1 Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2 scheme. The asks set out by this note reflect those submitted by the Council in response to the recent HS2 Ltd consultations on its Draft HS2 Environmental Statement and Design Refinements. These asks (set out in no particular order) are of the high-level, strategic nature relevant for consideration as part of the Hybrid Bill petitioning process. 1) Socio-economic Benefits UK Central, Skills and Employment To ensure the success of HS2 it is vital that the socio-economic benefits that may be generated both directly and indirectly by HS2 are identified and realised. UK Central has been launched recently by the Council and it sets a direction for managed growth across a wider geographical area than the HS2 Interchange station. Plans for HS2, should therefore be aligned with emerging plans for UK Central ( (formerly referred to as the M42 Economic Gateway in Solihull)) so that the economic growth potential associated with HS2 is captured for the benefit of Solihull and the wider region, including the Greater Birmingham and Solihull Local Enterprise Partnership area. There is a need for intervention to ensure that procurement and employment opportunities (and the accessibility of those opportunities) arising from the construction and operational phases of HS2 do not bypass the local economy. This should be implemented via a strategic partnership approach between HS2 Ltd, the Council and its partners including a statement of intent in the Construction Code of Practice, development of a Skills and Employment Strategy and inclusion of Targeted Recruitment and Training clauses in contracts and supply chain engagement and development activities. 2) Balsall Common Tunnel The Draft ES does not propose a deep bore tunnel in the Berkswell / Balsall Common area. It does however consider 3 different tunnel options as scheme alternatives. Whilst each of the tunnel options would have some form of impact, the Draft ES does acknowledge that (relative to the proposed scheme) the implementation of a deep bore tunnel would give rise to environmental and community benefits. However, it concludes that the magnitude of the benefits that would be generated would not be substantial enough to justify the increased cost and construction programme. The Draft ES does not provide evidence of the analysis carried out to support such a conclusion. Summary of SMBC Asks - 1 -
2 The Council considers that the implementation of a tunnel in the Balsall Common area will avoid the problems associated with crossing the West Coast Mainline and mitigate the enormous environmental impact on the local area. Serious reconsideration should therefore be given to running HS2 in a deep bore tunnel at this location. Furthermore, more detailed Cost-Benefit Analysis information is required, and has already been formally requested, in order for the Council to better understand the HS2 Ltd decision making processes carried out to date. 3) Hampton in Arden Realignment / Tunnelling The Draft ES does not propose realignment and / or tunnelling for the section of HS2 that runs to the east of Hampton in Arden. In its meeting with the Secretary of State, the Council requested consideration of the realignment of HS2, and / or tunnelling where possible, to minimise impacts on Hampton in Arden. The Draft ES does not refer to options having been considered for realignment or tunnelling adjacent to Hampton in Arden. Clarification on this matter is therefore required. 4) Heath Park, Chelmsley Wood In the vicinity of Chelmsley Wood, the alignment of HS2 has been shifted to the east, relative to that announced in January The impact of HS2 on the Bluebell Recreation Ground and the Chelmsley Wood area is therefore reduced. However, there remains an impact on Heath Park, over which HS2 is proposed to pass on a viaduct there will be both a temporary and permanent loss of greenspace and significant visual and noise impacts on local residents. Clarification is required on how the noise and visual impact of the viaduct over Heath Park will be mitigated, as well as the provision of like-for-like facilities to cater for the loss of greenspace; simply compensating financially is considered unacceptable. Options for mitigation should be developed through consultation with the Council and local communities. 5) Wider Landscape Enhancement Extent of Assessment Corridor The Draft ES sets out a range of mitigation (and, potentially, enhancement) measures within a finite corridor extending along the route of HS2. There appears to have been little consideration given towards providing mitigation measures and enhancements in more remote locations away from the railway. Opportunities should be explored to provide improvements of, and enhancement to, the wider area surrounding HS2. Landscape, ecological, heritage and green infrastructure enhancements could go some way towards offsetting the localised impacts of the railway (for communities and eco-systems etc.) as well as enhancing views from HS2 for its users. Early investment in these measures is important to ensure that the associated benefits are realised and established in advance of the opening of HS2. 6) Community Fund In its response to the Government / HS2 Ltd consultation on Property Compensation, the Council raised its concern regarding the impacts of both the construction and operation of HS2. The response suggested the establishment of a Community Fund to provide a form of mitigation of / compensation for the effects of HS2 on local communities. Summary of SMBC Asks - 2 -
