ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED
|
|
- Gary Darren Stafford
- 5 years ago
- Views:
Transcription
1 SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED
2 3" EXTERIOR GRADE LED STRIP ING SEE SITE ING PLANS 2 " 2 " 4" 5" " 3 2" 2" MIN. BASE COVER DOUBLE LEVELING NUTS FINISH GRADE HANDHOLE ING BOLT LAYOUT PER MFGR. TEMPLATE GROUT BASE " 6" CURB WALL ANCHOR BOLTS CONDUIT COPING DETAIL NO SCALE (4) 6'0"#5 VERT. 8" O.C. (4) 8"Ø#4 HORIZ. 6" O.C CONCRETE BASE DETAIL '6" FIRE/ WATER 07 LIMESTONE CAP EXTERIOR GRADE LED STRIP ING 6" 2'6" 6" 2" JUNCTION BOX VARIES 4" EXTERIOR GRADE /4" CONDUIT BETWEEN PLANTER JUNCTION BOXES PLANTER DETAIL NO SCALE LED STRIP ING SEE DETAILS THIS SHEET LED STRIP ING SEE DETAILS THIS SHEET /4" CONDUIT TO NEXT PLANTER JUNCTION BOX, CAST INTO CONCRETE CURB WALL (TYPICAL). 3/4" CONDUIT TO NEXT PLANTER T PLANTER DETAIL NO SCALE Luminaire Schedule Symbol Label Qty Arrangement Description LLF Lum. Lumens Lum. Watts Arr. Watts Total Watts A 6 80 DEGREES GE 5' AFG A2 3 SINGLE GE 5' AFG B SINGLE USA 5' AFG
3 08 FIRE/ WATER 07 06
4 9 8 SECOND LEVEL,806 SF +/ OFFICE CORRIDOR 2 OFFICE 7 CORRIDOR 5 JANITOR CLOSET 6 WOMEN'S 4 LOBBY MEN'S 3 STAIR # 2 #
5 THIRD LEVEL 309 2,28 SF +/ LOBBY 30 # CORRIDOR 305 OFFICE 307 JANITOR CLOSET 306 WOMEN'S 304 MEN'S 303 STAIR #
6 ,987 SF +/ 648 SF +/ GREEN ROOF / FOURTH LEVEL PAVERS LOBBY # CORRIDOR 405 WOMEN'S 404 MEN'S OFFICE 406 9,72 SF +/ STAIR # 402 PAVERS
7 +0 /2" +8" +5 3/4" +0 /4" +2" +2" +0" +2" +2" +0" +0" +0 /4" +6 /2" +6 /2"
8 FIRE/ WATER
9 9 8 SECOND LEVEL,806 SF +/ OFFICE CORRIDOR 2 OFFICE 7 CORRIDOR 5 JANITOR CLOSET 6 WOMEN'S 4 LOBBY MEN'S 3 STAIR # 2 # E302
10 2,28 SF +/ 309 THIRD LEVEL LOBBY 30 # CORRIDOR 305 OFFICE 307 JANITOR CLOSET 306 WOMEN'S 304 MEN'S 303 STAIR #
11 GENERAL NOTES: PLAN NOTES: GREEN ROOF / PAVERS,987 SF +/ OFFICE 406 FOURTH LEVEL 9,72 SF +/ PAVERS 648 SF +/ LOBBY 40 CORRIDOR 405 WOMEN'S 404 MEN'S 403 STAIR # 402 #
12 GENERAL NOTES: PLAN NOTES: +0 /2" +8" +5 3/4" +0 /4" +2" +2" +0" +2" +2" +0" +0" +0 /4" +6 /2" +6 /2"
13
14 V MACHINE ROOM RECEPTACLE CIRCUIT TO FIRE ALARM SYSTEM INITIATIING LOOP (TYP.) ROOF PHOTOCELL ED ON ROOF A F R F F MOTORIZED DER HOISTWAY TYPICAL LOBBY NOTES: HEAT DETECTOR TO OPERATE CONTACTOR TYPICAL FLOOR. ALL CONTROL WIRING TO BE INSTALLED IN CONDUIT POWER F R F F R F Off HOA SWITCH ED IN ENCLOSURE COVER TO EXTERIOR ING FIXTURES FUSED DISCONNECT SWITCH A RECALL (DESIGNATED LEVEL) Hand Auto