SECTION FIRE PUMPS 1.00 PART 1 & GENERAL Description of Work. A. Provide pumps for fire suppression Section Includes

Size: px
Start display at page:

Download "SECTION FIRE PUMPS 1.00 PART 1 & GENERAL Description of Work. A. Provide pumps for fire suppression Section Includes"

Transcription

1 SECTION Formatted 1.00 PART 1 & GENERAL 1.01 Description of Work A. Provide pumps for fire suppression Section Includes A. Single Stage, Double Suction, 8100 Series Horizontal Splitcase Fire Pump RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. Section & Submittals Section & Pipe and Fittings Section & Mechanical General Requirements Section & Electric Motors Section & Electrical General Requirements Section & Fire Pump Controllers Section & Jockey Pumps Section & Controller Jockey Pump 1.03 Quality Assurance A. All equipment or components of this specification section shall meet or exceed the requirements and quality of the items herein specified, or as denoted on the drawings. B. The fire pump shall be assembled by the pump manufacturer. An assembler of fire pumps not engaged in the design and construction of fire pumps shall not be considered as a fire pump manufacturer. The manufacturer shall assume Unit Responsibility for the complete fire pump. Unit responsibility shall be defined as responsibility for interface and successful operation of all system components supplied by the pumping system manufacturer. C. Ensure pump pressure ratings are at least equal to system s maximum operating pressure at point where installed, but not less than specified. D. The manufacturer shall have a minimum of 20 years experience in the design and construction of fire pump systems. E. The manufacturer shall carry a minimum product liability insurance of $2,000,000 per occurrence, with an aggregate product liability of $6,000,000. F. Equipment provider shall be responsible for providing certified equipment start&up and, when noted, an in the field certified training session. This pump start&up shall be by the pump manufacturer or a certified factory&trained representative per NFPA 20, Section 11&2. This start&up shall include verification of proper installation, system initiation, adjustment and fine tuning. Start&up shall not be considered complete until the sequence of operation, including all alarms, has been sufficiently demonstrated to the owner or owner s designated representative. This job site visit shall occur only after all hook&ups, tie&ins, and terminations have been completed and signed off on the manufacturer s start&up request form & 1

2 1.04 Product Handling A. Protection: Use all means necessary to protect equipment before, during, and after installation in accordance with manufacturer s storage, installation and maintenance instructions Regulatory Requirements A. National Fire Protection Association (NFPA 20) B. Factory Mutual (FM) C. Institute of Electrical and Electronic Engineers (IEEE) D. National Electrical Manufacturers Association (NEMA) E. American Society for Testing and Materials (ASTM) F. National Electric Code (NEC) G. Occupational Safety and Health Administration (OSHA) H. ANSI/HI standards I. Underwriters Laboratories, Inc Submittal A. Submit each item in this article according to the Conditions of the Contract and Specifications Sections B. Submit manufacture s installation instructions under provisions of General Conditions. C. Product Data including certified performance curves and rated capacities of selected models, weights (shipping, installed, and operating), furnished specialties, and accessories. Indicate pump s operating point on curve. D. Hanging and support requirements should follow the recommendations in the manufactures installation instructions Operation and Maintenance Data A. All equipment or components of this specification section shall meet or exceed the requirements and quality of the items herein specified, or as denoted on the drawings Delivery, Storage, and Handling A. Deliver materials to the site in such a manner as to protect the materials from shipping and handling damage. Provide materials on factory provided shipping skids. Materials damaged by the elements should be packaged in such a manner that they could withstand short&term exposure to the elements during transportation. Store materials in clean, dry place and protect from weather and construction traffic. Handle carefully to avoid damage Warranty: A. Provide a minimum one (1) year warranty from the date of operation or eighteen (18) months from the date of shipment on the product, whichever comes first Commissioning A. This section specifies a system or a component of a system being commissioned as defined in Section Commissioning. Testing of these systems is required, in cooperation with the Owner and the Commissioning Authority. Refer to Section Commissioning for detailed commissioning requirements & 2

