Environmental Statement Volume 1: Non-Technical Summary. for Welbeck Strategic Land LLP

Size: px
Start display at page:

Download "Environmental Statement Volume 1: Non-Technical Summary. for Welbeck Strategic Land LLP"

Transcription

1 Volume 1: Non-Technical Summary for Welbeck Strategic Land LLP May 2013

2 Environmental Impact Assessment Volume 1 Non-Technical Summary

3 Non-Technical Summary Introduction Welbeck Strategic Land LLP (hereafter referred to as Welbeck ) proposes the development of land south of Worcester (see Figure NTS 1). Figure NTS1: Site Location Welbeck has commissioned Savills to co-ordinate a formal Environmental Impact Assessment (EIA) including the preparation of an (ES) and Non-Technical Summary (NTS) (this document) to support their planning application, which will be in outline, for a sustainable urban extension to the City which has been masterplanned for Welbeck by John Thompson & Partners. The outline planning application is submitted by Welbeck for: Outline planning application, including approval of access (appearance, landscape, layout, and scale reserved) for a mixed-use development with local centre to the south of Worcester including demolition of existing buildings and the construction of up to 2,204 dwellings including affordable housing (Use Class C3) and up to 14ha of employment land. The development to also include: Hotel (Use Class C1); Elderly Persons Accommodation (Use Class C2); Business (Use Classes B1, B2 and B8); Retail (Use Classes A1, A2, A3, A4, A5); Primary School (Use Class D1); Assembly and Leisure (including: health (Use Class D1), Indoor Leisure (Use Class D2), Outdoor Sports and Leisure (Use Class D2)); Landscape, Public Realm, Open Space, Allotments and Orchards; Associated Infrastructure and Off-site Highways Works. Volume 1: Non-Technical Summary NTS - 1

4 The proposed masterplan also includes an element that will be submitted in full detail along with a listed building application for proposed modifications to Middle Broomhall Farmhouse in the centre of the site. The EIA is designed to support that future application. Furthermore, there are further parcels of land within the masterplan that might come forward which are not controlled by Welbeck but which are included within the assessments. This will ensure that the EIA considers the complete masterplan for the urban extension and can support these future applications as well as any other future applications related to the urban extension. Figure NTS2 at the end of this document illustrates the Project Area considered by the EIA denoted by the coloured boundary line. What is Environmental Assessment? EIA is a statutory process that is governed by UK and European law. The European Union set out the legal framework for EIA in June 1985 in Directive 85/337/EEC on the assessment of certain public and private projects on the environment. This has been subsequently amended, most recently being formalised by Directive 2011/92/EU. This is currently being reviewed again and it is expected that a new Directive will come into force in early The UK has incorporated the EIA Directive into its existing legal framework but in most cases it is applied to applications for planning permission under the Town and Country Planning Act The UK regulations have been subject to review and amendment, with the most recent version being the Town and Country Planning (Environmental Impact Assessment) Regulations EIA follows an iterative process in the following stages: Screening is the first stage of the EIA process where the relevant authorities (local authorities or the Secretary of State) decide if EIA is required. Once it has been agreed that EIA is required, scoping is undertaken to define what should be assessed as part of the EIA and reported in the ES. This is done in partnership between the applicant and the local authority. With the scope set, relevant information on the environmental baseline conditions is collected. This information is then used initially to understand the potential environmental effects and inform the design of the proposed development to minimise the potential for significant adverse impacts. The formal assessment process is then undertaken of the proposed scheme parameters to define the significant impacts of the proposed development. Where significant adverse impacts cannot be minimised through alterations to the design itself, mitigation or reduction measures are considered. Monitoring may also be considered to measure the actual significance of the impact during and post-construction to allow management of mitigation where appropriate. Once the EIA is completed, the ES is submitted to the local planning authority for consideration with the planning application. Volume 1: Non-Technical Summary NTS - 2

5 Purposes and Structure of the EIA is a process through which the likely significant environmental effects of a development proposal can be identified, assessed and, wherever possible, avoided or mitigated (reduced). This process and its outcomes are then reported in the ES to decision makers, the Council and its advisors, and the public. The NTS is provided to allow a wider public understanding of the project and environmental effects of the project. The ES is set out in a structured manner to allow easier navigation: Volume 1 (this volume) comprises the Non-Technical Summary (NTS) Volume 2 comprises the Main (ES) Volume 3 comprises the Appendices, including technical supporting reports Opportunity for Public Consultation Should interested parties wish to make comment on the content of this ES, they would be made in writing to the Development Control Manager at: Planning Services Malvern Hills District Council Council House Avenue Road Malvern WR14 3AF Planning Services Wychavon District Council Civic Centre Queen Elizabeth Drive Pershore WR10 1PT Development Planning Team Worcester City Council Orchard House Farrier Street Worcester WR1 3BB Alternatively representations can be made online by following the instructions at: The ES is available to purchase from the Planning and EIA Consultants working on behalf of the applicant using the following address: Volume 1: Non-Technical Summary NTS - 3

