1 x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. WALL BRACKET FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. WALL MTD. LIGHT FIXTURE, IE. WALL PACK, SCONCE, CYLINDER, ETC. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. CEILING MTD. LIGHT FIXTURE, IE. GLOBE, DOWNLIGHT, PENDANT, ETC. SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. SPOT LIGHT CAPITAL LETTER DENOTES TYPE. BOLLARD, CAPITAL LETTER DENOTES TYPE. POLE LIGHT, SEE LIGHT FIXTURE SCHEDULE AND DETAILS FOR POLE SPECIFICATION. CAPITAL LETTER DENOTES TYPE. TRACK HEAD CAPITAL LETTER DENOTES TYPE. FLUORESCENT LIGHT FIXTURE WITH EM BALLAST, EM BALLAST TO PROVIDE 1000 LUMENS MINIMUM. EMERGENCY LIGHT FIXTURE, IE FROGEYE, ALL EMERGENCY LIGHTS TO HAVE 1HR MINIMUM BATTERY BACKUP. EXIT SIGN, ALL EXITS LIGHTS TO HAVE 1HR MINIMUM BATTERY BACKUP. SHADING INDICATES ILLUMINATED FACE, PROVIDE CHEVRONS AS INDICATED. MOUNT 7'6" TO BOTTOM OF FIXTURE ABOVE FINISHED FLOOR. TOGGLE SWITCH, 20A, SINGLE POLE, VOLTAGE AS REQUIRED. MOUNT 48" AFF. 3-WAY, TOGGLE SWITCH, 20A, SINGLE POLE, VOLTAGE AS REQUIRED. MOUNT 48" AFF. 4-WAY, TOGGLE SWITCH, 20A, SINGLE POLE, VOLTAGE AS REQUIRED. MOUNT 48" AFF. ROCKER SWITCH WITH DIMMER ADJUSTABLE SLIDE, SINGLE POLE SWITCH, 1000W, 120V, UNO., MOUNT 48" AFF. 0-10V. DUAL TECH OCCUPANCY SENSOR, WALL MTD., 48" AFF. PROVIDE 0-10V DIMMING ADJUSTABLE SLIDE. DUAL TECH OCCUPANCY SENSOR, WALL MTD., 48" AFF. PROVIDE 0-10V DIMMING ADJUSTABLE SLIDE. DUAL TECH OCCUPANCY SENSOR, CEILING MTD. DUAL TECH OCCUPANCY SENSOR, WALL MTD. PHOTOCELL SWITCH, MOUNT ON FACING EXTERIOR WALL, UNO. POWER S DUPLEX RECEPTACLE, 20A, 120V, 3 WIRE GROUNDED, NEMA 5-20R, UNO. MOUNT 18" AFF. SUBSCRIPT DENOTES TYPE. IE. IG=ISOLATED GROUND, GFI=GFCI, WP=WEATHERPROOF QUAD RECEPTACLE, 20A, 120V, 3 WIRE GROUNDED, NEMA 5-20R, UNO. MOUNT 18" AFF. SUBSCRIPT DENOTES TYPE. IE. IG=ISOLATED GROUND, GFI=GFCI, WP=WEATHERPROOF SIMPLEX RECEPTACLE, 20A, 120V, 3 WIRE GROUNDED, NEMA 5-20R, UNO. SUBSCRIPT 'C' DENOTES CLOCK RECEPTACLE, MOUNT AT HEIGHT DIRECTED ARCHITECT. SPECIAL RECEPTACLE, 220V, TYPE AS INDICATED OR MATCH EQUIPMENT CAP. MOUNT AT HEIGHT AS REQUIRED PER EQUIPMENT. DUPLEX RECEPTACLE, 20A, 120V, 3 WIRE GROUNDED, NEMA 5-20R, UNO. WITH TIE-BAR REMOVED FOR SWITCHING. MOUNT 18" AFF. SPECIAL PURPOSE RECEPTACLE, NEMA TYPE AS INDICATED. MOUNT AT HEIGHT AS REQUIRED PER EQUIPMENT. PLUGMOLD, MULTI-OUTLET RACEWAY, RECEPTACLES SPACED 12" OC, UNO. MOUNT ABOVE COUNTER. MANUAL MOTOR STARTER WITH THERMAL OVERLOAD PUSHBUTTON OPERATOR. CEILING MTD. SPEAKER WALL MTD. SPEAKER NURSE/EMERGENCY CALL BUTTON NURSE CALL LIGHT KRONUS TIME CLOCK ADT TOUCH PAD PUSH BUTTON DOOR BELL TRANSFOMER TELEPHONE OUTLET. WIRING OTHERS, UNO. MOUNT 18" AFF. TELEPHONE