CONTROL RELAY 6 MECHANICALLY HELD CONTRACTOR RATED A, 600V A A Open MACHINE RM LOCATED AT TOP OF SHAFT ELEV. CONT. Close FIRST FLOOR PIT CIRCUITS AS SHOWN ON DRAWINGS V CONTROL CIRCUIT CONNECT TO CIRCUIT IN PANEL P TYPICAL CONTROL SCHEMATIC NO SCALE EXTERIOR ING CONTROL SCHEMATIC NO SCALE WALL BUILDING STEEL CONNECTION FINISHED FLOOR LINE STEEL BUILDING COLUMN FOUNDATION BARE CU GROUNDING CONDUCTOR ADDRESSABLE RELAY FOR CONTROL REMOTE ALARM FOR DUCT DETECTOR SMOKE DETECTOR WITH SOUNDER BASE V PROVIDE CAPACITY TO ADD % DEVICES ON EACH INITIATION LOOP WITH MINIMUM OF LOOP FOR EACH FLOOR H L V A A R ST TYPICAL FIRE/SMOKE DER V SF A D R NOTE: REFER TO FLOOR PLANS FOR DEVICE QUANTITIES H M F R PROVIDE CONTROL WIRING IN CONDUIT AS REQUIRED TYPICAL HVAC UNIT STARTER F PROVIDE CAPACITY TO ADD (2) SIGNAL DEVICES (TYP. OF EACH SIGNAL CIRCUIT) PROVIDE SIGNAL EXPANDER POWER SPLY AS REQUIRED FOR NEW AND SIGNAL DEVICES V TO NEAREST PANEL. VERIFY QUANTITY AND LOCATION WITH THE FIRE ALARM SPLIER PRIOR TO BID. BARE CU GROUNDING CONDUCTOR CONNECTED TO REBAR NOTES: 3/4"x0' LONG GROUND ROD. 2. BUILDING STEEL CONNECTION SHALL BE EXOTHERMIC WELDED. CLEAN SURFACE TO BRIGHT METAL BEFORE CONNECTION AND RESTORE TO ORIGINAL FINISH AFTER MAKING CONNECTION BUILDING STEEL CONNECTIONS SHALL BE LOCATED ABOVE THE FINISHED FLOOR REMOTE ANNUNCIATOR NEW FIRE ALARM CONTROL PANEL NEW DACT (2) DEDICATED TELEPHONE LINES FLOOR STRUCTURAL STEEL GROUND ROD GROUNDING DETAIL NO SCALE FIRE ALARM SYSTEM SCHEMATIC NO SCALE
15 TYPE A VOLT MULTI L & TYPE SURFACE LENS SERIES ACCEPTABLE MANUFACTURERS SERIES OLIER METALUX LITHONIA COLUMBIA PANELBOARD I.D. 3 SURFACE BKR. FRAME/ TRIP. MDP FUSIBLE SWITCH/ FUSE ENTRY 600/ /400 /8 PANEL HP /WIRE GROUND BUS LOAD SERVED 3/4 YES 3P600A MCB LOCATION 42,000 A /400 PANEL 2HP B MULTI () 5W LED, 000 DELIVERED LUMENS, 50,000 HOUR RATED CEILING RECESSED PORTFOLIO LD6 SERIES PRESCOLITE PORTFOLIO GOTHAM EVO OLIER /400 PANEL 3HP 400/400 PANEL 4HP /225 RTU # NONFUSED DISCONNECT / WP RECEPTACLE ON UNIT /225 RTU #2 NONFUSED DISCONNECT / WP RECEPTACLE ON UNIT C MULTI () 7W LED, CEILING MP ING L9 SERIES PRESCOLITE PORTFOLIO GOTHAM EVO OLIER /00 PANEL HHP /225 DISCONNECT HOUSE PANEL W MULTI WALL ED PATTERN " NOMINAL PRISMATIC ACRYLIC METALUX BAU OLIER METALUX LITHONIA COLUMBIA X MULTIPLE LED WITH SURFACE LITHONIA LQM LITHONIA OLIER SURELITE MARK LOCATION KVA CONNECTION TYPE LOAD SERVED PRIMARY SEC. PRIMARY SEC. EGR SURFACE FOCAL POINT LITHONIA