MEETING PURPOSE AND OVERVIEW
|
|
- Arron Richardson
- 5 years ago
- Views:
Transcription
1 MEETING PURPOSE AND OVERVIEW On February 23, 2012, the City of Elk Grove hosted the first of two community workshops related to the Southeast Policy Area. The workshop was held from 6:00 8:30 p.m. in the Elk Grove Council Chambers at 8400 Laguna Palms Way. Approximately 25 participants attended the workshop, which was facilitated by members of City staff including Taro Echiburu, Planning Director, and Christopher Jordan, Planning Manager. The goal of the meeting was to introduce the project to the community and receive input on assets and opportunities and related land use, amenities, and circulation improvements. The initial overview included orienting participants to the location and size of the property, reviewing past planning efforts and the project s background analysis, and providing an overview of the scope and timeline of the land use planning effort. Participants were also reminded of the many avenues to provide input and stay involved throughout the planning process, including through an innovative project website administered through MindMixer at Desired meeting outcomes included: To develop a list of possible land uses to be further explored for the project area. To receive direction from the community regarding project area vision, community oriented facilities, circulation, and other possible improvements. Gather direction to help develop up to three land use alternatives. After a brief welcome and introduction of project staff, Mr. Echiburu gave an overview of the purpose for the meeting and outlined the evening s agenda. Participants were introduced to the planning process and given an explanation of the project goals and its schedule. The group was then provided with an overview of the small work group breakout activities designed to foster input on the opportunities for the project area through an interactive land use activity. CITY OF ELK GROVE 1
2 SMALL WORK GROUP BREAKOUT ACTIVITIES ASSETS AND OPPORTUNITIES & LAND USE MAPPING ACTIVITIES Meeting participants broke out into three small work groups to provide input on assets and opportunities within the project area. Each group was given a project area map, General Plan Land Use and Existing Zoning Map, and an assets and opportunities diagram or base map and one large format poster with room to write notes. Each group was facilitated by one member of City staff who recorded comments on a flip chart. Once participants shared their thoughts about the assets and opportunities for the site, they were led through a land use mapping activity. Each group was given 24 potential land uses (which were derived from the background analysis and market study, and included an Other option to provide new ideas) printed on stickers, and asked to agree on the top land uses that would be most viable for the project area and place them in the appropriate location. The potential land uses included: Public plazas, Mixed use buildings, Small Lot Residential and Condos/Apartments, Retail/Commercial and Office, Civic/Cultural, Restaurants/Cafes, Neighborhood and Community Parks and Community Gardens, Sports complex/facilities, and Other. In addition, the group collaborated on a potential circulation system throughout the site (for pedestrians, bikes, cars, and a potential light rail line planned in the area) and to surrounding uses. At the end of the exercise, representatives from each group presented their completed maps highlighting their desired mix of land uses and key opportunities. The land use maps were left on the tables after the presentations to allow participants to view them close up after the workshop. The land use activity produced many great ideas for the type of land uses that should be pursued in the plan area. A common theme among the three groups was ensuring there were places for job generating uses and community facilities, including: Office Parks/Professional Office and Light Industry. Multiuse paths emphasizing pedestrian and bike travel. Focusing highest density and intensity of development around major intersections and potential transit stops. 2 CITY OF ELK GROVE
