ROMAS Remote Operations of Machinery and Automation Systems

Size: px
Start display at page:

Download "ROMAS Remote Operations of Machinery and Automation Systems"

Transcription

1 MARITIME ROMAS Remote Operations of Machinery and Automation Systems Haugesundkonferansen 6.februar 2019 Steinar Låg 06 February DNV GL February 2019 SAFER, SMARTER, GREENER

2 Outline The ROMAS Project Some of the work done CONOPS Concept of operations HaziD analysis IAS Data analysis Pilot testing Way forward 2

3 The ROMAS Project 3

4 The ROMAS project ROMAS: Remote Operation of Machinery and Automation Systems NFR application granted Dec 2016 Research project Total budget 9,5 MNOK Partners: Reference partner: 4

5 Remote machinery operation: Background and motivation Shortage of machinery engineers to man ships Increasingly complex ships, new skills needed Increased digitalisation & improved ship-shore connectivity Automation and remote operations is increasingly adopted in other industries Idea: Move the Engine Control Room (ECR) from the ship to a shorebased Engine Control Centre (ECC) Fleet wide control from an on-shore ECC Reduced need for engineers on-board Improved efficiency & safety Not as revolutionary as remote/autonomous navigation 5

6 Some of the work done so far - CONOPS Concept of Operations - HazID analysis - IAS data analysis 7

7 Concept qualification process as per CG-0264 (Class Guideline for Autonomous and remotely operated ships) Submitter s activities Decide on operations and automation High-level design Detailed design Build and integrate Commissioning and test Operations CONOPS Safety philosophy Maintenance philosophy Off-ship systems design Verification and validation strategy Test Reports Configuration management reports Preliminary risk analysis report Design philosophy Detailed vessel design Detailed risk analysis reports Test specifications DNV GL newbuild process Review of overall concepts Plan approval Newbuild survey Test scope approval Test witnessing DNV GL fleet in service process Analyse class operations data FiS surveys 9

8 Fjord1 s ferry route Molde-Vestnes M/F Korsfjord 10

9 Pilot vessel MF Fannefjord Norwegian flagged Ro-ro ferry built for Fjord1 in 2010 Yard: Gdanska Stocznia Remontowa, Gdansk Poland Built to DNV class (Vessel ID 28425/D28424) 1A1 Car ferry B Clean E0 Gas fuelled R4(nor) Double-ended ferry design with battery hybrid gas (and diesel) electric propulsion Highly redundant propulsion system: 2 azimuth thrusters Power: 2x Gas + Battery + Diesel 11

10 Remote operations concept: ECC side ECC located in Fjord1 s office in Molde Manning: 24x7 by 1 operator (chief engineer) Arrangement for additional support (bakvakt) ECC designed to support 3 ferries Similar design & operational profile Pilot tests: Just one ferry (MF Fannefjord) Responsibilities Main responsibility for maintenance & operation Communication with ship and shore-parties Equipment 2 workstations (~ECR-like) Big screen with fleet view 12

11 Remote operations concept: Ferry side Overall manning level (5) remains unchanged to comply with requirements for safety manning Chief engineer replaced by combiman Qualification: Able Seafarer Engine ( Motormann ) Responsibilities: Combination of deck- and machinery- work Emergency/safety duties acc.to safety plan Planned maintenance Assist ECC operator when required Visual inspections and routine work Take local command of technical systems (when required) Receive support and guidance from ECC ECR and Bridge workstations: upgraded 13

12 Remote operations concept: Communications The IAS Network onboard is extended to ECC over a reliable and redundant ship-shore communication link Communications 2 x 4G modems (Telia and Telenor) + ICE Automatic switching Always on 2-way voice ECC-Bridge VHF at ECC Portable communication device to support troubleshooting Example: DAQRI s smart helmet ( 14

13 Remote operations concept: Monitoring & Control IAS (Integrated Automation System) hub for monitoring & control of the machinery and engineering systems IAS functional enhancements Communication system integration: Health monitoring Transfer of Command: Automatic and manual Cyber protection Remote connections from other relevant ship systems such as: Fire alarm / safety systems Shiplog admin and operational data CCTV from engine room 15

14 CONOPS: Mapping of Normal operations 16

15 CONOPS: Identification of abnormal conditions / scenarios 17

16 HazID analysis 19

17 Hazid Analysis DNV GL, Fjord1, Høglund, Rederiforbundet and Sjøfartsdirektoratet Goal: Identify and assess hazards associated with the concept Input: CONOPS Output: Hazid Report + Risk sheets serving as input for further work Two steps Jan 2018 (v1.0): MF Norangsfjord (workshop) Oct-Dec 2018 (v1.1) MF Fannefjord (@ DNV GL) Limitations: Relative exercise, no formal voting, CONOPS completeness Effect on Human Safety Severity Minor Significant Severe Catastrophic Single or minor injuries Multiple or severe injuries Single fatality or multiple severe injuries Multiple fatalities Effect on Ship Local equipment Non-severe ship Severe damage Total loss Frequency F\S 0,01 0, Frequent Likely to occur once per month on one ship 1E+1 6 Probable Likely to occur once per year on one ship 1E+0 5 Reasonably probable Likely to occur once per year in a fleet of 10 ships, i.e. likely 1E-1 to occur a few times during the ship's life 4 Seldom Likely to occur once per 10 years in a fleet of 10 ships 1E-2 3 Remote Likely to occur once per year in a fleet of 1,000 ships, i.e. likely to occur in the total life of several similar ships 1E-3 2 Very remote Likely to occur once per 10 years in a fleet of 1000 ships 1E-4 1 Extremely remote Likely to occur once in the lifetime (20 years) of a world fleet of 5,000 ships 1E-5 20

18 Hazid Workshop risk matrix Conventional ops Rempote ops Remote ops w/mitigations Risk matrix 21

19 30 mitigations identified 30 mitigations Training (2) Design (13) Procedure (15) 22

