1 Land off Arbour Close and Cotswold Edge

2 Contents INTRODUCTION Vision SITE DESCRIPTION The site Technical Assessment ASSESSMENT & EVALUATION Constraints and opportunities SITE CONTEXT Pattern of Development Architectural Style ENGAGEMENT Project: Client: Author: AP Mickleton, Gloucestershire Newland Homes Checked by: AT Date: 02/10/13 DESIGN The design process Use & Amount Scale Appearance Landscaping Layout ACCESS Contents MASTERPLAN

3 INTRODUCTION This design and access statement has been prepared to accompany an outline planning application for a GP surgery and up to 70 proposed new homes at land off Arbour close and Cotswold Edge in Mickleton. SHLAA R_254 A review of these reports and an initial landscape evaluation led to the land off Arbour Close and Cotswold Way being selected by Newland Homes as the most appropriate site to pursue for a development that would successfully respond to local context within a sensitive landscape. Newland Homes prides itself on being a local company that truly cares. They strive to meet the aspirations of their customers but importantly they are considerate to the communities and the environment in which they build ensuring that their reputation for honesty is upheld at all times. They believe that their approach to thoroughness, quality and detail make them different from other residential developers. Their sensitivity to the environment and local communities helps them to create the quality homes that are needed whilst protecting the places we all value. For details of relevant planning policies and how these have assisted with the design, refer to the planning statement prepared by Hunter Page Planning, dated September VISION A landscape-led design approach for a village scale development that interacts with, and relates sensitively to the character of Mickleton. The design will take its inspiration from houses within the Conservation Area and rural landscape, creating an informal rural edge and providing high quality architecture enhancing the village. Cotswold District Strategic Housing Land Availability Assessment Review - October 2012 Not in AONB. On edge if settlement adjacent to housing to east. Possible access to site from 2 sides. Logical extension of village with opportunities to improve edge of village. Deliverable within 0-5 years Study of land surrounding key settlements in Cotswold District June 2000 White Consultants Visually discreet and would have a negligible impact of the perceived scale and character of the village The site s development would represent an extension of existing estates in the south east of the village and offers an opportunity to improve the edge of the settlement. NEWLAND HOMES Study of land surrounding key settlements in Cotswold District June 2000 White Consultants Entry to the village along Long Marston Road is important to the setting of the village allowing good views to the visually permeable village edge, church and scarp Cotswold District Strategic Housing Land Availability Assessment Review - October 2012 Constraints: conservation area. Listed buildings. Large site in centre that could have a profound effect on character. Logical extension of village with opportunities to improve edge of village. Deliverable within years CHARLES CHURCH MICKLETON CONSERVATION AREA COTSWOLD AONB CALA HOMES HEART OF ENGLAND WAY SHLAA R_249 R_250 Study of land surrounding key settlements in Cotswold District June 2000 White Consultants The land to the south is a detractor on the edge of the village. It is virtually derelict and can be categorised as brownfield land. Cotswold District Strategic Housing Land Availability Assessment Review - October 2012 Constraints: clean up costs + contamination. Impact on existing residential buildings Scale too large for size of settlements Limited development nearer village may have potential Deliverable 20+ Years COTSWOLD AONB Site comparison based on CDC SHLAA and White Report

4 SITE DESCRIPTION The study site is situated to the south west of the existing village of Mickleton, within the jurisdiction of Cotswold District Council. The site is situated immediately north of Broadway Lane (B4632) on entering the village from the west. Future access to the land is proposed via the existing residential development to the immediate east of the site. No access is proposed to the site from the B4632. The site comprises the following: Road. However, at this pointed union with the highway the site is bordered by established hedgerow incorporating a field gate. The northern and north eastern boundary of the site consists of fencing and a line of young trees. Part of the land is unfenced and extends northwards as part of an area of pasture which adjoins former market gardens and smallholdings. Approximately 4.6 hectares in size The site is predominately level with a slight fall from 70m AOD at its southern most boundary to approximately 67m AOD at the northern most boundary. The site is currently divided into 3 fields with 2 set to pasture and one used recently for arable production. Access to the site is currently via a field gate and fenced access of Arbour Close and Cotswold Edge. A public right of way crosses the site. Willow and ash are present in an informal grouping along the north western boundary. The north and south western boundary is formed by a running ditch which is fenced off with stockproof fencing. The eastern boundary of the site consists of timber fence and other garden boundary materials which define the extent of the present settlement edge. There is not a southern boundary due to the shape of the land where it adjoins Broadway

