1 Part 3, Part 6, Part 9, Part 4, and Part 13 IOP Report Margaret Goodrich CIMug Meeting May 18, 2012

2 Topics Infrastructure for IOP Tests CIM Part 3 IOP IOP Participants IOP Test Witnesses IOP Result Highlights CIM Part 6 IOP IOP Participants IOP Test Witnesses IOP Result Highlights

3 Topics Test Approach Part 3 & Part 6 Part 3 Scenarios Part 6 Scenarios CIM Part 9 IOP IOP Participants IOP Test Witnesses IOP Contents Test Scenarios

4 Topics CIM61968-Part 4 and Part 13 IOP IOP Participants IOP Test Witnesses & Test Host IOP Contents IOP Result Highlights Test Approach Part 4 & Part 13 Profile Data Groups Import/Export Exchange Tests Interoperation Tests Power Flow Tests IOP Report Contents & Status Future IOP Tests

5 Part 3, 6 & 9 Test Infrastructure All tests were remotely executed The ESB vendors performed any transformation that was necessary to transmit the messages from one Vendor to another From Generic WSDL to Strongly Typed WSDL From Strongly Types WSDL to Java Messaging Services Connectivity tests between the ESB and the Product vendors were conducted prior to the test as well as dry runs Used GoTo Meeting to allow the test witnesses to view the vendor screens, see the messages and watch the progress of the test.

6 Part 3 IOP Participants L+G AMI Oracle OMS Oracle ESB TIBCO ESB IBM ESB Alstom Grid DMS & SCADA EDF ESB EDF R&D SCADA GE OMS Telvent OMS

7 Part 3 IOP Test Witnesses David Bogen, ONCOR Electric Delivery (Transmission/Distribution Operator, USA) Frank Wilhoit, American Electric Power (AEP Transmission/Distribution Operator, USA Jim Greene, American Electric Power (AEP Transmission/Distribution Operator, USA Mark Ortiz, Consumers Energy (Transmission/Distribution Operator, USA) Hugo Bruers, Alcatel-Lucent (Belgium) Matthias Stifter, Austrian Institute of Technology (Austria)

8 Part 3 IOP Result Highlights All planned scenarios were executed All Product and ESB Vendors Passed all executed scenarios

9 Part 3 Test Approach: Scenarios

10 Part 3 Test Approach: Scenarios

11 Part 6 IOP Participants Alstom Grid DMS EDF R&D Simulator Sunflower Systems AMS IBM Maximo EDF ESB TIBCO ESB IBM ESB Oracle ESB

12 Part 6 IOP Test Witnesses David Bogen, ONCOR Electric Delivery (Transmission/Distribution Operator, USA) Frank Wilhoit, American Electric Power (AEP Transmission/Distribution Operator, USA Jim Greene, American Electric Power (AEP Transmission/Distribution Operator, USA Mark Ortiz, Consumers Energy (Transmission/Distribution Operator, USA) Hugo Bruers, Alcatel-Lucent (Belgium) Matthias Stifter, Austrian Institute of Technology (Austria)

13 Part 6 IOP Result Highlights All planned scenarios were executed All Product and ESB Vendors Passed all executed scenarios

14 Part 6 Test Approach: Scenarios

15 Part 6 Test Approach: Scenarios

16 Oracle Elster Landis + Gyr OPC Foundation Ecologic EnergyICT emeter AEP Alstom TIBCO ESB IBM ESB Oracle ESB Part 9 IOP Participants

17 Part 9 IOP Test Witnesses David Bogen, ONCOR Electric Delivery Jerry Grey and John Simmins, EPRI

18 Part 9 IOP Contents Messages Tested Include: Meter Reading End Device Control End Device Event

19 Part 9 Test Scenarios

20 Part 9 Test Scenarios

21 Part 9 Test Scenarios

22 Part 9 Test Scenarios

23 Part 9 Test Scenarios

24 Part 9 Test Scenarios

25 Part 9 Test Scenarios Request Meter Readings Sync R/R (1/2) MDM sends an on-demand meter readings request to AMI <MDM> emeter ESB sends the meter readings request to AMI without Changes. <ESB> WebSphere ESB Get(GetMeterReadings) <AMI> AEP Get(GetMeterReadings) Sync ACK Response ESB sends the ACK to MDM AMI returns an ACK to MDM synchronously without changes <MDM> emeter Get(GetMeterReadings) <ESB> WebSphere ESB Get(GetMeterReadings) <AMI> AEP

26 Part 4 & Part 13 IOP Participants Alstom Grid EDF GE Energy Open DSS Open Grid Systems Oracle Siemens SISCO SupeLec TIBCO

27 Part 4 & Part 13 IOP Test Witnesses & Test Host Alfredo Espinosa Reza, IIE (Institute for CFE, Mexico) Romano Napolitano, ENEL (DSO, Italy) Hugo Bruers, Alcatel-Lucent (Belgium) Matthias Stifter, Austrian Institute of Technology (Austria) EDF R&D Michel Barberis, Eric Lambert, Pascale Bredillet for Hosting the IOP and providing wonderful refreshments and food!

28 Part 4 & Part 13 IOP Contents CIM XML Profile Exchange tests for the Individual Profiles with a Profile Group including: Full Model Exchange (import and export) Power Flow Solutions Interoperation of full test models between two or more vendors CIM XML Profile Exchange tests for the combined Profile Group including: Full Model Exchange (import and export) Power Flow Solutions Interoperation of full test models between two or more vendors

29 Part 4 and Part 13 IOP Result Highlights All vendors imported at least one Profile Group file for one or more of the official test files. Five of the vendors ran a Power Flow solution on the imported files Seven of the vendors exported at least one set of Profile Data Group files for one or more of the official test files. All vendors executed one or more of the Interoperation Test Procedures There were also several unstructured tests generated and executed during this IOP.

