Exhibit J. Subcontract Agreement No.

Size: px
Start display at page:

Download "Exhibit J. Subcontract Agreement No."

Transcription

1 Exhibit J SUBCONTRACTOR TRADE INTERFACE AGREEMENT Subcontract Agreement No. PROJECT: NEW EASTSIDE REGIONAL PARK PHASE I PARTICIPANTS (PARTIES): Sundt Construction, Inc. PURPOSE: General Contractor (Sundt) Fire Protection Subcontractor Plumbing Subcontractor HVAC Subcontractor Integrated Automation Subcontractor Electrical Subcontractor Communications Subcontractor Electronic Safety and Security Subcontractor The intent of this Subcontractor Trade Interface Agreement [Agreement] is to coordinate the responsibilities of the Parties to eliminate conflicts between trades, and to provide complete, fully functional systems. DEFINITIONS Division 21: Division 22: Division 23: Division 25: Division 26: Division 27: Division 28: Provide: Furnish: Specification for work generally provided by Fire Suppression subcontractors. Specification for work generally provided by Plumbing subcontractors. Specification for work generally provided by Heating Ventilation and Air Conditioning subcontractors. Specification for work generally provided by Integrated Automation subcontractors. Specification for work generally provided by Electrical subcontractors. Specification for work generally provided by Communications subcontractors. Specification for work generally provided by Electronic Safety and Security subcontractors. Work to include all labor, material, plant, tools, shop submittals, shop fabrication, and equipment as required for complete operable system as indicated and specified (to furnish, store, set in place, install, connect, start-up, test, commission, and transfer O&M manuals to GC). Work to include all material, equipment, plant, shop fabrication, cost to deliver to the project site storage area, and transfer O&M manuals to GC. Upon delivery of manuals a representative of the addressee authorized to receive the delivered items shall inspect, sign for and take possession of the delivered items. In the case of integral items that are received by a subcontractor for installation by another subcontractor, the receiving subcontractor shall receive the item and store as directed. At the request of the installing subcontractor, the receiving subcontractor shall transfer the item to the installing subcontractor at the stored location and obtain the signature of the representative of the installing subcontractor.

2 Page 2 Install: Connect: EMCS: FID: FADS: Integral: Work to include receiving the material or equipment at the project site, store (unless storage is by another subcontractor) as directed, inventory, file notices of claims for damaged or shorted materials, uncrate, dispose of packing, set in place and secure as required, transfer O&M manuals to GC (if packed with item), connect, start-up and test. Work to include making conduit and wire, plumbing, gas, or ventilation connections to equipment installed by subcontractor or other subcontractors. Connection shall include furnishing and installing any disconnects, plugs, trim valves, pressure reducers, dampers, etc. not furnished with the equipment, but required for a complete installation. Energy Management and Control System. EMCS Field Interface Device. Fire Alarm and Detection System. Physically part or physically separate but furnished with equipment by the equipment manufacturer as a complete operable package. AGREEMENT The parties signatory to the Agreement collectively agree that the they will coordinate the work of each trade, and among them the work of all trades included in this Agreement will be fully coordinated to provide the Owner with complete operating systems. This Agreement attempts to establish the assignment of the various items of work by trade, but nothing within this Agreement, by its inclusion or its exclusion, shall abrogate the commitment by the parties to provide the Owner with complete operating systems. Sundt Construction, Inc. shall approve jurisdictional decisions, which change the assignments contained in this Agreement, and the parties will be fairly compensated for changes to this Agreement. Specific assignments are as follows: 1. Motor Starters a. Division 26 shall provide all motor starters, except for specialty motor starters such as variable speed, multi-speed, or reversing. The subcontractor that provides the motor shall provide all specialty motor starters. b. Division 23 shall furnish motor starters when integral with the mechanical equipment. c. Division 23 shall provide Division 26 with a list of all motor starters, including size and heater/thermal overload requirements that are to be provided by Division 26. However, Division 26 shall have the primary responsibility to provide motor starters in the event of conflicting or incomplete information. d. Division 26 shall provide branch circuit power wiring for all motor starters. e. Division 23 will supply all AFD s and or VFD s. Division 26 will install and wire all AFD s and or VFD s

