Sustainable Development Call for Projects

Size: px
Start display at page:

Download "Sustainable Development Call for Projects"

Transcription

1 Sustainable Development Call for Projects Infrastructure Project Examples *Note: This list is not all inclusive, but a sampling of the types of projects that were awarded funds.

2 137 Projects were submitted to the Sustainable Development Call for Projects 41 were funded for a total of $41M The following is a sample of the funded infrastructure projects. Please Note: The information presented in the following slides was provided by the project sponsors during selection process and may not reflect the most current development status.

3 City of Dallas Cityville at Carlisle Status Funded: $562,500 ($450,000/$112,500) Notice to Proceed (NTP): Issued Began Construction: Estimated Completion Date: Elements Funded: Pedestrian Amenities, Landscaping, and Street Construction

4 Cityville at Carlisle Project Description Located on Lemmon Avenue at the intersection of Carlisle Street Conceptual Landscape Plan acres Includes residential, restaurant and retail uses Approximately 204 housing units Approximately 50 jobs created Positive impact on congestion and air quality: Adjacent to Katy Trail with connection to Turtle Creek Trail and Lee Park Close proximity to DART s Cityplace station and M-Line streetcar Providing 1,200 square feet of space to Katy Trail Development creates linkages to surrounding developments which encourage residents, retail/restaurant users, employees and trail users to walk or ride, not drive Public Sponsor: City of Dallas Private Sponsor: FirstWorthing

5 Cityville at Carlisle Public Sponsor: City of Dallas Private Sponsor: FirstWorthing

6 Dallas Design District TIF Walking and Bicycling Improvements Status Funded: $1,037,236 ($829,447 / $207,447) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities and Landscaping)

7 Dallas Design District TIF Walking and Bicycling Improvements Project Description Improves more than 3-miles of sidewalk connections along Hi Line Drive, Turtle Creek Boulevard, Oak Lawn Avenue, Slocum and Edison streets in the Dallas Design District. Includes an estimated 31,753 SF of new or replacement sidewalks and crosswalks with shade trees, pedestrian scale lighting, benches, bike racks and trash receptacles. Supports private development of an estimated 772 new mixed-use residential units above 50,000 SF of ground floor retail, 10,000 SF of restaurant space and 150,000 SF of office space anticipated to be built within the next five years. Provides the anticipated 1,200+ new residents and 1,500+ new employees in this 160-acre TIF District with direct non-motorized connections to the in-design Trinity Strand Trail (was Old Trinity Trail) and the American Airlines Center/ Victory DART LRT and TRE Commuter Rail Stations, thereby reducing traffic congestion and improving air quality. DART LRT & TRE Commuter Rail 2025 MASTER PLAN DALLAS DESIGN DISTRICT TIF DISTRICT Public Sponsor: City of Dallas Private Sponsor: Dallas Design District TIF District/Trinity Association

8 Dallas Design District TIF Walking and Bicycling Improvements Conceptual Site Plan Public Sponsor: City of Dallas Private Sponsor: Dallas Design District TIF District/Trinity Association

9 Fiji/Compton Sustainable Development Project Status Funded: $3,514,983($2,811,986/ $702,983) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities, Landscaping, Street Construction, and Intersection and Rail Station Improvements)

10 Fiji/Compton Sustainable Development Project Project Description The Fiji/Compton Sustainable Development Project is a mixed use, affordable single and multi-family facility sited along DART s Blue Line in the southern sector. The initial phase of 110 units is situated on 7 acres currently owned by DART, within ¼ mile of both the Corinth St. and Morrell St. Stations. This project, located in a defined Area of Interest, will increase population density and create or enhance linkages within the community, to the DART Stations, and the Trinity Corridor. The Fiji/Compton Project will directly employ 5-7workers in management, sales and maintenance of the facility, but will also anchor additional infill development and preserve open space in an area adjacent to the Trinity Corridor and downtown. By increasing the urban density and connectivity with DART, the Fiji/Compton Project should significantly increase transit use, and reduce reliance on highemitting vehicles Public Sponsor: City of Dallas Private Sponsor: Sphinx Development Corp.

11 Fiji/Compton Sustainable Development Project Public Sponsor: City of Dallas Private Sponsor: Sphinx Development Corp.

12 City of Dallas Mockingbird Plaza and Midtown/Central/University Status Funded: $2,000,000 ($1,600,000/ $400,000) Notice to Proceed (NTP): Issued Began Construction: (NA) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities, Landscaping, and Bicycle Trails)

13 Mockingbird Plaza Project Description Located on Mockingbird Lane on the surface parking lots at DART s Mockingbird Station 10.3 total acres (6.3 acres developer will lease from DART) Includes residential and retail uses Conceptual Rendering Approximately 614 housing units Approximately 230 jobs created Positive impact on congestion and air quality: Located adjacent to existing Mockingbird Station DART light rail station Will accommodate future Katy Trail connection either in the middle or along periphery of development Central public plaza provides pedestrian and vehicular circulation, wide sidewalks, enhanced landscape and lighting, and pedestrian and bicycle amenities encourage pedestrian and alternative modes of travel Development focus to provide seamless connectivity to public transit and surrounding developments through innovative design and public features Public Sponsor: City of Dallas Private Sponsor: FirstWorthing