6 Michael Davies Savills (UK) Limited Innovation Court 121 Edmund Street Birmingham B3 2HJ Table 1 sets outs the costs related to the volumes of the ES available. The ES should also be available on the Local Planning Authorities websites. Table 1: Costs Volume Hard Copy CD-ROM/DVD 1 Non-Technical Summary Free of Charge 2 Main ES Report Appendices Please enquire at address above 5 Requests should be made in writing to the above address. Cheques should be made payable to Savills (UK) Limited. The Assessment Team The assessment team comprises the following organisations: Savills is the planning consultant preparing the application and has provided planning advice and technical assessment of baseline conditions and environmental effects with regards to Society and Economic impacts. Savills has co-ordinated and prepared the EIA. John Thompson & Partners (JTP) is the consultancy undertaking the masterplanning and urban design approach to the proposals. Environmental Dimension Partnership (EDP) has provided technical assessment of baseline conditions and environmental effects with regard to Right of Way and Open Space, Ecology, Agricultural Land and Farming Circumstances, Cultural Heritage and Archaeology, and Landscape and Visual Amenity. Peter Brett Associates (PBA) has provided technical assessment of baseline conditions and environmental effects with regard to Transport and Access, Ground Conditions, Drainage and Flood Risk, Air Quality and Noise and Vibration. Volume 1: Non-Technical Summary NTS - 4

7 The Proposals The Site and Surroundings The project area is located to the south of Worcester within the districts of Malvern Hills and Wychavon (see Figure NTS1). The area is mainly in agricultural use but also includes Norton Barracks, an existing residential area centred on a former military barracks. It is bound to the north by the A4440 Broomhall Way and Crookbarrow Way with the residential suburb of St Peter the Great and Worcester beyond (see Figure NTS2). To the east the boundary is defined by the Oxford-Worcester-Wolverhampton railway line and the M5 motorway, with agricultural land and Norton village beyond. To the south the boundary is defined by Broomhall Lane and the land beyond is also predominantly agricultural with the village of Kempsey approximately 1km away. To the west the area is bound by the River Severn with further agricultural land beyond. On the western side, the area is crossed north to south by the A38 Worcester Road. The River Severn runs to the west of the site, approximately m to the west. There are two brooks that run through the site. The area generally slopes gently from northeast to southwest with the highest point at 35m Above Ordnance Datum (AOD) in the northeast corner. Approximately m from the River Severn the land begins to slope steeply from 20m AOD to 10m AOD. The area is substantial and is crossed by a number of roads. Norton Road runs north-south through the eastern part of the site, connecting Norton Barracks with the A4440 and Worcester beyond. Taylors Lane runs northeast-southwest across the middle of the site, connecting Norton Road to the A38. The Ketch Bridge Roundabout sits to the northwest of the allocation where the A38 meets the A4440. Three listed buildings are identified within or on the edge of the site, which comprise Middle Broomhall Farmhouse (Grade II) on the site, and Upper Broomhall Farmhouse (Grade II) and Clerkenleap Farmhouse (Grade II) just on the edge of the site area (see Figure NTS3). The Proposed Development Welbeck Strategic Land LLP (WSL) has prepared a masterplan for the site which is for proposals similar to those required in the emerging planning policy document prepared by the three Councils: Malvern Hills District Council, Wychavon District Council and Worcester City Council the South Worcestershire Development Plan. The EIA assesses the following proposed development as set out in Figures NTS4 NTS8: 2,552 residential units Up to 54,600sqm of Employment Use Classes within three parcels to the south of the A4440 (amounting to approximately 20ha of employment) An 80 bed hotel up to 2,800sqm (which could provide an alternative use to some of the offices proposed above) Two mixed use centres, with one containing a public house (up to 930sqm), and the other: o a 2,800sqm supermarket Volume 1: Non-Technical Summary NTS - 5

8 o a 100 bed care home comprising standard (60 beds) and extra care (40 beds) up to 6,595 sqm o 1,145sqm retail uses o 2,027sqm of office floorspace o 1,380sqm of health facility, including pharmacy o an 869sqm community centre o a two form entry primary school up to 2,750sqm In addition, it is proposed to provide about 68Ha of open space including: outdoor sports facilities on land amounting to circa 8.4Ha including a sports hub building up to 1,500sqm orchards and allotments of circa 3Ha play spaces of circa 2.4Ha Detailed principles are set out to control the conversion of and development around the listed Middle Broomhall Farm. It is proposed that the community facilities could be managed by a Community Development Trust that would be set up. It is proposed that the scheme would be phased over the period , with development increasing up to a rate of delivery of 200 dwellings per annum by 2020 and then tailing off from 2027 to completion around Employment uses will be delivered as the market demands. Main Alternatives With the emerging planning policy allocating the site, the main alternatives that the applicant Welbeck has considered has consisted of the detailed masterplan and layout and type of uses. Consultation has taken place throughout the design of the scheme and will be ongoing with the local community and key stakeholders. As part of the changes considered, the heights around Middle Broomhall Farm have been reduced, uses to the east of Broomhall have been reconsidered and re-orientated to reduce impacts on existing residential properties and ensure the most suitable location for the sports facilities, and the employment uses have been positioned to the north along the A4440 to reduce noise impacts for the new development. Allotments have been repositioned and redesigned to ensure greater open space for residents of Broomhall Cottage, and the orientation of the school has been changed to retain views to the Malvern Hills. The open space network has been designed to protect and enhance existing features on the site such as Hatfield Brook and the line of the Roman Road. Welbeck has always looked at the masterplan as needing to create the best place responding to its physical, environmental and social context. Volume 1: Non-Technical Summary NTS - 6