3 Page 3 2. Disconnects a. Division 26 shall provide disconnects as required by the applicable edition of the National Electrical Code. b. Unless otherwise indicated, Division 26 assumes that all package mechanical equipment requires a single power connection and, if required by NEC, one disconnect. If actual requirements are different, the affected subcontractor shall transmit the information to Division 26 and Sundt. c. Division 23 shall furnish disconnects when integral with the mechanical equipment. 3. Power for Mechanical Systems a. Division 26 shall provide power connections to mechanical equipment in accordance with the Division 23 subcontractor s equipment schedules and shop drawings. Power requirements shall be provided to Division 26 to meet Sundt established design schedules. Changes to the requirements that require additional cost shall be paid for by the Division 23 subcontractor making the change. b. Division 26 shall size overcurrent protection, conductors, and conduit for motors based on the applicable edition of the NEC unless otherwise noted on the Division 23 subcontractor s information provided to Division 26. c. For proper sizing of overcurrent protective devices, conductors, and conduit, Division 23 shall provide the following information for all equipment where applicable. Voltage and Phase Motor HP Resistance Heat KW MCA (Minimum Circuit Amps) FLA (Full Load Amps) or RLA (Running Load Amps) MFS (Maximum Fuse Size) Maximum HACR Circuit Breaker Motor Starting Current AIC Rating of Equipment For packaged equipment, provide data for all components (motors, heat, etc.). Unless otherwise indicated, it is assumed that the starting method of the motors within equipment is non-concurrent. 4. Control Wiring for Mechanical Systems a. Division 25 shall provide all low voltage thermostats. b. Division 25 shall provide all control transformers. Division 26 shall provide the line voltage connection to the transformers. c. Division 25 shall provide all low voltage control wiring for their own equipment and equipment control. d. All line voltage thermostats shall be furnished by Division 25 and shall be installed by Division 26.

4 Page 4 5. Life Safety System a. Division 28 shall provide all fire alarm system equipment and wiring unless otherwise noted in this agreement. b. The Division 21 shall furnish and install sprinkler water flow detectors, valve monitor (tamper) switches, exterior water gong, and make final adjustments to devices for proper operation. All device locations and quantities shall be indicated on the fire suppression and fire alarm design shop drawings. Division 28 shall provide connections between the monitored devices and the FADS for monitoring the annunciation by the fire alarm system. c. Division 28 shall provide all heat detectors and smoke detectors including all duct detectors. Division 23 shall install all duct smoke detectors and duct airflow detectors. Division 23 and Division 28 shall coordinate the location of the duct smoke detector and duct airflow detectors and the locations shall be indicated on both the fire alarm design shop drawings and the ductwork shop drawings. Division 28 shall make fire alarm monitoring wiring connections to duct smoke detectors and duct airflow detectors. d. Dedicated smoke control equipment shall be controlled directly via the FADS with fan motor control connections provided by Division 26. Division 25 shall provide interlocking control connections to associated dampers. e. Fan control for dual duty fans shall be accomplished by a dry contact signal from FADS to FID provided by Division 28. Control wiring from FID to the dual duty fan provided by Division 25. f. All HVAC control damper wiring shall be provided by Division 25. Control and power wiring for fire/smoke dampers controlled from the FADS shall be by Division 26 and 28 respectively. g. Division 28 shall provide all required Hand-Off-Auto (HOA) control in fire alarm control panels. h. Division 28 shall provide a signal to the Division 25 EMCS to indicate when the building is in a fire mode. I. In the case of a pre-action or dry-chemical type fire suppression systems the Division 21 or 2 nd tier Division 21 specialty subcontractor shall furnish and install all emergency push button stations, heat detector and smoke detector devices for a complete and operating system including the design shop drawings. Division 28 shall make fire alarm monitoring connections, and Division 26 shall make control power connections and power connections to motors such as the compressor for a preaction system. 6. Miscellaneous a. All motors shall be provided by the participant whom furnishes the equipment the motor serves. b. Division 23 shall provide ventilation for electrical equipment rooms as indicated on the project documents. Division 26 shall provide Division 23 with transformer KVA sizes.

