PARDI MARKET PLAZA MASTER PLAN

Size: px
Start display at page:

Download "PARDI MARKET PLAZA MASTER PLAN"

Transcription

1 PARDI MARKET PLAZA MASTER PLAN CITY OF DIXON PLANNING COMMISSION MAY 16, 2017 Presented by: 1

2 CITY STAFF INTRODUCTION Deborah Barr Associate Civil Engineer, Project Manager Joe Leach City Engineer/Public Works Director 2

3 CONSULTANT TEAM INTRODUCTION FOOTHILL ASSOCIATES Public Outreach Park and Urban Planning Landscape Architecture Environmental Documentation OTHER PROJECT TEAM MEMBERS Bennett Engineering; Civil Engineering UNICO Engineering; Land Surveying Ken Rubitsky & Associates; Electrical Anderson Structural Group; Structural Wallace-Kuhl & Associates; Geotechnical KD Anderson & Associates; GHG Paul Weller, PLA, ISA, LEED AP Project Manager Landscape Architect for Parks, Streetscapes, and Downtown Redevelopment in Rural Communities Public Facilitation and Outreach Sustainable Design Arborist 3

4 DESIGN PRIORITIES AND GOALS Realistic, cost effective, innovative Balance function, vision, budget, and maintenance Identify challenges early in process Build community consensus Incorporate existing design vocabulary and community ideas Design a space encouraging people to dine, stay, shop, and enjoy Dixon 4

5 CONCEPT A 5

6 CONCEPT B 6

7 OPPORTUNITIES AND CHALLENGES Opportunities Passionate committed community Vested merchants Local pride Community Focal Point Rich history, diverse styles Completed street frontage Underground utilities Clear site Location and scale Local festivals and events Agriculture Challenges Spatial limitations Money, funding Parking (20, 25, 38 ) Impacts on businesses Diverse group of stakeholders Exposure Utilities, Soils Caltrans 7

8 OPPORTUNITIES AND CONSTRAINTS MAP 8

9 PUBLIC OPEN HOUSE RESULTS Wednesday, January 18 th, Dixon Senior Center Multipurpose Room Series of Booths/Stations set up to interact with attendees High interest in band stand/performance area, parking Moderate interest in pergolas, restroom, and seating Low interest in sport courts or games Plan A and Plan B Critique Consensus on 20 Parking spaces More disagreement about 38 Parking spaces People liked the bandstand and solar panels, did not like synthetic turf Attendees were interested in a space that was multi-purpose 9

10 SURVEY RESULTS 559 surveys were collected 96% of respondents live, work, or live and work in Dixon 45% never park, and 38% park less than 4 times a month on site (83%) 10

11 SURVEY RESULTS 72% selected no parking up to 20 parking spaces 13% wanted more than 30 parking spaces 11

12 SURVEY RESULTS 80% were willing to walk up to one block for parking 53% were willing to walk up to one to two blocks 12

13 SURVEY RESULTS Farmer s markets and performances were the top choices for use of site 73% said using green infrastructure on the project is important Focused on High and Moderate interest elements only High interest: band stand, pergola, seating Moderate interest: fountain, gazebo, parking, picnic tables, restroom Neutral interest: clock tower, community garden, informational kiosk, ornamental display garden Mixed interest: picnic shelter Low interest: bocce, pickle ball, shuffleboard 28% like Plan A & 18% would like more parking, 11% would like less parking 17% like Plan B & 5% would like more parking, 34% would like less parking 13

14 COMMUNITY CONCEPTUAL DESIGNS Designs from Dixon High School, Open House, and Website submittals Most featured a bandstand Bandstands located in a variety of locations Most featured some parking, but not all Variety of parking approaches (lots, one side only, street frontage) Most designs featured an element in or near the very center of the parcel Way to go, Dixon High School Arts & Design Academy! 14

15 PLAZA CONCEPT C -- PMSCDC WORKSHOP 15

16 PLAZA CONCEPT D -- PMSCDC WORKSHOP 16

17 PARKING UTILIZATION SUMMARY Dates survey completed: December 3, 5, 7 and 9 (Saturday, Monday, Wednesday, and Friday) Time: 7:00 am to 7:00 pm, Cars observed each hour on the hour Conditions: good weather, school in session, non-holiday During business hours and high usage (lunch and dinner hours) Total 524 parking spaces (236 street segment parking spaces and 288 parking lot parking spaces). Assumptions 40 spaces in Lot G (Pardi Market Site) and 30 spaces in Lot H (across from Police Station) Total Parking Utilization* Weekly Average: 37% (Off-peak average 4%, Peak average 50%) *Note: Includes both on street parking and parking lots. 17