5 TECHNICAL ASSESSMENT Transport A Transport Assessment has been undertaken. The site is well connected to the adjacent residential area by two connections directly to the existing residential roads (Arbour Close & Cotswold Edge) and further footpath connection. Cycling is well catered for locally, through a combination of quiet low trafficked residential street a small streets and small sections of nearby cycle priority. Mickleton is well served by public transport which is easily accessible on foot from the site, making nearby major service centres readily accessible by public transport. Local facilities are provided in Mickleton and easily accessible on and by bicycle from the site. The proposed development site is considered highly sustainable. The Transport Assessment concludes that traffic generation of a greater amount of dwellings greater than those proposed would not be of a sufficient scale to generate any concerns regarding highway operation. Detailed considerations clearly demonstrate that the proposals are entirely compliant with policy and practical consideration and there is therefore no defensible transport related ground for objection. Hydrology A Flood Risk Assessment has been undertaken. The proposed development is not at a significant flood risk subject to recommended flood mitigation measures such as SUDs development being implemented. Moreover the development will not increase the flood risk to the wider catchment area as a result of suitable management of surface water runoff discharging from the site. Ecological An Ecological Assessment has been undertaken. No protected species were found on site. A bat foraging corridor was identified along the woodland at the western edge of the site. Archaeological A desk based assessment established a low to nil potential for the survival of archaeological remains other than those related to agricultural practices. Following a detailed gradiometry survey fifteen evaluation trenches each approximately 30m long, were excavated following this it was concluded likely that all archaeological activity on site relates to medieval or post medieval agriculture and is of minor archaeological significance. Landscape A Landscape and Visual Appraisal has been undertaken. The site itself is of low landscape sensitivity; it does not contain any vulnerable or rare features that are protected locally or nationally. It is concluded residential development can be accommodated on site but will rely on maintaining key views into the village and surrounding landscape as well as incorporating tree planting and boundary vegetation to protect the visual amenity of adjoining properties. Maintaining a sense of openness and visual amenity for the public rights of way within the site will be important to maintain a sense of rural character. It is visually discreet and would have negligible impact of the perceived scale and character of the village. The site s development would represent an extension of the existing estates on the south east of the village and offers an opportunity to improve the edge of the settlement. From Study of Land surrounding Key Settlements in Cotswold District, White consultants, 2000.

6 OPPORTUNITIES AND CONSTRAINTS SKETCH ASSESSMENT AND EVALUATION In addition to incorporating the results with the local planning authority and local community, the technical assessments undertaken as part of the landscape visual impact and site assessment process have been used to inform the layout and design of the scheme. A summary of the constraints and opportunities identified are listed below CONSTRAINTS AND OPPORTUNITIES Opportunity to improve settlement edge to reflect the character of the village and integrate the settlement sensitively into the wider landscape Opportunity to create social infrastructure that has and identified local need; new homes and a GP surgery Opportunity to incorporate ecological enhancements such as a community orchard and wildflower planting a bat foraging corridors. The existing adopted roads of Arbour Close and Cotswold Edge abut the site and provide an opportunity for logical access points Opportunity to incorporate high quality architecture that relates to Mickleton Opportunity to incorporate positive drainage methods with integrated landscape and ecological enhancements Opportunity to improve existing drainage issues and address the new sites drainage in a sustainable manner Opportunity to preserve and enhance the setting of existing footpaths.

7 SITE CONTEXT The site context comprises of the following: To the east of the site lies the main settlement area of Mickleton. The areas adjoining the site boundary comprise more recent housing of both single and two storey properties. The older village area is located east of the modern housing, identifiable by the church spire of St Lawrence s Church, and visually separated from the present site by modern housing developments. Dwellings within the local study area are generally modern in construction and of brick and tile construction. The land to the north of the site is active vale farmland comprising predominately pasture. To the west of the site a well-established and substantial shelter-belt of mixed deciduous and evergreen trees is located immediately beyond the boundary. This forms a dense screen of the farmland and former market garden area beyond. To the south of the shelter belt a hedge defines the boundary of the site with the former market garden area. This hedge extends up to Broadway Lane and forms part of the roadside hedgerow adjoining the B4632. The site is located within generally level vale farmland which is seen against the backdrop of steeply rising Cotswold scarp to the immediate south of the main settlement area. Large specimen trees are identifiable on the mid to upper slopes of the rising scarp. Towards the upper scarp immediately south of the village a cluster of distinct evergreen trees indicate the location of Kiftsgate Court but no buildings are identifiable from the vale or settlement areas.

8 Oldmaps 1890 with current OS underlay showing the pattern of development: Pre 20th century village core 1890 s to 1950 s development Post 1950 s development Site boundary 600m walking distance from village centre PATTERN OF DEVELOPMENT The historic village of Mickleton was a clustered settlement focused on the village centre around St. Lawrence Church and the north eastern section of the high street. Building types in this area are generally Cotswold in style although timber frame and brick buildings do feature. A post-war extension to the village has altered the original settlement pattern resulting in an isolated eastern spread of development away from the village core. This has resulted in a block of development that does not reflect the established urban pattern of the village; dividing the village into two distinct zones. Post-war development to the south west of the village has created a visually abrupt edge that is suburban in appearance and detracts from the settlement s character. Local centre Conservation area The site s development would represent an extension of the existing estates on the south east of the village and offers an opportunity to improve the edge of the settlement. From Study of Land surrounding Key Settlements in Cotswold District, White consultants, 2000.

