruce Campbell Doug Fisher John Kampmeyer Tom Hammerberg Josh Elvove Jeff Van Keuren Art Black Nichole Fraley Milosh Puchovsky Roland Huggins Task Group FPRF Request TG Leader Brad Cronin Alan Sactor

17 Dave Frable Dave Hague John Hulett Dave Leblanc Warren Olsen Bob Tabet John Kampmeyer Rodger Reiswig NFPA 4 TASK GROUP (TG) ORGANIZATION AS OF January 5, 2012 Maurice Pilette CHAIRPERSON Kimberly Gruner SECRETARY Task Group Sample Test Plan Task Group Task Group Chapter 1 Task Group TG Leader Doug Fisher TG Leader Art Black Doug Fisher Tom Hammerberg Mike Devore Terry Victor Dave Frable Norbert Makowka Bob Tabet Dave Lowrey

18 NFPA 4 Standard for Testing of Integrated Fire Protection and Life Safety Systems 2015 Edition 1. Administration (Art) 1.1 Scope 1.2 Purpose 1.3 Application 2. Referenced Publications 3. Definitions (Bob S.) 3.1 General 3.2 NFPA Official Definitions 3.3 General Definitions 4. General Requirements 4.1 Conducting Integrated Tests Initial Integrated Test (includes retro)(joe) Periodic Integrated Test (Joe) 4.2 Test Team(Kim) 4.3 Qualifications(Kim) 4.4 Responsibilities (Kim) 4.5 Test Plan (Doug) 5. Test Methods (Bill) 6. Documentation (Bill w/ RPS Report) 6.1 Application 6.2 Minimum Required Test Documentation 6.3 Completion Documents 6.4 Records, Record Retention, and Record Maintenance 6.5 Forms [NOTE: Outline Styles with automatic numbering in MS Word have been defined through Level 5 ( ). To convert to NFPA format hard numbering and no indents select all text and Paste Special Un Formatted Text into a blank document.]

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Mr. Merton Bunker, Committee Chair, called the meeting to order at 8:05 on Wednesday September

More information

Technical Committee on Commissioning and Integrated Testing (CMI-AAA) Memorandum

Technical Committee on Commissioning and Integrated Testing (CMI-AAA) Memorandum Technical Committee on Commissioning and Integrated Testing (CMI-AAA) Memorandum DATE: October 26, 2015 TO: FROM: SUBJECT: Principal and Alternate Members of the Technical Committee on Commissioning and

More information

AGENDA. 1. Call to Order 8:00 am (8/23) 2. Introduction and Attendance. 3. Chairman Comments. 4. Approval of Previous Meeting Minutes

AGENDA. 1. Call to Order 8:00 am (8/23) 2. Introduction and Attendance. 3. Chairman Comments. 4. Approval of Previous Meeting Minutes Technical Committee on Commissioning and Integrated Testing () NFPA 3/4 Second Draft Meeting (Annual 2017) Tuesday, August 23, 2016 - Wednesday, August 24, 2016 NFPA Headquarters 1 Batterymarch Park, Quincy,

More information

Correlating Committee on Automatic Sprinklers

Correlating Committee on Automatic Sprinklers Correlating Committee on Automatic Sprinklers First Draft Correlating Committee Meeting December 6, 2016 MEETING MINUTES 1. Call to Order. CC Chair Ken Linder called the meeting to order at 8AM. 2. Self-Introductions

More information

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Correlating Committee on Signaling Systems for

More information

M E M O R A N D U M. Principal and Alternate Members of the Technical Committee on Commissioning Fire Protection Systems

M E M O R A N D U M. Principal and Alternate Members of the Technical Committee on Commissioning Fire Protection Systems 1 Technical Committee on Commissioning Fire Protection Systems M E M O R A N D U M DATE: March 30, 2010 TO: FROM: Principal and Alternate Members of the Technical Committee on Commissioning Fire Protection

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems M E M O R A N D U M DATE: May 14, 2014 TO: FROM: Principal and Alternate Members of the Correlating Committee on Automatic Sprinkler Systems Matt Klaus,

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter.