18 18

19 PMSCDC WORKSHOP RESULTS Thursday, February 23 rd, City Council Chambers Posters set up to interact with attendees, Four Concepts Presented Plans received votes: Plan D = 5, C = 4, A = 2, and B = 1. No votes = 2. Remove fountain Bandstand size needed for events is 20 x35 Bandstand location: opinions included near intersection, southeast corner Structures, lighting, and design: follow historic styles present in Dixon Needs landmark or wow factor near intersection Needs buffer along First Street side from traffic Concerns about modern, contemporary, solar panel structure design Interest in symmetrical design, avoid serpentine forms 19

20 DRAFT PLAZA MASTER PLANS DEVELOPMENT Master plans were developed based on feedback from public outreach efforts, PMSCDC Workshop, and site specific opportunities and constraints Two master plans developed, original conceptual designs still valid Master plans show spatial relationships Elements/facilities featured in one could be included in the other, or excluded from both Designed with solar and stormwater LID elements included Dixon historic architecture themes are interchangeable; are not tied to either master plan 20

21 PLAZA MASTER PLAN OPTION 1 21

22 PLAZA MASTER PLAN OPTION 2 22

23 PLAZA MASTER PLAN ELEVATIONS -- BANDSTANDS 23

24 PLAZA MASTER PLAN ELEVATIONS -- PERGOLA 24

25 PLAZA MASTER PLAN ELEVATIONS -- OVERALL 25

26 DIXON: DOWNTOWN DESIGN THEME Based on Dixon Architectural Precedent 26

27 DIXON: CALIFORNIA DESIGN THEME Based on Dixon Architectural Precedent 27

28 PLAZA COSTS Design and calculations are not complete Construction costs could range from $850K to $3M Final cost depends on engineering design, materials, and amenities included Base cost includes: Construction staging and staking Removal and excavation of existing gravel and other materials Paving, drainage (stormwater system limitations), lighting for safety Minimal landscape treatment Garbage cans, bike racks, but no other furnishings 28

29 PLAZA COSTS Design selection comes first How space is oriented spatially How space is intended to function or be used Vision for downtown, community preferences, future growth Cost management Value engineering, design calculations, phasing plan Urban Greening Grant Community gifts: Buy a brick, memorial benches or walls, clock tower Corporate partners could include: Basalite, Cardinal Health, Walmart Federal, State, Local, and Solar grants and rebates are being explored 29

30 CITY COUNCIL FEEDBACK Tuesday, April 25 th, City Council Chambers Presented Draft Master Plans and Design Process to Council Concerns of cost: initial capital improvement and long term maintenance Preferred to maximize parking Concerns of specific elements: e.g. restroom Concerns of layout and access: stage loading and unloading, florist shop 30

31 REVISED PLAZA MASTER PLAN 31

32 PLAZA MASTER PLAN ELEVATIONS -- SOUTH 32

33 PLAZA MASTER PLAN ELEVATIONS -- BANDSTAND 33

34 PLAZA MASTER PLAN ELEVATIONS -- OVERALL 34

35 PLAZA MASTER PLAN ELEVATIONS -- EAST 35

36 PLAZA MASTER PLAN ELEVATIONS -- ENLARGEMENT 36

37 PLAZA MASTER PLAN ELEVATIONS -- SOLAR 37

38 PLAZA MASTER PLAN ELEVATIONS SOLAR SIDE VIEW 38

39 PLAZA MASTER PLAN ELEVATIONS -- GATE 39

40 DESIGN PALETTE 1 40

41 DESIGN PALETTE 2 41

42 SUMMARY PERCEPTION OF PARKING SHORTAGE Data show plentiful parking opportunities Likely solution is better signage of lots and directional signage to lots PARDI MARKET PLAZA SPACE High interest from Public (Public Open House, On-Line Survey, Designs submitted, and Workshop) in space that is multi-purpose (multiple public uses) and sensitive to historic neighborhood and style High interest in band stand/performance area and space that could be used as a Farmer s market or other events High interest in low levels of parking High interest in green infrastructure (solar generation, storm water retention and treatment) that harmonizes with historic downtown 42