5 Page 5 For electronic equipment more sensitive to heat, Division 26 shall communicate exact requirements to Division 23. c. Saw cutting, trenching, core drilling, and backfill shall be performed by trade whose work requires it, and shall be coordinated with Sundt. d. Each participant shall be responsible for fire rated and acoustically rated penetrations through walls and floors as required for participant s work. e. Each participant shall provide signs, tags, and labels as required for participant s work. f. Division 26 in locations depicted in the project documents shall provide telephone backboards, unless stated otherwise in the Supplemental Instructions to Bidders or Subcontract Agreement Scope of Work. g. Painting indicated on the architectural drawings and architectural specifications shall be provided by Sundt or painting subcontracor. Painting indicated on the MEP drawings and specifications shall be provided by the participant providing the work to be painted unless stated otherwise in the Supplemental Instructions to Bidders or Subcontract Agreement Scope of Work. g. All participants agree to coordinate equipment requirements to ensure that no mismatching of components occurs. If such mis-match does occur, it will be resolved between the participants providing the mis-matched equipment without delay, or additional cost to the Project. h. All participants agree to coordinate in a timely manner throughout the design and construction process to ensure accurate and well-coordinated construction documents, and a well-coordinated construction phase. i. The HVAC and electrical systems will be Commissioned by Sundt Construction s Commissioning program and a Third-Party Commissioning Authority (CxA). j. A coordination meeting will be held to finalize the Mechanical/Electrical Coordination Matrix.

6 Page 6 AGREED TO BY (SIGNATURES): Sundt Construction, Inc. Fire Protection Subcontractor Plumbing Subcontractor HVAC Subcontractor Integrated Automation Subcontractor Electrical Subcontractor Communications Subcontractor Electronic Safety and Security Subcontractor END OF DOCUMENT

Subcontract Agreement No.

Subcontract Agreement No. ATTACHMENT G TRADE INTERFACE AGREEMENT Subcontract Agreement No. PROJECT: TEXASTECH UNIVERSITY HEALTH SCIENCES CAMPUS, EL PASO, TEXAS MEDICAL SCIENCE BUILDING II PARTICIPANTS: Sundt Construction, Inc.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES ADMINISTRATIVE SERVICES 4202 E. FOWLER AVENUE, FPC110 PHONE: (813) 974-2625 FACILITIES PLANNING & CONSTRUCTION TAMPA, FLORIDA 33620-7550 WEBSITE: USF.EDU/FPC DESIGN & CONSTRUCTION GUIDELINES DIVISION 21

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 12/4/2017 Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant

More information

BULLETIN. Temperature Controls (10/2013)

BULLETIN. Temperature Controls (10/2013) BULLETIN Temperature Controls (10/2013) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. This applies to Phase I & II only. Tenant Responsibility:

More information

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE PAGE 280800-1 SECTION 280800 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements ADDENDUM 1 CLIENT: PROJECT: TO: FROM: Guilford County Schools (GCS) Southeast High School Auditorium & Gymnasium HVAC Improvements All Prospective Bidders Derrick Giles, SAMR, PLLC. DATE: 6/6/2018 The

More information

Idaho Surveying & Rating Bureau, Inc South Cobalt Point Way Tel: (208) Meridian, Idaho FAX: (208)

Idaho Surveying & Rating Bureau, Inc South Cobalt Point Way Tel: (208) Meridian, Idaho FAX: (208) Idaho Surveying & Rating Bureau, Inc. 1871 South Cobalt Point Way Tel: (208) 343-5483 Meridian, Idaho 83642 FAX: (208) 895-8059 www.isrb.com e-mail info@isrb.com Joseph C. Harbacheck, CIC Secretary - General

More information

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING SECTION 15990 PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING PROJECT NO. ####### PART I - GENERAL 1.01 WORK INCLUDED A. Final test and balance of air distribution systems. B. Final test and balance