9 ARCHITECTURAL STYLE The historic core is generally Cotswold in style featuring a large number of buildings that are built of stone resonating the Cotswold character. However the building materials of the village as a whole reflect a relaxed mix of Cotswold stone timber framed thatched cottages and brick. The range of materials throughout the residential development can be categorised into four main types and styles. Stone building with stone slate roof in the Cotswold tradition Brick walls blue slate roof characteristic of the Evesham Vale Render/ painted brick. Black timber frame and white render panels with thatched roof characteristic of Warwickshire The variety in combinations of these materials are wide with several different materials and finishes frequently found within the same building. Chimneys feature on ridge lines. Windows tend to be recessed and window panes small. Sash, arch topped and mullioned windows feature. Architectural details such as lintels and sills feature above and around doors and windows constructed from a variety of materials. Roof styles vary between hipped and pitched, with staggered roof lines and gables featuring often. Decorative door canopies feature frequently. Boundary treatments vary between railings, brick wall, stone wall, hedging, willow fencing and combinations of these.

10 ENGAGEMENT The masterplan proposal of this planning application has been designed and has evolved with the contribution from a variety of professional consultants and bodies within the Cotswold District Council, and importantly, the local community. Early pre application discussion with the Cotswold District Council raised the following comments: The importance of retaining hedgerows and trees with enhancement planting A desire to see a community orchard and wildflower planting considered Provide suitable integration into the surrounding landscape (scale of development, massing and materials) A wider landscape belt adjacent to the existing housing A wider landscape belt to the south west boundary to provide a robust transitional zone to integrate the development into the landscape A desire for development to the north of the site to be kept to a minimum The inclusion of 50% affordable homes comprising of two thirds for rent and one third subsidised low cost home ownership Parking courts should be avoided Roads should be designed to a 20mph speed limit Proposals will include a contribution towards improving the capacity and suitability of Mickleton primary school and a library contribution The involvement of the community has been central to the design stages of this proposal. Such consultation has helped the design team shape the proposal by drawing on the knowledge of the local community, and responses to the consultation where appropriate have influenced the design and layout of the application. This consultation has enabled the community to have meaningful input into the development proposal. A summary of comments received is as follows: Concern that a through road would be used as a cut through Concern about flooding at end of Arbour Close Desire to see a GP surgery return to the village Desire for high quality architecture that relates to Mickleton Concern about parking and congestion Desire for more space between existing dwellings and new Desire for scale of new buildings to reflect scale of the existing buildings that will immediately neighbour them Please refer to Hunter Page Planning Statement of Community Engagement 2013 for more details.

11 DESIGN DESIGN PROCESS The design of this development has been a landscape-led approach following best practice to create a development that successfully responds to local context within a sensitive landscape. Guidance has been sought from a range of specialist technical disciplines, Cotswold District Council and the local community at key stages throughout the design development. Correspondingly the design has evolved to address the responses we have received enabling us to design a development that draws on expert knowledge and responds to the needs and desires of the local community and the wider district. The aim is to create a scheme that is designed specifically for the location. This way new homes can be created that fully reflect the local character and contribute to a strong sense of place. The use of local building materials and architectural detailing in carefully considered designs, creates homes which fit into the local community. By incorporating trees, shrubs and open space Newland homes also ensure that their homes protect the surrounding open countryside. The following design elements are considered important in our proposals at Mickleton: Maintain existing rights of way incorporated into landscape/ecological corridors that link to offsite footpaths and ecological features and link to community orchards and public open space Keep where possible new houses fronting onto/ overlooking footpaths for natural surveillance Enhance and create vistas to features within Mickleton village along the landscaped corridors and through the village to improve the setting of the village when viewed from public rights of way Use large rear gardens, low density housing and appropriate landscaped boundary treatments along the northern edge of the development to create a fragmented edge avoiding a straight line of rear garden fences Create sufficient space for large rear gardens and landscape buffers to maintain the visual amenity of local residents Affordable homes ( Help to Buy scheme to encourage families to live in the village) A GP surgery to serve Mickleton An open space for landscaping at the Arbour Close entrance to enhance the sense of arrival into Mickleton and create an appropriate sense of arrival into the new development. Provide ample off road parking ensuring an uncluttered street scene designed to be in keeping with the character of the village Propose building styles, details and materials that take influence from Mickleton village/ conservation area and rural dwellings, and provide a high quality architectural detailing to enhance the village See: Site Context, Architectural Style