9 Summary of Impacts Society and Economics The 2,552 households assessed for the proposed development will result in an increase in population for the area of approximately 5,870 people when completed. As a result of these dwellings, the population of Malvern Hills District will increase by around 7.6% and Wychavon District by 0.17%. It is proposed that the scheme will deliver market and affordable housing through the delivery of 2,552 dwellings in a range of sizes. A total of 40% affordable housing will be provided across the development. The increase in population would be likely to have a substantial impact on local services and facilities in the surrounding area and so the development proposes a range of services and facilities. A two-form entry primary school with nursery provision, a health facility with pharmacy, community centre and care home will be provided on-site. The development will promote employment in the area through the provision of a mix of offices, warehouses and general industry use, storage provision, retail, cafes, restaurants and pubs, along with other employment generating uses. An extensive range of formal and informal open space features will be provided on-site to meet need. This provision will be in accordance with and likely over and above the standards set by the local authorities. In terms of secondary school provision, the development will not generate enough pupils to require a new secondary school. It has been discussed with Worcestershire County Council that there is sufficient forecasted capacity at nearby secondary schools to accommodate children generated from the proposal, with financial support possible if found necessary whilst the application is being decided upon. The overall strategy for South Worcester will ensure that the development will assist with having a positive impact on the local neighbourhood and will not result in an adverse effect on local facilities and services. The development offers the chance to enhance the character of the area, whilst the increase in open space, community facilities and leisure activities will help create a sustainable community for the long term. Rights of Way and Open Spaces An assessment was made of the potential impacts of the proposed development on the public rights of way (PRoW) and informal open space network within and surrounding the EIA Project Area (see Figure NTS9). The developer will ensure that no illegal obstructions of the network occur and will need to work with the Planning Authorities to ensure that suitable alternative provision can be identified throughout any periods of temporary closure or diversion on the network. As far as possible, the development will be phased such that, where a route is required to be temporarily diverted, another part of the development will have been completed so that one or more alternatives may be possible in addition to the diverted route. It is suggested that details of any temporary diversions will be managed through a Green Infrastructure Management Scheme to be agreed with the Planning Authorities subject to granting of the outline planning permission. Mitigation is proposed as part of the development, which has been informed by the baseline assessment and integrated through the design process. This was developed as part of the rights of way and green infrastructure strategy arising from the baseline assessment, and will serve to ameliorate some of the potential negative changes arising from the partial urbanisation of on-site Volume 1: Non-Technical Summary NTS - 7

10 routes. It will, over time lead to a net improvement to the rights of way and informal open space resource through the addition of significant strategic connections between new and proposed population centres and informal recreational destinations on-site and within the surrounding landscapes of Worcestershire. The iterative process of Masterplan design enabled the incorporation of the existing on-site rights of way within the Green Infrastructure Framework. Whilst this has resulted in some modest realignment and a small number of diversions, overall the network of rights of way within the local landscape (including throughflow and linkages) would be greatly improved. This is set in the context of the relatively poor state of the existing PRoW and the evidence of blockages and occasional discouragement of access. Subject to the successful making and confirmation of temporary footpath diversion orders, no significant adverse impacts on the functionality of the footpath network are anticipated as a result of the construction or operational phases of the development. Significant enhancement in the provision of rights of way and informal open space has been accommodated within the development proposals for the EIA Project Area, largely set within the Green Infrastructure Framework and including extensive informal open space provision and significant additions to the footpath and cycleway network. Furthermore, on completion of the development, the permissive routes within the scheme will be designated as formal rights of way and added to the definitive map, greatly enhancing and increasing the formal PRoW network in this area. Transport and Access An assessment has been undertaken of the transport and access effects of the proposed development during construction and operation. The assessment has been based on a Transport Assessment, the scope of which has been consulted upon with Worcestershire County Council as the local highways authority and the Highways Agency. Traffic generated by the proposed development has been predicted and considered in detail in the context of the transport network. Consideration has been given to the likely significant effects of the proposed development in relation to a variety of factors including driver delay, pedestrian and cycle movement, public transport, and accidents and safety. Effects have been considered during the construction and operation of the proposed development. Key highway links to be assessed in the local area were identified and the predicted traffic associated with the completed development in 2031 used. The construction of the proposed development is likely to generate traffic, lead to temporary disruption to the local highway network while improvements are implemented and affect users, including pedestrians and cyclists utilising existing routes through the site. These effects will be intermittent through the construction period and may be up to medium adverse. The operational stage of the proposed development has generally been identified to have negligible effects in relation to most issues including driver delay. Occasional links may experience some low to medium adverse effects, whilst a low beneficial effect has been identified in relation to driver delay as a result of a reduction in existing congestion on the A4440 Broomhall Way. Improvements are proposed for users of public transport, pedestrians and cyclists through extending bus routes through the site and the provision of a network of pedestrian and cyclist Volume 1: Non-Technical Summary NTS - 8

