EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Size: px
Start display at page:

Download "EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT"

Transcription

1 EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Plot # Sector # 07, Chittagong Chittagong Chittagong 08 Jun 2014 The Alliance for Worker Safety Page 1/18

2 08 Jun 2014 Introduction to the Report The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by the Alliance for Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment was conducted against the Alliance for Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard, which is harmonized with the factory assessment guidelines developed by University of Engineering and Technology (BUET) for the National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technical requirements by which i Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairly evaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used by RMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on action steps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements through technical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wage support for workers if factories are closed for remediation. The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute or continued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to provide a non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF nor the Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report. For more information and report feedback please go to: The Alliance for Worker Safety Page 2/18

3 08 Jun 2014 GENERAL INFORMATION General Information Factory Country: Province: City: Chittagong Chittagong Zip Code: 4223 Audit Duration: Re-Audit: 1 Days Re-Audit After 0 Months Draft Report Final Report Are all Action Items From Previous Assessment Completed?: Buildings in Complex: Is the building(s) owned or rented by the Factory: Number of Building Levels (Stories): Approximate Building Area (SF): Date of Building Construction: N/A There are 4 buildings in the factory premises out of which one is main production building and three are ancillary buildings. The buildings are named as: 1) Two story prefab main production building, 2) Four story prefab admin building (under construction), 3) Three story prefab production building (under construction), 4) Single story dinning shed. Owned 1) Two story prefab main production building: Building height (est occupied floor level): 4 m or ft [Height up to roof: 7.62 m or 25 ft], Stories above grade: 2, Stories below grade: 0, Occupied levels: 2, 2) Four story prefab admin building (under construction), 3) Three story prefab production building (under construction), 4) Single story dinning shed: Building height (est occupied floor level): 30 cm or 1.00 ft above grade [Height up to roof: 3.65 m or12 ft], Stories above grade: 1, Stories below grade: 0, Occupied levels: 1. Total area of all buildings in the factory premises (except the under construction buildings): sft. Building wise breakdown as follows: 1) Two story prefab main production building: sft (Ground floor: sft, 1st floor: sft), 2) Four story prefab admin building (under construction), 3) Three story Prefab production building (under construction), 4) Single story dinning shed: sft. Factory personnel informed the date of building construction as follows: 1) Two story prefab main production building: Finished in 2001, 2) Four story prefab admin building (under construction): Started in 2013 and construction on going, 3) Three story prefab production building (under construction): Started in 2013 and construction on going, 4) Single story dinning shed: Finished in The Alliance for Worker Safety Page 3/18

4 08 Jun 2014 Date of Last Building Renovation/Addition: Ancillary Structures in Complex: Approximate Ancillary Structures Area (SF): Number of Occupants: Number of Ancillary Levels (Stories): Occupancy Type: Construction Type: Height of est Occupied Floor Level Above Grade: Factory personnel informed the date of last building renovation or addition as follows: 1) Four story prefab admin building (under construction): Started in 2013 and construction on going, 2) Three story prefab production building (under construction): Started in 2013 and construction on going. 1) Single story dinning shed. 1) Single story dinning shed: sft. Total number of occupants: ) Two story prefab main production building: 1350 (Ground floor: 725, 1st floor: 625), 2) Four story prefab admin building (under construction): 0, 3) Three story Prefab production building (under construction): 0, 4) Single story dinning shed: Ground floor: 5. 1) Single story dinning shed: Building height (est occupied floor level): 30 cm or 1.00 ft above grade [Height up to roof: 3.65 m or 12 ft], Stories above grade: 1, Stories below grade: 0, Occupied levels: 1. 1) Two story prefab main production building: [Ground floor: G2 (Sewing, finishing), K (Boiler, compressor), B2 (Childcare), H2 (Storage), 1stfloor: G2 (Sewing, cutting), F1 (Office)], 2) Four story prefab admin building (under construction): Not in use, 3) Three story Prefab production building (under construction): Not in use, 4) Single story dinning shed: ground floor: E3 (Dinning), K (Kitchen). 1) Two story prefab main production building: Non-rated, 2) Four story prefab admin building (under construction): Non-rated, 3) Three story prefab production building (under construction): Non-rated, 4) Single story dinning shed: Non-rated. 1) Two story prefab main production building: 4 m or ft, 2) Four story prefab admin building (under construction): Under construction, 3) Three story Prefab production building (under construction): Under construction, 4) Single story dinning shed: 30 cm or 1.00 ft above grade. The Alliance for Worker Safety Page 4/18

5 08 Jun 2014 ASSESSMENT FINDINGS Fire Protection Construction Are openings and penetrations through rated walls and/or assemblies protected? An unprotected opening was found through the rated wall of production area on the 1st floor towards the staircase and passageway. Also, there is an opening at the boiler room on the ground floor. Also, the doors at different locations are not fire rated. Photograph: Openings and penetrations through rated walls are not protected. Install fire rated doors and windows or fill in unprotected openings with fire resistive rated assemblies. 15 Nov 2014 Includes doors, windows, ducts, piping, etc. Reference Alliance Standards Part 4 Section 4.6 Opening Protectives and Section 4.7 Penetrations Are exit enclosures provided with fire-resistive rated construction barriers? There are 4 staircases in the 2 story main building. Among them 3 numbers of staircases is required. Two (stair-2 and stair-3) out of these three are exterior stair which are provided with fire rated doors and another one is RCC stair (stair-1 )in which fire door is not installed as a result exit enclosure is not fire rated which is required as per Alliance Standard. In stair-1 enclosure there are openings other than exit of production floor but in the direction of opening there is no occupancy and also there is no other opening of production floor within 10 ft distance. So, only installing the fire door can make smoke free enclosure. Internal stair is not the required stair and it is open to the production floor. So, in accordance to Alliance standard , this stair enclosure is not required. Photograph: No fire door is used in one exit enclosure at 1st floor of the main building. Provide outward opening, side-swinging, self-closing, non-lockable fire doors of 1 hr rating in all stairwell enclosures. Consult a qualified fire protection engineer to design the required rated construction barriers. 01 Oct 2014 The Alliance for Worker Safety Page 5/18