43 QUESTIONS & ATTACHMENT Attachment A Plaza Options 43

44 ATTACHMENT A PLAZA OPTIONS 44

45 PLAZA OPTIONS Pervious concrete, Permeable Pavers, Colored Concrete, Brick Inlay 45

46 PLAZA OPTIONS Solar Parking or Picnic Shelters 46

47 PLAZA OPTIONS Band Shell, Shade Shelter 47

48 PLAZA OPTIONS Clock, Entry Arch 48

49 PLAZA OPTIONS Seating, Pergolas 49

50 PLAZA OPTIONS Gathering Areas 50

PARDI MARKET PLAZA MASTER PLANS

PARDI MARKET PLAZA MASTER PLANS PARDI MARKET PLAZA MASTER PLANS CITY OF DIXON APRIL 25, 2017 Presented by: 1 CITY STAFF INTRODUCTION Deborah Barr Associate Civil Engineer, Project Manager Joe Leach City Engineer/Public Works Director

More information

PARDI MARKET PLAZA PMSCDC WORKSHOP

PARDI MARKET PLAZA PMSCDC WORKSHOP PARDI MARKET PLAZA PMSCDC WORKSHOP CITY OF DIXON FEBRUARY 23, 2017 Presented by: CITY STAFF INTRODUCTION Deborah Barr Associate Civil Engineer, Project Manager Joe Leach City Engineer/Public Works Director

More information

South th E ast Communit ity Centre (SECC)

South th E ast Communit ity Centre (SECC) South East Community Centre (SECC) 1 New Park Design & Community Centre Update Thursday, February 8, 2018 Public Open House Thank you for attending this Open House! The town and the Consulting Team will

More information

Building Great Neighbourhoods. Strathcona

Building Great Neighbourhoods. Strathcona Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide

More information

South East Sports Complex Phase I

South East Sports Complex Phase I South East Sports Complex Phase I City of Spokane Design Review Board August 29, 2018 (Revised) Objectives 1. Early discussion and collaboration. 2. Provide framework / catalyst for future improvements

More information

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016 Turn to the River is a multi-year project of Art Spaces - Wabash Valley Outdoor Sculpture Collection, Inc. to connect downtown Terre Haute with the Wabash River through public art and design. The four-square

More information

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016 2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of

More information

Design Alternatives Workshop. Hilfiker Park Master Plan Workshop #2

Design Alternatives Workshop. Hilfiker Park Master Plan Workshop #2 Design Alternatives Workshop Hilfiker Park Master Plan Workshop #2 Agenda for Tonight Staff Presentation (40 min) Introduction Master Plan Process Planning Context What We ve Heard So Far Design Alternatives

More information

Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.

Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc. TOWN OF NAGS HEAD NORTH CAROLINA Concept Plans Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc. Site Looking Southeast Dowdy Park Existing Conditions Nags Head Woods Sound Future

More information

Design Considerations

Design Considerations Essential to the development of a successful Master Plan for the Park Complex is input from the community that the park will serve. The community outreach component of the planning process included numerous

More information

SOUTHEAST SPORTS COMPLEX MASTER PLAN

SOUTHEAST SPORTS COMPLEX MASTER PLAN REPORT TO SOUTHGATE NEIGHBORHOOD COUNCIL APRIL 13, 2016 Visioning Process April 30: Stakeholder Meeting with Sports Groups May 5: Stakeholder Meeting with Southgate Land Use Committee May 13: SNC Meeting

More information

3.1 community vision. 3.3 required plan elements

3.1 community vision. 3.3 required plan elements Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan

More information

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access Welcome Thank you for coming this evening. Agenda PART I - Project Context The Downtown Revitalization Program Our DRI Projects Other

More information

New Park / Entry Court & Plaza Concept Design

New Park / Entry Court & Plaza Concept Design New Park / Entry Court & Plaza Concept Design The SECC Public realm is proposed to have a focus on health, wellness, and community and that site users will include patrons of the neighbourhood. The block

More information

CARMODY PARK MASTER PLAN

CARMODY PARK MASTER PLAN the site Smith Reservoir Cottonwood Lake Kendrick Lake Carmody Rec Center Carmody Middle School Pool Court Play Carmody Pond Sanderson Ditch Sports Fields Foothills Ice Arena Open Field why a master plan?