30 Part 4 & Part 13 IOP Test Approach Profile Data Groups For Power Flow: Functional Electrical Properties For GIS Import: Functional Asset For Power Flow Solution Exchange: State Variables Topology

31 Part 4 & Part 13 IOP Test Approach Import/Export Exchange Tests P a rticip a n t A XM L Im p o r t/ E x p o rt C IM XML Sc he m a P a rtic ip a n t B XM L Im p o rt / E xp o rt T e st Ca s e 5.x B ro w s er XSL S t yle S h ee t XML T oo ls

32 Part 4 & Part 13 UCTE IOP Test Approach Interoperation Tests Test Case-1 Test Case-2 Step 3 CIM XML Validator Step 4 Step 1 Step 2 CIM XML Export CIM XML Import Steps 1,4 Model Maint System Step 2 Steps 1,4 CIM XML Import Step 5 Step 5 Participant A Participant B Model Maint System

33 Part 4 & Part 13 IOP Test Approach Power Flow Tests Test Case-1 CIM XML Validator (3) Test Case-2 (a previously imported/exported set of CIM XML model files used in step 1) (1) (2,5) Solution 1 CIM XML Import (1) (2) Power Flow Application A (2) CIM XML Import Solution 2 (3) (4,5) (4) Participant A Participant B Power Flow Application B

34 All IOP Reports: Contents All IOP Test Reports will contain: List of Vendors, Test Witnesses, Products and Models that were part of the test including a full list of the Official files as well as the files that were generated Detailed Test Results Product Descriptions for all participants List of all Issues that were identified and the disposition/resolution/proposed solution if possible Summary description of the Test Approach The Report will be published to all UCA members, all SGIP/SGTCC members and every major CIM mail exploder we have as well as to many Customer lists by the Vendors. This report will be posted on the UCA Web Sites (both CIM and 61850) as soon as it is published.

35 All IOP Reports: Status The Part 4 and Part 13 Test Report has been reviewed by the participants and is in final revision. This will be published next week. The Part 3 IOP Test Report has been reviewed by the participants and is in final revision. This will be published next week. The Part 6 IOP Test Report is in final draft version and will be released to the Part 6 IOP team for review next week. It will be published the first week of June. The Part 9 IOP Test Report is in final draft version and will be released to the Part 9 IOP team for review next week. It will be published the first week of June.

36 Future IOP Tests Part 13 has been transferred to WG13 and will be tested with the other WG13 profiles as part of the ENTSO-e IOP tests. Future IOP tests to vet the Distribution standards, including Part 4, 3, 6 and 9 may be tested by the WG14 teams independently. Decision will be made at the next WG14 meeting at the end of this month. Future tests will include other messages that were not tested in these IOPs. Certified IOP tests will be performed by Test Labs certified by the UCA ITCA team.

37 Additional Information UCA IOP Test Sponsors: Kay Clinard at UCA - kay@ucaiug.org Randy Lowe at AEP rrlowe@aep.com John Simmins at EPRI jsimmins@epri.com UCA IOP Test Director: Margaret Goodrich margaret@sisconet.com Margaret Goodrich Cell UCA IOP Vendor Coordinators Bruce Scovill bruce1.scovill@ge.com Eric Lambert eric.lambert@edf.fr Nada Reinprecht nadarein@au1.ibm.com Jon Fairchild jon.fairchild@telvent.com Margaret Goodrich margaret@sisconet.com IOP Host for 61850, Part 3, 4, 6, and 13: Provided hosting, sponsorship and technical consulting Eric Lambert eric.lambert@edf.fr

Harmonization of the Common Information Model and

Harmonization of the Common Information Model and 1 Harmonization of the Common Information Model and MultiSpeak Gary McNaughton, P.E. Cornice Engineering, Inc. Robert Saint, P.E. National Rural Electric Cooperative Association 2 Acknowledgements The

More information

Plans for MultiSpeak /CIM Harmonization

Plans for MultiSpeak /CIM Harmonization Plans for MultiSpeak /CIM Harmonization Common Information Model (CIM) Role in Smart Grid for Transmission and Distribution September 8-9, 2010 Washington, D.C. Bob Saint MultiSpeak Program Manager robert.saint@nreca.coop

More information

ESB 2.0. Migration. egate IBM. WS Message Broker KBC. Warta. Java CSOB. Evolution. Standardization MQ K&H. Pilot case. Store & Forward. Web 2.

ESB 2.0. Migration. egate IBM. WS Message Broker KBC. Warta. Java CSOB. Evolution. Standardization MQ K&H. Pilot case. Store & Forward. Web 2. KB K&H ESQL Software AG Request-Reply Web 2.0 CSOB Application Integration Java Warta Pilot case KBC IBM Store & Forward Migration ESB 2.0 WS Message Broker Java CAPS Monk Microsoft ICT Service Evolution

More information

Oracle ESB Lesson05: SOAP Request/Reply against Customer_Data Table

Oracle ESB Lesson05: SOAP Request/Reply against Customer_Data Table Oracle ESB Lesson05: SOAP Request/Reply against Customer_Data Table Oracle Integration Product Management ESB Lesson05 Page 1 Scenario Overview Request/Reply CustomerQuery Use Case Add a database adapter

More information

Oracle ESB Lesson03: ESB CustomerData SOAP

Oracle ESB Lesson03: ESB CustomerData SOAP Oracle ESB Lesson03: ESB CustomerData SOAP Oracle Integration Product Management ESB Lesson03 Page 1 ESB SOAP Scenario Overview Functionality Add an outbound SOAP service callout to the CustomerData tutorial

More information

Conference call details: UK Numbers Tel: or Tel: Participant code:

Conference call details: UK Numbers Tel: or Tel: Participant code: EBS - IT 17 th March 2016 Conference call details: UK Numbers Tel: 0808 238 9819 or Tel: 0207 950 1251 Participant code: 4834 7876 https://meet.nationalgrid.com/antonio.delcastillozas/tyn7w1vt Agenda 1.