11 routes. These will allow people to access and move through the site, providing access to the facilities and amenities to be provided by the development for new residents and residents of existing local communities. Beneficial effects are therefore also anticipated for non-car users as well as for some car users. Ecology The Environmental Dimension Partnership (EDP) has assessed the potential ecological effects the project may have on the project area and its surroundings. The assessment included a review of the current conditions found within the area and identifies measures to avoid, mitigate and/or compensate where appropriate for significant effects that may arise as part of the project. The existing ecological interest within the project area and its surroundings was investigated through collating pre-existing information, e.g. on local sites of ecological value and records of protected species, and through field surveys using standard recording techniques (see Figures NTS 10-13). The field surveys investigated the value of the existing habitats within the site and the potential presence of protected species. The site does not contain any local sites of ecological value, although there are some such sites in close proximity. The habitats within the site are generally of low ecological value, reflecting the agricultural land use which dominates, however some habitats of higher value were identified, namely flower-rich grassland, woodland, orchards, hedgerows and water courses. Protected species/ species groups which were recorded within the site include great crested newts, reptiles, birds, bats, and dormice. The existing ecological interest within the project area and its surroundings was factored into the design of the development from an early stage to avoid or minimise impacts. In addition, opportunities were sought at the design stage to make the most of the undeveloped open spaces in the development, through creating new habitats of ecological value and/or opportunities for protected species. Although the ecological interest at the site has influenced the design, some adverse effects were predicted in the absence of further mitigation measures. Predicted effects on local sites, habitats and species have been considered for the periods up to and during construction, and during the lifetime of the completed development. The assessment concludes that the majority of predicted adverse effects are of low significance, however in accordance with both legislation and planning policy, measures are identified to mitigate these effects and/or compensate for effects which cannot be fully mitigated. The strategy to mitigate adverse effects during construction includes specific measures to protect features of ecological value which are to be retained within undeveloped open spaces in the project area, but which are at risk of damage or disturbance. In addition, measures are identified to avoid harming species which may be present within habitats that will be cleared during the construction process, through sensitive timings and working methods. The long-term strategy to mitigate adverse effects during the lifetime of the completed development includes measures to protect features of ecological value from disturbance. Furthermore, the strategy also includes creating and managing new habitats of ecological value (approximately 38Ha, 3km of new species-rich hedgerow and over 1,000 new native trees planted) and/or new opportunities for protected species, to compensate for losses during construction and provide net gains for biodiversity. The design and layout of the proposed new/ compensatory habitats, which includes woodland, hedgerows, flower-rich grassland and wetlands, has been closely integrated with the other objectives for undeveloped open ( green ) spaces such as public enjoyment and surface water management. Volume 1: Non-Technical Summary NTS - 9

12 The green space strategy for the development, of which ecology is one major component, has been prepared in close consultation with officers at the County Council, the Local Planning Authorities and other relevant bodies such as Natural England, Forestry Commission, Environment Agency and the local Wildlife Trust. Overall, through sensitive design and with the additional mitigation measures proposed, no significant adverse effects on the ecology of the area are anticipated, and there are genuine opportunities for ecological benefits to be delivered as part of the development. Ground Conditions The ES has considered the potential effects the project may have on ground conditions at the site plus the potential effects that ground conditions may have on the project. The assessment includes a review of the current conditions found within the area and identifies mitigation measures where appropriate for those significant effects that may potentially arise as part of the project. The assessment is supported by baseline conditions assessments that have reviewed the geological site setting and considered the impacts associated with potential contamination and land instability. The assessments have included consultation with the Environmental Health Department at Worcestershire Regulatory Services and the Groundwater and Contaminated Land officers at the Environment Agency. The site is mostly underlain by low permeability clay deposits that do not constitute a significant source for groundwater abstraction. Small areas of potentially more permeable deposits are shown on geological maps in parts of the site, but ground investigation works have shown these deposits to be of limited thickness and also of low permeability. There are three areas of in-filled ground present within the site, or in close proximity to the site: the Norton Barracks Landfill is a historical landfill site formed by placement of inert waste on top of otherwise level ground that is located in the northeastern part of the site; the A4440 Borrow Pit is a historical landfill site formed by placement of inert waste within a pit that is located immediately to the north of the site; and an additional area of Made Ground is recorded by the British Geological Survey immediately to the southeast of the site but this area is not listed as a historical landfill site. The following potential effects have been identified for the construction phase: the potential for contamination leaks and spills from construction plant; potential for contaminant release during any works on in-filled ground; potential for hazardous materials to be uncovered during excavation and site clearance works. Mitigation of these potential effects by adoption of a Construction Environmental Management Plan in consultation and agreement with the Local Authority will ensure that the residual effects will be negligible to very low. The following potential effects have been identified for the operational phase: potential for residual contaminants associated with the Norton Barracks Landfill to affect future land-users and/or controlled waters; potential for ground gases associated with historical landfills to affect future site users and buildings. Mitigation of these potential effects by completion of future plot specific ground gas monitoring and provision of an upgraded cap to the Norton Barracks Landfill will ensure that the residual effects will be negligible to very low. Drainage and Flood Risk The ES assesses the potential drainage and flood risk effects the project may have on the site and the surrounding area. The assessment includes a review of the current conditions found within the area and identifies mitigation measures where appropriate for those significant effects that may potentially arise as part of the project. The assessment is supported by a Flood Risk Assessment Volume 1: Non-Technical Summary NTS - 10