20 30 mitigations identified Training(2) Machinery training (Combiman) Safety training (Combiman) Design(13) UPS for IAS & Comms Descriptive Battery Alarm Alarm limits adjusted for remote operations Alarms with priority/criticality Sufficient IAS integration Additional ICE modem Comms outage alarm Walkthrough of all essential sensors Visual surveillance (CCTV) at ECC Redundancy of comms modems VHF at ECC Sufficient UPS, broadband and security at ECC Additional sensors or inspection tools for gas system Procedures(15) Avoid simultaneous overhaul of two engines/generators Procedure for ECC-Bridge communication Procedure for handling comms loss Procedure for spare ferry to be put into operations Procedure for ECC handling for simultaneous problems on two ferries Procedures/criteria for taking the ferry out of service Procedure for transferring command from ECC to Bridge Procedure for ECC support in severe weather conditions Updated procedures for remote/eccoperations Procedure for handling water ingress Procedure for fire handling Procedure for bilge handling CBM (Condition Based Maintenance) Updated procedure for gas system Updated procedure for battery system 23

21 Hazid Results Conventional ops ROMAS ops w/mitigations Increased risk 6.6 Communication failure 6.7 ECR/ECC outage Reduced risk Too many alarms for ECC operator Alarm information not detailed enough 6.4 Unplanned Maintenance & Repair 6.13 Fire incident 6.14 Environmental emissions 24

22 IAS data analysis 25

23 Analysis of historic IAS data why? The IAS (Integrated Automation System) the main user interface for the chief engineer integrates many important ship systems Displays the health status of the machinery logs important measurements, alarms and events Combine with other data sources ALARM Could be automated? Affecting manning levels? Does it trigger work? MF Fannefjord Does it trigger maintenance or repairs? Skills & tools needed? MF Norangsfjord Is safety affected? Analysis Could be done remotely? On-board or in port? Countermeasures? Insights Aim: Build knowledge about the existing operations and practices

24 Data sources IAS logs events and alarms AIS data position, speed, operational mode Historic maintenance logs Chief engineer s log book 27

25 IAS-log: Need for filtering... (Norangsfjord 2016) Alarmer + Eventer [126100] ~ 345 per dag Eventer: ikke behov for håndtering Overgangsalarmer rel til DG start/stop og THR stop Alarmer (alle statuser) [28166] Nye alarmer (status 5) [1773] Ex DG Stop/Start & THR Stop [1555] Pivot System-Alarmer [661] Kun hørbare alarmer Oppfølgingsalarmer for samme system (2 min) Alarmer fra M&R September Ekskludert Maintenance & Repair [540] Ex Other [250] ~ 0,7 per dag Koble på landstrøm Tester og feilsøk REPEAT og FIRE Alarmer 28

26 COMMON alarms 29

27 Handling of routine work (planned maintenance) 2017 : 1434 records Mapped into categories Currently carried out by Service Personell (external) Could be carried out by Service Personell (external) Requires local precence of Chief Engineer Could be carried out by other crew (e.g. Combiman) Could be remotely operated Could be automated/skipped 30

28 IAS data analysis key findings Better and wider integration needed Data collected/presented in fewer systems => operator-focus Alarm improvements are needed Too many «nuisance alarms» need for cleaning up and reduce volume Context/mode awareness and suppression of non-essential alarms Descriptive alarm texts - get rid of COMMON Alarms Categorisation of alarm criticality to enable prioritisation Increase automation minimise manual operations However, automation will call for new alarms.. Sensor quality and self-diagnostics Need for supporting offline analysis Historical IAS logs and digital engine log Standard data/formats Benefit: analysis / trending for CBM Total BILGE BLACKOUT BOILER BUS_ COMMUNICATIO DEAD DG1 DG2 DG3 DG4 FO FW HYD. AGG MBS MSB NODE PUBLIC ADDRES SEWAGE SLUDGE START AIR THR1 THR2 UPS 31

29 Pilot testing campaign 32

30 Pilot test program 1Q 2019 M/F Fannefjord as pilot vessel ECC in Molde (Fjord1 s premises) Based on previous work: CONOPS, Hazid and IAS data analysis In between test phases: Analysis of logs, documenting and assessing experiences. Making adjustment to equipment in ECC and on-board the ship, as well as operational procedures. 33

31 Hazid: 30 mitigations identified Training(2) Design(13) Procedures(15) Machinery training (Combiman) Safety training (Combiman) UPS for IAS & Comms Descriptive Battery Alarm Alarm limits adjusted for remote operations Alarms with priority/criticality Sufficient IAS integration Additional ICE modem Comms outage alarm Walkthrough of all essential sensors Visual surveillance (CCTV) at ECC Redundancy of comms modems VHF at ECC Sufficient UPS, broadband and security at ECC Additional sensors or inspection tools for gas system Avoid simultaneous overhaul of two engines/generators Procedure for ECC-Bridge communication Procedure for handling comms loss Procedure for spare ferry to be put into operations Procedure for ECC handling for simultaneous problems on two ferries Procedures/criteria for taking the ferry out of service Procedure for transferring command from ECC to Bridge Procedure for ECC support in severe weather conditions Updated procedures for remote/eccoperations Procedure for handling water ingress Procedure for fire handling Procedure for bilge handling CBM (Condition Based Maintenance) Updated procedure for gas system Updated procedure for battery system 34

32 Mitigations implemented for pilot testing (implemented, partly implemented) Training(2) Machinery training (Combiman) Safety training (Combiman) Design(13) UPS for IAS & Comms Descriptive Battery Alarms Alarm limits adjusted for remote operations Alarms with priority/criticality Sufficient IAS integration Additional ICE modem Comms outage alarm Walkthrough of all essential sensors Visual surveillance (CCTV) at ECC Redundancy of comms modems VHF at ECC Sufficient UPS, broadband and security at ECC Additional sensors or inspection tools for gas system Procedures(15) Avoid simultaneous overhaul of two engines/generators Procedure for ECC-Bridge communication Procedure for handling comms loss Procedure for spare ferry to be put into operations Procedure for ECC handling for simultaneous problems on two ferries Procedures/criteria for taking the ferry out of service Procedure for transferring command from ECC to Bridge Procedure for ECC support in severe weather conditions Updated procedures for remote/eccoperations Procedure for handling water ingress Procedure for fire handling Procedure for bilge handling CBM (Condition Based Maintenance) Updated procedure for gas system Updated procedure for battery system 35