3 A unique land use type that provides a local benefit but can also draw visitors regionally to the area and the City of Elk Grove something that gives people a reason to visit and stay in Elk Grove. Each group came up with a great concept that supports this idea, described in the summaries in the next section. The following is a record of the comments received from each of the groups and the community land use concepts they came up with, which are illustrated on the corresponding land use map. Community Group A Comments and Land Use Concept Generate jobs! Consider light industry (e.g., industries in Roseville) Locate job generating uses (office parks/light industry) along Kammerer Road Consider what will draw businesses to the area? Great schools Range of housing opportunities Community amenities (parks and open space) Locally oriented shops COMMUNITY GROUP A LAND USE CONCEPT Provide job training facilities (e.g., medical/nursing) Encourage a better job housing balance with more job opportunities offering living wage jobs Capitalize on college in close proximity and provide jobs, housing and commercial opportunities to support the college Encourage start ups Consider a Theater District supported by a mix of retail and housing in the northeast corner of the site Community draw Young professionals Encourage community oriented uses in close vicinity of existing homes Promote mixed use with housing above retail uses CITY OF ELK GROVE 3
4 Do not allow low density residential along major roads Encourage high density residential along major corridors Consider how will potential light rail influence? The location/path could be phased, starting initially as a multiuse pedestrian/bike path and building up from there Big Horn corridor is a valuable link to college Route light rail down Big Horn all the way to Kammerer Road where planned improvements will widen roadway, and light rail can act as buffer Create a transit corridor with retail, jobs, and multifamily residential Reduce roads Community Group B Comments and Land Use Concept Keep agriculture and incorporate into site Some ag. land has been destroyed but preserve and respect cultural history where possible Promote agriculture that attracts tourists Harry & David art gallery Wineries Viticulture Dairy COMMUNITY GROUP B LAND USE CONCEPT Agriculture next to residential = conflict with noise and smell May not be complementary Encourage something like a Pike s Market Cheese instead of fish? Something that will draw people Nature conservancy, Stone Lakes Tie this in! Bird watching 4 CITY OF ELK GROVE
5 Environmental research Consider institutional land uses (e.g., Elk Grove Medical) Allow/encourage live/work uses Need to generate jobs Encourage more state jobs Consider what SACOG says for jobs in this area? Encourage high density housing for youth and seniors High quality affordable housing for young married couples More residential will bring need for schools Make sure land uses fit into surrounding areas Integrate soccer fields (e.g., Field of Dreams) There may be some concern over more traffic Well planned sports facility With lots of sports and fields If city doesn t put up money this could be difficult Go back to Elk Grove roots Village feel!/walkable Make sure amenities are quality Keep current location of drainage ditch Could be a potential for bike/ped trail CITY OF ELK GROVE 5
6 Community Group C Comments and Land Use Concept Midtown lifestyle Follow the grid keep straight streets, there are enough curving streets Pull development to the street (e.g., townhomes and walkable retail) Cater to community needs Encourage parks (e.g., Prospect Park) Save trees Organic farming nearby Consider a medical college campus Bring in office jobs. Create business parks. Have some low density residential nearby Executive housing Professional office Medical row COMMUNITY GROUP C LAND USE CONCEPT Consider a large sports complex with a regional draw Encourage travel commercial services along Highway 99 Consider changing residential needs, product changes Encourage mixed use opportunities along transit Consider mini golf 6 CITY OF ELK GROVE
7 SUMMARY OF WORKSHOP INPUT Common Land Uses. The small group activities provided a great foundation from which to develop three distinct community land use concepts. There were many proposed land uses that were consistent between the three groups including: Professional office both within office parks and located above retail in vertical mixed use buildings Mix of residential types and densities including affordable workforce housing Focusing medium to high density transit oriented development (housing, office, and retail) within close vicinity of potential light rail transit stops College facilities that could provide job training opportunities building off of the college campus in close proximity Medical facilities Community oriented uses including community gardens, parks and sports facilities, and multiuse paths within walking distance of the majority of housing Unique Vision. Each group also came up with a unique vision or theme. Community Group A s Vision The unique community and regional draw that was envisioned in this group was to consider a theater district in the northeastern corner of the plan area that can provide space for a range of civic and cultural activities including a live theater and supporting uses. The group agreed that this type of use is currently missing in Elk Grove. It