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter. SC #12-8-56 D#12-15 Amy Beasley Cronin Secretary, Standards Council 30 August 2012 To: Interested Parties Subject: Standards Council Decision (Final): D#12-15 Standards Council Agenda Item: SC#12-8-56

More information

MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ

MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ 1. Call to Order. The meeting was called to order by Chair William Koffel

More information

Chair Robert P. Schifiliti (R.P. Schifiliti Associates, Inc.) called the meeting to order at 8:00 AM ET. International Association of Fire Chiefs

Chair Robert P. Schifiliti (R.P. Schifiliti Associates, Inc.) called the meeting to order at 8:00 AM ET. International Association of Fire Chiefs Meeting Minutes of the Technical Correlating Committee on the Signaling Systems for the Protection of Life and Property September 21, 2010 (Indianapolis, IN) Item 10-9-1 Call to Order Chair Robert P. Schifiliti

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

Call to Order Chair Jack Poole called the meeting to order at 8:00 AM on Monday, July 17, 2017.

Call to Order Chair Jack Poole called the meeting to order at 8:00 AM on Monday, July 17, 2017. NFPA 72 SIG-PRO Meeting Minutes NFPA Technical Committee on Protected Premises Fire Alarm Systems (SIG-PRO) Second Draft Meeting, July 17 19, 2017 Charlotte, North Carolina 17-7-1 Call to Order Chair Jack

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Technical Committee on Testing and Maintenance

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

Proposed Changes to NFPA

Proposed Changes to NFPA 2017 NFPA Conference & Expo Proposed Changes to NFPA 72-2019 Presented by: Manuelita David (SIG-FUN), Jensen Hughes Warren Olsen (SIG-SSS), Fire Safety Consultants, Inc. Merton Bunker (SIG-AAC), EYP Architecture

More information

Circulation Report for SIG-TMS Comments Document # 72

Circulation Report for SIG-TMS Comments Document # 72 1 72-12 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 209 ) 72-13 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 234 ) 72-15

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Notification

More information

AGENDA TECHNICAL COMMITTEE ON CARBON MONOXIDE DETECTION OCTOBER 7, 2010 TELECONFERENCE (10:00 A.M. ET)

AGENDA TECHNICAL COMMITTEE ON CARBON MONOXIDE DETECTION OCTOBER 7, 2010 TELECONFERENCE (10:00 A.M. ET) AGENDA TECHNICAL COMMITTEE ON CARBON MONOXIDE DETECTION OCTOBER 7, 2010 TELECONFERENCE (10:00 A.M. ET) Item No. Subject 10-10-1 Call to Order (10:00 A.M.) 10-10-2 Roll Call 10-10-3 Staff Remarks 10-10-4

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

NFPA s Standards Development Process

NFPA s Standards Development Process NFPA s Standards Development Process Revision Cycle 104 weeks or 141 weeks Guiding Principles Due process Openness Lack of dominance Seek society s balance between: Acceptable risk Commitment of resources

More information

NFPA 550 ROP Meeting Minutes

NFPA 550 ROP Meeting Minutes NFPA 550 ROP Meeting Minutes NFPA Technical Committee on Fire Risk Assessment Methods (FIR-AAA) June 24, 2010 Microsoft Live Meeting 1. Call to order. The meeting was called to order at 1:00 PM on Monday,

More information

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Notification Appliances for

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

Fire Code Action Committee (F-CAC) Meeting Minutes June 19-20, 2012 Chicago IL. Summary of Actions and Regional Work Group (RWG) Assignments

