1 Land East of Horndean, Hampshire Environmental Statement October 2014

2

3 Contents 1.0 Introduction Background Environmental Assessment Site Description The Proposals Background and Need Alternative Development Scenarios Description of the Development Consultation Approach to Consultation Environmental Impacts Ecology LVIA Lighting Socio-economic Noise and Vibration Air Quality Flood Risk and Drainage Ground Conditions and Contaminated Land Cultural Heritage Traffic and Transport Summary Conclusions Management of Environmental Impacts What happens next?... 17

4

5 1.0 Introduction 1.1 Background This document summarises the Environmental Statement (ES) which accompanies the planning application by Highwood Land (Horndean) Limited and CALA Homes (South Home Counties) (hereafter termed the Clients). The Development, called Land East of Horndean, comprises a mixed use development providing a maximum of 700 homes, a Care Village, employment, community and education land This document is a summary of the Environmental Impact Assessment (EIA) process in non-technical language. The main Environmental Statement (ES) (Volume 1) and the supporting Appendices (Volume 2) contain detailed information on the project and each of the environmental topics considered. 1.2 Environmental Assessment EIA is a formal process by which the likely environmental effects of a project are assessed, and where there is potentiall for a significant negative effect that cannot be avoided, works are identified to lessen the effect (mitigation). The ES reports on the findings of the EIA and sets out those areas where likely significant environmental effects have been identified and the mitigation proposed to lessen predicted effects. It forms an important part of the planning application decision making process Under the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 the Proposed Development is considered to be large enough to require an Environmental Impact Assessment On this basis, topics to be studied as part of the EIA were decided in an informal scoping process which involved consultation with a number of statutory and non statutory consultees, such as the Environment Agency, Natural England and Officers from East Hampshire District Council (EHDC). The outcome of the scoping stage was that the following topics should be included within the assessment: Ecology; Landscape and Visual Impact; Lighting; Socio-economic; Noise and Vibration; Air Quality; Flood Risk and Drainage; Ground Conditions and Contaminated Land; Cultural Heritage; and Traffic and Transport The EIA project team has been led by EIA co-ordinators from WYG, with input from other specialists within the company and from other companies, as set out over the page: Highwood Land (Horndean) Limited, CALA Homes (South Home Counties) and The Borrow Foundation 1

6 Role / Topic EIA Management and Co-ordination Planning Policy Ecology Landscape and Visual Impact Lighting Socio-economics Noise and Vibration Air Quality Flood Risk and Drainage Ground Conditions and Contaminated Land Cultural Heritage Traffic and Transport Author WYG WYG WYG WYG Ramboll WYG Ramboll Ramboll Ramboll Ramboll Ramboll WYG

7 1.3 Site Description Horndean is a town in East Hampshire District with a population of approximately 13,000 people and a full range of employment, retail and leisure facilities to meet the needs of its residents. It is located with access to public transport connections and direct links to the A3(M) The Proposed Development Site adjoins the eastern and southeastern boundaries of Horndean as defined by East Hampshire Local Plan Second Review (2006). The South Downs National Park is located immediately to the east of the Site (for the avoidance of doubt the entirety of the Site lies outside of the National Park). The Site location can be seen in Figure 1. The planning application boundary for the site (also known as the red line boundary) can be seen on Figure 2 over the page The Southern portion of the site straddles the parish boundaries of Horndean and Rowlands Castle There are a number of listed buildings located to the north and the east of the Proposed Development Site The Blendworth Conservation Area lies approximately 300m to the north of the Site The Site is made up, predominantly, of agricultural land with a number of hedgerows and wooded areas. In the southern section of the Site, there is a stream which only flows during periods of prolonged rainfall Figure 3 shows the constraints plan of the site which has been used to establish the developable parts of the site and to define the most suitable locations for the proposed land uses. 3