3 It is understood that a 'Countryside Initiative' was set up in association with HS1 to provide enhancement of landscape, biodiversity and heritage in areas affected by the railway through the provision of grants, advice, support and advocacy. A similar initiative should be set up in association with HS2, perhaps within the context of delivering enhancements to the wider landscape surrounding the railway. Any Community Fund arrangement that is set up should be done so on a local area basis. Funding should be apportioned to each area to enable local improvements to be delivered in those areas. Establishment of a single pot fund, to which all local areas could bid and compete for funds, would be considered inappropriate. HS2 Ltd should engage with the Council throughout the development and administration of any form of Community Fund scheme. 7) Noise Impact and Design Speed The Draft ES includes a series of noise contour maps, which provide an indication of the noise levels generated by HS2 through the borough. Whilst useful, the mapping is difficult for residents and communities to interpret as it does not demonstrate the increase in noise levels that they will be subject to relative to those currently experienced. This is due to baseline noise assessment remaining ongoing. Furthermore, the noise mapping released refers only to average noise levels; it does not provide an indication of the peak levels of noise that will be generated by HS2. The impact of peak noise is considered especially important for members of the local community as it is likely that the peak level of noise generated by HS2 will be most intrusive form of noise, for example in disrupting sleep. In order to fully understand the impact of noise generated by HS2, the Formal ES should include an assessment of the impact of peak noise and should demonstrate the increase in average noise levels that will be experienced throughout areas affected by HS2. The Formal ES should also consider the environmental benefits that may be brought about through a reduction in design speed of the railway in the Solihull area it is likely that the impact of noise will be decreased in association with a reduction in design speed. Furthermore, a lower design speed will enable tighter turning radii to be achieved, which could enable the railway to be realigned such that it passes further away from local communities, thereby further reducing impacts on those communities. 8) Construction Haul Routes, Enforcement, Engagement, Management and Funding. The Draft ES highlights roads that will be used as haul routes to serve HS2 construction sites, and provides an indication as to the potential usage of these roads. The Council s view is that, where possible, construction sites should be accessed directly from A roads to minimise impacts on communities and ensure that roads of a suitable construction standard and width are used. A number of the roads identified by HS2 Ltd as being used to serve construction compounds are considered unsuitable; for example Truggist Lane and Lavender Hall Lane in Balsall Common; Diddington Lane, Hampton in Arden; Water Orton Road, Castle Bromwich and Middle Bickenhill Lane, Bickenhill. Summary of SMBC Asks - 3 -
4 Clarification is required in more detail as to the intended use of these roads, and whether alternative options for construction site access are available (for, example through the construction of new, temporary roads and / or through use of the land upon which HS2 will be built). The Council is aware that the HS2 Hybrid Bill may not affect the general permitted development and works privileges afforded to Statutory Undertakers. It is important that works undertaken by Statutory Undertakers are well coordinated with those associated with the construction of HS2 such that disruption to the operation of the local highway network is minimised; clarity is required as to how this will be achieved. Clarity is required on the role of the Council in enforcing all construction activities (not just limited to haul routes) that do not comply with the requirements of the CoCP and / or any other agreements that may be established. Appropriate funding should be provided for Council resources in association with enforcing upon HS2-construction related activities. It is also important that engagement with local communities is continued throughout the construction process to enable a two-way flow of information and discussion with those directly affected by construction activities. The Draft CoCP makes reference to the development of a Stakeholder Engagement Framework; clarity is therefore required as to how HS2 Ltd and its construction contractors intend to engage with local communities throughout the construction of HS2. Communities should have a clear and effective link to HS2 to ensure any concerns are dealt with effectively and quickly. 