14 Mockingbird Plaza Public Sponsor: City of Dallas Private Sponsor: FirstWorthing

15 Downtown Garland Transit-Oriented Connectivity Project Status Funded: $2,312,500 ($1,850,000/ $462,500) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: (TBD) Elements Funded: (Pedestrian Amenities, Traffic Signal Improvements, Street Construction)

16 Project Description Transit-Oriented Connectivity Project This project establishes pedestrian, bicycle, and vehicular linkages to interconnect the proposed DCCCD satellite campus, the cultural amenities of downtown Garland, proposed mixed-use developments north and south of the DART rail line, and the DART bus transit center and light rail station. The project consists of three major components: Extension of Sixth Street for all modes of transportation to cross the DART rail lines and Walnut Street and become the main entrance into the campus, establish a linear pedestrian and bicycle corridor located between the rail lines, Sixth Street, Walnut Street and Fifth Street, and construct a new vehicular and pedestrian street south of the rail line between Sixth and Fifth Streets north of the proposed transit-oriented development site. The project is expected to have a positive impact on improving traffic congestion and air quality by facilitating travel by walking, riding bicycles, and using public transportation in lieu of the automobile. Location: Walnut Street between Glenbrook Drive and Fifth Street Residential Units: 544 Jobs Created: 1,205 Acreage: 42.5 Uses: community college, residential, retail, office, service Public Sponsor: City of Garland Private Sponsor: Dallas County Community College District (DCCCD)

17 Transit-Oriented Connectivity Project Site Plan Public Sponsor: City of Garland Private Sponsor: Dallas County Community College District (DCCCD)

18 Rowlett Downtown Mixed Use Development Status Funded: $1,687,500 ($1,350,000/ $337,500) Notice to Proceed (NTP): Issued Began Construction: ( ) Completion Date: ( ) Elements Funded: (Pedestrian Amenities, Traffic Signals, Intersection Improvements, and Street Construction)

19 Rowlett Downtown Mixed Use Development Project Description Project Location: Project Size: Project Uses: and Number of Res. Units: 286 Number of New Jobs: Impacts on C/AQ: Main Street, Rowlett, Texas 3.76 Acres Vertical Mixed Use Development including Restaurant, Retail, Office Residential Uses. 472 (Estimate based upon Facilities) The proposed project will have beneficial impacts on congestion and air quality by providing a dense, mixed-use development adjacent to the future DART Rowlett Light Rail Station. Additionally, the transportation improvements provide non motorized connections to schools, city facilities, and a significant number of single family residences, thus promoting a walkable community. Public Sponsor: City of Rowlett Private Sponsor: W. Paul Lott

20 Rowlett Downtown Mixed Use Development Proposed Transportation Improvements Public Sponsor: City of Rowlett Private Sponsor: W. Paul Lott

21 Irving- Las Colinas Urban Center LRT Station Area Status Funded: $1,625,000 ($1,300,000/ $325,000) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: ( ) Elements Funded: (Rail Transit and Landscaping)

22 Irving- Las Colinas Urban Center LRT Stations Project Description The station improvements (North Urban Center and Lake Carolyn Parkway) proposed are part of the LRT line being developed by DART to serve the Las Colinas Urban Center. This line is within the Sustainable Development Area of Interest as defined by NCTCOG. The quality development of these stations will enhance ridership and in turn contribute to congestion and air quality solutions at the regional and local level. The specific locations and design details for these stations are being defined in the PE/EIS process for the rail line. The proposed improvements will partially fund the station improvements and the associated final engineering. Remaining funds are committed in the DART financial plan. Support Graphics Public Sponsor: City of Irving Private Sponsor: LCLLP and BH O Connor

23 Irving- Las Colinas Urban Center LRT Stations Site Plan Public Sponsor: City of Irving Private Sponsor: LCLLP and BH O Connor

24 Arlington- UTA College Town Status Funded: $2,876,375 ($2,301,100/ $575,275) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities and Landscaping)

25 Central Arlington Mixed-Use District Project Description Our goal is to create a vibrant and diverse pedestrian neighborhood offering a great place for people to live and attend class, and access university life as well as community, retail and social activities. The project, which will become the Northeast boundary of the University of Texas at Arlington (UTA), will provide housing for college students and student parking combined with service retail and restaurants in a walkable and pedestrianoriented environment. This project creates a true college-town main street consistent with the UTA campus master plan, weaving together community, religious, social and campus uses with housing and retail development. The proposed multi-phased pedestrian development area is approximately 20 acres bounded by Pecan Street to the west, UTA Boulevard to the north, Mitchell Street to the south, and Center to the east. The project includes infrastructure improvements in conjunction with a mixed-use facility that includes 372 student housing units, 60+ new jobs, 47,000 square feet of retail/restaurant, 3,574 parking space garage, and a 6,000 seat basketball arena on the 20 acre site. The public part of the project will be pedestrian improvements to streets surrounding the development and a plaza at the corner of Mitchell and Center. The project will create additional housing density and jobs, thereby reducing congestion and improving air quality. Public Sponsor: City of Arlington Private Sponsor: Univ. of Texas at Arlington