8 Figure 1 - Site Location Plan 4

9 Figure 2 Redline Boundary Plan 5

10 Figure 3 Constraints Plan 6

11 2.0 The Proposals 2.1 Background and Need The EIA process started when Highwood Land (Horndean) Limited and CALA Homes (South Home Counties) began investigating the potential to develop the Land to the East of Horndean for mixed uses The Site was identified as having good potential l to support the development and was progressed to a more detailed feasibility study that included a site visit, technical consultations, and a planning policy review. This study indicated that the site was potentially technically, environmentally and financially viable for the proposed development, but that further assessment and clarification was needed. 2.2 Alternative Development Scenarios During the design phase of the Development Proposals, a number of different layouts were investigated. The illustrative masterplan showing the final proposed layout of the Development can be seen in Figure 4. Housing Initial layouts for the scheme allowed for approximately 850 dwellings on the site, however, following discussions with the Council and the finalisation of the red line boundary for the site, this figure has been reduced to Initial scheme designs contained a care home, with lower levels of independent living units. However, following the public consultation events, there was a high level of interest in independent living units for people wishing to downsize / retire to, so this has been reflected in the final scheme with a care home and higher numbers of independent living units to address this demand, including the potential for additional facilities to make this an attractive retirement area, such as a restaurant, cinema and gym. Employment Early layouts of the development included employment land to the north and south of Havant Road. However, following public consultation, pre-application discussions with Officers at EHDC and further highways assessments, it was decided that the employment land should be accessed off the improved Dell Piece East to provide better connection to the A3(M) and the Strategic Road network (SRN) and to create better separation between teh employment and residential traffic on site Following a review of the layout and based on consultee feedback, the local centre was relocated to the centre of the site where it would act as a focal point for the new development and where the local retail element would be visible to passing trade along Havant Road. Community Facilities and School The community facilities forming part of the development consist of a community building, sports pitches and allotments Early layouts had all the sportss pitches located together in the north of the Site. It was decided that the sports pitches should be split and that some of the football pitches should be located more centrally in the site where the majority of the population can easily access them. Based on feedback from consultees, the playing pitches, community facilities and Primary School site have been located close to the existing town with easy accesss to Havant Road and the A3(M). The allotments have also been split into two areas for better accessibility. Landscape and Visual Impact Due to the site being located adjacent to the National Park, the layout has been designed to ensure that the scheme does not negatively affect the views. This is achieved by placing low density development along the National Park edge and also by limiting access points from the more rural lanes which define this edge, i.e. Paterson s Lane and Pyle Lane. This approach has also been adopted to ensure sensitive 7

12 relationships with nearby heritage assets which are focussed along the eastern edge and to the north of the site. Ecology The main ecological constraint at the site is the presence of Bechstein s Bats using satellite roosts and foraging along vegetative margins. These are a nationally rare and protected species of bat. Their presence on the site has resulted in the layout being amended to include mitigation in the form of generous buffers, which will be landscaped and designed with these species in mind. These measures will ensure that no negative effects will occur as a result of the development. Noise As the site is located adjacent to the A3(M) theree is the potential for noise pollution, therefore the layout has been designed to consider this. Allotments, which are a type of use less sensitive to noise, have been located adjacent to the A3(M) and an acoustic wall and bund have been incorporated in this area. Also, traffic management measures for the road passing through the centre of the site aim to slow drivers down, which will have safety benefits, but will also reduce noise. 8

13 Figure 4 Illustrative Masterplan 9

14 2.3 Description of the Development Residential uses The development will provide residential dwellings and elderly persons accommodation as follows: Residential uses up to a maximum of 700 residential dwellings (including affordable housing) and a Care village (including a care home, assisted living units and independent living units); Employment Land approximately of 1.7Ha of employment land; Local Centre / Community Facilities a combination of community facilities and local retail / café uses (approximately 1.6Ha), a one-form entry primary school (approximately 1.2 Ha); and, Open Space the provision of up to 21.0 Ha of public open space, including formal open space and areas of informal open space. Employment and Commercial Land It is proposed to provide approximately 1.7 Ha of dedicated employment land to the South of Havant Road. The Care Village and Local Centre uses would also create some employment. Education The development plan includes 1.2 Ha of land South of Havant Road for a one-form entry primary school as agreed during pre-application discussions with Hampshire County Council to address local educational needs. Local Centre / Community Facilities The proposals include approximately 0.4Ha of land for community facilities including a new local community building and local retail/cafe uses. Open Space Approximately 21 Ha of public open space will be provided, including football pitches, cricket facilities (pitch and pavilion building), two areas of allotments and areas of formal parkland and informal woodland and grassland. It is proposed that these areas will be linked via a network of green corridors and foot/cycle paths, providing a range of leisure and recreation opportunities throughout the site. Highway works Following discussion with Hampshire County Council Transport Officers, the main access will be via B2149 Havant Road with further limited access via Rowlands Castle Road and Pyle Lane The scheme will include improvements to road junctions to increase capacity and accommodate additional traffic created by the Proposed Development The development allows for an active street frontage along Havant Road including a demand for residents and visitors to cross between development in the North and South. The speed limit along sections of Havant Road and Dell Piece East will therefore be reduced. This will bring the nature of the road in line with the proposed masterplan and the aspirations of the local community. 10

