FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

Size: px
Start display at page:

Download "FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE"

Transcription

1 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: Correlating Committee on Flammable and Combustible Liquids R. P. Benedetti DATE: October 24, 2016 SUBJECT: Agenda for NFPA 30 Second Draft Correlating Web Conference Monday, October 31, 2016, 9:30 AM to 12:30 PM (Eastern Time) Gentlemen: Attached is the Agenda for the NFPA 30, Flammable and Combustible Liquids Code, Second Draft Correlating Web Conference to be held from 9:30 AM to 12:30 PM (Eastern Time) on Monday, October 31, 2016, via AdobeConnect web conference service. The web conference link has already been sent to you via . This Agenda will also be posted to the NFPA 30 Document Information Page at: If you have anything to add to the agenda, please let me know as soon as possible. rpb/ cc FLCC Folders

2 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE AGENDA NFPA 30 Second Draft Correlating Web Conference Correlating Committee on Flammable and Combustible Liquids Monday, October 31, 2016, 9:30 AM to 12:30 PM (Eastern Time) 1. Call to Order. 2. Introduction of Attendees. Update of Committee Roster. [Attachment A1] 3. Approval of Minutes of Last Meeting. (November 2013 Web Conference.) [Attachment A2] 4. Report of Committee Chair. 5. Report of Staff Liaison. Correlating Committee Membership. [Attachment A3] Annual 2017 Document Revision Schedule. [Attachment A4] 6. Member Reports on Current Issues. 7. Review and Correlating Action on Second Revisions to NFPA 30. Because Second Revision 210 failed ballot, all related Second Revisions that passed ballot must be reversed (i.e., resolved by rejecting). These include Second Revisions s 212, 202, 203, 204, 211, and 206. Public Comment 5 (proposed addition of ASTM E 1529 to A ) was rejected. However, Second Revision 3 added this same reference to Annex I. Since the source reference was not added to Annex A it must be deleted from Annex I. The action on Public Comment 30 was to reject the addition of UL 142A to the body of the code, because it is an Outline of Investigation (OI) and not a full Standard. However, Second Revision 101 added UL 2152, which is also an OI, to the body of the code. These actions contradict each other and must be resolved to be consistent, one way or the other. [See Attachment A5 for the items in question, in order of discussion.] [Attachment A6 is a complete set of Second Revisions.] 8. Recent Correspondence. [NONE] 9. Other Old Business. [NONE] 10. New Business. [NONE] 11. Schedule Next Meeting(s). 12. Adjournment.

3 Address List No Phone Flammable and Combustible Liquids 08/25/2016 Robert P. Benedetti FLC-AAC Dwight H. Havens Chair Bechtel Marine Propulsion Corporation 20 Bellflower Road Malta, NY U 10/23/2003 FLC-AAC Luis F. Arango Principal Global Asset Protection Services Shallow Glen Lane Katy, TX XL Global Asset Protection Services I 7/16/2003 FLC-AAC Tracey D. Bellamy Principal Telgian Corporation 900 Circle 75 Parkway, Suite 680 Atlanta, GA The Home Depot U 10/29/2012 FLC-AAC William V. F. Cosey Principal Savannah River Nuclear Solutions, LLC 118 Beauregard Lane Aiken, SC U 03/03/2014 FLC-AAC Douglas W. Fisher Principal Fisher Engineering, Inc Medlock Bridge Road, Suite 520 Johns Creek, GA SE 10/29/2012 FLC-AAC John J. Foley Principal JENSEN HUGHES 3500 Piedmont Road, Suite 750 Atlanta, GA Alternate: Joseph L. Scheffey SE 3/21/2006 FLC-AAC Richard S. Kraus Principal API/Petroleum Safety Consultants 210 East Fairfax Street, Apt. 600 Falls Church, VA American Petroleum Institute Alternate: Clark D. Shepard M 1/1/1989 FLC-AAC David P. Nugent Principal TUV SUD America Inc./Global Risk Consultants 2037 Clover Road Northbrook, IL SE 04/08/2015 FLC-AAC Leo T. Old Principal Ensafe, Inc Summer Trees Drive Memphis, TN SE 08/11/2014 FLC-AAC Roland A. Riegel Principal UL LLC 1285 Walt Whitman Road Melville, NY Alternate: Alfredo M. Ramirez RT 4/15/2004 FLC-AAC John P. Woycheese M 08/11/2014 Principal FLC-AAC Saudi Aramco Engineer I 712 Nasiriyah Street P.O. Box Eastern Province, Dhahran, Saudi Arabia Scott Wright Principal 3M Company 3M Center Building 224 6W 28 St. Paul, MN U 12/08/2015 FLC-AAC Alfredo M. Ramirez Alternate UL LLC 333 Pfingsten Road Northbrook, IL Principal: Roland A. Riegel RT 4/15/2004 FLC-AAC Joseph L. Scheffey Alternate JENSEN HUGHES 3610 Commerce Drive, Suite 817 Baltimore, MD Principal: John J. Foley SE 08/11/2014 FLC-AAC 1

4 Address List No Phone Flammable and Combustible Liquids 08/25/2016 Robert P. Benedetti FLC-AAC Clark D. Shepard Alternate ExxonMobil Corporation Research & Engineering 3225 Gallows Road, Room 3A2111 Fairfax, VA American Petroleum Institute Principal: Richard S. Kraus M 7/19/2002 FLC-AAC Scott Ayers Nonvoting Member US Consumer Product Safety Commission 5 Research Place Rockville, MD C 03/07/2013 FLC-AAC Stephen W. Haines Nonvoting Member Haines Fire & Risk Consulting Corp. 1 Linda Lane, Suite B Southampton, NJ TC on Tank Storage and Piping Systems SE 08/09/2012 FLC-AAC John A. LeBlanc Nonvoting Member FM Global 1151 Boston-Providence Turnpike PO Box 9102 Norwood, MA TC on Storage and Warehousing of Containers and Portable Tanks I 1/14/2005 FLC-AAC Christopher J. Wieczorek Nonvoting Member FM Global 1151 Boston-Providence Turnpike PO Box 9102 Norwood, MA TC on Fundamentals I 11/2/2006 FLC-AAC Peter J. Willse Nonvoting Member XL Global Asset Protection Services 100 Constitution Plaza, 12th Floor Hartford, CT I 3/21/2006 FLC-AAC David L. Blomquist Member Emeritus 114 Golden Ridge Road Alamo, CA /1/1993 FLC-AAC Brooke B. Smith, Jr. Member Emeritus 1324 Longs Point Woodland Park, CO SE 1/1/1982 FLC-AAC Jack Woycheese Member Emeritus 1649 Constable Street Prescott, AZ SE 1/1/1991 FLC-AAC Robert P. Benedetti Staff Liaison National Fire Protection Association 1 Batterymarch Park Quincy, MA FLC-AAC 2