More information

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design 1 Fifth and Detroit Street Design May 2017 Capital Improvements Committee Agenda 2 Review Street Configuration Prior Meeting Review Outreach Synopsis Functional Street Design Refinements Curb Edge, Turning

More information

PLAN ELEMENTS WORKSHOP. April 5, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016 PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly

More information

Developing a Master Plan. By LH-PA, City of Sunnyvale, & Anderson Brulé Architects

Developing a Master Plan. By LH-PA, City of Sunnyvale, & Anderson Brulé Architects 2016 Developing a Master Plan By LH-PA, City of Sunnyvale, & Anderson Brulé Architects Steve Emslie Regional Director Lighthouse Public Affairs Katherine Rivard Project Manager Design Practice Leader Anderson

More information

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016 DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016 Welcome & Introduction Michael J. Finn, P.E. City Engineer Summary of Public Outreach to Date Ground the work in established principles December 2015

More information

TA B L E O F C ON T EN T S

TA B L E O F C ON T EN T S TA B L E O F C ON T EN T S Introduction 1 Site Analysis 2 EXISTING TREE ANALYSIS 3 Community Outreach 5 PUBLIC WORK SHOP #1 GENERAL PUBLIC 6 PUBLIC WORKSHOP #2 4 TH OF JULY CELEBRATION 9 PUBLIC WORKSHOP

More information

Roanoke Rapids Streetscape Master Plan. City Council Presentation

Roanoke Rapids Streetscape Master Plan. City Council Presentation SCHEDULE: Stakeholder Meeting/Kick off November,2016 Master Planning Phase (November March 2017) Public Meeting #1 December 13, 2016 Review Meeting with Key Stakeholders Refine Concepts Based on Input

More information

Maplewood Avenue Downtown Complete Street Project

Maplewood Avenue Downtown Complete Street Project Maplewood Avenue Downtown Complete Street Project Second Public Meeting January 24, 2018 Welcome and Introduction of Project Team City Planning and Public Works Staff City of Portsmouth Juliet Walker Planning

More information

BRADENTON RIVERWALK EXPANSION MASTER PLAN

BRADENTON RIVERWALK EXPANSION MASTER PLAN BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives

More information

Parks, and Recreation & Cultural Arts Master Plan Update

Parks, and Recreation & Cultural Arts Master Plan Update Parks, and Recreation & Cultural Arts Master Plan Update Community Profile Public Input Summary: Staff Interviews conducted April 14 and 15, 2014 Citizens Workshop - conducted April 15 th and 24 th, May

More information

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco,

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

Redevelopment Plan for the Former South Gifford Road Landfill

Redevelopment Plan for the Former South Gifford Road Landfill Redevelopment Plan for the Former South Gifford Road Landfill Summary Report July 2018 Treasure Coast Regional Planing Council Former South Gifford Road Landfill Site Redevelopment Plan July 2018 prepared

More information

RESEDA - WEST VAN NUYS COMMUNITY PLAN

RESEDA - WEST VAN NUYS COMMUNITY PLAN RESEDA - WEST VAN NUYS COMMUNITY PLAN Executive Summary As part of the initial outreach effort, the Department of City Planning hosted two workshops for the Reseda-West Van Nuys Community Plan Area during

More information

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1 Illustration of Eastlake Farmer s Cooperative Grain Elevator Chapter 5: implementation 5-1 chapter 5: implementation Introduction The Eastlake Subarea Plan includes a wide range of recommendations intended

More information

Crystal Pool & Wellness Centre Stakeholder Engagement

Crystal Pool & Wellness Centre Stakeholder Engagement Crystal Pool & Wellness Centre Stakeholder Engagement Hosted by April 25 th, 2018 What We Will Be Presenting Today Summary of input gained through the February 2018 public engagement and online survey.

