Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers
|
|
- Dora Bell
- 6 years ago
- Views:
Transcription
1 Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers Redevelopment of Ajax Plaza Area Why is the redevelopment of the Ajax Plaza important to the revitalization of Downtown Ajax? The redevelopment of the Ajax Plaza is another important step in achieving the Town s vision of a true downtown for Ajax - a mixed use, pedestrian oriented, transit supportive district. Along with current projects such as the retrofit of the Ajax Steam Plant and Medallion s Vision at Pat Bayly Square, the redevelopment of the Ajax Plaza is necessary to restore economic growth and establish a welcoming and vibrant environment in the downtown area making the area a community destination once again. The Ajax Plaza has been in existence since the early 50 s. Why develop it now? The revitalization of Ajax Plaza has long been a priority of Ajax Councils. The Ajax Plaza was originally built to serve a community of up to 25,000 people. At the time, the Plaza was the commercial heart of the community. However, with increasing competition from other retail centres, the closure of the Harwood/401 interchange, and a growing population of over 120,000, the Plaza no longer functions as the Town s primary commercial location. As a result, the condition of the site has deteriorated considerably, making redevelopment necessary. Why did the Town select Windcorp Developments Limited to lead the redevelopment of Ajax Plaza with Grand Harwood Place? The Windcorp team has a track record of working on large urban development projects in the Greater Toronto Area and elsewhere, and has demonstrated a solid understanding and support for the Town s Downtown vision. Does the Grand Harwood Place site plan match the Town s vision for the Ajax Plaza? The Grand Harwood Place site plan is unique in that it truly does bring to life the Town s vision for the Ajax Plaza. Specifically, it meets design and technical aspects, introduces change in a way that responds positively to its surroundings while setting the stage for future improvements. The finalization and approval of the site plan by Ajax Council will be an important milestone for the redevelopment of the Ajax Plaza. We will finally have a comprehensive plan to guide the redevelopment. The next critical step will be for Windcorp to secure 85% in sales to see the development through.
2 Grand Harwood Place Development What are the general timelines for Grand Harwood Place project? February 19, 2015 Public Open House Meeting. March 10, 2015 Committee of Adjustment Meeting. April 7, 2015 Community Affairs and Planning Committee Meeting to seek Council s endorsement of the Grand Harwood Place Project. July 15, 2015 Windcorp must meet Economic Feasibility Condition. Expected Completion Date 24 to 30 months after commencement of construction. How is the development of Ajax Plaza going to be phased? It is a Town desire to seek redevelopment of the entire plaza, but since there are 30 individual land owners, a complete redevelopment approach is neither practical nor economical. Initial development will be focused at the centre of the Plaza. The Town-owned parking lot will be developed first as Phase 1A, which will include a 10- storey, mixed-use building consisting of 2, 6-storey residential condominium towers on a 4- stoery podium. A total of 337 residential condominium units are proposed and between 5,400 m 2 and 6,500 m 2 of retail/office floor space. The proposal also includes 2 1/2 levels of underground parking, 2,370 m 2 of private outdoor amenity space and a number of sustainability initiatives. The construction timeframe will be determined once 85% sales has been achieved. Future phases will be determined only when this phase has been significantly completed. When will the work along Station Street be completed? The work along the south side of Station Street will be completed in April/May of These works will coincide with the start of the construction of the sales pavilion. When will the sales pavilion be built? Sales pavilion construction is expected to begin in May of The sales pavilion will take approximately 4 months to construct. What is the temporary and permanent parking solution during and after Phase 1A is built? While a development of this nature will cause some disruption, plans are in place to ensure that impacts are minimized. This includes temporary parking that will allow customers access to businesses. Prior to the start of construction, building a temporary parking plan will be put in place by the developer along the existing drive aisles (future Streets A, B, C, and D ) adjacent to the Ajax Plaza storefronts. Upon completion of the development a permanent