26 Arlington- UTA College Town Public Sponsor: City of Arlington Private Sponsor: Univ. of Texas at Arlington

27 Fort Worth- Museum Place Status: COMPLETE Funded: $3,000,000 ($2,400,000/ $600,000) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities)

28 Museum Place Development Project Description Museum Place: A Vertically, Integrated Mixed-Use Urban Development Located at the Intersection of University, West 7 th, Bailey & Camp Bowie 15-acres Bisected Into 6 City Blocks Includes Retail, Restaurants, Offices, Over 450 Residential Units & Relocation of the U.S. Post Office Support Graphics The Urban Form Provides: Deep Sidewalks With Outdoor Dining and Plazas for Public Gathering Raised Plateau Intersections and On-Street Parking Surrounding Each Block With Dedicated Bike Lanes Project Creates: Approximately 360 Permanent, Year-Round Jobs Impacts on Congestions and Air Quality: Reduces Vehicle Miles Traveled By Providing Needed Services Within the Development Dedicated Transit Stops for Low Threshold Buses or Light Rail Transit Provides Connectivity from the Cultural District Core to Downtown Nearly 500 Urban Households Reducing Vehicle Miles Traveled by 50% Greatly Contributes to a Severe Reduction in Emissions and Attainment of Air Quality Standards Public Sponsor: City of Fort Worth Planning Department Private Sponsor: Cultural District Development Initiatives, Inc.

29 Museum Place Development Site Plan Public Sponsor: City of Fort Worth Planning Department Private Sponsor: Cultural District Development Initiatives, Inc.

30 Fort Worth- Trinity Bluff Status Funded: $1,313,625 ($1,050,900/ $262,725) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities)

31 Trinity Bluff Project Description Trinity Bluff Development is truly the answer to many dreams. The movement from the suburbs to the inner city has proven effective in large municipalities across the United States. As air quality concerns and energy conservation encourage responsible alternatives to urban sprawl, a contiguous parcel of land in excess of thirty acres has been assembled within walking distance to Sundance Square in downtown Fort Worth. Trinity Bluff promises over 2000 residences to the Central City over a ten year period. This downtown neighborhood development provides needed urban housing master planned under the critical eye of Lincoln Property Company. This combination of expertise and location make this development both remarkable and sustainable. During the completion of this project, over $400 million will be invested by the private sector. Over 400 jobs will be sustained on average over the 10 years to completion. In 2005 the first phases began construction. The streetscape funds in this request will most assuredly pay many dividends as it helps raise the bar that inspires a great sense of place. Public Sponsor: City of Fort Worth Private Sponsor: Trinity Bluff Development, Ltd.

32 Public Sponsor: City of Fort Worth Private Sponsor: Trinity Bluff Development, Ltd.

33 West Berry Streetscape Grandmarc Development Status Funded: $3,000,000 ($2,400,000/ $600,000) Notice to Proceed (NTP): Issued Began Construction: ( ) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities and Street Construction)

34 West Berry Streetscape Grandmarc Development Project Description Streetscape enhancements adjacent to the Grandmarc development project, located in the heart of the Berry/University Urban Village and Texas Christian University. Location: West Berry Street, between University and Waits Avenue Acres: 2.9 (Grandmarc) Project Uses: Ground Floor Retail; Residential Housing Units: 212 Number of Jobs: 1,300 (including construction) Impacts on congestion and air quality: Provides needed student housing Decreases campus commutes, VMT Streetscape enhancements encourage pedestrian activity, safety, comfort, and connectivity Public Sponsor: City of Fort Worth Private Sponsor: Texas Christian University

35 West Berry Streetscape Grandmarc Development Location of Grandmarc Public Sponsor: City of Fort Worth Private Sponsor: Texas Christian University

36 Grapevine- Fairfield on Main Street Status Funded: $1,000,000 ($800,000/ $200,000) Notice to Proceed (NTP): Issued Began Construction: (2.1.07) Estimated Completion Date: ( ) Elements Funded: (Pedestrian Amenities, Landscaping, and Intersection Improvements)