More information

Community Assistantship Program. Milaca Downtown Revitalization

Community Assistantship Program. Milaca Downtown Revitalization Community Assistantship Program Milaca Downtown Revitalization Prepared in partnership with City of Milaca Prepared by Zachary Jorgensen Research Assistant University of Minnesota December, 2009 CAP Report

More information

Johnson Street Bridge Public Realm Update

Johnson Street Bridge Public Realm Update Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes

More information

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

Pine Hills Bus Transit Center Community Design Workshop. Presentation April 21, 2018

Pine Hills Bus Transit Center Community Design Workshop. Presentation April 21, 2018 Pine Hills Bus Transit Center Community Design Workshop Presentation April 21, 2018 1 Today s Workshop Welcome and Overview (10:00-1015 AM) Site Programming (10:15-10:45 AM) InfraWorks Demo (10:45-11:00

More information

Providence Waterfront Park

Providence Waterfront Park I-195 Redevelopment Parcels Providence Waterfront Park June 30, 2014 I-195 30% Design Review 1 November 19, 2012 endorses open space design. 2 Design Chronology October 2013 10% Design Submitted for both

More information

4.9 Mendocino Avenue Corridor Plan Design Guidelines

4.9 Mendocino Avenue Corridor Plan Design Guidelines 4.9 Mendocino Avenue Corridor Plan Design Guidelines The Mendocino Avenue Corridor Plan addresses the area between College Avenue and Steele Lane. Mendocino Avenue is a busy arterial that runs parallel

More information

4 Semi-Private & Private Open Spaces

4 Semi-Private & Private Open Spaces 4 Semi-Private & Private Open Spaces 4.1 Semi-private Open Space 4.1.1 Common Courtyards The common courtyards for each complex will be designed and programmed for the typical owners living there. They

More information

THEMES, VISION, + PRINCIPLES

THEMES, VISION, + PRINCIPLES CHAPTER 2: THEMES, VISION, + PRINCIPLES This page intentionally left blank. 20 VISION DRAFT AUGUST 2018 2 2 THEMES, VISION, + GUIDING PRINCIPLES The Key Themes, Vision, and Guiding Principles presented

More information

INSTITUTIONAL USE DESIGN COMPATIBILITY TECHNIQUES

INSTITUTIONAL USE DESIGN COMPATIBILITY TECHNIQUES INSTITUTIONAL USE DESIGN COMPATIBILITY TECHNIQUES INTRODUCTION Community institutions are an important part of the character and vitality of neighborhoods in Forsyth County. Institutional uses include

More information

More than 30 adults and 19 children were involved in these community workshops.

More than 30 adults and 19 children were involved in these community workshops. Linwood Workshops held at Household of Faith Deliverance Church 3.29.08 and 4.05.08 What is a Design Workshop? We use the term workshop (often called charrette among design professionals) to describe a

More information

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space

More information

Phase I Redevelopment Plan. First Community Meeting

Phase I Redevelopment Plan. First Community Meeting Hoboken Terminal and Yard Phase I Redevelopment Plan First Community Meeting May 31, 2011 One Hudson Place Phase I Redevelopment Plan Redevelopment Plan First Community Meeting Agenda 1. Redevelopment

More information

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project Olympia, WA: Greening Capitol Way Supporting Communities move towards sustainability is a priority for the federal government. A Greening America s Capitals Project Office of Sustainable Communities U.S.

More information

Stadium District Masterplan

Stadium District Masterplan Stadium District Masterplan Masterplan (noun): an evolving long-term planning document that establishes the framework and key elements of a site. It reflects a clear vision synthesizing developer goals

More information

Blood Alley Square/Trounce Alley Redesign

Blood Alley Square/Trounce Alley Redesign June 216 Kick-Off Events Questionnaire and Engagement Summary Background The City of Vancouver is redesigning Blood Alley Square and Trounce Alley, important public spaces in the heart of Gastown, which

More information

Washington Plaza at the. Lake Anne Village Center

Washington Plaza at the. Lake Anne Village Center Lake Anne Village Center Washington Plaza Design Charrette Washington Plaza at the Lake Anne Village Center Process and Recommendations Presentation to the Reston Association Board of Directors January

More information

Master Plan Implementation Committee Meeting

Master Plan Implementation Committee Meeting MILTON VILLAGE ZONING AND WATERFRONT STUDY Master Plan Implementation Committee Meeting February 12, 2018 7:00-9:00 pm IMAGE: GOOGLE COMPILED MEETING FEEDBACK/SURVEY RESULTS Waterfront Principles - Prioritized