5 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE Minutes of NFPA 30 Second Draft Correlating Web Conference Correlating Committee on Flammable and Combustible Liquids Monday, November 4, 2013, 12:00 PM Eastern Time I. Participation T. D. Bellamy, Telgian Corporation (Rep. The Home Depot) J. Campbell, Telgian Corporation (Alternate to T. D. Bellamy, Rep. The Home Depot) J. J. Foley, Hughes Associates/RJA Group D. H. Havens, Bechtel Marine Propulsion Corp. / Knowles Atomic Power Laboratory (Nonvoting Member - Rep. NFPA 30 T/C on Operations) R. S. Kraus, Petroleum Safety Consultants (Rep. American Petroleum Institute) J. A. LeBlanc, FM Global (Nonvoting Member - Rep. NFPA 30 T/C on Container and Portable Tank Storage) W. E. Rehr, International Code Council R. A. Riegel, UL LLC D. A. Rivers, 3M Company C. D. Shepard, ExxonMobil Corporation (Alternate to R. S. Kraus - Rep. American Petroleum Institute) C. J. Wieczorek, FM Global (Nonvoting Member - Rep. NFPA 30 T/C on Fundamentals) P. J. Willse, XL Global Asset Protection Services J. Woycheese, Hughes Associates, CHAIR R. P. Benedetti, National Fire Protection Association, STAFF LIAISON GUESTS: S. D. Curran, Fiberglass Tank & Pipe Institute D. Matthews, NFPA R. Peterson, ExxonMobil Corporation Members Not in Attendance L. F. Arango, XL Global Asset Protection Services (Alternate to P. J. Willse) S. Ayers, U. S. Consumer Product Safety Commission (Nonvoting Member) D. W. Fisher, Fisher Engineering, Inc. J. M. Eisenberg, RJA Group (Alternate to J. J. Foley) S. W. Haines, Haines Fire & Risk Consulting Corporation (Nonvoting Member - Rep. NFPA 30 T/C on Tank Storage and Piping Systems) A. M. Ramirez, UL, LLC (Alternate to R. A. Riegel) R. E. Stutzki, 3M Company (Alternate to D. A. Rivers) II. Minutes 1. The meeting was called to order at 12:10 PM on Monday, November 4, 2013 by Correlating Committee Chair Jack Woycheese. FLCAAC Minutes.doc

6 2. Attendees introduced themselves. The Correlating Committee roster was corrected as needed. An updated roster will be posted on the Correlating Committee s web page. 3. The Minutes of the previous meeting were unanimously approved as issued. 4. The Correlating Committee Chair had nothing to report. 5. The Staff Liaison reported on the following: Committee Scope Statements. The Correlating Committee agreed to the need for revised scopes that accurately reflects the various committee responsibilities. The Staff Liaison was directed to develop a set of revised scope statements for the review. Membership Status. The Staff Liaison reported on recent changes to committee membership and on the balance of interests on the committees. At this time, there is no balance issue. Document Revision Schedule for NFPA The Staff Liaison reviewed the Annual 2014 revision schedule for the 2015 edition of NFPA There were no reports on current issues. 7. Review Technical Committee Second Draft Ballot Reports. [NOTE: The Second Draft Report of the T/C on Fundamentals was unanimously affirmative. There was no Second Draft Report of the T/C on Storage & Warehousing of Containers & Portable Tanks.] The Correlating Committee reviewed the Second Draft report of the NFPA 30 Technical Committee on Operations, specifically Second Revisions SR-3, SR-6, and SR-7. The Correlating Committee took the actions described as follows: SR-3 / & / Negative Vote Ordile: The Correlating Committee created a Second Revision to make these Paragraphs an annex item to , because the referenced documents contain unenforceable language. SR-6 / / Affirmative Comment Wechsler: The Correlating Committee determined that the comment presented technical issues that were not within the purview of the Correlating Committee; therefore, no action was taken. The issue should be revisited next cycle. SR-7 / / 19.7 / Affirmative Comment Wechsler: The Correlating Committee determined that the issue was fully considered by the Technical Committee and agreed that listing incorporates temperature limitations; therefore, no action taken. The Correlating Committee reviewed the Second Draft report of the NFPA 30 Technical Committee on Tank Storage and Piping Systems, specifically Second Revisions SR-14, SR-15, SR-16, and SR-17. The Correlating Committee took the actions described as follows: SR-14 / / Affirmative Comment Geyer: The Correlating Committee determined this is just clarification; therefore, no action was taken. SR-16 / / Affirmative Comments Geyer & Wechsler & Negative Curran: The Correlating Committee determined that the issues raised were technical and not within the purview of the Correlating Committee; therefore, no action was taken. See Agenda Item 8 below for details. SR-17 / / Negative Cignatta: The Correlating Committee that the issues raised were technical and not within the purview of the Correlating Committee; therefore, no action was taken. See Agenda Item 8 below for details. SR-15 / A / Affirmative Comment Rocco: The Correlating Committee determined that the issue raised was technical and not within the purview of the Correlating Committee; therefore, no action was taken. FLCAAC Minutes.doc

7 8. Review of Potential Complaint to Standards Council on Second Revisions Nos. SR-16 and SR-17. The Correlating Committee discussed the complaint involving SR-16 & SR-17. The committee noted that the complaint was actually submitted outside the valid time frame and therefore should be resubmitted during the time frame for submitting a Notice of Intent to Make a Motion ( January 1, 2014 to February 7, Mr. Curran (proponent) presented justification for change, but change would be of substantive nature and, therefore no action can be taken by the Correlating Committee. At the Correlating Committee Chair s direction, the Staff Liaison had prepared a timeline of the text in question, which has remained almost unchanged since 1966 edition. Proposed changes via SR-16 and SR-17 do not amend the text, but do move the definition to a more appropriate place in Chapter 27 of NFPA 30 and do set stricter requirements for piping in diked areas and impoundments. Given the technical nature of the changes, the Correlating Committee suggested this be handled during the next document revision cycle, with the inclusion of technical data to justify handling glass fiber-reinforced plastic piping and thermoplastic piping differently. 9. There was no correspondence requiring the Technical Committee s attention. 10. There was no old business requiring the Technical Committee s attention. 11. The Technical Committee discussed the following new business items: Next Revision Cycle for NFPA 30. The Correlating Committee discussed planning for the next document revision cycle for NFPA The Technical Committee deferred action on scheduling future meetings. 13. The meeting adjourned at 1:30 PM. FLCAAC Minutes.doc

8 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE COMMITTEE MEMBERSHIP BALANCE TCC on Flammable & Combustible Liquids - FLC-AAC Principals: 12 M: 2 (17%)* U: 4 (33%) Voting Alternates: 0 I/M: 0 L/C: 0 Alternates: 4 R/T: 1 (8%) E: 0 Non-Voting: 5 I: 1 (8%) SE: 4 (33%) Emeritus: 3 Task Group: 0 Hold List: 1 Balance: OK *(containers: 0 liquids: 2) FLCC Scope Statements & Member Balance.doc - 9/29/2016