More information

Security Escort Central Console Software SE2000 Series

Security Escort Central Console Software SE2000 Series Release Notes Security Escort Central Console Software SE2000 Series Table of Contents 1 Security Escort v2.18.1.0... 2 1.1 Enhancements... 2 1.2 Errors Fixed... 2 1.3 Known Limitations and Restrictions...

More information

THE VALUE IS IN THE SOFTWARE

THE VALUE IS IN THE SOFTWARE Max Gutberlet September 27, 2017 THE VALUE IS IN THE SOFTWARE How Honeywell Saves You Money THE SCOPE OF TODAYS PRESENTATION 1 Honeywell PowerSpring Light-weight Meter Data Collection fully integrated

More information

Skyresponse ThingWorx Extension. Version 1.0. User Guide

Skyresponse ThingWorx Extension. Version 1.0. User Guide Skyresponse ThingWorx Extension Version 1.0 User Guide Software Change Log...1 Introduction...1 About Skyresponse...1 Installation...2 Importing the Skyresponse ThingWorx Extension...2 Configuration and

More information

GREEN WEDGE MANAGEMENT PLAN

GREEN WEDGE MANAGEMENT PLAN DRAFT PLAN AVAILABLE FOR COMMENT CITY OF GREATER DANDENONG PROJECT UPDATE The City of Greater Dandenong has prepared a Draft Management Plan for the municipality s Green Wedge. The plan provides a clear

More information

Real-Time Root Cause Analysis for Complex Technical Systems

Real-Time Root Cause Analysis for Complex Technical Systems Real-Time Root Cause Analysis for Complex Technical Systems Jan Eric Larsson, Joseph DeBor IEEE HPRCT Monterey, CA, August 29 th 2007 Handling Alarm Cascades Root cause analysis: find the initiating events

More information

Alessio Fioravanti, Silvano Lutri, TWS/DWC FP IBM Corporation

Alessio Fioravanti, Silvano Lutri, TWS/DWC FP IBM Corporation Alessio Fioravanti, alessio.fioravanti@it.ibm.com Silvano Lutri, silvano_lutri@it.ibm.com TWS/DWC 9.1.0 FP1 DWC FP1 Enhancements 2 TWS / DWC 9.1 FP1 DWC 9.1 FP1 Enhancements Direct Query: Monitoring task

More information

National Grid / DG Installation Process Guide per NY SIR / July 2011 ver. 1.0

National Grid / DG Installation Process Guide per NY SIR / July 2011 ver. 1.0 Distributed Generation Installation Process Guide for Connections to National Grid Distribution Facilities per the New York Standardized Interconnection Requirements Introduction National Grid ( The Company

More information

Members absent: Al Martin (Tyco/Raychem), Gary Schrempp (Dell), Tom Smith (TJS Technical Services Inc), Peter Tarver (Ericsson AB)

Members absent: Al Martin (Tyco/Raychem), Gary Schrempp (Dell), Tom Smith (TJS Technical Services Inc), Peter Tarver (Ericsson AB) IEEE PSES TSTC Meeting Minutes: March 23, 2011 Members present: Don Gies (Alcatel-Lucent), Philip Havens (Littelfuse), Peter Lim (Alpha Technology),, Mick Maytum, Paul Ng (GE Energy), Joe Randolph (Randolph

More information

Oracle Communications Performance Intelligence Center

Oracle Communications Performance Intelligence Center Oracle Communications Performance Intelligence Center System Alarms Guide Release 10.2.1 E77506-01 June 2017 1 Oracle Communications Performance Intelligence Center System Alarms Guide, Release 10.2.1

More information

Customer Engagement, National Platforms, and

Customer Engagement, National Platforms, and ACEE Market Transformation Symposium 2017 Energy Efficiency as a Distributed Energy Resource: Implications for Program Design, Customer Engagement, National Platforms, and EM&V Taylor Jantz-Sell ENERGY

More information

NOTE: Oracle Real Application Clusters 11g Page 2

NOTE: Oracle Real Application Clusters 11g Page 2 NOTE:! Oracle Real Application Clusters 11g Page " # $ " % & ' & ()*+, *-.*-/, *0, 13 4 5 4 ' 4 ) 6 +7 3 8 1+ 8-9 0) 9 # + 9 ) 9 :5 ; (

More information

Reducing the Distance to Integrate: DTE Energy use of CIM at the ESB

Reducing the Distance to Integrate: DTE Energy use of CIM at the ESB Reducing the Distance to Integrate: DTE Energy use of CIM at the ESB Dr. Gerald R. Gray Sr. Project Manager Enterprise Architecture & Integration, EPRI Kelly Flowers Detroit Edison Contents Common Information

More information

Veritas Storage Foundation and High Availability Solutions Oracle Support Matrix

Veritas Storage Foundation and High Availability Solutions Oracle Support Matrix Veritas Storage Foundation and High Availability Solutions Oracle Support Matrix May 09, 2017 Veritas Storage Foundation : Database Support Matrix The software described in this book is furnished under