OUTLET. WIRING OTHERS, UNO. WALL PHONE, MOUNT 48" AFF. DATA OUTLET. WIRING OTHERS, UNO. MOUNT 18" AFF. DATA/TELEPHONE OUTLET, WIRING OTHERS UNO. MOUNT 18" AFF. CATV OUTLET, WIRING OTHERS, UNO. MOUNT 18" AFF. CIRCUIT RUN, #12W, 1/2" CONDUIT UNO. HOMERUN, #12W, 1/2" CONDUIT UNO., ARROWS INDICATE QUANTITY. CIRCUIT RUN, UNDER FLOOR OR GROUND, #12W, 1/2" CONDUIT UNO. BRANCH CIRCUIT WITH REQUIRED EQUIPMENT CONNECTION. BRANCH CIRCUIT BREAK HORN ONLY HORN AND STROBE STROBE ONLY MANUAL PULL STATION SMOKE DETECTOR HEAT DETECTOR DUCT SMOKE DETECTOR MAGNETIC DOOR HOLD OPEN FIRE/ SMOKE DAMPER FIRE ALARM CONTROL PANEL ANNUNCIATION PANEL SPECIAL SYSTEM S COMMUNICATION SYSTEM S CIRCUITING SYSTEM S FIRE ALARM S ONE-LINE S CIRCUIT BREAKER, FRAME AND TRIP AS INDICATED. POWER TRANSFORMER, RATING AS INDICATED. GENERAL: THESE DRAWINGS REMAIN THE SOLE PROPERTY OF MCSHEA CONSULTING AND MAY BE USED ONLY FOR THE PROJECT AS INDICATED NAME AND LOCATION. ANY OTHER USE REQUIRES PRIOR, WRITTEN PERMISSION. THE CONTRACTOR WILL PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, TOOLS, TRANSPORTATION, LICENSES, FEES, PERMITS, ETC. TO COMPLETE THE ELECTRICAL WORK DESCRIBED ON THE DRAWINGS. THE CONTRACTOR WILL WARRANT EQUIPMENT, MATERIAL AND WORKMANSHIP FOR A MINIMUM PERIOD OF ONE YEAR FROM THE OF ACCEPTANCE. WARRANTY SHALL INCLUDE REPLACEMENTS OR REPAIRS WITHOUT COST TO THE OWNER DURING THE WARRANTY PERIOD. ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE (NEC) 2014 AND ALL OTHER APPLICABLE LOCAL CODES AND ORDINANCES. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS. USE OF DRAWINGS: DO NOT SCALE FROM THE ELECTRICAL DRAWINGS. FOR EXACT LOCATIONS USE ARCHITECT'S DIMENSIONED DRAWINGS, SHOP DRAWINGS AND FIELD MEASUREMENTS. VERIFY ALL LOCATIONS WITH THE ARCHITECT PRIOR TO ELECTRICAL ROUGH-IN. WIRING: ALL WIRING FOR LIGHTING AND POWER SYSTEMS WILL BE IN CONDUIT OR CABLE ASSEMBLIES APPROVED THE GOVERNING AUTHORITIES. CONDUCTOR SIZES SHOWN ARE BASED ON AMPACITIES FOR COPPER CONDUCTORS, UNLESS OTHERWISE NOTED. WHEN APPROVED ENGINEER, FEEDERS MAY BE ALUMINUM CONDUCTORS OF EQUIVALENT AMPACITIES. GROUNDING CONDUCTORS SHALL BE PROVIDED FOR ALL CIRCUITS SHOWN ON THE DRAWINGS. PROVIDE BLOCKING AND OTHER NECESSARY SUPPORTS IN WALLS AND CEILINGS FOR MATERIAL AND EQUIPMENT TO BE PROVIDED. BRANCH CIRCUIT NUMBERS SHOWN ON THE DRAWINGS MAY BE REARRANGED WITHIN A GIVEN PANELBOARD TO SUIT THE NEEDS OF THE INSTALLATION. ELECTRICAL BRANCH CIRCUITS SHALL BE BALANCED BETWEEN LINES AND PHASES. UTILITY COORDINATION: PROVIDE ALL COORDINATION WITH THE UTILITY INCLUDING LOAD DATA FORMS AND APPLICATION FOR SERVICE AS APPLICABLE. INSTALLATION OF SERVICE, PRIMARY OR SECONDARY FEEDERS AND METERING SHALL BE PERFORMED