More information

Port of Camas-Washougal Waterfront Trail Master Plan

Port of Camas-Washougal Waterfront Trail Master Plan Port of Camas-Washougal Waterfront Trail Master Plan The Port s facilities are the products of its mission: To make strategic investments that enhance the community s quality of life by bringing jobs,

More information

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic

More information

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Applicant Name Phone / Fax / Address City State Zip Code  . Property Owner Phone / Fax / Address City State Zip Code Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number

More information

Community Design Plan

Community Design Plan Gardena General Plan 2006 Authority While the is not a required element of a General Plan, it is included because improving the community appearance and image is paramount to the overall quality of life

More information

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010 University of the District of Columbia Van Ness Campus Master Plan Open House 3 December 8, 2010 Introductions Sequence of Work: Campus Master Plan BEGIN: INTRODUCE AND START WORK Project Initiation Team

More information

Charles P. Johnson and Associates. Annapolis Landscape Architects

Charles P. Johnson and Associates. Annapolis Landscape Architects Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros

More information

AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE

AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE INVENTORY AND RECOMMENDATIONS REPORT November 7, 2018 Our Mission Statement: To provide assistance and support, through professional expertise in matters of

More information

PARK AND RECREATION MASTER PLAN UPDATE

PARK AND RECREATION MASTER PLAN UPDATE PARK AND RECREATION MASTER PLAN UPDATE 2014-2018 Prepared for: Avon Parks, Recreation and Beautification Council (PRBC) and Town of Avon Prepared by: Lehman & Lehman, Inc. 24-Apr-14 Mission Statement The

More information

Thousand Oaks Downtown Core Master Plan. Master Plan Open House April 26, 2018

Thousand Oaks Downtown Core Master Plan. Master Plan Open House April 26, 2018 Thousand Oaks Downtown Core Master Plan Master Plan Open House April 26, 2018 The Site Community Outreach Events Online Community Survey (March 17 - April 22, 2018) 689 responses Pop-Up Workshops Oaks

More information

HOOVER-UNION TRIANGLE

HOOVER-UNION TRIANGLE HOOVER-UNION TRIANGLE TABLE OF CONTENTS INTRODUCTION Who? What? Why? MEETING #1 RECAP [3/25] Presentation Activities Post-it Boards Photos Generated Schemes MEETING #2 RECAP [4/8] Presentation Schematic

More information

Little Mountain UDP Presentation

Little Mountain UDP Presentation Summary of UDP Evaluation of Dec 2015 Plan Dec 2015 Site Plan Transitional edges work well Central spine and permeability are strong Tree retention is good Establish Big Idea Sameness of built form contributes

More information

Town Center (part of the Comprehensive Plan)

Town Center (part of the Comprehensive Plan) Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012 Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012 ALTERNATIVE #1 Like the big open lawn space in alternative 1. Like cohesiveness of sidewalk walk and play areas shown on alternative 1

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept Project purpose owns Road Beaumaris Road The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept + Guide Rehabilitation of Landscape and Community

More information

Figure 3-1: Public Realm Plan

Figure 3-1: Public Realm Plan 3 Public Realm Figure 3-1: Public Realm Plan 3.1 Public Realm Concept The public realm concept for the Little Mountain site integrates a clear and accessible movement network with public spaces for social

More information

CHAPPLES PARK MASTER PLAN

CHAPPLES PARK MASTER PLAN CHAPPLES PARK MASTER PLAN Presentation of Preliminary Development Options Public Open House #2 Wednesday November 2 nd, 2016 TONIGHT S AGENDA 1. Welcome & Introductions 2. Presentation by Sierra Planning

More information

LOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

LOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY LOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY Reagan Elementary School, Clovis, CA May 14, 2014 6:30pm-8:30pm SUMMARY On Wednesday, May 14, 2014, staff from the City of Clovis and PlaceWorks

More information

Denver Moves: Transit Task Force

Denver Moves: Transit Task Force Insert transit picture Denver Moves: Transit Task Force Meeting #8 October 5, 2017 1. Welcome & Introductions Opening remarks and housekeeping Task Force and audience introductions Upcoming events and