More information

GI Standardization Overview

GI Standardization Overview Second workshop on the use of GIS/OGC standards in meteorology GI Standardization Overview 1 nicolas.lesage@ign.fr 12 Janvier 2009 Modèle TN-02.018-1.1 The goal of standardization According to decree number

More information

1 Descriptions of Function

1 Descriptions of Function The Use Case #4 implements integrated management of s 1 Descriptions of Function 1.1 Function Name Date 12-15-2009, Version 1.13 implements integrated management of s 1.2 Function ID L-11.1.4 1.3 Brief

More information

MRMS Multi-Room Monitoring Station

MRMS Multi-Room Monitoring Station Technical Specification Sheet Document. 149-213 October 2, 2014 MRMS Multi-Room Monitoring Station High Definition Color (TFT) Touchscreen Display Meets CE Conformance Standards Immediate feedback on room

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 61968-14 Edition 1.0 2015-06 colour inside Application integration at electric utilities System interfaces for distribution management Part 14: MultiSpeak CIM harmonization

More information

Oracle Retail Furniture Retail System (FRS) Pricewriter to Xmargin Guide Release October 2015

Oracle Retail Furniture Retail System (FRS) Pricewriter to Xmargin Guide Release October 2015 Oracle Retail Furniture Retail System (FRS) Pricewriter to Xmargin Guide Release 1101 October 2015 Oracle Retail Furniture Retail System (FRS) Pricewriter to Xmargin Guide, Release 1101 Copyright 2015,

More information

D Implementation of a DEMO system related to Smart Fault Management in LV network (normal/storm conditions)

D Implementation of a DEMO system related to Smart Fault Management in LV network (normal/storm conditions) D 4.5.11 1 (13) D 4.5.11 Implementation of a DEMO system related to Smart Fault Management in LV network (normal/storm conditions) Version 1.0 Created: 2013-2-27 By: Joni Aalto, Empower IM Oy Jan Segerstam,

More information

ISO/TC 211 GEOGRAPHIC INFORMATION AND GEOMATICS A FRAMEWORK AND REFERENCE MODEL

ISO/TC 211 GEOGRAPHIC INFORMATION AND GEOMATICS A FRAMEWORK AND REFERENCE MODEL ISO/TC 211 GEOGRAPHIC INFORMATION AND GEOMATICS A FRAMEWORK AND REFERENCE MODEL Kian FADAIE Canada Centre for Remote Sensing Natural Resources Canada Fadaie@nrcan.gc.ca Paper number 1734 KEY WORDS: ISO/TC211,

More information

AK-CS On Board Guide

AK-CS On Board Guide MAKING MODERN LIVING POSSIBLE AK-CS On Board Guide electronic controls & sensors About this guide The AK-CS On Board guide highlights the use of the RMT tool, allowing remote software management. Consult

More information

First day: SmartLink Web and SmartPager SmartLink and SmartPager installation Second day: SmartLink and SmartPager Configuration Alarms Management

First day: SmartLink Web and SmartPager SmartLink and SmartPager installation Second day: SmartLink and SmartPager Configuration Alarms Management First day: SmartLink Web and SmartPager SmartLink and SmartPager installation Second day: SmartLink and SmartPager Configuration Alarms Management Trace Log and FAQ Lorenzo Marino Software Engineer in

More information

ESB Tools Reference Guide. Version: GA

ESB Tools Reference Guide. Version: GA ESB Tools Reference Guide Version: 1.1.0.GA 1. Introduction... 1 1.1. What is ESB?... 1 1.2. Other relevant resources on the topic... 1 2. ESB Support... 3 2.1. ESB Tools Installation... 3 2.2. Creating

More information

CFLRP 5-Year Ecological Indicator Progress Reporting EXPERT PANEL GUIDANCE

CFLRP 5-Year Ecological Indicator Progress Reporting EXPERT PANEL GUIDANCE CFLRP 5-Year Ecological Indicator Progress Reporting EXPERT PANEL GUIDANCE In passage of the Omnibus Public Land Management Act of 2009, Congress required Collaborative Forest Landscape Restoration (CFLR)

More information

Tollgrade Lighthouse Sensor Pilot at CenterPoint Energy. Presented at SWEDE 2011

Tollgrade Lighthouse Sensor Pilot at CenterPoint Energy. Presented at SWEDE 2011 Tollgrade Lighthouse Sensor Pilot at CenterPoint Energy Presented at SWEDE 2011 Outline History Objectives of Pilot Current Pilot Status Summary 2 History CNP has tried sensors/detectors before Too many

More information

Facility Commander Complete, Integrated Command and Control

Facility Commander Complete, Integrated Command and Control Facility Commander Complete, Integrated Command and Control 2.0 Facility Commander Complete, integrated command and control Securing your business facilities requires multiple systems, often from different

More information

Before you install ProSeries Express Edition software for network use

Before you install ProSeries Express Edition software for network use Before you install ProSeries Express Edition software for network use The following pages describe system requirements and other information you need to know before installing ProSeries Express Edition

More information

A new view on building protection. Cerberus DMS makes building protection smarter, easier and more flexible. Answers for infrastructure.