IN ACCORDANCE WITH THE UTILITIY REQUIREMENTS. GROUNDING: PROVIDE A COMPLETE GROUNDING SYSTEM AS REQUIRED THE NEC AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL BRANCH CIRCUITS SHALL INCLUDE A GROUND CONDUCTOR. USE OF RACEWAY FOR GROUNDING IS NOT PERMITTED. GALVANIZED GROUND RODS ARE NOT PERMITTED. PANELBOARDS: PROVIDE MINIMUM INTEGRATED EQUIPMENT SHORT CIRCUIT RATING AS INDICATED ON PANEL SCHEDULES. PROVIDE BOLT-ON BREAKERS UNLESS OTHERWISE NOTED. PROVIDE CIRCUIT BREAKERS SHOWN ON THE PANELBOARD SCHEDULES. ALL TERMINATIONS AND LUGS SHALL BE RATED FOR 75-DEGREE CONDUCTORS. PROVIDE TYPEWRITTEN CIRCUIT SCHEDULES TO IDENTIFY PANELBOARD AND EACH BRANCH BREAKER. ACCEPTABLE MANUFACTURERS ARE SQUARE D, SIEMENS AND EATON. WIRING DEVICES: PROVIDE SPECIFICATION GRADE 15 AND 20- AMPERE SWITCH AND RECEPTACLE DEVICES, AS APPLICABLE. OTHER DEVICES SHALL BE PROVIDED AS INDICATED AND SHALL MATCH PLUG-CONNECTED EQUIPMENT FURNISHED FOR THE PROJECT. DEVICE WALL PLATES SHALL BE SMOOTH, NYLON TYPE AND SHALL BE OFFICE WHITE IN COLOR OR AS OTHERWISE SPECIFIED. DEVICE COLOR SHALL MATCH WALL PLATES. DISCONNECT SWITCHES: HEAVY DUTY QUICK-MAKE, QUICK-BREAK TYPE, NON-FUSED UNLESS OTHERWISE NOTED. PROVIDE MEANS TO LOCK SWITCH IN OFF POSITION WITH PAD-LOCK. ENCLOSURES SHALL BE NEMA TYPE 1 OR NEMA TYPE 3R FOR OUTDOOR INSTALLATION. PROVIDE PERMANENT LABELS FOR DISCONNECTS TO INDICATE EQUIMENT SERVED. LIGHTING FIXTURES: SEE LIGHT FIXTURE SCHEDULE. PROVIDE ALL FIXTURES WITH LAMPS AS INDICATED. WHERE REQUIRED, FIXTURES SHALL BE WET OR DAMP LOCATION LABELED. VERIFY MOUNTING HEIGHTS PRIOR TO ELECTRICAL ROUGH-IN. ALTERNATES NOT ACCEPTABLE UNLESS NOTED AS "OR EQUAL" ON LIGHT FIXTURE SCHEDULE. VOICE/DATA: RACEWAY SYSTEM CONTRACTOR. ALL RACEWAYS SHALL BE PROVIDED WITH PULLSTRINGS OF MINIMUM OF 400-LB. TEST STRENGTH. ALL EQUIPMENT, RECEPTACLES AND CABLING OTHERS. PROVIDE BLANK COVERS OVER ALL UNUSED OUTLETS. CABLES, DEVICES AND CABLE TERMINATION IS OTHERS. FIRE ALARM: OTHERS, IF REQUIRED. ELECTRICAL CONTRACTOR TO VERIFY CONNECTION TYPE, POWER REQUIREMENTS, MOUNTING HEIGHTS, AND LOCATIONS OF ALL EQUIPMENT WITH TENANT PRIOR TO ROUGH IN. SEE MANUFACTURER'S INSTALLATION MANUALS FOR SPECIFIC DETAILS ON ALL EQUIPMENT. (E) DENOTES DEVICE IS EXISTING. EXISTING DEVICES TO REMAIN ON EXISTING CIRCUIT AND/OR SWITCHES UNLESS SHOWN OTHERWISE. (R) DENOTES DEVICE IS BEING RELOCATED FROM WITHIN EXISTING SPACE AND TO REMAIN ON EXISTING CIRCUIT AND/OR SWITCH UNLESS SHOWN OTHERWISE. INFORMATION ON EXISTING CONDITIONS ARE BASED ON EXISTING PANEL DIRECTORIES, AVAILABLE DRAWINGS FROM LOCAL BUILDING DEPARTMENTS, AND ON SITE VERIFICATIONS WHERE POSSIBLE. ELECTRICAL CONTRACTOR TO COORDINATE WITH ALL EXISTING CONDITIONS PRIOR TO NEW CONSTRUCTION. NOTIFY ENGINEER OF ALL DISCREPANCIES. NEC ARTICLE : ALL 125-VOLT 15 AND 20-AMPERE RECEPTACLES IN AREAS SPECIFIED IN SHALL BE LISTEDTAMPER-RESISTANT RECEPTACLES FLOOR BOX, FLUSH MOUNTED PROVIDE DEVICE, BOX AND COVER AS SPECIFIED. 