3 2.00 PART 2 & PRODUCTS A. The specifying engineer reserves the right to specify a primary supplier/lead spec manufacturer on all supplied schedule and specification documents. These primary suppliers have lead their respective industry in research and development and their products have had proven track records in the field. These primary suppliers, in the opinion of this engineering firm, produce a superior product to the other manufactures Single Stage, Double Suction, Horizontal Splitcase 8100 Series Fire Pumps A. Manufacturer The pump(s) shall conform to the standards of NFPA 20 latest edition for the Installation of Centrifugal Fire Pumps. Acceptable manufacturers include AC Fire Pump, Peerless, Synchro, Peterson. B. Double Suction Horizontal Split&case Pump 1. The pump will provide a rated capacity of 1,000 GPM and a differential pressure of 70 PSI. At 150% of rated capacity, the pump shall develop at least 65% of its rated head and shall not exceed 140% of the rated head at zero capacity. The pump shall be tested at the factory and a test curve shall be submitted showing the performance and horsepower requirements based on this test before final acceptance. 2. The pump shall be a single stage, double suction, horizontally split case design, in cast iron bronze fitted construction with packing bearing directly on a bronze shaft sleeve. The casing shall be (close& grained cast iron ASTM A48 Class 35A for working pressures up to 175 psig), (ductile iron for working pressures up to 400 psig), and shall be of axially&split design with suction and discharge flanges and mounting feet cast integral with the lower half casing. Tapped and plugged holes shall be provided for priming, vent drain and gauge connections. The pump internals shall be capable of being serviced by removing the upper half casing without disturbing the piping connections or packing area. Flanges shall be 125# or 250# per ANSI B16.1 Standard. Suction and discharge shall be on a common centerline in both horizontal and vertical planes. 3. The impeller shall be of the enclosed double suction type made of bronze ASTM B584&875 non& overloading in operating characteristics utilizing the motor service factor, statically or dynamically balanced. The impeller shall be keyed to the shaft and positioned axially by the shaft sleeves, which are, in turn, locked in place by shaft nuts. 4. The shaft shall be made of SAE&1045 Steel or better, and of ample size to operate under load with a minimum of deflection. Shaft shall not be threaded anywhere inside the pump casing. 5. The shaft sleeve shall be made of bronze ASTM B584&932 and shall be locked in place by threaded, bronze shaft sleeve nuts. An O &ring shall be furnished under the sleeve to prevent leakage. 6. Stuffing box housing/bearing brackets shall be made of cast iron ASTM A48 Class 25A or Class 30A separate from the casing. Stuffing boxes shall not be split, but machined of one concentric piece to ease sealing. Stuffing box/bearing brackets will be drilled and tapped for drain connection. The stuffing box shall consist of graphited acrylic yarn packing, and a split type gland to permit removal and access to packing. Ample space shall be provided for re&packing the stuffing box. 7. Piping, valve and seal cages (if necessary) can be supplied to provide packing lubrication and shall be mounted on the upper half of the casing. Flush from an external source shall also be possible for lubrication and/or cooling & 3

4 8. Casing rings shall be made of bronze ASTM B584&932 and shall be installed with an anti&rotation device and designed to restrict leakage across the ring fit. 9. Bearings shall be grease lubricated ball type, single row inboard, double row outboard, selected to carry radial and thrust loads. The outboard bearing shall be retained by a bearing locknut and lockwasher. (Snap rings are not acceptable). The bearings, (inboard and outboard) shall be replaceable without opening the pump casing. 10. Bearing housings are made of cast iron ASTM A48 Class 25A or Class 30A, bolted to the ends of the bearing bracket/stuffing box and shall be male&female fitted for a full 360 degrees to assure positive alignment. The housings shall provide a fit for the inboard bearing that allows freedom for thermal expansion while the outboard bearing shall be clamped in place to take all thrust loads and keep the rotating element in its proper axial location. Openings for adding new grease and draining old grease shall be provided. 11. Baseplate shall be steel with or without drip pan, sufficiently rigid to support the pump and the driver. Final alignment of pump and driver shall be made after grouting and installation, and shall be approved by customer prior to operation. 12. Coupling shall be of the manufacturer s choice and of the flexible type. Coupling hubs shall be secured to the driver and driven shafts by a set screw located over the key. 13. Coupling guard shall be the can type, all metal guard rated per ANSI B15&1, Section 8 and OSHA 1910&219 compliant. 14. The driver shall be mounted with the pump on a baseplate at the pump manufacturer s plant and shipped as one unit. 15. Pump rotation shall be clockwise or counterclockwise when viewed from the driver. 16. Nameplates and other data plates shall be all corrosion resistant and suitably secured to the pump. 17. Pump manufacturer shall be ISO9001 certified Accessories A. The 8100 Series Horizontal Splitcase Fire Pump shall be furnished with the following fittings as standard: 1. ¾ pilot operated casing relief valve 2. ¾ automatic air release valve 3. 4 dial, liquid filled suction and discharge gauges B. Other fittings and accessories will include the following: 1. Eccentric suction reducer (if required) 2. Concentric discharge increaser (if required) 3. 6 flush mount test header assembly with four (4) 2 ½ Hose Valves, finish to be polished chrome 4. 6 low suction control valve 2.03 Fire Pump Controller A. Manufacturer The electric fire pump controller and automatic power transfer switch will be manufactured by Tornatech and supplied by Vulcan Fire Systems, Inc. The electric fire pump controller will have a ViZi Touch operator interface. The fire pump controller shall be rated for 460v, 3 Phase, 60 Hz operation & 4