15 3.0 Consultation 3.1 Approach to Consultation The Clients and their consultants have undertaken extensive discussions with non-statutory consultees including the local community and landowners, and statutory consultees, such as the Environment Agency. The findings from the consultation exercise have influenced the design and scope of the EIA and the overall scheme design. Consultation began at the earliest stage of the development to establish feasibility and has carried on through to the submission of the planning application A number of meetings have been held with Planning Officers from EHDC. The proposals have been discussed in detail and revisions made to the scheme where appropriate In addition to pre-application discussions with the Planning Officers from EHDC, the Client s consultation with key stakeholders has included: Various meetings with other Officers and Members at EHDC; and Meetings with Horndean and Rowlands Castle Parish Councils A Statement of Community Involvement (SCI) has been submitted in support of the Planning Application, which includes full details of the consultation undertaken and the issues raised by respondents Wide ranging public consultation has taken place over a number of months. A project website was set up ( which providedd up to date information regarding the project and proposals and public consultation information. It also invited people to provide comments In addition to this, three public consultation events were held in April, May and July 2014 to provide the general public with an opportunity to view the work undertaken to date, the proposals being put forward and to make comments. The events in April and July were held in Horndean and approximately 500 local residents attended the first event and a further 230 attended the second event. The event in May was held in Rowlands Castle, the parish neighbouring the Site and approximately 40 people attended this event to provide their views. The comments and findings received were fed directly back into the design and planning process and have together helped to inform the final scheme layout. Photo 1 - Public Consultationn 11

16 4.0 Environmental Impacts 4.1 Ecology The Land East of Horndean Site comprises areas of horse grazed grassland with scattered trees. The fields are bordered by hedgerows and ditches. Woodland parcels are present in the southern section of the site including an area of that runs east to west throughout the Development Site. There are areas of Biodiversity Action Plan (BAP) Priority Habitat throughout the Site The most significant ecological factor that has shaped the design of the development is the presence of Bechstein s bats. These have been found to be using some of the trees within the Site on the land to the south-west of Havant Road to roost, as well as many trees in the surrounding area. Bechstein s bats are also using the tree lines and some of the woodland habitat to commute on the land within the Site to the south-west of Havant Road. Bechstein s bats have not been recorded within land to the north-east of Havant Road or land to the north of Rowlands Castle Road. The surveyss have shown that once the Bechstein s bats have emerged, they mainly forage off-site in nearby woodland. In addition to bats; dormice, reptiles (slow worms, common lizards, grass snakes and adders), notable birds and invertebrate species have also been found on the Site. In recognition of the wildlife value of the Site, 30% will be retained and maintained as open space to preserve features such as trees, hedgerows and other BAP habitats It has been recognised that the Proposed Development will cause an increase in recreational pressure on outdoor spaces in the local area. There are four statutory and eleven non-statutory designated sites within 2km of the site (which have public access), so the effects of any increase in recreational pressure will be spread across a number of sites. In addition, where the A3(M) bridge will be opened up as part of the development proposals, it is recognised that this will increase access between the site and Hazleton Common local nature reserve. A financial contribution is therefore to be provided to Hazleton Common Local Nature Reserve so that measures can be put in place to upgrade the footpaths to alleviate pressures from increased recreational use Should outline planning permission be granted, further radio-tracking of the Bechstein s bats will also be completed during the 2015 bat survey season, which will supplement the radio-tracking completed in The radio-tracking work undertaken to date is considered sufficient for an outline planning application to help establish the acceptability of the principle of development. The further survey work is intended only as an update of existing data and to refine the mitigation proposals at detailedd design stage. In addition, an Ecological Mitigation and Management Plan will be produced to protect the notable species and habitats throughout the lifetime of the development The changes which will be experienced as a result of the Proposed Development are substantial but appropriate mitigation has been recommended during the construction and operation of the development to reduce these effects. It is concluded that once the ecological mitigation package is i implemented, together with the long term monitoring program, the Proposed Land East of Horndean Development should have limited long term ecological impacts. 4.2 LVIA A Landscape and Visual Impact Assessment (LVIA) has been carried out to consider the effects of the Proposed Development on landscape The assessment concluded that potential landscape impacts vary in magnitude. Negative impacts on the landscape and vegetation would occur for short periods during construction. Some adverse impacts on the landscape would occur at the adjacent edge of the South Downs National Park, Blendworth Conservation Area, nearby dwellings located in rural areas, and public footpaths and to public road users. 12