13 (FRA). The assessments have included consultation with the Environment Agency, drainage officers at Worcestershire Regulatory Services and Councillors for Kempsey Parish Council. The site lies predominantly within Flood Zone 1 (the area of the lowest flood risk as defined by the National Planning Policy Framework) with some areas of higher flood risk zones associated with the Hatfield Brook and the Broomhall Brook that flow through the site. Improvements to the flow of water to the site will be undertaken as part of the works proposed including increased culvert capacity at road crossings and an off-take structure located at the downstream extents of the site to assist reduce on-site flood risk and to also remove flood risk downstream of the site. Infiltration techniques for the disposal of surface water are not viable due to the ground conditions, and therefore other sustainable drainage techniques (SuDS) will be used including swales (ditches used to convey water), attenuation ponds (that hold water) and permeable paving. The drainage system has been designed to ensure surface water runoff is equivalent to the existing green field situation therefore ensuring the downstream flood risks are not increased. The following potential effects have been identified for the construction phase: increased surface water runoff and sediment transport; potential for hazardous materials to be uncovered during excavation and site clearance works. Mitigation of these potential effects will be undertaken by adoption of a Construction Environmental Management Plan in consultation and agreement with the Local Authority and construction of surface water features at the commencement of each phase of development to ensure that the residual effects will be negligible to very low. The following potential effects have been identified for the operational phase: potential for fluvial flooding, loss of field drains and ditches and overland flow from rainfall events. Mitigation of these potential effects will be by the design of the masterplan by ensuring development lies outside of flood zones, construction of a sustainable drainage network increasing the number of ditches on site and ensuring the development is designed with surface flow (overland flow) will ensure that the residual effects will be negligible to very low. Agricultural Land and Farming Circumstances The development at South Worcester will lead to a number of effects upon the agricultural land (82% of which is classified as Grade 3b Moderate) and soil. In terms of defining the significance of these effects, it can be seen that by adopting the appropriate mitigation measures throughout both the construction and operational stages, effects at a significant level can be avoided. Residual effects, which are not significant, include the loss of agricultural land, loss of agricultural use and sealing of soil under the development site. Any built development proposed on a greenfield site will lead to such effects, however, the quality of the agricultural land in this location leads to the loss of agricultural land but not at a significant level. This is not only of note when considering the overarching development plan policy context (national and local), which is clear in stating that land of lesser value should be used for greenfield development where possible, but also in the context of the urban extension at Worcester, whereby development in this location would likely lead to a more limited loss of best and most versatile agricultural land than development on other land parcels surrounding the city. In terms of the farming circumstances, 40% of the area is farmed under annual grazing licences, 32% is let on farm business tenancies which are short term and for a maximum of two years, which can be terminated with relatively short notice and only 24% of the site is owner-occupied; the owners have all committed to the development. Therefore in terms of farming circumstances, the proposed development will not have a significant impact. Volume 1: Non-Technical Summary NTS - 11

14 Air Quality An air quality assessment has been carried out to consider the construction and road traffic effects associated with the proposed development at South Worcester. A number of Air Quality Management Areas (AQMAs) have been declared by Worcester City Council and Wychavon District Council, however the closest of these is currently 2.7km away from the site boundary. During construction, there is a risk that existing and proposed properties may be affected by dust generated by the construction activities on site. It will therefore be necessary to put in place measures which reduce the dust generated, such as damping down and covering vehicles delivering to the site. The development will generate additional traffic in the area, and the effects of the additional emissions from the vehicles on air quality has been considered at a number of existing properties which lie next to the affected roads, and also at the River Teme Site of Special Scientific Interest (SSSI) (see Figure NTS10). Air quality for proposed properties within the development has also been considered. Concentrations of pollutants are predicted to increase by a negligible amount at the majority of existing properties, and at the River Teme SSSI; concentrations at proposed properties are below the thresholds set by the Government. At one existing property, concentrations are predicted to increase by a moderate amount, however, they remain below the relevant threshold level even with the development in place. Overall, traffic impacts are considered insignificant. The impacts of the proposed development during the construction period are considered to be insignificant with mitigation measures in place. The impact of additional traffic once the site is occupied and operational is also considered insignificant on air quality. Air quality for future residents of the site will be good and the site is considered suitable for residential development. Noise and Vibration A noise and vibration assessment has been undertaken to determine the potential noise and vibration effects the project may have on the area around the site. Consultation was undertaken with Worcester Regulatory Service (WRS) to agree the noise survey and assessment methodology. The assessment has been undertaken in line with this and following the principles set out in the National Planning Policy Framework (NPPF) and Noise Policy Statement for England (NPSE). A baseline survey was undertaken between 6 to 10 June 2011 and 3 to 5 August The purpose of the survey was to establish the existing noise levels on site and to assist the validation of the computer noise model. A qualitative assessment has been undertaken for the likely noise and vibration impact associated with the construction phase of the proposed development. Noise limits for the construction activities have been proposed at the nearest existing receptors in accordance with British Standard (BS) 5288: 2009 Code of Practice for Noise and Vibration Control on Construction and Open Sites. Mitigation measures have been outlined based on best practice measures presented in BS5288. These include the use of quiet working methods, location of noisy plant and screening plant to reduce noise, among others. It is considered that, with mitigation in place, the residual effects at the existing dwellings within close proximity to the development are likely to be moderate adverse but that this will be limited to during the temporary period of construction works and would likely be intermittent depending on the construction works that are taking place. Volume 1: Non-Technical Summary NTS - 12