A new view on building protection. Cerberus DMS makes building protection smarter, easier and more flexible. Answers for infrastructure. A new view on building protection Cerberus DMS makes building protection smarter, easier and more flexible. Answers for infrastructure. Safety made easier. As an easy-to-use system with a single point

More information

Avigilon Control Center 5 System Integration Guide

Avigilon Control Center 5 System Integration Guide Avigilon Control Center 5 System Integration Guide for Paxton Net2 Access Control Systems 2014 Avigilon Corporation. All rights reserved. Unless expressly granted in writing, no license is granted with

More information

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC PART 1 GENERAL 1.01 SUMMARY SECTION 23 08 00 COMMISSIONING OF HVAC A. This section covers the Contractor's and Commissioning Authority (CA) responsibilities for commissioning; each subcontractor or installer

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61968-3 First edition 2004-03 Application integration at electric utilities System interfaces for distribution management Part 3: Interface for network operations Reference number

More information

New Features in Neuron ESB 3.0

New Features in Neuron ESB 3.0 New Features in Neuron ESB 3.0 The release of Neuron ESB 3.0 continues the trend of productivity and innovation for the Microsoft Platform. Neuron ESB 3.0 has been extended to support the Microsoft.NET

More information

LOWE'S EDI 832 Price/Sales Catalog Version: 4010 Final Publication: June 7, 2004

LOWE'S EDI 832 Price/Sales Catalog Version: 4010 Final Publication: June 7, 2004 Lowe's Companies, Inc. Price/Sales Catalog - 832 1 LOWE'S EDI 832 Price/Sales Catalog Version: 4010 Final Publication: June 7, 2004 Lowe's Companies, Inc. Price/Sales Catalog - 832 2 832 Price/Sales Catalog

More information

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates Host: Inland Empire Utilities Agency January 19, 2017 10:00 a.m. Purpose: To provide project overviews and updates to regional

More information

PM-ANALYZE. Overview 1. System Configuration 2. Operation 3. Analysis of Alarms and process values. User Interface 4

PM-ANALYZE. Overview 1. System Configuration 2. Operation 3. Analysis of Alarms and process values. User Interface 4 Overview 1 System Configuration 2 Operation 3 Analysis of Alarms and process values User Interface 4 Version 8 Configuration 5 Edition: 04/04/2017 Table of Contents Contents 1 Overview... 1-1 1.1 General

More information

Simplex Panel Interface Guide

Simplex Panel Interface Guide Simplex Panel Interface Guide February 2016 SATEON Software Integrations Simplex Panel Interface Guide Issue 1.0, released February 2016 Disclaimer Copyright 2016, Grosvenor Technology. All rights reserved.

More information

System Requirements and Supported Platforms for Oracle Real-Time Decisions Applications. Version May 2008

System Requirements and Supported Platforms for Oracle Real-Time Decisions Applications. Version May 2008 System Requirements and Supported Platforms for Oracle Real-Time Decisions Applications Version 2.2.1 May 2008 Copyright 2008, Oracle. All rights reserved. Part Number: E12184-01 The Programs (which include

More information

Setting up and Managing Alarms in McAfee ESM 10.x

Setting up and Managing Alarms in McAfee ESM 10.x McAfee SIEM Alarms Setting up and Managing Alarms in McAfee ESM 10.x Introduction McAfee SIEM provides the ability to send alarms on a multitude of conditions. These alarms allow for users to be notified

More information

International Standards Health Informatics. Audrey Dickerson, RN, MS ISO/TC 215 Secretary

International Standards Health Informatics. Audrey Dickerson, RN, MS ISO/TC 215 Secretary International Standards Health Informatics Audrey Dickerson, RN, MS ISO/TC 215 Secretary Objectives To appreciate the global role of standards in our lives To understand the role of international HIT standards

More information

Ubiquitous M2M Service Networks ITEA2 Usenet project

Ubiquitous M2M Service Networks ITEA2 Usenet project Ubiquitous M2M Service Networks ITEA2 Usenet project Internet of things is here Tekes Ubicom highlights Workshop 6th Oct 2011 Juhani.Latvakoski@vtt.fi 2 M2M (machine to machine )? M2M consists of ICT technologies

More information

Manage Alarms. Before You Begin CHAPTER

Manage Alarms. Before You Begin CHAPTER CHAPTER 8 Manage Alarms This chapter contains the procedures for viewing and managing the alarms and conditions on a Cisco ONS 15454. Cisco Transport Controller (CTC) detects and reports alarms generated

More information

Messenger Wireless Lock Access Network

Messenger Wireless Lock Access Network Messenger Wireless Lock Access Network SAFLOK TM introduces the next era of online communication with Messenger TM operating on a ZigBee-compliant platform. The ZigBee Prostack protocol is an internationally

More information

Use of the application program. Functional description. instabus EIB Application program description. October CO Touch-Manager wave

Use of the application program. Functional description. instabus EIB Application program description. October CO Touch-Manager wave Use of the application program Product family: Product type: Manufacturer: Display Display units Siemens Name: Touch-Manager wave UP 582 silver, with monochrome display Order no.: 5WG3 582-2AB71 Name:

More information

Managing Network Alarms and Events

Managing Network Alarms and Events 10 CHAPTER Prime Performance Manager allows you to view alarms and events that occur in your network. The following topics provide information about displaying network alarms and events: Displaying Active

More information

Licensing of FPGA-based Safety Platform RadICS: Case Study

Licensing of FPGA-based Safety Platform RadICS: Case Study Licensing of FPGA-based Safety Platform RadICS: Case Study Anton Andrashov, Head of International Projects Division 10th International Workshop on the Application of FPGAs in NPPs December 4-6 2017, Gyeongju,

More information

Tracking spatiotemporal patterns of building vulnerabilities and evacuations during flood hazards

Tracking spatiotemporal patterns of building vulnerabilities and evacuations during flood hazards Tracking spatiotemporal patterns of building vulnerabilities and evacuations during flood hazards Shane Hubbard Junchuan Fan Kathleen Stewart Emily White The University of Wisconsin Madison, SSEC/CIMSS

More information

Overview. Executive Summary. Solution Description CHAPTER

Overview. Executive Summary. Solution Description CHAPTER CHAPTER 1 Executive Summary In large and complex urban environments, it is critical for decision makers to reduce the time from detection of an incident to response by first responders. Additionally, it

More information

Brazil Localization Overview

Brazil Localization Overview Oracle Retail Merchandising System Release Notes Release 12.0.3BR October 2008 This document describes the changes made to the Oracle Retail Merchandising System (RMS) Release 12.0.3BR for Brazil localization.

