26 of 128 9/23/2014 9:25 AM

Size: px
Start display at page:

Download "26 of 128 9/23/2014 9:25 AM"

Transcription

1 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke detector symbol shown in the latest edition of NFPA 170 is used. The new symbol is a hexagon with the letter "S" as shown in Table 8.3 of the 2015 edition of NFPA 170. The Annex F figures are Figure F.2.3, F.2.4, F.2.5, F.2.6, F.2.7 and F.2.8. Supplemental Information File Name G72-252r1.jpg G72-49r1.jpg G72-50r1.jpg G72-51r1.jpg G72-52r1.jpg G72-53r1.jpg Description Submitter Information Verification Submitter Full Name: Lee Richardson Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Thu Aug 28 08:52:49 EDT 2014 Committee Statement Committee Statement: Response Message: NOTICE: This is a Second Revision developed by Staff for editorial purposes so that the smoke detector symbol used in Annex F is consistent with the symbol shown in the 2015 edition of NFPA 170. Committee review has been deemed advisable and the Second Revision is being processed in accordance with section of the Regulations Governing the Development of NFPA Standards.

2

3

4

5

6

7

8 7 of 128 9/23/2014 9:25 AM Second Revision No. 46-NFPA [ Global Comment ] In Table item 17(j)(2) through (5) change "Quarterly" to "Annually" in four (4) places. Submitter Information Verification Submitter Full Name: Richard Roux Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Wed Jul 02 07:38:15 EDT 2014 Committee Statement Committee Statement: NFPA 72 establishes the requirements for fire alarm switch testing frequency. The statistical failure rates of electronically supervised mechanical switches are extremely small. In a 3-year cycle, there was no evidence to suggest that more than an annual frequency was necessary. Response Message: Public Comment No. 124-NFPA [Section No ] Public Comment No. 172-NFPA [Section No ]

9 5 of 128 9/23/2014 9:25 AM Second Revision No. 53-NFPA [ Section No ] Site-Specific Software. (SIG-TMS) Site-specific software documentation shall be in accordance with (SIG-TMS) For software-based systems, a copy of the site-specific software shall be provided to the system owner or owner s designated representative The site-specific software documentation shall include both the user passcode and either the system programming password or specific instructions on how to obtain the programming password from the system manufacturer The passwords provided shall enable currently certified qualified programming personnel to access, edit, modify, and add to the existing system site-specific software A copy of the site-specific software shall be stored on-site in nonvolatile, nonerasable, nonrewritable memory. Submitter Information Verification Submitter Full Name: Lee Richardson Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Thu Jul 03 13:49:19 EDT 2014 Committee Statement See SR-56 Committee Statement: Section and related annex material has been relocated to become Moving the requirements for site-specific software to Chapter will improve usability of the Code by placing the site-specific software documentation requirements in the Documentation chapter. A reference pointer to has been added to by SR 56. Changes have been made to ( ) to ensure that the system owner is able to obtain the applicable access credentials, which will allow the system owner to determine who conducts future system programming for the installed system. Response Message: Public Comment No. 9-NFPA [Section No ] Public Comment No. 40-NFPA [Section No ] Public Comment No. 89-NFPA [Section No ]

10 2 of 128 9/23/2014 9:25 AM Second Revision No. 44-NFPA [ Section No ] In the event that any equipment is observed to be part of a recall program, the building owner system owner or the system owner's designated representative shall be notified in writing. Submitter Information Verification Submitter Full Name: Richard Roux Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Wed Jul 02 07:17:51 EDT 2014 Committee Statement Committee Statement: Response Message: The wording of was changed to be similar to the verbiage in the existing Section Public Comment No. 85-NFPA [Section No ]

11 8 of 128 9/23/2014 9:25 AM Second Revision No. 56-NFPA [ Section No ] Site-Specific Software. The requirements of shall apply to site-specific software For software-based systems, a copy of the site-specific software shall be provided to the system owner or owner s designated representative. The site-specific software documentation shall include either the system programming password or specific instructions on how to obtain the password from the system manufacturer A copy of the site-specific software shall be stored on-site in nonvolatile, nonerasable, nonrewritable memory. Submitter Information Verification Submitter Full Name: Lee Richardson Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Thu Jul 03 14:15:52 EDT 2014 Committee Statement Moved by SR-53 Committee Statement: Response Message: Moving the requirements for site-specific software to Chapter 7 with a reference to the appropriate section in Chapter 7 will improve usability of the Code by placing the site-specific software documentation requirements in the Documentation chapter. It is understood that SIG-TMS will retain control of any changes to the requirements. Refer to SR 53 for the relocated material.