33 + new features identified in pilot planning (implemented, partly implemented) Training(2) Machinery training (Combiman) Safety training (Combiman) 36 Design(13) UPS for IAS & Comms Descriptive Battery Alarms Alarm limits adjusted for remote operations Alarms with priority/criticality Sufficient IAS integration Additional ICE modem Comms outage alarm Walkthrough of all essential sensors Visual surveillance (CCTV) at ECC Redundancy of comms modems VHF at ECC Sufficient UPS, broadband and security at ECC Additional sensors or inspection tools for gas system IAS Command transfer functionality IAS alarm history resynchronisation Shiplog integration (ticket/adm system) Voice communication ECC-Bridge Comms system health monitoring Digital engine log book Big Screen Fleet view in ECC ESS/battery integration Fire system integration Procedures(15) Avoid simultaneous overhaul of two engines/generators Procedure for ECC-Bridge communication Procedure for handling comms loss Procedure for spare ferry to be put into operations Procedure for ECC handling for simultaneous problems on two ferries Procedures/criteria for taking the ferry out of service Procedure for transferring command from ECC to Bridge Procedure for ECC support in severe weather conditions Updated procedures for remote/eccoperations Procedure for handling water ingress Procedure for fire handling Procedure for bilge handling CBM (Condition Based Maintenance) Updated procedure for gas system Updated procedure for battery system

34 Fleet Status ECC implementation by Høglund Big Screen CCTV ECC BIG screen layout AIS

35 ECC Implementation by Høglund Fleet Status Persons On Board: Automatically updated from Shiplog. Can easily be expanded with other info e.g. dangerous cargo Time saver during emergencies

36 Pilot test scope Normal operations Test cases Abnormal cases & failures Functional tests Ship-to-shore comms failures IAS Comms interworking New ECC & IAS functionality Nr Test type Scenario 1 Abormal 2 Abormal 3 Abormal DG auto-stop 4 Abormal 5 Abormal Black-out. 6 Abormal Putting spare ferry into operation Operational problems on two ferries simultaneously Unplanned Maintenance & Repair. Loss of ship-shore communications 7 Abormal ECC unavailable. 8 Abormal Loss of propulsion or manoeuvring capability. 9 Abormal Extreme weather 10 Abormal Evacuation 11 Abormal Mob boat operation 12 Abormal Water ingress / Loss of stability. 13 Abormal Fire alarm / fire incident. 14 Abormal Equipment down for maintenance 39

37 Pilot test program 1Q 2019 Dry-run P0 Tønsberg 5/12 Test P1: Molde 23/1 40

38 Way forward 41

39 Way forward Continue and complete pilot campaign Document and share learnings within the project and externally Use learnings for future operations and development of new products & services Remote Ready IAS system [Høglund] Rules, RPs and TQ/AIP programs [DNV GL] and regulations [NMA] Consider commercial deployment for new ferries [Fjord1] 42

40 Thank you for the attention! Steinar Låg Phone: SAFER, SMARTER, GREENER Read more about ROMAS in DNV GL s Research Review 2018: 43

Sergey Gribanov Head of Technical Service, Germany

Sergey Gribanov Head of Technical Service, Germany MARITIME SHARING OPERATIONAL EXPERIENCE TANKERS Tanker Operator conference, Hamburg, 18.10.2016 Sergey Gribanov Head of Technical Service, Germany SAFER, SMARTER, GREENER AGENDA The DNV GL way to gather

More information

The SMART Choice of Control & Automation. always on top of the situation

The SMART Choice of Control & Automation. always on top of the situation The SMART Choice of Control & Automation II always on top of the situation We proudly present the SMART Solution SMART Chief II is the newest generation of Integrated Automation Systems covering all functions

More information

Solutions for Oil & Gas

Solutions for Oil & Gas Solutions for Oil & Gas AUTOMATION & SMART SOLUTIONS FOR OIL & GAS Westcon Power & Automation have performed EIT responsibility for over 110 rig yard stay and a wide range of projects offshore. Our commitment

More information

Design. Innovations in Integrated Control Systems

Design. Innovations in Integrated Control Systems Design Innovations in Integrated Control Systems Halvard Foss Kongsberg Maritime AS October 17-18, 2006 Return to Session Directory Innovations in Integrated Control Systems Halvard Foss Kongsberg Maritime

More information

Effective Alarm Management for Dynamic and Vessel Control Systems

Effective Alarm Management for Dynamic and Vessel Control Systems DYNAMIC POSITIONING CONFERENCE October 12-13, 2010 OPERATIONS SESSION Effective Alarm Management for Dynamic and Vessel Control Systems By Steve Savoy Ensco Offshore Company 1. Introduction Marine control

More information

Introduction to SRtP. Mr Georgios Vavourakis

Introduction to SRtP. Mr Georgios Vavourakis Introduction to SRtP Mr Georgios Vavourakis Outline Introduction SRtP requirements SOLAS approach Geometric Model Systems Modeling Analysis Results Introduction The term SRtP refers to a ship design concept

More information

BWTS Installation DNV GL Experience

BWTS Installation DNV GL Experience MARITIME BWTS Installation DNV GL Experience UK Chamber of shipping London 30 June 2016 Naufal Ashraff 1 BWM-1604 June 2016 SAFER, SMARTER, GREENER Installation of BWTS scope Planning/Designing Stage Approval

More information

Part 6 Additional class notations Chapter 2 Propulsion, power generation and auxiliary systems

Part 6 Additional class notations Chapter 2 Propulsion, power generation and auxiliary systems RULES FOR CLASSIFICATION Ships Edition January 2018 Part 6 Additional class notations Chapter 2 Propulsion, power generation and auxiliary systems The content of this service document is the subject of

More information

Manager Other (Specify) Gross Tonnage: Main Propulsion (kw): Generating Power (kw):