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

LXI Consortium 2010 Report to the Test Industry. Von Campbell, LXI Consortium President

LXI Consortium 2010 Report to the Test Industry. Von Campbell, LXI Consortium President LXI Consortium 2010 Report to the Test Industry Von Campbell, LXI Consortium President Topics LXI Consortium Business Overview New Members: The inside story Continued Growth Four Test Houses New China

More information

The future of the CPR, is CE marking changing? 26/10/2018

The future of the CPR, is CE marking changing? 26/10/2018 < The future of the CPR, is CE marking changing? 26/10/2018 Starting at the very beginning European Union 1989 Construction Products Directive CE marking for construction concept Fit for purpose European

More information

Instruction manual MTL process alarm equipment. October 2016 CSM 725B rev 2 MTL RTK 725B. Configuration Software Manual

Instruction manual MTL process alarm equipment. October 2016 CSM 725B rev 2 MTL RTK 725B. Configuration Software Manual Instruction manual MTL process alarm equipment October 2016 CSM 725B rev 2 MTL RTK 725B Configuration Software Manual SECTION 1 - INTRODUCTION... 5 Basic Requirements... 5 SECTION 2 - SOFTWARE INSTALLATION...

More information

Foundation Fieldbus Usability from field Device Perspective. Hemal Desai Endress+Hauser India Pvt. Ltd 16 th October 2014 Automation 2014 Mumbai

Foundation Fieldbus Usability from field Device Perspective. Hemal Desai Endress+Hauser India Pvt. Ltd 16 th October 2014 Automation 2014 Mumbai Foundation Fieldbus Usability from field Device Perspective Hemal Desai Endress+Hauser India Pvt. Ltd 16 th October 2014 Automation 2014 Mumbai Digital Revolution has come this far.. Digital Vendor neutral

More information

Alarm Manager Plug-in

Alarm Manager Plug-in Alarm Manager Plug-in User s Guide While every attempt is made to ensure both accuracy and completeness of information included in this document, errors can occur, and updates or improvements may be implemented

More information

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Sharon Ebert, Director Community Development Date: April 10, 2017 Agenda: City Council Work Session April

More information

PWM. Solar Charge controller with Ethernet. Solar Smart PWM 20Amp. Hardware Description : Release : 19 June 2014

PWM. Solar Charge controller with Ethernet. Solar Smart PWM 20Amp. Hardware Description : Release : 19 June 2014 Solar Charge controller with Ethernet Release : 19 June 2014 Hardware Version : Version 1 Firmware version 1 PC Application Software : Version 1.0.0.0 Hardware Description : The Solar Smart regulator was

More information

Enhancing Information Sharing for First Responders

Enhancing Information Sharing for First Responders Enhancing Information Sharing for First Responders Bill Hobgood, Department of Information Technology, City of Richmond VA Jim Slater, Massachusetts Criminal History Systems Board Lt. Michael Zohab, Division

More information

Evolving Broadcast Operations With ESB

Evolving Broadcast Operations With ESB Evolving Broadcast Operations With ESB Chris Contakes, Vice President IT, PBS Sylvain Nazef, Sr. Enterprise Architect, PBS Bryan Boggio, Sr. Director, Media Systems, PBS Joy Wang, Director Software Development,

More information

BlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7.

BlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7. BlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7.3, October 2017 Copyright 2017 BlackBerry Limited. All Rights Reserved.

More information

Smart Water Heater Project Update. Residential Two-way Water Heater Load Control Pilot

Smart Water Heater Project Update. Residential Two-way Water Heater Load Control Pilot Smart Water Heater Project Update EPRI Smart Grid Advisory Meeting Albuquerque, New Mexico October 13, 2009 1 Residential Two-way Water Heater Load Control Pilot Purpose Demonstrate a two-way water heater

More information

Getting Started with Live Exceptions

Getting Started with Live Exceptions Getting Started with Live Exceptions Live Exceptions provides alarm reporting by identifying problems that include delay, errors, failures, security, or configuration changes. The Live Exceptions Browser

More information

Temperature Monitoring, Operation and Maintenance of Research Freezers and Refrigerators SOP-TMOMRFR-01

Temperature Monitoring, Operation and Maintenance of Research Freezers and Refrigerators SOP-TMOMRFR-01 Standard Operating Procedure Temperature Monitoring, Operation and Maintenance of Research Freezers and Refrigerators SOP Number: SOP-TMOMRFR-01 Category: Lab Process Supersedes: N/A Effective Date: December

More information

Enterprise Application Mashup Architecting the Future

Enterprise Application Mashup Architecting the Future Enterprise Application Mashup Architecting the Future Eugene Ciurana Director, Systems Infrastructure LeapFrog Enterprises, Inc. eugenex@leapfrog.com pr3d4t0r @ irc://irc.freenode.net ##java, #esb, #awk,

More information

Standards and Safety Update

Standards and Safety Update Standards and Safety Update Presented By: Michael J. Johnston Executive Director Standards and Safety, NECA Update Objectives Update on NFPA 70E and NECA Safety products Update on NECA S National Electrical

More information

Lighting Xpert Insight User Manual

Lighting Xpert Insight User Manual Lighting Xpert Insight User Manual Table of Contents 1 About This Document... 3 1.1 Key Terms... 3 1.2 Related Fifth Light Documentation... 3 2 Lighting Xpert Insight Overview... 4 2.1 Key Features...