12 USE AND AMOUNT The Proposal is for a residential development of up to 70 dwellings at approximately 16dph of which around 35 are affordable as well as a single storey GP surgery. The proposed GP surgery has been informed through discussions with a local GP surgery and a formal assessment undertaken by GVA. The proposed surgery will be a single storey character/feature building of around 200m² and provide dispensary services as well as consultation rooms and 12 parking spaces SCALE The development has been designed to respond to the scale of the local context and reflecting the local vernacular of the village setting by ensuring most dwellings are 2 storey with bungalows and chalet style houses at key locations to respect the existing residential amenity. Heights of buildings will vary between 5-9m to reflect the local vernacular of the buildings of Mickleton. APPEARANCE The appearance of the buildings will vary to reflect the architectural traditions of Mickleton ensuring the development retains a strong sense of place that reflects the local character. Architectural details echoing the variety of the architecture of Mickleton will be incorporated with a range of materials, scales and boundary treatments reflecting the styles that have been identified Site Context section of this report. Roof styles will vary between hipped and pitched and details such as recessed windows and doors will cast shadows associated with traditional Mickleton architecture. Architectural style will draw on detailed characteristics that exemplify the village architecture associated with Mickleton as identified in the Site Context section of this report.

13 LANDSCAPING The site layout drawing, which forms the basis of the application, has been informed and developed in response to the existing features of the site, the character of the surrounding landscape, feedback from the local community and the desire to uphold the principles of sustainable design. Through both detailed ecological study and landscape appraisal, the visual character and ecological qualities of the site and its surrounding landscape have been identified and assessed. The landscaping of the scheme has been identified as being fundamental to creating a sensitive transition between the built edge and the open countryside and to protect the residential amenity of the existing dwellings neighbouring the site. The landscape strategy is fundamental to the scheme in terms of mitigating negative impacts, increasing sustainability and biodiversity as well as adding appeal and are therefore central to the success of the proposal. The existing network of hedgerows and vegetation form the basis of the green infrastructure network. This network will provide the setting for a series of footpaths and community spaces and enhance and protect existing wildlife corridors retaining links to the wider countryside. Landscape enhancements will be incorporated as part of the landscape strategy restoring and enhancing hedgerows and field boundaries. Boundary treatments which delineate the development and open countryside shall be sensitively designed to create a soft transitional edge between private gardens, community spaces and the countryside. Along the northern boundary native hedgerows and post and rail fence will be situated alongside the existing ditch at the northern boundary to ensure a robust yet soft and informal transition at the rural edge that integrate the development sensitively into the surrounding landscape. It is envisaged that cottage style planting will be incorporated in front gardens and boundary treatments typical of Mickleton conservation area will feature (see Site and Context section), incorporating boundary treatments such as low Cotswold stone walls. Rear boundaries will consist predominantly of native tree and hedge planting and post and rail fences. It is envisaged that driveway surfaces would comprise high quality finishes such as Cotswold chippings. Street tree planting and front gardens will feature where space allows. A positive sustainable drainage strategy will be incorporated as part of the green and blue infrastructure network providing ecological and amenity enhancements as well as slowing, cleansing and storing storm water runoff. This system will include an allowance for climate change whilst attenuating the runoff on site in periods of extreme rainfall. This strategy will have the dual benefits of addressing both any storm water runoff on site resultant of nearby urban areas and sustainably addressing the drainage requirements of the new development. A number of balancing ponds are featured as part of the sustainable urban drainage strategy (SUDs) adding desirable focal features to public open spaces and providing new ecological habitats to enhance biodiversity.

14 LAYOUT The site layout is designed to reflect the transitional role of the development as a gradual change between the village and the wider rural landscape. The development offers the opportunity to soften the edge of the village creating a far more sympathetic interface to the open countryside beyond. The layout features low density housing and wide open space corridors. Dwellings and along the northern boundary are detached houses set back from the road with extensive back gardens and have been designed to create a broken edge with views to the open countryside. Driveways have been placed to the side of the houses with a preferred ratio of two off street parking spaces and one garage to each dwelling. This is a reflection of the historic character of Mickleton and will reduce the visual clutter of the street scene. GREEN CORRIDOR An open space at the southern entrance of the site will give a sense of arrival to the new development and create a buffer between Broadway road and the housing. There are opportunities to incorporate an a small informal toddler play area such as in the central Village Green public open space. Green corridors based on existing field patterns and restored hedgerows create will enhance the setting of existing footpaths improving opportunities for natural surveillance and privacy of adjoining dwellings as and when appropriate.

