1 SECTION PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International Fire Code, 2006 Edition with 2010 Georgia State Amendments. 1.2 A. Provide a complete wet pipe sprinkler system in all heated areas of the Classroom building and Gymnasium. Connect new sprinklers to the existing risers. B. Provide outside and fire line main as indicated on the Plumbing Site Plan. Sheet P001. C. The occupancy classification of the building is light hazard except in specific areas where other classifications are required by NFPA 13. The sprinkler system shall be designed to deliver 0.10 gpm per square foot over an area of 1500 square feet in light hazard areas. D. The contractor shall determine the location of all sprinkler heads, arrange and size the sprinkler piping using hydraulic calculation. 1.3 SHOP DRAWINGS A. Submit the following information: 1. Water flow test data. 2. Hydraulic Calculations. 3. Materials and equipment lists, manufacturer's data and cut sheets. 4. Shop drawings, including dimensioned plans, sections, details, and elevations showing locations and arrangement of piping, sprinklers, valves, alarms and dampers. 5. Certificate of tests. B. The arrangement of sprinkler piping exposed to view in finished areas shall be approved by the Architect. C. Shop drawings shall be submitted to and approved by the Georgia State Fire Marshal before any work is started
2 1.4 HYDRAULIC CALCULATIONS A. The contractor shall perform a water flow test at the site in accordance with the procedure outlined in NFPA 13, Chapter 6. B. Hydraulic calculations indicating that the pipe sizes selected will deliver the required water flow density when the sprinkler system is connected to the existing water supply system shall be made by the contractor and submitted for approval. C. The calculations must be made using the HASS system or other approved computer program. 1.5 UTILITY CONNECTIONS A. It shall be the Contractor's responsibility to determine all requirements of the local Water Department regarding new utility service to the building. The installation shall be in complete accordance with those requirements. B. All costs incidental to complete utility services, including cutting and patching of street, water main connections and water meter shall be included in the bid price. 1.6 EXCAVATION AND BACKFILL A. All excavation and backfill for work under this section shall be in accordance with Division 2 requirements. PART 2 - PRODUCTS 2.1 INSIDE PIPING A. Piping for the sprinkler systems shall be steel pipe manufactured in accordance with ASTM A 120, A135, A795 and A 53. Piping with minimum wall thickness outlined in NFPA shall be used for pipe sizes greater than 2". Schedule 40 pipe may be used for smaller sizes. 2.2 FITTINGS (INSIDE PIPING) A. Pipe shall be joined with cast iron or malleable iron, screwed, flanged or welded steel fittings manufactured in accordance with NFPA or U.L. listed fittings suitable for grooved pipe couplings. Plain end pipe fittings will not be accepted. B. Sprinkler drops may be installed using U.L.listed flexible stainless steel tubing
3 2.3 HANGERS A. Suitable U.L. listed hangers shall be provided in accordance with NFPA VALVES A. OS & Y valves, gate valves, drain valves, post indicator valves and check valves shall be listed by U. L. for use in sprinkler systems. B. Provide a tamper switch on the post indicator valve for connection to the fire alarm system. 2.5 UNDERGROUND PIPING A. Underground piping shall be cement lined ductile iron pipe manufactured in accordance with ANSI B. Joints in ductile iron water pipe shall be Tyton joints except that joints at fittings shall be bolted mechanical joints. 2.6 FITTINGS AND COUPLINGS (UNDERGROUND PIPING) A. Fitting for underground piping shall be cast iron manufactured in accordance with ANSI A BACKFLOW PREVENTION VALVES A. Double check detector valve assembly shall be Watts 709 DCDA double check valve with detector CFM meter, two OS & Y gate valves and four test cocks. B. Valves shall have epoxy coated cast iron bodies. The valve assembly shall be U. L. listed. C. Valves shall be as manufactured by Watts or approved equal by Ames, Febco or Hersey. 2.8 SPRINKLERS A. Sprinklers in areas having no suspended ceilings or having gypsum board ceilings fasten directly to the bar joist shall be standard upright, 1/2" or extended coverage 3/4" U.L. listed types having brass finish. B. Sprinklers in lay-in ceilings shall be standard small frame surface mounted pendant 1/2" or extended coverage 3/4", U.L. listed types having a chrome finish arranged for surface mounting