4"X4" JUNCTION BOX, FLUSH/SURFACE MTD. POWER POLE WITH COMM AND POWER. MOTOR NON FUSIBLE DISCONNECT SWITCH, RATING AS INDICATED. RATING AS INDICATED. GROUND ELECTRODE CURRENT TRANSFORMER (CT) NON-FUSIBLE SWITCH, RATING AS INDICATED. FUSIBLE SWITCH, RATING AND FUSE SIZE AS INDICATED. FEEDER SCHEDULE KEY TAG UTILITY TRANSFORMER NEC ARTICLE 212(A): ALL 120-VOLT, SINGLE PHASE, 15- AND 20-AMPERE BRANCH CIRCUITS SUPPLYING OUTLETS INSTALLED IN DWELLING UNIT FAMILY ROOMS, ROOMS, ROOMS, PARLORS, LIBRARIES, DENS, S, SUNROOMS, RECREATION ROOMS, CLOSETS, HALLWAYS, OR SIMILAR ROOMS OR AREAS SHALL BE PROTECTED A LISTED ARC-FAULT CIRCUIT INTERRUPTER, COMBINATION-TYPE, INSTALLED TO PROVIDE PROTECTION OF THE BRANCH CIRCUIT. SMOKE ALARMS INSTALLED PURSUANT TO SECTION R314.1 OF THE IRC ARE NOT REQUIRED TO BE PROTECTED AN ARC-FAULT CIRCUIT INTERRUPTER. PER IECC 404.1: AT LEAST 50% OF THE LAMPS IN PERMANENT INSTALLED LIGHTING FIXTURES WILL BE HIGH-EFFICACY LAMPS. FUSIBLE DISCONNECT SWITCH, RATING AS INDICATED. UTILITY ELECTRIC METER UNO OC TVSS EWC E H TP SURFACE MTD. PANELBOARD/LOADCENTER. FLUSH MTD. PANELBOARD/LOADCENTER. UNLESS NOTED OTHERWISE. OVER COUNTER, MOUNT RECEPTACLE HORIZONTALLY, 1" ABOVE BACKSPLASH. TRANSIENT VOLTAGE SURGE SUPPRESSOR ELECTRIC WATER COOLER EXISTING DEVICE TO REMAIN. MOUNT DEVICE 6" AFF, HORIZONTALLY. TAMPER-PROOF ABBREVIATIONS MOTOR WITH DISCONNECT MOTOR WITH CONTROLLER AND DISCONNECT GENERATOR TRANSFER SWITCH WEATHERHEAD PANELBOARD OR LOADCENTER, IDENTIFICATION, AMPERES AND VOLTAGE. NOTE: NOT ALL S ARE USED. VERIFY ALL CONNECTIONS AND RECEPTACLE TYPES FOR EQUIPMENT FROM APPROVED MECHANICAL AND EQUIPMENT SUBMITTALS PRIOR TO INSTALLATION. HOMERUNS AND BRANCH WIRING FOR 20 AMP CIRCUITS SHALL BE AS FOLLOWS: LENGTH 1FT TO 50FT 51FT TO 75FT 76FT TO 120FT 121FT TO 190FT 191FT TO 300FT CIRCUIT WIRE SIZE NO.12 AWG NO.12 AWG NO.10 AWG NO.10 AWG NO.10 AWG FIRE ALARM WIRING NOTE: (IF APPLICABLE TO PROJECT) HOMERUN WIRE SIZE NO.12 AWG NO.10 AWG NO.8 AWG NO.6 AWG NO.4 AWG 1. FIRE ALARM INSTALLER TO COORDINATE WITH FIRE MARSHALL ON REQUIRED DOCUMENTATION NEEDED. 2. FIRE ALARM INSTALLER TO VERIFY LOCATION OF FIRE ALARM PANEL. 3. FIRE ALARM INSTALLER TO PROVIDE DUCT SMOKE DETECTORS FOR HVAC UNITS PER SECTION 606 OF THE INTERNATIONAL MECHANICAL CODE. REFER TO MECHANICAL RTU SCHEDULE FOR DETERMINATION OF UNITS TO RECEIVE SMOKE DETECTORS. 1 ELECTRICAL ONE-LINE DIAGRAM E1.0 NOT TO SCALE ELECTRICAL PLANS ONE-LINE AND DETAILS E1.0