Fire Code Action Committee (F-CAC) Meeting Minutes June 19-20, 2012 Chicago IL. Summary of Actions and Regional Work Group (RWG) Assignments Fire Code Action Committee (F-CAC) Meeting Minutes June 19-20, 2012 Chicago IL Fire-CAC Members in Attendance Anthony Apfelbeck (Vice-Chairman) Daniel Finnegan Howard Hopper, P.E. Andrew King Kelly Nicolello

More information

MEMORANDUM. NFPA Technical Committee on Fundamentals of Fire Alarm and Signaling Systems (SIG- FUN)

MEMORANDUM. NFPA Technical Committee on Fundamentals of Fire Alarm and Signaling Systems (SIG- FUN) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fundamentals of Fire

More information

AGENDA NFPA TECHNICAL COMMITTEE ON NOTIFICATION APPLIANCES. Report on Comments Meeting, October 13-14, Richmond Marriott, Richmond, VA

AGENDA NFPA TECHNICAL COMMITTEE ON NOTIFICATION APPLIANCES. Report on Comments Meeting, October 13-14, Richmond Marriott, Richmond, VA National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org AGENDA NFPA TECHNICAL COMMITTEE ON NOTIFICATION APPLIANCES Report on Comments

More information

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED MEETING MINUTES NFPA Correlating Committee on Safety to Life (SAF-AAC) November 7, 2013 Second Draft Meeting Embassy Suites Atlanta Hartsfield Airport Hotel Atlanta, GA 1. Call to Order. The meeting was

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Testing and Maintenance

More information

The Technical Committee on Commissioning and Integrated Testing

The Technical Committee on Commissioning and Integrated Testing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: The Technical Committee on Commissioning and Integrated Testing

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

NFPA Technical Committee on Unmanned Aerial Systems

NFPA Technical Committee on Unmanned Aerial Systems NFPA Technical Committee on Unmanned Aerial Systems NFPA 2400 DRAFT DEVELOPMENT MEETING (No. 2) AGENDA Renaissance Dallas Hotel 2222 Stemmons Freeway Dallas, TX 75207 May 7 9, 2017 Day One: 8:00 AM 5:00

More information

FINAL* REPORT OF THE MOTIONS COMMITTEE

FINAL* REPORT OF THE MOTIONS COMMITTEE FINAL* REPORT OF THE MOTIONS COMMITTEE ON CERTIFIED AMENDING MOTIONS FOR PRESENTATION AT THE 2012 ASSOCIATION TECHNICAL MEETING JUNE 13-14, 2012 LAS VEGAS, NEVADA I. Introduction. This is the second and

More information

Approval Meeting Minutes December 17, 2012 [Enclosure] Staff Remarks & Overview of New Process [Lee Richardson]

Approval Meeting Minutes December 17, 2012 [Enclosure] Staff Remarks & Overview of New Process [Lee Richardson] Agenda Correlating Committee on Signaling Systems for the Protection of Life and Property February 21, 2012 Teleconference (NFPA 72 Pre-First Draft Meeting) Item No. Subject 13-2-1 Call to Order (10:00

More information

TECHNICAL COMMITTEE ON FIRE PUMPS

TECHNICAL COMMITTEE ON FIRE PUMPS TECHNICAL COMMITTEE ON FIRE PUMPS MEMORANDUM TO: FROM: Technical Committee on Fire Pumps Joanne Goyette, on behalf of C. Duffy / R. P. Benedetti DATE: May 2, 2011 SUBJECT: Letter Ballot on Proposals to

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

SC # /16/17/18/19/23/24 D#03-24

SC # /16/17/18/19/23/24 D#03-24 SC #03-7-15/16/17/18/19/23/24 D#03-24 Casey C. Grant, P.E. Secretary, Standards Council 26 July 2003 To: Interested Parties Subject: Standards Council Decision (Final): D#03-24 Standards Council Agenda

More information

Dave Hague NFPA Staff Liaison 12 21,

Dave Hague NFPA Staff Liaison 12 21, Technical Committee on Sprinkler System Installation First Draft Meeting Marriott Gas Lamp Hotel San Diego, CA August 9-11, 2016 1. Ray Grill TC Chair called the meeting to order at 8:00am and self-introductions