15 ACCESS The study site is situated immediately north of Broadway Lane (B4632) on entering the village from the west. Access to the site is currently via a field gate and fenced access of Arbour Close and Cotswold Edge. Future access to the land is proposed via the existing residential development to the immediate east of the site from the existing access points at Arbour Close and Cotswold Edge. No access is proposed to the site from the B4632. Access arrangements are intended to allow all potential users regardless of age, sex or disability to enter and use the facilities. Drop off zones and disabled parking bays will be incorporated around the entrance to the facilities building. Access will be considered in its broadest sense, to include the needs of individuals with sensory, mobility and hidden impairments, learning disabilities, mental health needs. Others to whom the built environment can be disabling including carers with young children, elderly, and those with limited English. The site is to be landscaped to provide ease of accessibility across the site with clearly defined routes for those with disabilities. External doors will be provided with level thresholds. The scheme s inclusive pedestrian environment is indicated by graded approaches being gentler than 1:40. Emergency vehicular access will be provided as part of the route development strategy. Turning heads are provided for refuse vehicles, emergency services and delivery vans.

16 INDICATIVE MASTERPLAN Proposed foul water pumping station New native field boundary created along north eastern boundary of the site. Group of existing trees to be retained. Creation of new green corridors, for footpaths, recreation, community orchards, pond / streams and new tree planting. SUDs pond, capacity in accordance with Flood Risk Assessment prepared by consulting engineers. Existing boundary planting to be landscaped with native hedgerow to form characteristic boundary. COTSWOLD EDGE Existing ditch to remain unaltered and set within landscape corridor. Existing Public right of Way (PROW) unaltered. SUDs pond, capacity in accordance with Flood Risk Assessment prepared by consulting engineers. Creation of village green within centre of development. Character feature properties set at key points within development to form visual nodal points. Boundary with existing woodland to be retained as bat migration corridor. Approximately 10m wide open landscaped and unlit corridor to be created along line of public right of way. Proposed single storey and chalet style development to be located along site boundary with existing properties. Existing boundary to be enhanced with native hedge and tree planting. Properties to be orientated to overlook PROW to increase feeling of security and provide surveillance. Proposed single storey development to be located along site boundary with existing properties. Existing close board fence boundary to be enhanced with native hedge and tree planting. Public Right of Way (PROW) to run through surgery car park. Proposed doctors surgery containing 3 consultations rooms. Sufficient parking to be provided to avoid overspill into neighbouring streets. ARBOUR CLOSE Character feature properties set at key points within development to form visual nodal points. BROADWAY ROAD

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT January 2016 Contents Introduction section 1 Section 1 - Introduction Section 2 - Assessment Section 3 - Involvement Section 4 - Evaluation Section 5 - Design Section 6 - Layout

More information

PDP DESIGN & ACCESS STATEMENT

PDP DESIGN & ACCESS STATEMENT PDP The Planning & Design Partnership Planning.. Architecture.. Interiors.. Landscape The Chicory Barn Studio, The Old Brickyards, Moor Lane, Stamford Bridge York, The East Riding Of Yorkshire, YO41 1HU.

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

CAERNARFON DEPENDENCY CATCHMENT AREA

CAERNARFON DEPENDENCY CATCHMENT AREA CAERNARFON DEPENDENCY CATCHMENT AREA GWYNEDD UNITARY DEVELOPMENT PLAN - HOUSING Map not to scale Dependency Catchment Area Location 2 Caernarfon Topic Housing To the rear of Bro Eglwys, Bethel. Grid Ref.

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT Land to the South East of the A495, Bronington Erection of 31 Dwellings (27 dwellings and 4 bungalows including 4 Affordable Dwellings), Realignment and Improvements to A495 (including

More information

Welcome to our public exhibition

Welcome to our public exhibition About our scheme Welcome to our public exhibition Taylor Wimpey East Anglia intends to submit a detailed planning application for a new residential development of 39 high-quality homes at the B&M Concrete

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement

BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement Planning, Design and Access Statement Revised: 28 th Jan 2016 Peter Pendleton & Associates Ltd Introduction Planning permission will be sought for a refurbishment of existing courts and extension to provide

More information

ABOUT CALA HOMES CALA HOMES

ABOUT CALA HOMES CALA HOMES WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments

More information

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE Land adjacent Sandy Lane WALTHAM CHASE Existing Linden Homes developments Welcome Welcome to Linden Homes Southern s ( Linden ) public exhibition about its proposals for a range of high-quality homes for

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

CALA HO ME S WELCOME

CALA HO ME S WELCOME WELCOME Welcome to this public consultation event for our proposed residential development of 56 high quality homes on land to the north east of Station Road in Earls Colne. Thank you for taking the time

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT TRETHURFFE LADOCK, TRURO Design & Access Statement

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT TRETHURFFE LADOCK, TRURO Design & Access Statement PROPOSED RESIDENTIAL DEVELOPMENT LAND AT TRETHURFFE LADOCK, TRURO Design & Access Statement Heron Way, Newham, Truro, Cornwall, TR1 2XN Tel: 08453 707 111 Fax: 08453 707 113 www.csa-architects.co.uk E:

