ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

Size: px
Start display at page:

Download "ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED"

Transcription

1 SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

2 3" EXTERIOR GRADE LED STRIP ING SEE SITE ING PLANS 2 " 2 " 4" 5" " 3 2" 2" MIN. BASE COVER DOUBLE LEVELING NUTS FINISH GRADE HANDHOLE ING BOLT LAYOUT PER MFGR. TEMPLATE GROUT BASE " 6" CURB WALL ANCHOR BOLTS CONDUIT COPING DETAIL NO SCALE (4) 6'0"#5 VERT. 8" O.C. (4) 8"Ø#4 HORIZ. 6" O.C CONCRETE BASE DETAIL '6" FIRE/ WATER 07 LIMESTONE CAP EXTERIOR GRADE LED STRIP ING 6" 2'6" 6" 2" JUNCTION BOX VARIES 4" EXTERIOR GRADE /4" CONDUIT BETWEEN PLANTER JUNCTION BOXES PLANTER DETAIL NO SCALE LED STRIP ING SEE DETAILS THIS SHEET LED STRIP ING SEE DETAILS THIS SHEET /4" CONDUIT TO NEXT PLANTER JUNCTION BOX, CAST INTO CONCRETE CURB WALL (TYPICAL). 3/4" CONDUIT TO NEXT PLANTER T PLANTER DETAIL NO SCALE Luminaire Schedule Symbol Label Qty Arrangement Description LLF Lum. Lumens Lum. Watts Arr. Watts Total Watts A 6 80 DEGREES GE 5' AFG A2 3 SINGLE GE 5' AFG B SINGLE USA 5' AFG

3 08 FIRE/ WATER 07 06

4 9 8 SECOND LEVEL,806 SF +/ OFFICE CORRIDOR 2 OFFICE 7 CORRIDOR 5 JANITOR CLOSET 6 WOMEN'S 4 LOBBY MEN'S 3 STAIR # 2 #

5 THIRD LEVEL 309 2,28 SF +/ LOBBY 30 # CORRIDOR 305 OFFICE 307 JANITOR CLOSET 306 WOMEN'S 304 MEN'S 303 STAIR #

6 ,987 SF +/ 648 SF +/ GREEN ROOF / FOURTH LEVEL PAVERS LOBBY # CORRIDOR 405 WOMEN'S 404 MEN'S OFFICE 406 9,72 SF +/ STAIR # 402 PAVERS

7 +0 /2" +8" +5 3/4" +0 /4" +2" +2" +0" +2" +2" +0" +0" +0 /4" +6 /2" +6 /2"

8 FIRE/ WATER

9 9 8 SECOND LEVEL,806 SF +/ OFFICE CORRIDOR 2 OFFICE 7 CORRIDOR 5 JANITOR CLOSET 6 WOMEN'S 4 LOBBY MEN'S 3 STAIR # 2 # E302

10 2,28 SF +/ 309 THIRD LEVEL LOBBY 30 # CORRIDOR 305 OFFICE 307 JANITOR CLOSET 306 WOMEN'S 304 MEN'S 303 STAIR #

11 GENERAL NOTES: PLAN NOTES: GREEN ROOF / PAVERS,987 SF +/ OFFICE 406 FOURTH LEVEL 9,72 SF +/ PAVERS 648 SF +/ LOBBY 40 CORRIDOR 405 WOMEN'S 404 MEN'S 403 STAIR # 402 #