6 08 Jun 2014 Reference Alliance Standards Part 4 Section 4.5 Separation Are separations between hazards provided with fire-resistive rated construction barriers. Non-Compliance Level: 3 The main store (H2) and the production area (G2) is separated by a wooden door on the ground floor which is not fire resistive rated barrier. Also, wire mesh is used to separate the finished store area (H2) and production area (G2) on the ground floor. Fire resistive barrier is required to provide separation between these occupancies. Photograph: Separations between hazards are not provided at different points of the building. Provide fire-resistive rated construction barriers between hazard types following Table of Alliance Standard. Consult a qualified fire protection engineer to design the required rated construction barrier. 24 Dec 2014 Reference Alliance Standards Part 4 Section 4.5 Separation Certificates of Occupancy for each building have been issued and are on file. Low Non-Compliance Level: 1 No occupancy certificate is available for any building in the factory premises. Document Review: No document found. Apply to BEPZA for issuance of occupancy certificate and pursue the matter to expedite. 20 Aug 2014 Are certificates of occupancy provided for each building or ancillary structure? Fire Protection Systems The Alliance for Worker Safety Page 6/18

7 08 Jun 2014 Does the building have a Standpipe System? Non-Compliance Level: 1 Height of the highest occupied floor of the main building is ft (4 m) above grade. Therefore standpipe system is not required as per Alliance Standard Part 5 Section But class-ii stand pipe is installed in the building. No approved hydraulic calculation is available for this installed class II stand pipe. Photograph: class-ii stand pipe is available in the building. The system is to be compliant with the requirements of NFPA 14. The hydraulic calculations should be reviewed by Alliance. Testing of the installation shall be conducted in accordance with NFPA 14 acceptance testing requirements. Documentation of all testing shall be submitted for review by the Alliance. The Owner shall contact the Alliance prior to conducting the final acceptance testing of the standpipe installation to allow the Alliance the option of witnessing this testing and conduct a final inspection of the installation. 30 Sep 2014 Does the building have a standpipe system installed where required. Alliance Standard Part 5 Section Does the building have a fire pump? Non-Compliance Level: 1 A dedicated fire pump set is available with backup power; however it does not comply with the requirements of Alliance Standards and NFPA 20. Hydraulic calculation for installed standpipe systems is not also available. Photograph: Fire pump is available in the premises. Fire pump installation is to be tested for final acceptance in presence of Alliance and a final inspection of the installation shall be conducted by the Alliance prior to final acceptance of the installation by the Alliance as per clause Acceptance testing of the installation shall be in accordance with NFPA 20, 22, and 24 testing requirements. Documentation of all testing shall be submitted to the Alliance for review prior to final acceptance by the Alliance. 30 Sep 2014 Alliance Standard Part 5 Fire Protection Systems The Alliance for Worker Safety Page 7/18

8 08 Jun 2014 Are notification and initiation devices for the fire alarm system installed at required locations based on occupancy type? Non-Compliance Level: 1 Pull stations, smoke detectors, visual and audible devices are placed where required throughout the premises. But in the dining shed centralized smoke detectors were not available. Photograph: Notification and initiation devices for the fire alarm system installed at required locations in two story prefab shed based on occupancy type. Install automatic or manual fire alarm and detection systems throughout all new and existing buildings and structures where required in through Sep 2014 Pull stations at egress points, smoke detectors in air handling equipment, visual and audible devices spaced appropriately based on occupancy type. Reference NFPA 72 Are fire department connections provided and clearly identified for the Fire Protection Systems? Fire department inlet connection is not available but outlet connection (pillar hydrant) is provided. Outlet connections match fire service and civil defense hose thread standard. Connections are clearly identifiable for the fire protection system. Photograph: Only outlet connection (pillar hydrant) is available in the premises. Install fire department connections where required and in compliance with the Standard. Fire department (Siamese) inlet connections shall be provided to allow fire department pumper equipment to supplement the fire protection systems. Connections shall match the Fire Service and Civil Defense hose thread standard. 24 Dec 2014 Alliance Standard Part 5 Section Fire Department Connections Fire extinguishers are inspected, tested, and maintained as required. The Alliance for Worker Safety Page 8/18

9 08 Jun 2014 Extinguishers are inspected monthly by the factory's staff, but no document was found in support of i) annual maintenance of extinguishers by a servicing agent and ii) annual testing of nozzle of CO2 extinguisher. These are required as per NFPA 10. Document Review: No document was found in support of i) annual maintenance of extinguishers by a servicing agent and ii) annual testing of nozzle of CO2 extinguisher. Fire extinguishers are to be inspected, tested, and maintained in accordance with NFPA 10 requirements. 24 Dec 2014 NFPA 10 Chapter 7 Is the fire alarm and detection system monitored by a central station monitoring service or directly connected to the Fire Service and Civil Defense? Non-Compliance Level: 1 An automatic fire alarm and detection system is available in the factory, but currently there is no monitoring company in. Fire service and civil defense is not also capable of monitoring fire alarm and detection systems of the factories. Visual Assessment: Automatic fire alarm and detection system is available in the factory. Arrange for direct connection of the fire alarm system to a central monitoring station or Fire Service and Civil Defense as per Alliance Standard. Until that time that monitoring can be set up, arrange a monitoring system using factory's own central detection system and personnel. A person shall be assigned to contact the fire department in the event of fire alarm activation. An annunciator shall be located in a constantly attended location (such as a fire control room) to alert this person. 24 Dec 2014 Alliance Standard Part 5 Section Monitoring Are inspection, maintenance, and testing procedures of the standpipe and hose system documented and up to date? Including inspection and testing of hoses if provided. Low Inspection, maintenance, and testing procedures of the standpipe and hose are not documented and up to date. The Alliance for Worker Safety Page 9/18

