1 Page 1 of 15 Second Revision No. 8-NFPA [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 13, Standard for the Installation of Sprinkler Systems, 2013 edition. NFPA 31, Standard for the Installation of Oil-Burning Equipment, 2011 edition. NFPA 54, National Fuel Gas Code, 2012 edition. NFPA 58, Liquefied Petroleum Gas Code, edition. NFPA 70, National Electrical Code, edition. NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2013 edition. NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, 2012 edition. NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances, 2013 edition. NFPA 259, Standard Test Method for Potential Heat of Building Materials, 2013 edition. NFPA 5000, Building Construction and Safety Code, 2012 edition. Submittal Date: Thu Apr 04 10:57:24 EDT 2013 Updated references in accordance with the NFPA regulations. Notes: Date Submitted By Apr 4, 2013 Duval The names of the NFPA 70 and 5000, where not changed. They should not be underlined.

2 Page 2 of 15 Second Revision No. 7-NFPA [ New Section after ] External Waste Compactors. A waste compactor that is located outside of a building, but is accessed (i.e., hand-fed) from inside the building by means of an intake door and a hopper. Submittal Date: Wed Apr 03 15:29:42 EDT 2013 The added a new definition to further clarify the external waste compactor. Notes: Date Submitted By Apr 4, 2013 Duval New section, renumber subsequent sections.

3 Page 3 of 15 Second Revision No. 9-NFPA [ Section No ] Gravity Chute Intake Door. See Submittal Date: Thu Apr 04 11:08:09 EDT 2013 This term was removed in the First Draft, it is no longer used in the document. It is removed to avoid any confusion.

4 Page 4 of 15 Second Revision No. 10-NFPA [ Section No ] Pneumatic Chute Loading Door. See Submittal Date: Thu Apr 04 11:09:22 EDT 2013 This term was removed in the First Draft, it is no longer used in the document. It is removed to avoid any confusion.

5 Page 5 of 15 Second Revision No. 12-NFPA [ Section No ] All unlined steel chutes shall be protected internally by automatic sprinklers. (See ) Submittal Date: Thu Apr 04 12:34:48 EDT 2013 Editorial correction - corrected a cross-reference. The cross-reference is supposed to be to the sprinkler requirements for gravity chutes ( ) and not to the chute intake door requirements ( ). Notes: Date Submitted By Apr 4, 2013 Duval Cross-reference is to

6 Page 6 of 15 Second Revision No. 1-NFPA [ Section No ] A key shall be required to open the door. A lock shall be provided for the chute intake door. Submittal Date: Wed Apr 03 09:07:35 EDT 2013 The revised this section to clarify that the door is to be locked, not necessarily need a traditional key, but by the use of a locking mechanism such as electronic card readers or a key. Notes: Date Submitted By Apr 4, 2013 Duval Nor shown legislatively correct. Public Comment No. 8-NFPA [Section No ]

7 Page 7 of 15 Second Revision No. 2-NFPA [ Section No ] * Service Opening Room Key. Limited-Access Chute Intake Room If entrance to a limited-access chute intake room is gained by key provided with a lock, the chute intake door shall not require a key to be opened lock One opening or the other shall be keyed Keying shall be required only for limited-access installations. Submittal Date: Wed Apr 03 09:16:53 EDT 2013 The revised this section to be consistent with SR-1 and to clarify language and added annex material, see SR-16. Notes: Date Submitted By Apr 3, 2013 Duval Annex material to be moved

8 Page 8 of 15 Second Revision No. 3-NFPA [ New Section after ] Fire dampers shall not be required where an engineered alternative system is provided that is acceptable to the authority having jurisdiction. Submittal Date: Wed Apr 03 09:46:24 EDT 2013 The addition of will provide consistancy with Public Comment No. 9-NFPA [New Section after ]

9 Page 9 of 15 Second Revision No. 5-NFPA [ Section No. 8.3 ] 8.3 External Waste Compactors. (Reserved) The compactor shall be constructed of noncombustible material * The compactor hopper extension access from the building shall be protected by a self-closing, fire resistance rated intake door in accordance with * Fire department access shall be maintained in accordance with the local building code Compactor extinguishing and access point shall be clearly marked The intake door shall be located in a room in accordance with the applicable requirements of Submittal Date: Wed Apr 03 11:44:06 EDT 2013 The committee expanded on the requirements for external fed waste compactors. The main hazard associated with these types of waste compactors is the risk of fire and smoke spread from the compactor back into the building. The also added in a definition to clarify how an external waste compactor is different than a waste compactor.