would be important to locate a mix of residential and retail uses within close proximity of the civic/cultural uses connected with multimodal paths. Group A also decided to route the potential light rail line down Big Horn Road to Kammerer Road and line Kammerer Road with office parks, light industrial uses, and mixed use development with a mix of residential uses over retail. Community Group B s Vision This group s distinct vision for the plan area was focused around respecting the cultural and historic character of the plan area and providing space for land uses that can build off of that theme. To that end, the southwestern portion of the plan area was designated as agricultural use that could support viticulture linked with wineries and or educational/training facilities, sustainable harvesting of the land (potentially including orchards that allow customers to pick their own fruit), cheese production and sale at small retail use, and amenities that encourage activities to enjoy nature such as bird watching. In addition, Group B was interested in creating a village feel with land uses that support the community, including a sports facility that resembles the field of dreams concept with soccer fields for the youth. Community Group C s Vision Group C emphasized the need for job generating uses and educational/training facilities with a regional draw by considering land uses with large footprints including a college campus and large sports complex that could potentially house a professional soccer stadium. CITY OF ELK GROVE 7
8 The group also valued ample space for professional offices and research and development (R&D) facilities. A mix of residential densities and community oriented parks were also considered for the plan area. MEETING CONCLUSION At the conclusion of the meeting, staff provided information about next steps, how the workshop results would be used, and how participants could stay involved in the project. Participants were encouraged to access and sign up on the MindMixer project site (a station introducing the MindMixer site live online and the opportunity to sign up was actually available at the workshop, Attendees were welcomed to stay and ask questions of staff and also to review the work from the breakout groups. Workshop participants were then informed of the next community workshop, planned for March 29, when they can review the refined community land use concepts. At that workshop the community will work collaboratively to identify key features that ultimately will be represented in a preferred concept to be presented to the Planning Commission and City Council for approval. 8 CITY OF ELK GROVE
BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT
August 2018 Page intentionally left blank The Brooklyn Park Library adjacent to the 85th Ave LRT Station Area. OVERVIEW The Blue Line LRT Extension / Bottineau corridor offers a unique opportunity to leverage
More informationNORTH LAKE SPECIFIC PLAN AREA
NORTH LAKE SPECIFIC PLAN AREA June 21, 2018 WELCOME Workshop Agenda Introduction Provide information about the program and introduce the team Background Information Share information about the North Lake
More informationELK GROVE GENERAL PLAN VISION
2-1 CHAPTER 2: 2-2 CREATING OUR The Community Vision for Elk Grove, expressed through a Vision Statement and a series of Supporting Principles, is a declaration of the kind of community that Elk Grove
More informationSummary Community Workshop #6 Beacon Day School Saturday, November 14, :00 a.m. 12:00 p.m.
Summary Community Workshop #6 Beacon Day School Saturday, November 14, 2009 9:00 a.m. 12:00 p.m. Workshop Format and Process The City of Oakland is preparing a Specific Plan that will help define and determine
More informationDRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor
CHAPTER 5 Figure 5.23 The Road Corridor Road will develop as a mixed-use corridor, emphasizing regional retail, west of the river and mixed-use development east of the river. KEY RECOMMENDATIONS 1. High
More informationSt. Louis Park Wooddale LRT Station Site development guidelines
St. Louis Park Wooddale LRT Station Site development guidelines November 2013 OVERVIEW St. Louis Park s convenient location as a neighbor to Minneapolis means you re only minutes away from some of the
More informationSLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION. RPM TOD Plan Update
SLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION 1 SLIDE TITLE AGENDA Project Introduction TOD s and Development Trends Real Estate
More informationWORKSHOP PURPOSE PERRY COMPREHENSIVE PLAN COMMUNITY WORKSHOP APRIL 4 TH, 2013 WHAT IS A COMPREHENSIVE PLAN? AGENDA
WORKSHOP PURPOSE PERRY COMPREHENSIVE PLAN COMMUNITY WORKSHOP APRIL 4 TH, 2013 Provide background information on the Perry Comprehensive Plan Tap the expertise of the local experts (YOU!) Understand what