9) Viaduct Design The Draft ES includes photomontages of proposed viaducts. The photomontages illustrate that a relatively bland and imposing concrete structure will form the basis of the proposed viaducts. It is understood that the photomontages are, at this stage, purely indicative of the type of material that will be used in viaduct construction. It is therefore vital that HS2 Ltd works with the Council, and local communities, to develop viaduct design proposals that are iconic, attractive and complement and showcase the character of the area in which they are proposed. Similar principles should be applied to the design and development of the proposed people mover link between the Interchange Station and the NEC, Birmingham International Station and Birmingham Airport. 10) Kenilworth Greenway The Draft ES indicates that a section of the Kenilworth Greenway will be used as a haul route during the construction of HS2, and that a temporary diversion route will be provided to cater for this loss. Part of the temporary footpath is proposed to run through a flood plain, which is known to flood from time to time. It is important that the temporary measures are provided to an equivalent standard to that of the Greenway and that appropriate measures are put in place to prevent and / or mitigate any flooding issues that may arise. Following construction of HS2, the Draft ES suggests that the Greenway will be reinstated to its current standard. Given the impact on the Greenway (and the surrounding area) associated with the operation of HS2, the Council considers that opportunities to enhance the Greenway substantially should be captured in association with its reinstatement. Summary of SMBC Asks - 4 -
5 Furthermore, the opportunity should be explored to deliver, in association with HS2, an effective link between the northern end of the Greenway and Balsall Common village centre. 11) Lack of background information, evidence and analysis The Draft ES has been released to show the current thinking of HS2 Ltd and to gauge opinion on some of the mitigation measures that are currently proposed. It therefore includes statements on the significance of HS2-generated effects for a number of potential impacts, e.g. the effects of noise on people, the effect of road closures, the effect on cultural heritage assets etc. However, due to a number of assessments remaining on-going, there is a lack of evidence supplied in support of those statements. It is therefore difficult to form an informed decision as to whether or not the statements put forward by Draft ES are valid. Furthermore, not all potential environmental impacts appear to have been addressed by the Draft ES. For example, no information appears to have been provided in relation to either the potential electromagnetic interference or the potential for light pollution that may be generated by the scheme. In order for the Council to fully understand the impacts of HS2, it is important that the Formal ES includes all the analysis and evidence relied upon in drawing its conclusions. The analysis should be provided in relation to all effects generated by HS2, not solely those identified as being significant. Summary of SMBC Asks - 5 -
Euston Community Forum. 11 June Maria Fidelis School
Euston Community Forum 11 June 2013- Maria Fidelis School Item Topic Lead Duration Introductions Welcome and introductions/apologies Chair 6.00pm - Minutes of the meeting on 18 th April 6.15pm Format of
More informationHS2 Environment. Protecting the environment
HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant
More informationDraft Eastern District Plan
Draft Eastern District Plan Submission_id: 31238 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: Turrulla Gardens Pty Ltd C/- Mecone Organisation type: Industry First name:
More informationNeighbourhood Planning Local Green Spaces
Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...
More informationHS2 Interchange Station Design
Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange
More informationUniversity Park, Worcester Non Technical Summary December 2011
University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to
More informationBEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT
BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT 2017-18 Summary 1 Progress on local development documents 1 Local development documents adopted in the monitoring period 1st April 2017 31st
More informationEbbsfleet Development Corporation
Title of Paper Planning and Housing Delivery Report September 2018 Presented by Sub-Committee Mark Pullin, Chief Planning Officer Planning Committee Purpose of Paper and Executive Summary This paper provides
More informationWednesbury to Brierley Hill Extension
19 February 2019 Wednesbury to Brierley Hill Extension Evidence Given on Behalf of the Applicant: WMCA Civil Engineering Summary Proof of Evidence Ian Collins Transport and Works Act 1992 The Transport
More informationCotswolds AONB Landscape Strategy and Guidelines. June 2016
Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction
More information9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED
9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following
More informationINTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?
1 INTRODUCTION Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. This is the third round of information events that we have undertaken on the project, following
More informationGreat Easton Neighbourhood Plan Statement of Basic Conditions
Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..
More informationLongbridge Town Centre Phase 2 Planning Application
Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham
More informationEnvironmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.