10 Page 10 of 15 Second Revision No. 24-NFPA [ Section No ] Chute intake loading and discharge doors shall be maintained clear and unobstructed at all times. Submittal Date: Thu Apr 04 14:08:07 EDT 2013 The term 'loading' was replaced by 'intake' during the First Draft stage. This revision is to make it consistent with the rest of the document.

11 Page 11 of 15 Second Revision No. 4-NFPA [ New Section after ] 11.5 Decommissioning of Waste and Linen Handling Systems and Equipment. Section 11.5 shall apply where a waste or linen chute is taken out of service permanently Chute Intake Door. The chute intake door shall be removed on all floors and the opening shall be filled with construction equivalent to the construction of the shaft or replaced with an access door with a fire protection rating in accordance with Chute Intake Room. If the chute intake room is a fire resistance rated room and is no longer used for storage of combustible materials, then the fire resistance rating of the room shall not be required to be maintained Chute Discharge Room Except as permitted by , the fire resistance rating of the chute discharge room shall be maintained and the door at the bottom of the chute shall be maintained in a closed position If the chute discharge room is no longer used for storage of combustible materials and the opening in the wall/floor accessing the chute is sealed with construction equivalent to the construction of the floor slab or replaced with a fire-rated access door with a fire rating in accordance with , the fire resistance rating of the room shall not be required to be maintained Chute Sprinkler System Sprinklers within the decommissioned chute shall be permitted to be taken out of service Where the sprinklers are not taken out of service, access to inspect and service the sprinklers in the chute shall be provided Waste Wash-Down System. Wash-down systems within the decommissioned chute shall be taken out of service. Submittal Date: Wed Apr 03 11:10:32 EDT 2013

12 Page 12 of 15 Based on the First Revision for the addition of the general chapter which added that all doors are to be installed and maintained in accordance with NFPA 80 except as modified, the wanted to make sure that when chutes are taken out of service permanently, the doors are removed properly while maintaining the fire-resistance rating of the chute enclosure. In order to maintain the rating of the chute enclosure (shaft), the openings need to be protected. When a chute is taken out of service, typically, the chute doors are left in place. This is fine, so long as these doors are not secured shut. When a door is permanently secured shut, it is no longer keeping the rating. Part of the fire resistance rating requirement for doors is to be able to inspect the door. If the door is not able to open, it is not considered to have the fire rating. It is this reason that the added in the requirements for decommissioning a chute, to give the users a method to remove the chute door while maintaining the rating of the chute enclosure.

13 Page 13 of 15 Second Revision No. 16-NFPA [ New Section after A ] A Locking is required only for limited-access installations. One opening or the other should be locked, but both are not required to be locked. Submittal Date: Thu Apr 04 13:22:47 EDT 2013 Added annex material for clarification of SR-2-NFPA

14 Page 14 of 15 Second Revision No. 26-NFPA [ Section No. A ] A The door or damper at the discharge opening of a waste chute is not required to be a labeled assembly; but rather shall should be of construction similar to a rated assembly to afford the protection required by Submittal Date: Thu Apr 04 14:17:41 EDT 2013 Editorial correction - removal of 'shall' from the annex and replaced with 'should'.