17 The scale of impact varies considerably depending on distance from the Site and which part of the Development is being constructed In the longer term, the Proposed Development provides green spaces and public routes. Such routes would benefit future residents of the Site and existing residents of Horndean, Blendworth and the wider area. These improvements would help to balance out a proportion of the adverse impact of the Development Visual effects are generally negative due to the scale of change in views, but there are opportunities to mitigate visual impacts by screening views of the Development. These measures have been incorporated into the masterplan in the form of a landscape or green infrastructure strategy. The arrangement and form of buildings, particularly along the edges of green spaces would create visual interest and reduce the apparent scale of development. Proposed planting would also help the Proposed Development become integrated into the landscape. 4.3 Lighting A lighting assessment was undertaken following industry standard guidance to consider the effects of additional lighting on the existing environment at both the construction and operational phase. A number of potential effects have been identifiedd in terms of local residents and in particular sensitive ecological receptors, including Bechstein s bats At the construction phase of the development additional lighting will be introduced to light works particularly during winter months. Due to the measures to be incorporated in the design through tools such as the CEMP which will provide controls to types, locations and methods of construction lighting, the impact on receptors will not be significant and will only be temporary for the duration of the works At the operational phase, lighting effects on non-ecological receptors have been determined to be not significant, given the design considerations set out in the lighting strategy. However, given the sensitive nature of the ecological receptors the lighting effects will potentially have a significant adverse effect as a result of the development, particularly at Dell Piece Way East where the lighting level of 1 lux is exceeded. In order to address this additional detailed design considerations will need to be made at the reserved matters stage of the application, including the appropriate spacing of columns or termination of lighting in advance of the junction, further mitigation might be in the form of louvers reducing light spill and viewed intensity and finally lighting could be controlled on a demand basis using a sensor or dimmed with CMS control of pre-programmed ballasts. Once this mitigation is i in place the significance of the effect is reduced so that the effect is no longer significant in EIA terms. 4.4 Socio-economic The proposals will provide a comprehensive mixed-use development to include a wide range of new housing and employment creation to meet the Council s strategic objectives for Horndean In terms of job creation, the dedicated employment land, local centre, primary school and Care Village will generate up to 4,200 new jobs 3,500 jobs at the construction phase and approximately 675 jobs at the operational phase as follows: 1.7 Ha of Employment Land (based on office use) Local Centre - 12 Primary School - 31 Care Village The proposals will provide up to 700 new homes, which will provide the majority of the housing requirement for Horndean; and make a significant contribution the district-wide housing needs. In addition, the housing provided will help to address an identified shortfall in housing land supply, which will limit opportunities for speculative proposals and mean that development comes forward in a planned and sustainable manner. 13