OLIER PINNACLE T ST FLOOR DELTA WYE PAD DRY PANEL LP T2 2ND FLOOR DELTA WYE PAD DRY PANEL 2LP T3 3RD FLOOR DELTA WYE PAD DRY PANEL 3LP TP TP TP T4 4TH FLOOR DELTA WYE PAD DRY PANEL 4LP TP NOTES: NOTE: HHP 277/480 /WIRE 3/4 00A MLO 42,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 2 LOBBY RM MECHANICAL ROOM ING TOTAL TOTAL LHP /8 /WIRE 3/4 00A MCB SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 42,000 AIC WEST SIDE PLANTER LED ING 2 REAR PARKING / WALL PACK S TREE WELL RECEPTACLES FIRE ALARM CONTROL PANEL SIDEWALK S 5 6 IRRIGATION CONTROL PANEL TOTAL TOTAL
16 HP 277/480 /WIRE 3/4 400A MLO 42,000 AIC LP /8 /WIRE 3/4 3P400A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 08 FEED THRU LUGS 2 EUH TOTAL TOTAL PANEL LP RECEPTACLES 2 PIT & RECEPTACLE 3 4 RECEPTACLES TOTAL TOTAL HP2 277/480 /WIRE 3/4 0A MLO 42,000 AIC LP2 /8 /WIRE 3/4 3P0A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 8 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 8 FEED THRU LUGS ING 2 30 WATER HEATER TOTAL TOTAL PANEL 2LP RECEPTACLES EWC (GFI) FIRE ALARM POWER SPLY TOTAL TOTAL 6 8
17 HP3 277/480 /WIRE 3/4 400A MLO 42,000 AIC LP3 /8 /WIRE 3/4 3P0A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 308 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 308 FEED THRU LUGS ING 2 ING TOTAL TOTAL PANEL 3LP RECEPTACLES 2 WATER HEATER EWC / S GFCI TOTAL TOTAL HP4 277/480 /WIRE 3/4 400A MLO 42,000 AIC LP4 /8 /WIRE 3/4 3P0A MCB 22,000 AIC SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 408 SURFACE ENTRY GROUND BUS YES LOCATION ELECT. RM 408 FEED THRU LUGS ING TOTAL TOTAL RECEPTACLES 2 WATER HEATER EWC / GFCI TOTAL TOTAL
FIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT
More informationSCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL
SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,
More informationPROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER
PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------
More informationCT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING
More informationM001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings
1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL
More informationLIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES
LIGHT LEVEL REQUIREMENTS LOCATION Classrooms and instrumental areas- Study Halls, Lecture Rooms, Art Rooms, Offices, Libraries, Conference Rooms, Work Rooms, Shops, Laboratories and Secondary School Cafeterias.