Manager Other (Specify) Gross Tonnage: Main Propulsion (kw): Generating Power (kw): PLEASE READ THE ATTACHED IMO RESOLUTION A.1047(27) BEFORE COMPLETING THIS FORM Maritime Authority of the Cayman Islands 133 Elgin Avenue P.O. Box 2256 Grand Cayman KY1-1107 Cayman Islands Tel: +1 345 949

More information

Innovations in Integrated Control Systems

Innovations in Integrated Control Systems Author s Name Name of the Paper ession DYNAMIC POITIONING CONFERENCE October 17-18, 2006 Design Halvard Foss Kongsberg Maritime A Kongsberg, Norway Introduction ince the 80 s there has been a move in the

More information

Marine Solutions. Honeywell s Solution for LNG Vessels

Marine Solutions. Honeywell s Solution for LNG Vessels Marine Solutions Honeywell s Solution for LNG Vessels Integrated automation systems for LNG vessels. Honeywell is the leading supplier of Integrated Automation Systems (IAS) for LNG carriers and newer

More information

ARM 10.2 MAINTENANCE OF CRITICAL SYSTEMS

ARM 10.2 MAINTENANCE OF CRITICAL SYSTEMS 1. Purpose The purpose of this procedure is to set forth the identity and procedures associated with the critical systems and equipment to ensure their reliability on R/V Armstrong. 2. References a. Condition

More information

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN Content of the lecture 1. DRILLS AND EMERGENCY EXERCISES (general requirements) 2. Emergency procedures

More information

FT NAVVISION AMCS TYPE-APPROVED, USER-CENTERED YACHT AUTOMATION

FT NAVVISION AMCS TYPE-APPROVED, USER-CENTERED YACHT AUTOMATION FT NAVVISION AMCS TYPE-APPROVED, USER-CENTERED YACHT AUTOMATION Yachting has never been so easy and comfortable. FT NavVision AMCS. As versatile as you need it. The FT NavVision Alarm, Monitoring & Control

More information

Training, Assessment, Consultants for Hazardous & Industrial Areas

Training, Assessment, Consultants for Hazardous & Industrial Areas Training, Assessment, Consultants for Hazardous & Industrial Areas EPIT provides specialist training, assessment and consultancy services for engineers working in hazardous and industrial environments.

More information

Part 4 Systems and components Chapter 5 Control and Monitoring Systems

Part 4 Systems and components Chapter 5 Control and Monitoring Systems RULES FOR CLASSIFICATION Inland navigation vessels Edition December 2015 Part 4 Systems and components Chapter 5 The content of this service document is the subject of intellectual property rights reserved

More information

PLN9 Security Services Pvt. Ltd.

PLN9 Security Services Pvt. Ltd. PLN9 Security Services Pvt. Ltd. Introduction The PLN9 team is committed to deliver a consistent level of product and service which is reliable, safe, innovative & customer driven. Our protection solution

More information

IMO GUIDELINES ON THE LAYOUT AND ERGONOMIC DESIGN OF SAFETY CENTRES ON PASSENGER SHIPS. Submitted by the Cruise Lines International Association (CLIA)

IMO GUIDELINES ON THE LAYOUT AND ERGONOMIC DESIGN OF SAFETY CENTRES ON PASSENGER SHIPS. Submitted by the Cruise Lines International Association (CLIA) INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SAFETY OF NAVIGATION 55th session Agenda item 12 NAV 55/12 13 May 2009 Original: ENGLISH GUIDELINES ON THE LAYOUT AND ERGONOMIC DESIGN OF SAFETY

More information

Imtech Marine Free Technics. Type-approved, user-centered yacht automation

Imtech Marine Free Technics. Type-approved, user-centered yacht automation Imtech Marine Free Technics FT NavVision AMCS Type-approved, user-centered yacht automation FT NavVision AMCS: as versatile as you need it. The FT NavVision Alarm, Monitoring & Control System is the automation

More information

MSC Guidelines for Vital System Automation Procedure Number: E2-01 Revision Date: 11/10/2011

MSC Guidelines for Vital System Automation Procedure Number: E2-01 Revision Date: 11/10/2011 S. J. Kelly, CDR, Chief Engineering Division Purpose: References: To provide guidance for plans submitted to the vital system automation installation aboard self-propelled vessels of 500 gross tons and

More information

SmartShip Technologies

SmartShip Technologies SmartShip Technologies A Manning & Life Cycle Cost Reduction Initiative Program POC: Mr. Paul Socoloski NAVSEA Philadelphia 215-897-7034 SocoloskiPP@nswccd.navy.mil Ivan Caplan Director, Business Development

More information

Every ETY marine panel is fully inspected and tested to IEC Switchboards Power management systems Panels and systems

Every ETY marine panel is fully inspected and tested to IEC Switchboards Power management systems Panels and systems E-Tech Yachting builds new and retro-fits existing switchboards with the latest power management systems, resulting in a seamless integration of existing and newly designed equipment. Years of experience

More information

1. GENERAL. In case of change of Class, foreseen Classification Society 20 Date of last Dry Docking

1. GENERAL. In case of change of Class, foreseen Classification Society 20 Date of last Dry Docking 1. GENERAL 1 Name of Ship 2 IMO No 3 Present Flag 4 Port of Registry 5 Call Sign 6 Type of Ship 7 Registered owner 8 Ship s Manager 9 GT/NT 10 Deadweight 11 Length 12 Breadth 13 Depth 14 Year of build

More information

Health and Safety Documents in connection with offshore oil and gas operations

Health and Safety Documents in connection with offshore oil and gas operations Health and Safety Documents in connection with offshore oil and gas operations DWEA guideline 65.1.13 January 2017 The most important rules on Health and Safety Documents for installations with connected

More information

Human-centered Design of a Mooring Winch Control Panel DNV GL & IST

Human-centered Design of a Mooring Winch Control Panel DNV GL & IST Crew-centered Design and Operations of ships and ship systems Human-centered Design of a Winch Control Panel DNV GL & IST winch Control Panels A high variety of s can be found on merchant

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE TYPE APPROVAL CERTIFICATE Certificate No: TAA00000VH Revision No: 1 This is to certify: That the Power Management System with type designation(s) Delomatic 4 Issued to DEIF A/S Skive, Midtjylland, Denmark