12 3 of 128 9/23/2014 9:25 AM Second Revision No. 45-NFPA [ Section No. A ]

13 4 of 128 9/23/2014 9:25 AM A

14 5 of 128 9/23/2014 9:25 AM Table , Item 24. The extent of testing of a fire alarm or signaling system, including devices that were not tested, should be documented per in accordance with the Test Plan in NFPA 72 does not require testing of an emergency control function, such as elevator recall, but does require testing of the emergency control function interface device, such as the relay powered by the fire alarm or signaling system. Where the emergency control function is not being tested concurrent with the fire alarm or signaling system testing, measurement of the emergency control function interface device output should be verified using the proper test devices. This might require reading or observing the condition of a relay, a voltage measurement, or the use of another type of test instrument. Once testing is complete, verification that any disabled or disconnected interface devices have been restored to normal is essential, and this verification should be documented in the testing results. Testing of the emergency control functions themselves is outside of the scope of NFPA 72. A complete end-to-end test that demonstrates the performance of emergency control functions activated by the fire alarm or signaling system might be required by some other governing laws, codes, or standards, or the authority having jurisdiction. In that situation, other applicable installation standards and design documents, not NFPA 72, would address testing and performance of the emergency control functions. NFPA 3, Recommended Practice for Commissioning and Integrated Testing of Fire Protection and Life Safety Systems, provides guidance for integrated (end-to-end) testing of combined systems. The following excerpt from NFPA 3 includes guidance on when integrated testing should be performed. 7.2 Test Frequency. [3:7.2] In new construction, integrated testing of fire protection and life safety systems should occur following: (1) Verification of completeness and integrity of building construction (2) Individual system functional operation and acceptance as required in applicable installation standards tests (3) Completion of pre-functional tests of integrated systems [3:7.2.1] Existing fire protection and life safety systems should have periodic integrated testing. [3:7.2.2] Integrated systems that were commissioned upon installation in accordance with Chapter 6 should have integrated testing at the interval specified in the commissioning plan. [3: ] For integrated systems that were not commissioned, an integrated testing plan should be developed to identify the appropriate extent and frequency of integrated system testing. [3: ] In addition to periodic integrated testing, integrated system testing should be done when any of the following events occurs: (1) New component fire protection or life safety systems are installed and interconnected to existing fire protection and life safety systems. (2) Existing fire protection or life safety systems are modified to become components of interconnected systems. (3) Interconnections or sequence of operations of existing integrated fire protection and life safety systems are modified. [3:7.2.3] NFPA 3 also includes guidance on test methods for integrated testing. It is important to note that the appropriate NFPA standard would provide the acceptance criteria for the overall emergency control function operation requirements, including performance and test methods, whilenfpa 72 covers the required performance and testing of the emergency function interface device. For instance, if an end-to-end test for a building with an engineered smoke control system is required by some other governing laws, codes, standards, or the authority having jurisdiction, the test protocol would have unique criteria for the smoke control system design, and a special inspector would be responsible for the overall operation and performance of the smoke control system in accordance with the appropriate standard (NFPA 92, Standard for Smoke Control Systems, and NFPA 101, Life Safety Code ) during the testing, including measuring pressure differentials and ensuring proper fan and damper operation. Refer to the following extract from NFPA 101 on smoke control: System Designer. The engineer of record shall clearly identify the intent of the system, the design method used, the appropriateness of the method used, and the required means of inspecting, testing, and maintaining the system. [101:9.3.2] Acceptance Testing. Acceptance testing shall be performed by a special inspector in accordance with Section [101:9.3.3] Even though the fire alarm or signaling system initiating device might activate the smoke control system, the actual testing of the dampers and fan operation would be as required by the smoke control design and not part of the fire alarm or signaling system. Other emergency control operation requirements might be as follows: For fan shutdown and smoke damper operation, the fan and damper operations would be in accordance with NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, and NFPA 105, Standard for Smoke Door Assemblies and Other