10 08 Jun 2014 Document Review: No document found regarding inspection, maintenance and testing procedures of the standpipe and hose system. Establish an inspection, maintenance, and testing program for the standpipe and hose system. Program must comply with the requirements of NFPA 25 Chapter 6 Table Dec 2014 Reference NFPA 25 Chapter 6 Standpipe and Hose Systems Table Are inspection, maintenance, and testing procedures of the fire pump documented and up to date? Low Inspection, maintenance, and testing procedures of the fire pump is not documented. Document Review: No document found. Establish an inspection, maintenance, and testing program for the fire pump. Program must comply with NFPA Dec 2014 Reference NFPA 25 Chapter 8 Fire Pumps Is signage for the standpipe system installed at required locations and on required components? Low Non-Compliance Level: 1 Signage for the existing standpipe system is installed at different locations but not compliant with the requirements of NFPA 14 Chapter 6. Photograph: Signage for standpipe installed at some locations. Install required identification signs at the required locations. Signage must comply with NFPA 14 Chapter Aug 2014 Reference NFPA 14 Chapter 6 Means of Egress The Alliance for Worker Safety Page 10/18

11 08 Jun 2014 Doors are not locked in the direction of egress under any conditions. All hasps, locks, slide bolts, and other locking devices have been removed where required. Non-Compliance Level: 3 There are locking arrangements like hasps, locks, slide bolts at the exit doors but doors are not locked. This violates the Alliance Standard. Photograph: Collapsible gate is available at the main exit of the main building. Remove all hasps, locks, slide bolts, or other locking devices at the noted locations. 23 Jul 2014 Alliance Standards Part 6 Section 6.8 Doors and Gates Doors along the path of egress have a minimum width of 0.8 m (32 in) and have required ratings. Non-Compliance Level: 3 Out of a total of three stairways, only two stairways are provided with fire rated doors but no credible certificate was found. Another stairway is not provided with any door. Photograph: Door widths were sufficient but did not have required rating. Exits connecting three or fewer stories shall be enclosed with a minimum 1-hr fire-resistance rating. Provide fire door of required rating to access the corridor. 01 Oct 2014 Alliance Standard Part 6 Section Minimum Widths. Increased occupant loads will require a door width greater than 0.8 m. All doors in a means of egress are of the side-hinged swinging type. Non-Compliance Level: 3 Some of the doors in means of egress are rolling shutter, sliding steel type and some doors are not provided. This violates Alliance Standard. Photograph: All doors in the means of egress are not side-hinged swinging type. The Alliance for Worker Safety Page 11/18

12 08 Jun 2014 Replace all non-compliant doors and frames in the means of egress with doors that are listed, approved, automatic-closing, side-swinging, fire rated doors in compatible fire rated frames with latching panic hardware. 01 Oct 2014 Alliance Standards Part 6 Section 6.8 Doors and Gates Exit discharge is directly to the exterior of the building, unless the requirements of are met, at grade or provides direct access to grade. Exit discharge shall not reenter a building. There is a 4 ft wide egress court with an unprotected opening from production building which serves the exit discharge of the stair-3. The exit discharge of stair-2 and internal stair is exterior to the building and enters in dining shed. The exit discharge of stair-1 is directly exterior to the building. Photograph: the exit discharge of stair-1 is directly to outside of the building. The discharge of stair-2 and internal stair is exterior to the building and then re enter in dining shed. The exit discharge of stair-3 passes through egress court for final discharge. Egress courts less than 3050 mm (10 ft) in width (as measured from the building and the adjacent property line) shall be provided with walls having a 1 hr fire resistance rated construction for a distance of 3050 mm (10 ft) above the floor of the court in accordance to Alliance standard The exit access corridor of dining shed with occupant load greater than 30 has to be protected with 1 hour fire resistance rating. 01 Oct 2014 Alliance Standard Part 6 Section 6.17 Exit Discharge. See Section and for exceptions. Exit access corridors serving an occupant load exceeding 30 are separated by walls having a fire-resistance rating of 1 hr. The exit discharge of the internal stair and stair-2 is directly outside of the building and then re-enters into the dining shed. Then, this exit discharge is passed through a non-rated passageway. The Alliance for Worker Safety Page 12/18

13 08 Jun 2014 Photograph: A non-rated passageway with a occupant load greater than 30 was found in the non-sprinklered dining shed. The exit access corridor of dining shed with occupant load greater than 30 has to be protected with 1 hour fire resistance rating. 30 Sep 2014 Alliance Standard Part 6 Section 6.3 and Part 4 Section 4.5. Does not apply if an automatic sprinkler system is installed throughout the building. Exterior exit stairs are separated from the building with the required rating. The rating of the exterior wall shall extend 3.05 m (10 ft) beyond the ends of the stair structure. There are two external steel staircases at the main building, but these staircases are not separated from the production building which has an opening within 10 feet of its span. As as per Alliance Standard, exterior exit staircases shall be separated from the building with the rating requirements. The rating of the exterior wall shall extend 3.05 m (10 ft) beyond the ends of the stair structure. Photograph: The external steel staircases are not separated with required rating from the main building. Provide a fire-resistive rated assembly between the exterior exit stairs and the building up to 10 ft beyond the end of the stair to achieve the required separation. The rated assembly should be approved and designed by a qualified fire protection engineer. 01 Oct 2014 Alliance Standard Part 6 Section Three stories or less 1-hr rating. Four stories of more 2-hr rating Occupant loads are posted for every assembly and production floor in a conspicuous space near the main point of egress. Occupant loads are not posted in a conspicuous space near the main exits or exit access doorways as per Alliance Standard. Visual Assessment: Occupant loads are not posted for assembly and production floor in a conspicuous space near the main point of egress. Post the occupant load for every assembly and production floor in a facility in a conspicuous space near the main exit or exit access doorway for the space. The Alliance for Worker Safety Page 13/18