More information

Part 6 Additional class notations Chapter 6 Additional fire protection for passenger vessels

Part 6 Additional class notations Chapter 6 Additional fire protection for passenger vessels RULES FOR CLASSIFICATION Inland navigation vessels Edition December 2015 Part 6 Additional class notations Chapter 6 Additional fire protection for passenger vessels The content of this service document

More information

Crosswalk: Weight-Based Rating versus Performance-Based Rating

Crosswalk: Weight-Based Rating versus Performance-Based Rating 46 CFR 25.30 (Subchapter C) Motorboats Motorboat size Old New With no fixed fire With a fixed fire extinguishing System extinguishing system Motorboats under 16ft B-I 5-B 1 0 Motorboats 16ft-26ft B-I 5-B

More information

AUTOMATED CLIMBER DETECTION

AUTOMATED CLIMBER DETECTION AUTOMATED CLIMBER DETECTION AUTOMATED CLIMBER DETECTION CLiMBERguard automatically detects, tracks and classifies intruders scaling the side of a vessel or structure, immediately alerting operators to

More information

APPENDIX D Inspection Check List for Chartering Non-UNOLS Vessels

APPENDIX D Inspection Check List for Chartering Non-UNOLS Vessels APPENDIX D Vessel Name: Owner: Address and Contact Information: Operator: Address and Contact Information: Licenses held: Vessel Type and General Description: Length Overall: Displacement: Tonnage [GT/GRT/NT]

More information

ClassNK Technical Information No. TEC-0838 (iii) The dormant period, visual indication, first stage audible alarm, second stage remote audible alarm a

ClassNK Technical Information No. TEC-0838 (iii) The dormant period, visual indication, first stage audible alarm, second stage remote audible alarm a Subject Implementation of Bridge Navigational Watch Alarm System (BNWAS) (Excluding Japanese-flagged ships) To whom it may concern Technical Information No. TEC-0838 Date 8 December 2010 Paragraphs 2.2.3

More information

A safe journey with Dräger CRUISE CATALOGUE

A safe journey with Dräger CRUISE CATALOGUE A safe journey with Dräger CRUISE CATALOGUE Introduction ADVANTAGES Total FRS package Fast delivery 24/7, 365 days support Largest FRS product range Top quality Worldwide Dräger locations SAFETY ON BOARD

More information

Fact Sheet TANK CONTENT AND DRAUGHT MEASURING SYSTEM Issue Date

Fact Sheet TANK CONTENT AND DRAUGHT MEASURING SYSTEM Issue Date SYSTEM OVERVIEW The Hoppe Marine Tank Content and Draught Measuring System with electric pressure type sensors type HCG (Hoppe electric pressure type TCDM system) is the state of the art solution for continuous

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE TYPE APPROVAL CERTIFICATE Certificate No: TAA00000W5 Revision No: 2 This is to certify: That the Control and Monitoring System with type designation(s) K-Chief 700 and K-Safe Issued to KONGSBERG MARITIME

More information

MSC Guidelines for General Emergency Alarm & Public Address Systems

MSC Guidelines for General Emergency Alarm & Public Address Systems S. T. Brady, CDR, Chief of Engineering Division Purpose: This document outlines a basic method for submitting general emergency alarm and public address system drawings. References: a) 46 CFR 113.25 General

More information

ARE YOU AN AUTHORISED REFRIGERATION GAS PRACTITIONER?

ARE YOU AN AUTHORISED REFRIGERATION GAS PRACTITIONER? ARE YOU AN AUTHORISED REFRIGERATION GAS PRACTITIONER? HISTORY Through a voluntary registration process the safe handling of refrigerants started in 2000 this was replaced by a mandatory registration

More information

Fully redundant and customizable alarm, monitoring & Control system

Fully redundant and customizable alarm, monitoring & Control system Imtech AMCS Fully redundant and customizable alarm, monitoring & Control system Photo Daniel Ramirez Reliable, stable, safe Imtech AMCS Imtech s new Alarm, Monitoring & Control System is the automation

More information

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC CLASS PROGRAMME Type approval DNVGL-CP-0396 Edition December 2015 Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC The electronic pdf version of this document,

More information

GUIDE TO APPROVAL OF RETROFIT BALLAST WATER MANAGEMENT SYSTEM INSTALLATIONS

GUIDE TO APPROVAL OF RETROFIT BALLAST WATER MANAGEMENT SYSTEM INSTALLATIONS GUIDE TO APPROVAL OF RETROFIT BALLAST WATER MANAGEMENT SYSTEM INSTALLATIONS September 2016 DNV GL Approval Ship and Offshore Environmental Protection bwm@dnvgl.com DNV GL Headquarters, Veritasveien 1,

More information

WELCOME. The human touch in technology. marine

WELCOME. The human touch in technology. marine WELCOME The human touch in technology ALPHATRON MARINE IS SPECIALIZED IN THE FOLLOWING AREAS: ALPHATRON MARINE COMMUNICATION The human touch in technology TELEPHONE EXCHANGE (PABX) PUBLIC ADDRES SYSTEMS

More information

COMPANY PROFILE. Design, Development & Installation of Electrical & Automatic Control Systems

COMPANY PROFILE. Design, Development & Installation of Electrical & Automatic Control Systems COMPANY PROFILE Design, Development & Installation of Electrical & Automatic Control Systems MSB/ESB Main & Emergency Switchboards PMS Power Management Systems Engine Room Alarm Monitoring Systems Engine

More information

C Command. Engine monitoring that puts you in control

C Command. Engine monitoring that puts you in control C Command Engine monitoring that puts you in control Engine information at your fingertips Cummins offers a modular panel system with a selection of display options designed to help marine operators protect

More information

SUPERYACHT SAFETY & SECURITY 360 AIR, SURFACE & UNDERWATER PROTECTION

SUPERYACHT SAFETY & SECURITY 360 AIR, SURFACE & UNDERWATER PROTECTION SUPERYACHT SAFETY & SECURITY 360 AIR, SURFACE & PROTECTION NIDAR PROTECTS SUPERYACHTS AND PRIVACY BY BUILDING A LONG-RANGE 360 AWARENESS PICTURE AND PERIMETER SECURITY SHIELD AROUND A YACHT. Operating

More information

Access Professional Edition. The flexible access control system that grows with your business.