9 2017 ANNUAL REVISION CYCLE *Public Input Dates may vary according to standards and schedules for Revision Cycles may change. Please check the NFPA Website for the most up to date information on Public Input Closing Dates and schedules at # (i.e. and click on the Next Edition tab. Process Stage Process Step Dates for TC Dates for TC with CC Public Input Closing Date* 7/6/15 7/6/15 Final Date for TC First Draft Meeting 12/14/15 9/14/15 Public Input Posting of First Draft and TC Ballot 2/1/16 10/26/15 Stage Final date for Receipt of TC First Draft ballot 2/22/16 11/16/15 `(First Draft) Final date for Receipt of TC First Draft ballot recirc 2/29/16 11/23/15 Posting of First Draft for CC Meeting 11/30/15 Final date for CC First Draft Meeting 1/11/16 Posting of First Draft and CC Ballot 2/1/16 Final date for Receipt of CC First Draft ballot 2/22/16 Final date for Receipt of CC First Draft ballot recirc 2/29/16 Post First Draft Report for Public Comment 3/7/16 3/7/16 Public Comment closing date 5/16/16 5/16/16 Final Date to Publish Notice of Consent Standards (Standards that 5/30/16 5/30/16 received no Comments) Appeal Closing Date for Consent Standards (Standards that received 6/13/16 6/13/16 no Comments) Final date for TC Second Draft Meeting 10/31/16 7/25/16 Comment Posting of Second Draft and TC Ballot 12/12/16 9/5/16 Stage Final date for Receipt of TC Second Draft ballot 1/2/17 9/26/16 (Second Final date for receipt of TC Second Draft ballot recirc 1/9/17 10/3/16 Draft) Posting of Second Draft for CC Meeting 10/10/16 Final date for CC Second Draft Meeting 11/21/16 Posting of Second Draft for CC Ballot 12/12/16 Final date for Receipt of CC Second Draft ballot 1/2/17 Final date for Receipt of CC Second Draft ballot recirc 1/9/17 Post Second Draft Report for NITMAM Review 1/16/17 1/16/17 Tech Session Notice of Intent to Make a Motion (NITMAM) Closing Date 2/20/17 2/20/17 Preparation Posting of Certified Amending Motions (CAMs) and Consent 4/17/17 4/17/17 Standards (& Issuance) Appeal Closing Date for Consent Standards 5/2/17 5/2/17 SC Issuance Date for Consent Standards 5/12/17 5/12/17 Tech Session Association Meeting for Standards with CAMs 6/4 7/2017 6/4 7/2017 Appeals and Appeal Closing Date for Standards with CAMs 6/27/17 6/27/17 Issuance SC Issuance Date for Standards with CAMs 8/10/17 8/10/17 Approved: October 30, 2012 Revised

10 1 of 4 10/18/ :44 AM Committee Comment No. 210-NFPA [ New Section after ] This was a Second Revision that failed ballot Table shall apply to the following: 1. Automatic sprinkler protection or foam-water sprinkler protection 2. Single- and double-row rack storage 3. Class II and Class III nonmiscible and Class II and Class III miscible liquids 4. Relieving-style metal containers Table Design Criteria for Sprinkler Protection or Foam-Water Sprinkler Protection of Singleand Double-Row Rack Storage of Class II and Class III Liquids in Relieving-Style Metal Containers Capacity (gal) Maximum Storage Height (ft) Maximum Ceiling Height (ft) Sprinkler Protection Ceiling Sprinkler Protection In-Rack Sprinklers Notes Fire Test Ref. >5 and 60 Unlimited Unlimited See , Fire Protection System Design Scheme E See , Fire Protection System Design Scheme E 1, 2 See Section D.3 (new) For SI units, 1 gal = 3.8 L, 1 ft = 0.3 m. Notes: 1. Minimum aisle width in all cases is 6 ft (1.8 m). 2. Maximum rack depth in all cases is 9 ft (2.7 m). Submitter Information Verification Submitter Full Name: FLC-SWC Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jun 27 13:47:49 EDT 2016 Committee Statement and Meeting Notes Committee Statement: The technical committee has reviewed all of the supporting documentation that substantiates the inclusion of new Table , including the answers to all questions that were raised by the technical committee when the public input was first submitted. Based on its review, the technical committee agrees that this new table provides acceptable fire protection system design criteria for the commodities to which the table applies.

11 2 of 4 10/18/ :44 AM Response Message: Public Comment No. 55-NFPA [New Section after ] Ballot Results This item has failed ballot 31 Eligible Voters 3 Not Returned 13 Negative with Comments 14 Affirmative All 0 Affirmative with Comments 1 Abstention Not Returned Bellamy, Tracey D. Cosey, William V. F. Fitzgerald, Keric M. Negative with Comment Apostoluk, Peter R. I agree with John LeBlanc. De Taeye, Claire V. I agree with John LeBlanc's comments. Havens, Dwight H. I have reviewed and agree with the concerns raised by Mr. LeBlanc. Hicks, Donald B. I agree with John Leblanc s comments. Kirby, David C. After reviewing John Leblanc's comments, they confirm my thoughts from the Meeting - that the tests were not conservative enough to meet worst credible case. I believe that there should at least be a safety factor. Unfortunately, I am not qualified to recommend a safety factor. Kraus, Richard S. agree with Mr LeBlanc comment Kulpit, Jonathan This protection scheme for unlimited storage height was extrapolated from one fire test which does not represent a reasonable worst case scenario of what the protection scheme aims to protect. That fire test did not address the possibility that a spill fire originating at the top and spilling down the face of a storage arrangement greater than four barrier levels tall may open more than the seven sprinklers (three at the top level and two on each of the next two lower levels) required to be calculated and / or involve ceiling sprinklers which are not required to be calculated. The protection scheme should not permit unlimited height without requiring hydraulic consideration of all sprinkler levels or proving with multiple fire tests that the number of sprinkler levels involved is independent of the height of the arrangement / number of barrier levels below the spill fire level of origin. LeBlanc, John A. The testing that was done used a ~34 ft high rack (4 tiers of filled drums, 3 tiers of empty drums) in a 48 ft high building. Actual filled drums were only used in the lower 4 tiers of the rack. The spill location was located at the bottom