More informationHo-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)
Ho-Chunk Gaming POWER SYMBOLS X ELECTRICAL PANEL - REFER TO DRAWINGS FOR WIDTH AND PANEL SCHEDULES PANEL NAMING: XXP-#X: DENOTES PANEL FUNCTION: L = LIGHTING P = GENERAL POWER E = EMERGENCY S = OPTIONAL
More informationAppendix B. Facilities Assessment Report
Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates
More informationI.C. Thomasson Associates, Inc. CONSULTING ENGINEERS 2950 KRAFT DRIVE, SUITE 500 NASHVILLE, TN. 37204 PHONE (615) 346-3400 FAX (615) 346-3550 www.icthomasson.com ICT PROJECT # 170647 HODGSON DOUGLAS landscape
More informationTechnical II Report Electrical Systems
Technical II Report Electrical Systems Kelly Chan Consultant: Prof T. Dannerth, P.E. Part A Drawings Drawings needed for single-line diagram EE1.01 title sheet (electrical drawings) EE2.09 penthouse/roof
More informationRocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004
Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities
More informationSINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18" AFF
LUORESCENT STRIP SURACE/PENDANT MOUNTED ' X ' LUORESCENT RECESS MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT STRIP WALL MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT EMERGENCY STRIP SURACE/PENDANT
More informationAGORA PALM UNIT TYPE A2, A2A, A2B, A2C, A2D, A2F, A2G, A2H, A2J UNIT TYPE A1 & A1-A UNIT TYPE A3-A, A3B, A3C, A3E, A3F, A3H UNIT TYPE A4, A4A
F- RF 0 Winding Way Round Rock Texas 7-970-97 Ph UNIT TYPE A & A-A BEROOM /" = '-0" LIVING UNIT TYPE A, AA, AB, AC, A, AF, AG, AH, A BEROOM /" = '-0" UNIT TYPE A-A, AB, AC, AE, AF, AH LIVING PROVIE SECURITY
More informationIntroduction Limited-Use / Limited-Application
NBL DEC 2015 V1 Introduction Niagara Belco Ltd has been in the elevating industry for 30 years, we take pride in our work and aim to please all of our customers. We appreciate your business and always
More information135'c " Conduit, 6-#3, 12-#4 Wires Rated-50% 45'c 345'w. 1" Conduit, 3-#4 3.43%VD. 66'c 411'w 4.08%VD. Wires Rated-50% 77'c. 421'w 14 4.
,, Panelboard NEM R enclosure. 90 positions 18K breakers Extend existing concrete base per base details. Paint panel very dark green which is close to the panel across the street. Use existing meter. 58'
More informationTABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater
TABLE 9.4.5 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE 90.1 Uncovered Parking Areas Parking Lots and drives Building Grounds Walkways less that 10 feet wide Walkways 10 feet wide or greater
More informationRE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan
ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or
More informationA. This Section includes the following lighting control devices:
Attachment G LIGHTING CONTROL SPECIFICATIONS (Download Document separately) LIGHTING CONTROL SPECIFICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including
More informationInspector: PROPERTY INFORMATION Photo Smoke Detector Notification Control Panel Stand Alone Smoke Detector Dialer SUMMARY ONLY
FIRE ALARM INSPECTION AND TESTING SUMMARY PAGE PER 2013 NFPA 72 Inspector: Jim Smith Test Date: 5/22/2014 PROPERTY INFORMATION Name of Property: Windsor Tower Owner of Property: Jim Gibbs Properties Address:
More informationHVAC LEGEND HVAC ABBREVIATIONS PLUMBING LEGEND PLUMBING ABBREVIATIONS PRELIMINARY NOT FOR CONSTRUCTION
GENERAL NOTES SPECIFICATIONS LEGEND SYMBOL DESCRIPTION ABBREV. SYMBOL DESCRIPTION ABBREV. SYMBOL DESCRIPTION ABBREV. ABBREVIATIONS PLUMBING LEGEND SYMBOL DESCRIPTION ABB. SYMBOL DESCRIPTION ABB. SYMBOL
More informationCorbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth
Corbin Building Technical Assignment 2 Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth 10/26/2011 Technical Report II 1 Executive Summary The following report is an overview
More informationA. This Section includes the following lighting control devices:
SECTION 26 09 23 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationElement D Services Electrical
PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.