More information

Agenda Technical Committee on Protected Premises Fire Alarm Systems September 9-11, 2013 Saint Louis, MO

Agenda Technical Committee on Protected Premises Fire Alarm Systems September 9-11, 2013 Saint Louis, MO Agenda Technical Committee on Protected Premises Fire Alarm Systems September 9-11, 2013 Saint Louis, MO Item No. Subject 13-9-1 Call to Order (8:00 A.M) 13-9-2 Roll Call 13-9-3 Approval of Agenda 13-9-4

More information

Technical Committee on Water Mist Fire Suppression Systems

Technical Committee on Water Mist Fire Suppression Systems Date: January 29, 2013 1. Call to Order. Meeting was called to order by Chair Larry Owen at 8:00 AM. 2. Building Safety Message. Building safety was discussed and exits identified by Chair Larry Owen.

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA The NFPA 1521 Task Group and NFPA 1561 Task Group, established

More information

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th, 2016 Meeting called to order at 8:07 AM by Chairman

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

1. The meeting was called to order by Chair James Lathrop at 8:00 AM (CDT) on Wednesday, August 26, 2015.

1. The meeting was called to order by Chair James Lathrop at 8:00 AM (CDT) on Wednesday, August 26, 2015. MINUTES NFPA Technical Committee on Residential Occupancies NFPA 101 and NFPA 5000 First Draft Meeting Wednesday, August 26, 2015 InterContinental Milwaukee Milwaukee, WI 1. The meeting was called to order

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks R. P. Benedetti DATE: September 16, 2010 SUBJECT:

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

Proposed Changes to NFPA

Proposed Changes to NFPA 2017 NFPA Conference & Expo Proposed Changes to NFPA 72-2019 Presented by: Daniel O Connor (SIG-IDS), Jensen Hughes Robert Schifiliti (SIG-NAS), R.P. Schifiliti Associates William Koffel (SIG-ECS), Koffel

More information

ANSI/NETA Standards Update

ANSI/NETA Standards Update Specifications and Standards Activity ANSI/NETA Standards Update NOW AVAILABALE!!!! NETA Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems The NETA Acceptance Testing

More information

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) National Capital Region

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

NFPA Technical Committee on Fire Tests

NFPA Technical Committee on Fire Tests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Tracy

More information

ROP MEETING MINUTES. 2. Introduction of Attendees. The following committee members and guests were in attendance. TECHNICAL COMMITTEE MEMBERS PRESENT

ROP MEETING MINUTES. 2. Introduction of Attendees. The following committee members and guests were in attendance. TECHNICAL COMMITTEE MEMBERS PRESENT BLD/SAF-FIR 24-25 September 2009 ROP Meeting Minutes ROP MEETING MINUTES Building Code Life Safety Technical Committee on Fire Protection Features Thursday-Friday, September 24-25, 2009 Meeting Embassy

More information

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Pyrotechnics Elena Carroll,

More information

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333 Paul Cabot Administrator National Fuel Gas Ms. Gabriella Davis Recording Secretary, IAPMO Standards Council International Association of Plumbing and Mechanical Officials (IAPMO) IAPMO Group World Headquarters

More information

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES 1.

More information

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting. October 10 12, 2011 Baltimore, MD

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting. October 10 12, 2011 Baltimore, MD National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting October 10 12, 2011 Baltimore, MD Chairman Glenn Benarick called the meeting to order

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M (AMENDMENT) TO: FROM: Technical Committee on Mercantile

More information

Council Members Chad Beebe and Daniel O Connor recused themselves during the deliberation and vote on this issue.