15 Page 15 of 15 Second Revision No. 6-NFPA [ New Section after A.6.4 ] A The intake door in this section is in reference to the door located in the building that is the access opening into the exterior waste compactor. The door opens into the hopper that extends to the compactor. The hopper extension should extend at least 1.83 m (6 ft) beyond the building so that the angle does not cause blockage or a build-up of waste. As always, waste compactors and components should be installed in accordance with the manufacturer's instructions. A The fire department access is typically a separate door into the compactor. This door allows for the fire department to easily access any potential fire within the compactor. Submittal Date: Wed Apr 03 15:07:11 EDT 2013 The added in some annex material to help further clarify the requirements added on external fed waste compactors. The recommended the distance of 6 ft from the building because during a survey of existing installations, most compactors where located more than 6 ft from the building. The distance of 6 ft is intended to give the user a distance that will allow for an angle to prevent waste building-up in the hopper. Additionally, as with most self-contained and breakaway compactors, there should be a separate fire department access door located on the compactor. The added in clarification for the reason why there should be a separate door and it being maintained.

Second Revision No. 3 implements the text of Committee Input No. 36 as proposed in the First Draft Report, along with the following amendments:

Second Revision No. 3 implements the text of Committee Input No. 36 as proposed in the First Draft Report, along with the following amendments: Second Revision No. 3-NFPA 31-2015 [ Section No. 10.5.1 ] 10.5.1* Oil burners, other than oil stoves with integral tanks, shall be provided with some means for manually stopping the flow of oil to the

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

WORKING DRAFT OF COMMITTEE MEETING OUTPUT WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 221 Revision Cycle: A2014 Meeting Date: 5/20/2013

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

Gravity and Pneumatic Waste and Linen Handling Systems NFPA 82 Inspection Form

Gravity and Pneumatic Waste and Linen Handling Systems NFPA 82 Inspection Form Gravity and Pneumatic Waste and Linen Handling Systems NFPA 82 Inspection Form PART 1 GRAVITY CHUTES CHUTE DESIGN AND INSTALLATION INTAKE OPENINGS LIMITED ACCESS OFFSETS DIMENSIONS VENTING CONSTRUCTION

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement Second Revision No. 5501-NFPA 5000-2016 [ New Section after 29.2.1.2 ] 29.2.1.3 Bathtubs, bathtub-shower combinations, and nonemergency showers shall be provided with grab bars in accordance with the provisions

More information

First Revision No. 15-NFPA [ Chapter 2 ]

First Revision No. 15-NFPA [ Chapter 2 ] Page 1 of 28 First Revision No. 15-NFPA 91-2013 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

NFPA 45 NFPA 211 NFPA 1600

NFPA 45 NFPA 211 NFPA 1600 NFPA 45 NFPA 211 NFPA 1600 Prepared by: William E. Koffel, P.E., FSFPE Expertly Engineering Safety From Fire 1 Objectives Overview of the NFPA process Understand the scope and application of NFPA 45, NFPA

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM of 66 5/18/2015 1:01 PM Second Revision No. 36-NFPA 32-2015 [ Detail ] 6.5 Solvents (See Annex C for additional information on solvents) Submittal Date: Tue Mar 17 17:20:03 EDT 2015 Committee Statement:

More information

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting.

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. Input No. 7-NFPA 80-2013 [ Section No. 3.3.8 ] 3.3.8 Automatic Fire Detector. A device designed to detect the presence of a fire signature and to initiate action. For the purpose of this standard, automatic

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR3002 SAF-HEA (18.1.3.2) Recommendation: 18.1.3.2 Atrium walls in accordance with 6.1.14.4.6 shall be permitted to serve as part of the separation required by 6.1.14.4.1 for creating separated occupancies

More information

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ]

1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ] National Protection Association Report http://submittals.nfpa.org/terraviewweb/formlaunch?id=/terraview/c... 1 of 4 10/26/2015 1:58 PM Committee Input No. 3514-NFPA 5000-2015 [ Section No. 8.7.2 ] National

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

Page 1 of 12 Input No. 62-NFPA 409-2013 [ Section No. 3.3.9 ] 3.3.9 Hangar Building Cluster. A group of buildings with more than one area for the storage and servicing of aircraft and all attached or contiguous

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical self-closing device

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

Second Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 6/23/ :34 AM

Second Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 6/23/ :34 AM of 56 6/23/2016 11:34 AM Second Revision No. 1-NFPA 96-2016 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE California Society for Healthcare Engineering SOUTHERN CALIFORNIA SEMINAR LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE 1 PROGRAM AGENDA Adoption of 2012 LSC CMS Final Rule / Amendments