37 FAIRFIELD ON MAIN STREET TRANSIT ORIENTED DEVELOPMENT Project Description The project is a pedestrian friendly complex of three buildings, two of which accommodate ground level commercial/retail with residential units above. The buildings are surrounded by public sidewalks and form an outdoor plaza between them. The plaza will have bench seating, potential outdoor dining patios for adjacent restaurants and landscaping and trees. Streetscape and walkway improvements are included along Main Street extending from the development site north to Franklin Street in the Main Street Historic District. Main Street Perspective Located in Downtown Grapevine on the southeast corner of Dallas Road and Main Street 5.5 acre parcel Mixed Use development 251 residential units 62 area jobs provided Close access to future regional rail service Dallas Road Perspective Public Sponsor: City of Grapevine Private Sponsor: Fairfield Residential

38 FAIRFIELD ON MAIN STREET TRANSIT ORIENTED DEVELOPMENT Site Plan Public Sponsor: City of Grapevine Private Sponsor: Fairfield Residential

Sustainable Development Call for Projects Western Infrastructure Project Submissions

Sustainable Development Call for Projects Western Infrastructure Project Submissions 2009-2010 Sustainable Development Call for Projects Western Infrastructure Project Submissions January 20, 2010 2009-2010 SDCFP Summary of Infrastructure Funding Infrastructure Projects Number of Projects

More information

1.0 VISION STATEMENT. December 6, PRINCIPLES

1.0 VISION STATEMENT. December 6, PRINCIPLES Vision Statement Lincoln Regional Airport 1.0 VISION STATEMENT 1.1 City LOCATION of AND OVERVIEW The Easton Lincoln Place Land Use Master Plan identifies the principles, goals, policies, and standards

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N Sheridan Boulevard S TAT I O N A R E A P L A N 1 City of Lakewood Adopted November, 2006 S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N The Vision The City of Lakewood s overall vision is

More information

Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011

Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011 Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project Community Meeting April 27, 2011 Overview Introduction to Subregion 4 TOD Implementation Program

More information

Wadsworth Boulevard S TAT I O N A R E A P L A N

Wadsworth Boulevard S TAT I O N A R E A P L A N Wadsworth Boulevard S TAT I O N A R E A P L A N City of Lakewood Adopted November, 2006 The Vision The City of Lakewood s overall vision is to transform the area around the light rail station into a mixed-use

More information

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning Today Land & People Employment Major employers include Saint Alphonsus, the College of Western Idaho, the Auto Mall, Sorrento Lactalis and Walmart. 3,004 jobs in 2010 (COMPASS-CIM 2040 TAZ data) 4,345

More information

C. Westerly Creek Village & The Montview Corridor

C. Westerly Creek Village & The Montview Corridor C. Westerly Creek Village & The VISION Community Vision When the goals of the city are achieved Westerly Creek Village, a distinctive community defined by Montview Boulevard and Westerly Creek, is a strong

More information

3.1 community vision. 3.3 required plan elements

3.1 community vision. 3.3 required plan elements Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan

More information

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION June 15, 2015 Revised: August 1, 2016 I. VISION Brookhill is a proposed community based upon the principles of Albemarle County

More information

DOWNTOWN RESIDENTIAL DISTRICT DEVELOPMENT OPPORTUNITES

DOWNTOWN RESIDENTIAL DISTRICT DEVELOPMENT OPPORTUNITES DOWNTOWN RESIDENTIAL DISTRICT DEVELOPMENT OPPORTUNITES Out of all the areas in Downtown Painesville, this district provides the greatest opportunity for change with the vacation of Lake East Hospital.

More information

Welcome! to Keller Town Hall

Welcome! to Keller Town Hall Welcome! to Keller Town Hall Keller Town Center Planning a New Downtown What is Keller Town Center? A new, growing downtown district planned as an urban village A combination of retail and office spaces,

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE Shady Grove Metro Station Area Charrette Closing Presentation October 25-28, 2000 MONTGOMERY COUNTY, MD M-NCPPC Design Collective, Inc. Architects

More information

The University District envisions, in its neighborhood

The University District envisions, in its neighborhood Envisioning the University District Link Light Rail in Seattle s neighborhoods CIY OF SEALE CONCEP-LEVEL SAION AREA PLANNING RECOMMENDAION RESOLUION # 30165 EXHIBI L Vision 08.2000 he University District

More information

Chapter 4. Linking Land Use with Transportation. Chapter 4

Chapter 4. Linking Land Use with Transportation. Chapter 4 Chapter 4 Linking Land Use with Transportation Chapter 4 59 Chapter 4 Linking Land Use with Transportation Community Design and Transportation Program Introduction Since the 1950s, the predominant development

More information

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

Developer s Program. The Station at East 54

Developer s Program. The Station at East 54 Developer s Program The Station at East 54 Existing Conditions The Station at East 54 is proposed for a 1.12 acre site at the northeast corner of Hamilton Road and Prestwick Road, tucked between the East

More information

DRAFT Land Use Chapter

DRAFT Land Use Chapter Stevens Creek Urban Village DRAFT 1 18 17 Land Use Chapter INTRODUCTION This Land Use Chapter describes how the Stevens Creek Urban Village will accommodate the growth that is planned for it in the Envision