Council Members Chad Beebe and Daniel O Connor recused themselves during the deliberation and vote on this issue. REVISED SC #14-3-31 D#14-1 Christian Dubay, P.E. Secretary, Standards Council 13 March 2014 To: Interested Parties Subject: Standards Council Decision (Final): D#14-1 (REVISED) Standards Council Agenda

More information

home smoke candles alarms electrical burns smoking medical oxygen cooking FIREFIGHTING MATCHES & LIGHTERS SPRINKLERS

home smoke candles alarms electrical burns smoking medical oxygen cooking FIREFIGHTING MATCHES & LIGHTERS SPRINKLERS FIREFIGHTING home smoke alarms REGULATIONS GOVERNING THE NFPA EDUCATIONAL MESSAGES DESK REFERENCE FOR THE FIRE SERVICE AND FIRE AND LIFE SAFETY EDUCATORS MATCHES & LIGHTERS medical oxygen cooking FIRE

More information

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call vember 20, 2012 2-4 PM EDT (1-3 PM CT; 12-2 PM MT; 11-1 PM PT) 1. Welcome-Glenn McGinley, Committee Chair

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

M E M O R A N D U M. Please do not vote negatively because of editorial errors. However, please bring such errors to my attention for action.

M E M O R A N D U M. Please do not vote negatively because of editorial errors. However, please bring such errors to my attention for action. M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Marshal Professional Qualifications Stacey Van Zandt DATE: July 13, 2010 SUBJECT: NFPA 1037 ROP TC Letter Ballot (F2011) The ROP letter ballot

More information

9/10/12. NFPA Consumer Alert Antifreeze sprinkler systems. Dear Fire Sprinkler System Owner,

9/10/12. NFPA Consumer Alert Antifreeze sprinkler systems. Dear Fire Sprinkler System Owner, 9/10/12 Subject: NFPA Consumer Alert Antifreeze sprinkler systems Dear Fire Sprinkler System Owner, Recent events have led the National Fire Protection Association (NFPA) to issue Tentative Interim Amendments

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY

More information

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS 2013 Randal Brown & Associates Engineering Ltd. 1 RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001-11 INTEGRATED

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

Technical Correlating Committee on Automatic Sprinklers

Technical Correlating Committee on Automatic Sprinklers Technical Correlating Committee on Automatic Sprinklers ROC Meeting December 6, 2011 Windows Live Meeting and Conference Call AGENDA 1. Call to Order (1:00 PM) (Acting TCC Chair Ken Linder). 2. Self-Introductions

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee Renaissance Blackstone Chicago 636 South Michigan Avenue, Chicago, IL 60605 May 13-14, 2014 Chicago, IL 1. Call to Order. Call the meeting to

More information

Technical Committee on Liquefied Natural Gas

Technical Committee on Liquefied Natural Gas Technical Committee on Liquefied Natural Gas MEMORANDUM TO: FROM: Technical Committee on Liquefied Natural Gas Denise Beach, Senior Engineer/Staff Liaison DATE: March 16, 2011 RE: NFPA 59A LNG-AAA ROP

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee March 4, 2015 Teleconference/Web Meeting 1. Call to Order. Call the meeting to order by Chair, Jim Quiter, at 1:00 pm EST on Wednesday, March

More information

U.S. Codes & Standards for Energy Storage Systems. Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group

U.S. Codes & Standards for Energy Storage Systems. Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group U.S. Codes & Standards for Energy Storage Systems Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group Regulatory Update: U.S. Codes & Standards Agenda NFPA 70 (NEC) UL 1973 & 9540 Fire Codes NFPA

More information

TECHNICAL COMMITTEE MEMBERS PRESENT

TECHNICAL COMMITTEE MEMBERS PRESENT National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0770 www.nfpa.org MINUTES NFPA Technical on Fire Doors and Windows NFPA 80 and NFPA 105

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases Committee on 51A M E M O R A N D U M To: From: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant Date: June 14, 2010 Subject: NFPA 51A ROC Letter Ballot Circulation