More information

SECTION : MEPS IDENTIFICATION & LABELING

SECTION : MEPS IDENTIFICATION & LABELING SECTION 01 70 10: MEPS IDENTIFICATION & LABELING 1. GENERAL A. The intent of this section is to define the labeling and identification requirements for building mechanical, electrical, plumbing, and specialty

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

SUBJECT: Effective Date: Procedure Number:

SUBJECT: Effective Date: Procedure Number: SUBJECT: Effective Date: Procedure Number: Facilities Operations/ Utilities and Energy 9/1/2015 FS 2015 UES0002 Services Division of Responsibility Procedure APPLICABILITY/ACCOUNTABILITY: Supersedes: Page

More information

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE SUPERVISION OF AUTOMATIC FIRE SPRINKLER SYSTEMS SUPERVISION OF ALTERNATIVE AUTOMATIC FIRE-EXTINGUISHING SYSTEMS FIRE ALARM AND DETECTION SYSTEMS The Fire Alarm

More information

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST DATE: PROJECT NO.: EXPIRATION DATE: STATUS: INFORMATION PROJECT ADDRESS:

More information

CxA to Answer this Section

CxA to Answer this Section EXHIBIT 01 91 13-3, SAMPLE Construction checklist items are to be completed as part of initial checkout and subsequent startup, preparatory to Functional testing. This checklist does not take the place

More information

FIRE & LIFE SAFTEY STANDARD

FIRE & LIFE SAFTEY STANDARD Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

BULLETIN. Temperature Controls (VAV) (3/11/2010)

BULLETIN. Temperature Controls (VAV) (3/11/2010) BULLETIN Temperature Controls (VAV) (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with Tenant s temperature controls. Tenant Responsibility: 1. Unit power is by

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax) FIRE DEPARTMENT SANTA CLARA COUNTY 14700 Winchester Blvd., Los Gatos, CA. 95032-1818 (408) 378-4010 (408) 378-9342 (fax) www.sccfd.org STANDARD DETAILS & SPECIFICATIONS Spec No C-4 Rev. Date 03/10/10 SUBJECT:

More information

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline Moreno Valley Fire Department Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 8, 2017 Alarm & Signaling Systems PURPOSE Fire alarm and signaling systems are designed to

More information

Brighton Area Fire Authority

Brighton Area Fire Authority 615 W. Grand River Ave. Brighton, MI 48116 o: 810-229-6640 f: 810-229-1619 January 14, 2019 Fire Alarm Contractors RE: Fire Alarm Credential & Submittal Requirements To Whom It May Concern: The following

More information

Building & Safety PERMIT APPLICATION

Building & Safety PERMIT APPLICATION (661) 255-4935 PERMIT APPLICATION 1 Project Location Please complete all applicable fields. Optional fields are surrounded by dashes --------. Address: Assessor s Parcel No. (APN): Street Number Street

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS VALOUR COMMUNITY CENTRE FIRE ALARM SYSTEM Section 28 00 00 GYMNASIUM ADDITION & RENOVATION Page 1 of 3 28 00 00 FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS 1.2 SCOPE 1. The specification covering the General

More information

SECTION SPRINKLER SYSTEMS

SECTION SPRINKLER SYSTEMS SECTION 15325 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Wet-pipe sprinkler systems. B. Preaction sprinkler systems. C. System design, installation, and certification. D. Fire department

More information

SECTION COMMERCIAL-KITCHEN HOODS

SECTION COMMERCIAL-KITCHEN HOODS SECTION 23 38 13 COMMERCIAL-KITCHEN HOODS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Delete other items or paragraphs in the section that are not applicable and renumber

More information

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used. PART 1 GENERAL 1.01 Scope of Standard A. This Standard is intended to assure that fire alarm and signaling systems at Sam Houston State University provide the highest level of life safety possible. This

More information

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010) BULLETIN Temperature Controls (Chilled Water) Phase III only (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant Responsibility:

More information

SECTION INSPECTION AND TESTING OF WORK

SECTION INSPECTION AND TESTING OF WORK SECTION 01455 PART I - GENERAL 1.01 SECTION INCLUDES A. Project Inspections and Procedures B. Scheduling Inspectors Notification requirements 1.02 RELATED SECTIONS A. Section 01310 COORDINATION B. Section