More information

2.0 THE PLATINUM TRIANGLE VISION

2.0 THE PLATINUM TRIANGLE VISION 2.0 THE PLATINUM TRIANGLE VISION The envisions an exciting future for the area surrounding Angel Stadium of Anaheim, the Honda Center and The Grove of Anaheim. 2.1 Planning Principles In order to further

More information

SPRINGHILL LAKE TRANSIT VILLAGE

SPRINGHILL LAKE TRANSIT VILLAGE Greenbelt Metro Area Sector Plan - Subarea Design Policies and Guidelines - Springhill Lake Transit Village 113 SPRINGHILL LAKE TRANSIT VILLAGE Residential Neighborhood and Village Center CONCEPT Springhill

More information

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction 2.1 Introduction 2.1 Introduction This section of the Specific Plan describes and illustrates the desired form, character and uses of the Downtown Addition and explains the underlying design principles.

More information

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers Metro Activity Center Design Guidelines Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers Metro Activity Centers What is a MAC? Legacy, the adopted guide for the future growth

More information

Blue Line LRT Extension

Blue Line LRT Extension v e Noble Pkwy Noble Pkwy Xerxes Ave N Shingle Creek Penn Ave N Penn Ave N Fremont Ave N Lyndale Ave N S Washington Ave University Ave NE Blue Line LRT Extension LIGHT RAIL PLATFORM AND STATION DESIGN

More information

The Need to Develop a Transit Ready Community

The Need to Develop a Transit Ready Community Evaluation & Appraisal Report (EAR) Major Issue # 6 The Need to Develop a Transit Ready Community July 3, 2007 EAR Major Issue # 6 Transit Ready Existing Comp Plan policies apply only to Indiantown Road:

More information

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins Hopkins Blake Road LRT Station Area Development Guidelines May 2015 Sponsored by: Blake Road Corridor Collaborative City of Hopkins Overview Hopkins is a dynamic community of over 17,000 residents located

More information

Transit-Oriented Development

Transit-Oriented Development Transit-Oriented Development Path to Sustainability West Windsor February 22, 2007 George S. Hawkins Context for Presentation NJ Future is a non-partisan, 501(c)3 non-profit organization. Offer perspective,

More information

TEMPLE MEDICAL & EDUCATION DISTRICT

TEMPLE MEDICAL & EDUCATION DISTRICT City of Temple, Texas TEMPLE MEDICAL & EDUCATION DISTRICT 1 Description. The City of Temple joined in partnership with key public and private entities to jointly promote education and medical activities

More information

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Notes: This document is provided for information purposes

More information

THE NEIGHBORHOOD TODAY

THE NEIGHBORHOOD TODAY THE NEIGHBORHOOD TODAY CORE AREA VISION How are we Good Urbanism A Site s DNA thinking about Elements of great Unique elements urban communities embedded in a place the site and design? ELEMENTS LIKE:

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Vision Statement Sunrise Blvd. Hazel Ave. Prairie City Rd. Gencorp Property Lincoln Regional Airport 1.0 VISION STATEMENT The identifies City of the principles, goals, policies, and standards Lincoln that

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by

More information

The Trinity River Corridor, offering Dallas areas of natural

The Trinity River Corridor, offering Dallas areas of natural IMPLEMENTATION PLAN FOR THE TRINITY RIVER CORRIDOR The Trinity River Corridor, offering Dallas areas of natural beauty and untapped potential, runs through the heart of the city. Proposed improvements

More information

City of Ennis. Downtown Master Plan Catalyst Projects

City of Ennis. Downtown Master Plan Catalyst Projects City of Ennis Downtown Master Plan Catalyst Projects Revised Framework Plan REVISED Project Types and Descriptions Project Types A. Visitor Attracting Projects: Projects in this category are intended to

More information

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008. Page 1 of 11 Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008. 1.0 Introduction: On January 30, 2008 the City of Mississauga, in conjunction with the consulting team of Brook

More information

RESEDA - WEST VAN NUYS COMMUNITY PLAN

RESEDA - WEST VAN NUYS COMMUNITY PLAN RESEDA - WEST VAN NUYS COMMUNITY PLAN Executive Summary As part of the initial outreach effort, the Department of City Planning hosted two workshops for the Reseda-West Van Nuys Community Plan Area during

More information

Millbrae TOD #2 Project Analysis

Millbrae TOD #2 Project Analysis Millbrae TOD #2 Project Analysis Project Description A Site Development Permit and Conditional Use Permit are proposed to allow for a mixed-use transitoriented development on approximately 9 Acres located

More information

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013 Elm Fork Land Use Trinity River Corridor Project Committee May 13, 2013 Purpose Discuss Trinity River planned Land Use and Appropriate Compatible Uses, particularly with respect to the Elm Fork Area 2