More information

Second Revision No. 2-NFPA [ Section No ]

Second Revision No. 2-NFPA [ Section No ] Page 1 of 8 Second Revision No. 2-NFPA 410-2014 [ Section No. 10.2 ] 10.2* Fire Extinguishers. In addition to extinguishers required by NFPA 409, extinguishers shall be provided for aircraft maintenance

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Page 1 of 126 First Revision No. 113-NFPA 45-2013 [ Global Input ] Change all references to Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS) Submittal Date: Thu May 09 11:40:44 EDT 2013 Response

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR7040 SAF-MER (36.1.1.4) 36.1.1.4 The provisions of this chapter shall apply to life safety requirements for all new mercantile buildings. Specific requirements shall apply to suboccupancy groups,

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition Copyright National Fire Protection Association 2013. All rights reserved. This copy is solely for your personal, noncommercial use in connection with participation in the NFPA Standards Development Process.

More information

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] 4.3.11.5.5 Materials within a raised floor plenum exposed to the airflow shall be (a) noncombustible or (b) exhibit a maximum flame spread index of 25

More information

MSC Guidelines for Watermist Fire Suppression Systems Procedure Number: E1-03 Revision Date: 02/16/2017

MSC Guidelines for Watermist Fire Suppression Systems Procedure Number: E1-03 Revision Date: 02/16/2017 Procedure Number: E1-03 Revision Date: 02/16/2017 References: S. T. Brady, CDR, Chief, Engineering Division a. National Fire Protection Association (NFPA) 750, 1996 Edition, Standard on Water Mist Fire

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 3-4, 20 CODE CHANGES Issue : Clarification of when 703.6 can be used rather than 76. 76.2 --rated glazing. --rated

More information

CHAPTER 5: EXHAUST SYSTEMS

CHAPTER 5: EXHAUST SYSTEMS MOTORS, FANS AND FILTERS 503.1 General. Motors and fans shall be sized to provide the required air movement. Motors in areas that contain flammable vapors or dusts shall be of a type approved for such

More information

CHAPTER 8 CHIMNEYS AND VENTS

CHAPTER 8 CHIMNEYS AND VENTS CHAPTER 8 CHIMNEYS AND VENTS SECTION 801 GENERAL 801.1 Scope. This chapter shall govern the installation, maintenance, repair and approval of factory-built chimneys, chimney liners, vents and connectors.

More information

6/9/ :58 PM. First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement

6/9/ :58 PM. First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement First Revision No. 1-NFPA 259-2016 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D5865, Standard Test Method

More information

Committee on NFPA 51A

Committee on NFPA 51A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant DATE: May 6, 2010 SUBJECT: ROC Letter Ballot The ROC letter ballot

More information

Technical Committee on Incinerators and Waste Handling Systems

Technical Committee on Incinerators and Waste Handling Systems Technical Committee on Incinerators and Waste Handling Systems Date: April 27, 2017 To: From: Technical Committee on Incinerators and Waste Handling Systems Eric Nette, Staff Liaison/Engineer Re: Agenda

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

CHIMNEYS AND VENTS CHAPTER 8

CHIMNEYS AND VENTS CHAPTER 8 CHAPTER 8 CHIMNEYS AND VENTS SECTION 801 GENERAL 801.1 Scope. This chapter shall govern the installation, maintenance, repair and approval of factory-built chimneys, chimney liners, vents and connectors.

More information

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET 1 SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT

More information

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Protected Premises Fire Alarm

More information

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009. SECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fabricated breechings. B. Manufactured chimneys for gas fired equipment. C. Manufactured double wall chimneys for

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

CHAPTER 8 CHIMNEYS AND VENTS

CHAPTER 8 CHIMNEYS AND VENTS CHAPTER 8 CHIMNEYS AND VENTS SECTION 801 GENERAL 801.1 Scope. This chapter shall govern the installation, maintenance, repair and approval of factory-built chimneys, chimney liners, vents and connectors.