4 C. Sprinklers in suspended gypsum board ceiling shall be standard small frame %2" or extended coverage 3/4" U.L. listed concealed type with round cover. D. Sprinklers having an ordinary temperature rating shall be used except in mechanical equipment rooms and near duct outlets where sprinklers having an intermediate rating shall be used. E. Sprinklers shall be located in lay-in ceiling tiles in the center of the 24" X 48" tile or at quarter points in the tile, i.e. 12" from one end and 12" from each side. Sprinkler heads shall be arranged symmetrically in each space. Shop drawings shall indicate location of sprinkler heads in ceiling grid and shall show dimensions from sprinkler head to grid system. F. The sprinklers in the freezer, cooler, and the outside area at the can wash shall be ordinary temperature rated U.L. listed dry pendant types with minimum 12" long bodies, sealed in the ceiling as detailed on the drawings. Install %2" thick foam insulation on the first 24" of pipe from the sprinkler head. G. Install wire guards on each sprinkler head in the Gymnasium and Locker Rooms area. H. A stock of at least 6 spare sprinklers of each type used and a wrench shall be provided in a suitable accessible cabinet in the main valve room of each building. 2.9 INSPECTORS TEST VALVES A. Inspectors test valves shall be located at each sprinkler riser and shall discharge into the main sprinkler drain ESCUTCHEON PLATES A. Escutcheon plates having a chrome finish shall be provided for all exposed wall and ceiling penetrations. Where sprinklers are within 12 inches of surface mounted lighting fixtures, 1 inch deep plates shall be used for standard surface mounted pendent sprinklers
5 PART 3 - EXECUTION 3.1 UNDERGROUND PIPING A. Underground piping which is used for fire protection shall be installed by a contractor which holds a Georgia Certificate of Competency for Automatic Fire Sprinkler Systems. B. Underground piping shall be installed in accordance with NFPA through 8-7. All tees, plugs, caps and bends shall be anchored with clamps, tie rods and concrete thrust blocks in accordance with NFPA Piping shall have a minimum of 42" cover above the top of the pipe. C. Underground piping shall be thoroughly flushed in accordance with NFPA prior to the connection of inside piping. All piping shall be hydrostatically pressure tested at 200 psi for at least two hours in accordance with NFPA The joint Owner-Contractor inspection and test certificates shall be satisfactorily completed and submitted in accordance NFPA-24-A A. The sprinkler system shall be coordinated with and arranged to clear all ceiling grid, lighting fixtures, conduit ceiling diffusers, ductwork, piping and mechanical and electrical equipment as shown on the drawings. B. Sprinkler piping shall not be installed in service areas of air conditioning units. See drawings for details locating the service areas. Where conflicts occur, provide offsets in the sprinkler system piping. C. Sprinkler piping shall not be installed over the tops of electrical panels and switchboards in areas where piping is prohibited by the National Electrical code. D. A sign or placard shall be permanently affixed in the main valve room stating, "The sprinkler system's pipe sizes have been calculated to provide a density of.10 gpm per sq. ft. for 1,500 sq. ft.". E. A drawing framed under plastic showing the areas of the building served by each sprinkler zone shall be installed in the main valve room adjacent to the riser. End of Section
C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.
SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this
More informationSECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM
SECTION 213100 WET PIPE FIRE PROTECTION SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The requirements of the General Conditions and Supplementary Conditions apply to all work herein.
More informationB. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.
DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS
More informationWest District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8
City of Ottawa Project No. CR006230 Page 1 of 8 PART 1 - GENERAL 1.1 Reference Standards.1 Conform to the following:.1 Provincial and municipal building and fire regulations as approved by Provincial Fire
More informationCubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM
SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for
More informationFIRE SUPPRESSION SPRINKLER SYSTEM
PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this
More informationFIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.
15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.
More information1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.
FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment
More informationA. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:
SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationSECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS
SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,
More informationDIVISION 21 - FIRE SUPPRESSION
DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,
More informationDIVISION 21 - FIRE SUPPRESSION
DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,
More information2. Welding Materials and Procedures shall conform to the ASME Code.
PART 1 GENERAL 1.01 Scope of Standard A. The design guidelines contained herein include the requirements for systems, materials, fittings and valves utilized for fire protection systems at Sam Houston
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL
SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationUC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS
DIVISION 21 - FIRE SUPPRESSION Includes the following sections: None DESIGN REQUIREMENTS It is the policy of City of Santa Cruz to install fire sprinkler systems in all new construction/facilities. If
More informationGas Station & C Store SECTION CWM Job No
SECTION 21 1300 - PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract
More informationA. Section includes wet-pipe sprinkler system, system design, installation, and certification.
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes wet-pipe sprinkler system, system design, installation, and certification. 1.2 REFERENCES A. General: Comply
More informationWET AUTOMATIC FIRE SPRINKLER SYSTEMS
SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,
More informationMLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN
DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE
More informationUNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1
GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and
More information1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:
SECTION 21 10 00 - WATER-BASED FIRE-SUPPRESSION PART I - GENERAL 1.1 SUMMARY A. Inclusion of sprinkler and standpipe systems shall be as determined by NFPA National Fire Code pamphlet 101 and program statement.
More informationTABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5
DOC Cremer Heating and Hot Water Plant Project Number: M 1411-04 TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION 21 30 00- WATER BASED FIRE PROTECTION SYSTEMS... 5 SECTION 22 40 00 -PLUMBING
More informationSECTION SPRINKLER SYSTEMS
SECTION 15325 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Wet-pipe sprinkler systems. B. Preaction sprinkler systems. C. System design, installation, and certification. D. Fire department
More informationB. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.
(816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the
More informationTHE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION
SECTION 21 1301- FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY: A. This Section includes fire-suppression piping and equipment for the following building systems: 1. Wet-pipe, fire-suppression
More informationSECTION WET-PIPE FIRE SUPPRESSION SPRINKLERS
SECTION 15932 WET-PIPE FIRE SUPPRESSION SPRINKLERS PART 1 - GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred
More informationDivision 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21
Division 21: FIRE SUPRESSION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM Table of Contents 1 Division 21 SECTION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationWALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"
SOUTH TEJON ST., SUITE 00 COLORADO SPRINGS, CO. 00 TELE.: FAX: WALL ESCUTCHEON PACK ANNULAR SPACE WITH MINERAL WOOL GENERAL NOTES. THIS PROJECT INCLUDES THE DESIGN AND PROVISION OF A NEW WET SPRINKLER
More informationSECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE
SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department
More informationSECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE
SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department
More informationPort of St Helens SIA Aircraft Hanger Scappoose, OR
Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance
More informationSECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section
PART 1 - GENERAL 1.00 GENERAL PROVISIONS A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section 1.01 DESCRIPTION OF WORK A. Work Included: Provide
More information***Specifications***
Bid No. B18-02 Fire Suppression System Bldg 1300 ***Specifications*** Bid RFI Questions Due: Friday, January 26, 2018 2:00PM Gale Stevens, Buyer gasteven@cabrillo.edu copy to purchasing@cabrillo.edu BID
More informationDIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES
DIVISION 21 FIRE SUPPRESSION PART 1 GENERAL 1.01 DESCRIPTION A. Provide UL listed, FM approved listed fire protection specialties or accessories as required by either the equipment manufacturer or the
More informationNew Construction Fire Inspection Process
New Construction Fire Inspection Process This document is intended to provide the Owner, Designer, and/or Contractor of new construction with an outline of required fire inspections and with the specific
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE
SECTION 21 1313 WET-PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Wet-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.02 RELATED
More informationSPRINKLERS TABLE OF CONTENTS
SPRINKLERS TABLE OF CONTENTS SECTION 21 13 13 WET PIPE SPRINKLER SYSTEMS SECTION 211313 - WET PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,
More informationB. Related Sections: The following Sections contain requirements that relate to this Section.