12 GENERAL NOTES: PLAN NOTES: +0 /2" +8" +5 3/4" +0 /4" +2" +2" +0" +2" +2" +0" +0" +0 /4" +6 /2" +6 /2"

13

14 V MACHINE ROOM RECEPTACLE CIRCUIT TO FIRE ALARM SYSTEM INITIATIING LOOP (TYP.) ROOF PHOTOCELL ED ON ROOF A F R F F MOTORIZED DER HOISTWAY TYPICAL LOBBY NOTES: HEAT DETECTOR TO OPERATE CONTACTOR TYPICAL FLOOR. ALL CONTROL WIRING TO BE INSTALLED IN CONDUIT POWER F R F F R F Off HOA SWITCH ED IN ENCLOSURE COVER TO EXTERIOR ING FIXTURES FUSED DISCONNECT SWITCH A RECALL (DESIGNATED LEVEL) Hand Auto CONTROL RELAY 6 MECHANICALLY HELD CONTRACTOR RATED A, 600V A A Open MACHINE RM LOCATED AT TOP OF SHAFT ELEV. CONT. Close FIRST FLOOR PIT CIRCUITS AS SHOWN ON DRAWINGS V CONTROL CIRCUIT CONNECT TO CIRCUIT IN PANEL P TYPICAL CONTROL SCHEMATIC NO SCALE EXTERIOR ING CONTROL SCHEMATIC NO SCALE WALL BUILDING STEEL CONNECTION FINISHED FLOOR LINE STEEL BUILDING COLUMN FOUNDATION BARE CU GROUNDING CONDUCTOR ADDRESSABLE RELAY FOR CONTROL REMOTE ALARM FOR DUCT DETECTOR SMOKE DETECTOR WITH SOUNDER BASE V PROVIDE CAPACITY TO ADD % DEVICES ON EACH INITIATION LOOP WITH MINIMUM OF LOOP FOR EACH FLOOR H L V A A R ST TYPICAL FIRE/SMOKE DER V SF A D R NOTE: REFER TO FLOOR PLANS FOR DEVICE QUANTITIES H M F R PROVIDE CONTROL WIRING IN CONDUIT AS REQUIRED TYPICAL HVAC UNIT STARTER F PROVIDE CAPACITY TO ADD (2) SIGNAL DEVICES (TYP. OF EACH SIGNAL CIRCUIT) PROVIDE SIGNAL EXPANDER POWER SPLY AS REQUIRED FOR NEW AND SIGNAL DEVICES V TO NEAREST PANEL. VERIFY QUANTITY AND LOCATION WITH THE FIRE ALARM SPLIER PRIOR TO BID. BARE CU GROUNDING CONDUCTOR CONNECTED TO REBAR NOTES: 3/4"x0' LONG GROUND ROD. 2. BUILDING STEEL CONNECTION SHALL BE EXOTHERMIC WELDED. CLEAN SURFACE TO BRIGHT METAL BEFORE CONNECTION AND RESTORE TO ORIGINAL FINISH AFTER MAKING CONNECTION BUILDING STEEL CONNECTIONS SHALL BE LOCATED ABOVE THE FINISHED FLOOR REMOTE ANNUNCIATOR NEW FIRE ALARM CONTROL PANEL NEW DACT (2) DEDICATED TELEPHONE LINES FLOOR STRUCTURAL STEEL GROUND ROD GROUNDING DETAIL NO SCALE FIRE ALARM SYSTEM SCHEMATIC NO SCALE

15 TYPE A VOLT MULTI L & TYPE SURFACE LENS SERIES ACCEPTABLE MANUFACTURERS SERIES OLIER METALUX LITHONIA COLUMBIA PANELBOARD I.D. 3 SURFACE BKR. FRAME/ TRIP. MDP FUSIBLE SWITCH/ FUSE ENTRY 600/ /400 /8 PANEL HP /WIRE GROUND BUS LOAD SERVED 3/4 YES 3P600A MCB LOCATION 42,000 A /400 PANEL 2HP B MULTI () 5W LED, 000 DELIVERED LUMENS, 50,000 HOUR RATED CEILING RECESSED PORTFOLIO LD6 SERIES PRESCOLITE PORTFOLIO GOTHAM EVO OLIER /400 PANEL 3HP 400/400 PANEL 4HP /225 RTU # NONFUSED DISCONNECT / WP RECEPTACLE ON UNIT /225 RTU #2 NONFUSED DISCONNECT / WP RECEPTACLE ON UNIT C MULTI () 7W LED, CEILING MP ING L9 SERIES PRESCOLITE PORTFOLIO GOTHAM EVO OLIER /00 PANEL HHP /225 DISCONNECT HOUSE PANEL W MULTI WALL ED PATTERN " NOMINAL PRISMATIC ACRYLIC METALUX BAU OLIER METALUX LITHONIA COLUMBIA X MULTIPLE LED WITH SURFACE LITHONIA LQM LITHONIA OLIER SURELITE MARK LOCATION KVA CONNECTION TYPE LOAD SERVED PRIMARY SEC. PRIMARY SEC. EGR SURFACE FOCAL POINT LITHONIA OLIER PINNACLE T ST FLOOR DELTA WYE PAD DRY PANEL LP T2 2ND FLOOR DELTA WYE PAD DRY PANEL 2LP T3 3RD FLOOR DELTA WYE PAD DRY PANEL 3LP TP TP TP T4 4TH FLOOR DELTA WYE PAD DRY PANEL 4LP TP NOTES: NOTE: HHP 277/480 /WIRE 3/4 00A MLO 42,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 2 LOBBY RM MECHANICAL ROOM ING TOTAL TOTAL LHP /8 /WIRE 3/4 00A MCB SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 42,000 AIC WEST SIDE PLANTER LED ING 2 REAR PARKING / WALL PACK S TREE WELL RECEPTACLES FIRE ALARM CONTROL PANEL SIDEWALK S 5 6 IRRIGATION CONTROL PANEL TOTAL TOTAL