More informationGold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan
Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated
More informationPort Lavaca Future Land Use
Port Lavaca Future Land Use Introduction The City of Port Lavaca is beginning to see sustained growth, after many years of relative stable population. New single family homes, apartments, and businesses
More informationNeighborhood Districts
NEIGHBORHOOD DISTRICTS SEVEN MAIN DISTRICTS Neighborhood Districts While the Development Plan provides a broad-scale overview of the neighborhood, this section focuses on uses and relationships at the
More informationTHE NEIGHBORHOOD TODAY
THE NEIGHBORHOOD TODAY CORE AREA VISION How are we Good Urbanism A Site s DNA thinking about Elements of great Unique elements urban communities embedded in a place the site and design? ELEMENTS LIKE:
More informationHockessin Community Redevelopment Plan
Hockessin Community Redevelopment Plan 3.1 Introduction The Community Redevelopment Plan for the Village of Hockessin is the result of the people s vision for a distinct village center that serves as the
More informationVIRGINIA / LAKE HIGHLAND TRANSPORTATION AND LAND USE STUDY
VIRGINIA / LAKE HIGHLAND TRANSPORTATION AND LAND USE STUDY COMMUNITY MEETING #2 - PRESENTATION OVERVIEW 1 INTRODUCTION 2 CONTEXT STUDIES 3 VISION FRAMEWORK 4 DEVELOPMENT SCENARIOS 2 1 INTRODUCTION Project
More informationThe University District envisions, in its neighborhood
Envisioning the University District Link Light Rail in Seattle s neighborhoods CIY OF SEALE CONCEP-LEVEL SAION AREA PLANNING RECOMMENDAION RESOLUION # 30165 EXHIBI L Vision 08.2000 he University District
More informationConcord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)
Concord Community Reuse Project Goals and Guiding Principles Overarching Goals (OG) No priority is implied by the order of presentation of the goals and guiding principles. Overarching goals for the Concord
More informationAldershot GO Draft Mobility Hub Concepts. East Plains United Church September 13, :30 8:30 pm
Aldershot GO Draft Mobility Hub Concepts East Plains United Church September 13, 2017 6:30 8:30 pm Today s Agenda 6:30pm: 6:35pm: 7:10pm: 8:10pm: 8:25pm: Opening Remarks Rosa Bustamante, Manager Mobility
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationSmall Area Plan. South Gateway
Small Area Plan Adopted May 12, 2008 South Gateway Purpose. The South Gateway Small Area Plan defines the City s expectations for the future of the southern entrance to the City at Interstate 85 and Highway
More information1.0 VISION STATEMENT. December 6, PRINCIPLES
Vision Statement Lincoln Regional Airport 1.0 VISION STATEMENT 1.1 City LOCATION of AND OVERVIEW The Easton Lincoln Place Land Use Master Plan identifies the principles, goals, policies, and standards
More information1 October Dear Citizens of Charlotte and Mecklenburg County,
1 October 2011 Dear Citizens of Charlotte and Mecklenburg County, As co-chairs of the Center City 2020 Vision Plan Steering Committee, we are proud to present the Center City 2020 Vision Plan, which sets
More informationHopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins
Hopkins Blake Road LRT Station Area Development Guidelines May 2015 Sponsored by: Blake Road Corridor Collaborative City of Hopkins Overview Hopkins is a dynamic community of over 17,000 residents located
More informationClair-Maltby Community visioning
Clair-Maltby Community visioning workshop #1 Summary April 27th, 2017 Table of Contents INTRODUCTIon 1 PURPOSE 1 CONSULTATION STRUCTURE 2 PARTICIPANT FEEDBACK 3 VISIONING EXERCISE 8 ONLINE SURVEY RESULTS
More informationCommunity Meeting #2.1
Community Meeting #2.1 Thursday, October 20, 2016, 7:00 p.m. to 9:00 p.m. Eliot Elementary School, 475 Old Gilroy Street, Gilroy, CA 95020 Meeting Summary The City of Gilroy held its third community meeting
More informationSahuarita District & Phase 1 Master Plan. Town Council December 11, 2017
Sahuarita District & Phase 1 Master Plan Town Council December 11, 2017 Visioning Study Visioning Process Advisory Group Meetings Community Questionnaire Town Center Case Studies Community Analysis The
More informationUrban Planning and Land Use
Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning
More informationJeff Brasel, Senior Planner, Community Planning and Development Analiese Hock, Senior Planner, Community Planning and Development
To: From: Jeff Brasel, Senior Planner, Community Planning and Development Analiese Hock, Senior Planner, Community Planning and Development Ascendant Capital Partners Date: February 21, 2017 Re: Summary
More informationPLAN ELEMENTS WORKSHOP. April 5, 2016
PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly
More informationEnvision Front Royal Workshop 1 of 2