SECTION 211313- FIRE-SUPPRESSION PIPING PART1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationB. Section Identification for Fire Suppression Piping and Equipment.
SECTION 211300 - FIRE SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.2 RELATED
More informationSECTION FIRE SUPRESSION
PART 1 GENERAL 1.1 SCOPE SECTION 21 00 00 FIRE SUPRESSION A. The work under this section of the specifications consists of furnishing all materials, equipment, labor, testing, appurtenances, engineering
More informationSECTION FIRE PROTECTION
SECTION 15300 PART I - GENERAL 1.01 WORK INCLUDED A. Furnish all labor, materials, tools, and equipment to complete the automatic fire sprinkler system as hereinafter described, ready for service to the
More informationSECTION FIRE-SUPPRESSION STANDPIPES
PART 1 - GENERAL 1.1 DESCRIPTION Fire-suppression wet and manual dry standpipes. 1.2 SCOPE OF WORK SECTION 21 12 00 A. Design, installation and testing shall be in accordance with NFPA 14 except for specified
More informationSECTION FIRE PROTECTION
SECTION 15300 - FIRE PROTECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR
More informationSECTION WET FIRE SPRINKLER SYSTEMS
SUNY GENESEO 211310-1 PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in
More informationCITY OF PASADENA FIRE DEPARTMENT
Page 1 of 8 CITY OF PASADENA FIRE DEPARTMENT INSTALLATION OF COMMERCIAL SPRINKLERS (Revised 12/10/2014) SCOPE: This standard applies to the design and installation of automatic fire sprinkler systems in
More informationAUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)
AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) This standard applies to the design and installation of automatic fire sprinkler systems in conjunction with
More informationDesign and Construction Standards SECTION FIRE SUPPRESSION
SECTION 13900 FIRE SUPPRESSION PART 1 GENERAL 1.1 SCOPE A. The work under this section of the specifications consists of furnishing all materials, equipment, labor, testing, appurtenances, engineering
More informationSECTION AUTOMATIC SPRINKLER PIPING
SECTION 15330 AUTOMATIC SPRINKLER PIPING ****** ***** **** *** ** * ** *** **** ***** ****** NOTE TO SPECIFIER: This section contains several types of automatic sprinkler piping. Some piping is allowed
More informationEL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD
EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD INSTALLATION OF COMMERCIAL FIRE SPRINKLER SYSTEMS STANDARD #C-001 EFFECTIVE 03-25-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 21 1314W - AUTOMATIC SPRINKLER SYSTEMS (WET PIPE SYSTEMS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA. All Fire Suppression System design and installation shall comply with the most current and adopted version of NFPA 13.
21 10 00 PART 1 - GENERAL 1.01 SCOPE A. The following standards and procedures apply to the design and installation of all wet pipe and dry pipe sprinkler systems. The design of fire suppression systems
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 21 1314D - AUTOMATIC SPRINKLER SYSTEMS (DRY-PIPE) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 13 13 PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The design and installation of a hydraulically
More informationDIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS
2006 Edition, Published January 1, 2006; Division Revision Date: June 30, 2016 21 00 00. FIRE SUPPRESSION 21 00 03. GENERAL PROVISIONS.1 PREPARATION OF CONTRACT DOCUMENTS.1.1 PLUMBING CONTRACT: Include
More informationMontgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040
Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 SPRINKLER SHOP DRAWINGS 2007 NFPA 13 and 2007 NFPA 24 Project: Listed items require sprinkler
More informationSECTION DRY-PIPE SPRINKLER SYSTEMS
SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition
More informationDIVISION 21: FIRE SUPPRESSION WATER BASED FIRE SUPRESSION SYSTEMS
DIVISION 21: FIRE SUPPRESSION 21 1000 WATER BASED FIRE SUPRESSION SYSTEMS 21 1200 FIRE-SUPPRESSION DRY STANDPIPES 21 1313 WET PIPE SPRINKLER PROTECTION SYSTEM 21 1314 WET-PIPE AUTOMATIC SPRINKLER SYSTEM
More informationDESIGN & CONSTRUCTION GUIDELINES
ADMINISTRATIVE SERVICES 4202 E. FOWLER AVENUE, FPC110 PHONE: (813) 974-2625 FACILITIES PLANNING & CONSTRUCTION TAMPA, FLORIDA 33620-7550 WEBSITE: USF.EDU/FPC DESIGN & CONSTRUCTION GUIDELINES DIVISION 21
More informationA. This section includes design and performance information for fire protection and suppression systems.
SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials
More informationPublic School Facilities Authority State of New Mexico 2019 Galisteo, Suite B Santa Fe, New Mexico 87505
Public School Facilities Authority State of New Mexico 2019 Galisteo, Suite B Santa Fe, New Mexico 87505 SPECIFICATIONS FOR FIRE PROTECTION SYSTEMS NEW MEXICO PUBLIC SCHOOLS November 7, 2005 . TABLE OF
More informationSECTION WATER BASED FIRE SUPPRESSION SYSTEMS
PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University-San Marcos for automatic fire sprinkler and standpipe systems.
More informationSECTION ADDENDUM NO. 1 FIRE SPRINKLER SYSTEM
PART 1 - GENERAL 1.01 GENERAL DESCRIPTION A. Furnish all materials and labor for the detailed design and installation for new fire sprinkler wet pipe systems for Buildings A through R hereafter referred
More informationUMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015
SECTION 211000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Related Documents: Drawings, Notice to Bidders, General Conditions, Project Coordination, RFP Format, Requested RFP Alternatives, Cutting and
More informationADDENDUM NO. 3 March 19, 2018
ADDENDUM NO. 3 March 19, 2018 PROJECT: MT. VIEW ELEMENTARY CASSIA SCHOOL DISTRICT NO 151 BURLEY, IDAHO The following addenda apply to the Project Manual and / or Drawings for this project and shall be
More informationDESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES
SECTION 21 13 00 - FIRE SUPRESSION SPRINKLER SYSTEMS SCOPE OF WORK This standard provides general guidance concerning the specific preferences of The University of South Alabama for automatic fire sprinkler
More informationSECTION SPRINKLER SYSTEMS
SECTION 13900 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationB. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.
SECTION 21 13 13 FIRE PROTECTION SPRINKLER SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes labor and materials for the installation of a hydraulically calculated automatic, wet-pipe sprinkler
More informationMONTECITO FIRE PROTECTION DISTRICT
Section 5a MONTECITO FIRE PROTECTION DISTRICT FIRE PROTECTION PLAN Residential Automatic Fire Sprinkler System Installations I Automatic Fire Sprinkler System Standards 1. Definition and Standard: An automatic
More informationSECTION DRY-PIPE SPRINKLER SYSTEMS
Ul611-0l SECTION 211316- DRY-PIPE SPRINKLER SYSTEMS PARTl-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification
More informationDARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES
SECTION 15300 FIRE PROTECTION PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. Dartmouth College is currently insured by Factory Mutual. References to the owner s insurance company in this specification
More informationLucy s Pizza 100% CD Specification 06/22/2018
DIVISION 21: FIRE SUPPRESSION 210500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 210548 VIBRATION & SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING & EQUIPMENT 210553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING
More informationSECTION FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 211313 WET-PIPE SPRINKLER SYSTEMS PRT 1 GENERL 1.01 RELTED DOCUMENTS. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationMercury Plastics New Building February TABLE OF CONTENTS
DIVISION 21: FIRE SUPPRESSION 210500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 210548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 211300 WET PIPE FIRE SUPPRESSION SPRINKLERS
More informationDIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION
DIVISION 21 FIRE SUPPRESSION 21 00 00 FIRE SUPRESSION 21 01 00 Operation and Maintenance of Fire Suppression 21 01 10 Operation and Maintenance of Water Based Fire Suppression Systems 21 01 20 Operation
More informationEnvironmental Health & Safety
Environmental Health & Safety Oklahoma State University FIRE SPRINKLER SYSTEM STANDARD Environmental Health and Safety University Health Services Suite 002 Stillwater, OK 74078 (405) 744-7241 www.ehs.okstate.edu
More informationSECTION FIRE-SUPPRESSION SYSTEMS
SECTION 13900 FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Automatic wet-type, Class I, fire-suppression standpipes and branches for sprinklers. 2. Wet-pipe, fire-suppression