16 HP 277/480 /WIRE 3/4 400A MLO 42,000 AIC LP /8 /WIRE 3/4 3P400A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 FEED THRU LUGS 2 EUH TOTAL TOTAL PANEL LP RECEPTACLES 2 PIT & RECEPTACLE 3 4 RECEPTACLES TOTAL TOTAL HP2 277/480 /WIRE 3/4 0A MLO 42,000 AIC LP2 /8 /WIRE 3/4 3P0A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 8 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 8 FEED THRU LUGS ING 2 30 WATER HEATER TOTAL TOTAL PANEL 2LP RECEPTACLES EWC (GFI) FIRE ALARM POWER SPLY TOTAL TOTAL 6 8

17 HP3 277/480 /WIRE 3/4 400A MLO 42,000 AIC LP3 /8 /WIRE 3/4 3P0A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 308 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 308 FEED THRU LUGS ING 2 ING TOTAL TOTAL PANEL 3LP RECEPTACLES 2 WATER HEATER EWC / S GFCI TOTAL TOTAL HP4 277/480 /WIRE 3/4 400A MLO 42,000 AIC LP4 /8 /WIRE 3/4 3P0A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 408 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 408 FEED THRU LUGS ING TOTAL TOTAL RECEPTACLES 2 WATER HEATER EWC / GFCI TOTAL TOTAL

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------

More information

CT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES LIGHT LEVEL REQUIREMENTS LOCATION Classrooms and instrumental areas- Study Halls, Lecture Rooms, Art Rooms, Offices, Libraries, Conference Rooms, Work Rooms, Shops, Laboratories and Secondary School Cafeterias.

More information

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608) Ho-Chunk Gaming POWER SYMBOLS X ELECTRICAL PANEL - REFER TO DRAWINGS FOR WIDTH AND PANEL SCHEDULES PANEL NAMING: XXP-#X: DENOTES PANEL FUNCTION: L = LIGHTING P = GENERAL POWER E = EMERGENCY S = OPTIONAL

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

I.C. Thomasson Associates, Inc. CONSULTING ENGINEERS 2950 KRAFT DRIVE, SUITE 500 NASHVILLE, TN. 37204 PHONE (615) 346-3400 FAX (615) 346-3550 www.icthomasson.com ICT PROJECT # 170647 HODGSON DOUGLAS landscape

More information

Technical II Report Electrical Systems

Technical II Report Electrical Systems Technical II Report Electrical Systems Kelly Chan Consultant: Prof T. Dannerth, P.E. Part A Drawings Drawings needed for single-line diagram EE1.01 title sheet (electrical drawings) EE2.09 penthouse/roof

More information

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

SINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18" AFF

SINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18 AFF LUORESCENT STRIP SURACE/PENDANT MOUNTED ' X ' LUORESCENT RECESS MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT STRIP WALL MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT EMERGENCY STRIP SURACE/PENDANT

More information

AGORA PALM UNIT TYPE A2, A2A, A2B, A2C, A2D, A2F, A2G, A2H, A2J UNIT TYPE A1 & A1-A UNIT TYPE A3-A, A3B, A3C, A3E, A3F, A3H UNIT TYPE A4, A4A