5 B. Listing and Approval The electric fire pump controller and automatic power transfer switch shall meet the latest NFPA 20 requirements, be listed with UL (in accordance with UL218, UL1008 and CSA C22.2 No. 14 Industrial Control Equipment), approved by FM Global (in accordance with approvals Class 1321/1323) and by the City of New York for fire pump service. C. Starting Method The electric fire pump controller and automatic power transfer switch shall be a full service combined manual and automatic type suitable for full voltage Across&the&Line starting of the electric fire pump motor. D. Short Circuit Withstand Rating The short circuit withstand rating of the electric fire pump controller and automatic power transfer switch shall be 100 ka RMS at 200V & 480V or 50 ka RMS at 600V. E. Enclosure The standard enclosure shall be NEMA type 2 (IP31). The enclosure shall incorporate a bottom entry gland plate for normal and alternate power and/or motor lead entrance. The gland plate shall be field removable and meet the same NEMA rating of the enclosure. Lifting lugs shall be provided. F. Power Circuit Components The electric fire pump controller and automatic power transfer switch shall be supplied with an across the line electric motor starter and the following power components for both the normal and alternate (emergency) power supply: 1. Voltage surge arrestor for normal 2. Motor rated combination isolating switch and circuit breaker assembly. Both the isolating switch and circuit breaker shall be rated not less than 115% of the motor full load current. 3. The circuit breaker overcurrent sensing shall be non&thermal type, magnetic only. 4. Locked rotor protector set to automatically trip the circuit breaker within 8 to 20 seconds at 600% of full load current. The locked rotor protector shall be factory calibrated, set and tested. 5. An automatic power transfer switch mechanically held and electrically operated. Manual operation of the transfer switch shall be provided by means of manual operating handle. G. Operational Components The electric fire pump controller and automatic power transfer switch shall be supplied with the following externally flange mounted components approved to match the NEMA rating of the enclosure: 1. Common operating handle for the isolating switch and the circuit breaker assembly for normal power 2. Common operating handle for the isolating switch and circuit breaker assembly for alternate (emergency) power 3. Mechanically interlocked with the enclosure door to prohibit access to the interior in the ON position 4. One Emergency Start and run handle mechanism, latchable in the ON position H. Touch Screen Operator Interface The electric fire pump controller and automatic power transfer switch shall be supplied with a 4.2 LCD color touch screen (HMI technology) operator interface powered by an embedded microcomputer with software PLC logic. The operator interface s touch screen shall allow navigation through the various operating screens. The following keypad type pushbuttons shall be provided: 1. Start 2. Stop 3. Run Test 4. Navigation 5. Help 6. Home 7. Alarm(s) 8. Settings/Configuration 9. History/Statistics & 5

6 The touch screen operator interface shall graphically display: 1. Normal and alternate (emergency) power voltage and amperage readings of all three (3) phases, simultaneously and independently displayed with true RMS technology 2. Transfer switch status 3. Motor starting transition 4. Motor stopped/running 5. Type of starting cause 6. Actuation mode 7. Type of controller 8. Method of shutdown 9. Time and date 10. Pump room temperature (*F or *C) 11. System pressure in five (5) different user selectable units of measure a. PSI b. kpa c. Bar d. Feet of Head e. Meter of Water The touch screen operator interface shall allow for the program and display of: 1. Cut&in and Cut&out pressure settings 2. Minimum run period timer 3. Sequential start timer 4. Periodic test timer The user shall be able to select the language of operation on&site Contextual HELP screens shall be accessible to the user while navigating through the operator interface I. Condition and Alarm Visual Indicators The touch screen operator interface shall visually indicate alarms and differentiate the criticalness by color code: 1. Normal and alternate (emergency) power phase reversal 2. Normal and alternate (emergency) power phase loss 3. Locked rotor 4. Fail to start 5. Transfer switch trouble 6. Normal and alternate (emergency) power loss 7. Service required 8. Undercurrent 9. Overcurrent 10. Under voltage 11. Over voltage 12. Phase unbalance 13. Periodic test cut&in not reached 14. Periodic test solenoid valve check 15. Faulty pressure transducer 16. Low water level 17. Low system (discharge) pressure 18. Pump on demand 19. Over pressure 20. Under pressure 21. Alternate (emergency) power isolating switch OFF 22. Alternate (emergency) power circuit breaker open & 6

7 23. Low pump room temperature J. Pressure and Event Recording The fire pump controller s touch screen operator interface shall be capable of logging pressure data and operational events with time and date stamp. It shall be able to display the last 500 operational events and display the pressure data in text and/or graphic form. Under regular maintained operation, pressure data and operational events can be stored in memory for up to 5 years. The data shall also be retrievable and downloadable to a flash memory disk via the USB port accessible to the user without having to open the controller door. General system information, events and alarms include the following: 1. Last service statistics a. Powered since b. On time c. Motor last run d. Motor run time e. Motor start count f. Minimum, maximum, average system PSI g. Minimum, maximum, average pump room temperature h. Generator last run i. Generator run time j. Transfer switch transfer count 2. All time statistics a. First power up b. First start up c. On time 3. Power statistics a. Voltage between phases with date stamp b. Amperage between phases with date stamp K. Wetted Parts (Pressure Transducers) The electric fire pump controller and automatic power transfer switch shall be supplied with two (2) pressure transducers and run test solenoid valve assembly. The pressure sensing line connection to the pressure transducer shall be ½ FNPT. The second pressure transducer is provided as a backup to the primary setup. This assembly shall be rated 500psi (calibrated at 0&300psi) working pressure and be externally mounted with a protective cover. The electric fire pump controller s operator touch screen programming shall be designed to switch pressure transducers in the event of a primary failure. L. Service/Flow Testing Capabilities The electric fire pump controller s touch screen operator interface shall have the capability of scheduling maintenance reminders. It shall also have the capability of inputting pump flow test data, generate and display the pump curve and store this information in memory for the lifetime of the controller. M. Connection for External Devices The electric fire pump controller and automatic power transfer switch shall provide terminals for the connection for the following external devices: 1. Manual remote start device 2. Automatic remote start device 3. Deluge valve start 4. Generator start signal N. Alarm Contacts for Remote Indication SPDT dry alarm contacts rated for 8A 250VAC for remote indication shall be provided for the following conditions: 1. Power or phase failure and/or circuit breaker in open position 2. Phase reversal & 7