More informationELECTRICAL DESIGN BRIEF
4211 Yonge Street Suite 500 Toronto Ontario M2P 2A9 416 487 8151 f 416 487 9104 smithandandersen.com ELECTRICAL DESIGN BRIEF FOR 128 HAZLETON AVENUE RESIDENTIAL CONDOMINIUM BUILDING TORONTO, ONTARIO OUR
More informationSECTION LIGHTING CONTROL DEVICES
SECTION 16145 LIGHTING CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationLindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2
Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The
More informationBuilding Electrical System Overview
Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power
More information.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code
More informationRESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS
RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch
More informationDESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES
2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.
More informationCITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)
CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505) 599-1377 http://www.fmtn.org IMMEDIATE ATTENTION Construction Services for Municipal Operations Center Expansion
More informationTABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2
Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as
More informationDivision 26 ELECTRICAL TABLE OF CONTENTS
Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND
More informationGRILLE, REGISTER AND DIFFUSER SCHEDULE
ROOFTOP UNIT SCHEDULE (NATURAL GAS HEAT) MARK MANUFACTURER MODEL SUPPLY FAN COOLING COIL HEAT EXCHANGER MIN. MIN. MCA MOCP V/PH WEIGHT NOTES FAN CFM MIN ESP REFR. TH SH EAT LAT MIN. OUTPUT MIN. EFF. NOM.
More informationCHAPTER 20 SERVICE EQUIPMENT
SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control
More informationRelated Sections: TBD. Effective Date: January 1, 2016
Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:
More informationSCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003
SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on
More informationCOMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods
1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,
More informationElectrical Design Guidelines Table of Contents
C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6
More informationPort of Portland Conveying Equipment Guidelines
Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate
More informationConstruction Management at Risk Services. New North East Branch Library Project. August 3, 2018
Construction Management at Risk Services New North East Branch Library Project ADDENDUM 01 August 3, 2018 1. The attendance sheets (4 pages) from the Pre-Bid Conference are attached. 2. The proposals may
More informationSECTION STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following:
Working Together to Serve SECTION 307 - STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following: 307-1 GENERAL. The Work under this Section consists of furnishing and installing all
More informationIN2 Lighting Control Devices
Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Lighting Control Devices Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals
More informationSECTION ENCLOSED CONTROLLERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,
More informationLIGHTING CONTROL DEVICES
SECTION - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this
More informationSubcontract Agreement No.
ATTACHMENT G TRADE INTERFACE AGREEMENT Subcontract Agreement No. PROJECT: TEXASTECH UNIVERSITY HEALTH SCIENCES CAMPUS, EL PASO, TEXAS MEDICAL SCIENCE BUILDING II PARTICIPANTS: Sundt Construction, Inc.
More informationELECTRICAL SYSTEMS ASSESSMENT Hanover High School
ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,
More informationSECTION LIGHTING CONTROLS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to
More informationBuilding Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationGENERAL NOTES: E-OHE PRESERVE CONTINUITY OF EXISTING CIRCUIT AFTER REMOVAL OF EXISTING LIGHT POLE. EXISTING POWER UTILITY DIP POLE E-OHE
GENERAL 1. MOST UNDERGROUND UTILITIES ARE NOT INDICATED. THE UNDERGROUND UTILITIES INDICATED ARE SCHEMATIC ONLY. THE CONTRACTOR S BE RESPONSIBLE FOR JOBSITE LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES
More informationDates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000
Executive Summary The Milton S. Hershey Medical Center Academic Support Building is located on The Pennsylvania State University's campus in Hershey, PA. The building is owned by The Pennsylvania State
More informationExhibit J. Subcontract Agreement No.