2 A R C H I T EC T U R E BLDG REVS. ELECTRICAL PLANS PANEL SCHEDULES RESIDENTIAL CALCULATIONS E1.1 RAF

3 A B C D E BATH 3 (OPT. LIVE / WORK) (OPT. LIVE / WORK) 1 1ST LEVEL ELECTRICAL LIGHTING PLAN E2.0 SCALE: 1/4" = 1'-0" ELECTRICAL LIGHTING PLAN E2.0

4 A B C D E PWDR PWDR H. BATH H. BATH OPEN TO BELOW OFFICE/ OPT. BEDRM EDGE OF FLOOR ABOVE OFFICE/ OPT. BEDRM 1 2ND LEVEL ELECTRICAL LIGHTING PLAN E2.1 SCALE: 1/4" = 1'-0" ELECTRICAL LIGHTING PLAN E2.1

5 A B C D E SITTING SITTING W W D LAUND. D LAUND. W D W D 1 3RD LEVEL ELECTRICAL LIGHTING PLAN E2.2 SCALE: 1/4" = 1'-0" ELECTRICAL LIGHTING PLAN E2.2

6 A B C D E W.H. BATH BATH 3 W.H. W.H. (OPT. LIVE / WORK) BATH 3 BATH 3 (OPT. LIVE / WORK) LANDSCAPE GARDEN GARDEN COURTYARD COURTYARD GARDEN GARDEN 1 1ST LEVEL ELECTRICAL POWER PLAN E3.0 SCALE: 1/4" = 1'-0" ELECTRICAL PLANS POWER PLAN E3.0

7 A B C D E PWDR PWDR H. BATH H. BATH OPEN TO BELOW OFFICE/ OPT. BEDRM OFFICE/ OPT. BEDRM EDGE OF FLOOR ABOVE 1 2ND LEVEL ELECTRICAL POWER PLAN E3.1 SCALE: 1/4" = 1'-0" ELECTRICAL POWER PLAN E3.1

8 A B C D E SITTING SITTING LAUND. LAUND. 1 3RD LEVEL ELECTRICAL POWER PLAN E3.2 SCALE: 1/4" = 1'-0" ELECTRICAL POWER PLAN E3.2

9 SITE LIGHTING SITE PHOTOMETRIC DATA E4.0 SCALE: 1/8" = 1'-0" PHOTOMETRIC DATA WITH PROPERTY LINE E4.0

10 SITE LIGHTING A R CH I T EC T U R E BLDG REVS. E4.1 RAF EXTERIOR LIGHTING SPECIFICATION SHEETS AND SCHEDULE

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

I.C. Thomasson Associates, Inc. CONSULTING ENGINEERS 2950 KRAFT DRIVE, SUITE 500 NASHVILLE, TN. 37204 PHONE (615) 346-3400 FAX (615) 346-3550 www.icthomasson.com ICT PROJECT # 170647 HODGSON DOUGLAS landscape

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

SECTION (16140) - WIRING DEVICES

SECTION (16140) - WIRING DEVICES SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -

More information

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch

More information

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with

More information

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016) Cheboygan County Department of Building Safety 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 TX: (231) 627-8813 FX: (231) 627-8454 www.cheboygancounty.net Service Entrance ONE- AND TWO-FAMILY

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

PANELBOARDS & BUILDING DISTRIBUTION

PANELBOARDS & BUILDING DISTRIBUTION 262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic

More information

SINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18" AFF

SINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18 AFF LUORESCENT STRIP SURACE/PENDANT MOUNTED ' X ' LUORESCENT RECESS MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT STRIP WALL MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT EMERGENCY STRIP SURACE/PENDANT

More information

CHAPTER 20 SERVICE EQUIPMENT

CHAPTER 20 SERVICE EQUIPMENT SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control

More information

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets

More information

CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST

CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST Plan Check No. Plan Check Expiration Date Job Address: Square Footage Use Zone Fire Zone Occ. Group Type of Construction No. of Stories Applicant Phone

More information

B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates.