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. Introduction Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. We are currently considering options for the mixed-use redevelopment

More information

Mortimer NDP, Principles, Vision and Policies

Mortimer NDP, Principles, Vision and Policies The Three Principles Mortimer NDP, Principles, Vision and Policies 1. The NDP must make it possible for people to live the whole of their lives in the parish if they so wish 2. 2. The NDP will ensure that

More information

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history... Board 1 A message from Satnam... Thank you for attending today s public consultation about proposals to develop a new residential neighbourhood at. The display boards show why the development is needed

More information

INTRODUCTION. Land south of Bishopswood Lane, Tadley

INTRODUCTION. Land south of Bishopswood Lane, Tadley 0 INTRODUCTION THE SITE Introduction Gladman Developments Ltd. has successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD 0 WELCOME INTRODUCTION Gladman Developments Ltd have successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial and industrial

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

Warwickshire County Council. Upper and Lower Brailes. Landscape Study

Warwickshire County Council. Upper and Lower Brailes. Landscape Study Warwickshire County Council Upper and Lower Brailes Landscape Study Produced by WCC Landscape Architects March 2016 Landscape Assessment of Potential Development Sites within the parish of Brailes 1.0

More information

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation. Story Homes An Introduction to Story Homes Founded by Fred Story in 1987, Story Homes has a long and successful reputation of building high quality and high specification homes. The family owned business

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us HARDWICK GREE, King s Lynn Welcome to our Exhibition Welcome to our exhibition, which is being held to provide you with the opportunity to understand and comment upon our proposals for new residential

More information

INTRODUCTION. Land off Beresford Road, Holt. Introduction. Site Description. Housing Need. Why is the site suitable for development?

INTRODUCTION. Land off Beresford Road, Holt. Introduction. Site Description. Housing Need. Why is the site suitable for development? 01 INTRODUCTION Introduction Thank you for taking the time to view this public exhibition and find out more about Gladman Development s latest proposals to develop a new sustainable community of up to

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand. WELCOME Welcome to this public consultation event for our proposed development on land to the south of Twelve Leys in Wingrave. Thank you for taking the time to come along today. Homes is preparing a planning

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Alder View. Introduction. Alder View. Harwell. The Vision. The Team. Taylor Wimpey

Alder View. Introduction. Alder View. Harwell. The Vision. The Team. Taylor Wimpey Introduction Welcome to the public exhibition for, a development by Taylor Wimpey on the land south of Grove Road,. This exhibition will provide an overview of the development proposals for the site and

More information

vision & process willowburn, tarves community engagement 04/18

vision & process willowburn, tarves community engagement 04/18 vision & process Historic Conservation area Scotia intend to create a high quality residential development based upon best practice urban design principles. This will include a contemporary reinterpretation

More information

INTRODUCTION. Land West of Main Road, Stanton Harcourt THE SITE. Why is the Site Suitable for Development?

INTRODUCTION. Land West of Main Road, Stanton Harcourt THE SITE. Why is the Site Suitable for Development? 0 INTRODUCTION THE SITE Application Boundary Gladman Developments Ltd has successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential,

More information

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development Adopted June 18, 2009 This section of the Design and focuses on site planning and design guidance for new multi-family

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies Environment and Landscape Policy 1 - Landscape Setting Development should respect and wherever possible enhance the landscape setting of Cuddington

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

MATURE SUBURBS RESIDENTIAL DEVELOPMENT GUIDELINES

MATURE SUBURBS RESIDENTIAL DEVELOPMENT GUIDELINES MATURE SUBURBS RESIDENTIAL DEVELOPMENT GUIDELINES DRAFT FEBRUARY 2005 BIRMINGHAM CITY COUNCIL 1 Introduction Mature Suburbs Residential Development Guidelines - Interim Supplementary Planning Advice -

More information

Section Three, Appendix 17C Multiple Unit Housing Design Assessment Criteria

Section Three, Appendix 17C Multiple Unit Housing Design Assessment Criteria APPENDIX 17C MULTIPLE UNIT HOUSING DESIGN ASSESSMENT CRITERIA Purpose of Appendix 17C In the Residential 9 Zone the construction and use of multiple household units located within the Multiple Household

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

Emmer Green, Reading. Site Location Plan

Emmer Green, Reading. Site Location Plan 0 Welcome Introduction Gladman Developments Ltd have successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial and industrial

More information

01 Welcome. Why are we here?

01 Welcome. Why are we here? 01 Welcome Why are we here? In July 2014 GreenSquare unveiled its plans for 1500 homes to the local community providing much needed houses during the first half of the Stroud District Local Plan period.