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

DOWNTOWN NORFOLK COUNCIL ACTION PLAN. Strategic Initiatives Focus Area Objectives. Departmental Focus Area Key Objectives

DOWNTOWN NORFOLK COUNCIL ACTION PLAN. Strategic Initiatives Focus Area Objectives. Departmental Focus Area Key Objectives DOWNTOWN NORFOLK COUNCIL ACTION PLAN FY18 Strategic Initiatives Focus Area Objectives Departmental Focus Area Key Objectives STRATEGIC INITIATIVES FOCUS AREA OBJECTIVE #1: NURTURE A VIBRANT URBAN ENVIRONMENT

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax

February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax Master Planning Charge Van Dyck Park s first Master Plan will provide the City with a road map as to how best incorporate

More information

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, 2015 Duncan St Supervisorial District 8 Supervisor Scott Wiener 1 Agenda Welcome & Introductions Purpose of Meeting Ground Rules Project

More information

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit Avila Ranch Avila Ranch Specific Plan Development Standards High Medium Density - High Residential Density Residential Lot and Building Lot and Standards Building (R-3) Standards (R-3) EXAMPLES These sketches

More information

MADISON MANOR PARK RENOVATIONS

MADISON MANOR PARK RENOVATIONS MADISON MANOR PARK RENOVATIONS COMMUNITY KICK-OFF MEETING MINUTES To: Wilfredo Calderon, Steven Torgerson (AMT), Tom Mitchler, Kevin Stalica, Vincent Verweij, Greg Anselene, Chris Willett, Peter Alchin,

More information

City of Plantation Midtown District Conceptual Plan Implementation Update. City Council Presentation February 22, 2017

City of Plantation Midtown District Conceptual Plan Implementation Update. City Council Presentation February 22, 2017 City of Plantation Midtown District Conceptual Plan Implementation Update City Council Presentation February 22, 2017 Purpose of Presentation The purpose of this presentation is to: 1. Review key concepts

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

Master Plan Visioning #1 Section 3 Informal amphitheater at Community Development Services Building. Section 3 MP Visioning #1

Master Plan Visioning #1 Section 3 Informal amphitheater at Community Development Services Building. Section 3 MP Visioning #1 Section 3 Informal amphitheater at Community Development Services Building Section 3 MP Visioning #1 THIS PAGE INTENTIONALLY LEFT BLANK. appendix As with the master planning of any government campus, the

More information

Future Proposed Development

Future Proposed Development Future Proposed Development on and around Link light rail s Capitol Hill Station Meeting September 24, 2012 Tonight s Agenda 6:00 pm Open House 6:30 pm Introductions Richard Conlin, City of Seattle Councilmember/Sound

More information

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site Memorandum PLANNING DIVISION DEPARTMENT OF COMMUNITY AND NEIGHBORHOODS To: Historic Landmark Commission From: Katia Pace, Principal Planner Date: October 26, 2016 Re: Liberty Park Improvements The purpose

More information

East Bayshore Road Neighbourhood

East Bayshore Road Neighbourhood East Bayshore Road Neighbourhood Northridge Property Management Urban Design Brief 3195 East Bayshore Road City of Owen Sound January 2016 East Bayshore Road Neighbourhood Northridge Property Management

More information

Arlington County. Courthouse Square Community Outreach Workshop. 23 April 2014

Arlington County. Courthouse Square Community Outreach Workshop. 23 April 2014 Arlington County Courthouse Square Community Outreach Workshop 23 April 2014 Cooper, Robertson & Partners Architecture, Urban Design with Buro Happold, HR&A, Kimley Horn, Nelson Nygaard, & Tactical Aesthetics

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director Date: March 7, 2018 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director Dan Mauer,

More information

VISION AND GUIDING DESIGN PRINCIPLES

VISION AND GUIDING DESIGN PRINCIPLES pleasure point commercial corridor VISION AND GUIDING DESIGN PRINCIPLES Public Draft November 26, 2018 County of Santa Cruz with assistance from MIG CONTENTS PART I: INTRODUCTION AND VISION... 3 Community

More information

City Council March 27, Parks, Recreation, and Trails Master Plan

City Council March 27, Parks, Recreation, and Trails Master Plan City Council March 27, 2018 Parks, Recreation, and Trails Master Plan Planning Process Develop Goals and Objectives Inventory of Areas and Facilities Needs Assessment And Identification Public Participation