More information

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER CEQA scoping Meeting March 19 th, 2014 Winters City Council Chambers - 6:30 pm AGENDA FOR THE MEETING 6:30 Welcome (John Donlevy) 6:40 Overview

More information

ENERGY MISSION OF TODAY.

ENERGY MISSION OF TODAY. ENERGY MISSION OF TODAY www.fimel.pt About Us 30 years 10 years 100 workers More then 30 years of experince in heating systems, industrial automation and industrial coating Almost 10 years in the wind

More information

Improved Lifecycle Management for BI. David Brockington SAP Business Objects, Product Management June, 2009

Improved Lifecycle Management for BI. David Brockington SAP Business Objects, Product Management June, 2009 Improved Lifecycle Management for BI David Brockington SAP Business Objects, Product Management June, 2009 Agenda 1. Introduction 2. SAP BusinessObjects LifeCycle Manager Overview 3. Other SAP BusinessObjects

More information

Alarm setup and definitions in Cisco Unified Serviceability

Alarm setup and definitions in Cisco Unified Serviceability Alarm setup and definitions in Cisco Unified Serviceability Set up Cisco Unified IM and Presence Serviceability alarms, page 1 Alarm setup and update for a service, page 2 Alarm definitions and user-defined

More information

Oracle Communications Performance Intelligence Center

Oracle Communications Performance Intelligence Center Oracle Communications Performance Intelligence Center System Alarms User s Guide Release 10.1 E55927 Revision 2 October 2014 Oracle Communications Performance Intelligence Center System Alarms User s Guide,

More information

Desigo CC Building Automation and Fire Safety FAQs

Desigo CC Building Automation and Fire Safety FAQs Desigo CC Building Automation and Fire Safety FAQs New market opportunities Greater customer benefits Precise, efficient, integrated building control usa.siemens.com/desigocc s For Internal Use Only 1

More information

Thermoguard. Thermoguard Alarm Relay Channel Version 2.90 (as of April 26, 2014)

Thermoguard. Thermoguard Alarm Relay Channel Version 2.90 (as of April 26, 2014) Thermoguard Thermoguard Alarm Relay Channel Version 2.90 (as of April 26, 2014) Contents - Introduction / Requirements... 3 - Resistor Wiring - Two Alternatives... 4 - Table of Values... 5 - Overview 1:

More information

Implementation Guidance for ISO 9001:2008

Implementation Guidance for ISO 9001:2008 Document: ISO/TC 176/SC 2/N 836 Our ref Secretariat of ISO/TC 176/SC 2 Date: 15 October 2008 Implementation Guidance for ISO 9001:2008 CONTENTS 1.0 INTRODUCTION 2.0 BACKGROUND ON ISO 9001:2008 REVISION

More information

Implementing the OGC Sensor Web Enablement Standards for Marine Applications

Implementing the OGC Sensor Web Enablement Standards for Marine Applications Implementing the OGC Sensor Web Enablement Standards for Marine Applications ROBEX Sensor Workshop, Vienna, 27 th April 2017 Simon Jirka, 52 North GmbH, jirka@52north.org Motivation Existing earth observation

More information

Signing Up... 1 Logging in for the First Time... 2 The Search Panel... 3

Signing Up... 1 Logging in for the First Time... 2 The Search Panel... 3 A Guide to Using TABLE OF CONTENTS Signing Up... 1 Logging in for the First Time... 2 The Search Panel... 3 Keywords... 3 Type... 3 Location... 3 Current Status... 3 On Site... 3 Commencement Received...

More information

GCM (~100 km) UCM (~100 m) RCM (~10 km)

GCM (~100 km) UCM (~100 m) RCM (~10 km) Urban climate projections for Central European cities and modelling tools for urban planning Maja Žuvela-Aloise NWP Applications, ZAMG, Vienna, Austria GCM (~100 km) UCM (~100 m) RCM (~10 km) Regional

More information

Technology, innovation and performances are the outcomes our customers want and expect us to deliver.

Technology, innovation and performances are the outcomes our customers want and expect us to deliver. a TELEMA spa Group Company TELEMA Group Technology, innovation and performances are the outcomes our customers want and expect us to deliver. Since 1975, the TELEMA Group (www.telemait.com), currently

More information

Business Process and Procedures Workstream. Event Log Collection, Processing & Delivery process (BP05)

Business Process and Procedures Workstream. Event Log Collection, Processing & Delivery process (BP05) Business Process and Procedures Workstream Options Paper Collection, Processing & Delivery process (BP05) Version Number: Status: Author: Version 0.1 Draft P Egger Date Published: 07 February 2011 File

More information

Content. Motivation General Framework The BGR Algorithm Simulation Results Conclusion. BGR: Blind Geographic Routing for Sensor Networks

Content. Motivation General Framework The BGR Algorithm Simulation Results Conclusion. BGR: Blind Geographic Routing for Sensor Networks BGR: Blind Geographic Routing for Sensor Networks Matthias Witt and Volker Turau TUHH - TELEMATIK TUHH - TELEMATIK WITT, TURAU: BGR WISES 2005 2 Geographic Routing Nodes know their geographic position