More information

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot PART A Report of: DEVELOPMENT MANAGEMENT SECTION HEAD Date of Committee: 26 th June 2014 Site address: Rounton, 28, Nascot Wood Road Reference Number: 14/00497/REM Description of Development: Reserved

More information

Land East of Cromwell Lane

Land East of Cromwell Lane Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place

More information

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows:

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows: Appendix A Stakeholder presentation + powerpoint slides Planning Context and Emerging Proposals presentation Nick Tyrrell, Alder King, Planning Consultants Alder King began by setting the site context

More information

Briefing Document of CNP. June 2017

Briefing Document of CNP. June 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Briefing Document of CNP June 2017 Cholsey Neighbourhood Plan Page! 1 of! 8 Cholsey Plan Briefing v1.4 Page Left Intentionally Blank Cholsey Neighbourhood

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

SITE ASSESSMENT CHECKLIST

SITE ASSESSMENT CHECKLIST 1. Site Details a. What is the site s name/reference? CR3 FORUM NEIGHBOURHOOD PLAN SITE ASSESSMENT CHECKLIST CR3NPCOH3016 Douglas Brunton Centre Park Rd b. Where is the site located? Caterham Hill urban

More information

Linden Homes Proposals for land off Ringwood Road, Verwood

Linden Homes Proposals for land off Ringwood Road, Verwood Welcome Welcome to Linden Homes first public exhibition displaying proposals for new homes on land off Ringwood Road in Verwood. Award-winning house builder Linden Homes, part of the Galliford Try Group,

More information

Housing Development at Balloonagh Tralee Co Kerry

Housing Development at Balloonagh Tralee Co Kerry Design Statement Housing Development at Balloonagh Tralee Co Kerry Area of site 10,400m2 24 houses-12no 3 bed, 12no 2 bed and 4 single bed apartments total residential area of 2411m2 Open space provided

More information

DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow.

DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow. DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow. The following Design & Access Statement is in support of a Full Planning Application for a residential

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

November Opus House

November Opus House Planning, Design and Access Statement Supporting a Planning Application in Hopton for the Extension of the Village Hall, A Doctors Surgery, A Village Green and 37 New Homes November 2015 Opus House 01359

More information

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES WELCOME Thank you for coming to our consultation event to find out more about our emerging proposals for Hayfield Park, a residential development jointly promoted by the Hayfield Consortium: Martin Grant

More information

Neighbourhood Plan Representation

Neighbourhood Plan Representation Date: 10 th November 2017 Neighbourhood Plan Representation Land to the east of Callow Hill Road, Alvechurch Introduction This representation has been prepared by RPS Planning and Development on behalf

More information

Lower Hollow Copse. Questions and Answers on Proposals for Permanent Gypsy and Traveller Accommodation

Lower Hollow Copse. Questions and Answers on Proposals for Permanent Gypsy and Traveller Accommodation Lower Hollow Copse Questions and Answers on Proposals for Permanent Gypsy and Traveller Accommodation 0 Why does Mid Sussex District Council need to provide permanent gypsy and traveller accommodation?

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD 1.0 Introduction: The relocation of the City Council stores and depot from Bolton Street creates an exciting opportunity for development

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 5 June 2013 AUTHOR/S: Planning and New Communities Director S/0747/13/FL HISTON Construction of Car Park at Histon Baptist Church, Station

More information

GREENBANK DEVELOPMENT MASTERPLAN

GREENBANK DEVELOPMENT MASTERPLAN DEVELOPMENT MASTERPLAN POTENTIAL TRAIN STATION COMMUNITY CENTRE Greenbank will be a connected masterplanned community providing easy access to local and surrounding amenity. Affordable quality homes, green

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Response by The Dartington Hall Trust

Response by The Dartington Hall Trust Consultation Response by The Dartington Hall Trust Site Reference: SH_39_02_08/13 Contents Introduction 1 Site Description 2 Development Proposal and Context 3 Site Technical Assessment 4 Planning Policy

More information

PROPOSED RESIDENTIAL DEVELOPMENT MAWNAN SMITH CORNWALL Design & Access Statement

PROPOSED RESIDENTIAL DEVELOPMENT MAWNAN SMITH CORNWALL Design & Access Statement PROPOSED RESIDENTIAL DEVELOPMENT MAWNAN SMITH CORNWALL Design & Access Statement St Piran House, Heron Way, Newham, Truro, Cornwall, TR1 2XN Tel: 08453 707 111 Fax: 08453 707 113 www.csa-architects.co.uk

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT . DESIGN & ACCESS STATEMENT Site Adjacent to The Manor House, Upper Street,, Kingsdown, Deal, Kent. DESIGNS ARCHITECTURE + PLANNING CONTENTS Design and Access Statement Introduction Site and Location Planning