8 3. Pump run (2x) 4. Common pump room alarm (field re&assignable) 5. Common motor trouble (field re&assignable) 6. Emergency power isolating switch in the OFF position 7. Transfer switch in normal position 8. Transfer switch in emergency position 9. Field programmable Removable alarm contact terminals shall be provided. O. Audible Alarm A 4 alarm bell rated for 85dB at 10ft (3m) shall sound during boot up and internal communication error Jockey Pump A. The contractor shall install a Gould, vertical inline, multiple stage jockey pump manufactured by A&C Fire Pump and supplied by Vulcan Fire Systems. The jockey pump will be installed in accordance with NFPA 20. B. The jockey pump shall be rated at 10% of the flow (GPM) and 15 PSI greater than the differential pressure of the main fire pump. The jockey pump shall be rated for 460v, 3 Phase, 60 Hz operation Jockey Pump Controller A. Manufacturer The jockey pump controller shall be manufactured by Tornatech and supplied by Vulcan Fire Systems. The jockey pump controller shall be rated for 460v, 3 Phase, 60 Hz. B. Approval and Listings The jockey pump controller shall meet the requirements of UL508A, CSA, and by the City of New York. C. Enclosure Rating The standard enclosure shall be NEMA 2 D. Operational Components The jockey pump controller shall be supplied with the following door mounted components approved to match the NEMA rating of the enclosure: 1. One main disconnect switch complete with door interlock and padlock provision in the OFF position 2. One Hand&Off&Auto rotary type selector switch The following control components shall be mounted inside the controller: 1. One magnetic across&the&line motor contactor rated for the jockey pump motor horsepower 2. One thermo magnetic motor protector complete with short circuit and motor overload protection E. Microprocessor Logic The jockey pump controller shall be supplied with a microprocessor to perform the automatic sequence of operation. The microprocessor shall be mounted inside the jockey pump controller and have a high luminosity LED digital display which shall display the following: & 8

9 1. System Pressure 2. Cut&in pressure setting 3. Cut&out pressure setting 4. Minimum run period timer 5. Delay start timer The system pressure indication shall be continuously displayed. The microprocessor shall allow the system pressure, cut&out and cut&in settings to be displayed in either PSI, Bar, kpa, meter of head, or feet of head. F. Pressure Sensing Device The jockey pump controller shall be supplied with a 316 stainless steel pressure transducer rated for fresh water operational between 0 and 300psi. The pressure transducer shall be used to display the pressure in the sprinkler system and also control the automatic start circuit. The pressure transducer shall be installed inside the controller directly mounted to a bulkhead allowing for an external connection to the sprinkler system sensing line 3.00 PART 3 & EXECUTION 3.01 Coordination A. Coordinate installations with other contractors, specifically Division 26 and 28, to insure that a complete, operable system meeting the intent of these specifications and the plans that are provided. B. Coordinate voltage on fire pumps, fire pump controllers, jockey pumps, and jockey pump controllers with electrical drawings Installation A. Installations to be done by a licensed sprinkler contractor in the Commonwealth of Kentucky B. Provide and install fire pump systems in accordance with NFPA edition, NFPA 25, these specifications, and as shown on the contract drawings C. Prior to start&up, test all piping connections to insure that they are adequate D. Prepare and test pumps to assure that it meets capacity as specified in these specifications. A factory representative shall be made available, on the project site, to check installation, provide flow acceptance testing, start&up, and demonstrate to the owner s representative(s) the proper operation and maintenance of each fire pump system Startup A. Major equipment and system startup and operational tests shall be scheduled and documented in accordance with Section Commissioning Functional Performance Tests A. Major equipment and system startup and operational tests shall be scheduled and documented in accordance with Section Commissioning. END OF SECTION & 9

SECTION FIRE PUMP AND CONTROLS

SECTION FIRE PUMP AND CONTROLS SECTION 15320 FIRE PUMP AND CONTROLS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Fire pump, jockey pump, and controls including necessary accessories as shown in Construction Documents, specified

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps Note: The A/E must choose all design values in brackets below before using in project specifications 1 General 1.1 Provide UL listed and FM approved fire pump complete with pump, driver, controller and

More information

Project: Customer: Engineer: Pump Manufacturer: Model GPY + GPU. with Automatic Power Transfer Switch

Project: Customer: Engineer: Pump Manufacturer: Model GPY + GPU. with Automatic Power Transfer Switch Project: Customer: Engineer: Pump Manufacturer: Model GPY + GPU with Automatic Power Transfer Switch Contents: NOTE: The drawings included in this package are for controllers covered under our standard

More information

Drawing Submittal Package

Drawing Submittal Package Project: Customer: Engineer: Pump Manufacturer: Drawing Submittal Package Model GPL + GLU Limited Service Full Voltage Across the Line Start Electric Pump Controller with Automatic Power Transfer Switch

More information

Drawing Submittal Package

Drawing Submittal Package Project: Customer: Engineer: Pump Manufacturer: Drawing Submittal Package Model GPL + GLU Limited Service Full Voltage Across the Line Start Electric Pump Controller with Automatic Power Transfer Switch

More information

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016 SECTION 23 21 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.

More information

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL SECTION 21 30 00 FIRE PROTECTION PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00,

More information

Model VPS Pressure Limiting (VFD) Electric Fire Pump Controller with Soft Start Bypass

Model VPS Pressure Limiting (VFD) Electric Fire Pump Controller with Soft Start Bypass Project: Customer: Engineer: Pump Manufacturer: Submittal Document Model VPS Pressure Limiting (VFD) with Soft Start Bypass Contents: Data Sheets Dimensional Data Wiring Schematics Field Connections Note:

More information

Technical Data Submittal Document

Technical Data Submittal Document Project: Customer: Engineer: Pump Manufacturer: Technical Data Submittal Document Model GPL + GLU Limted Service Full Voltage Across the Line Start Electric Fire Pump Controller Contents: Data Sheets Dimensional

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

P.C. Simonton & Associates, Inc. Consulting Engineers. Paul C. Simonton

P.C. Simonton & Associates, Inc. Consulting Engineers. Paul C. Simonton P.C. Simonton & Associates, Inc. Consulting Engineers 309 North Main Street 1050 Parkside Commons Post Office Box 649 Suite 101 Hinesville, Georgia 31310 Greensboro, Georgia 30642 Addendum No. One Date:

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

.2 Section Waste Management and Disposal..5 Section Motors, Drives and Guards for Mechanical Systems.

.2 Section Waste Management and Disposal..5 Section Motors, Drives and Guards for Mechanical Systems. Issued 2006/08/01 Section 15131 Pumps Hydronic Systems Page 1 of 6 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal.3 Section 01780

More information

SECTION Fire Pumps

SECTION Fire Pumps SECTION 21 30 00 Fire Pumps PART 1 GENERAL 1.1 WORK INCLUDED A. Furnish, install and test a motor-driven fire pump, jockey pump, and controllers in the space provided and as shown in the contract drawings.

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

Model VPS + VPU Pressure Limiting (VFD) Electric Fire Pump Controller with Soft Start Bypass with Automatic Power Transfer Switch

Model VPS + VPU Pressure Limiting (VFD) Electric Fire Pump Controller with Soft Start Bypass with Automatic Power Transfer Switch Project: Customer: Engineer: Pump Manufacturer: Technical Data Submittal Document Model VPS + VPU Pressure Limiting (VFD) with Soft Start Bypass with Automatic Transfer Switch Contents: Data Sheets Dimensional

More information

WITH POWER TRANSFER SWITCH STANDARD SUBMITTAL PACKAGE

WITH POWER TRANSFER SWITCH STANDARD SUBMITTAL PACKAGE WITH POWER TRANSFER SWITCH STANDARD SUBMITTAL PACKAGE SBP1000-61 FTA1000 Full Voltage Starting Electric Fire Pump Controllers Product Description Description Firetrol FTA1000 Full Voltage Fire Pump Controllers

More information

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI Hydraulic Institute Standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals. SECTION 23 21 23 - HYDRONIC PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Soft Start Series MP700 Solid State, Reduced Voltage

Soft Start Series MP700 Solid State, Reduced Voltage Metron Fire Pump Controls and Accessories Soft Start Series MP700 Solid State, Reduced Voltage Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s

More information

SECTION ELECTRIC-DRIVEN, FIRE PUMPS

SECTION ELECTRIC-DRIVEN, FIRE PUMPS SECTION 21 30 13 ELECTRIC-DRIVEN, FIRE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between // --- // if not applicable to the project. Also delete any other item or paragraph including

More information

FTA550 JOCKEY PUMP CONTROLLERS

FTA550 JOCKEY PUMP CONTROLLERS FTA550 JOCKEY PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE SBP550E (A) FTA550E XG Jockey Pump Controllers Product Description Failed to start indication Main switch not in Auto alarm Pressure recording

More information

DS series STERLING PUMPS. Industrial End Suction Pumps ISO/DP

DS series STERLING PUMPS. Industrial End Suction Pumps ISO/DP DS series Industrial End Suction Pumps ISO/DP 5199 www.sterlingpumps.com.au DS series Capacities from: Heads from: 340 to 5,680 m3/h (1,500 to 25,000 USPGM) 21 to 106 metres (70 to 350 feet) Power range

More information

MARLOW PUMPS RECIRCULATION

MARLOW PUMPS RECIRCULATION End suction centrifugal pump line available in both close coupled and frame mounted configurations allow users to meet exactly most flow conditions on commercial pool and waterpark applications. Features

More information

Across-the-Line SERIES MP300 Combined Manual and Automatic

Across-the-Line SERIES MP300 Combined Manual and Automatic Across-the-Line SERIES MP300 Combined Manual and Automatic Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s Standard for Centrifugal Fire Pumps

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps...

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps... PUMPS FOR INDUSTRY CONTENTS: The Vertical Pump Specialists Introduction & User List Product Overview Vertical Process Pumps... Series 600 Vertical Sewage Pumps... Series 700 Vertical Sump Pumps... Series

More information

MODEL 652A MODEL 654A MODEL 652A MODEL 653A MODEL 651A AURORA. 650 Series SINGLE STAGE SOLIDS HANDLING PUMPS

MODEL 652A MODEL 654A MODEL 652A MODEL 653A MODEL 651A AURORA. 650 Series SINGLE STAGE SOLIDS HANDLING PUMPS MODEL 652A MODEL 654A MODEL 652A MODEL 651A MODEL 653A AURORA 650 Series SINGLE STAGE SOLIDS HANDLING PUMPS WWW.AURORAPUMP.COM 2 AURORA 650 Series Single Stage Solids Handling Pumps Capacities to 2000

More information

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps. Issued 2006/08/01 Section 13920 Packaged Fire Pumps and Controllers Page 1 of 7 PART 1 GENERAL 1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1

More information

3020/3120 Series DEMING PUMPS. Frame-mounted and close-coupled Enclosded and semi-enclosed impeller Capacities to 4,000 GPM Heads to 780 feet

3020/3120 Series DEMING PUMPS. Frame-mounted and close-coupled Enclosded and semi-enclosed impeller Capacities to 4,000 GPM Heads to 780 feet 3020/3120 Series Frame-mounted and close-coupled Enclosded and semi-enclosed impeller Capacities to 4,000 GPM Heads to 780 feet A Crane Co. Company DEMING PUMPS Introducting Deming 3020/3120 Series End-Suction

More information

MODEL 664A MODEL 662A MODEL 663A MODEL 661A AURORA. 660 Series SINGLE STAGE SOLIDS HANDLING VORTEX PUMPS

MODEL 664A MODEL 662A MODEL 663A MODEL 661A AURORA. 660 Series SINGLE STAGE SOLIDS HANDLING VORTEX PUMPS MODEL 662A MODEL 664A MODEL 661A MODEL 663A AURORA 660 Series SINGLE STAGE SOLIDS HANDLING VORTEX PUMPS WWW.AURORAPUMP.COM 2 AURORA 660 Series Single Stage Solids Handling Vortex Pumps Capacities to 2600

More information

FTA550F JOCKEY PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE

FTA550F JOCKEY PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE FTA550F JOCKEY PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE SBP550F (A) FTA550F XG Jockey Pump Controllers Product Description Description Firetrol FTA550F XG Jockey Pump Controllers are intended for use

More information

LN series STERLING PUMPS. Horizontal Split Case Pumps. Double Volute. Single Stage.

LN series STERLING PUMPS. Horizontal Split Case Pumps. Double Volute. Single Stage. LN series Horizontal Split Case Pumps Double Volute. Single Stage www.sterlingpumps.com.au LN series Sizes: 6 to 42 Capacity to 12,500 m³/h Heads to 190 metres A rugged, single stage, double volute horizontal

More information

380 Series Multi-Stage Centrifugal Pumps

380 Series Multi-Stage Centrifugal Pumps 380 Series Multi-Stage Centrifugal Pumps Flows to: 2,500 GPM Heads to: 2100 Feet Temperatures to: 500+ F TDH - Feet 140 Years of Pump Manufacturing American-Marsh Pumps, one of the oldest pump lines in

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product

More information

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",

More information

LMR Electric Fire Pump Controllers Features

LMR Electric Fire Pump Controllers Features 1-1 Printer / Recorder The industrial grade thermal printer is housed in a rugged steel enclosure within the controller. The on/off switch, feed and reset buttons are front accessible. A bi-color status

More information

Ruhrpumpen Fire Systems

Ruhrpumpen Fire Systems FIRE SYSTEMS RP FIRE SYSTEMS Ruhrpumpen Fire Systems Fire pumps play a vital role as the first response to a fire situation, saving countless lives and property from destruction. They are usually found

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS SECTION 23 22 23 STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

SECTION DOMESTIC WATER PUMPS

SECTION DOMESTIC WATER PUMPS SECTION 22 11 23 DOMESTIC WATER PUMPS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following all-bronze and bronze-fitted centrifugal pumps for domestic cold- and hot-water circulation: 1. Close-coupled,

More information

Goulds 3600 Between-Bearing, Axially-Split, Multi-Stage Pumps. Goulds Pumps

Goulds 3600 Between-Bearing, Axially-Split, Multi-Stage Pumps. Goulds Pumps Between-Bearing, Axially-Split, Multi-Stage Pumps Goulds Pumps A Leader in API Engineered Pump Package Solutions Proven API Leadership ITT Goulds Pumps is a proven leader in API Pumps Over 18,000 units

More information

Variable Frequency Drive SERIES MP800 VFD

Variable Frequency Drive SERIES MP800 VFD Metron Fire Pump Controls and Accessories Variable Frequency Drive SERIES MP800 VFD Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s Standard for

More information

Horizontal Split Case Pumps Type U

Horizontal Split Case Pumps Type U Horizontal Split Case Pumps Type U 7.1 7.2 Stage U Type Pumps Features: Axially Split Case Design Range from 20M 3 /Hr to 600M 3 /Hr Two Stage Pump Single Suction Twin Volute Casing Design Closed type

More information

SECTION PACKAGED HEAT TRANSFER SYSTEM

SECTION PACKAGED HEAT TRANSFER SYSTEM PACKAGED HEAT TRANSFER SYSTEM Page 1 of 6 SECTION PACKAGED HEAT TRANSFER SYSTEM 1 GENERAL 1.1 SUMMARY A. Packaged steam-to-water heat transfer system 1.2 REFERENCES A. ASHRAE American Society of Heating,

More information

LMR Electric Fire Pump Controllers Features

LMR Electric Fire Pump Controllers Features 1-1 Printer / Recorder The industrial grade thermal printer is housed in a rugged steel enclosure within the controller. The on/off switch, feed and reset buttons are front accessible. A bi-color status

More information

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y CPO. Open Impeller ASME (ANSI) B73.1 Pump for continuous use in Chemical Process Services

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y CPO. Open Impeller ASME (ANSI) B73.1 Pump for continuous use in Chemical Process Services N N O V A T I O N E F F I C I E N C Y Q U A L I T Y CPO Open Impeller ASME (ANSI) B73.1 Pump for continuous use in Chemical Process Services Horizontal Split Case For more than 6 years the name Ruhrpumpen

More information

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES SECTION 21 30 00 FIRE PUMPS GENERAL This standard provides general requirements of The University of South Alabama in Mobile Alabama for fire pumps. This document is not intended to serve as a guide specification.

More information

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION HEATING BOILER FEEDWATER EQUIPMENT SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American

More information

Goulds 3600 Between-Bearing, Axially-Split, Multistage Pumps

Goulds 3600 Between-Bearing, Axially-Split, Multistage Pumps Goulds Pumps Goulds 3600 Between-Bearing, Axially-Split, Multistage Pumps motralec 4 rue Lavoisier. ZA Lavoisier. 95223 HERBLAY CEDEX Tel. : 01.39.97.65.10 / Fax. : 01.39.97.68.48 Demande de prix / e-mail

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

DualPak Series FILE NO: DATE: Feb. 15, 1999 SUPERSEDES: DATE: Sept. 28, DualPak 6900 Series Booster System

DualPak Series FILE NO: DATE: Feb. 15, 1999 SUPERSEDES: DATE: Sept. 28, DualPak 6900 Series Booster System DualPak Series 6900 FILE NO: 62.11 DATE: Feb. 15, 1999 SUPERSEDES: 62.11 DATE: Sept. 28, 1995 DualPak 6900 Series Booster System D U A L P A K 6 9 0 0 Armstrong proudly presents the Series 6900 DualPak

More information

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes). Guide Specifications PART 1 GENERAL 1.01 SYSTEM DESCRIPTION Microprocessor controlled, air-cooled liquid chiller utilizing scroll compressors, low sound fans, hydronic pump system and optional fluid storage

More information

Dean Pump High Temperature Chemical Process Inline Pumps

Dean Pump High Temperature Chemical Process Inline Pumps Bulletin C-1.2.21. Dean Pump High Temperature Chemical Process Inline Pumps Series DL Dean Pump Series DL High Temperature Chemical Process Inline Pumps Capacities to 600 GPM (182 m 3 /hr) Heads to 0 feet

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221123 - DOMESTIC WATER PUMPS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following all-bronze and bronze-fitted centrifugal pumps for domestic cold- and hot-water circulation: 1.

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS SECTION 23 22 23 - STEAM CONDENSATE PUMPS PART I - GENERAL 1.1 SECTION INCLUDES A. Steam Condensate Return Units, Gravity Return Type 1. Receiver 2. Pumps 3. Control Panel 4. Accessories Note to PSC: Although

More information

FDF Foam Pump Controllers Features

FDF Foam Pump Controllers Features FDF100 Diesel Engine Foam Pump Controllers 1-1 Product Description The FDF Series of Foam Pump Controllers are designed for use with foam concentrate injection, foam transfer and water mist systems for

More information

Series 4302 & FILE NO: 43d.12 DATE: June 1, 2004 SUPERSEDES: 43d.12 DATE: July 15, dualarm Vertical In-Line Pumps

Series 4302 & FILE NO: 43d.12 DATE: June 1, 2004 SUPERSEDES: 43d.12 DATE: July 15, dualarm Vertical In-Line Pumps Series 0 & FILE NO: d. DATE: June, 00 SUPERSEDES: d. DATE: July, 00 dualarm Vertical In-Line Pumps dualarm Smart pumps for the commercial HVAC market Vertical In-Line pump, the best design for HVAC systems,

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof

More information

SECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections.

SECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections. SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15410 - Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections. 1.02 SUBMITTALS A. Submit properly identified

More information

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE SECTION 21 1313 WET-PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Wet-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.02 RELATED

More information

SECTION FAN COIL UNITS

SECTION FAN COIL UNITS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

References are in agreement with UMRL dated April 2018 **************************************************************************

References are in agreement with UMRL dated April 2018 ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-23 21 23 (August 2017) ---------------------------- Preparing Activity: USACE Superseding UFGS-43 21 13 (January 2008) UFGS-43 21 39 (April 2008)) UNIFIED FACILITIES

More information

SECTION ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS

SECTION ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2

More information

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps...

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps... PUMPS FOR INDUSTRY CONTENTS: The Vertical Pump Specialists Introduction & User List Product Overview Vertical Process Pumps... Series 600 Vertical Sewage Pumps... Series 700 Vertical Sump Pumps... Series

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating

More information

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y CPO. ASME/ANSI B73.1 Chemical Process Pump

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y CPO. ASME/ANSI B73.1 Chemical Process Pump N N O V A T I O N E F F I C I E N C Y Q U A L I T Y CPO ASME/ANSI B73.1 Chemical Process Pump Horizontal Split Case For more than 6 years the name Ruhrpumpen TM has been synonymous worldwide with innovation

More information

dualarm Vertical In-Line Pumps

dualarm Vertical In-Line Pumps Series 430 & 438 dualarm Vertical In-Line Pumps FILE NO: 43d.1 DATE: Jan. 0, 010 SUPERSEDES: 43d.1 DATE: Sept., 008 Series 430 & 438 Smart pumps for the commercial HVAC market. Armstrong Vertical In-Line

More information

SECTION CHILLERS

SECTION CHILLERS SECTION 15650 PART I - GENERAL 1.01 WORK INCLUDED A. Extent of work shall be as indicated on Drawings and provisions of this section, including schedules and equipment lists associated with either Drawings

More information

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work. Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED

More information

Full-line Product Overview

Full-line Product Overview Full-line Product Overview End Suction Centrifugal Pumps This general purpose pump can be configured in frame-mounted and close-coupled, semi-open and enclosed impeller configurations. They are available

More information

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc MASTER JOCKEY PUMP CONTROLLER Model JPCE INSTRUCTION MANUAL C 2018 Master Control Systems, Inc TABLE OF CONTENTS Important Safety Information. Page 3 General Description and Installation.. Page 4 Model

More information

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps...

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps... PUMPS FOR INDUSTRY CONTENTS: The Vertical Pump Specialists Introduction & User List Product Overview Vertical Process Pumps... Series 600 Vertical Sewage Pumps... Series 700 Vertical Sump Pumps... Series

More information

380 Series Multi-Stage Centrifugal Pumps

380 Series Multi-Stage Centrifugal Pumps 380 Series Multi-Stage Centrifugal Pumps Flows to: 4,800 GPM Heads to: 2100 Feet Temperatures to: 500 F TDH - Feet 130 Years of Pump Manufacturing American-Marsh Pumps, one of the oldest pump lines in

More information

A. Codes and Standards that are Standard at the University:

A. Codes and Standards that are Standard at the University: PART 1: GENERAL 1.01 Purpose: 1.02 References: 1.03 Requirements: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The

More information

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section PART 1 - GENERAL 1.00 GENERAL PROVISIONS A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section 1.01 DESCRIPTION OF WORK A. Work Included: Provide

More information

SECTION ROTARY-SCREW WATER CHILLERS

SECTION ROTARY-SCREW WATER CHILLERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Factory-assembled packaged chiller. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Electrical power connections.

More information

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y VTP. Vertical Turbine Pump

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y VTP. Vertical Turbine Pump N N O V A T I O N E F F I C I E N C Y Q U A L I T Y VTP Vertical Turbine Pump For more than 60 years the name Ruhrpumpen TM has been synonymous worldwide with innovation and reliability for pumping technology

More information

Technical Data Submittal Documents

Technical Data Submittal Documents Project: Customer: Engineer: Pump Manufacturer: Technical Data Submittal Documents Model PD - FM Diesel Engine Driven Fire Pump Controller Contents: Data Sheets Dimensional Data Wiring Schematics Field

More information

SECTION PUMPS. 6. Section Steam and Condensate Piping and Specialties.

SECTION PUMPS. 6. Section Steam and Condensate Piping and Specialties. SECTION 15540 PUMPS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Base Mounted Pumps. 2. Horizontal Split Case Pumps. 3. In line Pumps. 4. Steam Condensate Return Pumps. B. Related Sections: 1. Section

More information

SERIES 1600 Quality Design Features Assure Long, Trouble-Free Service

SERIES 1600 Quality Design Features Assure Long, Trouble-Free Service Vortex End Suction SERIES 1600 Quality Design Features Assure Long, Trouble-Free Service WIDE RANGE OF APPLICATIONS: Food Processing Solids Waste Water Treatment Pollution Control Slurries Industrial Process

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

GH Series End Suction Centrifugal Pumps For Flows to 2,500 GPM

GH Series End Suction Centrifugal Pumps For Flows to 2,500 GPM GH Series End Suction Centrifugal Pumps For Flows to 2,500 GPM The GH Series The GH is Carver s horizontal, end suction pump series for handling water, oils, and chemicals in marine, process, and general

More information

CPO N N O V A T I O N E F F I C I E N C Y Q U A L I T Y. ASME/ANSI B73.1 Chemical Process Pump. Springer Pumps, LLC

CPO N N O V A T I O N E F F I C I E N C Y Q U A L I T Y. ASME/ANSI B73.1 Chemical Process Pump. Springer Pumps, LLC N N O V A T I O N E F F I C I E N C Y Q U A L I T Y CPO ASME/ANSI B73.1 Chemical Process Pump Tel: 866-777-66 Horizontal Split Case For more than 6 years the name Ruhrpumpen TM has been synonymous worldwide

More information

FAIRBANKS NIJHUIS SOLIDS HANDLING PUMPS.

FAIRBANKS NIJHUIS SOLIDS HANDLING PUMPS. FAIRBANKS NIJHUIS SOLIDS HANDLING PUMPS www.fairbanksnijhuis.com FAIRBANKS NIJHUIS History and Development Since the early part of this century, Fairbanks Nijhuis Pump has set industry standards in innovative

More information

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc MASTER PRESSRE MAINTANENCE CONTROLLER Models PMCE INSTRUCTION MANUAL C 2018 Master Control Systems, Inc TABLE OF CONTENTS Important Safety Information. Page 3 General Description and Installation.. Page

More information

SENTRA Series Water Unit

SENTRA Series Water Unit SENTRA Series Water Unit Standard Unit: F to 0 F Process Fluid Temperatures* Optional High Temperature Configuration to 0 F Direct Injection Cooling 0 to kw Heaters to 7. HP Centrifugal Pumps (0-00 GPM)

More information

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Design and Construction Standards SECTION PLUMBING EQUIPMENT SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES

More information