1 PART 4 ELECTRICAL STANDARDS

2 1.0 INTRODUCTION AND SCOPE: These standards reflect the general requirements and recommendations of elevator contractors, with respect to the power distribution system to achieve acceptable elevator performance. Additional requirements will be found on the Power Supply Confirmation Data Form. 1.1 Design Responsibility and System Boundary Point: The requirements and recommendations of these standards represent design and installation responsibility for the contractor(s) who design and install the building or site electrical distribution system. Because of design requirements and electrical contractor(s) responsibility for coordination with other building loads, it is necessary to define and agree upon the boundaries of responsibility between electrical contractor, and elevator installer. The defined boundary of responsibility for the elevator installer is at the mainline input power terminals to the elevator equipment. The electrical contractor is responsible for all electrical power system design up to the elevator equipment, including the appropriate location of the point of common coupling for other building loads that might be influenced by harmonic distortion. See AC Line Distortion Tutorial in NEII 1, Part 4 for recommendations on point of common coupling. 2.0 VOLTAGE: Nominal System Voltage. 208, 240, 480, Phase, 3 live phases plus a ground, Main Elevator Feeders Phase (See 11.0, Additional Power). 3.0 VOLTAGE VARIATION: The actual continuous service voltage supplied to the elevator equipment (measured at per car Mainline Disconnecting Means) should be at the nominal system voltage. Under all load conditions short duration voltage variations must be limited to the maximum and minimum values found on the appropriate Power Supply Confirmation Data Form, inclusive of voltage drop. Continuous operation of equipment at or near the maximum or minimum values may result in reduction of equipment life. 4.0 VOLTAGE BALANCE: Maximum deviation from the average voltage, divided by the average voltage times 100. Phase to Phase 5% Phase to Neutral 5% 5.0 NOMINAL FREQUENCY: Confirmed at site. 60 Hz 50 Hz 6.0 FREQUENCY TOLERANCE: ± 2% with a maximum Slew Rate (the rate of change of frequency with respect to time) of 5 Hz/s. For static DC control 1 Hz/s maximum (continuous) 3.5 Hz/s maximum (10 cycles maximum transient). 7.0 HARMONIC DISTORTION: Solid-state power converters used in elevator control panels generate line current harmonics and line voltage distortion. See AC Line Distortion Tutorial in NEII-1, Part 4. Equipment that is sensitive to these distortions should be properly isolated from the elevator feeders. 8.0 CONDUCTORS: Ampacity of conductors is determined by the electrical contractor per NFPA 70 and/or local code requirements, based on information provided on the Power Supply Confirmation Data Form. 9.0 CONDUCTOR BRACING: Recommend conductor bracing to avoid unwanted noise being emitted from raceway MAIN LINE DISCONNECTING MEANS: Size and locate the fused Main Line Disconnect switch or circuit breaker in accordance with NFPA 70. Fuses are to be current limiting class RK1 or equivalent. Circuit breakers are to have current limiting characteristics equivalent to RK1 fuses ADDITIONAL POWER: Requirements for additional supplies will vary with the type of equipment. These are typically single phase, 125 Vac (nominal) 15A or 20A circuits. The additional supplies are used for: 11.1 Machinery Spaces, Machine Rooms, Control Spaces and Control Rooms: Lighting per ASME A17.1/CSA B44, Section 2.7 and 125 V duplex receptacle Secondary Level Rooms: Lighting per ASME A17.1/CSA B44, Section 2.7 and 125 V duplex receptacle. Page Oct-13