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

SITE ASSESSMENT CHECKLIST

SITE ASSESSMENT CHECKLIST 1. Site Details a. What is the site s name/reference? SITE ASSESSMENT CHECKLIST CR3NPWHY 3007 Gasometer Site Godstone Road CR3 0EG b. Where is the site located? Wyhteleafe; Godstone Road. Urban category1

More information

Introduction. Grounds of Objection

Introduction. Grounds of Objection Planning application ref. number 18/04496/APP Planning application to Aylesbury Vale District Council for the erection of 17 dwellings and associated works to the South of Hogshaw Road Granborough. Granborough

More information

The Fairfield Partnership Vision for North-East Elsenham

The Fairfield Partnership Vision for North-East Elsenham The Fairfield Partnership Vision for North-East Elsenham August 2009 Frequently Asked Questions Who is The Fairfield Partnership? The Fairfield Partnership is a joint venture between Marchfield Developments

More information

Land at Pirton Fields. South Churchdown, Innsworth Design and Access Statement Addendum

Land at Pirton Fields. South Churchdown, Innsworth Design and Access Statement Addendum Land at Pirton Fields South Churchdown, Innsworth Design and Access Statement Addendum February 2017 Revisions Revision Date Description Prepared Approved Document No. 15-45-CR02 - Land at Pirton Fields

More information

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD Proposals for land at Smug Oak Lane BRICKET WOOD Previous Linden Homes and Wates Developments scheme Welcome Welcome to Linden Homes and Wates Developments public exhibition. Working together as joint

More information

WELCOME. North East Haverhill. The Planning Process

WELCOME. North East Haverhill. The Planning Process WELCOME North East The site to the North East of, known as Great Wilsey Park, is identified by St Edmundsbury Borough Council in its Core Strategy as capable of delivering a Sustainable Urban Extension.

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 29 th November 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: LA11/2016/0854/O Outline Shared

More information

WELCOME TO THE NEW WILTON PARK

WELCOME TO THE NEW WILTON PARK WELCOME TO THE NEW WILTON PARK VISION HISTORY OF WILTON PARK TOWARDS A PLANNING APPLICATION Our objective is to create a truly outstanding environment at Wilton Park. At the heart of our proposals is a

More information

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials Wide asphalt driveway abutting school property incompatible fencing materials garage built with incompatible materials, too close to park Lack of plantings as a buffer between private property and open

More information

East Bayshore Road Neighbourhood

East Bayshore Road Neighbourhood East Bayshore Road Neighbourhood Northridge Property Management Urban Design Brief 3195 East Bayshore Road City of Owen Sound January 2016 East Bayshore Road Neighbourhood Northridge Property Management

More information

Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017

Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017 Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017 Site: ALP086 - Middle Lakes, Toddington Site size (ha): 2.83 Site: ALP086 - Middle Lakes, Toddington Site size (ha): 2.83 Site description

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016 Colchester Northern Gateway Master Plan Vision Review Draft July 2016 Contents Introduction 4 Context 8 Purpose of the Report 8 Strategic Position 9 Overview of the Process 11 2012 Master Plan Vision 12

More information

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

SPG 1. * the northern and western sections which are open fields used for pasture and grazing; SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

STRENSALL RAILWAY BUILDINGS CONSERVATION AREA APPRAISAL. In association with Strensall with Towthorpe Parish Council

STRENSALL RAILWAY BUILDINGS CONSERVATION AREA APPRAISAL. In association with Strensall with Towthorpe Parish Council STRENSALL RAILWAY BUILDINGS CONSERVATION AREA APPRAISAL In association with Strensall with Towthorpe Parish Council CONTENTS Page 1 Introduction 2 2 Location and Context 3 3 Topography and Setting 4 4

More information

Residential Development at Menehay Farm, Bickland Water Road, Falmouth Design and Access Statement

Residential Development at Menehay Farm, Bickland Water Road, Falmouth Design and Access Statement Residential Development at Menehay Farm, Bickland Water Road, Falmouth Design and Access Statement Galliford Try STRIDE TREGLOWN JOB NO. PREPARED BY CHECKED BY DATE REVISION REVISION NO. 150220 Coral Ducroq

More information

September A new neighbourhood at Kemsing Station. Concept Masterplan

September A new neighbourhood at Kemsing Station. Concept Masterplan September 2018 A new neighbourhood at Kemsing Station Concept Masterplan 1 Kemsing Station Neighbourhood - Key Benefi ts Transport Hub Extra parking, station improvements and links across the district

More information

National Character Area 70 Melbourne Parklands

National Character Area 70 Melbourne Parklands Summary The are a landscape of rolling farmland, parkland and woodland on the northern flanks of the ridge between Burton upon Trent and Swadlincote. The land slopes down to the River Trent, which borders

More information

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016) Introduction This background paper sets out a methodology for the definition of settlement boundaries in the North Northumberland Coast Neighbourhood Plan. The neighbourhood plan is planning positively

More information