3 parking plan will be implemented, which will provide on-street parallel parking along both sides of these future streets. This permanent parking layout will be public parking. What safety and security measures will be taken to ensure safety of customers and employees? Similar to redevelopment projects in other downtown areas, security fencing, safety hoarding, signage and safe access will be provided to ensure the safety and accessibility of customers and employees of nearby businesses while construction is underway. Will transit service be affected? As of June 2013, transit service to the Ajax GO Station was taken over by Durham Transit. GO bus service will only be provided along Highway 2. A future bus stop will be directly accessible from Harwood Avenue. Surrounding surface routes will be unaffected. How will this development impact traffic? Harwood Avenue can accommodate the additional traffic anticipated by this development. Improvements have already been made along Station Street to enhance the functionality to the plaza. This will help alleviate traffic congestion at the corner and provide greater safety for drivers, cyclists and pedestrians at this key intersection. I may want to sell my property, who do I contact? Windcorp has retained the 3rd party services of DTZ Barnicke to conduct appraisals which will be relied upon for the purposes of arriving at fair market value. In addition, Windcorp has retained Cushman Wakefield Ltd. to assist with the negotiations. If you are interested in selling your property, please contact the Ajax Business team at or priority@ajax.ca What if I do not want to sell my property? Whether you decide to stay or sell is a business decision. However, three buildings at the south end of the Plaza will need to be removed to allow for roads and servicing. An amicable sale is always preferable but the Town maintains its right of expropriation as necessary. Can I relocate my business? There may be an opportunity for your business to relocate into the new building. Retail and office space will available in the first Grand Harwood Place building at market rents. Please contact the Ajax Business Development team to discuss your options at or priority@ajax.ca.
4 Ajax Downtown Road Network Improvements Environmental Assessment Study Why is the Town undertaking an Environmental Assessment (EA) for the Ajax Downtown? The Town s Official Plan and Transportation Master Plan Update have identified the need for new east-west roads within the downtown to: Improve vehicle and pedestrian connectivity Facilitate the goals for the downtown including intensification, pedestrian orientation, transit support and growth The EA provides a process to evaluate various alternatives to accomplish these goals by using set criteria and input from stakeholders to select the best alternative(s). If Grand Harwood Place is already designed, why is the EA still happening? Aren t the road locations already known? The Town is working closely with the developer of Grand Harwood Place to create a plan that accomplishes the above. However, the EA will review the larger study area and create a long term plan for the Ajax Plaza. If for some reason Grand Harwood Place is not constructed, will new roads still be constructed? Yes, the Official Plan and Transportation Master Plan (TMP) have already identified the needs for new roads. These roads are required to fulfill the long term goals of the Town. Will the Town expropriate my land? The property owners that are directly impacted by the municipal roads to be constructed will be offered a fair market value for their land either by the developer for GHP or by the Town. An amicable sale is always preferable but the Town will maintain its right of expropriation as necessary. Where exactly will the roads be located? Will there be new traffic signals at the new intersections? Various design options will be developed using engineering design standards. These options will be evaluated during the next phase Phase 3 of the EA and there will be a second Public Information Centre to obtain input on these designs before the final design decisions are made. When will the roads be constructed? Construction of any roads included in the first phase of the GHP development is expected to start in The remaining roads will likely not be constructed for at least five years.