AGORA PALM UNIT TYPE A2, A2A, A2B, A2C, A2D, A2F, A2G, A2H, A2J UNIT TYPE A1 & A1-A UNIT TYPE A3-A, A3B, A3C, A3E, A3F, A3H UNIT TYPE A4, A4A F- RF 0 Winding Way Round Rock Texas 7-970-97 Ph UNIT TYPE A & A-A BEROOM /" = '-0" LIVING UNIT TYPE A, AA, AB, AC, A, AF, AG, AH, A BEROOM /" = '-0" UNIT TYPE A-A, AB, AC, AE, AF, AH LIVING PROVIE SECURITY

More information

Introduction Limited-Use / Limited-Application

Introduction Limited-Use / Limited-Application NBL DEC 2015 V1 Introduction Niagara Belco Ltd has been in the elevating industry for 30 years, we take pride in our work and aim to please all of our customers. We appreciate your business and always

More information

135'c " Conduit, 6-#3, 12-#4 Wires Rated-50% 45'c 345'w. 1" Conduit, 3-#4 3.43%VD. 66'c 411'w 4.08%VD. Wires Rated-50% 77'c. 421'w 14 4.

135'c  Conduit, 6-#3, 12-#4 Wires Rated-50% 45'c 345'w. 1 Conduit, 3-#4 3.43%VD. 66'c 411'w 4.08%VD. Wires Rated-50% 77'c. 421'w 14 4. ,, Panelboard NEM R enclosure. 90 positions 18K breakers Extend existing concrete base per base details. Paint panel very dark green which is close to the panel across the street. Use existing meter. 58'

More information

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater TABLE 9.4.5 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE 90.1 Uncovered Parking Areas Parking Lots and drives Building Grounds Walkways less that 10 feet wide Walkways 10 feet wide or greater

More information

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: Attachment G LIGHTING CONTROL SPECIFICATIONS (Download Document separately) LIGHTING CONTROL SPECIFICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including

More information

Inspector: PROPERTY INFORMATION Photo Smoke Detector Notification Control Panel Stand Alone Smoke Detector Dialer SUMMARY ONLY

Inspector: PROPERTY INFORMATION Photo Smoke Detector Notification Control Panel Stand Alone Smoke Detector Dialer SUMMARY ONLY FIRE ALARM INSPECTION AND TESTING SUMMARY PAGE PER 2013 NFPA 72 Inspector: Jim Smith Test Date: 5/22/2014 PROPERTY INFORMATION Name of Property: Windsor Tower Owner of Property: Jim Gibbs Properties Address:

More information

HVAC LEGEND HVAC ABBREVIATIONS PLUMBING LEGEND PLUMBING ABBREVIATIONS PRELIMINARY NOT FOR CONSTRUCTION

HVAC LEGEND HVAC ABBREVIATIONS PLUMBING LEGEND PLUMBING ABBREVIATIONS PRELIMINARY NOT FOR CONSTRUCTION GENERAL NOTES SPECIFICATIONS LEGEND SYMBOL DESCRIPTION ABBREV. SYMBOL DESCRIPTION ABBREV. SYMBOL DESCRIPTION ABBREV. ABBREVIATIONS PLUMBING LEGEND SYMBOL DESCRIPTION ABB. SYMBOL DESCRIPTION ABB. SYMBOL

More information

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth Corbin Building Technical Assignment 2 Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth 10/26/2011 Technical Report II 1 Executive Summary The following report is an overview

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: SECTION 26 09 23 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

ELECTRICAL DESIGN BRIEF

ELECTRICAL DESIGN BRIEF 4211 Yonge Street Suite 500 Toronto Ontario M2P 2A9 416 487 8151 f 416 487 9104 smithandandersen.com ELECTRICAL DESIGN BRIEF FOR 128 HAZLETON AVENUE RESIDENTIAL CONDOMINIUM BUILDING TORONTO, ONTARIO OUR

More information

SECTION LIGHTING CONTROL DEVICES

SECTION LIGHTING CONTROL DEVICES SECTION 16145 LIGHTING CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2 Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The

More information

Building Electrical System Overview

Building Electrical System Overview Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.