15 6 of 128 9/23/2014 9:25 AM Opening Protectives, respectively, and those equipment operations would be verified by those responsible for HVAC systems in combination with the fire alarm system personnel. Guidance for elevator inspection and testing can be found in ASME A.17.2, Guide for Inspection of Elevators, Escalators and Moving Walks. For elevator systems, the recall function, elevator power shutdown, and hat illumination would be done with the elevator mechanics present during the test. This operational test is often accomplished during routine periodic fire alarm testing. For fire door holder and fire shutter release, it would be expected that the emergency control function operation of the doors/shutters would be verified in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives, and NFPA 101 during the test. In some cases, the door manufacturer representative might need to be present to reset the equipment. Guidance on documenting and handling of faults, failures, and corrective action for integrated testing can be found in of NFPA 3. Table Item 22(a) and 22(b) If during the course of the periodic test of audible appliances, it is suspected that alarm sound levels could be lower than the required minimum, the building system owner or the system owner's designated building representative should be notified in writing. Such notification will allow the building owner or designated building representative to determine whether sound pressure level readings should be taken for the area(s) in question. Submitter Information Verification Submitter Full Name: Richard Roux Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Wed Jul 02 07:21:35 EDT 2014 Committee Statement Committee Statement: Language was changed to use "system owner or the system owner's designated representative", which correlates the terminology used in other locations within NFPA 72. The TC also added "in writing" to clarify the medium of notification. Response Message: Public Comment No. 86-NFPA [Section No. A ]

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

NFPA 72 Code Changes vs 2013

NFPA 72 Code Changes vs 2013 NFPA 72 Code Changes - 2010 vs 2013 AFAA-NE Westborough, MA February 7, 2018 Richard Roux NFPA 72 National Fire Alarm and Signaling Code Overview and 2013 Changes NFPA 72 1993 Edition Aug 20, 1993 1996

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

First Revision No. 158-NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No. 158-NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 326 11/21/2013 1:03 PM First Revision No. 158-NFPA 72-2013 [ Global Input ] Revise 2.3.1 to update UL 864 to "2003, revised 2012" and upate ANSI/ASME A17 to 2013. Submittal Date: Wed Sep 11 11:08:52

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN) 4 of 326 11/21/2013 1:03 PM First Revision No. 161-NFPA 72-2013 [ Section No. 3.3.11 ] 3.3.11 Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Testing and Maintenance

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

NFPA Changes

NFPA Changes Chapter 21, Emergency Control Functions and Interfaces Summary. Chapter 21 is new. These requirements were formerly found in Chapter 6, Protected Premises Fire Alarm Systems. The term fire safety function

More information

Second Revision No. 2-NFPA [ Section No ]

Second Revision No. 2-NFPA [ Section No ] Page 1 of 8 Second Revision No. 2-NFPA 410-2014 [ Section No. 10.2 ] 10.2* Fire Extinguishers. In addition to extinguishers required by NFPA 409, extinguishers shall be provided for aircraft maintenance

More information

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM 2 of 326 11/21/2013 1:03 PM First Revision No. 82-NFPA 72-2013 [ Section No. 2.3.4 ] 2.3.4 ISO Publications. International Organization for Standardization, 1, ch. de la Voie-Creuse, Case postale 56, CH-1211

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical self-closing device

More information

Page 1 of 40 First Correlating Revision No. 15-NFPA 72-2014 [ Global Input ] 10.5.4 Plans Examiners and Inspectors. 10.5.4.1 Fire alarm system and emergency communications system plans and specifications

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Protected Premises Fire Alarm

More information

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS 2013 Randal Brown & Associates Engineering Ltd. 1 RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001-11 INTEGRATED

More information

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Supervising Station

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline Moreno Valley Fire Department Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 8, 2017 Alarm & Signaling Systems PURPOSE Fire alarm and signaling systems are designed to

More information

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

WORKING DRAFT OF COMMITTEE MEETING OUTPUT WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 221 Revision Cycle: A2014 Meeting Date: 5/20/2013

More information

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) National Capital Region

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement 10/20/ :03 AM

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement 10/20/ :03 AM of 496 10/20/2016 11:03 AM First Revision No. 2501-NFPA 72-2016 [ Global Input ] Any place in the body of Chapter 18 or its annex that the value 0.0375 lumens/ft 2 is used the metric equivalent shall be

More information

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016 Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting Prepared Especially for : OSFM TEC 2016 Acceptance Testing 11-2008 Agenda Before you begin Completing the