Environmental Impact Assessment for Waterway Restoration Projects Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects What is Environmental Impact
More informationStrategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017
Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task
More informationBRE Strategic Ecological Framework LI Technical Information Note 03/2016
BRE Strategic Ecological Framework Technical Information Note 03/2016 September 2016 Contents 1. Introduction 2. Aims of BRE s Strategic Ecological Framework 3. How SEF is different from previous approaches
More information11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2
11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON
More informationTaking forward the All London Green Grid
Taking forward the All London Green Grid Foreword Earlier this year, the Mayor published the All London Green Grid Supplementary Planning Guidance to the London Plan which set the vision, and framework,
More informationPerth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager
Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West
More informationINTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB
INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive
More information3. Neighbourhood Plans and Strategic Environmental Assessment
1. Introduction This report sets out a draft Screening Determination for the Preston Parish Council s Neighbourhood Plan and has been prepared by rth Hertfordshire District Council. The purpose of the
More informationSouth District What we heard
What we heard Vision to 2056 and Priorities Governance and implementation Infrastructure and funding Feedback supported: The vision for a metropolis of three cities, but emphasised the importance of infrastructure
More informationBETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS
Report To: Greater Cambridge Partnership Joint Assembly 20 th September 2018 Lead Officer: Peter Blake GCP Director of Transport BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE
More informationTable of Allocated Housing Sites
Draft as of 0 November 016 Table of Allocated Housing s Name Green 1 (30, 33, 10, 169, 36/ 100) Barratt s Farm Balsall Common Yes 57 800 Includes existing park. Listed buildings to edge of site. of search
More informationROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document
ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL
More informationWestern Sydney Parklands Australia s Largest Urban Park
Western Sydney Parklands Australia s Largest Urban Park 37 WLA 1 MAGAZINE 21 38 WESTERN SYDNEY PARKLANDS AUSTRALIA S LARGEST URBAN PARK Large urban parks have dual roles to play in meeting the demands
More informationParish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN
Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council
More informationSHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS
These plans may provide opportunities as well as concern for recreational boating. They are currently being revised and consulted on. This document explains how we can engage in the process. Shoreline,
More informationCookham Parish Council s Response to The Draft Local Borough Plan
Cookham Parish Council s Response to The Draft Local Borough Plan As Agreed at the Planning Committee Meeting on 10 th January 2017. Designation of Poundfield as a Local Green Space The Parish Council
More informationKibworth Harcourt. Introduction. Introduction
Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to
More informationScottish Natural Heritage. Better places for people and nature
Scottish Natural Heritage Better places for people and nature Contents Summary... 3 SNH approach... 5 Place-making in policy and practice... 6 Developing the contribution of the natural heritage to place-making...
More informationLand at Fiddington Hill Nursery, Market Lavington
Land at Fiddington Hill Nursery, Market Lavington Briefing Report for Market Lavington Parish Council Persimmon Homes (Wessex) April 2016 Background This brief report has been prepared following the Market
More informationSustainability Statement. Whitby Business Park Area Action Plan
Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan
More information3 Urban Design and the State Highway Network
NZ Transport Agency Page 1 of 14 Urban Design Professional Services Guide 1 Introduction This is a professional services guide on urban design, which provides direction to the NZ Transport Agency (NZTA)
More informationThe Gwennap Parish Vision Statement
QUICK GUIDE What is a Neighbourhood Development Plan? Ultimately it is a document used by developers or anyone wishing to submit a planning application that describes the vision, strategy, plans, regeneration,
More informationIn your area. Ravenfield to Clayton LA13. June Introduction
June 2018 www.hs2.org.uk In your area Ravenfield to Clayton LA13 LA13 A6195 A6195 to Leeds Great Houghton Thurnscoe Hickleton A635 A633 A633 Clayton Clayton junction Thurnscoe East Goldthorpe Barnburgh
More informationLocal Growth Planning in North Central Green Line Communities
2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments
More informationWelcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.
WELCOME Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along. The South Western Relief Road (SWRR) route is proposed in Stratford-on-Avon
More information8.0 Design and Form of Development 43/
42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive
More information6 Growth Management Challenges and Opportunities
6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s
More informationPANSHANGER QUARRY, Hertfordshire
PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note
More informationHigh Speed Rail (London- West Midlands)
High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 3: Draft Heritage Memorandum November 2013 ESA 4.4 High Speed Rail (London- West Midlands) Draft Environmental Minimum
More informationEnvironmental Impact Assessment
Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.
More informationLooking Forward. Tuesday 22 nd April 2018
Looking Forward Tuesday 22 nd April 2018 Vernon Loo Community Engagement Manager Area Central Online HS2 has partnered with Commonplace to provide a locally focused website. This is currently being updated
More informationNew Century Park Welcome
Welcome 1 Welcome to our public exhibition on the proposals for the New Century Park project which will comprise 70 acres of commercial development, facilitated by a new 1.6 mile access road, improved
More informationDevelopment of green infrastructure in EU regions Nature-based solutions delivering multiple benefits
Development of green infrastructure in EU regions Nature-based solutions delivering multiple benefits A Policy Brief from the Policy Learning Platform on Environment Introduction What is green infrastructure?
More informationWELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of
WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high
More informationvolume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08
DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This
More informationWHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014
WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to
More informationSummary of Heritage Input
Summary of Heritage Input Commonwealth is providing services to the City of Ottawa, as heritage expert in the Lansdowne Revitalization project recognizing not only that Lansdowne accommodates designated
More informationWOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD)
Agenda Item No. 5 EECUTIVE - 15 JANUARY 2015 Executive Summary WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD) The report outlines the various responses to the consultation on the Design Supplementary
More informationPerth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager
Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices
More informationLONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY
LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2
More informationDevelopment of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site
Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality
More informationRichard Lemon Spatial Project Manager. Biodiversity and Green Infrastructure
Richard Lemon Spatial Project Manager Biodiversity and Green Infrastructure A key concept: Multifunctionality Combining different functions on the same piece of land multi-functional green space, new
More informationDRAFT GREATER SYDNEY REGION PLAN OBJECTIVES, STRATEGIES AND ACTIONS
Greater Sydney Commission DRAFT GREATER SYDNEY REGION PLAN OBJECTIVES, STRATEGIES AND ACTIONS Issued: 26 OCTOBER 2017 Version: 1 Subject: Greater Sydney Region and District Plans This information note
More informationCranfield University Masterplan
Central Bedfordshire Council EXECUTIVE Tuesday, 5 December 2017 Cranfield University Masterplan Report of: Cllr Nigel Young, Executive Member for Regeneration, (nigel.young@centralbedfordshire.gov.uk )
More informationLand at Rampton Road. Cottenham
Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire
More informationSummary of Changes for the Comprehensive Draft Proposed Official Plan Amendment
Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment Note: Due to the broad scope of the Official Plan Review, this list is not exhaustive of the extent of changes in the comprehensive
More informationCanal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report
High Speed Two Phase 2a: West Midlands to Crewe Response to Working Draft Environmental Impact Assessment Report Please find below the response of the Canal & River Trust. The Trust is the guardian of
More informationE16: MAINTENANCE OF LANDSCAPED AREAS
HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular
More informationWelcome to our exhibition
Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes
More informationGrantham Southern Quadrant Link Road Environmental Statement
Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of
More information12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE
12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE MARTIN SMALL HISTORIC ENVIRONMENT PLANNING ADVISER ENGLISH HERITAGE Policy ENGLISH HERITAGE GOOD
More informationExamination of South Cambridgeshire Local Plan
Matter SC6A - Policy SS/5 Waterbeach New Town Historic England( formerly English Heritage) 874 Rep Nos 59748, 60250, 60253 Examination of South Cambridgeshire Local Plan Historic England, Hearing Statement
More informationFixing the Foundations Statement
Fixing the Foundations Statement 13 th August 2015 The Heritage Alliance is the largest coalition of non-government heritage interests in England, bringing together 98 national organisations which are
More informationWestern City District What we heard
What we heard Vision to 2056 and Priorities Governance and implementation Infrastructure and funding The protection of the natural landscape including biodiversity and the Metropolitan Rural Area for food
More informationCardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement
Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical
More informationEnvironmental. Non-Technical Summary PHASE ONE
DRAFT Environmental Statement Non-Technical Summary PHASE ONE 2 HS2 Phase One Draft Environmental Statement Non-Technical Summary High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place,
More informationCITY VIEW OBJECTIVES
SECTION 2: CITY VIEW OBJECTIVES CONTENTS 2.1 Introduction 1 2.2 Strategic Direction 1 2.3 The City View Resource Management Issues for the City 1 2.4 The Goal 3 2.5 The City View Objectives 3 Palmerston
More informationImplementing sustainable water strategy through development industry engagement
Implementing sustainable water strategy through development industry engagement Ian Director, Organica Engineering, Melbourne, Australia E-mail: iadams@organicaeng.com.au Edward Cotter Sustainability Leader,
More informationWelcome to the Public Consultation Exhibition
Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised
More informationPeter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).
Our ref: 30062 2 nd August 2017 Kettering Borough Council Planning Department Municipal Offices Bowling Green Rd Kettering NN15 7QX 61 Oxford Street Manchester M1 6EQ T: +44 (0)161 245 8900 E: manchester@peterbrett.com
More informationThe Hadean-Creation studio.