More information

a vibrant office and retail development enters the gateway to rutherford county

a vibrant office and retail development enters the gateway to rutherford county a vibrant office and retail development enters the gateway to rutherford county PF UP Introducing Fountains at Gateway in Rutherford County Fountains at Gateway is a new 31-acre Class A multi-tenant office

More information

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Robbinsdale LRT Station. CDI Development Guidelines. August Overview Robbinsdale LRT Station August 2018 Overview The City of Robbinsdale may have the coolest opportunity site along the 13 mile stretch of the Bottineau LRT corridor / Blue Line extension. Located a block

More information

Lehigh Acres Land Development Regulations Community Planning Project

Lehigh Acres Land Development Regulations Community Planning Project Lehigh Acres Land Development Regulations Planning Effort Summary In July, 2010 Commissioner Frank Mann invited the Lehigh Acres community to start discussing how to achieve their recently adopted community

More information

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013 CRCOG Transportation Committee Meeting Monday, December 9, 2013 Introduction Why the Project was Initiated About Downtown New Britain Master Plan Goals Master Plan Overview Master Plan Study Areas and

More information

SECTION TWO: Urban Design Concepts

SECTION TWO: Urban Design Concepts SECTION TWO: Urban Design Concepts The Gardnerville Plan for Prosperity shapes economic opportunities presented by regional growth. The Urban Design Concepts provide policies and concepts for land use,

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program 1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the

More information

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012 Welcome Comprehensive Plan & Transportation Plan Open House November 7, 2012 Agenda Proposed future land use plan Comprehensive Plan strategies Traffic forecasts Future traffic operations Possible future

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information

1 Adapted from the Statewide Transit-Oriented Development Study by CalTrans, 2006

1 Adapted from the Statewide Transit-Oriented Development Study by CalTrans, 2006 APPENDIX C: LAND USE PLANNING FOR ENHANCED RAIL SERVICE 72 BACKGROUND One of the consistent themes heard from localities in the Route 29 corridor Planning Forums was the need for expanding rail service

More information

Lynn Housing Authority and Neighborhood Development. Washington Street Gateway District Plan A p r i l

Lynn Housing Authority and Neighborhood Development. Washington Street Gateway District Plan A p r i l Lynn Housing Authority and Neighborhood Development Washington Street Gateway District Plan A p r i l 2 0 0 8 rendering of sagamore hill from lynnway pedestrian overpass table of contents project area

More information

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

Tyvola & Archdale Transit Station Area Plan. June 5, 2008 Tyvola & Archdale Transit Station Area Plan Second Public Meeting June 5, 2008 Presentation Outline 1. Purpose and Process 2. Station Area Overview 3. Plan Recommendations 4. Comments Received and Proposed

More information

Urban Development Areas Frederick County

Urban Development Areas Frederick County 18 Urban Development Areas Frederick County UDA Needs Profile: All UDAs Frederick County, Virginia's northernmost county has two UDA s, surrounded by the City of Winchester and located adjacent to the

More information

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1 INTRODUCTION CHAPTER 1 Ms. Guajardo s Class - Central Elementary CH 1 1 1.1 SETTING South Centre City is a linear corridor south of Downtown Escondido paralleling Centre City Parkway and South Escondido

More information

Creating Quality Places: Successful Communities by Design

Creating Quality Places: Successful Communities by Design Creating Quality Places: Successful Communities by Design Communities across the metropolitan Kansas City area are growing. Our challenge is to shape future development in ways that will maintain and enhance

More information

City of Dallas Plans

City of Dallas Plans City of Dallas Plans Name Year 1. A Report on a Sheltered Pedestrian System in CBD 1979 2. A Report on the Public Uses of Block 250 1980 3. Achieving the Goals for Dallas 1978 4. Amendments to the City

More information

South Davis County COMMUNITY SPOTLIGHT

South Davis County COMMUNITY SPOTLIGHT South Davis County COMMUNITY SPOTLIGHT Davis/SLC Community Connector Bus Rapid Transit line connecting SLC & Davis County RTP Phase 1 Project Generate 3,100 average weekday riders Relieve congestion on

More information

1.0 Future Land Use. 1.1 Introduction. 1.2 Future Land Use Objectives

1.0 Future Land Use. 1.1 Introduction. 1.2 Future Land Use Objectives 1.0 Future Land Use 1.1 Introduction Can Holly Springs continue to accommodate significant growth while retaining and enhancing a Village-like atmosphere? Can enough commercial land be set aside for business

More information

Easton. Smart Growth Through Innovation. Easton

Easton. Smart Growth Through Innovation. Easton Hazel Ave. Sunrise Blvd. Prairie City Rd. Smart Growth Through Innovation offers a unique opportunity to meet the region s future need for jobs and housing. It embodies smart growth principles advocated

More information

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY MAIN STREET ECONOMIC DEVELOPMENT STRATEGY A PATHWAY TO A BETTER POUGHKEEPSIE DRAFT Working Paper #2: Planning Strategies Submitted December 1 st, 2015 to the City of Poughkeepsie LAND USE LAW CENTER PACE