More information

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following: PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of Sam Houston State University for the design and construction of standpipe systems to include combination standpipe

More information

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

This is only the scope of work for the project. For more information, interested parties should contact Procurement at "This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a

More information

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

This is only the scope of work for the project. For more information, interested parties should contact Procurement at "This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

DIVISION 21 FIRE SUPPRESSION

DIVISION 21 FIRE SUPPRESSION Table of Contents 21 00 00 FIRE SUPPRESSION...2 A. REFERENCE ABBREVIATIONS... 2 B. GENERAL... 2 C. DESIGN REQUIREMENTS... 2 D. DOCUMENTATION... 2 21 08 00 FIRE SUPPRESSION COMMISSIONING...2 A. PIPE CLEANING...

More information

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III SECTION 28 3111 - DIGITAL ADDRESSABLE FIRE ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

MODELS B1PA024, 030 AND 036

MODELS B1PA024, 030 AND 036 STELLAR 2000 SINGLE PACKAGE HEAT PUMPS INSTALLATION INSTRUCTION Supersedes: 511.26-N1Y (892) 511.26-N1Y (893) MODELS B1PA024, 030 AND 036 035-11622 GENERAL YORK Model B1PA units are factory assembled heat

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website. 4.e STATE OF MISSOURI County of Franklin ss. COMMISSION ORDER Commission Order No. 2016-316 Third Quarter Term 2016 Tuesday,August,09,2016 Bid Notice IN THE MATTER OF ADVERTISING FOR SEALED BIDS FOR SMOKE

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS 536306-UAI-B-1009 Electric Heat Accessory 10, 16, 20, 26, 32, 36 & 52kW For Split-System R-410A Air Handling Units Both Air Conditioners and Heat Pumps 7-1/2, 10,

More information

Plan Submittal Checklist

Plan Submittal Checklist City of Aurora Public Works Department HIGH-PILED COMBUSTIBLE STORAGE Plan Submittal Checklist Building Division 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303-739-7420 Fax: 303-739-7551 Project

More information

Installation Instructions

Installation Instructions CAELHEAT001A00 - CAELHEAT039A00 AAHC05AHAA - AAHC70ESAA PACKAGED AIR---HANDLING UNITS ELECTRIC HEAT ACCESSORY 6 to 30 TONS (21 to 105 kw) 50/60 Hz Installation Instructions TABLE OF CONTENTS SAFETY CONSIDERATIONS...

More information

University of Texas Project Schedule Narrative February 17, 2009 Page 1

University of Texas Project Schedule Narrative February 17, 2009 Page 1 Page 1 I. General A. The purpose of this narrative is to explain key elements of the sample project schedule and their relevance to completion of the security system by the project Substantial Completion

More information

350 Pine Street, Suite 720 Edison Plaza Beaumont, TX Fax

350 Pine Street, Suite 720 Edison Plaza Beaumont, TX Fax 350 Pine Street, Suite 720 Edison Plaza Beaumont, TX 77701 409.866.7196 409.866.1745 Fax Project: Addendum No. 1 FIRE STATION #2 NORTH END CITY OF BEAUMONT 4990 HELBIG ROAD, BEAUMONT, TEXAS BID PROPOSAL:

More information

Linear Floor Heaters

Linear Floor Heaters Linear Floor Heaters The Price Linear Floor Heater family provides ultimate flexibility in terms of style, performance, and ease of installation. Using room-side heat virtually eliminates the requirement

More information

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015. SECTION 000050 - INVITATION AND NOTICE TO BIDDERS PROJECT: OWNER: 3003 Cisco Road Sidney, Ohio 45365 Ohio Presbyterian Retirement Services 1001 Kingsmill Parkway Columbus, Ohio 43229 ARCHITECT: 4685 Larwell

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Terminal Commissioning Case Study- Terminal A Logan International Airport

Terminal Commissioning Case Study- Terminal A Logan International Airport Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Brad Jones, PE, AP Sebesta Blomberg Sam Sleiman, PE, CCM