B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates. SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram

Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram Leviton SmartLockPro 15 Amp Tamper-Resistant Combination GFCI Duplex Outlet and Switch - White-R02-X7299-00W - The Home Depot. From

More information

Allegany College of Maryland ACM Welcome Center M&D Project No

Allegany College of Maryland ACM Welcome Center M&D Project No SECTION 26.010 GENERAL PROVISIONS PART 1 - GENERAL 1.1 SCOPE: A. Work under this section shall be subject to the GENERAL CONDITIONS hereinbefore written for the entire work, noting especially the reference

More information

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA American Electrical Institute 2014 PART 2 83 CONTINUING EDUCATION FOR OREGON ELECTRICIANS AMERICAN ELECTRICAL INSTITUTE PO Box 31131 Spokane, WA 99223 www.aeitraining.com 84 PART 3 American Electrical

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

2011 and 2014 National Electrical Code Changes Residential Only

2011 and 2014 National Electrical Code Changes Residential Only 2011 and 2014 National Electrical Code Changes Residential Only Sponsored By: and.net Instructor: Fritz Gunther, Chief Electrical Inspector 585-436-4460 www.nyeia.com NEW YORK ELECTRICAL INSPECTION AGENCY

More information

Residential Wiring (2014 NEC) (Homestudy)

Residential Wiring (2014 NEC) (Homestudy) Residential Wiring (2014 NEC) (Homestudy) Oregon Electrical License This course will cover the requirements in the 2014 NEC for installing electrical systems in dwelling units. Code sections for residential

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section "Wiring Devices" for wall-box dimmers and manual light switches.

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section Wiring Devices for wall-box dimmers and manual light switches. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 REFERENCES... 2 1.4 DEFINITIONS... 2 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 3 1.7 COORDINATION... 3 1.8 DELIVERY, STORAGE, AND

More information

PART GENERAL 1.01 SECTION INCLUDES

PART GENERAL 1.01 SECTION INCLUDES Specification Number: 26 24 16.06 Product Name: Emergency Lighting Control NQ Circuit Panelboards: 240 Vac, 48 Vdc Maximum SECTION 26 24 16.06 Emergency Lighting Control NQ Circuit Panelboards: 240 Vac,

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and

DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and equipment), and discussions with maintenance personnel

More information

Residential Wiring According to 2011 NEC (Homestudy)

Residential Wiring According to 2011 NEC (Homestudy) Residential Wiring According to 2011 NEC (Homestudy) Utah Electrical License This course will cover the requirements in the 2011 NEC for installing electrical systems in dwelling units. Code sections for

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

More information

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004 Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004 Table of Content: Page 1 ~ Single Line Diagram 1 2 ~ Electrical System Narrative 2-3 3 ~ Lamp

More information

Renovate MCRC Facilities Great Lakes, IL

Renovate MCRC Facilities Great Lakes, IL 6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEM DESCRIPTION The electrical repair work includes the design and construction of the electrical distribution system for the B3200 Marine Corps Reserve

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

C. Pigtail: Short lead used to connect a device to a branch-circuit conductor.

C. Pigtail: Short lead used to connect a device to a branch-circuit conductor. SECTION 26 27 26 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW) SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill

More information

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------

More information

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608) Ho-Chunk Gaming POWER SYMBOLS X ELECTRICAL PANEL - REFER TO DRAWINGS FOR WIDTH AND PANEL SCHEDULES PANEL NAMING: XXP-#X: DENOTES PANEL FUNCTION: L = LIGHTING P = GENERAL POWER E = EMERGENCY S = OPTIONAL

More information

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018 Construction Management at Risk Services New North East Branch Library Project ADDENDUM 01 August 3, 2018 1. The attendance sheets (4 pages) from the Pre-Bid Conference are attached. 2. The proposals may

More information

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,

More information

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 It has come to the attention of the electrical authorities having jurisdiction (AHJs) at the DOE sites there is inconsistency

More information

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater TABLE 9.4.5 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE 90.1 Uncovered Parking Areas Parking Lots and drives Building Grounds Walkways less that 10 feet wide Walkways 10 feet wide or greater

More information

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR September 2012, rev. 00 26 0553 Identification for Electrical Systems PART 1. GENERAL 1.01 Summary A. Section Includes: 1.02 Submittals 1. Identification for raceways. 2. Identification of power and control

More information

WINDSOR FOREST HIGH SCHOOL HVAC REPLACEMENT ADDENDUM #2 SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM FEBRUARY 18, 2016

WINDSOR FOREST HIGH SCHOOL HVAC REPLACEMENT ADDENDUM #2 SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM FEBRUARY 18, 2016 SECTION 26 2030 - LIGHTING FIXTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 1 Specification Sections,

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

2009 ELECTRICAL CODE REQUIREMENTS

2009 ELECTRICAL CODE REQUIREMENTS 2009 ELECTRICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Inspection Request Line (231) 533-3510 Electrical requirements

More information

The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall.