3 11.3 Elevator Pit: Adequate illumination with switch near entrance and 125 V duplex receptacle (ASME A17.1/CSA B44, Section 2.2.5) Car: Separate 125 V feed with disconnecting means in machinery space, machine room, control space or control room to each elevator. The car lighting branch circuit is not required to be provided with ground-fault circuit-interrupter (GFCI) protection for personnel Other: Elevator contractor should identify any other additional circuits or requirements for their equipment (e.g. intercom systems, console panels, car receptacles, etc.) Receptacles: 125 V receptacles must be provided with ground fault circuit interrupter protection, where required by NFPA 70, Article 620 Note: A single receptacle supplying a permanently installed sump pump (in pits) does not require GFCI protection. It is recommended that the sump pump receptacle not be provided with GFCI protection ADDITIONAL WIRING: 12.1 Guidelines for Initiating Devices for Phase I Emergency Recall Operation: Installed in compliance with NFPA 72. See ASME A17.1/CSA B44, Section Elevator control circuits must functionally interface with fire alarm initiating devices as required by ASME A17.1/CSA B44, As a life-safety system, the integrity of the signalization from the fire alarm system is very important. The wiring practices of the interface circuits between the fire alarm system and the elevator control circuits is governed by NFPA NFPA 72 requires that the field installed wiring between the fire alarm control unit and the elevator control circuit interface be monitored for signal integrity. The design for monitoring is the responsibility of the fire alarm system contractor Furthermore, to maintain the signal integrity on the elevator side of the interface, relays or modules must be placed in a secure location per NFPA 72, so that the wiring from the interface relay or module is unlikely to be subjected to external faults NFPA requires such interface relays or modules to be physically located within three feet of the controlled circuit. Practically, this means that the field installed wiring is either by direct entry in dedicated conduit to the elevator controller, or within the confines of the elevator machine room, control room, or control space (e.g. within wiring duct). See diagram 12.1 for an illustration of incorrect and correct interface wiring practices Communications: Communication lines, one per car, to be brought into the machine room by others, for hookup by the elevator contractor ALTERNATE POWER REQUIREMENTS: 13.1 Alternate power may be either standby or emergency. The requirements specified for standby power and emergency power shall conform to NFPA 70 and local code. For example, display of car position at fire command station Elevator contractors require that the standby (emergency) power system be sized to provide the required operation of the elevators The maximum electrical demand on the standby (emergency) power system depends upon the number of elevators to be simultaneously started. The required per car starting/acceleration power is provided by the elevator contractor on the Power Supply Confirmation Data Forms The duration of the accelerating load on the standby (emergency) power system varies depending on elevator contract speed. It is important to note that the accelerating load on the power system can persist for periods of several seconds each time the elevator(s) runs The standby (emergency) power system must be capable of absorbing the regenerative power from the elevators, in compliance with NFPA 70, Article 620, to prevent overspeed during regeneration. The maximum per car regenerative power is provided by the elevator contractor on the Power Supply Confirmation Data Forms For standby (emergency) power operation of one car out of a group, avoid reducing the size of the standby (emergency) power feeders and the protective device. Static power converters usually have isolation or autotransformers. Each car's transformer may remain connected to the line. On energizing, the transformers have large peak magnetizing in-rush currents lasting for several cycles of the ac line. A reduced size circuit breaker will likely trip ADDITIONAL DISCONNECTING MEANS: When sprinklers are provided in an elevator machinery space, machine room, control space, or control room, or hoistway see ASME A17.1/CSA B44, Section for requirements POWER DISTRIBUTION SYSTEM: 15.1 NFPA 70 requires all main feeder and branch circuit full load, starting and accelerating currents of the elevator(s) electrical system must be completely coordinated with the time-current characteristic of the elevator(s) branch circuit protection device(s). Also, the short circuit component of elevator(s) main, feeder and branch circuit device(s) must be coordinated. In particular, the time-current characteristics thermal, thermal magnetic or magnetic branch circuit protection 30-Oct-13 Page 4-3