More information

Lincoln Multi-Modal Center

Lincoln Multi-Modal Center University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Theses from the Architecture Program Architecture Program May 2006 Lincoln Multi-Modal Center Jeffrey Bayer Follow this

More information

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1 1.0 Introduction The Town of Castle Rock is situated between the metropolitan areas of Denver and Colorado Springs, amidst a unique terrain of rolling hills, mesas, ravines, and waterways. Like many Front

More information

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background Windsor Locks Transit-Oriented Development Planning Grant Request Project Background Downtown Windsor Locks runs along Main Street in the vicinity of the intersection of Routes 159 and 140. The current

More information

3.1 Existing Land Use

3.1 Existing Land Use 3.0 Land Use This strategy has been developed taking into account the position of the Town of Sidney as the economic center of the Saanich Peninsula. It acknowledges existing land use patterns in the downtown

More information

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014 Courthouse Square Planning & Urban Design Study Courthouse Square Working Group #13 October 15, 2014 1 Courthouse Square Process Working Group Community Courthouse Square Advisory Groups & Civic Associations

More information

REDLANDS TRANSIT VILLAGES SPECIFIC PLAN

REDLANDS TRANSIT VILLAGES SPECIFIC PLAN REDLANDS TRANSIT VILLAGES SPECIFIC PLAN CITY COUNCIL STUDY SESSION JANUARY 4, 2019 Redlands Blvd. Eureka St. Orange St. State St. Citrus Ave. Vine St. GENERAL PLAN TRANSIT VILLAGES WE ARE HERE SPECIFIC

More information

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT August 2018 Page intentionally left blank The Brooklyn Park Library adjacent to the 85th Ave LRT Station Area. OVERVIEW The Blue Line LRT Extension / Bottineau corridor offers a unique opportunity to leverage

More information

Northwest commuter rail station US 36 BRT. Westminster Station

Northwest commuter rail station US 36 BRT. Westminster Station Northwest commuter rail station Westminster Station US 36 BRT Westminster Center US 36 & Church Ranch Broomfield Flatiron/96 th St. US 36 & McCaslin Table Mesa Boulder Junction 13-month effort that will

More information

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Tyvola & Archdale Transit Station Area Plan. May 15, 2008 Tyvola & Archdale Transit Station Area Plan First Public Meeting May 15, 2008 Presentation Outline 1. Purpose and Process 2. Station Area Overview 3. Plan Recommendations Vision Land Use Transportation

More information

Development Excellence. North Central Texas Council of Governments. Center of Development Excellence

Development Excellence. North Central Texas Council of Governments. Center of Development Excellence Development Excellence North Central Texas Council of Governments Center of Development Excellence Complex Issues Facing the Region Transportation Air Quality Water Supply Environment Solutions Emphasize

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

3.0 URBAN DESIGN. December 6, OVERVIEW

3.0 URBAN DESIGN. December 6, OVERVIEW Urban Design 3.0 URBAN DESIGN December 6, 2007 3.1 OVERVIEW The highly urban character of Easton Place is defined by the overall design of the community. The following sections provide an overview of the

More information

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT FEBRUARY 2013 TABLE OF CONTENTS 1.0 BACKGROUND... 1 1.1 Amendment... 1 2.0 LOCATION & CONTEXT... 2 2.1 Land Ownership... 2 3.0 POLICY CONTEXT... 3 3.1 Municipal Development Plan... 3 3.2 Capital Region

More information

DINING ENTERTAINMENT SHOPPING

DINING ENTERTAINMENT SHOPPING DINING ENTERTAINMENT SHOPPING Proscenium is a unique community that combines the ease of upscale living with the luxury of retail shops and dining options right outside your front door. Perfect for young

More information

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES August 2018 OVERVIEW The City of Robbinsdale has a prime-opportunity site in the middle of the 13 mile stretch of the Bottineau LRT corridor / Blue Line extension. Robbinsdale offers a prominent, vital,

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

Bay Meadows Specific Plan Amendment - Phase II Overview. I. Phase II Overview. November 7, 2005 I - 1

Bay Meadows Specific Plan Amendment - Phase II Overview. I. Phase II Overview. November 7, 2005 I - 1 I. Phase II Overview November 7, 2005 I - 1 Explanatory Note This Specific Plan Amendment amends the Bay Meadows Specific Plan adopted by the San Mateo City Council on April 22, 1997. The original Specific

More information

Silverdale Regional Center

Silverdale Regional Center Silverdale Regional Center Vision for Silverdale Regional Center The Silverdale Regional Center Plan (Plan) will guide the evolution of the Silverdale Regional Center from a collection of strip malls and

More information

Highland Village Green Design Guidelines

Highland Village Green Design Guidelines Highland Village Green Design Guidelines Publishing Information Title Highland Village Green Design Guidelins Author The City of Calgary Status DRAFT - Proposed document subject to changes Additional Copies