5 Won t the proposed development make traffic worse in the Study Area? The traffic analysis has identified that for the most part intersections in the area are functioning satisfactorily. However, there are some locations, particularly the gateway locations (Harwood and Station for example) that have particular movements that have higher delay. Various traffic improvements, including providing improved traffic signal phasing and timing, reducing the number and location of driveways and providing new roadways are designed to improve overall operations and provide more opportunities to circulate around and through the area. The Town s TMP, identifies strategies to accommodate additional traffic generated by the new Grand Harwood Place development. These strategies include Transportation Demand Management (TDM) efforts that are designed to reduce the reliance on single occupant vehicles, as well as encouraging greater active transportation. The land uses proposed in the downtown will include mixed-use development that provides the opportunity to have a greater number of employees live and work in the downtown without the need to drive from home to work. While there will be a net increase in trips generated in the downtown, over time a greater share of these trips will be by non-automobile modes. How will pedestrians and cyclists be accommodated in the Study Area? A complete streets approach to design of new and improved streets is proposed in the Town s TMP. This approach includes designing road rights-of-way to accommodate the needs of all road users. Harwood Ave, Station St and Hunt St have been identified to include bicycle lanes, and future cycling facilities will be accommodated onsite to tie into the broader Ajax cycling and pedestrian networks. The proposed development will include frontages which are accessible to pedestrians and cyclists. Transit service improvements and links to the GO station and other areas of the Town are also proposed as part of a balanced approach to serving the future travel needs to and from downtown Ajax. How can I be involved in the design? Be sure to sign in and leave your contact information so that we can add you to our contact list. Fill out a comment sheet to ensure that your issues are considered in the design. Attend the next PIC meeting, likely in the spring of Check out our website for future updates at
6 Zoning By-law Amendment Application Z3/13 What is the purpose of the rezoning application to permit retail uses on the lands generally bound by Commercial Ave, Mills Rd, Station St. and Hunt St.? The purpose of permitting retail uses on the subject lands is to provide existing Retail Stores located within the Ajax Plaza an opportunity to relocate while redevelopment of the Ajax Plaza occurs. The additional retail opportunities will also serve the growing downtown Ajax population. I own lands located within the Commercial Ave, Mills Rd, Station St, and Hunt St block, can I have multiple Retail Stores on my property with a combined gross leasable floor area of 4,645 m² (50,000 ft²) or more? If the by-law is adopted, you would be permitted to have multiple Retail Stores on one property provided that none of the individual Retail Stores exceed a maximum gross leasable floor area of 4,645 m² (50,000 ft²). Why limit individual Retail Stores to a maximum gross leasable floor area of 4,645 m²? The goal of the downtown is to create a vibrant, intensive and pedestrian friendly environment. By limiting the maximum size of individual Retail Stores the goal is to create more store fronts that interact with the street, avoiding large retail warehouses with large uninterrupted walls and expansive parking lots.
ELMVALE ACRES SHOPPING CENTRE MASTER PLAN
ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent
More informationFigure 1- Site Plan Concept
Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More informationSt. Clair Avenue West Area Transportation Master Plan
1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present
More informationJohn M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference
Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street
More informationCHAPTER 7: Transportation, Mobility and Circulation
AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to
More informationPUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN
PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN Tuesday, February 28, 2012 6pm 9pm 1 st Floor Atrium, City Hall 2 Wellington Street West, Brampton 1 POLICY FRAMEWORK The 2006 Provincial Growth
More informationTown Center (part of the Comprehensive Plan)
Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center
More informationWelcome. Walk Around. Talk to Us. Write Down Your Comments
Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,
More information38 Queen s University Campus Master Plan Part 1
38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by
More informationCity of Toronto. Emery Village Transportation Master Plan
City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:
More informationPublic Information Centre #1
and Highway 401 Interchange Improvements WELCOME Public Information Centre #1 Veterans Memorial Parkway Extension and Highway 401 Interchange Improvements Study May 23, 2012 4 p.m. to 7 p.m. Brief Overview
More information[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014
[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site
More informationMill Woods Town Centre Proposed Rezoning LDA
Mill Woods Town Centre Proposed Rezoning LDA15 0649 The City of Edmonton has received an application for rezoning and an amendment to the Mill Woods Station Area Redevelopment Plan (ARP) for the Mill Woods
More informationKANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT
KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT JUNE 2015 PREPARED BY: FOTENN Consultants Inc. 223 Mcleod Street Ottawa, ON K2P OZ8 (613) 730-5709 PREPARED FOR: Kanata
More information13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154
13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained
More informationTRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More informationPolicies and Code Intent Sections Related to Town Center
Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections
More informationDOWNTOWN GEORGETOWN PLANNING STUDY
DOWNTOWN GEORGETOWN PLANNING STUDY Community Workshop #3 Thursday, May 4, 08 The Planning Partnership OVERVIEW OF STUDY, PROCESS & MILESTONES We are here PURPOSE OF THE STUDY To develop a clear vision
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationBroadway District Specific Plan. Community Workshop #2 February 23,2016
Broadway District Specific Plan Community Workshop #2 February 23,2016 1 Agenda Introductions Project Progress Status Upcoming Milestones Emerging Framework Land Use Urban Design Circulation Infrastructure
More information4- PA - LD - LIVELY DOWNTOWN. LD - Background
4- PA - LD - LIVELY DOWNTOWN LD - Background The downtown has been the service centre for the community since the city s inception and the area continues to supply people with their personal services,
More information2900 Steeles Avenue East at Don Mills Road in the Town of Markham
STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community
More information141 GEORGE STREET PLANNING RATIONALE
141 GEORGE STREET PLANNING RATIONALE MINOR ZONING BY-LAW AMENDMENT NOVEMBER 2, 2016 PLANNING RATIONALE 223 McLeod Street Ottawa, ON K2P 0Z8 613.730.5709 fotenn.com INTRODUCTION FOTENN Consultants is acting
More informationFANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016
FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for
More informationEXISTING COMPREHENSIVE PLAN
EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an
More information4.1.3 LAND USE CATEGORIES
4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping
More information5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN
5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,
More informationWELCOME and introduction
1 WELCOME and introduction Mobility Hub Locations within Burlington STUDY OVERVIEW STUDY OBJECTIVES The City of Burlington is developing four Area Specific Plans, one for each of Burlington s Mobility
More informationMaking TOD Work in the Heart of Suburban Sprawl
Making TOD Work in the Heart of Suburban Sprawl Rocky Mountain Land Use Institute March 6, 2009 Speakers Ben Herman, FAICP, Principal Clarion Associates Darcie White, AICP, Principal Clarion Associates
More informationWorkshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership
Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic
More information7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER
7 Community Character The beauty of Clemmons won t necessarily be a reflection of our past, but our future. This quote from Comprehensive Plan Steering Committee member Wayne Dodson captures the essence
More informationWelcome to the Oakridge Centre Open House
Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive
More informationExecutive Summary. NY 7 / NY 2 Corridor
Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions
More informationUrban Planning and Land Use
Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning
More informationShift Rapid Transit Public Participation Meeting May 3, 2017
Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public
More informationPLAN ELEMENTS WORKSHOP. April 5, 2016
PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly
More informationBloor St. W. Rezoning - Preliminary Report
STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community
More informationUrban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas
111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number
More informationMcCowan Precinct Plan Study Background & Deliverables
1 DRAFT & WITHOUT PREJUDICE McCowan Precinct Plan Study Background & Deliverables In September, 2011, City Planning (Scarborough District) began a study of an area within the Scarborough Centre, identified
More informationPublic Meeting #3 May 9, 2009 MVVA Team
Public Meeting #3 May 9, 2009 MVVA Team Welcome to the third Public Meeting for the Lower Don Lands Municipal Class Environmental Assessment (EA) Infrastructure Master Plan and Keating Channel Precinct
More informationPurpose of Open House #3
Public Meeting #3 May 9, 2009 MVVA Team Purpose of Open House #3 The main purpose of this Open House is to present and seek input on the: Evaluation of transportation and infrastructure design alternatives
More informationLUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY
PUBLIC INFORMATION MEETING #2 October 12, 2016 LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY AGENDA 5:00 to 5:30pm: Open House 5:30 to 6:15pm: Presentation 6:15 to 7:00pm: Individual paced workshop with
More informationSouth of Eastern Strategic Direction Status Update
STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning
More informationCommissioners Road West Realignment Environmental Assessment
City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre
More informationPROJECT BACKGROUND. Preliminary Design Scope and Tasks
PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of
More information178 Carruthers Properties Inc.