More information

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505) CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505) 599-1377 http://www.fmtn.org IMMEDIATE ATTENTION Construction Services for Municipal Operations Center Expansion

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

GRILLE, REGISTER AND DIFFUSER SCHEDULE

GRILLE, REGISTER AND DIFFUSER SCHEDULE ROOFTOP UNIT SCHEDULE (NATURAL GAS HEAT) MARK MANUFACTURER MODEL SUPPLY FAN COOLING COIL HEAT EXCHANGER MIN. MIN. MCA MOCP V/PH WEIGHT NOTES FAN CFM MIN ESP REFR. TH SH EAT LAT MIN. OUTPUT MIN. EFF. NOM.

More information

CHAPTER 20 SERVICE EQUIPMENT

CHAPTER 20 SERVICE EQUIPMENT SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control

More information

Related Sections: TBD. Effective Date: January 1, 2016

Related Sections: TBD. Effective Date: January 1, 2016 Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018 Construction Management at Risk Services New North East Branch Library Project ADDENDUM 01 August 3, 2018 1. The attendance sheets (4 pages) from the Pre-Bid Conference are attached. 2. The proposals may

More information

SECTION STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following:

SECTION STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following: Working Together to Serve SECTION 307 - STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following: 307-1 GENERAL. The Work under this Section consists of furnishing and installing all

More information

IN2 Lighting Control Devices

IN2 Lighting Control Devices Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Lighting Control Devices Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,

More information

LIGHTING CONTROL DEVICES

LIGHTING CONTROL DEVICES SECTION - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

Subcontract Agreement No.

Subcontract Agreement No. ATTACHMENT G TRADE INTERFACE AGREEMENT Subcontract Agreement No. PROJECT: TEXASTECH UNIVERSITY HEALTH SCIENCES CAMPUS, EL PASO, TEXAS MEDICAL SCIENCE BUILDING II PARTICIPANTS: Sundt Construction, Inc.

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

SECTION LIGHTING CONTROLS

SECTION LIGHTING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

GENERAL NOTES: E-OHE PRESERVE CONTINUITY OF EXISTING CIRCUIT AFTER REMOVAL OF EXISTING LIGHT POLE. EXISTING POWER UTILITY DIP POLE E-OHE

GENERAL NOTES: E-OHE PRESERVE CONTINUITY OF EXISTING CIRCUIT AFTER REMOVAL OF EXISTING LIGHT POLE. EXISTING POWER UTILITY DIP POLE E-OHE GENERAL 1. MOST UNDERGROUND UTILITIES ARE NOT INDICATED. THE UNDERGROUND UTILITIES INDICATED ARE SCHEMATIC ONLY. THE CONTRACTOR S BE RESPONSIBLE FOR JOBSITE LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES

More information

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000 Executive Summary The Milton S. Hershey Medical Center Academic Support Building is located on The Pennsylvania State University's campus in Hershey, PA. The building is owned by The Pennsylvania State

More information

Exhibit J. Subcontract Agreement No.

Exhibit J. Subcontract Agreement No. Exhibit J SUBCONTRACTOR TRADE INTERFACE AGREEMENT Subcontract Agreement No. PROJECT: NEW EASTSIDE REGIONAL PARK PHASE I PARTICIPANTS (PARTIES): Sundt Construction, Inc. PURPOSE: General Contractor (Sundt)

More information

PART 4 ELECTRICAL STANDARDS

PART 4 ELECTRICAL STANDARDS PART 4 ELECTRICAL STANDARDS 1.0 INTRODUCTION AND SCOPE: These standards reflect the general requirements and recommendations of elevator contractors, with respect to the power distribution system to achieve

More information

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual ITC 2000 HEATING CONTROL CABINET Installation & Operation Manual VTI, Incorporated 24 McMillan Way Newark, DE 19713 Phone (302) 738 0500 FAX (302) 738 6594 Revision Level 0.03 Manual No. 90003314 June,