Exhibit J SUBCONTRACTOR TRADE INTERFACE AGREEMENT Subcontract Agreement No. PROJECT: NEW EASTSIDE REGIONAL PARK PHASE I PARTICIPANTS (PARTIES): Sundt Construction, Inc. PURPOSE: General Contractor (Sundt)
More informationPART 4 ELECTRICAL STANDARDS
PART 4 ELECTRICAL STANDARDS 1.0 INTRODUCTION AND SCOPE: These standards reflect the general requirements and recommendations of elevator contractors, with respect to the power distribution system to achieve
More informationITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual
ITC 2000 HEATING CONTROL CABINET Installation & Operation Manual VTI, Incorporated 24 McMillan Way Newark, DE 19713 Phone (302) 738 0500 FAX (302) 738 6594 Revision Level 0.03 Manual No. 90003314 June,
More informationF. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17
ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED
More informationVanilla Box Design Criteria
Description: 1. Floor: 2. Walls: 3. Ceiling: A. Finished and sealed 4 thick concrete slab on 10 mil poly vapor barrier on 4 of crushed stone throughout, including toilets. A. Interior gypsum board walls
More informationCONSTRUCTION DOCUMENTS U OF U BUILDING 72 REMODEL FOR EAE GSBS PROJECT NO
CONTRACT DOCUMENTS ADDENDUM No. 1 April 25, 2016 University of Utah EAE remodel of Building 72 Project No. 21843 This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents
More informationKitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI.
UNIT # NOTES Receptacle in living room, south wall not working properly; 1 kitchen east, north, west wall receptacles have no power. Living room north wall outlet not working properly; kitchen 2 south
More informationPLAN REVIEW SUBMITTAL GUIDE
PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide
More informationBuildingName The Description of the Project P DOCUMENTS
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
More informationCHAPTER 8 ELECTRICAL
CHAPTER 8 0 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1
More informationDIVISION 16 - ELECTRICAL
DIVISION 16 - ELECTRICAL I. GENERAL A. This division contains the following elements: 1. Electrical Distribution System. 2. Power System. 3. Lighting System. 4. Emergency Power System. 5. Fire Alarm Detection
More informationState College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More informationMichigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1
Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping
More information16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5
Construction Standards Page 1 of 5.1 General Description.1 The University requires that all new fire alarm system control panel, components, and devices, as required for the project, be Secutron 2900 Series
More informationSECTION : MEPS IDENTIFICATION & LABELING
SECTION 01 70 10: MEPS IDENTIFICATION & LABELING 1. GENERAL A. The intent of this section is to define the labeling and identification requirements for building mechanical, electrical, plumbing, and specialty
More informationJames Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018
EXHIBIT A James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania 19139 Project Determination Report Major Renovation October 26, 2018 School District of Philadelphia Office of Capital
More informationElectrical Systems Existing Conditions and Building Load Summary Report
The building was constructed a few years ago to act as both a Headquarters and to be a display of what the product they manufacture can accomplish when put to work. The building features both office and
More informationELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015
ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 Basic Safety (Construction Site Safety Orientation) (12.5 Hours) (Module ID 00101-15) Presents basic jobsite safety information to prepare workers for
More informationDIVISION 16 ELECTRICAL
DIVISION 16 ELECTRICAL Saratoga Springs / standards / 02-2004 Page - 0 ELECTRICAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Grounding electrodes and conductors, equipment
More informationINDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan
30 Greenway, NW Suite 11 Glen Burnie, Maryland 21061 tel 410.528.8899 fax 410.558.6312 www.gbalternatives.com INDEX Page 2 to 7 Electrical Specifications Page 8 Electrical Schemes: Basement Plan Page 9
More informationF. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15
ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED
More informationSECTION ELECTRICAL IDENTIFICATION
SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationFinal EC Inspection Report 03/2010
2491 Alluvial Avenue, Suite 59 Clovis, California 93611 Tel: (559)392-2838 - Fax: (559)325-7599 Contractor License #933910 (C-10/C-16) Final EC.02.03.05 Inspection Report 03/2010 This Final Report Covers
More informationSECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Nameplates and labels B. Wire and cable markers C. Conduit markers 1.2 REFERENCES A. NFPA 70 - National Electrical
More informationMemphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc.