14 08 Jun Aug 2014 Alliance Standards Part 6 Section Posting of Occupant Load All paths of egress are provided with compliant means of illumination. Aisles, exit doors, and stairways are provided with the required means of illumination, but all the paths of egress are not illuminated as required in accordance with the Alliance Standard. Photograph: All the paths of egress are not provided with proper illumination. Install appropriate means of illumination at the noted locations. The means of egress paths shall be illuminated at all times the building is occupied. Illumination shall be a minimum of 10 lux for all corridors, exit doors, and stairways. Aisles shall be provided with a minimum 2.5 lux. 24 Dec 2014 Alliance Standards Part 6 Section 6.7 Egress Illumination and Part 10 Section Illumination of Exit Signs and Means Of Escape Emergency power for means of egress illumination is verified at least once per year. If battery operated lights are used, these lights are tested on a monthly basis. Functional testing of battery powered lights is provided for a minimum 90 min once per year. Record of verifying emergency power for means of egress illumination was not found as required in accordance with Alliance Standards. Document Review: No document was found regarding functional testing of battery powered signs. Develop a testing and maintenance program that ensures the operation of all exist signs is verified at least once per year. If battery-operated signs are used, these signs shall be tested on a monthly basis. Functional testing of battery powered signs shall be provided for a minimum 90 min once per year. 06 Aug 2014 Alliance Standards Part 10 Section Illumination of Exit Signs and Means Of Escape Lighting The Alliance for Worker Safety Page 14/18

15 08 Jun 2014 Illuminated exit signs are placed at entrances to exits and along the path of egress anywhere the continuation of egress is not obvious or there is a change in the direction of the path of travel. Illuminated exit signs are placed at entrances to exits, but along the path of egress additional exit signs or directional signs are not provided where there is a change in direction and where the continuation of egress is not obvious. This condition fails to satisfy the requirements stated in Alliance Standards. Photograph: Along the path of egress additional exit signs or directional signs are not provided. Install illuminated exit signs at entrances to exits and along the path of egress anywhere the continuation of egress is not obvious or there is a change in the direction of the path of travel. 24 Dec 2014 Alliance Standard Part 6 Section 6.11 Exit Signs Emergency power for exit signs is tested at least once per year. If battery operated, these lights are tested on a monthly basis. Functional testing of battery powered signs is provided for a minimum 90 min once per year. No record of testing emergency power for exit signs was found as per Alliance Standard. Document Review: No document found. Develop a testing and maintenance program that ensures the emergency power for exit signs is tested at least once per year. If battery operated signs are used, these signs are tested on a monthly basis. Functional testing of battery powered signs is provided for a minimum 90 min once per year. 06 Aug 2014 Alliance Standard Part 10 Section Illumination of Exit Signs and Means Of Escape. Handrails are provided on both sides of each stairway. Intermediate handrails are provided when the stair width exceeds 2.2 m (87 in.). Handrails are not mounted lower than 760 mm (30 in.) or higher than 1100 mm (44 in.). The Alliance for Worker Safety Page 15/18

16 08 Jun 2014 One stairway has handrails on both sides which are mounted at 44 inches. The other two stairways in the building only have handrails on one side and are mounted at 27 inches and 30 inches. Photograph: Handrails were not provided on both sides of each stairway. Provide handrails on both sides of each stairway. Provide intermediate handrail when the stair width exceeds 2.2m (87 inch). Provide handrail of height between the range 865 mm (34 in.) and 965 mm (38 in.). 24 Dec 2014 Alliance Standard Part 6 Section 6.9 Stairs and 6.12 Handrails and Guards Fire Safety Programs Are the required number of people trained and certified in fire fighting, first aid, and rescue training by the appropriate authority. Record kept by the factory shows that 40 workers had been trained by proper authority but no certificate had been issued. Document Review: No certificate found. Train and certify at least 339 numbers of workers which is 25% of total occupant in fire fighting, first aid and rescue by the proper authority. 24 Dec 2014 Alliance Standard Part 13 Human Element Programs An emergency evacuation plan has been developed and communicated to all employees. Workers are aware of the evacuation procedure upon sounding of the alarm, however no procedure defining the evacuation process was available. Visual Assessment: Document as evacuation plan was not found. Develop an emergency evacuation plan which includes duties and responsibilities of various people/groups, interfacing between groups and fire brigade, headcount and identification of trapped victims, physically disabled people and their rescue, etc. and all components required by the Alliance Standards and communicate the plan to all employees. The evacuation plan shall include provisions to assist physically disabled persons. A list of all employees with physical disabilities shall be kept by the Fire Service Director. The Alliance for Worker Safety Page 16/18

17 08 Jun Aug 2014 Alliance Standards Part 13 Section 13.1 Fire Safety Director Fire Department pre-planning has been completed. Low Fire department pre-planning was not found. Document Review: Fire Department pre-planning has not been completed. Complete fire department pre-planning activities with the local Fire Service and Civil Defense. 06 Aug 2014 Alliance Standards Part 13 Section 13.1 Fire Safety Director A hot-work permit program has been established. Low A hot-work permit program is not established. It is required as per Alliance Standards. However, hot-work is not going on in the factory right now. Document Review: No document found. Develop a hot-work permit program. The program must comply with the requirements of NFPA 51B. In general, this program should address the process of request and approval of authorities, necessary checks prior to approval, standby fire watch and fire fighting equipment, sounding of alarm procedure, duration and expiry of permit and re-approval procedure, etc. 24 Dec 2014 Alliance Standards Part 13 Section 13.4 Hot Work Permit and NFPA 51B Are all applicable permits up to date including Fire License & Boiler License. Low Electrician license is not available. Factory license, fire licenses, and trade license are up-to-date. Boiler license, and boiler operator license are available. Document Review: Electrician license not available. The Alliance for Worker Safety Page 17/18

18 08 Jun 2014 Apply to Biddyut Paridaptor for electrician license. 06 Aug 2014 Alliance Standard Part 13 Human Element Programs The Alliance for Worker Safety Page 18/18

INITIAL FIRE ASSESSMENT REPORT (FAR)