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for the design and construction of standpipe systems to include combination standpipe

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

WEST VIRGINIA UNIVERSITY

WEST VIRGINIA UNIVERSITY WEST VIRGINIA UNIVERSITY Environmental Health and Safety (SOP) WV State Fire Marshal (SFM) Project Plans Review Process & Procedures West Virginia University Environmental Health & Safety Page 1 of 10

More information

ASSESSING THE HIDDEN DANGERS IN YOUR INDUSTRIAL CONTROL PANELS

ASSESSING THE HIDDEN DANGERS IN YOUR INDUSTRIAL CONTROL PANELS Schneider Electric NEC 409.2 January 15, 2008 ASSESSING THE HIDDEN DANGERS IN YOUR INDUSTRIAL CONTROL PANELS by Grant Van Hemert, P.E., application engineer, Water and Wastewater Competency Center, Schneider

More information

Smoke Detector Activation of any smoke detector shall start the alarm verification mode.

Smoke Detector Activation of any smoke detector shall start the alarm verification mode. Description: The purpose of the section is to provide the UMCP Design Standards for the design and implementation of Fire Alarm Systems at the UMCP campus. Related Sections: TBD Effective Date: July 10,

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating

More information

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES SECTION 21 30 00 FIRE PUMPS GENERAL This standard provides general requirements of The University of South Alabama in Mobile Alabama for fire pumps. This document is not intended to serve as a guide specification.

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

PREFACE. Your comments or suggestions are welcome and appreciated. They should be sent to:

PREFACE. Your comments or suggestions are welcome and appreciated. They should be sent to: PREFACE Because of changes in installation codes, the increasing complexity of the equipment involved, and other factors, more and more markings are being used on electrical heating and cooling equipment.

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

Sheetz Inc. Fire Protection Service Guidelines

Sheetz Inc. Fire Protection Service Guidelines Sheetz Inc. Fire Protection Service Guidelines Overview The following are guidelines for Sheetz Fire Protection Services for the 2016/2018 contract year. Each key area is listed below with the appropriate

More information

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Technical Development Program COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Introduction System

More information

Valuation: # of Plans Submitted: # of pages: Type of Work (select one): New Addition Existing System/Modification Project Name: Scope of Work:

Valuation: # of Plans Submitted: # of pages: Type of Work (select one): New Addition Existing System/Modification Project Name: Scope of Work: PERMIT FEE: $ 907 Billy Mitchell Blvd. P: (210) 228-1022 Fire Alarm Permit Application PAYMENT TYPE: Check Credit Card Charge to Job #: (Please complete all of the following information. Please PRINT).

More information

Installation Instructions

Installation Instructions Electric Heater Kit For use with GC Geothermal Heat Pumps KWCEH0101B05 KWCEH0101B10 KWCEH0101B15 KWCEH0101B20 Installation Instructions NOTE: Read the entire instruction manual before starting the installation.

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

Fire Protection Essentials QA/QC Plan Sample

Fire Protection Essentials QA/QC Plan Sample Fire Protection Essentials QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: FirstTimeQuality 410-451-8006

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

SECTION AIR DOORS

SECTION AIR DOORS SECTION 23 34 33 AIR DOORS Berner Series VSA air doors are designed for openings up to 12 ft for environmental separation and up to 10 ft for insect control. Berner Series VSB air doors are designed for

More information

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608) Ho-Chunk Gaming POWER SYMBOLS X ELECTRICAL PANEL - REFER TO DRAWINGS FOR WIDTH AND PANEL SCHEDULES PANEL NAMING: XXP-#X: DENOTES PANEL FUNCTION: L = LIGHTING P = GENERAL POWER E = EMERGENCY S = OPTIONAL

More information

Indoor Air Handlers with Compressors MVS and MVW

Indoor Air Handlers with Compressors MVS and MVW Indoor Air Handlers with Compressors MVS60-90-120-144 and MVW60-90-120-144 General Description The Marvair Marine self-contained water and air cooled air conditioners are designed for both new installations

More information

HEATING & COOLING SUBMITTAL The DuraPac Series Unit 559F/579F180, 216, 240, , 18, 20, and 25 NOMINAL TONS