The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall. The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall. Demolition: The area of work shall be a complete gut ; removing all

More information

Residential Wiring (2017 NEC) (Homestudy)

Residential Wiring (2017 NEC) (Homestudy) Residential Wiring (2017 NEC) (Homestudy) Idaho Electrical License This course will cover the requirements in the 2017 NEC for installing electrical systems in dwelling units. Code sections for residential

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ELECTRICAL STANDARDS DESIGN CHECKLIST

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ELECTRICAL STANDARDS DESIGN CHECKLIST ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ELECTRICAL STANDARDS DESIGN CHECKLIST February 01, 2006 2 Project Name: Architect: Electrical Engineer: Completed By:

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

AFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults?

AFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults? RECEPTACLEFAQs AFCI 1 What is an arc fault? UL provides a definition for an arc fault in UL 1699 (Standard for Safety Arc Fault Circuit Interrupters). It is an unintentional arcing condition in a circuit.

More information

Spring Test 6 due 04/26/2013

Spring Test 6 due 04/26/2013 Spring Test 6 due 04/26/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. The article that covers TV wiring installations in residences

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

INDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan

INDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan 30 Greenway, NW Suite 11 Glen Burnie, Maryland 21061 tel 410.528.8899 fax 410.558.6312 www.gbalternatives.com INDEX Page 2 to 7 Electrical Specifications Page 8 Electrical Schemes: Basement Plan Page 9

More information

The following information shall become and form part of the contract documents.

The following information shall become and form part of the contract documents. October 4, 206 To: Attention: Re: All Bidders All Bidders JCBE Gymnasium HVAC Upgrades BC#: 206433 Edmonds Project No.: BHM6090 All bidders, The following information shall become and form part of the

More information

Electrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING

Electrical System (N) PANELBOARD L1 VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

DIVISION 16 ELECTRICAL

DIVISION 16 ELECTRICAL DIVISION 16 ELECTRICAL Saratoga Springs / standards / 02-2004 Page - 0 ELECTRICAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Grounding electrodes and conductors, equipment

More information

SECTION LOW VOLTAGE LIGHTING CONTROLS

SECTION LOW VOLTAGE LIGHTING CONTROLS SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3 HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California 95833 September 15, 2016 Woodland Joint Unified School District Spring Lake Area Elementary School HMC No. 3535003.000 DSA Appl.

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service

More information

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 28 3111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Fire-alarm control unit. 2. Manual fire-alarm boxes. 3. System smoke detectors. 4. Heat detectors.

More information

CT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING

More information

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10 Belleville, Ontario Page 1 of 10 1 GENERAL 1.1 GENERAL REQUIREMENTS.1 The General Conditions of CCDC2-2008, and the General requirements of Division 1, form part of this Section and must read in conjunction

More information

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems. SECTION 26 0553 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Voltage markers. E. Underground warning

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is low voltage cable allowed to be run through drilled

More information

How to keep you, your family, and your possessions safe usa.siemens.com/circuitbreakers

How to keep you, your family, and your possessions safe usa.siemens.com/circuitbreakers AFCI and GFCI Homeowner s Guide How to keep you, your family, and your possessions safe usa.siemens.com/circuitbreakers Congratulations on the purchase of your new home. This guide will help you understand

More information

Units 2, 3, 4, 5, 6, 8, 9, 10, Electrical Wiring Residential Unit 2 (Unit 5 Fourth Edition)

Units 2, 3, 4, 5, 6, 8, 9, 10, Electrical Wiring Residential Unit 2 (Unit 5 Fourth Edition) Units 2, 3, 4, 5, 6, 8, 9, 10, 11-22 Electrical Wiring Residential Unit 2 (Unit 5 Fourth Edition) 1. What is an outlet? Point on a wiring system where current is taken to supply utilization equipment 2.

More information

SOUTHVIEW MEDICAL CENTER

SOUTHVIEW MEDICAL CENTER PROJECT TITLE: SOUTHVIEW MEDICAL CENTER ENTRANCE VESTIBULE 1997 Miamisburg Centerville Rd. Dayton, Ohio DRAWING INDEX: STRUCTURAL ARCHITECTURAL JUNE 26, 2014 Bulletin #1 - September 12, 2014 AREA OF WORK

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

SECTION LIGHTING

SECTION LIGHTING SECTION 26 50 00 LIGHTING PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to furnish and install

More information

ELECTRICAL DESIGN BRIEF

ELECTRICAL DESIGN BRIEF 4211 Yonge Street Suite 500 Toronto Ontario M2P 2A9 416 487 8151 f 416 487 9104 smithandandersen.com ELECTRICAL DESIGN BRIEF FOR 128 HAZLETON AVENUE RESIDENTIAL CONDOMINIUM BUILDING TORONTO, ONTARIO OUR

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

BASIC ELECTRICAL ENGINEERING FOR CE

BASIC ELECTRICAL ENGINEERING FOR CE EE24 BASIC ELECTRICAL ENGINEERING FOR CE LECTURE NO. B-2 Basic Electrical Code Provisions Codes/Standards/Organizations PEC Philippine Electrical Code NEC National Electrical Code IEEE - Institute of Electrical

More information

DIVISION SECTION ELECTRICAL. A. Provisions of General Requirements, Division 1, are a part of this section.