INITIAL FIRE ASSESSMENT REPORT (FAR) INITIAL FIRE ASSESSMENT REPORT (FAR) Factory SQ Station, Plot # 221-223, Jamirdia, Valuka, Mymensingh Mymensingh 17 Jun 2014 The Alliance for Bangladesh Worker Safety Page 1/17 Factory 17 Jun 2014 Introduction

More information

INITIAL FIRE ASSESSMENT REPORT (FAR)

INITIAL FIRE ASSESSMENT REPORT (FAR) INITIAL FIRE ASSESSMENT REPORT (FAR) Factory 94/95 (OLD) 46 NEW (Ground To 5th), BLOCK C TONGI INDUSTRIAL AREA,, TONGI, GAZIPUR, GAZIPUR, 0, BD GAZIPUR Dhaka Bangladesh 11 Apr 2014 The Alliance for Bangladesh

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Address: Plot # 59-87, Adamjee Export Processing ZONE, Adamjee Nagar, Siddergonj, Narayangonj, Siddirgonj, Narayangonj Dhaka Bangladesh 09 Jun 2014 The

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Assessor: 28 S.S. Tower, Vogra, Joydebpur, Gazipur Joydebpur, Gazipur Dhaka Uttaron The Alliance for Worker Safety Page 1/17 12 Apr 2015 Introduction to the Report The following

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Plot No -246-249, Adamjee EPZ, Siddhirganj, Narayanganj Narayanganj 17 Jul 2016 The Alliance for Bangladesh Worker Safety Page 1/17 Factory 17 Jul 2016 Introduction

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Name: 4 YOU CLOTHING LTD 367/1 Senpara Parbata, Mirpur-10, Dhaka Dhaka Dhaka Bangladesh 27 May 2014 The Alliance for Bangladesh Worker Safety Page 1/20

More information

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION INITIAL FIRE SAFETY ASSESSMENT - EXPANSION Factory Mogorkhal, Chowrasta, National University, Gazipur Gazipur Dhaka 09 May 2016 The Alliance for Worker Safety Page 1/13 09 May 2016 Introduction to the

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Address: Plot 1175 & 1179, Bashan Sarak, Vogra, PO. National University, Gazipur Sadar, Gazipur Gazipur Dhaka Bangladesh 15 Jun 2016 The Alliance for Bangladesh Worker

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Bashtoli, Sinabah, Sofipur, Kaliakoir, Gazipur Gazipur Dhaka 08 Sep 2014 The Alliance for Worker Safety Page 1/10 Factory 08 Sep 2014 Introduction to the Report The

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Dhanpur, Chapapur, Kotwali, Comilla COMILLA Chittagong The Alliance for Worker Safety Page 1/16 Introduction to the Report The following report contains a site profile and

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Assessor: Plot no. A102, BSCIC Industrial Estate, Tongi, Gazipur Tongi, Gazipur Emkay Enterprises 06 Jul 2014 The Alliance for Bangladesh Worker Safety Page 1/22

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory 214 Baiozid Bostami Road Nasirabad Industrial Area Chittagong 04 Sep 2016 The Alliance for Bangladesh Worker Safety Page 1/11 Factory 04 Sep 2016 Introduction to

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Nayabari, Kanchpur, Sonargaon, Narayanganj. Sonargaon Dhaka 14 Nov 2013 The Alliance for Worker Safety Page 1/15 Factory 14 Nov 2013 Introduction to the

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT B.K. Bari, Taltoli, Mirzapur Bazar, Gazipur Sadar Gazipur Gazipur Dhaka The Alliance for Worker Safety Page 1/11 Introduction to the Report The following report

More information

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION INITIAL FIRE SAFETY ASSESSMENT - EXPANSION Factory Plot 47-52 & 68-73, KEPZ North Patenga Chittagong Chittagong 06 Mar 2017 The Alliance for Bangladesh Worker Safety Page 1/23 06 Mar 2017 Introduction

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT 171-181, Baizid Bostami Road Nasirabad I/A, Chittagong Chittagong The Alliance for Bangladesh Worker Safety Page 1/14 Introduction to the Report The following

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Name: Maks Fashion Ltd 1 Kapashgola Road Chawkbazar Chittagong Chittagong Bangladesh 19 Apr 2014 The Alliance for Bangladesh Worker Safety Page 1/16 19 Apr 2014 Introduction

More information

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION INITIAL FIRE SAFETY ASSESSMENT - EXPANSION Hatimara Road, Barenda, Kashimpur, Gazipur, Gazipur Dhaka The Alliance for Worker Safety Page 1/11 30 Oct 2016 Introduction to the Report The following report

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Nishchintapur, Ashulia DEPZ road, Zirabo, Savar Savar Dhaka 08 May 2014 The Alliance for Worker Safety Page 1/8 08 May 2014 Introduction to the Report The following

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Assessor: Konabari, Neelnagar, Gazipur Gazipur Dhaka Bangladesh Uttaron The Alliance for Bangladesh Worker Safety Page 1/13 Introduction to the Report The following

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Vill: Golora, Post: Kaitta P.S. Saturia, Manikgonj Manikgonj, Dhaka The Alliance for Bangladesh Worker Safety Page 1/14 Introduction to the Report The following

More information

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION INITIAL FIRE SAFETY ASSESSMENT - EXPANSION 228/1, Tin Sharak, Luxmipura, Joydevpur, Gazipur Joydebpur, Gazipur The Alliance for Bangladesh Worker Safety Page 1/18 Introduction to the Report The following

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Name: 2 New Eskaton Road, Mogbazar, Dhaka Dhaka Dhaka Bangladesh 15 Jun 2013 The Alliance for Bangladesh Worker Safety Page 1/10 Factory Name: 15 Jun 2013

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Plot No. 74, Block -K, Rupnagar Ind. Area, Secti, Dhaka Dhaka Dhaka The Alliance for Worker Safety Page 1/8 Introduction to the Report The following report