Access Professional Edition. The flexible access control system that grows with your business. Access Professional Edition The flexible access control system that grows with your business www.boschsecurity.com Access Professional Edition: the ideal solution for easy and intuitive access management

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE TYPE APPROVAL CERTIFICATE Certificate No: TAA00000VH This is to certify: That the Power Management System with type designation(s) Delomatic 4 Issued to DEIF A/S SKIVE, Denmark is found to comply with

More information

The evolution of level switches and detectors

The evolution of level switches and detectors Introduction Improving maintenance practices is vital in process industries, bringing significant gains in terms of safety, production up-time and reduction in unscheduled downtime. Increasing efficiency

More information

Certification and Class reports Item Common deficiencies Check items Finding Corrective Action Statutory / mandatory certificates

Certification and Class reports Item Common deficiencies Check items Finding Corrective Action Statutory / mandatory certificates Note: This checklist is based on PSC deficiencies noted on ships in year 2016 do not cover the whole requirements of Conventions or Regulations. Certification Class reports Statutory / matory certificates

More information

WORLD CALIMA. Summary report on engine room fire

WORLD CALIMA. Summary report on engine room fire WORLD CALIMA Summary report on engine room fire 15 NOVEMBER 2017 SUMMARY REPORT ON ENGINE ROOM FIRE ON BOARD WORLD CALIMA ON 15 NOVEMBER 2017 Published by DMAIB Carl Jacobsens Vej 29 DK-2500 Valby This

More information

NOTTINGHAM CITY HOMES

NOTTINGHAM CITY HOMES APPENDIX 1 NOTTINGHAM CITY HOMES FIRE SAFETY POLICY 2013/14 Draft for Board Uncontrolled when printed Page 1 of 14 DOCUMENT CONTROL Identification and Approval Status Document Title: Nottingham City Homes

More information

OFFSHORE SUPPORT VESSELS 2014

OFFSHORE SUPPORT VESSELS 2014 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2014 NOTICE NO. 1 JULY 2014 The following Rule Changes were approved by the ABS Rules Committee on 28 May 2014 and become EFFECTIVE AS OF 1 JULY

More information

PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL. (Public Version) SOP 517. July 2015

PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL. (Public Version) SOP 517. July 2015 PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL (Incorporating) Pollution Incident Response Management Plan (Public Version) SOP 517 July 2015 40-46 FAIRFIELD STREET FAIRFIELD EAST, NSW 2165 TELEPHONE: 02 8774

More information

REPUBLIC OF LIBERIA BUREAU OF MARITIME AFFAIRS

REPUBLIC OF LIBERIA BUREAU OF MARITIME AFFAIRS REPUBLIC OF LIBERIA BUREAU OF MARITIME AFFAIRS Marine Notice INS-004 Rev. 4/05 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND AUTHORIZED CLASSIFICATION SOCIETIES Operational/Safety

More information

DNVGL-CP-0407 Edition February 2016

DNVGL-CP-0407 Edition February 2016 CLASS PROGRAMME Type approval DNVGL-CP-0407 Edition February 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

ELC International Inc

ELC International Inc (Loss Control through Engineering) Company Profile & Capability Document INTRODUCTION ELC International Inc., an independent consultancy firm established in 2006, specializes in providing engineering solutions

More information

MV THOMSON MAJESTY Engine-room fire South of Gorgona Island 21 October 2016

MV THOMSON MAJESTY Engine-room fire South of Gorgona Island 21 October 2016 Marine Safety Investigation Unit SIMPLIFIED SAFETY INVESTIGATION REPORT REPORT NO.: 22/2017 October 2017 The Merchant Shipping (Accident and Incident Safety Investigation) Regulations, 2011 prescribe that

More information

E-16 Main Engine Remote Control System

E-16 Main Engine Remote Control System Guideline No.E-16 (201510) E-16 Main Engine Remote Control System Issued date: 20 October, 2015 China Classification Society Foreword This Guide is a part of CCS Rules, which contains technical requirements,

More information

ESF 4. Fire Fighting

ESF 4. Fire Fighting ESF 4 Fire Fighting This page left blank intentionally. 1 Introduction: Purpose and Scope Emergency Support Function 4 coordinates and manages all fire detection, control, and suppression efforts within

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice INS-004 Rev. 06/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

A Bridge to Inspection

A Bridge to Inspection A Bridge to Inspection Mr. Roy L. Murphy Senior Marine Inspector US Coast Guard Towing Vessel National Center of Expertise 270-444-7715 Roy.L. Murphy @USCG.MIL 1 4/5/2013 Towing Vessel Bridging Program

More information

Course Outline Cover Page

Course Outline Cover Page College of Micronesia FSM P.O. Box 159 Kolonia, Pohnpei Course Outline Cover Page Advanced Fire Control and Prevention MM 173 Course Title Department and Number Course Description: To provide candidates

More information

ROUTINE MAINTENANCE CHECKLIST FOR THE MASTERS

ROUTINE MAINTENANCE CHECKLIST FOR THE MASTERS ROUTINE MAINTENANCE CHECKLIST FOR THE MASTERS MARCH 2007 1. SHIP S CERTIFICATES AND LOG BOOKS All Certificates are available on board and remain valid (see Annex to this Publication List of certificates

More information

DeltaV Operate. DeltaV Operate. Introduction. DeltaV Product Data Sheet. Robust and secure plant operations

DeltaV Operate. DeltaV Operate. Introduction. DeltaV Product Data Sheet. Robust and secure plant operations February 2016 Page 1 DeltaV Operate You can easily manage your process with. Robust and secure plant operations Powerful operator interface, optionally up to four monitors Constant visibility and access

More information

LIQUEFIED GAS TANK BARGES WITH REMOTE CONTROL AND MONITORING OF ESSENTIAL SYSTEMS

LIQUEFIED GAS TANK BARGES WITH REMOTE CONTROL AND MONITORING OF ESSENTIAL SYSTEMS Guide for Liquefied Gas Tank Barges with Remote Control and Monitoring of Essential Systems GUIDE FOR BUILDING AND CLASSING LIQUEFIED GAS TANK BARGES WITH REMOTE CONTROL AND MONITORING OF ESSENTIAL SYSTEMS