Envision Front Royal Workshop 1 of 2 September 12, 2013 Summary The Envision Front Royal project held the first of two public workshops on September 12, 2013. The purpose of the workshop was to evaluate
More informationAtlanta BeltLine. Subareas 9 & 10. Master Plan Updates. March 26, Washington Park Jamboree 1
Atlanta BeltLine Subareas 9 & 10 Master Plan Updates March 26, 2018 Washington Park Jamboree 1 22 miles, connecting 45 neighborhoods 22 MILES of transit 46 MILES of streetscapes and complete streets 33
More informationChapter 1.0 Introduction
Chapter 1.0 Introduction 1.1 Background The North Metro commuter rail line is part of the RTD FasTracks regional transit system expansion program to build more than 100 miles of rail transit throughout
More informationCity of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004
City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual
More informationComprehensive Plan Advisory Panel Meeting #3
Comprehensive Plan Advisory Panel Meeting #3 November 7, 2016 Agenda 1. September 19 th Meeting Notes 2. Summary of Focus Areas Charrette 3. Heart of the City Focus Area a. HOC2/Station Areas Concept &
More informationDALY CITY VISIONING PROCESS COMMUNITY WORKSHOP 3 MAY 8, 2008
DALY CITY VISIONING PROCESS COMMUNITY WORKSHOP 3 MAY 8, 2008 PROCESS General Plan - a statement of the community s values, vision and aspirations for now and into the future... Timeframe LONG TERM - 2030
More informationMetro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers
Metro Activity Center Design Guidelines Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers Metro Activity Centers What is a MAC? Legacy, the adopted guide for the future growth
More informationStaff Report and Recommendation
Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: City Council Neighborhoods and Planning Committee
More informationElderberry, Pioneer, Junction
February 15, 2018 Pioneer Road Pioneer Mineral Point Road Elderberry Pleasant View Road Junction Junction Road Agenda Recap of Background Information, Open House #1 Draft Neighborhood Development Plan
More informationCreate Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2
Background Grandview-Woodland Community Plan In the spring of 2012, the City of Vancouver embarked on a comprehensive community planning program in the Grandview-Woodland neighbourhood. The process has
More informationTown Center (part of the Comprehensive Plan)
Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center
More informationIntroduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1
Chapter 1 Introduction Lakewood 2025: Moving Forward Together Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1 Purpose of the Comprehensive Plan The Comprehensive
More informationTASK FORCE MEETING #6 SUMMARY
TASK FORCE MEETING #6 SUMMARY CITY OF REDWOOD CITY INNER HARBOR SPECIFIC PLAN Tuesday, January 14, 2013 7:00 P.M. 9:30 P.M. Seaport Conference Center, 459 Seaport Court, Redwood City, CA 94063 I. WELCOME
More informationDRAFT PLAN PRESENTATION
DRAFT PLAN PRESENTATION 1.23.2018 AGENDA Process Project Schedule Results from Visioning Workshop Draft Plan Highlights Concept Plans Feedback Next Steps PROJECT SCHEDULE KICK-OFF WORKSHOP August 29 th
More informationLEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director
LEED-ND 101: Practical Strategies for Achieving Sustainability Goals Travis Parker Lakewood Planning Director Metro Vision Idea Exchange Oct 11, 2012 West Corridor Stations West Corridor Overview West
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More informationDRAFT: NOT FINAL DESIGN
T H E M E S O F S T A K E H O L D E R I N P U T GREEN INFRAST RUCTURE & EDGES STEWARDSHIP THROUGH P ARTNERSHIP AMENITIES & ANCHORS DESTINATION DISTRICT sustainable landscapes & infrastructure that are
More informationLOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY
LOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY Reagan Elementary School, Clovis, CA May 14, 2014 6:30pm-8:30pm SUMMARY On Wednesday, May 14, 2014, staff from the City of Clovis and PlaceWorks
More informationSecrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018
Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit
More informationW O R K S H O P S U M M A R Y. Community Workshop #1: Visioning September 11th, 2007
W O R K S H O P S U M M A R Y Community Workshop #1: Visioning September 11th, 2007 Upper Market Community Workshop Series and Design Plan Page 1 of 9 INTRODUCTION The Upper Market Community Workshop Series
More informationNew York Avenue Streetscape and Trail Project Public Meeting #1 Summary
New York Avenue Streetscape and Trail Project Public Meeting #1 Summary I. King Jordan Student Academic Center (SAC) Gallaudet University, Washington, DC February 23, 2017 Table of Contents 1.0 Introduction...