15 A computer noise model was prepared to assess the noise impact upon existing noise-sensitive receptors. The model was also used to determine the noise climate for the future residents. The residual effect upon nearby existing dwellings close to the site due to the additional road traffic associated with the proposed development, is considered to be not significant as the increase in noise level should not be perceptible to the human ear. The potential noise impact upon the proposed residential development from the local road network has been assessed. Mitigation measures have been outlined to meet the good internal noise level criteria agreed with WRS to ensure suitable levels of noise inside the proposed dwellings. Any machinery associated with the commercial uses, such as air conditioning units, will be required to adhere to specific noise limits which have been set out to ensure that this effect is also not significant. Cultural Heritage and Archaeology In order to accord with current legislation and planning policy, the EIA for the site has been informed by a phased investigation of archaeological sites, monuments and remains and cultural heritage resources, both within its boundary and within its wider zone of influence. The form of development proposed for the site has responded to these constraints and opportunities, building upon extensive and prolonged consultation with officers to eliminate or minimise adverse impacts upon the historic environment wherever possible. As far as archaeology is concerned, extensive investigation, comprising a preliminary desktop study and site-wide geophysical survey, followed by targeted trial trenching where appropriate, has identified only one hitherto unrecorded site and nothing of sufficient importance on its own to warrant physical preservation. Nevertheless, despite targeted trial trenching establishing its poor condition, the course of the Gloucester-Worcester Roman road, to the east of the A38, will be retained within a linear corridor of public open space running north-south through the proposed development, with associated interpretation materials provided along the route to disseminate information about its significance. At the same time, it is recognised that further archaeological investigation will be required, as the proposed development progresses, in order to identify any localised or ephemeral sites of significance. Whilst it is expected that any, which are found, will be preserved by record ahead of construction, there is sufficient flexibility within the masterplan for the site to preserve in situ should that unlikely requirement emerge. A range of designated cultural heritage resources are located within the site s wider zone of influence. However, only two are actually located within the boundary; namely the Grade II listed Middle Broomhall farmhouse in the east and a small section of the southern tip of the Riverside Conservation Area in the northwest. Whilst it is recognised that there will be adverse effects on these assets, as a result of the proposed development being implemented, they will be comparatively minor when balanced against the benefits of the scheme. Most notably, these include the restoration and refurbishment of Middle Broomhall farmhouse a characteristic feature of the historic environment locally and one that is in urgent need of substantial investment in order to secure its long term conservation. Finally, whilst the implementation of the proposed development will bring about a significant degree of change to the local landscape, its effect in that regard has been minimised through dialogue with Volume 1: Non-Technical Summary NTS - 13

16 both officers and consultees, culminating in the preparation of a Green Infrastructure Management Strategy that retains and enhances a broad range of assets, ranging from historic hedgerows to agricultural buildings. Landscape and Visual Amenity An assessment was made of the likely effects of proposed development upon the landscape and visual resource within the vicinity of the EIA Project Area. It included a review of current conditions found within the site and locale, assessed the effects of the development, and identified mitigation measures to address impacts and maximise opportunities for enhancement of the landscape. The assessment was undertaken in tandem with the development of a Green Infrastructure Strategy which embodies a landscape framework for the urban extension. The scheme design and Green Infrastructure Framework were developed to consider the sensitivity of the landscape and views within and around the EIA Project Area. In keeping with the advice contained within best practice guidance, the assessment of effects has regard to the influence of the landscape proposals as set out within the Green Infrastructure Strategy, and their effect over time. The landscape character of the EIA Project Area is assessed as being of medium/ low to high sensitivity. The Area does not lie within or in proximity to nationally or locally designated landscapes; indeed, many on-site landscape features are not in good condition as a result of intensive agricultural practices. As a result, the core areas of the EIA Project Area have been identified in the Worcester Green Infrastructure Partnership s Strategy documents as being of moderate condition and preferred areas for development, reflecting the pre-existing settlement pattern and relative sensitivity of other locations within the wider landscape across the County. The assessment identified significant adverse impacts on landscape character within the construction and early operational phases of development as a result of the substantive change in land use. Whilst these impacts are mitigated by the design of the scheme, mixed use development on a green field site and at the scale proposed at South Worcester will invariably result in the loss of open countryside at a level which materially alters the character of the receiving landscape. Despite the loss of open farmland, the current condition and key characteristics of the land have been considered throughout the design of the proposed development and integrated into the layout wherever possible. For example, a hierarchy of hedgerows are retained with preference for those of greatest value and connectivity, and the loss of redundant orchards is mitigated for through the planting of significant substantial new provision across the development area. Furthermore, the development of the EIA Project Area provides the opportunity to enhance on-site landscape fabric in keeping with the key characteristics of the wider landscape identified in the Worcestershire Landscape Character Assessment. The careful design of the development and its interface with rural areas to the south (typified by reducing density/ scale housing, woodland blocks and a diversity of open space uses) provides for a distinct and legible urban edge, in contrast to the existing southern frontage of the City onto the A4440 just to the north of the site. This outcome is important in considering not only impacts on the wider countryside, but also the impact on strategic gap policies within the Wychavon and Malvern Hills local plans and emerging SWDP. This new proposed strong and defensible southern boundary reinforces the character and appearance of the City as well as the distinctive nature of adjoining countryside. It also reduces the perceived impact of the proposed development on the identity of Kempsey and, once Green Infrastructure Framework has become established, provides a logical basis for resisting development within the Strategic Gap as proposed within the emerging SWDP. Volume 1: Non-Technical Summary NTS - 14