More information

2016 Annual Revision Cycle Consent Document NFPA 75

2016 Annual Revision Cycle Consent Document NFPA 75 2016 Annual Revision Cycle Consent Document NFPA 75 The Committee on Electronic Computer Systems produced a Technical Committee Report that received at least one Notice of Intent to Make a Motion (NITMAM)

More information

Standards and Safety Update

Standards and Safety Update Standards and Safety Update Presented By: Michael J. Johnston Executive Director Standards and Safety, NECA Update Objectives Update on NFPA 70E and NECA Safety products Update on NECA S National Electrical

More information

NFPA AN INTRODUCTION TO THE NFPA STANDARDS DEVELOPMENT PROCESS

NFPA AN INTRODUCTION TO THE NFPA STANDARDS DEVELOPMENT PROCESS NFPA AN INTRODUCTION TO THE NFPA STANDARDS DEVELOPMENT PROCESS Safety Is Everybody s Business Disasters can occur anywhere, and they often occur when least expected. NFPA standards provide ways to prevent

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

NFPA 72 Code Changes vs 2013

NFPA 72 Code Changes vs 2013 NFPA 72 Code Changes - 2010 vs 2013 AFAA-NE Westborough, MA February 7, 2018 Richard Roux NFPA 72 National Fire Alarm and Signaling Code Overview and 2013 Changes NFPA 72 1993 Edition Aug 20, 1993 1996

More information

Compliance with Lighting Standards and Management Systems (ANSI C137)

Compliance with Lighting Standards and Management Systems (ANSI C137) Compliance with Lighting Standards and Management Systems (ANSI C137) Howard Wolfman, PE Lumispec Consulting O 847 656 5753 M 847 366 6700 h.wolfman@ieee.org 1 AABC Commissioning Group AIA Provider Number

More information

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda]) FINAL MINUTES Healthcare Interpretations Task Force Tuesday, June 15, 2016 Mandalay Bay Convention Center South Convention Center, Level 2 Room Surf F Las Vegas, NV 1. Call to Order. The meeting was called

More information

Slide 1. Slide 2 Instructor. Slide 3. NFPA 25 The Owner s Manual. Roles & Responsibilities DISCLAIMER

Slide 1. Slide 2 Instructor. Slide 3. NFPA 25 The Owner s Manual. Roles & Responsibilities DISCLAIMER Slide 1 NFPA 25 The Owner s Manual Roles & Responsibilities Presented by: Bob Caputo Slide 2 Instructor Bob is the Executive Vice President of Compliance Solutions with Telgian Corporation. He is the Chairman

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Protected Premises

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m. 1. Call to Order: NFPA Technical Committee on Building Systems NFPA 900 First Draft Teleconference/Web Meeting AGENDA Thursday, February 13, 2014 11:00 a.m. Noon EDT Online meeting link: http://nfpa.adobeconnect.com/r366m2eaxx6/

More information

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON WATER-COOLING TOWERS First Draft Meeting Agenda February 7, 2014 10:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions and Update of

More information

LVSD Subcommittee Meeting Minutes Asheville, NC, USA September 24, 2014

LVSD Subcommittee Meeting Minutes Asheville, NC, USA September 24, 2014 Attendance: Members: P. Barnhart Underwriters Laboratories D. Dunne D. Edwards Siemens Industry, Inc. M. Flack Southern Company K. Flowers S. Gohil Siemens Industry, Inc. AZZ / Central Electric Manufacturing

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015 CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015 Fire Commissioning in Canadian Codes and Standards BACKGROUND Why Commissioning?

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Technical Committee on Fundamentals of Fire

More information

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA - TF N 687rev1 2015-06-02 CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA - 1 I - Drafting

More information

Understanding and Applying NFPA 25

Understanding and Applying NFPA 25 Understanding and Applying NFPA 25 Texas Edition Learning Objectives Describe the scope of NFPA 25. Distinguish between sprinkler system problems that fall within the scope of NFPA 25 and those that do

More information

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Supervising Station

More information