12 3 of 4 10/18/ :44 AM of the third tier instead of at the bottom of the highest stored drum. Two barrier/in-rack levels were provided. No ceiling sprinklers were provided. I believe the testing has clearly shown that this in-rack arrangement will meet the goal of keeping steel drums cool when they are exposed to a spill fire, however, the next critical element, the sprinkler system design, was not validated to support unlimited storage heights and roof heights. When using large orifice, quick response sprinklers at the ceiling or as in-racks it is critical to design the sprinkler system for an adequate number of sprinklers to conserve the water supply. Past full scale fire tests by FM Global with barriers installed in racks has shown that a spill down the face of an array will operate a large number of quick response in-rack sprinklers at every barrier level. Extrapolating the test results beyond the building height and storage height tested ignores this potential. Also, if the spill was initiated at the bottom of the top level of storage, there would have been a possibility of ceiling sprinkler involvement if ceiling sprinklers were installed. Since this protection option involves the use of K 25.2 sprinklers flowing 138 gpm each, operating more sprinklers than were included in the design can quickly overtax a water supply. The bottom line is this testing does not support extrapolating the results to unlimited storage heights when large containers are being stored. Ordile, Anthony M. I am concerned about this proposed Table and Scheme being developed on a single fire test. The TC has previously developed the protection criteria Tables based on redundant large-scale fire tests. My concern about basing this on a single test is emphasized by the fact that the in-rack sprinklers operated at 6 seconds after ignition. Perhaps a second test altering the location of the spill and ignition would yield different results that could have resulted in a delay of sprinkler operation that may have also caused some drums of product to be more involved and more than 2 rack sprinklers to operate. I also have concern over the unlimited storage height involving drums, especially when standard lift trucks are involved. The unlimited ceiling height is a concern with larger containers should the spill incident occur in an aisle or staging area. Riegel, Roland A. A single test is not sufficient. There is a need for additional testing that would substantiate unlimited storage heights for drums. Additional test scenarios should evaluate if an alternate ignition source / location and subsequent fire propagation would bypass the rack sprinkler systems and operate ceiling sprinklers. Wechsler, David B. After having reviewed the committee actions, the original submittal and the response from John Leblanc on SR210- I find the complete actions on all these related changes ill advised and We should not advocate an unlimited conditions. Again as my common voting comment: The proposed Scheme E is linked to the justification provided in Public Comment No. 52, which was associated with the test results of a single fire test conducted at UL. The protection recommendations are based on a single spill scenario and a single ignition source location. The two sprinklers that operated during the test both activated at 6 seconds after ignition, which leads to questions of whether a more delayed or relocated ignition or spill location, perhaps to a higher location in the rack structure, might have produced unsatisfactory results. It is unprecedented to base the entire protection scheme for an unlimited area, unlimited storage quantity of drums of Class II liquids on a worst case scenario of operating 3 in-rack sprinklers, particularly when that basis represents a single fire test and contemplates only a single additional operating sprinkler beyond the two that operated in the cited test as the factor of safety. Willse, Peter J. After reviewing John Leblanc's comments, I vote negative. Workman, Martin H. The fire test provided showed an exceptional fast operation of the sprinkler within the rack. This occurred because the fuel was ignited upon fuel release. In the past, fuel was allowed to discharge from the container prior to igniting the fuel, which would have created a spill fire and would have had slower sprinkler operation and in the long term would have activated more sprinklers within the rack area. I don't think the sprinkler operation would be realistic in a true scenario. I think the committee should reconsider this testing and ask the submitter to modify the testing scenario. Affirmative All Carter, Glen A. Foley, John J. Hild, Richard J. Kidd, Todd M. Lentz, Thomas S.

13 4 of 4 10/18/ :44 AM Nauman, Susan Nugent, David P. Rindfuss, Lee T. Seuss, Jr., George A. Stephens, Ronald J. Swenson, David C. Wright, Scott Wypychoski, Kevin M. de Nooij, Tom Abstention Ozog, Nicholas Changes to this section should be based in research and testing. However, there is concern that existing industrial storage arrangements will be invalidated due to a vacuum in the current testing. How can the code provide additional options for those facilities? Editorial Comment Click here

14 1 of 5 10/18/ :48 AM Second Revision No. 212-NFPA [ Section No [Excluding any Sub-Sections] ]

15 2 of 5 10/18/ :48 AM Where automatic sprinkler systems or low-expansion foam-water sprinkler systems are used to protect storage of liquids, Figure (a), Figure (b), or Figure (c), whichever is applicable, and the appropriate table in Section 16.5 shall be used to determine protection criteria. Figure (a) Fire Protection Criteria Decision Tree for Miscible and Nonmiscible Flammable and Combustible Liquids in Metal Containers. Figure (b) Fire Protection Criteria Decision Tree for Miscible and Nonmiscible Flammable and Combustible Liquids in Nonmetallic Containers.

16 3 of 5 10/18/ :48 AM Figure (c) Fire Protection Criteria Decision Tree for Miscible Flammable and Combustible Liquids in Nonmetallic Containers. Supplemental Information File Name Public_Comment_No._67_Figure_16.4.1_a_.pdf Description Shows revision to figure (a) Submitter Information Verification Submitter Full Name: FLC-SWC Organization: [ Not Specified ] Street Address: City:

17 4 of 5 10/18/ :48 AM State: Zip: Submittal Date: Tue Jun 28 09:31:51 EDT 2016 Correlating Committee Actions The correlating committee may override this SR with a Second Correlating Revision Committee Statement and Meeting Notes Committee Statement: Response Message: Committee Notes: The technical committee has amended Figure (a) to reflect the adoption of new Table via SR#210. Date Jun 28, 2016 Submitted By Janna Shapiro The only change section is in Figure (a), as shown in the attachment. No other changes should be made to this section (Terra is showing struck text that should not be). Public Comment No. 67-NFPA [Section No [Excluding any Sub-Sections]] Ballot Results This item has passed ballot 31 Eligible Voters 3 Not Returned 26 Affirmative All 1 Affirmative with Comments 1 Negative with Comments 0 Abstention Not Returned Bellamy, Tracey D. Cosey, William V. F. Fitzgerald, Keric M. Affirmative All Apostoluk, Peter R. Carter, Glen A. De Taeye, Claire V. Foley, John J. Havens, Dwight H. Hicks, Donald B. Hild, Richard J. Kidd, Todd M. Kirby, David C.

18 5 of 5 10/18/ :48 AM Kraus, Richard S. Kulpit, Jonathan LeBlanc, John A. Lentz, Thomas S. Nauman, Susan Nugent, David P. Ordile, Anthony M. Ozog, Nicholas Riegel, Roland A. Rindfuss, Lee T. Seuss, Jr., George A. Stephens, Ronald J. Swenson, David C. Willse, Peter J. Wright, Scott Wypychoski, Kevin M. de Nooij, Tom Affirmative with Comment Workman, Martin H. agree with committee Negative with Comment Wechsler, David B. After having reviewed the committee actions, the original submittal and the response from John Leblanc on SR210- I find the complete actions on all these related changes ill advised and We should not advocate an unlimited conditions. Again as my common voting comment: The proposed Scheme E is linked to the justification provided in Public Comment No. 52, which was associated with the test results of a single fire test conducted at UL. The protection recommendations are based on a single spill scenario and a single ignition source location. The two sprinklers that operated during the test both activated at 6 seconds after ignition, which leads to questions of whether a more delayed or relocated ignition or spill location, perhaps to a higher location in the rack structure, might have produced unsatisfactory results. It is unprecedented to base the entire protection scheme for an unlimited area, unlimited storage quantity of drums of Class II liquids on a worst case scenario of operating 3 in-rack sprinklers, particularly when that basis represents a single fire test and contemplates only a single additional operating sprinkler beyond the two that operated in the cited test as the factor of safety. Editorial Comment Click here

19 1 of 2 10/18/ :45 AM Second Revision No. 202-NFPA [ Section No [Excluding any Sub-Sections] ] Paragraphs through and their related tables, Table through Table Table , shall be used to determine the protection criteria and storage arrangement for the applicable liquid class, container type, and storage configuration, as described in through and subject to the provisions of Submitter Information Verification Submitter Full Name: FLC-SWC Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 21 14:14:21 EDT 2016 Correlating Committee Actions The correlating committee may override this SR with a Second Correlating Revision Committee Statement and Meeting Notes Committee Statement: This section has been revised to reflect the adoption of new Table via SR#210. Response Message: Public Comment No. 52-NFPA [Section No [Excluding any Sub-Sections]] Ballot Results This item has passed ballot 31 Eligible Voters 3 Not Returned 26 Affirmative All 1 Affirmative with Comments 1 Negative with Comments 0 Abstention Not Returned Bellamy, Tracey D. Cosey, William V. F. Fitzgerald, Keric M. Affirmative All