More information

IMO UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED FIRE TEST PROCEDURES

IMO UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED FIRE TEST PROCEDURES INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON FIRE PROTECTION 46th session Agenda item 5 FP 46/5 30 November 2001 Original: ENGLISH UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 105 1/21/2016 7:49 AM Public Input No. 2-NFPA 30A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

M E M O R A N D U M. All Licensed Assisted Living Facilities. Felicia Cooper, Deputy State Fire Marshal Administrator Don Zeringue, Chief Architect

M E M O R A N D U M. All Licensed Assisted Living Facilities. Felicia Cooper, Deputy State Fire Marshal Administrator Don Zeringue, Chief Architect M E M O R A N D U M To: From: Approved: All Licensed Assisted Living Facilities Felicia Cooper, Deputy State Fire Marshal Administrator Don Zeringue, Chief Architect Henry Fry, Deputy Assistant Secretary

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

First Revision No. 36-NFPA [ Section No. 1.1 [Excluding any Sub-Sections] ]

First Revision No. 36-NFPA [ Section No. 1.1 [Excluding any Sub-Sections] ] of 71 6/11/2014 8:20 AM First Revision No. 36-NFPA 76-2014 [ Section No. 1.1 [Excluding any Sub-Sections] ] This standard provides requirements for fire protection of telecommunications facilities where

More information

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Construction

More information

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region The following sections, paragraphs, and sentences of the 2015 International Existing

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Building Service and

More information

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 2-NFPA 259-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D 5865, Standard Test Method

More information

CUMULATIVE ANALYSIS OF UNIFORM MECHANICAL CODE CHANGES to 2003

CUMULATIVE ANALYSIS OF UNIFORM MECHANICAL CODE CHANGES to 2003 CUMULATIVE ANALYSIS OF UNIFORM MECHANICAL CODE CHANGES 2000 to 2003 The following pages contain comments regarding the changes to the 2000 edition of the UNIFORM MECHANICAL CODE (UMC ) that were made to

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

Committee on NFPA 30A

Committee on NFPA 30A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Automotive and Marine Service Stations Patti Mucci, Administrative Assistant DATE: February 5, 00 SUBJECT: ROP Letter Ballot The ROP

More information

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4 THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4 WELCOME Moderator: Richard Schieferdecker support.webinato.com Audio 1 QUESTIONS How To Ask a Question: POLLING There will be occasional

More information

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. 1.1.1.1 (B), (C), & (D)

More information

Report on First Revision June 2014 NFPA 101

Report on First Revision June 2014 NFPA 101 101- Log #62 SAF-BSF Final Action: (9.2.3) Submitter: Doug Hohbein, Northcentral Regional Fire Code Development Committee Recommendation: Revise to read: 9.2.3 Commercial Cooking Equipment Operations.

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M (AMENDMENT) TO: FROM: Technical Committee on Mercantile

More information

IMC Significant Changes Summary Tier I

IMC Significant Changes Summary Tier I 2009-2015 IMC Significant Changes Summary Tier I 202 Environmental Air The definition of environmental air has been expanded through the addition of parking garage exhaust. 306.1 Access More than just

More information

First Revision No. 158-NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No. 158-NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 326 11/21/2013 1:03 PM First Revision No. 158-NFPA 72-2013 [ Global Input ] Revise 2.3.1 to update UL 864 to "2003, revised 2012" and upate ANSI/ASME A17 to 2013. Submittal Date: Wed Sep 11 11:08:52

More information

"Spray area" is the term that is used throughout the document. This change is for consistency.

Spray area is the term that is used throughout the document. This change is for consistency. of 78 5/30/2014 2:08 PM Public Comment No. 39-NFPA 33-2013 [ Global Input ] For Chapter 18, replace "spray paint area" with "spray area". "Spray area" is the term that is used throughout the document.

More information

The following are the Proposed Amendments to 2015 edition of the Life Safety Code (NFPA 101):

The following are the Proposed Amendments to 2015 edition of the Life Safety Code (NFPA 101): The following are the Proposed Amendments to 2015 edition of the Life Safety Code (NFPA 101): 1.1.1 Title. NFPA 101, Life Safety Code, shall be known as the Life Safety Code, is cited as such, and shall

More information

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev This fact sheet provides an overview of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. These revisions are published

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure