1 1. Introduction Workspace Group Plc (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of (hereafter referred to as the Site ), situated to the north of the Isle of Dogs within the administrative boundary of the London Borough of Tower Hamlets. The Site is approximately 1.65 hectares in area and is bounded by the Docklands Light Railway (DLR) to the west, the DLR and Aspen Way (A1261) to the south, residential and retail buildings to the north, and a residential building, with ground floor retail uses, to the east. Site Boundary The proposed redevelopment (hereafter referred to as the Development ) comprises a mix of uses, including office/light industrial, residential and hotel, retail and plant space in a range of buildings from 3 to 30 storeys above ground level and associated parking, public realm and landscaping. An Environmental Impact Assessment (EIA) has been undertaken to assess the environmental effects of the Development. The EIA is reported in an Environmental Statement (ES) which accompanies the planning application for the Development. The ES describes the likely significant environmental effects of the Development. This document provides a summary of the ES findings in non-technical language. 1

2 Non-Technical Summary 2. EIA Methodology EIA is a process which aims to ensure that the likely significant environmental effects of a new development (which can be beneficial or adverse) are taken into account by the local planning authority when deciding whether to grant planning permission. The EIA was undertaken by a qualified and experienced team of EIA consultants using established methods and assessment criteria, following the requirements of the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations, 1999 (as amended) (hereafter referred to as the EIA Regulations ). During the EIA process the consultants undertook site visits and surveys, data reviews, computer modelling and specialist assessments, and consulted with a number of relevant authorities. The first stage of the EIA process involved undertaking a Scoping Study. The purpose of this study was to identify the potentially significant environmental issues associated with the Development in order to decide which environmental studies would need to be undertaken as part of the EIA. A Scoping Report, which presented the findings of the Scoping Study, was submitted to London Borough of Tower Hamlets in October 2009 for agreement (referred to as a Scoping Opinion ). It was agreed with London Borough of Tower Hamlets that the following topic areas should be assessed in the EIA (in no particular order): Waste; Socio-Economics; Transportation and Access; Noise and Vibration; Air Quality; Archaeology and Built Heritage; Ground Conditions and Contamination; Water Resources and Flood Risk; Wind; Daylight, Sunlight, Overshadowing, Solar Glare and Light Pollution; Telecommunications; Townscape and Visual; and Cumulative Effects. The assessment of each topic is reported in the ES as a technical chapter. Each technical chapter describes how the assessment in relation to that topic was undertaken, the current conditions on and adjacent to the Site and the potential effects of the Development. Each technical chapter also describes a range of measures that would be incorporated to avoid, reduce, or offset any identified adverse effects, and/or enhance potential beneficial effects. Such measures are referred to as mitigation measures. The resulting effects (known as residual effects), following the implementation of the mitigation measures, are also described. An Ecological Appraisal was undertaken to ascertain the general ecological value of the Site, advise the design of the proposed Development and assess its potential ecological effects. The Scoping Report identified ecology as a topic to be scoped out of the EIA because the Site supports little of ecological interest, is not located on or adjacent to any statutory or non-statutory designated sites and due to the limited potential for ecological effects. Natural England accepted this approach in their consultation response to the EIA Scoping Report. 3. Existing Land Uses and Activities The Site currently comprises three buildings of one to two-storeys in height, which provide units suitable for office, studio, workshop and light industrial use. The buildings are surrounded by hardstanding and access roads, and associated car parking for approximately 100 cars. The Site currently provides floorspace of 6,945 sq m (74,755 sq ft) Gross External Area (GEA) in B1 (business) use although not all of this floorspace is currently let. A cellular communication (mobile phone) base station, operated by T-Mobile, is located in the southwest corner of the Site. The height of the mast is approximately 23m above ground. 2

3 Northern Boundary looking East towards Wharfside Point Western Boundary looking South towards Docklands Light Railway Northern Boundary looking West Looking North towards the rear of Poplar High Street The Site is located in a mixed use area comprising residential buildings, office and commercial uses including retail. The DLR lies immediately adjacent to the west and south of the Site, with Aspen Way beyond the DLR to the south. The rear of retail and residential buildings along Poplar High Street are located immediately to the north of the Site and the recently constructed Wharfside Point development is located to the northeast and east comprising retail uses at ground level and residential above, although the development is not yet fully occupied. Land uses and activities surrounding the Site are varied and include: Residential properties surrounding the Site, including those on Poplar High Street, Preston Road and Cotton Street; Retail properties to the north of the Site along Poplar High Street; Commercial and light industrial businesses to the east of the Site; Highway users, cyclists and pedestrians; Woolmore Primary School approximately 200m north of the Site; Nearby open spaces, including Robin Hood Gardens; The River Thames approximately 400m south-east of the Site; Poplar Dock approximately 160m south of the Site; The River Lea approximately 900m to the north-east of the Site at its closest point; Surrounding Grade II listed buildings within 250m of the Site include Greenwich Pension Public House, several buildings fronting Montague Place and Poplar All Saints Church, as set out further below; and Conservation Areas (CA) between 100m and 200m from the Site (All Saints Church CA, St Matthias Church CA and Naval Row CA). 3

4 Non-Technical Summary The Site is located within an area undergoing significant redevelopment. The recently constructed 13 and 25-storey buildings which form the Wharfside Point development are located to the northeast and east of the Site respectively. Blackwall Reach Regeneration Area is located to the east of the Site and the area to the south of the Site, beyond Aspen Way, has planning permission for redevelopment comprising retail and residential. 4. Alternatives and Design Evolution In line with the statutory requirements contained in the EIA Regulations, the ES provides a description of the main alternatives to the proposed Development considered by the Applicant. These include the do-nothing scenario (that is, leaving the Site in its current state) and a series of design alternatives. It is considered that the do-nothing scenario (i.e. no redevelopment) would result in a range of adverse effects for the Site and the surrounding area, including: Under-utilisation of the current Site; A missed opportunity for optimising development at a key location delivering new residential units; A lost opportunity to facilitate the delivery of enhanced and better defined pedestrian links between Poplar High Street to the north of the Site, and Canary Wharf to the south, and a public open space for Poplar; and Failure to intensify the users/population of the Site. No alternative site or land uses were considered by the Applicant. However, a number of alternatives to the Development were examined as part of the design process in relation to: Building massing; The architectural identity, and thus visual appearance, of the Development; and Public realm/landscape scheme. The massing and orientation of the buildings within the proposed Development was informed by the Site s context and urban grain. In particular, the Applicant selected the proposed Development design over other alternatives taking into account the sunlight and daylight, townscape, commercial and technical issues as well as the issues raised during extensive consultation with officers at the London Borough of Tower Hamlets and the Greater London Authority. 5. The Proposed Development Building Key Plan 4

5 The Development would involve the demolition of the existing buildings on the Site and the construction of a mixed-use scheme between 3 and 30 storeys in height above ground providing: 7,057m 3 of office/light industrial use; 211m3 retail use (cafe and restaurant; 312 residential units; 91 bedroom hotel; and Associated plant, parking and landscaping. The Development comprises a group of buildings referred to as A1 to A5, B1 to B6 and C1 to C3 arranged around two squares; a major public square in the eastern part of the Site and a raised semipublic courtyard in the western part of the Site. Blocks A1 to A5 and B1 to B6 form an F shaped building with taller elements formed of Blocks A1, A3, B1 and B3. A second building is formed by Blocks C1 to C3, which encompasses the tallest element of the proposed Development which is Block C3 at 30-storeys above ground. Ground Floor Plan Residential apartments would face onto the western and southern edges of the semi-public courtyard (Blocks A1 to A4 and Block B4) with commercial (light industrial and office) land use located on the lower floors of the eastern edge (Block B1, B2 and B3). Residential units would be located above a semi-basement, and therefore the lowest residential floor would be raised above existing ground level by approximately 1.5m. Commercial land use would occupy the lower floors of Block A3, A4 and B1 to B4 and all floors of Blocks B5 and B6. The lower two floors of Block A1 and A2 would be occupied by an access/exit ramp for the semi-basement car parking and service plant rooms. Residential apartments would occupy each A and B Block above the commercial land use, plant and basement access/exit ramp. The ground floor of Block C1 and C2 would be occupied by hotel lobby and restaurant facilities and the ground floor level of Block C3 would be occupied by a residential lobby. Hotel use would occupy all five upper floors of Block C1 and all four upper floors of Block C2. Hotel use would also occupy the first to fourth floors of Block C3 with residential units from sixth floor upwards (the fifth floor being a service plant floor). 5

6 Non-Technical Summary Proposed Development Massing and Land Use Active uses would be located around the major public square in the eastern part of the Site at ground floor level with a restaurant located within the hotel and a cafe within Block B6. New public realm would be provided through the creation of a major public square in the eastern part of the Site and a raised semi-public courtyard in the western part of the Site. In addition, a variety of amenity roof gardens would be created, both communal and private, and each residential unit would include a balcony. The proposed Development would facilitate the delivery of a new north-south pedestrian route through the Site linking Poplar High Street to the north, to the Docklands and Canary Wharf beyond the DLR and Aspen Way to the south. This route would run alongside the western side of Blocks C1 to C3 and a hotel colonnade would also draw pedestrians in a north-south linear direction. Landscape Masterplan 6

7 Landscaping measures would include soft landscaping in the form of planters, hedgerow and tree planting, species rich living roof space, garden roofs in the form of lawns, all of which would provide an opportunity for wildlife. There would also be the potential for allotments and hedge planting, and bird and bat boxes, and bee keeping areas. A semi-basement would be provided under the western semi-public courtyard accommodating parking that would be accessed via the ramp at the northwest corner of Block A1. A further full basement area would be provided under Blocks C1 to C3 to accommodate plant and equipment. A total of 110 car parking spaces would be provided within the Development, of which at least 10% would be for disabled use. Electric charging points would be provided. In addition, 396 cycle spaces and 12 motorcycle spaces would be provided. Cycle spaces would be provided at ground level and within the semi-basement for use by residents, employees and visitors. Waste storage areas would be provided for residential, retail, hotel and commercial uses and these would be large enough to enable the storage and separation of recyclable waste. The Development has been designed to reduce carbon emissions through a combination of energy efficient measures and low and zero carbon technologies, including the implementation of a natural gas-fired Combined Heat and Power system and solar water heating panels. These solar panels would be located on the roofs of Block A3 and C3. 3D Illustration of the Development 6. Development Programme, Demolition and Construction It is estimated that the Development would be built over a period of approximately 6 years, including demolition, other enabling works and construction. It is anticipated that these works would be undertaken from 2013 to In order to control and manage the potential environmental effects typically associated with demolition and construction works, a site-specific construction Environmental Management Plan would be developed and implemented throughout the duration of the works. This would specify a range of measures to manage the environmental effects that could arise and would provide, for example, details of controls in relation to dust, noise and vibration, waste management, dealing with hazardous materials and protecting archaeological resources. 7

8 Non-Technical Summary The Environmental Management Plan would be prepared in line with relevant legislative and best practice guidelines, and contractors would be required to implement it throughout the demolition and construction works. Environmental Management Plans are an established method of managing environmental effects resulting from demolition and construction works and they are successfully adopted for other construction projects in urban areas. 7. Waste An assessment has been undertaken to establish the amount of waste which would be likely to arise from both the demolition and construction works, and the complete and occupied Development. Consideration was also given as to how waste could be stored within, and removed from, the completed Development. The demolition, excavation and construction works have the potential to generate significant volumes of waste. It is estimated that approximately 17,000 cubic metres of material would be generated during demolition and excavation. The implementation of a Site Waste Management Plan (which is a statutory requirement for a development of this size) would include a variety of measures that would ensure waste is managed in a sustainable manner by reusing and recycling materials wherever possible throughout the construction phase. Whilst it would not be possible to reuse much of this material on-site, the material would be transported off-site and reused elsewhere or disposed of, in accordance with appropriate statutory guidance. The volume of waste going to landfill would be minimised as far as practically possible. The type and amount of waste produced by the occupied Development would increase compared with that currently produced by the Site occupiers. Waste storage provision would be provided within the Development to store the waste generated by occupiers of the residential and commercial (office, light industrial, retail and hotel) accommodation. This would include waste separation measures to accord with relevant legislation and assist occupiers with recycling. The occupants of the completed Development would be provided with information on reducing, reusing and recycling waste. The implementation of a Site Waste Management Plan during demolition and construction, and the provision of sufficient space for storage for segregated waste for future occupiers of the Development, would result in a negligible effect in relation to waste. 8. Socio-economics The Development would be likely to generate a number of employment opportunities. It is estimated that 90 people would be employed during the demolition and construction phase and approximately 110 jobs over and above those currently available on the Site, when fully occupied, would be created once the Development is completed. Additional spending by those working and living within the Development would further benefit the local economy. The Development would provide 312 new residential units, a proportion of which would be affordable, and all would be built to good quality and environmental standards. This provides a positive contribution towards London Borough of Tower Hamlets housing policy target of creating 2,885 new homes each year. The inclusion of a hotel as part of the Development is in line with planning policy objectives for more visitor accommodation. The Development would be likely to accommodate approximately 560 new residents, which would be expected to generate an increased demand for local health and education facilities. Available information shows that secondary schools and community facilities have enough capacity to accommodate the likely new demand for these services. Additional demand in relation to primary schools and healthcare, in the context of other developments coming forward in the near future in the Borough, would require mitigation and would be met through the Applicant providing funding as part of an appropriate planning obligation contribution. There is currently no public realm or open space within the Site. The Development would create new public realm through the major public square in the eastern part of the Site and the raised semi-public courtyard in the western part of the Site. In addition, residents of the Development would have access to a variety of amenity roof gardens, both communal and private, and a balcony. Overall, the Development would have a beneficial effect as a result of the employment opportunities created, increased spending within the local economy, creation of open space included within the Development and the provision of new housing and visitor accommodation. 8

9 9. Transportation and Access A detailed study of the effects of the Development on local roads, public transport, pedestrians and cyclists has been undertaken. This study is presented in a Transport Assessment which accompanies the ES. Construction vehicles would be likely to average approximately 90 (one-way) trips per day, which accounts for only 20% of the total daily vehicle trips estimated for the proposed Development once fully operational. The implementation of a construction Environmental Management Plan and Construction Logistics Plan would minimise the effect of the construction traffic and therefore, the effect on the highway network is considered to be of negligible significance. The completed Development would enhance the pedestrian environment within and in the vicinity of the Site and there is potential to improve connectivity and permeability to Preston s Road roundabout. An assessment of the effects of additional trips generated by the Development concluded that the DLR, underground and bus networks, together with the local highway network, would have adequate capacity to cope with the relatively insignificant increase in demand. Despite the assessment identifying negligible effects as a result of the completed Development, Residential and Workplace Travel Plans, which would focus on encouraging residents, employees and visitors to travel by more sustainable modes of transport, have been submitted to London Borough of Tower Hamlets with the application. 10. Air Quality The administrative area of London Borough of Tower Hamlets has been declared an Air Quality Management Area due to relatively high levels of pollutants in the air. These pollutants are mainly caused by exhaust emissions from road vehicles. Accordingly, an air quality assessment was undertaken to determine the likely effects of the Development on local air quality. The main effect during the demolition and construction phase on local air quality relates to dust, which would be most likely to be generated from demolition activities and earthworks. A range of best practice environmental controls would be implemented to minimise dust emissions from the Site, thereby reducing the potential for nuisance. These measures would form part of the site-specific Environmental Management Plan and would include damping-down of surfaces, the use of protective hoarding around the Site, covering construction materials and the regular cleaning of frequently used areas. However, even with mitigation in place to minimise the effects of dust generated from demolition and construction, it is difficult to completely eliminate such effects. Consequently, the overall effects of dust upon nearby receptors is considered to be minor to moderate in the very worstcase. These effects would be temporary and would depend on the type of work being undertaken, and its location within the Site. As described above, it is estimated that construction traffic would average approximately 90 one-way vehicle trips (i.e. 180 movements) per day. As a result, the effects of vehicle emissions would be minor adverse during the peak construction phases but negligible at other times. The Development would be expected to generate very low levels of additional traffic in the context of existing traffic flows in the surrounding area and it is predicted that exhaust emissions from this traffic would have negligible effects on air quality in the vicinity of the Site. In addition, they would not result in any breaches to the National Air Quality Objectives, which are maximum values for a number of problematic pollutants in the UK, based on European Union standards, to be achieved within specific timescales. However, Residential and Workplace Travel Plans have been prepared for the Development to reduce travel by car and further reduce the potential effect. The conditions at the Development itself would also be acceptable. The Development would include the use of modern heating/cooling plant and facilities that would have improved efficiencies and low emissions in line with tightened legislation. Design specification complying with a series of legislative provisions including the Clean Air Act 1993 and the Environment Act 1990 would ensure that no unacceptable effects on air quality at local existing and new receptors (i.e. people/land-uses/specific locations that are currently, or could potentially be susceptible to adverse effects) would arise as a result of this plant. 9

10 Non-Technical Summary 11. Noise and Vibration An assessment of the potential noise and vibration effects of the Development has been undertaken. The assessment included a monitoring survey at the Site to measure the existing noise and vibration levels and an assessment of the suitability of noise conditions for new residents. The assessment also considered any potential increase in noise or vibration resulting from the Development on local existing and future sensitive receptors. The most sensitive existing receptors to noise and vibration near to the Site are residential properties to the north and east. Within the completed Development, occupants of the new residential units would also be sensitive to noise and vibration. The existing sources of noise at the Site include road traffic on the surrounding roads and railway noise from the DLR, which is on an elevated trackway to the south. Demolition and construction activities would inevitably give rise to some noise and vibration effects to the receptors closest to the Site. However, steps would be taken to minimise any vibration, which would be implemented through planning conditions and would form part of the construction Environmental Management Plan. This would include careful selection of modern and quiet plant and machinery, agreed working hours, traffic management measures and monitoring of demolition and construction noise and vibration levels. The assessment found that, given the existing noise sources surrounding the Site, an appropriate choice of materials and design to façades, windows and ventilation for the residential apartments within the proposed Development, would be required to meet guidance. However, with these design measures, internal noise would be sufficiently reduced such that residents would be unlikely to be affected by traffic and railway noise. The assessment considered that the Development would generate a negligible amount of additional road traffic noise off-site due to the low levels of traffic generated by the Development. Appropriate design would ensure that residential and hotel uses within the Development would not be adversely affected by noise from servicing, building plant or noise from commercial uses. 12. Archaeology and Built Heritage The potential effect of the Development on archaeological remains and built heritage resources within the Site and in the immediate surrounding area was assessed. This involved a review of various historical information sources including historical maps and archaeological literature and documentary sources held by the Greater London Sites and Monuments Record, specifically for records of previously identified archaeological sites, monuments and finds. Additional information regarding listed buildings, Conservation Areas and other designations was obtained from the London Borough of Tower Hamlets and English Heritage. The Site lies within an Archaeological Priority Area, and as such there is the potential for old river deposits beneath the Site to contain well preserved archaeological remains and to provide information about past climatic conditions. Any remains (where present) are likely to be of local importance. In addition, the southern extent of the Site was affected by a reservoir constructed as part of the West India Docks in the mid 19th century. However, the development history of the Site is such that any remains are likely to be fragmentary (having been disturbed through previous construction activities) meaning that potential for significant archaeological remains would be low. There would be the potential for the proposed Development to affect archaeological remains beneath the Site, where present. However, these effects would be mitigated by implementing a programme of archaeological investigation and preservation by record of any remains that are discovered as agreed with the Greater London Archaeological Advisory Service. A number of conservation areas and listed buildings are present in the vicinity of the Site, although they are effectively screened from the Site by intervening buildings. Only the spire of the Grade II* listed All Saints Church is visible from the Site and could therefore be affected by the Development. However, it was determined that due to the presence of tall buildings around the Site, any change in setting resulting from the Development itself would represent a negligible effect. 10

11 13. Ground Conditions A ground conditions and contamination assessment was undertaken in order to establish the likely risks from ground contamination on construction workers, future Site users, soil, and groundwater. The assessment was based on a range of information sources including a desk-based Preliminary Environmental Risk Assessment, historical maps, geological maps and results of Site walkovers. There is the potential for contamination to be present on parts of the Site due to current and historical activities, most notably from former railway sidings and coal depots at the Site. At present, the Site is entirely covered with buildings and hard standing. As such, any contamination beneath the Site would be largely contained and presents a low risk to the present Site users. Demolition and construction works would be subject to a range of mandatory legislative health and safety controls. These would prevent construction workers coming into direct contact with the ground and sub-surface soils. Such controls would form part of the site-specific Environmental Management Plan which would also include protective and preventative measures to ensure that contamination risks to underlying soils, groundwater and nearby surface water resources would be reduced to a negligible level. Intrusive environmental ground investigation prior to construction of the Development would be undertaken to determine more definitively the presence, location and concentration of existing soil and/or groundwater contamination. The results of the site investigation would be used to determine the precise scope of remediation required prior to, or during, the construction works, in addition to the classification of excavated waste material in order to ensure appropriate disposal. On completion of the Development, the risk posed by contamination to future occupants, soil and groundwater would be negligible due to the removal of soil associated with the construction of the basements, the implementation of gas protection measures (if found to be necessary), and the fact that significant areas of hardstanding within the Development would serve to act as a physical barrier between the contamination source and the potential receptor. In areas where soft landscaping is proposed, the implementation of a clean top layer would result in a similar protective effect. 14. Water Resources and Flood Risk The assessment of the likely effects of the Development on surface water, drainage and flood risk was informed by a Site visit and review of various information sources, including those made available by the Environment Agency and Thames Water. A Flood Risk Assessment was undertaken that assessed the risk of rapid inundation of the Site by floodwater as a consequence of overtopping or breach of the River Thames flood defences. The construction Environmental Management Plan would set out measures to ensure that surface water pollution would be prevented as far as practically possible during demolition and construction. For example, liquids and solids would be stored in line with the Environment Agency s requirements and discharges to the drainage system would pass through settlement tanks and/or oil interceptors prior to release. The River Thames is located approximately 400m to the south-east of the Site, Poplar Dock approximately 160m south of the Site and the River Lea approximately 900m to the north-east of the Site, at its closest point. The Environment Agency s indicative floodplain map shows that, without protection, the Site lies within an area at potential risk from flooding. However, the Site is protected from flooding by the River Thames flood defences and the Thames Barrier. The assessment indicated that, whilst the Site is protected by flood defences, there remains a very small risk of the defences being breached. However, all proposed residential units would be situated above the maximum flood depth and occupants would therefore remain safe in the worst-case event of a breach in the flood defences. Nevertheless, a Flood Response Plan would be developed for the Site to reduce the potential adverse effects to public safety in the event of a severe flood warning from the Environment Agency. It would be developed in consultation with London Borough of Tower Hamlets, the Environment Agency and other emergency services. The Flood Response Plan would include measures to ensure that the basements and commercial uses on the ground floor would be evacuated promptly on receipt of a severe flood warning from the Environment Agency Floodline Service. 11

12 Non-Technical Summary The inclusion of living and garden roofs, permeable surfaces and storage tanks would ensure that surface water drainage would be restricted in line with Environment Agency guidance and would not affect the capacity of the existing sewers. In addition, water-efficient fixtures and fittings would be installed within the Development and it is proposed that rainwater harvesting would be used for landscaping irrigation and external cleaning. As such the effect of the proposed Development on water demand would be negligible. Overall, it is considered that the effects of the Development on surface water, drainage and flood risk would be negligible. 15. Wind The potential effects of the Development on local wind conditions were assessed with regard to the pedestrian comfort and safety. The assessment used a 3-dimensional scale model of the Development which was subjected to the simulated prevailing wind and weather conditions of the Site within a wind tunnel. The Development was tested, including the ground and roof level landscaping proposed, and the screening of between 1.1m and 1.8m tall, proposed for roof terraces. The assessment predicted wind conditions within the proposed Development to be equivalent to, or better than, those required for the desired pedestrian activities of the Site both at ground and roof level. 16. Sunlight, Daylight, Overshadowing, Solar Glare and Light Pollution Changes in the massing (i.e. general shape), layout and height of buildings can result in changes to the daylight and sunlight availability to buildings surrounding the Site, and can cause overshadowing of surrounding open space. In addition, without careful design, new developments have the potential to create light pollution and solar glare (dazzle when sunlight is reflected from a glazed façade). An assessment was undertaken to determine the likely effect of the proposed Development on the amount of daylight and sunlight experienced by residential buildings close to the Site and also the residential accommodation proposed within the Development itself. The assessment also considered whether the new buildings would overshadow amenity spaces within and around the Development and predicted the likelihood of light pollution and solar glare which would arise from the proposals. There would be no specific construction related effects on sunlight, daylight, overshadowing, light pollution or solar glare. As construction work proceeds, the levels of daylight and sunlight received by adjacent properties would decrease, while the effect of overshadowing would increase as the Development progresses to completion, as would be expected. An accurate three-dimensional model was developed to identify the effects of the Development on surrounding residential properties at Wharfside Point North and South, Caraway Heights, Poplar High Street and Poplar High Street. This assessment was based on guidance published by the Building Research Establishment (BRE). Due to the urban nature of the surroundings and the scale of the Development, there would be some unavoidable adverse effects on the amount of daylight and sunlight experienced at some of these properties. Although not fully compliant with the BRE guidance, the guidance recommends a flexible approach and it is considered that the resultant daylight and sunlight levels would be consistent with other city developments. The assessments considered the levels of daylight and sunlight within the proposed residential rooms on the lowest residential floors of Block A1 to A4, B1 to B4 and C3. The results indicated that the majority of rooms tested would be compliant with daylight levels suggested by the BRE, and all rooms in higher storeys would meet the criteria and be well lit internally. The results indicated that the majority of windows would be sunlight compliant. Where figures were low, this would be caused by the presence of balconies which take away the available sunlight. This is considered to be acceptable for a development of this nature as a trade off is made between sunlight and external amenity area. 12

13 Built development can also affect the level of overshadowing on amenity areas, such as gardens or open space. However, the level of permanent overshadowing within existing and proposed amenity spaces, caused by the Development, would be well within the levels outlined as acceptable by the BRE Guidelines. Some instances of solar glare from the glazing of the proposed Development would occur to motorists approaching on Aspen Way. However, given the amount of time the glare would last at specific dates of the year, this is not considered unsafe for road or pedestrian users. The internal and external lighting strategy would be designed to minimise light pollution and a preliminary assessment has indicated that the lighting of the Development would not cause light spillage to unacceptable levels at neighbouring properties. 17. Telecommunications The effects of the Development on local reception of broadcast radio, satellite television, terrestrial television and cellular telephone have been determined by a desk-based study. This used knowledge of signal propagation and their physical properties, together with a review of the proposed Development s siting and massing. During the demolition and construction works, tall items of plant such as cranes could affect terrestrial television and satellite reception. Such effects would be intermittent and temporary and could be easily reduced and eliminated through careful siting of cranes and the periodic realignment of reception antennae to areas of better reception. Effects on terrestrial radio reception would not be discernible to the users. The mobile phone base station currently located on the southwest boundary of the Site would be relocated as part of the Development, to roof-level. It may be necessary to remove the base station during the demolition and construction phase, i.e. before it can be reinstated on the roof of the proposed Development, for logistical reasons. There would be a risk that T-Mobile subscribers could be adversely affected during the temporary period if this is the case. However, this would be temporary until the base station is reinstated within the proposed Development. On completion of the Development, the proposed buildings would create a shadow over a limited number of residential properties located north-east and south of the Site. The terrestrial television and satellite signals received by these properties would be obstructed and impeded. However, the effects would be easily mitigated through a number of measures including upgrading of reception equipment, realigning of aerials to areas of better reception or alternative transmitters, or switching to satellite, cable or asymmetrical digital subscriber line (ASDL) television services which would experience a negligible effect as a result of the Development. Similarly, the effect on radio reception was determined to be negligible. 18. Townscape and Visual An assessment of the baseline conditions of the Site and its surroundings was made through a study of the historic development of the area, Site visits, and study of maps and aerial photographs. The effects of the proposed Development on townscape and visual amenity were then assessed, informed by an assessment of the design quality of the proposed Development and the consideration of visual effects from 14 viewpoints, taking into account relevant planning guidance and policy. The existing townscape and urban grain in the area around the Site is varied and rapidly changing with new buildings being constructed and planning permission granted for a number of new tall buildings in the local area. In relation to the demolition and construction phase, the erection of hoardings around the Site and the presence of tower cranes would constitute a temporary minor adverse effect on the townscape and users of / visitors to the area. The Development would have urban design benefits in terms of improving permeability in the local area, by facilitating the opening up of a public route through the Site to link Poplar High Street with Aspen Way and areas beyond including Canary Wharf, and by providing a new public and semi-public squares. 13

14 Non-Technical Summary View from Preston s Road View from East India Dock Road (junction with Cotton Street) The Development would have a beneficial effect on the townscape of surrounding areas and the views in which it is most prominent, and would generally have a neutral or negligible effect on the settings of designated heritage assets, where it is generally less prominent. The most significant beneficial effects of the Development in terms of urban design and architecture would be to open up a previously closed off site and provide a new gateway route for pedestrians walking to and from Poplar, and to introduce high quality new architecture into an area currently dominated by mediocre post-war buildings. The most significant effect of the Development would be in local views in which it would introduce a high quality new focal point. 14

15 19. Cumulative Effects Two types of cumulative effects have been assessed in relation to the Development: The combination of individual effects arising from the Development, for example the combination of noise, dust and visual intrusion effects; and The effects resulting from the Development in combination with other development projects in the surrounding area. During the demolition and construction works of the Development there would be some temporary combined effects predominantly associated with townscape and visual effects, dust, noise, vibration and traffic. The site-specific Environmental Management Plan would provide the mechanism by which temporary demolition and construction impacts on surrounding receptors would be minimised. The cumulative effects of the Development, in conjunction with the construction of a number of other reasonably foreseeable schemes, were generally found to be minimal. The cumulative schemes considered were agreed with LBTH, the nearest of which were the proposed scheme at Trafalgar Way to the south of the Site beyond Aspen Way, for two towers of 29 and 35 storeys, and the potential regeneration of Blackwall Reach to the northeast of the Site. Adverse cumulative effects may arise in terms of demolition and construction waste, noise and air emissions from construction traffic, and noise and dust from additional demolition and construction activities in the vicinity of the cumulative scheme sites. However, it is assumed that the other cumulative schemes considered within the assessment would also be the subject of site-specific Environmental Management Plans, which would serve to minimise any such adverse cumulative effects. Beneficial cumulative socio-economic effects would be possible through job creation during the demolition and construction phase, job creation on completion of the Development and the other cumulative schemes (approximately 50,000 full time jobs) and increased housing provision (5,500 to 5,900 new homes). In addition, if the cumulative schemes implement Sustainable Drainage System measures similar to the proposed Development, the cumulative effects on surface water run-off and flood risk have the potential to result in long term, local minor beneficial effects. If you would like to receive further copies of this Non-Technical Summary or would like to purchase a copy of the Environmental Statement, please contact: Waterman Energy, Environment & Design Versailles Court 3 Paris Garden London SE1 8ND Tel: Fax: eed@waterman-group.co.uk 15

NON - TECHNICAL SUMMARY

NON - TECHNICAL SUMMARY WATERMAN ENERGY, ENVIRONMENT & DESIGN LTD 60 ludgate hill / 30 old bailey environmental STATEMENT NON - TECHNICAL SUMMARY REV. 01 january 2011 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 1. Introduction

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction RT Group Property Investments Limited (the Applicant ) is seeking detailed planning permission for the redevelopment of 1.28 hectares of land off Norton Folgate to the north of Liverpool

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction DV4 Properties Park Street Co. Ltd (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of 185 Park Street, situated on land bounded

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary The Haymarket 189 Morrison Street, Edinburgh Environmental Statement Volume 1 Non Technical Summary 16 August 2010 Tiger Haymarket Limited Partnership Non Technical Summary Contents 1 Introduction 1 2

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Non-Technical Summary

Non-Technical Summary Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,

More information

South Quay Plaza Tower Hamlets Community Forum; Record of Discussion

South Quay Plaza Tower Hamlets Community Forum; Record of Discussion South Quay Plaza Tower Hamlets Community Forum; 03.02.14 Record of Discussion Attendees: Jerry Bell - Tower Hamlets Council Nasser Farooq - Tower Hamlets Council Emily Harris - Berkeley Homes (South East

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction ASDA Stores Limited and Ashbourne Beech Property Limited (hereafter referred to as the Applicants ) are seeking to obtain planning permission for the redevelopment of the existing supermarket

More information

Library of Birmingham integrated with The REP

Library of Birmingham integrated with The REP 0123456789 Birmingham City Council Library of Birmingham integrated with The REP Environmental Statement Chapter 9 Shadowing 9 Shadowing Chapter Summary Key features A private amenity garden is located

More information

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction Workspace 14 Limited (hereafter referred to as the Applicant ) has applied for full planning permission for the redevelopment of and 14 Marshgate Lane, situated on land bound by Marshgate

More information

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision 5. 5.1. Area Vision 5.1.1. are: A globally significant central London business district which is home to international business headquarters; At the heart of the commercial and cultural life of the capital

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Meridian Gate. Non Technical Summary. Submitted by Meridian Property Holdings Ltd.

Meridian Gate. Non Technical Summary. Submitted by Meridian Property Holdings Ltd. Meridian Gate Non Technical Summary Submitted by Meridian Property Holdings Ltd. Meridian Gate May 2014 Waterman Energy, Environment & Design Limited Pickfords Wharf, Clink Street, London SE1 9DG, www.watermangroup.com

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010 GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY 24 December 2010 Our Ref: DT/JLL0509 Appeal Ref (optional): RPS 1 st Floor West Cottons Centre Cottons Lane London

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013

on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013 on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013 1. INTRODUCTION LS Portland House Developer Limited (hereafter

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report 7. The Landscape 7.1 Introduction The purpose of this section of the EIS Scoping Report is to describe the scope of work and methods to be applied in the identification and assessment of landscape and

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Chapter 24 Route Window SE5 Arsenal Way shaft. Transport for London

Chapter 24 Route Window SE5 Arsenal Way shaft. Transport for London Chapter 24 Route Window SE5 Arsenal Way shaft Transport ARSENAL WAY SHAFT 24 Route Window SE5 Arsenal Way shaft Introduction Transport 24.1 South of the River Thames (see Route Window SE4), the tunnel

More information

Environmental Statement Non-Technical Summary

Environmental Statement Non-Technical Summary Environmental Statement Non-Technical Summary 91-101 Moorgate Over Site Development September 2011 Aviva Life and Pensions UK Ltd 1. Introduction 1.1 The Application Aviva Life and Pensions UK Ltd and

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) Central Chelmsford Development Agency / Genesis 27/08/2014 Central Chelmsford Development Agency: Environmental Statement Quality Management

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Duddingston House Properties and Urbanist Hotels Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Environmental Statement Non-Technical Summary 3rd September 2015 www.oldroyalhighschool.com

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157 NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY September 2016 Our Ref: Q60157 Contents 1 INTRODUCTION... 2 2 EIA METHODOLOGY... 5 3 SITE DESCRIPTION AND SETTING... 6 4 ALTERNATIVES...

More information

Quality Management. Issue/revision Issue 1 Revision 1 Revision 2 Revision 3. Date 26/08/2014. Signature. Signature. Signature. Project number

Quality Management. Issue/revision Issue 1 Revision 1 Revision 2 Revision 3. Date 26/08/2014. Signature. Signature. Signature. Project number Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks FINAL Date 26/08/2014 Prepared by Charlotte Powell Signature Checked by Kevin Herman Signature Authorised by Alan Heatley

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

Route Window Environmental Topic Summary of Significant Residual Impacts

Route Window Environmental Topic Summary of Significant Residual Impacts Table 1.3: Summary of Eliminated Significant Residual Impacts Route Window Environmental Topic Summary of Significant Residual Impacts C6 and C7: Farringdon Station and Liverpool Street Station Townscape

More information

Non-Technical Summary

Non-Technical Summary The Wharves, Deptford Environmental Statement Non-Technical Summary Prepared for Lend Lease by Quod THE WHARVES DEPTFORD ES NON TECHNICAL SUMMARY PAGE 2 Contents Introduction... 3 The Site And Surroundings...

More information

6. Bermondsey 6.1. Bermondsey Area Vision

6. Bermondsey 6.1. Bermondsey Area Vision 6. 6.1. Area Vision 6.1.1. is: An inner-london neighbourhood characterised by modest worker ho associated with the historic Rotherhithe docks and local manufacturing industries such as biscuits, jam, vinegar

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Plumstead Temporary Railway Sidings and Associated Permanent Works

Plumstead Temporary Railway Sidings and Associated Permanent Works Plumstead Temporary Railway Sidings and Associated Permanent Works Environmental Impact Assessment Non-Technical Summary Document Number: February 2013 Plan Design Enable Page 2 of 20 Contents Contents...

More information

12. Environmental baseline and assessment of impacts: Southeastern section

12. Environmental baseline and assessment of impacts: Southeastern section 12. Environmental baseline and assessment of impacts: Southeastern section 12.1 Introduction 12.1.1 This chapter describes the southeast route section of Crossrail from the Isle of Dogs station to the

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Maidstone Medical Campus Ltd is applying to Maidstone Borough Council for

More information

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. Introduction Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. We are currently considering options for the mixed-use redevelopment

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments SUMMARY This Advice Note provides

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

PDP DESIGN & ACCESS STATEMENT

PDP DESIGN & ACCESS STATEMENT PDP The Planning & Design Partnership Planning.. Architecture.. Interiors.. Landscape The Chicory Barn Studio, The Old Brickyards, Moor Lane, Stamford Bridge York, The East Riding Of Yorkshire, YO41 1HU.

More information

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION PLANNING & BUILDING CONTROL Tracy Harvey Head of Planning & Building Control Rob Wells Savills Innovation Court 121 Edmund Street Birmingham B3 2HJ Our Ref: 5/16/3441 E-mail: Date: planning@stalbans.gov.uk

More information

SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY Waterman Energy, Environment & Design

SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY Waterman Energy, Environment & Design SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY 2013 Waterman Energy, Environment & Design 1. Introduction Henderson Global Investors Limited

More information

Peckham Peckham Area Vision Map

Peckham Peckham Area Vision Map Area Vision Map PNAAP13 PNAAP8 Sumner Road Surrey Canal Walk Bird in Bush Park Key: NSP Site Allocations PNAAP Allocations Greenspace Low Line Cycle Network Primary Shopping Areas Square Surrey Canal Walk

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary. London Borough of Lambeth Lambeth Depots Environmental Impact Assessment Environmental Statement: Non-Technical Summary April 2009 This Non-Technical Summary (NTS) sets out the findings of an Environmental

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This public exhibition gives you the opportunity to view and comment on our proposals to create a new residential development on land adjacent to

More information

Battersea Park East Environmental Statement

Battersea Park East Environmental Statement Environmental Statement Non-Technical Summary July 2014 , Battersea, London July 2014 Waterman Energy, Environment & Design Limited Pickfords Wharf, Clink Street, London SE1 9DG, www.watermangroup.com

More information

This document provides a summary of the ES findings in non-technical language.

This document provides a summary of the ES findings in non-technical language. Introduction MOTO Hospitality Limited (the Applicant ) is seeking full planning permission to redevelop the Kinross Motorway Service Area (the Site ) located at Turfhills, near Kinross, west of Junction

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically

More information

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon

More information

16. Peckham Peckham Area Vision

16. Peckham Peckham Area Vision 16. 16.1. Area Vision 16.1.1. is: A lively town centre providing a range of daytime and night time activities on Rye Lane including a Library, a Leisure Centre and many independent retailers which specialise

More information

RECOMMENDATION APPROVE THE APPLICATION SUBJECT TO:

RECOMMENDATION APPROVE THE APPLICATION SUBJECT TO: LOCATION: Gateway House, 318-330 Regents Park Road, Finchley Church End, London, N3 REFERENCE: F/03933/13 Received: 03/09/2013 Accepted: 30/09/2013 WARD: Finchley Church End Expiry: 30/12/2013 APPLICANT:

More information

1 INTRODUCTION 1.1 INTRODUCTION

1 INTRODUCTION 1.1 INTRODUCTION 1 INTRODUCTION 1.1 INTRODUCTION RREEF (UK) Ltd in partnership with Sheffield City Council (SCC) is applying for planning permission for the construction of: a new indoor city centre market hall and indoor

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY

ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY HWK-DOC-INF-ESNTA-02 FEBRUARY 2017 REVISION HACKNEY WICK CENTRAL OUTLINE PLANNING APPLICATION Contents Introduction... 1 Application Site and Surroundings...2

More information

9 Archaeology & Cultural Heritage

9 Archaeology & Cultural Heritage High Clachaig Wind Farm Scoping Report Page 56 9 Archaeology & Cultural Heritage 9.1 Introduction Cultural heritage in this context means the above- and below-ground archaeological resources, built heritage,

More information

EVALUATION OF MASTER PLAN ALTERNATIVES

EVALUATION OF MASTER PLAN ALTERNATIVES 7 The Environmental Report is required to identify, describe and evaluate reasonable alternatives, taking into account the objectives and geographical scope of the Master Plan 2008. Three plan alternatives

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information