20 2 of 2 10/18/ :45 AM Apostoluk, Peter R. Carter, Glen A. De Taeye, Claire V. Foley, John J. Havens, Dwight H. Hicks, Donald B. Hild, Richard J. Kidd, Todd M. Kirby, David C. Kraus, Richard S. Kulpit, Jonathan LeBlanc, John A. Lentz, Thomas S. Nauman, Susan Nugent, David P. Ordile, Anthony M. Ozog, Nicholas Riegel, Roland A. Rindfuss, Lee T. Seuss, Jr., George A. Stephens, Ronald J. Swenson, David C. Willse, Peter J. Wright, Scott Wypychoski, Kevin M. de Nooij, Tom Affirmative with Comment Workman, Martin H. agree with committee Negative with Comment Wechsler, David B. After having reviewed the committee actions, the original submittal and the response from John Leblanc on SR210- I find the complete actions on all these related changes ill advised and We should not advocate an unlimited conditions. Again as my common voting comment: The proposed Scheme E is linked to the justification provided in Public Comment No. 52, which was associated with the test results of a single fire test conducted at UL. The protection recommendations are based on a single spill scenario and a single ignition source location. The two sprinklers that operated during the test both activated at 6 seconds after ignition, which leads to questions of whether a more delayed or relocated ignition or spill location, perhaps to a higher location in the rack structure, might have produced unsatisfactory results. It is unprecedented to base the entire protection scheme for an unlimited area, unlimited storage quantity of drums of Class II liquids on a worst case scenario of operating 3 in-rack sprinklers, particularly when that basis represents a single fire test and contemplates only a single additional operating sprinkler beyond the two that operated in the cited test as the factor of safety.

21 1 of 2 10/18/ :45 AM Second Revision No. 203-NFPA [ Section No [Excluding any Sub-Sections] ] Table through Table Table shall apply only to stable liquids. Submitter Information Verification Submitter Full Name: FLC-SWC Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 21 14:16:06 EDT 2016 Correlating Committee Actions The correlating committee may override this SR with a Second Correlating Revision Committee Statement and Meeting Notes Committee Statement: This section has been revised to reflect the adoption of new Table via SR#210. Response Message: Public Comment No. 53-NFPA [Section No [Excluding any Sub-Sections]] Ballot Results This item has passed ballot 31 Eligible Voters 3 Not Returned 26 Affirmative All 1 Affirmative with Comments 1 Negative with Comments 0 Abstention Not Returned Bellamy, Tracey D. Cosey, William V. F. Fitzgerald, Keric M. Affirmative All Apostoluk, Peter R. Carter, Glen A.

22 2 of 2 10/18/ :45 AM De Taeye, Claire V. Foley, John J. Havens, Dwight H. Hicks, Donald B. Hild, Richard J. Kidd, Todd M. Kirby, David C. Kraus, Richard S. Kulpit, Jonathan LeBlanc, John A. Lentz, Thomas S. Nauman, Susan Nugent, David P. Ordile, Anthony M. Ozog, Nicholas Riegel, Roland A. Rindfuss, Lee T. Seuss, Jr., George A. Stephens, Ronald J. Swenson, David C. Willse, Peter J. Wright, Scott Wypychoski, Kevin M. de Nooij, Tom Affirmative with Comment Workman, Martin H. agree with committee Negative with Comment Wechsler, David B. After having reviewed the committee actions, the original submittal and the response from John Leblanc on SR210- I find the complete actions on all these related changes ill advised and We should not advocate an unlimited conditions. Again as my common voting comment: The proposed Scheme E is linked to the justification provided in Public Comment No. 52, which was associated with the test results of a single fire test conducted at UL. The protection recommendations are based on a single spill scenario and a single ignition source location. The two sprinklers that operated during the test both activated at 6 seconds after ignition, which leads to questions of whether a more delayed or relocated ignition or spill location, perhaps to a higher location in the rack structure, might have produced unsatisfactory results. It is unprecedented to base the entire protection scheme for an unlimited area, unlimited storage quantity of drums of Class II liquids on a worst case scenario of operating 3 in-rack sprinklers, particularly when that basis represents a single fire test and contemplates only a single additional operating sprinkler beyond the two that operated in the cited test as the factor of safety.

23 1 of 2 10/18/ :46 AM Second Revision No. 204-NFPA [ Section No ] The Fire Test Ref. number given for each entry in Table through Table Table shall be used to identify in Sections D.2or D.3 the information on the fire tests on which the protection criteria for that entry are based. Submitter Information Verification Submitter Full Name: FLC-SWC Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 21 14:18:47 EDT 2016 Correlating Committee Actions The correlating committee may override this SR with a Second Correlating Revision Committee Statement and Meeting Notes Committee Statement: Response Message: This section has been revised to reflect the adoption of new Table via SR#210 and explanatory reference information in Annex D via SR#206. Public Comment No. 54-NFPA [Section No ] Ballot Results This item has passed ballot 31 Eligible Voters 3 Not Returned 26 Affirmative All 1 Affirmative with Comments 1 Negative with Comments 0 Abstention Not Returned Bellamy, Tracey D. Cosey, William V. F. Fitzgerald, Keric M.

24 2 of 2 10/18/ :46 AM Affirmative All Apostoluk, Peter R. Carter, Glen A. De Taeye, Claire V. Foley, John J. Havens, Dwight H. Hicks, Donald B. Hild, Richard J. Kidd, Todd M. Kirby, David C. Kraus, Richard S. Kulpit, Jonathan LeBlanc, John A. Lentz, Thomas S. Nauman, Susan Nugent, David P. Ordile, Anthony M. Ozog, Nicholas Riegel, Roland A. Rindfuss, Lee T. Seuss, Jr., George A. Stephens, Ronald J. Swenson, David C. Willse, Peter J. Wright, Scott Wypychoski, Kevin M. de Nooij, Tom Affirmative with Comment Workman, Martin H. agree with committee Negative with Comment Wechsler, David B. After having reviewed the committee actions, the original submittal and the response from John Leblanc on SR210- I find the complete actions on all these related changes ill advised and We should not advocate an unlimited conditions. Again as my common voting comment: The proposed Scheme E is linked to the justification provided in Public Comment No. 52, which was associated with the test results of a single fire test conducted at UL. The protection recommendations are based on a single spill scenario and a single ignition source location. The two sprinklers that operated during the test both activated at 6 seconds after ignition, which leads to questions of whether a more delayed or relocated ignition or spill location, perhaps to a higher location in the rack structure, might have produced unsatisfactory results. It is unprecedented to base the entire protection scheme for an unlimited area, unlimited storage quantity of drums of Class II liquids on a worst case scenario of operating 3 in-rack sprinklers, particularly when that basis represents a single fire test and contemplates only a single additional operating sprinkler beyond the two that operated in the cited test as the factor of safety.