17 The combined residual effect of the changes to the landscape includes many beneficial aspects and is considered to be not significant in the long term. The distribution of views has found that the EIA Project Area is well contained in the east and more open in the west where agricultural intensification has reduced the size and pattern of hedgerows and trees. Long distance views from the north are curtailed by the screening effects of built form and vegetation. The proposed woodland planting along the southern boundary of the EIA Project Area, along the water course to the north, and to some extent through the western parts and along Broomhall Brook, will mitigate effects on both short and long distance views. As a result of the substantive change in land use, the assessment found that the majority of on-site views would be subject to significant adverse visual effects during construction and in early operation. These effects are to be expected in the context of an urban extension, but also reflect the wide variety of vantage points offered by the edge of settlement location and network of roads and rights of way across the EIA Project Area. Following the establishment and maturation of the Green Infrastructure Framework, on-site visual effects are in part compensated for through the creation of alternative informal open spaces with public access and set within an enhanced network of footpaths and cycleways. Whilst the loss of rural views is undesirable (hence the identification of residual significant adverse visual effects onsite), the long term potential exists for the EIA Project Area to deliver a high quality public realm with a number of semi-natural features and areas which will be to the benefit of both the existing and new residents. From the outset, the EIA Project Area benefits as a potential development site from its topographic situation above and to the east of the River Severn floodplain, to the south and west of the existing urban edge of Worcester and Norton Barracks, and from the containment and visual separation resulting from the imposition of the M5 corridor to the southeast. The assessment found that viewpoints from the southwest through southeast often included (to varying degrees) long distance views of existing urbanising elements including St Peter the Great, Norton Barracks, the A38 and the M5 corridor. The assessment considered this visual context and reviewed a number of key locations within the wider area ranging from locations along the boundary of the EIA Project Area to North Hill (Malvern Hills), some 9km to the southwest, and found that: Views from the north are dominated by the existing urban edge of Worcester, the A4440 corridor and Norton Barracks which have an influence on the character of the EIA Project Area as perceived from vantage points along the A4440 corridor. Visual effects were found not to extend further north into Battenhall or other areas of the city. From the east, Norton Barracks, the railway and the M5 corridor provide separation between the EIA Project Area and adjoining rural areas, and reduce the potential for visual effects to extend east of the motorway. However, the assessment did find that limited views from high ground at Hatfield may be subject to significant effects due to the visible southwards extension of Worcester City, but also found that these effects would reduce following the maturation of proposed on-site Green Infrastructure and that the development would ultimately not significantly affect the expansive views from this location. From the south, the gentle drainage pattern towards Kempsey was found to result in a landscape with generally contained views and as such, a small number of short range views were identified between Hatfield Bank and Lower Broomhall Farm (all within approximately 200m of the EIA Project Area). Of these, the majority were found to fall below the threshold of being significant due to the offset of the proposed development from Broomhall Lane and the introduction of 30-50m of open space and woodland planting, which will allow for an appreciation of the development edge, but avoid the new development exerting an overbearing Volume 1: Non-Technical Summary NTS - 15

18 influence on countryside to the south. Significant adverse effects were identified from the public footpath west of Lower Broomhall Farm, although these are contained to within approximately 250m of the EIA Project Area and reduce to the extent of being not significant subject to the maturation of the woodland planting. The effect of the development on views from Kempsey was found to be not significant largely due to the existing and proposed tree planting along the southern boundary. From the west, the assessment found that views from important locations across the River Severn floodplain (Old Hills and the Malvern Hills Area of Outstanding Natural Beauty - AONB) into the EIA Project Area were not subject to significant visual effects by virtue of distance, and the context of Norton Barracks and the wider extents of Worcester City. However, the assessment found that views from the Severn Way and public routes on the floodplain to the immediate west of the River were sensitive to development on the river cliff to the west of the A38. The parameter plans control the height of development and allow for residential development in this location to be set within large plots and set back from the ridgeline. It has been identified that detailed design proposals should be subject to scrutiny at the Reserved Matters stages to ensure that development achieves an appropriate balance of maximising vistas of the Malvern Hills from the new properties, and architectural design and landscaping which integrates the buildings into the view and ties them in with the generally wooded river cliff. No long term (residual) significant visual off-site effects are identified. This assessment has considered the requirements of the Malvern Hills AONB Management Plan in respect of views to and from the nationally designated landscape. The assessment found that a number of on-site views were subject to significant effects, including the loss of several vistas of the Malvern Hills. However, none of the views identified were considered to be of more than representative or typical value. Considerable efforts to retain views of the AONB were undertaken as part of the design exercise, directly leading to the layout of open space between the new local centre and Norton Barracks in such a way that this key view of the Hills from the edge of Norton Barracks (and their subsequent appreciation in the transition of views to the west) could be accommodated in the development. The footpath access to the River Severn has also been directed to align with a high quality view of the Hills from the river cliff west of the A38. This assessment has not identified any effects which detract to any significant degree from the special qualities of the AONB. The assessment of private views concludes that there are likely to be residual effects on the visual amenity of many properties around the proposed development. However, subject to the establishment and maturation of landscape proposals, none of these effects are considered such that the development will have an overbearing influence on the amenities of the properties. The greatest level of effect is considered likely to be experienced by the occupants of Upper Broomhall Farm whose needs will require to be accommodated carefully within the construction phases. The masterplanning of the EIA Project Area has been an iterative process, taking account of feedback from the specialists within the developer team and public and local authority consultees (including the Worcestershire Green Infrastructure Partnership) during the assessment of landscape and visual effects. The proposed development incorporates a wealth of landscape and ecological features, and in particular substantial areas of multifunctional open space (Green Infrastructure) in order to reduce and mitigate potential impacts. Volume 1: Non-Technical Summary NTS - 16