18 4.4.4 In terms of social benefits, the proposed local centre will include a community building, local retail and restaurant/cafe uses. This will be a focal point for the new development, providing opportunities for social integration and community building between the existing community of Horndean and new residents. The proposals will also include the provision of a wide range of open space and recreational facilities, including allotments, cricket facilities and football facilities, which will provide further opportunities for social interaction and encourage healthy and active lifestyles. 4.5 Noise and Vibration Noise and vibration effects associated with the Proposed Development have been determined as part of the EIA The assessment has considered existing receptors in the vicinity of the Application Site and also new receptors forming part of the Proposed Development. Due to the phased nature of the development, it is intended that dwellings whichh form part of the initial phases of the development will be occupied whilst subsequent phases are being constructed The noise climate across the Application Site has been established through a baseline noise survey, with six monitoring positions which measured the noise levels over a seven day period. The main noise contribution in the area of the Application Site was found to be road traffic on the adjacent road network The assessment of effects has considered both construction and operational phases of the Proposed Development, with mitigation measures introduced as necessary The construction phase assessment has identified that there is potential for significant effects to occur when construction works are being undertaken in close proximity to surrounding sensitive receptors, although the exposure to elevated levels of noise and vibration will be limited in duration. A range of mitigation measures will be adopted to minimise and control the noise and vibration generated by the construction activities Proposed Development buildings which are located in the vicinity of the site boundary will be exposed to high noise levels due to their proximity to road traffic. To account for this, mitigation will be adopted to ensure appropriate noise levels within internal and external amenity areas. 4.6 Air Quality An air quality impact assessment of the likely environmental effect of the Proposed Development has been undertaken. It considered the likely effects of dust arising during the construction phase and exhaust emissions from vehicles travelling to and from the Site during the construction and operational phases Air quality monitoring around the Site showed that air-borne pollutants along the roadside, such as vehicle exhaust and dust, are within UK air quality standards. It was also shown that the air quality at residential sites around the Site was within the UK standards. The EIA assessment concluded that it is likely that the air quality at the Site will also be within the UK standards Good site working practises such as; sheeting Heavy Goods Vehicles (HGV), controlling site speed limits and damping down during dry periods, will ensure dust generation will be kept to a minimum during the construction period. This should ensure no impacts occur on properties in the general area of the Proposed Development. However, a contact number will be provided should any air quality issues arise in order for appropriate actions to be taken. 4.7 Flood Risk and Drainage A flood risk and drainage impact assessment has been undertaken to consider the likely effects of the proposed development in terms of flood risk, surface water management and foul water drainage. It assessed the effect of flood risk to the development from river 14

19 flooding, the effect of surface water runoff from the development on downstream receptors and the quality of the local water environment. It considered the flood risk associated with the construction phase and the effect on foul and surface water infrastructure The site is currently Greenfield and drains to existing drainage ditches. The majority of the site is considered to be at low risk of flooding from local water sources. There is a moderate risk associated with the seasonal stream contained within a perforated land drainage pipe crossing the site. Opening up the stream and re-profiling the site to provide storage in high intensity storms, as proposed as part of the Development, is likely to reduce downstream flood risk and provide ecological benefit Potential negative effects associated with the construction phase include the potential for pollution to enter the local waterbodies. However, good site practice measures such as silt traps, coverings to stockpiles, and bunded fuel storage areas would reduce these impacts to a low overall impact The development would increase the impermeable areas on the site, which when combined with the predicted effects of climate change on rainfall levels over the lifetime of the development, would increase surface water runoff from the site. However, the Scheme includes mitigation measures in the form of swales, filter drains, permeable pavements, attenuation tanks and wetlands providing reductions in flow rate and improvement to water quality. As a result there would be a low overall impact from the development upon surface water runoff and off-site flood risk Sufficient treatment is incorporated for both the sensitivity of the receiving watercourse and the nature of the development; it is considered that the development would have a low overall impact on water quality Consultation with Southern Water is being undertaken to ensure that adequate infrastructure is provided for the management of increased foul water flows generated by the site. Further details on the water infrastructure will be provided future planning application. at the reserved matters stage of any 4.8 Ground Conditions and Contaminated Land An assessment of the likely significant environmental effects of the Proposed Development has been undertaken. The underlying geology, hydrogeology and hydrology have been taken into account, and the potential for contaminated land at the Site has been assessed A review of the Contaminated Land and Geotechnical Desk Study and Site history revealed a number of potential sources of contamination, such as; fly-tipped waste disposed of on-site; historical agricultural use; the storage of agricultural machinery; Made Ground on-site including a mound surroundedd by old oil drums; old chemical barrels and tractor oil tubs scattered around the Site; and surrounding land use including the B2149 that crosses the Site, the A3(M), Horndean Oilfield, a Gas Distribution Station and an oil well to the Northeast. Three historic landfills are located close to the Site, Padnell Farm to the South, Pyle Farm and Five Heads Farm to the East, and Dell Piece West Landfill to the Northwest. The historic landfill sites could potentially act as a source of ground gas or leachate, which could migrate into the Site area during the construction and operation phases There is a risk on-site of disturbing previously undiscovered solution features, and the formation of new solution features; this is due to the solubility of the underlying Tarrant Chalk Bedrock in the North and Lambeth Group in the South A joint contaminated land and geotechnical ground investigation has been proposed that will confirm the ground and groundwater conditions, with six rounds of ground gas monitoring that will allow the confirmation of the ground gas regime in accordance with CIRIA C665 guidance. The findings of the ground investigation will inform the design of any mitigation deemed necessary for the project. 15