25 1 of 7 10/18/ :48 AM Second Revision No. 211-NFPA [ New Section after ] Fire Protection System Design Scheme E.

26 2 of 7 10/18/ :48 AM

27 3 of 7 10/18/ :48 AM Sprinklers and horizontal barriers shall be installed in accordance with Figure (a) or Figure (b), whichever is applicable. Horizontal barriers shall be of plywood having a minimum thickness of 3 8 in. (10 mm) or of sheet metal of minimum 22 gauge thickness. All liquid storage shall be located beneath a barrier. Figure (a) Single-Row Rack Sprinkler Layout for Design Scheme "E." Figure (b) Double-Row Rack Sprinkler Layout for Design Scheme "E."

28 4 of 7 10/18/ :48 AM Vertical baffles shall not be installed between in-rack sprinklers In-rack sprinklers shall meet the following requirements: (1) In-rack sprinklers shall be intermediate temperature rated, pendent sprinklers with a nominal K-factor of 25.2 and shall be listed as extended coverage control mode density/area storage sprinklers. (2) In-rack sprinklers shall be positioned in a transverse flue below each barrier level. (3) In-rack sprinklers shall not be positioned within 3.5 ft (1 m) of a rack upright. (4) The minimum in-rack sprinkler discharge pressure shall not be less than a gauge pressure of 30 psi (207 kpa). (5) Where one level of in-rack sprinklers is installed, the design shall include the 3 most hydraulically remote sprinklers on a single line. (6) Where two levels of in-rack sprinklers are installed, the design shall include the 3 most hydraulically remote sprinklers on a single line, and the 2 most hydraulically remote sprinklers on the next adjacent level. (7) Where three or more levels of in-rack sprinklers are installed, the design shall include the 3 most hydraulically remote sprinklers on a single line, and the 2 most hydraulically remote sprinklers on the next two adjacent levels. (8) Foam-water sprinkler protection shall be permitted to be substituted for water sprinkler protection, provided the same design criteria is used, and that the sprinkler is listed for use with foam If there are adjacent bays of in-rack arrays that are not dedicated to storage of liquids, the barrier and in-rack sprinkler protection shall be extended at least 6 ft (1.8 m) beyond the area devoted to liquid storage.

29 5 of 7 10/18/ :48 AM Ceiling sprinkler demand shall not be included in the hydraulic calculations for in-rack sprinklers Water demand at point of supply shall be calculated separately for in-rack and ceiling sprinklers and shall be based on the greater demand Ceiling sprinklers shall meet the following requirements: (1) Ceiling sprinkler protection shall be designed to protect the surrounding occupancy. (2) Any sprinkler type shall be acceptable. (3) If standard spray sprinklers are used, they shall be capable of providing not less than 0.30 gpm/ft 2 over 3000 ft 2 (8 mm/min over 270 m 2 ) when supplied with water. Design area can be reduced to 2000 ft 2 when using a preprimed foam-water system installed in accordance with NFPA 16 and maintained in accordance with NFPA 25. (4) If the liquid storage does not extend to the full height of the rack, protection for commodities stored above the top horizontal barrier shall meet the requirements of NFPA 13 for the commodities stored, based on the full height of the rack A 500 gpm (1900 L/min) hose stream allowance shall be provided. Supplemental Information File Name Figure_16_6_4_1_a_ pdf Figure_16_6_4_1_b_ pdf Description Figure (a) Figure (b) Submitter Information Verification Submitter Full Name: FLC-SWC Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jun 27 14:16:26 EDT 2016 Correlating Committee Actions The correlating committee may override this SR with a Second Correlating Revision Committee Statement and Meeting Notes Committee Statement: The technical committee has reviewed all of the supporting documentation that substantiates the inclusion of new Section , which accompanies new Table Response Message: Committee Notes: Date Submitted By

30 6 of 7 10/18/ :48 AM Jun 27, 2016 Janna Shapiro Corresponding figures added as attachments Public Comment No. 57-NFPA [New Section after ] Ballot Results This item has passed ballot 31 Eligible Voters 3 Not Returned 21 Affirmative All 1 Affirmative with Comments 6 Negative with Comments 0 Abstention Not Returned Bellamy, Tracey D. Cosey, William V. F. Fitzgerald, Keric M. Affirmative All Apostoluk, Peter R. Carter, Glen A. De Taeye, Claire V. Foley, John J. Hild, Richard J. Kidd, Todd M. Kirby, David C. Kraus, Richard S. Kulpit, Jonathan LeBlanc, John A. Nauman, Susan Nugent, David P. Ozog, Nicholas Riegel, Roland A. Rindfuss, Lee T. Stephens, Ronald J. Swenson, David C. Willse, Peter J. Wright, Scott Wypychoski, Kevin M. de Nooij, Tom Affirmative with Comment

31 7 of 7 10/18/ :48 AM Workman, Martin H. agree with committee Negative with Comment Havens, Dwight H. Based on my revised vote on SR-210, this revision is no longer needed. Hicks, Donald B. I agree with Wechsler's comments. Lentz, Thomas S. The time heads operated from the ignition of the fire test. Did not simulate a worse case scenario of possible obstructions or other delays Ordile, Anthony M. SAME RESPONSE AS SR I am concerned about this proposed Table and Scheme being developed on a single fire test. The TC has previously developed the protection criteria Tables based on redundant large-scale fire tests. My concern about basing this on a single fire test is emphasized by the fact that the in-rack sprinklers operated at 6 seconds after ignition. Perhaps a second test altering the location of the spill and ignition would yield different results that could have resulted in a delay of sprinkler operation that may have also caused some drums of product to be involved and more than 2 rack sprinklers to operate. I also have concern over the unlimited storage height with larger containers especially when standard lift trucks are involved. The unlimited ceiling height is a concern with larger containers should the spill incident occur in an aisle or staging area. Seuss, Jr., George A. I agree with John Leblanc's reasoning for why this resolution should not pass. Further, I am not comfortable with using only 3 in-rack sprinkler heads as the design basis. Wechsler, David B. After having reviewed the committee actions, the original submittal and the response from John Leblanc on SR210- I find the complete actions on all these related changes ill advised and We should not advocate an unlimited conditions. Again as my common voting comment: The proposed Scheme E is linked to the justification provided in Public Comment No. 52, which was associated with the test results of a single fire test conducted at UL. The protection recommendations are based on a single spill scenario and a single ignition source location. The two sprinklers that operated during the test both activated at 6 seconds after ignition, which leads to questions of whether a more delayed or relocated ignition or spill location, perhaps to a higher location in the rack structure, might have produced unsatisfactory results. It is unprecedented to base the entire protection scheme for an unlimited area, unlimited storage quantity of drums of Class II liquids on a worst case scenario of operating 3 in-rack sprinklers, particularly when that basis represents a single fire test and contemplates only a single additional operating sprinkler beyond the two that operated in the cited test as the factor of safety. Editorial Comment Click here

32 1 of 2 10/18/ :47 AM Second Revision No. 206-NFPA [ New Section after D.2 ] D.3 Design Criteria for Sprinkler Protection of Single- and Double-Row Rack Storage of Class II and Class III Liquids. Fire protection criteria in , Table , and are based on a fullscale fire test documented in the Underwriters Laboratories Inc. report, Class II Combustible Liquids in 55-Gallon Steel Drums Stored in Racks with Continuous Combustible Horizontal Barriers Protected by K=25.2 EC In-Rack Sprinklers. Submitter Information Verification Submitter Full Name: FLC-SWC Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Tue Jun 21 14:24:35 EDT 2016 Correlating Committee Actions The correlating committee may override this SR with a Second Correlating Revision Committee Statement and Meeting Notes Committee Statement: Response Message: This revision provides a cross reference to the test report that supports new Table and new Scheme E diagrams. Public Comment No. 65-NFPA [New Section after D.2] Ballot Results This item has passed ballot 31 Eligible Voters 3 Not Returned 27 Affirmative All 1 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned Bellamy, Tracey D. Cosey, William V. F. Fitzgerald, Keric M.

33 2 of 2 10/18/ :47 AM Affirmative All Apostoluk, Peter R. Carter, Glen A. De Taeye, Claire V. Foley, John J. Havens, Dwight H. Hicks, Donald B. Hild, Richard J. Kidd, Todd M. Kirby, David C. Kraus, Richard S. Kulpit, Jonathan LeBlanc, John A. Lentz, Thomas S. Nauman, Susan Nugent, David P. Ordile, Anthony M. Ozog, Nicholas Riegel, Roland A. Rindfuss, Lee T. Seuss, Jr., George A. Stephens, Ronald J. Swenson, David C. Wechsler, David B. Willse, Peter J. Wright, Scott Wypychoski, Kevin M. de Nooij, Tom Affirmative with Comment Workman, Martin H. agree with committee Editorial Comment Click here

34 1 of 2 10/18/2016 2:58 PM Public Comment No. 5-NFPA [ Section No. A ] A For further information, see ASTM E119, Standard Test Methods for Fire Tests of Building Construction and Materials, and ANSI/UL 1709, Standard for Rapid Rise Fire Tests of Protection Materials for Structural Steel or ASTM E1529. Additional Proposed Changes File Name Description Approved ASTM_vs_NFPA_vs_UL_vs_ISO_vs_IEC_tests_with_titles_Nov_2015.pdf Statement of Problem and Substantiation for Public Comment Comparison between ASTM, NFPA and UL tests ASTM E1529 is the same type of test as UL I attach a file that shows the comparison by ASTM E05 (Fire Standards committee) between ASTM, NFPA and UL standard tests. I cannot provide a copy due to copyright reasons. The standard needs to be added also to the list of referenced standards in the annex. Related Public Comments for This Document Related Comment Public Comment No. 6-NFPA [Section No. I.1.2.6] Related Item Public Input No. 83-NFPA [Section No. A ] Relationship Submitter Information Verification Submitter Full Name: Marcelo Hirschler Organization: GBH International Street Address: City: State: Zip: Submittal Date: Thu Mar 24 20:10:29 EDT 2016 Committee Statement Committee Action: Resolution: Rejected The annex is intended to provide examples of standards and it is unnecessary for the list to be complete.

Committee Comment No. 212-NFPA [ Section No [Excluding

Committee Comment No. 212-NFPA [ Section No [Excluding of 27 12/12/2016 12:23 PM Committee Comment No. 212-NFPA 30-2016 [ Section No. 16.4.1 [Excluding any Sub-Sections] ] This was a Second Revision that has been modified or deleted as the result of Second

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks R. P. Benedetti DATE: September 16, 2010 SUBJECT:

More information

If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following:

If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following: Dear FLC-SWC Committee, If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following: Audio NOTE: For audio you MUST dial in on your phone. I will not be enabling the use of

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks R. P. Benedetti DATE: June 6, 2013 SUBJECT:

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks Janna Shapiro DATE: August 13, 2015 SUBJECT:

More information

NFPA 30 FLC-SWC Public Comment Report

NFPA 30 FLC-SWC Public Comment Report of 224 9/6/2016 1:13 PM Public Comment No. 56-NFPA 30-2016 [ Global Input ] These definitions of Protected and Unprotected are intended for inclusion in Sections 9.2, 10.2, 11.2, 13.2 and 16.2. The current

More information

NFPA 30. Flammable and Combustible Liquids Code Edition {EF6DAC55-A2FB-4989-A71E-5F7317D5967C}

NFPA 30. Flammable and Combustible Liquids Code Edition {EF6DAC55-A2FB-4989-A71E-5F7317D5967C} NFPA 30 Flammable and Combustible Liquids Code NFPA, 1 Batterymarch Park, Quincy, MA 02169-7471 An International Codes and Standards Organization IMPORTANT NOTICES AND DISCLAIMERS CONCERNING NFPA STANDARDS

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems M E M O R A N D U M DATE: May 14, 2014 TO: FROM: Principal and Alternate Members of the Correlating Committee on Automatic Sprinkler Systems Matt Klaus,

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following:

If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following: Dear Committee, If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following: Audio NOTE: For audio you MUST dial in on your phone. I will not be enabling the use of computer

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ]

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ] of 46 11/6/2015 9:21 AM First Revision No. 208-NFPA 30-2015 [ Section No. 9.3.3.1 ] 9.3.3.1 Storage of liquids shall not physically obstruct a means of egress. Submittal Date: Wed Sep 09 18:24:20 EDT 2015

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

2016 Annual Revision Cycle Consent Document NFPA 75

2016 Annual Revision Cycle Consent Document NFPA 75 2016 Annual Revision Cycle Consent Document NFPA 75 The Committee on Electronic Computer Systems produced a Technical Committee Report that received at least one Notice of Intent to Make a Motion (NITMAM)

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m. 1. Call to Order: NFPA Technical Committee on Building Systems NFPA 900 First Draft Teleconference/Web Meeting AGENDA Thursday, February 13, 2014 11:00 a.m. Noon EDT Online meeting link: http://nfpa.adobeconnect.com/r366m2eaxx6/

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS

TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS MEMORANDUM TO: FROM: Technical Committee on Solvent Extraction Plants R. P. Benedetti DATE: May 2, 2012 SUBJECT: Agenda for Conference Call ROC Meeting

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018) M EM O RA N D UM TO: FROM: DATE: SUBJECT: Correlating Committee on Combustible Dusts Yiu Lee, Project Administrator January 27, 2017 NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

More information

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers Suppression, Detection and Signaling Research and Applications Conference SupDet 2015 March 5, 2015

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Emergency Power Supplies Kelly

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Tank Storage and Piping Systems R. P. Benedetti DATE: November 23, 2009 SUBJECT: Agenda for December

More information

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on This list represents the membership at the time the Committee was balloted on the text of this edition. Since that time, changes

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON WATER-COOLING TOWERS First Draft Meeting Agenda February 7, 2014 10:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions and Update of

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Sprinkler System

More information

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle)

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Telecommunications

More information

M E M O R A N D U M. NFPA 1911 Second Draft Technical Committee FINAL Ballot Results (F2016 Cycle)