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Assessor: 180, Baizid Bostami Road Nasirabad I/A Area-1, Building -1, Chittagong Chittagong Chittagong Bangladesh Emkay Enterprises 31 Jan 2015 The Alliance for Bangladesh

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Assessor: N. Islam Center, Mazar Road, Dhakkhin Khan Uttara, Dhaka Dhaka Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/10 09 Jun 2014 Introduction to

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory 154 Kamrabad, Atarar Depot Chittagong Chittagong Chittagong The Alliance for Worker Safety Page 1/7 Introduction to the Report The following report contains

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Mouza Chandra, Shafipur, Kaliakoir, Gazipur Gazipur Dhaka 24 Mar 2014 The Alliance for Worker Safety Page 1/12 24 Mar 2014 Introduction to the Report The following

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Cha 72/1/C, Ground-4th FL, Progoti Swarani, Uttar Badda, Dhaka Dhaka The Alliance for Bangladesh Worker Safety Page 1/16 Introduction to the Report The following report contains

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Name: Assessor: Anzir Apparels Limited, Unit-1 Karim supermarket, Baipal, Baipal, Savar Savar Dhaka Bangladesh Emkay Enterprises 30 Apr 2014 The Alliance for Bangladesh

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Anowara, Plot # G1 and G2, Korean EPZ, Chittagong Chittagong 21 May 2015 The Alliance for Bangladesh Worker Safety Page 1/22 21 May 2015 Introduction to the Report

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Assessor: 107/112 Nazrul Market 1st & 2nd floor, Chawk Bazar, Chittagong Emkay Enterprises 09 Apr 2014 The Alliance for Bangladesh Worker Safety Page 1/28 Factory

More information

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection Factory Name Address Fire Safety Follow up INTIMATE APPARELS LTD Karnaphuli EPZ, Plot no. 91-93, rth Patenga Date 05/20/2014 Date Report Received 11-August/15 Date of 1 st Follow-up 08-vember/15 Date of

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Kunia, K.B.Bazar, Joy Bangla Road, Barabari, Gazipur Gazipur Dhaka 12 May 2014 The Alliance for Worker Safety Page 1/14 Factory 12 May 2014 Introduction

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: Maks Fashion Ltd 1 Kapashgola Road Chawkbazar Chittagong Chittagong Bangladesh 19 Apr 2014 The Alliance for Bangladesh Worker Safety Page 1/15 19

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Assessor: N. Islam Center, Mazar Road, Dhakkhin Khan Uttara, Dhaka Dhaka Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/6 Introduction to

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory South Panishail, Kashimpur, Joydebpur, Gazipur Joydebpur, Gazipur 04 May 2014 The Alliance for Bangladesh Worker Safety Page 1/17 Factory 04 May

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory 50-60, Dakkhin Panishail. N.K. Link Road, Kashimpur, Gazipur Gazipur 08 May 2014 The Alliance for Bangladesh Worker Safety Page 1/23 08 May 2014

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Sharoj Tower, Plot No, M-4/2, Section-14, Mirpur, Dhaka Dhaka Dhaka 20 May 2014 The Alliance for Worker Safety Page 1/18 20 May 2014 Introduction

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Hatimara Road, Barenda, Kashimpur, Gazipur, Gazipur Dhaka The Alliance for Worker Safety Page 1/18 Introduction to the Report The following report contains

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: 4 YOU CLOTHING LTD 367/1 Senpara Parbata, Mirpur-10, Dhaka Dhaka Dhaka Bangladesh 27 May 2014 The Alliance for Bangladesh Worker Safety Page 1/18

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory 169-171 Tetulzhora Union, Hemayetpur, Savar Savar Dhaka 24 May 2014 The Alliance for Worker Safety Page 1/20 24 May 2014 Introduction to the Report

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Assessor: Thakurbari TEAC, Masumabad, Bhulta, Rupganj, Narayangonj Rupgonj Uttaron 18 Nov 2013 The Alliance for Bangladesh Worker Safety Page 1/12

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT PORTLAND TEXTILE LTD. ACCORD ID: 11873 PLOT NO. 14-15, SECTOR 6, CHITTAGONG EXPORT PROCESSING ZONE, CHITTAGONG OTHER FACTORIES: NONE November 3, 2015 Page 2 SUMMARY was surveyed

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Assessor: 5th floor, Ehasan Tower, 227/B, Hafez Nagar, Bakalia, Chittagong. Uttaron 22 Jul 2014 The Alliance for Bangladesh Worker Safety Page 1/19 Factory

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory C-13, South Badda, Gulshan-1, Badda, Dhaka Dhaka Dhaka 22 May 2014 The Alliance for Worker Safety Page 1/21 22 May 2014 Introduction to the Report The

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Assessor: Plot #92 (Partial) DEPZ Extention Area-02 Ganakbari, Ashulia, Savar Uttaron 10 Feb 2014 The Alliance for Bangladesh Worker Safety Page

More information

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION Assessor: Nalzani, Chandana Joydebpur, Gazipur Joydebpur, Gazipur Dhaka Emkay Enterprises The Alliance for Worker Safety Page 1/13 Introduction to the Report

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT M.S.ATTIRES LTD. ACCORD ID: 10887 A. RAHMAN PLAZA, SHANSHONGAON, FATULLAH, NARAYANGONJ OTHER FACTORIES: AISA FASHION LTD.; PRINT GARDEN LTD.; S.M. COLLECTION LTD. February

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: AJ Super Garments Ltd (Woven) Aj Garden, Goshbagh Zirabo Zirabo, Savar Savar Dhaka Bangladesh 23 Mar 2014 The Alliance for Bangladesh Worker Safety

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory SFB 2 Adamjee EPZ, Siddergonj, Narayangonj, Siddhirgonj Dhaka 22 Feb 2017 The Alliance for Worker Safety Page 1/18 Factory 22 Feb 2017 Introduction to