HEATING & COOLING SUBMITTAL The DuraPac Series Unit 559F/579F180, 216, 240, , 18, 20, and 25 NOMINAL TONS HEATING & COOLING SUBMITTAL The DuraPac Series Unit 559F/579F180, 216, 240, 300 15, 18, 20, and 25 NOMINAL TONS COMMERCIAL ROOFTOP GAS HEATING/ELECTRIC COOLING UNITS ELECTRIC HEATING/ELECTRIC COOLING UNITS

More information

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM SECTION 213100 WET PIPE FIRE PROTECTION SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The requirements of the General Conditions and Supplementary Conditions apply to all work herein.

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with a Cheetah Xi 50 addressable detection and control system.

More information

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5 Construction Standards Page 1 of 5.1 General Description.1 The University requires that all new fire alarm system control panel, components, and devices, as required for the project, be Secutron 2900 Series

More information

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume COMMERCIAL HVAC PACKAGED EQUIPMENT Rooftop Units Level 1: Constant Volume Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application

More information

The Owner will provide the QEI inspection and certification services.

The Owner will provide the QEI inspection and certification services. General The Owner will provide the QEI inspection and certification services. Elevators Electric operated traction elevators are preferred; holeless hydraulic oil operation may be considered where use

More information

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems 233100 AIR DISTRIBUTION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 230700 HVAC Insulation B. Section 237300 Air Handling C. Section 230900 Building Automation and Control System Guidelines D. Section

More information

TESTING, ADJUSTING AND BALANCING

TESTING, ADJUSTING AND BALANCING PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components

More information

Electrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments.

Electrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments. Electrical Laws & Rules Licensing Electrical Work Scope Administrator Duties Certification Supervision RCW 19.28 WAC 296-46B Permits Inspections Access Description Directions Comments Electrical Program

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

SECTION PACKAGED HEAT TRANSFER SYSTEM

SECTION PACKAGED HEAT TRANSFER SYSTEM PACKAGED HEAT TRANSFER SYSTEM Page 1 of 6 SECTION PACKAGED HEAT TRANSFER SYSTEM 1 GENERAL 1.1 SUMMARY A. Packaged steam-to-water heat transfer system 1.2 REFERENCES A. ASHRAE American Society of Heating,

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

NFZP Variable Refrigerant Flow Guide Specification

NFZP Variable Refrigerant Flow Guide Specification PART 1 - GENERAL 1.01 SECTION INCLUDES SECTION 23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEM A. (VRF) HVAC system includes: 1. Outdoor/Condensing unit(s): a. Size Range: 14 Tons Nominal b. YANMAR VRF

More information

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

SECTION (13900) - FIRE SUPPRESSION SYSTEMS PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with automatic detection and control. The work described in

More information

Unified Fire Authority - Fire Prevention Bureau

Unified Fire Authority - Fire Prevention Bureau Unified Fire Authority - Fire Prevention Bureau FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM RECORD OF COMPLETION To be completed by the system installation contractor at the time of system acceptance

More information

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS Single Package Rooftop Gas Heating/Electric Cooling Unit Two Stage Cooling Capacity Control with Puronr (R---410A) Refrigerant Sizes: 17, 20, 24, 28, 30 Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION

More information

Introduction Limited-Use / Limited-Application

Introduction Limited-Use / Limited-Application NBL DEC 2015 V1 Introduction Niagara Belco Ltd has been in the elevating industry for 30 years, we take pride in our work and aim to please all of our customers. We appreciate your business and always

More information

C. Samples for Initial Selection: For units with factory-applied color finishes.

C. Samples for Initial Selection: For units with factory-applied color finishes. SECTION 238126- SPLIT-SYSTEM AIR-CONDITIONERS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Demonstration and Training of MEP Systems Page 1 of 15

Demonstration and Training of MEP Systems Page 1 of 15 Page 1 of 15 Last Update: May 17, 2018 A. General: 1. Demonstrations and Training of various MEP and other systems is very important to BSU Facilities, especially on new building or major renovation projects.

More information