More informationSECTION (13900) - FIRE SUPPRESSION SYSTEMS
PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety
More information2016 CDM Smith All Rights Reserved July 2016 SECTION FIRE PROTECTION - SPRINKLER AND STANDPIPE SYSTEMS
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 21 13 13 FIRE PROTECTION - SPRINKLER AND STANDPIPE SYSTEMS A. Furnish all labor, materials, equipment services and incidentals required to design and install properly
More informationWET-PIPE SPRINKLER SYSTEMS
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationDISCONTINUED PRODUCT
SEE VICTAULIC PUBLICATION 10.01 FOR DETAILS These Model V27 residential sprinklers are designed to meet the requirements of NFPA 13, 13D and 13R for residential use in a variety of room sizes, depending
More informationAddendum No. 2 to the Contract Documents
Addendum No. 2 to the Contract Documents Lewis County Jefferson Community College Education Center Project CONTRACT 2A: GENERAL CONSTRUCTION CONTRACT 2B: ELECTRICAL CONSTRUCTION CONTRACT 2C: MECHANICAL
More informationDesign & Construction Standards, Revised January
PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for fire-extinguishing systems other than water-based fire suppression systems.
More informationExaggerated for Clarity. Residential Pendent, Recessed Pendent. System No. Submitted By Spec Sect Para Location Date Approved Date
SEE VICTAULIC PUBLICATION 10.01 FOR DETAILS The Model V3426 residential sprinkler is designed with optimal flow characteristics for use in residential NFPA 13 systems. The larger 6.9 K-Factor will aid
More informationADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri
ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July
More informationA. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationRevision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.
SECTION 211300 FIRE SUPPRESSION SYSTEMS 1.0 All new and renovated buildings shall be provided with automatic sprinklers throughout and fire standpipe systems. The design and installation of these systems
More informationDesign & Construction Standards, Revised January
PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for the design and construction of standpipe systems to include combination standpipe
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-21 13 17.00 10 (May 2009) Change 1-02/13 ------------------------------ Preparing Activity: USACE Superseding UFGS-21 13 17.00 10 (November 2008) UNIFIED FACILITIES GUIDE
More informationSECTION PREACTION SPRINKLER SYSTEMS
PART 1 GENERAL SECTION 211316 - PREACTION SPRINKLER SYSTEMS 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNorth Hanover Township School District North Hanover Township, New Jersey
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationD. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:
PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of Sam Houston State University for the design and construction of standpipe systems to include combination standpipe
More informationTECHNICAL DATA. Refer to the Approval Chart and Design Criteria for UL and FM Listing/Approval requirements that must be followed.
Page 1 of 10 1. DESCRIPTION Viking Early Suppression Fast Response (ESFR) Dry Pendent Sprinkler VK504 is a fast response fusible element type sprinkler designed for use in storage areas subject to freezing
More informationDIVISION 21 FIRE SUPPRESSION
DIVISION 21 FIRE SUPPRESSION Table of Contents 21 00 01 General 21 00 02 Scope 21 00 03 Codes 21 00 04 Design Intent Report 21 00 05 Coordination with University of Minnesota Departments 21 00 06 Access
More informationSECTION DRY-PIPE SPRINKLER SYSTEMS
SECTION 21 13 16 DRY-PIPE SPRINKLER SYSTEMS SPEC WRITER NOTES: Delete between // --- // if not applicable to the project. Also delete any other item or paragraph including NFPA references which are not
More informationPHYSICAL FACILITIES. 1 General. 2 Related Requirements. 5 Quality Assurance. 3 Wiring. 4 Submittals
1 General 1.1 Provide all material, labor, engineering and operations for the installation of complete and operable fire suppression systems as shown in the job scope and as specified herein. 1.2 Provide