More informationREVIEW AND EVALUATION OF REGIONAL LAND USE
REVIEW AND EVALUATION OF REGIONAL LAND USE AND TRANSPORTATION SCENARIOS #220831 Environmental Justice Task Force October 7, 2014 VISION 2050 Process Development of Guiding Vision for Land Use and Transportation
More informationOne said, without a clear understanding of what will be annexed, this is an exercise in futility.
Stakeholder Focus Groups: Summary of Meetings Stakeholder Focus Group meetings were held on at the Pinellas County Planning Department conference room. Focus Group meetings will be held during each of
More informationMAYFIELD WEST SECONDARY PLAN PHASE 2
MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome
More information2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016
2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of
More informationGlenborough at Easton Land Use Master Plan
Vision Statement Sunrise Blvd. Hazel Ave. Prairie City Rd. Gencorp Property Lincoln Regional Airport 1.0 VISION STATEMENT The identifies City of the principles, goals, policies, and standards Lincoln that
More informationElm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013
Elm Fork Land Use Trinity River Corridor Project Committee May 13, 2013 Purpose Discuss Trinity River planned Land Use and Appropriate Compatible Uses, particularly with respect to the Elm Fork Area 2
More informationRobbinsdale LRT Station. CDI Development Guidelines. August Overview
Robbinsdale LRT Station August 2018 Overview The City of Robbinsdale may have the coolest opportunity site along the 13 mile stretch of the Bottineau LRT corridor / Blue Line extension. Located a block
More informationCobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017
Community Design Workshop January 12, 2017 Agenda Opening Remarks / Introductions Scope of Work Existing Conditions Key Issues / Opportunities VPS Summary Draft Vision & Goal Statement Implementation Concepts
More informationReview of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015
Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions Special Working Group Meeting March 4, 2015 The slides that follow identify where the draft Comprehensive Plan has
More informationHeart of the Triad A Dynamic Plan for the Future. Steering and Technical Meeting April 27, 2006
Heart of the Triad A Dynamic Plan for the Future Steering and Technical Meeting April 27, 2006 The Week in Review Specific Group Findings There Was Uniform Agreement the Time Was Right Growth is Imminent
More informationINDEPENDENCE BOULEVARD AREA PLAN
INDEPENDENCE BOULEVARD AREA PLAN Public Meeting October 28, 2008 Tonight s Agenda Introduction 4:00 4:05 Tom Warshauer Presentation 4:05 5:00 Blake Drury Group Exercises 5:00 5:50 All Wrap Up & Next Steps
More information4 C OMMUNITY D ISTRICTS
4 C OMMUNITY D ISTRICTS N ew development in the Area will include many different types of land uses, including a destination retail area that attracts people from all over the region; recreation opportunities
More informationCity of Heath. Town Center Concept
In the give-and-take of getting projects designed, financed, and approved, the famous refrain from the film Field of Dreams is heard often: if you build it, they will come. From the perspective of the
More informationWelcome. Walk Around. Talk to Us. Write Down Your Comments
Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,
More informationPUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN
Connecting the heart of Eagle to the soul of the river - Kathy Chandler-Henry, Commissioner Eagle County CHAPTER 1 PUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN town of eagle - river corridor plan 1 PUBLIC
More informationAPPENDIX 4 NEWBURY TOWNSHIP TOWN CENTER MASTER PLAN
APPENDIX 4 NEWBURY TOWNSHIP TOWN CENTER MASTER PLAN Prepared by the Urban Design Center of Northeast Ohio September, 2008 Newbury Township Land Use Plan A4-1 INDEX Page No. 1 Newbury Township Town Center
More informationLaird in Focus Community Information Session
Laird in Focus Community Information Session Tuesday, December 5, 2017 St. Anslem Catholic School, 182 Bessborough Drive Session 1: 5:30 pm - Presentation and Question and Answer Period 6:15 pm - Breakout
More informationMunicipal Development Plan Update Urban Service Area and Hamlets
ENCLOSURE 1 Municipal Development Plan Update Urban Service Area and Hamlets Priorities Committee January 24, 2017 MUNICIPAL DEVELOPMENT PLAN UPDATE SHAPING OUR FUTURE MDP Update - Agenda MDP Update Public
More informationCITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA
CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James
More informationRio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018
Rio/29 Small Area Plan Design Plan & Implementation Framework Open House - January 25, 2018 MEETING PURPOSE PRESENTATION 1. Orient to the updated design plans 2. Introduce implementing options 3. Explain