Memphis Housing Authority High Rise Fire Alarm Upgrades Questions from Contractors (Through Addendum #2) Communications Systems, Inc.: Legend 1. DL - Dome light symbol should be on the tenant emergency
More informationChoice of factory set distributions. Thermally set white polyester powder paint. Optional wet location listing
LOBAY The Lobay luminaire combines the efficiency of HID light sources with special lens optics to create an enclosed luminaire that produces a wide variety of lighting distributions. This makes Lobay
More informationNote: The office/work area is not in the scope of the PER. Existing Condition
ROBERT G. DASHIELL, JR., P.E., INC. Consulting Engineers 1225 West 26 th Street, Norfolk, Virginia 23508 (757) 623-5012 September 14, 2016 Draft Electrical Portion of the PER Petersburg Main Sanitary Sewage
More informationElectrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING
Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board
More informationDIVISION 16 - ELECTRICAL. A. This division contains the following elements:
DIVISION 16 - ELECTRICAL I. GENERAL A. This division contains the following elements: 1. Electrical Distribution System. 2. Power System. 3. Lighting System. 4. Emergency Power System. 5. Fire Alarm Detection
More informationRENEWAL PARTS IDENTIFICATION. Type TTUH and TTUH-CO URN Heaters. Dimensions (In.) Extends. Model Volts kw W/In 2 A B C D
Chromalox Installation, Operation and RENEWAL PARTS IDENTIFICATION DIVISION DATE SALES REFERENCE (Supersedes PD00-1) OCTOBER, 000 SECTION TTUH PD00-15 161-0815-001 Type TTUH and TTUH-CO URN Heaters TTUH-0A
More informationDEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and
DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and equipment), and discussions with maintenance personnel
More informationNYC Department of Education
NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 314 - BROOKLYN, 330 59 STREET, New York, 11220 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-23
More informationStudent Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.
SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:
More informationPLATTEVILLE MIDDLE SCHOOL
Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle
More informationCHAPTER 8 ELECTRICAL
CHAPTER 8 ELECTRICAL 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1
More informationBuilding electrical systems should be 480/277 volts, 3 phase, 4 wire and/or 208/120 volt, 3-phase, 4-wire for lighting and power.
DIVISION 26 ELECTRICAL Includes the following sections: 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 26 Grounding 26 05 29 Hangers and Supports 26 05 33 Raceway and Boxes 26 05 43
More informationMaintence/Renewal Report
Maintence/Renewal Report Property Address: C4U Inspections Lloyd Kenzle CPBC # 47652 3518 Webber Rd. West Kelowna, BC V4T 1H9 866 765-4434 Table of Contents Cover Page... 1 Table of Contents...2 I SUMMARY...
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018
SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry
MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal
More informationPlot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line
± 4' ± 13' ± 72' Lease Line ± 6' ± 7' Plot # R019A ± 18' Lease Line Site N o : Site N ame: Lo catio n: Submitted B y: D rawn by D ate: 991 Santee Trolley Square Santee, CA ID Plans 11/10/2016 This drawing
More informationHeat Recovery Units. EXTERNAL STATIC REQUIRED (in.h2o) (Pa) MOTOR (Bhp/Hp) (bkw/kw) SPEED (rpm)
Heat Recovery Units AIR HANDLING UNIT No. SERVICE AREA MANUFACTURER MODEL HRU-3 & HRU-4 B-Section Low Rate Ventilation Tempeff RG 16000 (9500) SUPPLY FAN - SIZE/TYPE AIRFLOW RATE (cfm) (l/s) TOTAL STATIC
More informationRenovate MCRC Facilities Great Lakes, IL
6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEM DESCRIPTION The electrical repair work includes the design and construction of the electrical distribution system for the B3200 Marine Corps Reserve
More informationSECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.
SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance
More informationPOWER AND CONTROL PRODUCTS QUICK RESPONSE PROGRAM.
POWER AND CONTROL PRODUCTS QUICK RESPONSE PROGRAM. CUSTOM CONFIGURED PRODUCTS READY FOR SHIPMENT IN ONE TO TEN BUSINESS DAYS. Appleton s Quick Response Program places select power and control products
More informationPrinceton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors
Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors 1. SUMMARY AND BACKGROUND: Princeton Joint Unified School District located in Princeton
More informationSECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More information