20 4.9 Cultural Heritage A cultural heritage impact assessment of the effects of the Proposed Development has been undertaken, based on the findings of a Desk- Based Assessment and geophysical survey of the Site. This found that the likely effects during the construction phase will be on any below- those parts of the ground archaeological deposits which exist within Site which will be subject to groundworks. An Archaeological Mitigation Strategy has been designed to guide the mitigation for reducing the impact on archaeology in the area. Following adoption of this strategy, effects to the Site s archaeological resource are predicted to reduce, however, some will remain significant For the operation of the Proposed Development, likely low level effects are limited to those associated with the change in the setting compared to adjacent heritage features. These include undesignated parkland associated with Blendworth Lodge and Cadlington House, Listed Buildings adjacent to the Site at Pyle Farm and at Hook Cottage as well as an undesignated late 19th century house known as Blanchards Traffic and Transport The Highways, Traffic and Transport Chapter assessed the impacts of the Proposed Development on the surrounding highway network, public transport and pedestrian/cycle environments The assessment considered the impact of the additional traffic generated by the Proposed Development in the context of walking, cycling, public transport and the highway network A wide ranging package of highway mitigation measures is proposed to accommodate the multi-modal traffic movements. This includes: New access points into the Proposed Development including a new roundabout on Havant Road; An upgraded roundabout at Havant Road / Dell Piece East to accommodate the additional traffic; New signalised crossings on Havant Road and Dell Piece East to encourage pedestrian movement; Dedicated left turn from Dell Piece East onto southbound on-slip of A3(M); Signalisation of northbound off-slip from A3(M) to improve capacity; New footways on Havant Road, Dell Piece East and Rowlands Castle Road; Internal footpaths / cycle paths providing links to existing footways and public rights of way; and Creation of a pedestrian / cycle route from the Proposed Development to Morrisons The mitigation measures have been considered in terms of highway capacity, pedestrian and cycle movement and impact on public transport. The proposed measures, as described above, fully mitigate against the predicted levels of traffic generated by the Proposed Development and the assessment shows that in the development completion year of 2020, all junctions would operate within capacity. Equally key pedestrian and cycle desire lines have been considered and new footways and cycle routes are proposed to link the Proposed Development with Horndean Precinct, Morrisons and bus stops. 16

21 5.0 Summary 5.1 Conclusions The ES has considered how the environment and would be affected by the development A range of potential environmental effects have been predicted to occur as a result of the development, both positive and negative. However, mitigation and compensation measures have been identified to appropriately reduce, minimise or offset any potential negative environmental effects Once these measures have been implemented a small number of significant effects will remain only at the construction phase of the development. These are: Construction Noise: Effects on local residents up to 50m from the works during the construction of the development; Construction Vibration: Effects on local residents in close proximity to the works during construction; Construction Archaeology: Damage or removal to below ground; and the local community archaeology remains Construction Heritage: Removal of an area of Parkland in Parcel A Whilst these effects are considered significant, the noise and vibration effects are only temporary and will only affect residents when they are within 50m of the particular phase of constructionn works, and the level of significance decreases the further away the resident is. The archaeology effects are reduced as far as possible through the comprehensive Archaeological Mitigation Strategy (AMS) specified, which will ensure that all finds will be protected and recorded should they be found as part of the trial trenching or construction works. However at this stage it is unclear whether they are present. The effect on the heritage assets of the site has been minimised as far as possible and through the design of the scheme which ensures that the development is as sensitive as possible on the existing heritage. The area of parkland lost actually only forms 12% of the overall area of parkland in the wider area and so the effect whilst being significant locally, is less significant in the wider context of the area In addition to these significant adverse effects, the development will also provide a number of significant beneficial effects in socio-economic terms through job creation, provision of homes (including affordable) in an area of identified need and development of a wide range of new community facilities and open space. 5.2 Management of Environmental Impacts The impacts of the construction activities will be managed through a Construction Environmental Management Plan. This will ensure that working hours, traffic management, control of pollution, waste management, noise, dust and vibration are all managed and controlled. Other mitigation includes an Ecological Mitigation and Management Plan, an Archaeological Management Strategy and a Geotechnical and Contaminated Land Investigation. 5.3 What happens next? Prior to making a decision on the planning application, EHDC will seek advice from statutory and non-statutory consultees as part of the determination process for the submitted planning application EHDC will make the full Environmental Statement available for examination by members of the public at the Council s offices. 17

22 Printed copies of the Non-technical Summary and ES (including figures and appendices) may be obtained from: The Pavilion, 1st Floor, Botleigh Grange Office Campus, Hedge End, Southampton, Hampshire, SO30 2AF Tel: The Non-technical Summary is available free of charge, and a limited number of hard copies of the Environmental Statement are available for 350* per copy (plus p&p). Alternatively, these documents are available as adobe acrobat files on CD from the same address at 25 (plus p&p) per copy or can be downloaded from the client s website ( Copies of the ES may also be viewed on East Hampshire District Council s online services ( * Includes 18

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015 Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M) 1. Welcome Bloor Homes welcomes you to today s Public Exhibition relating to development proposals for Land to the East of Horndean. Idsworth Close Rowlands Castle Road Roa d Dell Piece East J2 Pyle Farm

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016 Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement September 2016 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment...

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES WELCOME Thank you for coming to our consultation event to find out more about our emerging proposals for Hayfield Park, a residential development jointly promoted by the Hayfield Consortium: Martin Grant

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PUBLIC CONSULTATION YOUR VIEW MATTERS TO US LOCATION PLAN Thank you for taking the time to read this information leaflet regarding a proposed residential

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Inert Recycling (UK) Ltd Boxgrove Quarry Restoration Environmental Statement

Inert Recycling (UK) Ltd Boxgrove Quarry Restoration Environmental Statement November 2013 Non-Technical Summary Empress House, 12 Empress Road, Lyndhurst, SO43 7AE Tel: 023 8028 3226 Email: waste.enquiries@wyg.com Introduction Background EIA is a process by which the environmental

More information

Applicant: Mr C Fletcher Agent: Ms B Stala Case Officer: Sally Smith (HBC) Jill Lee (WCC) Ward: Stakes Parish Southwick and Widley

Applicant: Mr C Fletcher Agent: Ms B Stala Case Officer: Sally Smith (HBC) Jill Lee (WCC) Ward: Stakes Parish Southwick and Widley Site Address: Berewood Phase 2 Development Site, London Road, Purbrook, Waterlooville Proposal: Reserved Matters Application for landscaping of Phase A of the Town Park (under Condition 6(i)d)), together

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION Proposed Residential Development YOUR VIEW MATTERS TO US PROPOSED RESIDENTIAL DEVELOPMENT AREA Thank you for taking the time to read this information

More information

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE Land adjacent Sandy Lane WALTHAM CHASE Existing Linden Homes developments Welcome Welcome to Linden Homes Southern s ( Linden ) public exhibition about its proposals for a range of high-quality homes for

More information

Buckinghamshire Aylesbury Woodlands Advantage Ltd Aerial View from West

Buckinghamshire Aylesbury Woodlands Advantage Ltd Aerial View from West The proposed Aylesbury Woodlands site is located to the east of Aylesbury and is being promoted by Buckinghamshire Advantage, which is the infrastructure delivery arm of Buckinghamshire Thames Valley Local

More information

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history... Board 1 A message from Satnam... Thank you for attending today s public consultation about proposals to develop a new residential neighbourhood at. The display boards show why the development is needed

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Welcome to our public exhibition

Welcome to our public exhibition About our scheme Welcome to our public exhibition Taylor Wimpey East Anglia intends to submit a detailed planning application for a new residential development of 39 high-quality homes at the B&M Concrete

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

The Gwennap Parish Vision Statement

The Gwennap Parish Vision Statement QUICK GUIDE What is a Neighbourhood Development Plan? Ultimately it is a document used by developers or anyone wishing to submit a planning application that describes the vision, strategy, plans, regeneration,

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary PINEWOODS HOLIDAY PARK: HORSE PADDOCK June 2014 1 Introduction 1.1 The existing Pinewoods Holiday Park is located approximately 1 km to the north of Wells-nextthe-Sea on the north Norfolk coast. Pinewoods

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

Welcome to our public consultation

Welcome to our public consultation About our development Welcome to our public consultation This exhibition gives you the chance to view and comment on our proposals for a residential development of up to 187 high-quality homes, along with

More information

Development of Land at Thorp Arch Estate, Wetherby. Environmental Statement Non-Technical Summary July 2013

Development of Land at Thorp Arch Estate, Wetherby. Environmental Statement Non-Technical Summary July 2013 Development of Land at Thorp Arch Estate, Environmental Statement July 2013 Contents 1. Introduction... 3 1.1 Background... 3 1.2 Environmental Assessment... 3 1.3 Site Description... 4 2. The Proposals...

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016 CONTENTS CONTENTS... i 1 Introduction... 1 2 The Proposed Development... 3 3 Need and Alternatives

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

Hunts Grove, Gloucestershire

Hunts Grove, Gloucestershire Hunts Grove, Gloucestershire Environmental Statement Non Technical Summary February 2007 ISSUING OFFICE OXFORD T: 01865 887050 F: 01865 887055 E: info@lda-design.co.uk HUNTS GROVE, GLOUCESTERSHIRE ENVIRONMENTAL

More information

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation. Story Homes An Introduction to Story Homes Founded by Fred Story in 1987, Story Homes has a long and successful reputation of building high quality and high specification homes. The family owned business

More information

GREENBANK DEVELOPMENT MASTERPLAN

GREENBANK DEVELOPMENT MASTERPLAN DEVELOPMENT MASTERPLAN POTENTIAL TRAIN STATION COMMUNITY CENTRE Greenbank will be a connected masterplanned community providing easy access to local and surrounding amenity. Affordable quality homes, green

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES

WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES Technical studies will be undertaken to inform the master planning process for the Waterloo precinct to develop a Precinct Proposal to redevelop the

More information

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your address

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your  address Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April 2014 Your name Your email address Please either: - complete this feedback form and put it in the box before leaving the Memorial Hall

More information

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us HARDWICK GREE, King s Lynn Welcome to our Exhibition Welcome to our exhibition, which is being held to provide you with the opportunity to understand and comment upon our proposals for new residential

More information

LAND OFF TOLLBAR WAY, HEDGE END PUBLIC CONSULTATION. Proposed Residential Development

LAND OFF TOLLBAR WAY, HEDGE END PUBLIC CONSULTATION. Proposed Residential Development LAND OFF TOLLBAR WAY, HEDGE END PUBLC CONSULTATON Proposed Residential Development YOUR VEW MATTERS TO US PROPOSED STE AREA Thank you for taking the time to read this information leaflet regarding a proposed

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Introduction An application for outline planning permission has been submitted

More information

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD Proposals for land at Smug Oak Lane BRICKET WOOD Previous Linden Homes and Wates Developments scheme Welcome Welcome to Linden Homes and Wates Developments public exhibition. Working together as joint

More information

WELCOME LAND EAST OF TYE LANE, WALBERTON. Above all, it s about people

WELCOME LAND EAST OF TYE LANE, WALBERTON. Above all, it s about people WELCOME Welcome to this public exhibition relating to our draft residential proposals for the land east of Tye Lane, Walberton. Today gives you the opportunity to have an active role in shaping these ideas

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council

More information

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows:

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows: Appendix A Stakeholder presentation + powerpoint slides Planning Context and Emerging Proposals presentation Nick Tyrrell, Alder King, Planning Consultants Alder King began by setting the site context

More information