DIVISION SECTION ELECTRICAL. A. Provisions of General Requirements, Division 1, are a part of this section. DIVISION 16000 SECTION 16100 ELECTRICAL PART I - GENERAL 1.01 Related Documents A. Provisions of General Requirements, Division 1, are a part of this section. 1.02 This work shall include, but not necessarily

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

Photovoltaic (Solar) Array Installation Guide

Photovoltaic (Solar) Array Installation Guide Building & Safety Division Community Development Department 7351 Rosanna Street, Gilroy, CA 95020 Phone: 408 846-0451 Fax: 408 846-0429 Visit us: www.cityofgilroy.org Photovoltaic (Solar) Array Installation

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

TOM BURNS, PLANNING DIRECTOR

TOM BURNS, PLANNING DIRECTOR ~~ 0 173 COUNTY OF SANTA CRUZ August 4,2005 PLANNING DEPARTMENT 701 OCEAN STREET, qth FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 TOM BURNS, PLANNING DIRECTOR Agenda:

More information

Understanding Your Options: AFCI Protection and the 2015 CE Code

Understanding Your Options: AFCI Protection and the 2015 CE Code Understanding Your Options: AFCI Protection and the 2015 CE Code November 25, 2014 Eaton 2008 Eaton Corporation. All rights reserved. Classifying An Arc Fault Operational Arcs - occur in a properly functioning

More information

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2 Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The

More information

DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1

DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1 DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1 PART 1: GENERAL 1.1 SUMMARY.1 This section covers materials, methods, and requirements common to all electrical work..2 When it becomes

More information

Chapter 1 General... 5

Chapter 1 General... 5 About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of

More information

CurrentGuard TM. Installation, Operation and Maintenance Manual. CurrentGuardTM. Flush Mount. Surge Protective Devices A00

CurrentGuard TM. Installation, Operation and Maintenance Manual. CurrentGuardTM. Flush Mount. Surge Protective Devices A00 TM CGFS u r g e P R O T E C T I O N CurrentGuardTM Installation, Operation and Maintenance Manual 750-0098-006 A00 Surge Protective Devices CurrentGuard TM Flush Mount Table of Contents Guide to Installation

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

NEC Study Guide CORRECT: C NEC (A)(1)

NEC Study Guide CORRECT: C NEC (A)(1) 1 According to the NEC, the maximum distance from the point of entrance to the building that the water pipe may be used as a grounding electrode interconnect is: A. 3' B. 4' C. 5' D. 6' CORRECT: C NEC

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: SECTION 26 09 23 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION LIGHTING CONTROL DEVICES AND CONTROL PANELS

SECTION LIGHTING CONTROL DEVICES AND CONTROL PANELS SECTION 26 09 23 LIGHTING CONTROL DEVICES AND CONTROL PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Remote control lighting relays. 2. Lighting contactors. 3. Switches. 4. Switch plates.

More information

13. ELECTRICAL - TECHNICAL

13. ELECTRICAL - TECHNICAL 13. ELECTRICAL - TECHNICAL 13.1 GENERAL REQUIREMENTS 1. Base the electrical design on providing the following features at the most economical cost, considering both investment and operating expenditures:

More information

SECTION FIRE ALARM SYSTEMS

SECTION FIRE ALARM SYSTEMS SECTION 16721 FIRE ALARM SYSTEMS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work

More information

ELECTRICAL DESIGN GUIDELINES SECTION GUIDELINE SPECIFICATIONS-DUVAL COUNTY PUBLIC SCHOOL

ELECTRICAL DESIGN GUIDELINES SECTION GUIDELINE SPECIFICATIONS-DUVAL COUNTY PUBLIC SCHOOL The design guidelines, which follow, are intended to supplement the Educational Specifications and State Requirements for Educational Facilities (SREF). All electrical service (temporary, new, disconnection

More information

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

SECTION LIGHTING CONTROLS

SECTION LIGHTING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information