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY

More information

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement Second Revision No. 5501-NFPA 5000-2016 [ New Section after 29.2.1.2 ] 29.2.1.3 Bathtubs, bathtub-shower combinations, and nonemergency showers shall be provided with grab bars in accordance with the provisions

More information

1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ]

1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ] National Protection Association Report http://submittals.nfpa.org/terraviewweb/formlaunch?id=/terraview/c... 1 of 4 10/26/2015 1:58 PM Committee Input No. 3514-NFPA 5000-2015 [ Section No. 8.7.2 ] National

More information

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Notification Appliances for

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Notification Appliances

More information

Addressing Sound Masking Requirements in the National Fire Alarm and Signaling Code and UL Standards

Addressing Sound Masking Requirements in the National Fire Alarm and Signaling Code and UL Standards Addressing Sound Masking Requirements in the National Fire Alarm and Signaling Code and UL Standards Wayne D. Moore, P.E., CFPS, SET Vice President JENSEN HUGHES 117 Metro Center Boulevard, Suite 1002

More information

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018 STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018 STANDARD INFORMATION Standard Number: NFPA 72 Standard Name: National Fire Alarm and Signaling Code Standard Edition and Issue Date: 2016 Edition

More information

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting.

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. Input No. 7-NFPA 80-2013 [ Section No. 3.3.8 ] 3.3.8 Automatic Fire Detector. A device designed to detect the presence of a fire signature and to initiate action. For the purpose of this standard, automatic

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

Bold items are particular to the City of Euless

Bold items are particular to the City of Euless EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 8/2004 Fire Chief Lee Koontz Fire Marshal Paul Smith EFD-FMO 3-1 2003 International Fire & Building Code as Amended NFPA Standards

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 43 10/20/2015 4:02 PM First Revision No. 2035-NFPA 101-2015 [ Global Input ] To 14.3.4.4.1, add an item (4) to read: (4) Carbon monoxide detectors shall be installed centrally located within occupiable

More information

FIRE & LIFE SAFTEY STANDARD

FIRE & LIFE SAFTEY STANDARD Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications

More information

Circulation Report for SIG-TMS Comments Document # 72

Circulation Report for SIG-TMS Comments Document # 72 1 72-12 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 209 ) 72-13 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 234 ) 72-15

More information

rpsa FIRE PROTECTION ENGINEERS

rpsa FIRE PROTECTION ENGINEERS FIRE PROTECTION ENGINEERS R.P. SCHIFILITI ASSOCIATES, INC. P.O. Box 297 Reading, Massachusetts 01867-0497 USA 781.944.9300 Fax / Data 781.942.7500 Telephone Elevator Fire Safety: Elevator Recall and Elevator

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Testing and Maintenance

More information

Please think twice about printing this matrix. You can it, along with your ballot to or

Please think twice about printing this matrix. You can  it, along with your ballot to or Page Line Clause E/G Organization Comment (rationale) ii Foreword E GWM Recommend inserting the following text between the first and second paragraphs, Fire Alarm Systems shall be installed in accordance

More information

The Technical Committee on Commissioning and Integrated Testing

The Technical Committee on Commissioning and Integrated Testing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: FROM: The Technical Committee on Commissioning and Integrated Testing

More information

Second Revision No. 102-NFPA [ Global Comment ] Submitter Information Verification. Committee Statement

Second Revision No. 102-NFPA [ Global Comment ] Submitter Information Verification. Committee Statement of 1 9/22/2014 12:54 PM Second Revision No. 102-NFPA 72-2014 [ Global Comment ] 10.12.2 Visible notification appliances, textual visible notification appliances, and speaker notification appliances located

More information

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Rancho Cucamonga Fire Protection District Prevention Bureau Standard Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Updated: December 2016 for consistency

More information

Committee Input No. 28-NFPA 13R-2013 [ Global Input ]

Committee Input No. 28-NFPA 13R-2013 [ Global Input ] Page 1 of 6 Committee Input No. 28-NFPA 13R-2013 [ Global Input ] 6.2.2 Outside Dwelling Units. 6.2.2.1 All sprinklers used outside of the dwelling units shall be in accordance with 6.2.2 7.2 and 7.3.