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Statement of Common Ground

Statement of Common Ground South Worcestershire Development Plan Examination February May 2015 Statement of Common Ground Between Savills on behalf of Welbeck Strategic Land LLP and The South Worcestershire Councils Relating to

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

South Worcestershire Development Plan. South Worcestershire Design Guide Supplementary Planning Document

South Worcestershire Development Plan. South Worcestershire Design Guide Supplementary Planning Document South Worcestershire Development Plan South Worcestershire Design Guide Supplementary Planning Document Statement of Consultation: Early Engagement Scoping Paper February 2017 1. Introduction 1.1 This

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies The criteria for assessing sites for future housing and business development in Dunsfold are set out below. (Development criteria, covering what it is

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:-

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- 8. THE DISTRICT VILLAGES 8.1 Population About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- Village No. of Persons Cottingham

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES WELCOME Thank you for coming to our consultation event to find out more about our emerging proposals for Hayfield Park, a residential development jointly promoted by the Hayfield Consortium: Martin Grant

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your address

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your  address Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April 2014 Your name Your email address Please either: - complete this feedback form and put it in the box before leaving the Memorial Hall

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 9 January 2013 AUTHOR/S: Planning and New Communities Director S/2270/12/FL FEN DRAYTON 850m long flood defence embankment ranging in

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

Elderberry Walk. Developer HAB Housing

Elderberry Walk. Developer HAB Housing Case studies Elderberry Walk Developer HAB Housing Development of 161 new homes on the former Dunmail Primary School site, focused around a central green street, with retained trees, new multifunctional

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Policy DM19: Development and Nature Conservation

Policy DM19: Development and Nature Conservation Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure

More information

Development in the setting of the Cotswolds AONB

Development in the setting of the Cotswolds AONB COTSWOLDS CONSERVATION BOARD POSITION STATEMENT Development in the setting of the Cotswolds AONB.1. Introduction Areas of Outstanding Natural Beauty (AONBs) are designated by the Government for the purpose

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Neighbourhood Plan Representation

Neighbourhood Plan Representation Date: 10 th November 2017 Neighbourhood Plan Representation Land to the east of Callow Hill Road, Alvechurch Introduction This representation has been prepared by RPS Planning and Development on behalf

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION PLANNING & BUILDING CONTROL Tracy Harvey Head of Planning & Building Control Rob Wells Savills Innovation Court 121 Edmund Street Birmingham B3 2HJ Our Ref: 5/16/3441 E-mail: Date: planning@stalbans.gov.uk

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Droitwich Spa 6. Reasoned Justification

Droitwich Spa 6. Reasoned Justification 87 Droitwich Spa 6 Reasoned Justification 6.1 Droitwich Spa is identified in the settlement hierarchy (Policy SWDP1) as a main town being the largest settlement in Wychavon District with an estimated population

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

Introduction. Grounds of Objection

Introduction. Grounds of Objection Planning application ref. number 18/04496/APP Planning application to Aylesbury Vale District Council for the erection of 17 dwellings and associated works to the South of Hogshaw Road Granborough. Granborough

More information

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD 0 WELCOME INTRODUCTION Gladman Developments Ltd have successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial and industrial

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016) Introduction This background paper sets out a methodology for the definition of settlement boundaries in the North Northumberland Coast Neighbourhood Plan. The neighbourhood plan is planning positively

More information

LANDSCAPE PLANNING ECKLAND LODGE REDDITCH ROAD CRIBBS CAUSEWAY YEW TREE HILL LUBENHAM TENBURY WELLS

LANDSCAPE PLANNING ECKLAND LODGE REDDITCH ROAD CRIBBS CAUSEWAY YEW TREE HILL LUBENHAM TENBURY WELLS We offer our expertise at all stages of the landscape planning and environmental assessment process, including strategic landscape assessment or capacity studies to determine the scale of development opportunities;

More information

WELCOME TO THE NEW WILTON PARK

WELCOME TO THE NEW WILTON PARK WELCOME TO THE NEW WILTON PARK VISION HISTORY OF WILTON PARK TOWARDS A PLANNING APPLICATION Our objective is to create a truly outstanding environment at Wilton Park. At the heart of our proposals is a

More information

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13

More information

Great Easton Neighbourhood Plan Statement of Basic Conditions

Great Easton Neighbourhood Plan Statement of Basic Conditions Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Land East of Cromwell Lane

Land East of Cromwell Lane Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PUBLIC CONSULTATION YOUR VIEW MATTERS TO US LOCATION PLAN Thank you for taking the time to read this information leaflet regarding a proposed residential

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information