4 devices that service main, feeder and branch circuits must be analyzed for compliance with selective coordination. The omission of selective coordination will result in a total or partial elevator system blackout In addition to selective coordination of main, feeder and branch circuit protection devices, electronically controlled circuit protection devices should be rms current sensing to avoid nuisance tripping. Electronically controlled circuit protection devices which are not rms current sensing may trip under normal operating conditions as a result of measuring peak or harmonic currents of variable voltage and/or variable frequency elevator drives. The application of electronic circuit protection devices with solid-state elevator drive systems should be verified with the device manufacturer When variable frequency drives are used to control ac motors and a ground fault or earth leakage device is provided, it should be specified as "Product For Inverter Use" or be designed so that its sensitivity is reduced at high frequencies REFERENCES: 16.1 The following Codes and Standards are referenced: Safety Code for Elevators and Escalators, ASME A17.1/CSA B National Electrical Code, NFPA National Code, NFPA Power Supply Confirmation Data Forms: An information bulletin that states the characteristics of the equipment's electrical load demand upon the power supply system. It is intended as a "Universal Approach" which all elevator contractors can use to obtain required information prior to manufacture and to establish the conditions expected as part of the elevator, escalator or moving walk installation. Page Oct-13

5 DIAGRAM 12.1(a) Elevator Control Enclosure Initiating Devices INCORRECT METHOD Unsupervised wiring is subject to faults or external disturbance. Signal integrity not assured. 30-Oct-13 Page 4-5

6 DIAGRAM 12.1(b) Initiating Devices Shortest Practical Distance Elevator Control Enclosure MAIN Elevator Control Room, Control Space, Machinery Room, Machinery Space, Hoistway All Other Levels Relays and/or s are located outside of restricted spaces such as the hoistway or pit. Initiating Devices Control Panel Shortest Practical Distance Annunciator(s) Elevator Control Enclosure MAIN Control Panel Elevator Control Room, Control Space, Machinery Room, Machinery Space, Hoistway All Other Levels Annunciator(s) Correct Methods Installed wiring is supervised and monitored between the fire alarm system and the fire alarm interface. Signals to elevator control circuits are secure due to close proximity to elevator control enclosure. Signal Integrity is assured. Page 4-6 NEII , National Elevator Industry Inc., Salem, NY. NEII and NEII logo Registered, U.S. Patent and Trademark Office. 18-Nov-11

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 12/23/16 Rev 9 UltraLITE Model ELU General Specification 4.2 KW to 5 KW UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 1.0 General General Specification This specification describes

More information

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations... Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6

More information

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems 5/25/16 rev 6 elite Model ELN General Specification 550 W to 1.5 KW elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems 1.0 General General Specification This specification

More information

Interfacing Fire Alarm, Sprinkler and Elevator Systems

Interfacing Fire Alarm, Sprinkler and Elevator Systems 1 Interfacing Fire Alarm, Sprinkler and Elevator Systems Rodger Reiswig, SET Director, Industry Relations SimplexGrinnell November 17, 2010 Interfacing to Elevators 2 ASME A17.1 Safety Code for Elevators

More information

CONTENTS AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19 TABLE OF CONTENTS About This Textbook...xiii How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase

Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase General Specification 550 VA/Watts 1300 VA/Watts 1.0 GENERAL This specification defines the electrical and mechanical characteristics

More information

Introduction Limited-Use / Limited-Application

Introduction Limited-Use / Limited-Application NBL DEC 2015 V1 Introduction Niagara Belco Ltd has been in the elevating industry for 30 years, we take pride in our work and aim to please all of our customers. We appreciate your business and always

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.

9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc. Chapter 1 GROUNDING AND BONDING 1 Proper grounding practices protect people from the hazards of electric shock and ensure the correct operation of overcurrent protection devices. Grounding is the intentional

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 7 Test Requirements for Statical Converters with Semi-Conductors Edition

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

SECTION POWER SUPPLIES AND DISTRIBUTION

SECTION POWER SUPPLIES AND DISTRIBUTION SECTION 17460 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for Power Supplies and Power Distribution for Station communications. 1.02 REFERENCE STANDARDS A. American National Standards

More information

Functional Performance Test

Functional Performance Test Fire Alarm Control Panel & Fire Alarm Annunciator Panel Notify all building occupants that testing will be conducted. Fire alarm contractor shall have personnel with 2-way radios at the fire alarm control

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

Installation Guide for models:

Installation Guide for models: 140 58th St. Brooklyn, NY Access Power Controllers with Power Supplies Installation Guide for models: Maximal3FD - 12VDC @ 4.6 amp or 24VDC @ 5.2 amp. - Sixteen (16) PTC protected power-limited outputs.