More information

Requirements for ships carrying hydrogen and compressed natural gas vehicles

Requirements for ships carrying hydrogen and compressed natural gas vehicles Lloyd's Register briefing IMO FP 55 Summary report for clients Overview The 55 th session of the IMO Fire Protection Sub Committee (FP) was held from 25 th to 29 th July 2011, at the IMO headquarters in

More information

PROJECT PERIODIC REPORT

PROJECT PERIODIC REPORT PROJECT PERIODIC REPORT Grant Agreement number: SCP7-GA-2009-218513 Project acronym: ASPIS Project title: Autonomous Surveillance in Public transport Infrastructure Systems Funding Scheme: Collaborative

More information

Terminal lugs for LV power cables with aluminum conductors

Terminal lugs for LV power cables with aluminum conductors CLASS PROGRAMME Type approval DNVGL-CP-0409 Edition January 2018 Terminal lugs for LV power cables with aluminum conductors The content of this service document is the subject of intellectual property

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61892-2 Edition 2.0 2012-03 Mobile and fixed offshore units Electrical installations Part 2: System design INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XC ICS 47.020.60

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON STANDARDS OF TRAINING AND WATCHKEEPING 41st session Agenda item 12 STW 41/12/1 9 October 2009 Original: ENGLISH DEVELOPMENT OF MODEL PROCEDURE

More information

For the compliance with the resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

For the compliance with the resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority. Certificate No: TP00000ZS This is to certify: That the Ballast Water Management System with type designation(s) Ecochlor Ballast Water Management System Issued to Ecochlor, Inc. Maynard M, United States

More information

Safer & quicker evacuation From Emergency Lighting Systems to Adaptive Evacuation Systems

Safer & quicker evacuation From Emergency Lighting Systems to Adaptive Evacuation Systems Safer & quicker evacuation From Emergency Lighting Systems to Adaptive Evacuation Systems Kai Sabla 12.07.2018 Large buildings, housing retail, leisure, hospitality, entertainment and transport facilities

More information

GL-001. CIRM Guideline PERFORMANCE TEST PROCEDURE FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) Edition 1.

GL-001. CIRM Guideline PERFORMANCE TEST PROCEDURE FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) Edition 1. CIRM Guideline GL-001 PERFORMANCE TEST PROCEDURE FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) Edition 1.0 September 2018 Comité International Radio-Maritime (CIRM) 202 Lambeth Road, London,

More information

EPSS FOR CARGO HOLD HUMIDITY CONTROL. Mr Rajan Bhandari Senior Lecturer. Ms. Chong Yee Shia Technical Officer. Mr. Apurva Lawale Technical Officer

EPSS FOR CARGO HOLD HUMIDITY CONTROL. Mr Rajan Bhandari Senior Lecturer. Ms. Chong Yee Shia Technical Officer. Mr. Apurva Lawale Technical Officer EPSS FOR CARGO HOLD HUMIDITY CONTROL Mr Rajan Bhandari Senior Lecturer Ms. Chong Yee Shia Technical Officer Mr. Apurva Lawale Technical Officer R&D Centre Singapore Maritime Academy ABSTRACT Carrying forest

More information

Smarter Field Instrumentation Life Cycle Management. Ray Rogowski Global Marketing PMC Instruments

Smarter Field Instrumentation Life Cycle Management. Ray Rogowski Global Marketing PMC Instruments Smarter Field Instrumentation Life Cycle Management Ray Rogowski Global Marketing PMC Instruments Smart LifeCycle Management Pressure Temperature Radar Remote Seal Flange Mount User Interface Buttons Single

More information

TRANSAS ENGINE ROOM SIMULATOR

TRANSAS ENGINE ROOM SIMULATOR TRANSAS ENGINE ROOM SIMULATOR TRANSAS ENGINE ROOM SIMULATOR TRAINING OBJECTIVES Engine room equipment familiarization System layout and flow diagrams Control system and automation Alarm and safety system

More information

SAFETY ON A BROADER SCALE Safety and security for people, processes, plants, communities and environment

SAFETY ON A BROADER SCALE Safety and security for people, processes, plants, communities and environment Phil Jarrell, Director Integrated Protective Solutions June, 2016 SAFETY ON A BROADER SCALE Safety and security for people, processes, plants, communities and environment 1 INTEGRATED PROTECTIVE SOLUTIONS

More information

Safety Instrumented Systems The Smart Approach

Safety Instrumented Systems The Smart Approach Safety Instrumented Systems The Smart Approach The Emerson Approach to Safety More than ever, running your plant productively and safely requires the right technologies and experience. With increasingly

More information

Sustain.Ability. Adrian Fielding Integrated Safety & Security Honeywell Users Group EMEA

Sustain.Ability. Adrian Fielding Integrated Safety & Security Honeywell Users Group EMEA Sustain.Ability. Adrian Fielding Integrated Safety & Security 2012 Honeywell Users Group EMEA 1 Safety Moment DALE EARNHARDT Sr. 1951-2001 76 NASCAR Wins in 677 Races Refused to wear his HANS (Head and

More information

/ / White Paper. Focusing on user experience

/ / White Paper. Focusing on user experience / / Tyco Fire Protection Products is a leading manufacturer of fire detection, suppression and protection solutions. Here, it examines how to ensure effective use of fire detector control panel technology

More information

Design & Use of Ground Based Pumps Guidance Document

Design & Use of Ground Based Pumps Guidance Document Design & Use of Ground Based Pumps The information and recommendations in this guidance are given in good faith and belief in their accuracy at the time of publication, but do not imply any legal liability

More information

Fire Safety in Guest Harbours and Marinas

Fire Safety in Guest Harbours and Marinas CFPA-E Guideline No 15:2007 Fire Safety in Guest Harbours and Marinas FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