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

Page 1 of 10 Second Revision No. 8-NFPA 600-2014 [ Section No. 3.3.17 ] 3.3.17* Incident Management System (IMS). A system that defines the roles and responsibilities to be assumed by responders and the

More information

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety Div B 3.2.1.1.(4), (5) & (6) Exceptions in Determining Building Height BCBC1998-3.2.1.1.(4), (5) & (7) replace (harmonize with NBC) - NBC 2005 has significant revisions to provisions for mezzanines. These

More information

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.017 Version 2 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group

More information

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018) M EM O RA N D UM TO: FROM: DATE: SUBJECT: Correlating Committee on Combustible Dusts Yiu Lee, Project Administrator January 27, 2017 NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

More information

M E M O R A N D U M. NFPA Technical Committee on Fire Safety and Emergency Symbols. NFPA 170 Second Draft TC FINAL Ballot Results (F2014)

M E M O R A N D U M. NFPA Technical Committee on Fire Safety and Emergency Symbols. NFPA 170 Second Draft TC FINAL Ballot Results (F2014) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Fire Safety

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure

More information

Liberty Township Fire Department Fire Prevention Bureau. Clean Agent Fire Protection Plan Submittal Checklist

Liberty Township Fire Department Fire Prevention Bureau. Clean Agent Fire Protection Plan Submittal Checklist Liberty Township Fire Department Fire Prevention Bureau Clean Agent Fire Protection Plan Submittal Checklist Project Name: Date: Project Address: Designers Name: Company Name: Phone Number: Email: Fax:

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 47 10/21/2015 9:37 AM First Revision No. 5041-NFPA 101-2015 [ Global Input ] Throughout the document, change electrically controlled egress door assemblies to door hardware-release of electrically locked

More information

Fire Alarm Inspection, Testing, Maintenance. Assuring the System s Operational Reliability

Fire Alarm Inspection, Testing, Maintenance. Assuring the System s Operational Reliability Fire Alarm Inspection, Testing, Maintenance Assuring the System s Operational Reliability What does AFAA-NE do? Education We supply the tools our members require to perform within the guidelines of our

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015 CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015 Fire Commissioning in Canadian Codes and Standards BACKGROUND Why Commissioning?

More information

MEMORANDUM. Technical Committee on Fundamentals of Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Fundamentals of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Fundamentals of Fire Alarm

More information

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used. PART 1 GENERAL 1.01 Scope of Standard A. This Standard is intended to assure that fire alarm and signaling systems at Sam Houston State University provide the highest level of life safety possible. This

More information

First Revision No. 339-NFPA [ Section No. 2.2 ]

First Revision No. 339-NFPA [ Section No. 2.2 ] 8 of 326 11/21/2013 1:03 PM First Revision No. 339-NFPA 72-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Notification

More information

ICC CODE CORNER 2012 IFC Code & Commentary

ICC CODE CORNER 2012 IFC Code & Commentary 907.7 Acceptance tests and completion. Upon completion of the installation, the fire alarm system and all fire alarm components shall be tested in accordance with NFPA 72. A complete performance test of

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

First Revision No. 88-NFPA [ Section No. 2.4 ] Submitter Information Verification. Committee Statement. 3 of /21/2013 1:03 PM

First Revision No. 88-NFPA [ Section No. 2.4 ] Submitter Information Verification. Committee Statement. 3 of /21/2013 1:03 PM 3 of 326 11/21/2013 1:03 PM First Revision No. 88-NFPA 72-2013 [ Section No. 2.4 ] 2.4 References for Extracts in Mandatory Sections. NFPA 70, National Electrical Code, 2011 2014 edition. NFPA 96, Standard

More information

Proposed Changes to NFPA

Proposed Changes to NFPA 2017 NFPA Conference & Expo Proposed Changes to NFPA 72-2019 Presented by: Manuelita David (SIG-FUN), Jensen Hughes Warren Olsen (SIG-SSS), Fire Safety Consultants, Inc. Merton Bunker (SIG-AAC), EYP Architecture

More information

Committee Input No. 9-NFPA [ Global Input ] Supplemental Information. Submitter Information Verification. Committee Statement

Committee Input No. 9-NFPA [ Global Input ] Supplemental Information. Submitter Information Verification. Committee Statement Committee Input No. 9-NFPA 2001-2016 [ Global Input ] Incorporate revisions per the attached file. Supplemental Information File Name 2001-CI_9.pdf Description Data and specific revisions presented at

More information

ALARM SYSTEMS AND EVACUATION PLANS SELF INSPECTION CHECKLIST

ALARM SYSTEMS AND EVACUATION PLANS SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ALARM SYSTEMS AND EVACUATION PLANS Guidelines: This checklist covers regulations issued