More informationSouth Davis County COMMUNITY SPOTLIGHT
South Davis County COMMUNITY SPOTLIGHT Davis/SLC Community Connector Bus Rapid Transit line connecting SLC & Davis County RTP Phase 1 Project Generate 3,100 average weekday riders Relieve congestion on
More informationTHEMES, VISION, + PRINCIPLES
CHAPTER 2: THEMES, VISION, + PRINCIPLES This page intentionally left blank. 20 VISION DRAFT AUGUST 2018 2 2 THEMES, VISION, + GUIDING PRINCIPLES The Key Themes, Vision, and Guiding Principles presented
More informationGRANDVIEW HEIGHTS NCP AREA #3 CITIZEN ADVISORY COMMITTEE (CAC) MEETING #6
WELCOME TO THE NCP AREA #3 CITIZEN ADVISORY COMMITTEE (CAC) MEETING #6 For more information visit the city of surrey webpage at: www.surrey.ca/gh3ncp 1 Feb 1, 2018 CAC Meeting NEIGHBOURHOOD CONCEPT PLAN
More informationEast Central Area Plan
East Central Area Plan Steering Committee Meeting January 10 th, 2019 Tears-McFarlane House Community Room East Central Area Plan Steering Committee Meeting January 10 th, 2019 CHUN Tears-McFarlane House
More informationFurther input invited as Colchester Growth Strategy nears final phase
IUE 3 / NOVEMBER 2015 Further input invited as Colchester Growth trategy nears final phase trathcona County is seeking public feedback as it enters the final phase of work on a Growth Management trategy
More informationA. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities
A. Background 1 A Main Street Master Plan Study was performed and completed in October of 2007. The study was initiated to review current land uses and development patterns along Main Street, from Parrish
More informationPlano Tomorrow Vision and Policies
Plano Tomorrow Vision and Policies PLANO TOMORROW PILLARS The Built Environment The Social Environment The Natural Environment The Economic Environment Land Use and Urban Design Transportation Housing
More informationBehnke Ranch Property, Pasco County: Master Plan Development Approach
February 24, 2014 , Pasco County: Master Plan Development Approach Location & Program The (Legacy PUD) is located in southwest Pasco County along State Road 54 approximately 1.5 miles west of the Suncoast
More informationFUNDING CORRIDOR REVITALIZATION
FUNDING CORRIDOR REVITALIZATION Integrated corridor planning for the 21 st Century America Planning Association Annual Conference Atlanta, GA April 27, 2014 Mariia Zimmerman, MZ Strategies, LLC mariia@mzstrategies.com
More informationNew Partners for Smart Growth Conference February 5, 2010
Dan Stroh, Planning Director City of Bellevue Planning and Community Development Bellevue, WA New Partners for Smart Growth Conference February 5, 2010 Summary of Project Long-range plan update for Bel-Red
More informationWELCOME and introduction
1 WELCOME and introduction Mobility Hub Locations within Burlington STUDY OVERVIEW STUDY OBJECTIVES The City of Burlington is developing four Area Specific Plans, one for each of Burlington s Mobility
More informationSchedule B to Report PLS
Page 25 Q1. The land use concept is made up of many different land uses (residential, commercial, parks, schools, environmental areas etc.) A number of land uses are concentrated in the Community Core,
More informationGAMMAGE SQUARE - RECOMMENDATIONS
GAMMAGE SQUARE - RECOMMENDATIONS We envision an expanded cultural district surrounding the historic ASU Gammage. Creating a cultural district will enhance the existing historic landmark by activating the
More informationTransportation. Strategies for Action
Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;
More informationPLACEMAKING & MOBILITY WORKSHOP. January 27, 2016
PLACEMAKING & MOBILITY WORKSHOP January 27, 2016 Boston needs more housing. But there is no one-size fitsall solution. Every neighborhood has its own character. In some places, density is not only appropriate
More informationCommunity Working Group Workshops - Workshop Summary September TOD Corridor Strategy and Access Planning Study. Workshop Introduction
Community Working Group Workshops - Workshop Summary September 11-13 2018 TOD Corridor Strategy and Access Planning Study With VTA s BART Phase II (the Study), VTA seeks to build upon existing transportation
More informationCourtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT
Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT July 22, 2009 Tonight s Meeting 7:00 pm Introduction David Crome, Director of Planning 7:05 Presentation Stasia Bogdan,
More informationTASK FORCE MEETING #10 SUMMARY
TASK FORCE MEETING #10 SUMMARY CITY OF REDWOOD CITY INNER HARBOR SPECIFIC PLAN Tuesday, April 8, 2014 7:00 P.M. 9:30 P.M. Seaport Conference Center, 459 Seaport Court, Redwood City, CA 94063 TASK FORCE
More informationSubarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.