Safety, Security and Entertainment The Turnkey Solution for all kind of Ships

Safety, Security and Entertainment The Turnkey Solution for all kind of Ships The Turnkey Solution for all kind of Ships General Safety and Security s and concepts for safety and security are becoming increasingly important in modern times. The change in the worldwide political

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 125/2 Official Journal of the European Union 21.5.2010 REGULATIONS COMMISSION REGULATION (EU) No 428/2010 of 20 May 2010 implementing Article 14 of Directive 2009/16/EC of the European Parliament and

More information

DNVGL-CP-0398 Edition December 2015

DNVGL-CP-0398 Edition December 2015 CLASS PROGRAMME Type approval DNVGL-CP-0398 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. T4/4.01 MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE

More information

Implementation Guidance for ISO 9001:2008

Implementation Guidance for ISO 9001:2008 Document: ISO/TC 176/SC 2/N 836 Our ref Secretariat of ISO/TC 176/SC 2 Date: 15 October 2008 Implementation Guidance for ISO 9001:2008 CONTENTS 1.0 INTRODUCTION 2.0 BACKGROUND ON ISO 9001:2008 REVISION

More information

EMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM

EMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM Page: 1 of 12 EMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM TABLE OF CONTENTS 1. PURPOSE... 2 2. SCOPE... 2 3. REFERENCES... 2 4. DEFINITIONS... 3 5. RESPONSIBILITIES... 4 NOTE: LICENCE

More information

Additional Fire Protection (F-AMC)

Additional Fire Protection (F-AMC) RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 4 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Additional Fire Protection (F-AMC) JANUARY 2011 This chapter has been amended since the main

More information

ALARM DEVICES FOR MAN OVER BOARD AND RESCUE ACTIONS (DAHMAS)

ALARM DEVICES FOR MAN OVER BOARD AND RESCUE ACTIONS (DAHMAS) DIVISION 332 ALARM DEVICES FOR MAN OVER BOARD AND RESCUE ACTIONS (DAHMAS) Edition of 27 JUIN 2005, published in OJ 21 August 2005 A day of following orders: Date of signature Release Date O.J. 27 06 05

More information

This is a preview - click here to buy the full publication

This is a preview - click here to buy the full publication TECHNICAL REPORT IEC/TR 62351-10 Edition 1.0 2012-10 colour inside Power systems management and associated information exchange Data and communications security Part 10: Security architecture guidelines

More information

VANUATU GENERAL CONDITION SURVEY REPORT

VANUATU GENERAL CONDITION SURVEY REPORT NAME OF VESSEL: PREVIOUS NAMES: CURRENT PORT OF REGISTRY: CURRENT OWNER: OPERATOR/ MANAGER: TYPE OF VESSEL: YEAR & PLACE OF CONSTRUCTION: ITC 69/REGULATORY GRT: ITC 69/REGULATORY NRT: DEADWEIGHT TONNAGE:

More information

Dynamic Solutions. Endless Possibilities. Steve Padasack, Finch Paper LLC Rick Van Fleet, Honeywell

Dynamic Solutions. Endless Possibilities. Steve Padasack, Finch Paper LLC Rick Van Fleet, Honeywell Honeywell Users Group 2010 Dynamic Solutions. Endless Possibilities. Steve Padasack, Finch Paper LLC Rick Van Fleet, Honeywell A(bout) with Obsolescence Moore Micro DCS Transition to Experion Background

More information

RULES PUBLICATION NO. 35//P ONE MAN BRIDGE OPERATED (OMBO) SHIPS March

RULES PUBLICATION NO. 35//P ONE MAN BRIDGE OPERATED (OMBO) SHIPS March RULES PUBLICATION NO. 35//P ONE MAN BRIDGE OPERATED (OMBO) SHIPS 2017 March Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules and are mandatory

More information

ALARMING NEWS FROM INVENSYS PROCESS SYSTEMS, INC.

ALARMING NEWS FROM INVENSYS PROCESS SYSTEMS, INC. ALARMING NEWS FROM INVENSYS PROCESS SYSTEMS, INC. The Foxboro I/A Series and the newly developed and highly versatile I/A Series System Message Manager working in combination to meet all of your plant

More information

How Oslo works with Sustainable Mobility. Ellen de Vibe, Chief Town Planner Agency for Planning and Building Services, City of Oslo

How Oslo works with Sustainable Mobility. Ellen de Vibe, Chief Town Planner Agency for Planning and Building Services, City of Oslo How Oslo works with Sustainable Mobility Ellen de Vibe, Chief Town Planner Agency for Planning and Building Services, City of Oslo The city takes the lead An active municipal property strategy for increased

More information

Main changes in BV Rules for Steel Ships

Main changes in BV Rules for Steel Ships Main changes in BV Rules for Steel Ships Main changes in Bureau Veritas Rules for the Classification of Steel Ships (January 2019 edition, into force on January 1 st, 2019), regarding the previous edition

More information

VANUATU GENERAL CONDITION SURVEY REPORT

VANUATU GENERAL CONDITION SURVEY REPORT NAME OF VESSEL: PREVIOUS NAMES: CURRENT PORT OF REGISTRY: CURRENT OWNER: OPERATOR/ MANAGER: TYPE OF VESSEL: YEAR & PLACE OF CONSTRUCTION: ITC 69/REGULATORY GRT: ITC 69/REGULATORY NRT: DEADWEIGHT TONNAGE:

More information

CCU Family of Modules

CCU Family of Modules The CCUNet range of products, when integrated with XL, provide fire network amalgamation for various differing fire networks. Rapid and effective monitoring and control is provided via multi-drop secure

More information

Riviera 51 Enclosed $949,000

Riviera 51 Enclosed $949,000 Riviera 51 Enclosed $949,000 Specifications Boat Details Price $949,000 Boat Brand Riviera Model 51 ENCLOSED FLYBRIDGE Length 17.73 Year 2008 Category Motor & Power Boats Hull Style Single Hull Type GRP

More information

For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority. Certificate No: TP00000ZS Revision No: 1 This is to certify: That the Ballast Water Management System with type designation(s) Ecochlor Ballast Water Management System Issued to Ecochlor, Inc. Maynard

More information