More information

AGENDA NFPA TECHNICAL COMMITTEE ON NOTIFICATION APPLIANCES. Report on Comments Meeting, October 13-14, Richmond Marriott, Richmond, VA

AGENDA NFPA TECHNICAL COMMITTEE ON NOTIFICATION APPLIANCES. Report on Comments Meeting, October 13-14, Richmond Marriott, Richmond, VA National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org AGENDA NFPA TECHNICAL COMMITTEE ON NOTIFICATION APPLIANCES Report on Comments

More information

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities Fire Alarm and Signaling Code Overview NFPA 72-2010 usa.siemens.com/infrastructure-cities Siemens Building Technologies, Inc. is a Registered Provider with The American Institute of Architects Continuing

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

The 2013 National Fire Alarm and Signaling Code

The 2013 National Fire Alarm and Signaling Code ARE YOU A MEMBER OF AFAA? WHY SHOULD YOU BE A MEMBER BECAUSE YOUR BUSINESS IS IMPORTANT James Mongeau The 2013 National Fire Alarm and Signaling Code 1 NFPA 72 Organization Be*er organiza2on Easier to

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

MNEC NFPA 72 WHITE PAPER

MNEC NFPA 72 WHITE PAPER MNEC NFPA 72 WHITE PAPER In 2010, the National Fire Protection Assocation (NFPA), significantly changed their code # 72 (National Fire Alarm Code) and has forever improved the importance of communicating

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Protected Premises

More information

Unified Fire Authority - Fire Prevention Bureau

Unified Fire Authority - Fire Prevention Bureau Unified Fire Authority - Fire Prevention Bureau FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM RECORD OF COMPLETION To be completed by the system installation contractor at the time of system acceptance

More information

Australian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS

Australian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS AS 1670 1986 Australian Standard Automatic fire detection and alarm systems System design, installation, and commissioning This Australian standard was prepared by Committee FP/2, Automatic Fire Detection

More information

Audio Verified Alarms Best Practices

Audio Verified Alarms Best Practices Audio Verified Alarms Best Practices April 2015 PPVAR Audio Verification Committee Table of Contents PPVAR Audio Verification Committee..2 1. Introduction... 3 2. Scope... 3 3. Glossary... 4-5 4. Training

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

MEMORANDUM. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Initiating Devices for Fire

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition Copyright National Fire Protection Association 2013. All rights reserved. This copy is solely for your personal, noncommercial use in connection with participation in the NFPA Standards Development Process.

More information

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course Florida Building Code 2010 Chapter 9 Fire Protection Systems Advanced Course 1 Introduction This course will cover specific sections of Chapter 9 that relate to fire alarm systems. While many contractors

More information

Florida Building Code 2010

Florida Building Code 2010 Introduction Florida Building Code 2010 Chapter 9 Fire Protection Systems This course will cover specific sections of Chapter 9 that relate to fire alarm systems. While many contractors are familiar with

More information

Page 1 of 31 Second Revision No. 1-NFPA 80-2014 [ Section No. 2.3.2 ] 2.3.2 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A36/A36M,

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2 Architectural & Engineering Specifications Control Panel 1.0 GENERAL... 2 1.1 SCOPE OF WORK... 2 1.1.1 Introduction... 2 1.2 GENERAL CONDITIONS... 2 1.2.1 After-Sales Support... 2 1.2.2 Quality assurance...

More information

Page 1 of 12 Input No. 62-NFPA 409-2013 [ Section No. 3.3.9 ] 3.3.9 Hangar Building Cluster. A group of buildings with more than one area for the storage and servicing of aircraft and all attached or contiguous

More information

APPENDIX H (DESIGN SUBMISSION CRITERIA)

APPENDIX H (DESIGN SUBMISSION CRITERIA) APPENDIX H (DESIGN SUBMISSION CRITERIA) FIRE ALARM SYSTEM As per ACCORD standard Part 5, section 5.7 Fire Alarm System Design to be verified by ACCORD Chief Safety Inspector. Testing of the installation

More information

SECTION SECURITY TESTING AND COMMISSIONING

SECTION SECURITY TESTING AND COMMISSIONING SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,

More information

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 2-NFPA 73-2014 [ Section No. 4.1.3 ] 4.1.3 Unused Openings. 4.1.3.1 Unused openings, other than those intended for the operation of equipment, those intended for mounting purposes, or

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,

More information