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Assessor: 33/1, Darail, Shataish Tongi, Gazipur Tongi, Gazipur Dhaka Emkay Enterprises 26 Feb 2014 The Alliance for Worker Safety Page 1/12 26 Feb

More information

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION Yunusco (BD) Ltd(Formerly Shore To Shore Textiles Ltd.) Plot# 224-233, Adamjee EPZ, Shiddirgonj, Narayangonj Siddirgonj The Alliance for Bangladesh Worker

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Plot No. 60&61, Sector-3, KEPZ, North Patenga, Chittagong Chittagong 11 Feb 2015 The Alliance for Bangladesh Worker Safety Page 1/17 11 Feb 2015 Introduction

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT RAISA FASHIONS LTD. ACCORD ID: 11741 PLOT# B63, BSCIC INDUSTRIAL ESTATE, KANCHPUR, SONORGAON, NARAYANGANJ OTHER FACTORIES: NONE February 27, 2015 Page 2 SUMMARY was surveyed

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT MAHID APPAREL LTD ACCORD ID: 11956 NOWPARA, MADHABDI, NARSINGDI, DHAKA-1604 OTHER FACTORIES: NONE February 20, 2015 Page 2 SUMMARY was surveyed for fire safety on 2/20/2015

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: Plot 33-35, Dhaka (EPZ), Savar Savar Dhaka Bangladesh 06 Jul 2014 The Alliance for Bangladesh Worker Safety Page 1/19 06 Jul 2014 Introduction to

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Address: 687, Al-Haj Nurl Amin Sowdagar Lane CDA, R/A, Road No 20, South Agrabad Chittagong Chittagong Bangladesh 03 Apr 2014 The Alliance for Bangladesh

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Assessor: Karardi, Shibpur, Narsingdi Narsingdi Dhaka Bangladesh Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/15 10 Apr 2016 Introduction

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT DANNY'S KNITWEAR LTD. ACCORD ID: 12228 SURABARI, GAZIPUR, SADAR, GAZIPUR Other Factories: ne October 17, 2015 Page 2 Fire Safety Inspection Report Introduction manufacturing

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT N.A GARMENTS PLOT # 36, ROAD # 46, GULSHAN NORTH C/A, DHAKA OTHER FACTORIES: SIDKO LIMITED, SIDKO APPARELS LIMITED, DELTA TIES LIMITED April 17, 2014 Page 2 SUMMARY was surveyed

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Address: Assessor: 1Plot # 4 (half) 8, 12 (half)-16, DEPZ (Old), Dhaka EPZ, Ganakbari, Ashulia, Savar Ashulia, Savar Dhaka Bangladesh Uttaron 25

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT YOUNG INTERNATIONAL PLOT NO. 32-36, SECTOR 5-CEPZ, CHITTAGONG OTHER FACTORIES: NONE July 20, 2014 Page 2 SUMMARY was surveyed for fire safety on 7/20/2014 by Hughes Associates,

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT VINTAGE GARMENTS LTD EAST NARSHINGPUR, BURI PARA, ASHULIA, SAVAR Other Factories: ne June 1, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing complex was

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT MULTIFABS LTD KASHIMPUR, NAYAPARA Other Factories: ne April 9, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing complex was surveyed for fire safety on

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Address: Plot 61-64 & 70-73, Sector 02, KEPZ Karnafully, North Patenga, Chittagong Chittagong Chittagong Bangladesh The Alliance for Bangladesh Worker Safety

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT A-PLUS IND LTD PLOT # 28, MILK VITA ROAD, SECTION #07, MIRPUR, DHAKA - 1216, BANGLADESH March 10, 2014 Page 2 SUMMARY was surveyed for fire safety on 3/10/2014 by Hughes Associates,

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT BEQ KNIT LTD. ZIRABO, ASHULIA, SAVAR, DHAKA Other Factories: Beq Sweaters Ltd., Tammam Design Ltd. April 22, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT KAROONI KNIT COMPOSITE RATANPUR, SHAFIPUR KALIAKOIR OTHER FACTORIES: NONE April 5, 2014 Page 2 SUMMARY was surveyed for fire safety on 4/5/2014 by Hughes Associates, Inc.

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT TOYO COMPOSITE KNIT GARMENTS LTD 1, SOUTH KAMALAPUR SARDER COMPLEX, DHAKA Other Factories: Pure Cotton Ltd, Knit and Knitwear Ltd June 7, 2014 Page 2 Fire Safety Inspection

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT TUBA GARMENTS LTD. PLOT # 1682, ANANDA NAGAR, MERUL BADDA, BADDA, DHAKA OTHER FACTORIES: NONE July 5, 2014 Page 2 SUMMARY was surveyed for fire safety on 7/5/2014 by Hughes

More information

Letter of Recognition

Letter of Recognition Letter of Recognition The on Fire and Building Safety () hereby recognizes that: KARIM TEXTILES LIMITED (9297) orbag, Kaliakoir, Gazipur Has successfully completed all remediation measures required from

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT Page 1 FIRE SAFETY INSPECTION REPORT Impress Fashion Ltd. ACCORD ID: 12245 Dag No. 2224, Matuial, Konapara, Katherpool, Jatrabari, Dhaka-1362 Other Factories: None Date: August 27, 2015 Sl No. Category

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT HAN A HATS & CAPS LTD. ACCORD ID: 12339 DAG NO. CS &SA-115/117, RS-188/181, KHOTION NO. CS-128, SA-274, BAIPAIL, ASHULIA, SAVAR, DHAKA. OTHER FACTORIES: TEXTSTREAM FASHION

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: Tetlabo, Rupgonj, Narayangonj Rupgonj Dhaka Bangladesh 27 May 2014 The Alliance for Bangladesh Worker Safety Page 1/22 27 May 2014 Introduction

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT GLOBAL OUTWEAR LTD. PLOT # M/1, ROAD # 7, SECTION # 7, MIRPUR, DHAKA March 3, 2014 Accord - Bangladesh RMG Fire Safety Inspection Global Outwear Ltd. Page 2 SUMMARY Global