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual ITC 2000 HEATING CONTROL CABINET Installation & Operation Manual VTI, Incorporated 24 McMillan Way Newark, DE 19713 Phone (302) 738 0500 FAX (302) 738 6594 Revision Level 0.03 Manual No. 90003314 June,

More information

Installation Guide for models:

Installation Guide for models: 140 58th St. Brooklyn, NY Access Power Controllers with Power Supplies Installation Guide for models: Maximal11F - Power Supply 1: 12VDC @ 3.3 amp or 24VDC @ 3.6 amp. - Power Supply 2: 12VDC @ 3.3 amp

More information

National Electrical Code

National Electrical Code National Electrical Code 409.30 Disconnecting Means Disconnecting means that supply motor loads shall comply with Part IX of Article 30. 410.81 Control (A) Disconnection Luminaires (fixtures) or lamp installation

More information

Fire Alarm System Fundamentals

Fire Alarm System Fundamentals Fire Alarm System Fundamentals Mircom is the largest and oldest privately owned fire alarm and life safety manufacturer in North America and 5th largest overall with 50 years of industry experience. Mircom

More information

Remote NAC Power Supply D7038

Remote NAC Power Supply D7038 Operation and Installation Guide Remote NAC Power Supply D7038 D7038 REMOTE NAC POWER SUPPLY Page 2 2005 Bosch Security Systems Contents Contents 1.0 Overview...5 1.1 Module Control...5 1.1.1 Option Bus

More information

Chapter 1 General... 5

Chapter 1 General... 5 About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of

More information

www. ElectricalPartManuals. com GADD MKIII Ground Fault Indication System Instruction Manual Ground Fault Protection

www. ElectricalPartManuals. com GADD MKIII Ground Fault Indication System Instruction Manual Ground Fault Protection Ground Fault Protection GADD MKIII Ground Fault Indication System Instruction Manual 7615 Kimbel Street, Mississauga, Ontario Canada L5S 1A8 Tel: (905)673-1553 Fax: (905)673-8472 Toll Free: 1-888-RESISTR

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with

More information

PSN-1000 & PSN 1000(E) Installation Manual

PSN-1000 & PSN 1000(E) Installation Manual PSN-1000 & PSN 1000(E) Installation Manual Potter Electric Signal Company, LLC St. Louis, MO Customer Service: (866) 240-1870 Technical Support: (866) 956-1211 Fax: (314) 595-6999 www.pottersignal.com

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES SECTION 26 36 23 AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

Model 17A00 Expansion Enclosure

Model 17A00 Expansion Enclosure HOME AUTOMATION, INC. Model 17A00 Expansion Enclosure Installation Manual Document Number 17I00-1 Rev A March, 2002 Home Automation, Inc. Model 17A00 Expansion Enclosure Installation Manual Document Number

More information

SECTION ELECTRIC TRACTION ELEVATORS PART 1 GENERAL 1.01 SUMMARY. A. Section Includes: Electric Traction Elevators.

SECTION ELECTRIC TRACTION ELEVATORS PART 1 GENERAL 1.01 SUMMARY. A. Section Includes: Electric Traction Elevators. SECTION 142200 - ELECTRIC TRACTION ELEVATORS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Electric Traction Elevators. B. Products Supplied But Not Installed Under this Section: 1. Hoist Beam 2. Pit

More information

CHAPTER 20 SERVICE EQUIPMENT

CHAPTER 20 SERVICE EQUIPMENT SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control

More information

Step by Step Detailed Procedure Expected Result Observations Verify power off at all loads on emergency power. Verify all loads have power.

Step by Step Detailed Procedure Expected Result Observations Verify power off at all loads on emergency power. Verify all loads have power. 1. ATS Breaker Open ATS Breaker Verify power off at all loads on emergency power. Close ATS Breaker & put ATS Sw. to Auto Verify all loads have power. 2. Generator Cold Open normal power breaker & immediately

More information

SECTION INTERIOR LIGHTING

SECTION INTERIOR LIGHTING SECTION 26 51 00 INTERIOR LIGHTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1 Description. 2 Specifications. HP600ULM Access Control Power Supply/Charger with Power Distribution Controller PN 52393:A 1/05/06 ECN

1 Description. 2 Specifications. HP600ULM Access Control Power Supply/Charger with Power Distribution Controller PN 52393:A 1/05/06 ECN Honeywell 12 Clintonville Road Northford, CT 06472 http://www.honeywellpower.com HP600ULM Access Control Power Supply/Charger with Power Distribution Controller PN 52393:A 1/05/06 ECN 04-350 Product Installation

More information

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD PART 1 - GENERAL PURPOSE This Standard is intended to assure that fire detection/alarm systems at The University of Texas at Austin provide the highest level of fire safety possible. SCOPE This standard

More information

www. ElectricalPartManuals. com GADP Ground Fault Indication System Instruction Manual Ground Fault Protection

www. ElectricalPartManuals. com GADP Ground Fault Indication System Instruction Manual Ground Fault Protection Ground Fault Protection GADP Ground Fault Indication System Instruction Manual 7615 Kimbel Street, Mississauga, Ontario Canada L5S 1A8 Tel: (905)673-1553 Fax: (905)673-8472 Toll Free: 1-888-RESISTR 737-4787

More information

Microgrid Fault Protection Based on Symmetrical and Differential Current Components

Microgrid Fault Protection Based on Symmetrical and Differential Current Components Microgrid Fault Protection Based on Symmetrical and Differential Current Components Prepared for Public Interest Energy Research California Energy Commission Prepared by Hassan Nikkhajoei and Robert H.

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

Electrical Safety Through Design. Mersen EP formerly Ferraz Shawmut

Electrical Safety Through Design. Mersen EP formerly Ferraz Shawmut Electrical Safety Through Design Mersen EP formerly Ferraz Shawmut Agenda Who is Mersen? Selective Coordination Code Requirements Coordination Made Easy Mitigating Arc Flash Energy on Transformer Secondary

More information

4100U City and Relay Cards Installation Instructions

4100U City and Relay Cards Installation Instructions 4100U City and Relay Cards Installation Instructions Introduction This publication describes the installation procedure for the following: 4100-6031/6032 City Circuit Cards 4100-6033 Alarm Relay Card Inspecting

More information

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev Installation Guide for AL600ULM Multi-Output Access Control Power Supply Charger Rev. 091800 1 AL600ULM - Multi-Output Access Control Power Supply/Charger Overview: The AL600ULM multi-output access control

More information

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM SECTION 48 14 14 SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES The work of this section consists of furnishing a complete Solar Photovoltaic (PV) Power Generation

More information

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.01 SUMMARY SECTION 26 22 00 (16460) - LOW-VOLTAGE TRANSFORMERS A. Section Includes: 1. Dry-Type Distribution And Specialty Transformers Rated 1000 V And Less. a. General-Purpose Distribution

More information

PART GENERAL 1.01 SECTION INCLUDES

PART GENERAL 1.01 SECTION INCLUDES Specification Number: 26 24 16.06 Product Name: Emergency Lighting Control NQ Circuit Panelboards: 240 Vac, 48 Vdc Maximum SECTION 26 24 16.06 Emergency Lighting Control NQ Circuit Panelboards: 240 Vac,

More information

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 It has come to the attention of the electrical authorities having jurisdiction (AHJs) at the DOE sites there is inconsistency

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

NECA 169. Standard for Installing and Maintaining Arc-Fault Circuit Interrupters (AFCIs) and Ground-Fault Circuit Interrupters (GFCIs)

NECA 169. Standard for Installing and Maintaining Arc-Fault Circuit Interrupters (AFCIs) and Ground-Fault Circuit Interrupters (GFCIs) NECA 169 Standard for Installing and Maintaining Arc-Fault Circuit Interrupters (AFCIs) and Ground-Fault Circuit Interrupters (GFCIs) Industry Review Draft (Date TBD) National Electrical Installation Standards,

More information

For a red enclosure add an R suffix to the part # e.g. eflow4na8r. Altronix Corp th St. Brooklyn, NY. Installing Company: Service Rep.

For a red enclosure add an R suffix to the part # e.g. eflow4na8r. Altronix Corp th St. Brooklyn, NY. Installing Company: Service Rep. Power Supply/Chargers Installation Guide Models Include: eflow4na8-4a @ 12VDC or 24VDC - Eight (8) Fused Outputs eflow6na8-4a @ 12VDC or 24VDC - Eight (8) Fused Outputs eflow102na8-10a @ 12VDC - Eight

More information

Reyrolle Protection Devices. 7PG26 DAD High Impedance Current Relay. Answers for energy

Reyrolle Protection Devices. 7PG26 DAD High Impedance Current Relay. Answers for energy Reyrolle Protection Devices 7PG26 DAD High Impedance Current Relay Answers for energy Siemens Protection Devices Limited 2 7PG26 DAD High Impedance Circulating Current Relay Description The type DAD relay

More information

50M Integrated Single or Two-Stage HSI Integrated Furnace Control Kit INSTALLATION INSTRUCTIONS

50M Integrated Single or Two-Stage HSI Integrated Furnace Control Kit INSTALLATION INSTRUCTIONS 50M56-743 Integrated Single or Two-Stage HSI Integrated Furnace Control Kit INSTALLATION INSTRUCTIONS FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD

More information

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

CAUTION WARNING. 50T Integrated Furnace Control INSTALLATION INSTRUCTIONS DESCRIPTION PRECAUTIONS

CAUTION WARNING. 50T Integrated Furnace Control INSTALLATION INSTRUCTIONS DESCRIPTION PRECAUTIONS 50T35-743 Integrated Furnace Control INSTALLATION INSTRUCTIONS FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD CAUSE PERSONAL INJURY AND/OR PROPERTY

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install automatic transfer switch (ATS) with number of poles, amperage, voltage and withstand current ratings as shown

More information

Molded Case Circuit Breakers, Bulletin 140G

Molded Case Circuit Breakers, Bulletin 140G ROCKWELL AUTOMATION PROCUREMENT SPECIFICATION PROCUREMENT SPECIFICATION Molded Case Circuit Breakers Bulletin 140G NOTICE: The specification guidelines in this document are intended to aid in the specification

More information

CNA-Series - Large Industrial Heaters Tankless Water Heating Solutions

CNA-Series - Large Industrial Heaters Tankless Water Heating Solutions 36-144 kw (122,800-491,300 BTUs) Certified Lead-Free Design New & Improved Pressure Drop Advantage Variable Temp Heat Exchanger NEMA 4 enclosure standard Independent Safeties ETL and cetl certified to

More information

ELECTRICAL POWER SYSTEMS

ELECTRICAL POWER SYSTEMS Scope The various Codes applicable to the University's electrical power system are mainly based upon a model of a single utility service, connected to a single premise. The University s electrical system,

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved

More information

Combination Type AFCI

Combination Type AFCI Combination Type AFCI Evolution of the Arc Fault Circuit Interrupter www.usa.siemens.com/afci 2 Alarming Statistics According to the U.S. Fire Administration (USFA), an estimated 67,800 fires, 485 deaths,

More information

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Rancho Cucamonga Fire Protection District Prevention Bureau Standard Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Updated: December 2016 for consistency

More information

C1N Series - Light Industrial Heaters Tankless Water Heating Solutions

C1N Series - Light Industrial Heaters Tankless Water Heating Solutions 18-25 kw (61,4000-85,300 BTUs) Low flow activation options at 0.25 and 0.50 GPM (1.0 and 1.9 LPM) Certified Lead-Free Design Variable Temp Heat Exchanger Pressure Drop Advantage NEMA 4 enclosure standard

More information

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features: PART 1 - GENERAL 1.1 SUMMARY A. This Section includes fast-transfer central battery inverters with the following features: 1. Emergency-only circuits. 1.2 DEFINITIONS A. LCD: Liquid-crystal display. B.

More information

APS-300 SERIES DUAL VOLTAGE UL 294 LISTED ACCESS CONTROL POWER SUPPLIES

APS-300 SERIES DUAL VOLTAGE UL 294 LISTED ACCESS CONTROL POWER SUPPLIES APS-300 SERIES DUAL VOLTAGE UL 294 LISTED ACCESS CONTROL POWER SUPPLIES POWER SUPPLY AND BATTERY CHARGER AC AND DC STATUS INDICATORS ENOUGH POWER TO SUPPORT UP TO 3 MAGLOCKS OR ELECTRIC STRIKES PLUS REQUIRED

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

tcm100, tcm101 Series Temperature Control Modules and PTS100, PTS100/3 Pipe Temperature Sensors Operations Manual

tcm100, tcm101 Series Temperature Control Modules and PTS100, PTS100/3 Pipe Temperature Sensors Operations Manual tcm100, tcm101 Series Temperature Control Modules and PTS100, PTS100/3 Pipe Temperature Sensors Operations Manual This manual covers operation of the tcm100 and tcm101 Series Temperature Control Modules.

More information

TECHNICAL DATA OBSOLETE

TECHNICAL DATA OBSOLETE Deluge Devices 270a 1. PRODUCT NAME VIKING PAR-3 Available since 1991 2. MANUFACTURED FOR: THE VIKING CORPORATION 210 N. Industrial Park Road Hastings, Michigan 49058 U.S.A. Telephone: (269) 945-9501 (877)

More information

8. Multi-Family Residential Buildings

8. Multi-Family Residential Buildings Mu lti-f a mily Re s id e n tia lbu ild in g s 2016 Electric Service Requirements, 3rd Edition Section 8 Section 8 Multi-Family Residential Buildings Directory Page 8.1 General 61 8.2 Maximum Available

More information

RAPID RESPONSE Model RCP-1 Residential Control Panel 1 or 1-1/2 Inch (DN25 or DN40), 175 psi (12,1 bar) General Description.

RAPID RESPONSE Model RCP-1 Residential Control Panel 1 or 1-1/2 Inch (DN25 or DN40), 175 psi (12,1 bar) General Description. Worldwide Contacts www.tyco-fire.com RAPID RESPONSE Model RCP-1 Residential Control Panel 1 or 1-1/2 Inch (DN25 or DN40), 175 psi (12,1 bar) General Description The TYCO RAPID RESPONSE Model RCP-1 Residential

More information

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc MASTER JOCKEY PUMP CONTROLLER Model JPCE INSTRUCTION MANUAL C 2018 Master Control Systems, Inc TABLE OF CONTENTS Important Safety Information. Page 3 General Description and Installation.. Page 4 Model

More information

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Guidelines: This checklist

More information

TECHNICAL DATA. Humidity: 85% Relative Humidity (non-condensing) at 90 F (32 C) maximum.

TECHNICAL DATA. Humidity: 85% Relative Humidity (non-condensing) at 90 F (32 C) maximum. September 29, 1997 Firecycle III 433 a 1. PRODUCT NAME VIKING Model E-1 Manufactured 1997 Present 2. MANUFACTURED FOR THE VIKING CORPORATION 210 N Industrial Park Road Hastings, Michigan 49058, U.S.A.

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS GENERAL INDEECO Industrial Control Panels are designed to provide years of trouble free operation if properly

More information

PowerWave 2 Busway System

PowerWave 2 Busway System PowerWave 2 Busway System Guide Specifications (Revision 004, 11/17/2017) 1 GENERAL 1.1 Summary This specification covers the electrical characteristics and general requirements for a continuous opening,

More information

Installation Guide for AL300ULM. Multi-Output Access Control Power Supply Charger

Installation Guide for AL300ULM. Multi-Output Access Control Power Supply Charger Installation Guide for AL300ULM Multi-Output Access Control Power Supply Charger R AL300ULM - Multi-Output Access Control Power Supply/Charger Overview: The AL300ULM multi-output access control power supply/charger

More information

For a red enclosure add an R suffix to the part # e.g. eflow4na8dr. Altronix Corp th St. Brooklyn, NY. Installing Company: Service Rep.

For a red enclosure add an R suffix to the part # e.g. eflow4na8dr. Altronix Corp th St. Brooklyn, NY. Installing Company: Service Rep. Power Supply/Chargers Installation Guide Models Include: eflow4na8d - 4A @ 12VDC or 24VDC - Eight (8) PTC Outputs eflow6na8d - 4A @ 12VDC or 24VDC - Eight (8) PTC Outputs eflow102na8d - 10A @ 12VDC - Eight

More information

RAPID RESPONSE Model RCP-1 Residential Control Panel 1 or 1-1/2 Inch (DN25 or DN40), 175 psi (12,1 bar) General Description

RAPID RESPONSE Model RCP-1 Residential Control Panel 1 or 1-1/2 Inch (DN25 or DN40), 175 psi (12,1 bar) General Description Worldwide Contacts www.tyco-fire.com RAPID RESPONSE Model RCP-1 Residential Control Panel 1 or 1-1/2 Inch (DN25 or DN40), 175 psi (12,1 bar) SECTIONS General Description.... 1 Warnings.... 2 Technical

More information

NFPA Changes

NFPA Changes Chapter 21, Emergency Control Functions and Interfaces Summary. Chapter 21 is new. These requirements were formerly found in Chapter 6, Protected Premises Fire Alarm Systems. The term fire safety function

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with automatic detection and control. The work described in

More information

Cat. N. Cat. N (s) 1. DESCRIPTION - USE 3. OVERALL DIMENSIONS. Technology : 4. PREPARATION - CONNECTION 2. PRODUCT RANGE

Cat. N. Cat. N (s) 1. DESCRIPTION - USE 3. OVERALL DIMENSIONS. Technology : 4. PREPARATION - CONNECTION 2. PRODUCT RANGE Cat. N STOP & GO automatic resetting 87045 LIMOGES Cedex - FRANCE Telephone : + 33 5 55 06 87 87 Fax: + 33 5 55 06 88 88 Cat. N (s) : 4 062 88 / 4 062 89 CONTENTS PAGE 1. Description - Use... 1 2. Product

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018 STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018 STANDARD INFORMATION Standard Number: NFPA 72 Standard Name: National Fire Alarm and Signaling Code Standard Edition and Issue Date: 2016 Edition

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

SERVICE BY QUALIFIED PERSONNEL ONLY

SERVICE BY QUALIFIED PERSONNEL ONLY Installation Instructions Automatic Load Control Relay For Emergency Lighting! IMPORTANT SAFEGUARDS! WHEN USING ELECTRICAL EQUIPMENT, BASIC SAFETY PRECAUTIONS SHOULD ALWAYS BE FOLLOWED, INCLUDING THE FOLLOWING:

More information

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS HVAC Upgrades Phase 2 Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Section Includes:.1 Materials and installation for fire alarm systems upgrades..2 Audible signal devices..3 End-of-line devices..4 Sustainable

More information

Series. Access Power Controllers. Installation Guide

Series. Access Power Controllers. Installation Guide Series Access Power Controllers Installation Guide Models Include: Maxim11 - Power Supply 1: 12VDC @ 3.5 amp or 24VDC @ 2.7 amp. - Power Supply 2: 12VDC @ 3.5 amp or 24VDC @ 2.7 amp. - Sixteen (16) fuse

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! 50A66-743 Integrated Furnace Control Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD CAUSE PERSONAL

More information

Guide Specification Model CTG Automatic Transfer Switch

Guide Specification Model CTG Automatic Transfer Switch Guide Specification Model CTG Automatic Transfer Switch PART 1 GENERAL 1.1 Scope A. It is the intent of this specification to secure a transfer switch that has been prototype tested, factory built, production

More information