More information

CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017

CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017 CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017 This is a rare moment in the City s history which affords us the opportunity to create a civic landmark born of comprehensive

More information

PLACEMAKING & MOBILITY WORKSHOP. January 27, 2016

PLACEMAKING & MOBILITY WORKSHOP. January 27, 2016 PLACEMAKING & MOBILITY WORKSHOP January 27, 2016 Boston needs more housing. But there is no one-size fitsall solution. Every neighborhood has its own character. In some places, density is not only appropriate

More information

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT FEBRUARY 2013 TABLE OF CONTENTS 1.0 BACKGROUND... 1 1.1 Amendment... 1 2.0 LOCATION & CONTEXT... 2 2.1 Land Ownership... 2 3.0 POLICY CONTEXT... 3 3.1 Municipal Development Plan... 3 3.2 Capital Region

More information

9/19/2018 TODAY S WEBINAR AGENDA CONTINUING EDUCATION UPCOMING TRAINING FROM APBP

9/19/2018 TODAY S WEBINAR AGENDA CONTINUING EDUCATION UPCOMING TRAINING FROM APBP TODAY S WEBINAR AGENDA 3:00 pm: Introduction 3:05 pm: Presentation 3:45 pm: Questions 4:00 pm: Webinar Ends For technical assistance during the webinar: 1-800-263-6317 Choose these prompts: 1, 1, 1 CONTINUING

More information

Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services

Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services Information Item Date: August 11, 2015 To: From: Subject: Mayor and City Council Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services Reed Park Improvement

More information

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN Public Meeting October 2016 1 Plan Summary and Discussion Public Meeting May 4 2017 City of Brockton Bill Carpenter, Mayor Department of Planning

More information

Preferred Riverwalk Alternative Components August 17, 2017:

Preferred Riverwalk Alternative Components August 17, 2017: Preferred Riverwalk Alternative Components August 17, 2017: 1. Entrance and Future Pump Station Location: Entrance location to line up with main parking entrance to Captain Parkers and allows future Pump

More information

California Environmental Quality Act (CEQA) Environmental Review Process

California Environmental Quality Act (CEQA) Environmental Review Process California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation

More information

Isabel Neighborhood Plan: Alternatives

Isabel Neighborhood Plan: Alternatives Isabel Neighborhood Plan: Alternatives Presented by: Lori Parks, Associate Planner February 2, 2015 Agenda 1. Background on BART to Livermore 2. Isabel Neighborhood Plan 3. Alternative Scenarios 4. General

More information

LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm

LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm LINCOLN COUNTY COMMONS - REVISED MASTER PLAN Lincoln County Public Meetings June 26-27, 2018, 6pm PROJECT OVERVIEW Lincoln County is preparing a Refined Master Plan for facilities at the Lincoln County

More information

ART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to:

ART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to: Date Submitted: July 21, 2017 ART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to: AARB@dgs.virginia.gov) Agency Name: George Mason University (Fairfax

More information

WARM SPRINGS PARK MASTER PLAN

WARM SPRINGS PARK MASTER PLAN TABLE OF CONTENTS page 1.0 Introduction and Overview 1 2.0 Information Gathering 2 3.0 Conceptual Alternative Development 8 4.0 Master Plan Development 14 5.0 Construction Cost Estimates 19 LIST OF FIGURES

More information

4.0 Concept Plan Implementation

4.0 Concept Plan Implementation 4.0 Concept Plan Implementation The following section defines the recommended strategy for the implementation of the Terwillegar Park Concept Plan including park management guidelines, capital costs, development

More information

Sewanee Village + Request for Builder/Developer Proposals

Sewanee Village + Request for Builder/Developer Proposals Sewanee Village + Request for Builder/Developer Proposals Contact: Frank X. Gladu Special Assistant to the Vice Chancellor University of the South 735 University Ave Version 3 Sewanee TN 37383 Released:

More information

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015 KENDALL SQUARE INITIATIVE Planned Unit Development Special Permit Application - SoMa September 8, 2015 GENERAL DEVELOPMENT GOALS Kendall Square PUD 2 PRE-ZONING PUBLIC ENGAGEMENT 2008-2009 2010-2012 2013

More information