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT AMITY DESIGNS LTD. HOUSE#7&9, ROAD#9 BLOCK D, SECTION #11MIRPUR DHAKA OTHER FACTORIES: NONE April 21, 2014 Page 2 SUMMARY was surveyed for fire safety on 4/21/2014 by Hughes

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 92 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS Type Memo Tag FED - K9999 - FINAL OBSERVATIONS Title FINAL OBSERVATIONS Type Memo Tag FED - KA100 - General Requirements - Other Title

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT MAGPIE COMPOSITE TEXTILE LTD. 832/833, DEWAN IDRIS ROAD, AMTOLI, ASHULIA, SAVAR, DHAKA OTHER FACTORIES: NONE May 17, 2014 Page 2 SUMMARY was surveyed for fire safety on 5/17/2014

More information

FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 3, 2014 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four story factory housing Redpoint Jackets Ltd. located in Dhaka Export Processing

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT AMAZON TEX KNIT FASHION LTD JOBEDA PLAZA, 85 AC DHAR ROAD KALIRBAZAR May 21, 2014 Page 2 SUMMARY was surveyed for fire safety on 5/21/2014 by Hughes Associates, Inc. This

More information

CHAPTER 7 ALTERATIONS LEVEL

CHAPTER 7 ALTERATIONS LEVEL CHAPTER 7 ALTERATIONS LEVEL 2 SECTION 701 GENERAL 701.1 Scope. Level 2 alterations as described in Section 404 shall comply with the requirements of this chapter. Exception: Buildings in which the reconfiguration

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT ALAUDDIN GARMENTS LTD. 88, KAZI NAZRUL ISLAM AVENUE, TAJGAON, DHAKA- 1215 OTHER FACTORIES: CAMBRIDGE GARMENTS, PRIMODIAL April 27, 2014 Page 2 SUMMARY was surveyed for fire

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory 81, Kalmessar, "Jalal Shopping Complex" Board Bazar, Gazipur. 20 May 2014 The Alliance for Bangladesh Worker Safety Page 1/21 20 May 2014 Introduction

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT COMFORT APPAREL, ( PVT ) LTD. 96, DARUS SALAM, MIRPUR, DHAKA OTHER FACTORIES: SALMA FASHION WEARS LTD, COMFORT KNIT FASHION LTD March 27, 2014 Page 2 SUMMARY was surveyed

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT ABA FASHIONS LTD. SENA KALYAN COMMERCIAL COMPLEX (2ND FLOOR), PLOT # 9, BLOCK # F, TONGI, GAZIPUR March 16, 2014 Accord - Bangladesh RMG Fire Safety Inspection ABA Fashions

More information

Residential Care Facilities Requirements

Residential Care Facilities Requirements Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Residential Care Facilities Requirements SUBMITTAL REQUIREMENTS: Note: These requirements are in addition

More information

Life Safety - Means of Egress/Exits NFPA 101

Life Safety - Means of Egress/Exits NFPA 101 Life Safety - Means of Egress/Exits NFPA 101 Properly designed exits provide a safe path of escape from a fire or other emergency environment. The means of egress (exits) should be arranged to permit all

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT PADMA SWEATERS LTD. 1/B DARUS SALAM ROAD, SECTION 1. MIRPUR OTHER FACTORIES: NONE. July 9, 2014 Page 2 SUMMARY was surveyed for fire safety on 7/9/2014 by Hughes Associates,

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 100 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS CFR Type Memo Tag FED - K9999 - FINAL OBSERVATIONS Title FINAL OBSERVATIONS CFR Type Memo Tag FED - KA100 - General Requirements - Other

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT CHAITY COMPOSITE LTD. CHOTTO SHILMONDI, TRIPURDI, SONARGAON OTHER FACTORIES: NONE April 7, 2014 Page 2 SUMMARY was surveyed for fire safety on 4/7/2014 by Hughes Associates,

More information

SAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly.

SAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly. SAFETY GENERAL Buildings must be designed according to building and fire safety codes and other regulatory standards at the time of construction. However, such codes and standards are continuously changing.

More information

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. 2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 51 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS CFR Type Memo Tag FED - K0130 - MISCELLANEOUS Title MISCELLANEOUS OTHER LSC DEFICIENCY NOT ON 2786 FED - K9999 - FINAL OBSERVATIONS Title

More information

Osceola County Department of Fire Rescue and Emergency Medical Services

Osceola County Department of Fire Rescue and Emergency Medical Services St. Number Dir Street Name Street Type Inspected Time of Day to be Re-inspected Zip Code Occupancy Type Emergency Contact Phone (Inc. Area Code) Building Owner Building Owner Mailing Address Bldg. Owner

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD LICENSED CARE FACILITIES SCOPE: This standard provides requirements for licensed care facilities known as for the Elderly with seven

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT PIMKIE APPARELS LTD. PLOT # 328, BLOCK # F, TONGI, INDUSTRAL AREA OTHER FACTORIES: NONE May 25, 2014 Page 2 SUMMARY was surveyed for fire safety on 5/25/2014 by Hughes Associates,

More information

MULTI-LEVEL & COVERED BOOTH CONDITIONS

MULTI-LEVEL & COVERED BOOTH CONDITIONS MULTI-LEVEL & COVERED BOOTH CONDITIONS Covered Booth Definition To place something over or upon an exhibit or portion of an exhibit (e.g., roof, ceiling, tenting, lattice, fabric, plastic) to cover the

More information

C. None (No sprinkler system) K3 E. NUMBER OF BEDS CERTIFIED FOR MEDICAID

C. None (No sprinkler system) K3 E. NUMBER OF BEDS CERTIFIED FOR MEDICAID DEPARTMENT OF HEALTH AND HUMAN SERVICES CENTERS FOR MEDICARE & MEDICAID SERVICES FIRE SAFETY SURVEY REPORT - 2000 LIFE SAFETY CODE Intermediate Care Facilities for the Mentally Retarded LARGE PART I Figure