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED

More information

Vanilla Box Design Criteria

Vanilla Box Design Criteria Description: 1. Floor: 2. Walls: 3. Ceiling: A. Finished and sealed 4 thick concrete slab on 10 mil poly vapor barrier on 4 of crushed stone throughout, including toilets. A. Interior gypsum board walls

More information

CONSTRUCTION DOCUMENTS U OF U BUILDING 72 REMODEL FOR EAE GSBS PROJECT NO

CONSTRUCTION DOCUMENTS U OF U BUILDING 72 REMODEL FOR EAE GSBS PROJECT NO CONTRACT DOCUMENTS ADDENDUM No. 1 April 25, 2016 University of Utah EAE remodel of Building 72 Project No. 21843 This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents

More information

Kitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI.

Kitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI. UNIT # NOTES Receptacle in living room, south wall not working properly; 1 kitchen east, north, west wall receptacles have no power. Living room north wall outlet not working properly; kitchen 2 south

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL CHAPTER 8 0 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1

More information

DIVISION 16 - ELECTRICAL

DIVISION 16 - ELECTRICAL DIVISION 16 - ELECTRICAL I. GENERAL A. This division contains the following elements: 1. Electrical Distribution System. 2. Power System. 3. Lighting System. 4. Emergency Power System. 5. Fire Alarm Detection

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5 Construction Standards Page 1 of 5.1 General Description.1 The University requires that all new fire alarm system control panel, components, and devices, as required for the project, be Secutron 2900 Series

More information

SECTION : MEPS IDENTIFICATION & LABELING

SECTION : MEPS IDENTIFICATION & LABELING SECTION 01 70 10: MEPS IDENTIFICATION & LABELING 1. GENERAL A. The intent of this section is to define the labeling and identification requirements for building mechanical, electrical, plumbing, and specialty

More information

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018 EXHIBIT A James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania 19139 Project Determination Report Major Renovation October 26, 2018 School District of Philadelphia Office of Capital

More information

Electrical Systems Existing Conditions and Building Load Summary Report

Electrical Systems Existing Conditions and Building Load Summary Report The building was constructed a few years ago to act as both a Headquarters and to be a display of what the product they manufacture can accomplish when put to work. The building features both office and

More information

ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015

ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 Basic Safety (Construction Site Safety Orientation) (12.5 Hours) (Module ID 00101-15) Presents basic jobsite safety information to prepare workers for

More information

DIVISION 16 ELECTRICAL

DIVISION 16 ELECTRICAL DIVISION 16 ELECTRICAL Saratoga Springs / standards / 02-2004 Page - 0 ELECTRICAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Grounding electrodes and conductors, equipment

More information

INDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan

INDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan 30 Greenway, NW Suite 11 Glen Burnie, Maryland 21061 tel 410.528.8899 fax 410.558.6312 www.gbalternatives.com INDEX Page 2 to 7 Electrical Specifications Page 8 Electrical Schemes: Basement Plan Page 9

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Final EC Inspection Report 03/2010

Final EC Inspection Report 03/2010 2491 Alluvial Avenue, Suite 59 Clovis, California 93611 Tel: (559)392-2838 - Fax: (559)325-7599 Contractor License #933910 (C-10/C-16) Final EC.02.03.05 Inspection Report 03/2010 This Final Report Covers

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Nameplates and labels B. Wire and cable markers C. Conduit markers 1.2 REFERENCES A. NFPA 70 - National Electrical

More information

Memphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc.

Memphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc. Memphis Housing Authority High Rise Fire Alarm Upgrades Questions from Contractors (Through Addendum #2) Communications Systems, Inc.: Legend 1. DL - Dome light symbol should be on the tenant emergency

More information

Choice of factory set distributions. Thermally set white polyester powder paint. Optional wet location listing

Choice of factory set distributions. Thermally set white polyester powder paint. Optional wet location listing LOBAY The Lobay luminaire combines the efficiency of HID light sources with special lens optics to create an enclosed luminaire that produces a wide variety of lighting distributions. This makes Lobay

More information

Note: The office/work area is not in the scope of the PER. Existing Condition

Note: The office/work area is not in the scope of the PER. Existing Condition ROBERT G. DASHIELL, JR., P.E., INC. Consulting Engineers 1225 West 26 th Street, Norfolk, Virginia 23508 (757) 623-5012 September 14, 2016 Draft Electrical Portion of the PER Petersburg Main Sanitary Sewage

More information

Electrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING

Electrical System (N) PANELBOARD L1 VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board

More information

DIVISION 16 - ELECTRICAL. A. This division contains the following elements:

DIVISION 16 - ELECTRICAL. A. This division contains the following elements: DIVISION 16 - ELECTRICAL I. GENERAL A. This division contains the following elements: 1. Electrical Distribution System. 2. Power System. 3. Lighting System. 4. Emergency Power System. 5. Fire Alarm Detection

More information

RENEWAL PARTS IDENTIFICATION. Type TTUH and TTUH-CO URN Heaters. Dimensions (In.) Extends. Model Volts kw W/In 2 A B C D

RENEWAL PARTS IDENTIFICATION. Type TTUH and TTUH-CO URN Heaters. Dimensions (In.) Extends. Model Volts kw W/In 2 A B C D Chromalox Installation, Operation and RENEWAL PARTS IDENTIFICATION DIVISION DATE SALES REFERENCE (Supersedes PD00-1) OCTOBER, 000 SECTION TTUH PD00-15 161-0815-001 Type TTUH and TTUH-CO URN Heaters TTUH-0A

More information

DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and

DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and equipment), and discussions with maintenance personnel

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 314 - BROOKLYN, 330 59 STREET, New York, 11220 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-23

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL CHAPTER 8 ELECTRICAL 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1

More information

Building electrical systems should be 480/277 volts, 3 phase, 4 wire and/or 208/120 volt, 3-phase, 4-wire for lighting and power.

Building electrical systems should be 480/277 volts, 3 phase, 4 wire and/or 208/120 volt, 3-phase, 4-wire for lighting and power. DIVISION 26 ELECTRICAL Includes the following sections: 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 26 Grounding 26 05 29 Hangers and Supports 26 05 33 Raceway and Boxes 26 05 43

More information

Maintence/Renewal Report

Maintence/Renewal Report Maintence/Renewal Report Property Address: C4U Inspections Lloyd Kenzle CPBC # 47652 3518 Webber Rd. West Kelowna, BC V4T 1H9 866 765-4434 Table of Contents Cover Page... 1 Table of Contents...2 I SUMMARY...

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal

More information

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line ± 4' ± 13' ± 72' Lease Line ± 6' ± 7' Plot # R019A ± 18' Lease Line Site N o : Site N ame: Lo catio n: Submitted B y: D rawn by D ate: 991 Santee Trolley Square Santee, CA ID Plans 11/10/2016 This drawing

More information

Heat Recovery Units. EXTERNAL STATIC REQUIRED (in.h2o) (Pa) MOTOR (Bhp/Hp) (bkw/kw) SPEED (rpm)

Heat Recovery Units. EXTERNAL STATIC REQUIRED (in.h2o) (Pa) MOTOR (Bhp/Hp) (bkw/kw) SPEED (rpm) Heat Recovery Units AIR HANDLING UNIT No. SERVICE AREA MANUFACTURER MODEL HRU-3 & HRU-4 B-Section Low Rate Ventilation Tempeff RG 16000 (9500) SUPPLY FAN - SIZE/TYPE AIRFLOW RATE (cfm) (l/s) TOTAL STATIC

More information

Renovate MCRC Facilities Great Lakes, IL

Renovate MCRC Facilities Great Lakes, IL 6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEM DESCRIPTION The electrical repair work includes the design and construction of the electrical distribution system for the B3200 Marine Corps Reserve

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

POWER AND CONTROL PRODUCTS QUICK RESPONSE PROGRAM.

POWER AND CONTROL PRODUCTS QUICK RESPONSE PROGRAM. POWER AND CONTROL PRODUCTS QUICK RESPONSE PROGRAM. CUSTOM CONFIGURED PRODUCTS READY FOR SHIPMENT IN ONE TO TEN BUSINESS DAYS. Appleton s Quick Response Program places select power and control products

More information

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors 1. SUMMARY AND BACKGROUND: Princeton Joint Unified School District located in Princeton

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information