More information

Oracle Retail Merchandising System Release Notes Release 12.0 May 2006

Oracle Retail Merchandising System Release Notes Release 12.0 May 2006 Oracle Retail Merchandising System Release Notes Release 12.0 May 2006 Copyright 2006, Oracle. All rights reserved. The Programs (which include both the software and documentation) contain proprietary

More information

A guide to preparing the land use element of a local comprehensive plan. Land Use. Resource guide

A guide to preparing the land use element of a local comprehensive plan. Land Use. Resource guide Chapter 0 A guide to preparing the land use element of a local comprehensive plan Title Land Use Resource guide A strong economy, a healthy environment, and an enjoyable quality of life all depend on the

More information

ESB Tools Reference Guide. Version: CR2

ESB Tools Reference Guide. Version: CR2 ESB Tools Reference Guide Version: 1.1.0.CR2 1. Introduction... 1 1.1. What is ESB?... 1 1.2. Other relevant resources on the topic... 1 2. ESB Support... 3 2.1. ESB Tools Installation... 3 2.2. Creating

More information

SAM and ESB Update. Spring 2016 NYS Coordinator s Conference. May 18, 2016

SAM and ESB Update. Spring 2016 NYS Coordinator s Conference. May 18, 2016 SAM and ESB Update Spring 2016 NYS 9-1-1 Coordinator s Conference May 18, 2016 May 18, 2016 2 Streets and Address Maintenance (SAM) Program May 18, 2016 3 SAM Address Points 6.2 million total points delivered

More information

PcVue Solutions. PcVue Solutions

PcVue Solutions. PcVue Solutions PcVue Solutions PcVue Solutions Corporate company profile The Independent Global The Independent SCADA Global provider SCADA Global in figures The 30 Years of experience in SCADA 10 Language versions of

More information

Hardware and Software Requirements

Hardware and Software Requirements Oracle Retail Invoice Matching Release Notes Release 13.0.1 August 2008 This document describes Oracle Retail Invoice Matching 13.0.1. ReIM Release 13.0.1 is a full product release that replaces ReIM 13.0.

More information

Esri Roads and Highways: Integrating and Developing LRS Business Systems

Esri Roads and Highways: Integrating and Developing LRS Business Systems Esri Roads and Highways: Integrating and Developing LRS Business Systems Tom Hill Esri UC 2014 Technical Workshop Overview: Esri Roads and Highways Esri UC 2014 Technical Workshop Esri Roads and Highways:

More information

FLAMMABLE REFRIGERANTS UPDATE FOR HVAC&R EQUIPMENT IN NORTH AMERICA

FLAMMABLE REFRIGERANTS UPDATE FOR HVAC&R EQUIPMENT IN NORTH AMERICA FLAMMABLE REFRIGERANTS UPDATE FOR HVAC&R EQUIPMENT IN NORTH AMERICA April 2015 Barry Karnes, Principal Engineer UL LLC UL and the UL logo are trademarks of UL LLC 2015 1 Some History Pre 1990, most refrigerants

More information

Fire O&M AiM. Need help: call IMS https://sscaimapp.assetworks.com/fmax

Fire O&M AiM. Need help: call IMS https://sscaimapp.assetworks.com/fmax Fire O&M AiM 2016 Need help: call IMS 862-3388 https://sscaimapp.assetworks.com/fmax Fire O&M - 2 Table of Contents What is Fire O&M?... 5 What Appears in Fire App?... 5 Fire O&M Settings... 6 Fire O&M

More information

NATURAL GAS 1 DAY ANGVA WORKSHOP ON. WORKSHOP 20 May for VEHICLES, YANGON, MYANMAR

NATURAL GAS 1 DAY ANGVA WORKSHOP ON. WORKSHOP 20 May for VEHICLES, YANGON, MYANMAR ANGVA ON for S, YANGON, MYANMAR Natural Gas for Vehicles Overview and Safety Practices for Vehicle Conversions ORGANIZED BY: CERTIFIED BY: global GROUP SPONSORS: MEDIA PARTNER: ABOUT US MESSAGE FROM THE

More information

DEVELOPMENT OF THE TANGO ALARM SYSTEM

DEVELOPMENT OF THE TANGO ALARM SYSTEM 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, WE3B.1-70 (2005) DEVELOPMENT OF THE TANGO ALARM SYSTEM L. Pivetta Sincrotrone Trieste, Trieste, Italy

More information

Avigilon Control Center System Integration Guide

Avigilon Control Center System Integration Guide Avigilon Control Center System Integration Guide with Gallagher Command Centre INT-CARDAX-C-Rev2 Copyright 2011 Avigilon. All rights reserved. No copying, distribution, publication, modification, or incorporation

More information

Reference report Traffic & Transportation

Reference report Traffic & Transportation Operational and traffic control station for the Espiye-Sarp tunnels Siemens supplied an operations management and traffic control-system for one of the most progressive stretches of road in the world in

More information

STEMSEL Beginners Project 1: Alarm System

STEMSEL Beginners Project 1: Alarm System STEMSEL Beginners Project 1: Alarm System Problem How can we use microchips to protect our valuables? How can a microchip know if there is a thief and what can it do when it detects one? Background Have

More information

Hardware and Software Requirements. Integration Enhancements. Functional Enhancements

Hardware and Software Requirements. Integration Enhancements. Functional Enhancements Oracle Retail Point-of-Service Release Notes Release 13.4 E25272-01 December 2011 This document highlights the major changes for Release 13.4 of Oracle Retail Point-of-Service. Overview Oracle Retail Point-of-Service

More information