M E M O R A N D U M. NFPA 1911 Second Draft Technical Committee FINAL Ballot Results (F2016 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Department Apparatus

More information

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Correlating Committee on Signaling Systems for

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Correlating Committee on Combustible Dusts Susan

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda]) FINAL MINUTES Healthcare Interpretations Task Force Tuesday, June 15, 2016 Mandalay Bay Convention Center South Convention Center, Level 2 Room Surf F Las Vegas, NV 1. Call to Order. The meeting was called

More information

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th, 2016 Meeting called to order at 8:07 AM by Chairman

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Testing and Maintenance

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Fundamentals R. P. Benedetti DATE: September 16, 2010 SUBJECT: Agenda for ROC Meeting September 29,

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Nonvoting Industrial and Medical Gases Michael W. St. Clair, Chair Ostrander, OH [U] Rep. NFPA Industrial Fire Protection Section

More information

Technical Committee on Water Mist Fire Suppression Systems

Technical Committee on Water Mist Fire Suppression Systems Date: January 29, 2013 1. Call to Order. Meeting was called to order by Chair Larry Owen at 8:00 AM. 2. Building Safety Message. Building safety was discussed and exits identified by Chair Larry Owen.

More information

TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES

TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES MEMORANDUM TO: FROM: Technical Committee on Internal Combustion Engines R. P. Benedetti DATE: August 17, 2016 SUBJECT: Agenda for NFPA 37 Second Draft

More information

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT MEMORANDUM TO: FROM: Technical Committee on Liquid Fuel Burning Equipment R. P. Benedetti DATE: March 10, 2015 SUBJECT: Agenda for March 25, 2015 NFPA

More information

Correlating Committee on Automatic Sprinklers

Correlating Committee on Automatic Sprinklers Correlating Committee on Automatic Sprinklers First Draft Correlating Committee Meeting December 6, 2016 MEETING MINUTES 1. Call to Order. CC Chair Ken Linder called the meeting to order at 8AM. 2. Self-Introductions

More information

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Code Kelly Carey,

More information

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT MEMORANDUM TO: FROM: Technical Committee on Liquid Fuel Burning Equipment R. P. Benedetti DATE: May 15, 2014 SUBJECT: Agenda for May 28-29, 2014 NFPA

More information

Page 1 of 19 Committee Input No. 14-NFPA 33-2013 [ Global Input ] Type your content here... Supplemental Information File Name IndoorDraftforCI.docx Description This committee input would be added to new

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Residential Occupancies Kelly

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Portable Fire Extinguishers

More information

Developing Sprinkler System Design Criteria for Flammable and Combustible Liquid Storage

Developing Sprinkler System Design Criteria for Flammable and Combustible Liquid Storage Developing Sprinkler System Design Criteria for Flammable and Combustible Liquid Storage David P. Nugent Aon Risk Consultants Introduction Safe handling and storage of flammable and combustible liquids

More information

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES 1.

More information

NFPA 550 ROP Meeting Minutes

NFPA 550 ROP Meeting Minutes NFPA 550 ROP Meeting Minutes NFPA Technical Committee on Fire Risk Assessment Methods (FIR-AAA) June 24, 2010 Microsoft Live Meeting 1. Call to order. The meeting was called to order at 1:00 PM on Monday,

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

Committee Input No. 28-NFPA 13R-2013 [ Global Input ]

Committee Input No. 28-NFPA 13R-2013 [ Global Input ] Page 1 of 6 Committee Input No. 28-NFPA 13R-2013 [ Global Input ] 6.2.2 Outside Dwelling Units. 6.2.2.1 All sprinklers used outside of the dwelling units shall be in accordance with 6.2.2 7.2 and 7.3.

More information

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call vember 20, 2012 2-4 PM EDT (1-3 PM CT; 12-2 PM MT; 11-1 PM PT) 1. Welcome-Glenn McGinley, Committee Chair

More information

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Notification Appliances for

More information

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Water Additives

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

NFPA Technical Committee on Fire Tests

NFPA Technical Committee on Fire Tests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Tracy

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Correlating Committee on

More information

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Mr. Merton Bunker, Committee Chair, called the meeting to order at 8:05 on Wednesday September

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

Technical Committee on Record Protection (REA-AAA)

Technical Committee on Record Protection (REA-AAA) Technical Committee on Record Protection (REA-AAA) DATE: September 8, 2015 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Record Protection (REA-AAA) Audrey

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT

Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT PREPARED BY: Garner A. Palenske, P.E., and William N. Fletcher, P.E. Aon Fire Protection Engineering San Diego, CA, USA September 2015 Fire Protection

More information

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Protected Premises Fire Alarm

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M (AMENDMENT) TO: FROM: Technical Committee on Mercantile

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Alternative Approaches to

More information

Plan Submittal Checklist

Plan Submittal Checklist City of Aurora Public Works Department HIGH-PILED COMBUSTIBLE STORAGE Plan Submittal Checklist Building Division 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303-739-7420 Fax: 303-739-7551 Project

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Building Service and

More information

Report of the Committee on Makhoul (Mike) T. Kadri, Automotive and Marine Service Stations Patrick A. McLaughlin, John S. Robison, Robert L.

Report of the Committee on Makhoul (Mike) T. Kadri, Automotive and Marine Service Stations Patrick A. McLaughlin, John S. Robison, Robert L. Report of the Committee on Automotive and Marine Service Stations John S. Robison, Chair Alabama State Fire Marshal s Office, AL [E] Rep. International Fire Marshals Association E. Joseph Bocci, US Department

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Technical Committee on Testing and Maintenance

More information

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases Committee on 51A M E M O R A N D U M To: From: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant Date: June 14, 2010 Subject: NFPA 51A ROC Letter Ballot Circulation

More information

CORRELATING COMMITTEE ON COMBUSTIBLE DUSTS

CORRELATING COMMITTEE ON COMBUSTIBLE DUSTS CORRELATING COMMITTEE ON COMBUSTIBLE DUSTS June 19-21, 2013 NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 AGENDA 1. Meeting opening, welcome members and guests, and introductions 2. Chair's remarks,

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 35 12/3/2015 7:13 AM Public Input No. 1-NFPA 90A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI/ASHRAE

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee Renaissance Blackstone Chicago 636 South Michigan Avenue, Chicago, IL 60605 May 13-14, 2014 Chicago, IL 1. Call to Order. Call the meeting to

More information

Technical Committee on Multiple Burner Boilers

Technical Committee on Multiple Burner Boilers Technical Committee on Multiple Burner Boilers AGENDA Salt River Project PERA Club 1 Continential Drive Tempe, AZ January 14-15, 2014 1. Chair s welcome, call to order, and opening remarks at 8:00 a.m.

More information

Public Comment No. 13-NFPA [ Section No ]

Public Comment No. 13-NFPA [ Section No ] Public Comment No. 13-NFPA 30-2013 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A 395/A395M, Standard

More information

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED MEETING MINUTES NFPA Correlating Committee on Safety to Life (SAF-AAC) November 7, 2013 Second Draft Meeting Embassy Suites Atlanta Hartsfield Airport Hotel Atlanta, GA 1. Call to Order. The meeting was

More information