More information

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

Improve Neighborhood Design and Reduce Non Point Source Water Pollution HOW TO Planning Guide Improve Neighborhood Design and Reduce Non Point Source Water Pollution This document was funded by a grant from the New Hampshire Coastal Program with funding from the National Oceanic

More information

burlington mobility hubs study Downtown Burlington Mobility Hub

burlington mobility hubs study Downtown Burlington Mobility Hub burlington mobility hubs study Downtown Burlington Mobility Hub Draft Precinct Plan Workbook PIC #3, September 7, 2017 downtown mobility hub objectives City staff and their consultants are proposing an

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

PORT WHITBY COMMUNITY

PORT WHITBY COMMUNITY PORT WHITBY COMMUNITY SECONDARY PLAN UPDATE COMMUNITY IMPROVEMENT PLAN URBAN DESIGN GUIDELINES September 2015 DRAFT PROPOSED AMENDMENT NUMBER # to the Whitby Official Plan PURPOSE: The intent of this Amendment

More information

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

Citizen Comment Staff Response Staff Recommended Revision Planning Committee Citizen Comment Staff Response Staff Recommended Revision Planning Committee Area No. 1: Owner desires retail land uses. Area No. 1a: Owner of two small parcels adjacent to Area No. 1 desires retail land

More information

Packet Contents. Joint Planning Work Session Timeline.. Introduction.. Work Session Directions... 5

Packet Contents. Joint Planning Work Session Timeline.. Introduction.. Work Session Directions... 5 City Council and Planning & Zoning Commission Joint Planning Work Session Packet June 30, 2014 1 2 Packet Contents Joint Planning Work Session Timeline.. Introduction.. 4 4 Work Session Directions... 5

More information

Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and Chapel Hill Transit.

Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and Chapel Hill Transit. M 1/ 4 1/ 2 E IL M E IL Station Family: County: City: UNC Hospitals WHY THIS STATION? University Village Orange Chapel Hill Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

K. SMART ASSOCIATES LIMITED

K. SMART ASSOCIATES LIMITED Planning Justification Report Zoning By-Law Amendment 185 King Street North Waterloo, Ontario April 7th, 2017 Project Reference Number 16-245 K. SMART ASSOCIATES LIMITED CONSULTING ENGINEERS AND PLANNERS

More information

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham Planning Commission March 14, 2013 Presented by: City of Bellingham Port of Bellingham 1 Agenda Waterfront District Background Waterfront District Proposal Overview Sub-area Plan Development Regulations

More information

Derry Green Corporate Business Park

Derry Green Corporate Business Park Town of Milton Derry Green Corporate Business Park Urban Design Guidelines BMI/Pace - June 2010 Draft 3 Prepared by: Brook McIlroy Planning + Urban Design / Pace Architects Suite 300-51 Camden Street Toronto,

More information

THE 355/270 CORRIDOR:

THE 355/270 CORRIDOR: THE 355/270 CORRIDOR: Strategic Ideas for Sustaining a Livable Work Place Project Summary ACCESS LIFE DESIGN HEALTH WORK Montgomery County Planning Department The Maryland-National Capital Park and Planning

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

Good Neighbor Plan Dallas Love Field Airport Transportation and Environment Committee

Good Neighbor Plan Dallas Love Field Airport Transportation and Environment Committee June 25, 2012 Good Neighbor Plan Dallas Love Field Airport Transportation and Environment Committee Overview Vision for Dallas Love Field Downtown Dallas 360 Plan Targeted Improvement Zones Lemmon Avenue

More information

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005 1 Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005 Purpose To update the Committee on the ForwardDallas! Plan, including: Status Anticipated Products Public

More information

DOWNTOWN AREA PLAN. June 9, 2009

DOWNTOWN AREA PLAN. June 9, 2009 DOWNTOWN AREA PLAN June 9, 2009 Issues Identified by Councilmembers Overlap with Southside Plan Southwest Residential Area & Herrick Shadows & Residential Areas Shadows on Streets & Canyon Effect Transit

More information

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director LEED-ND 101: Practical Strategies for Achieving Sustainability Goals Travis Parker Lakewood Planning Director Metro Vision Idea Exchange Oct 11, 2012 West Corridor Stations West Corridor Overview West

More information

Realities and Assets in an In-Town Shopping Center

Realities and Assets in an In-Town Shopping Center SUSTAIN SOUTHERN MAINE MILL CREEK PILOT LESSONS LEARNED April 15, 2013 Realities and Assets in an In-Town Shopping Center 1. An older shopping district that was laid out in a low-density, strip center

More information

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA Planned Community Stockton, CA Project Overview March 2007 Summary of Proposed Community is a master-planned community proposed for development on approximately 3,810 acres in southeast Stockton. In 2004,

More information

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES 1 THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES The Civic District is the physical and emotional heart of the downtown. It is also a major gateway into the central core, establishing the image and identity

More information