Play-4-All Spring 2016 The Hadean-Creation studio. We provide sustainable and ethical responses to the client s brief by adding value and empowering a sense of pride and ownership. Hadean-Creation is a
More informationGarden Bridge Planning Application
Planning Application Additional Verified photomontages and assessment September 2014 Contents Page 1 Visual assessment 2 1.1 Introduction 2 1.2 Baseline 2 1.3 Potential effects and good environmental
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 9 January 2013 AUTHOR/S: Planning and New Communities Director S/2270/12/FL FEN DRAYTON 850m long flood defence embankment ranging in
More informationIpswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation
Ipswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation Having reviewed the issues and options documents, the Society has made the following response: Part 1 Strategic
More informationDublin Mountains Project Q & A
01 What is the background to the project? What is the Project? Why is the needed now? Why Hellfire/Masseys? What has happened so far? What is the project status now? Why is the planning application for
More informationChapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts
Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor
More informationSTATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY
STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff
More informationInterim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents
Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives
More informationSPG 1. * the northern and western sections which are open fields used for pasture and grazing;
SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended
More informationCITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)
CITY CLERK Clause embodied in Report No. 10 of the, as adopted by the Council of the City of Toronto at its meeting held on November 6, 7 and 8, 2001. 10 Parkland Acquisition Strategic Directions Report
More informationChapter 1. Introduction
Chapter 1 Introduction 2 Crossrail Amendment of Provisions 1 Introduction 1.1.1 The Crossrail Bill was submitted to Parliament together with an Environmental Statement (ES) (hereafter referred to as the
More informationSummer North West Greenway Network - Information Booklet
NORTH WEST GREENWAY NETWORK Summer 2018 1 Overview This leaflet provides an overview of the North West Greenway Network, a project led by Derry City and Strabane District Council working in partnership
More informationHobart A Strategic Framework
Hobart 2025 A Strategic Framework Adopted by the Hobart City Council 15 October 2007 Table of Contents Introduction...2 Vision and Future Directions...3 FD1 Offers opportunities for all ages and a city
More informationHeritage Action Zone. Explanatory Notes and Guidance
Heritage Action Zone Explanatory Notes and Guidance Contents What is a Heritage Action Zone?...2 What support can Historic England offer to a Heritage Action Zone?...2 What could a Heritage Action Zone
More informationFormer North Works, Lickey Road, Longbridge, Birmingham
Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham
More informationPLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4
Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:
More informationBalcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report
Balcombe Neighbourhood Plan Habitats Regulations Assessment Screening Report Produced for Regulation 14 of the Neighbourhood Planning (General) Regulations 2012 17 th July 2015 1.0 Introduction 1.1 This
More informationLocal Authority Borough: Pembrokeshire Coast National Park
Case Study Theme: Our Council Rhagoriaeth Cymru Local Authority Borough: Pembrokeshire Coast National Park Good Practice: Oriel y Parc Creating the St. Davids Landscape Gallery in partnership with the
More informationReserved Matters application for a site that straddles the boundary between CBC and BBC
BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic
More informationSuffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation
Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation Having reviewed the issues and options documents, the Society has made the following response: Part 1 - Strategic
More informationHAYLE NEIGHBOURHOOD PLAN FUTURE HOUSING EXPANSION VISION DOCUMENT. Prepared for Hayle Neighbourhood Plan Steering Group by AECOM
HAYLE NEIGHBOURHOOD PLAN FUTURE HOUSING EXPANSION VISION DOCUMENT Prepared for Hayle Neighbourhood Plan Steering Group by AECOM December 2015 1. Introduction Context Hayle is a linear town situated in
More informationbuilding with nature - a new benchmark for green infrastructure
building with nature - a new benchmark for green infrastructure Danielle Sinnett, Gemma Jerome, Sarah Burgess, Nick Smith and Roger Mortlock outline the aims, development and proposed operation of Building
More informationLONGDEN VILLAGE DEVELOPMENT STATEMENT
LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned
More informationResponse by the Wiltshire Archaeological and Natural History Society
Highways England Consultation A303 Stonehenge Response by the Wiltshire Archaeological and Natural History Society Background About the Society Founded in 1853 to educate the public by promoting, fostering
More informationThe Fairfield Partnership Vision for North-East Elsenham
The Fairfield Partnership Vision for North-East Elsenham August 2009 Frequently Asked Questions Who is The Fairfield Partnership? The Fairfield Partnership is a joint venture between Marchfield Developments
More informationGreen Infrastructure planning must be evidence led, thus the importance of this stage in collating your information and responses.
Green Infrastructure Consultation Proforma Recipients: Andy Maginnis (Countryside Services) regarding access, recreation and tourism Ed Dursley (Transport) regarding access and movement Steve Bloomfield