indian creek 180 extends south from 101st Street to I-435. The I-435 and Metcalf intersection is one of the primary intersections in the Kansas City Metro Area. The area includes several residential neighborhoods
More informationROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES
August 2018 OVERVIEW The City of Robbinsdale has a prime-opportunity site in the middle of the 13 mile stretch of the Bottineau LRT corridor / Blue Line extension. Robbinsdale offers a prominent, vital,
More informationCorridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program
1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the
More informationProsperity Hucks Area Plan. Transportation and Planning Committee May 11, 2015
Prosperity Hucks Area Plan Transportation and Planning Committee May 11, 2015 Presentation Outline 1. Background and Location 2. Community Dialog Process 3. Activity Center Recommendations 4. Wedge Recommendations
More informationThe Village of Shirlington
The Village of Shirlington Suburban Smart Growth Without Rail Transit July 2018 Agenda History (1940 to present) Attributes and Outcomes Lessons Learned Setting the Stage Arlington County Arlington is
More informationCommunity Workshop #2 December 4, 2014 Team Tonight s Agenda 6:00 pm Welcome! 6:05 pm The Future of Downtown Tustin Ideas, Strategies and Recommendations 6:35 pm Questions and Comments 6:50 pm Open
More informationCity of Charlottesville
City of Charlottesville MEMORANDUM To: Charlottesville Planning Commission From: Ebony Walden, Neighborhood Planner and Missy Creasy, Planning Manager Date: November 15, 2012 Re: Comprehensive Plan Fall
More informationStatus Report: MD 355 Project
Status Report: MD 355 Project OCTOBER 2006 M-NCPPC MONTGOMERY COUNTY PLANNING DEPARTMENT Summary of Community Comments, and break to the Results of the MD 355 Participation Session Brookside Gardens -
More informationChristine Vina VIA. Liz Trainor Highland Hills NA. Onofre Garza Calumet. Joanie Barborak Bond Initiative
MEETING SUMMARY Meeting: Brooks Area Planning Team Meeting #8 Date: Thursday, April 12, 2018 Time: Location: Attendees: 4:00 pm 6:00 pm McCreless Library Jesse Pacheco South Central Alliance of Neighborhoods
More informationGENERAL PLAN AND ENVIRONMENTAL IMPACT REPORT
City of Menifee HEARING DRAFT GENERAL PLAN AND ENVIRONMENTAL IMPACT REPORT City Council November 2013 PURPOSE OF MEETING Overview of GP Process Overview of required and optional GP elements Receive direction
More informationVision Plan Kickoff Meeting Summary Report
Vision Plan Kickoff Meeting Summary Report October 2018 The Vision Plan With the redevelopment of the Amtrak Property, Penn Station Partners (PSP) seeks to build on the creative talent and entrepreneurial
More informationMoody Centre Station TOD Area Today
Moody Centre Station TOD Area Today WHAT IS a transit-oriented Murray Street development area? A Transit-Oriented Development (TOD) Area is a dense, walkable residential and commercial area built to support
More informationSPRINGHILL LAKE TRANSIT VILLAGE
Greenbelt Metro Area Sector Plan - Subarea Design Policies and Guidelines - Springhill Lake Transit Village 113 SPRINGHILL LAKE TRANSIT VILLAGE Residential Neighborhood and Village Center CONCEPT Springhill
More information