178 Carruthers Properties Inc. Planning Rationale for 178 Carruthers Avenue Site Plan Control Application June 2014 Table of Contents 1.0 Introduction 2.0 Overview of Subject Property 3.0 Current Zoning
More informationSouth th E ast Communit ity Centre (SECC)
South East Community Centre (SECC) 1 New Park Design & Community Centre Update Thursday, February 8, 2018 Public Open House Thank you for attending this Open House! The town and the Consulting Team will
More information12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN
12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August
More informationPortage Parkway Environmental Assessment Public Information Centre No. 1
City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces
More informationTransportation. Strategies for Action
Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;
More informationChapter 1.0 Introduction
Chapter 1.0 Introduction 1.1 Background The North Metro commuter rail line is part of the RTD FasTracks regional transit system expansion program to build more than 100 miles of rail transit throughout
More informationAGINCOURT SECONDARY PLAN
1 AGINCOURT SECONDARY PLAN 1. AGINCOURT SECONDARY PLAN The following policies and principles apply to the area herein referred to as Agincourt, as outlined on Map 1-1. 1. GENERAL POLICIES 1.1 This Secondary
More informationSUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting
Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building
More informationGO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018
GO Station Mobility Hubs: Draft Precinct Plans Committee of the Whole July 12, 2018 Purpose of this Workshop Present Draft Precinct Plans for the 3 GO Station Mobility Hubs Continue the conversations that
More informationNorthwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS
4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations
More informationCHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018
TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER ADELAIDE STREET
More informationNew-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario
URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from
More informationNorth York Centre South Service Road
North York Centre South Service Road Municipal Class Environmental Assessment Addendum Potential Changes to Doris Avenue, Bonnington Place & Tradewind Avenue Study Summary (June 11, 2015) toronto.ca/nyc-south-road.
More informationClairtrell Area Context Plan
Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...
More informationCONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM
CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto
More informationburlington mobility hubs study Downtown Burlington Mobility Hub
burlington mobility hubs study Downtown Burlington Mobility Hub Draft Precinct Plan Workbook PIC #3, September 7, 2017 downtown mobility hub objectives City staff and their consultants are proposing an
More informationCourtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT
Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT July 22, 2009 Tonight s Meeting 7:00 pm Introduction David Crome, Director of Planning 7:05 Presentation Stasia Bogdan,
More informationFigure 3-1: Public Realm Plan
3 Public Realm Figure 3-1: Public Realm Plan 3.1 Public Realm Concept The public realm concept for the Little Mountain site integrates a clear and accessible movement network with public spaces for social
More information8implementation. strategies
PROGRAM STRATEGIES 8implementation strategies T he implementation actions of this chapter are designed to support and carry out the land use, economic development, transportation, urban design, and program
More information8. NORTH YORK CENTRE SECONDARY PLAN
8. NORTH YORK CENTRE SECONDARY PLAN 1. GENERAL CONCEPT AND OBJECTIVES This Secondary Plan forms the general basis for the redevelopment of the North York Centre as identified on Map 8-1. 1.1 North York
More information2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN
2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN Pursuant to Section 17(15) of the Planning Act, as amended, the Regional Planning
More informationWestwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT
FEBRUARY 2013 TABLE OF CONTENTS 1.0 BACKGROUND... 1 1.1 Amendment... 1 2.0 LOCATION & CONTEXT... 2 2.1 Land Ownership... 2 3.0 POLICY CONTEXT... 3 3.1 Municipal Development Plan... 3 3.2 Capital Region
More information30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report Date: March 14, 2016 To: From: Wards: Reference Number: Etobicoke York Community Council Director,
More informationCity of Bristol Route 6 Corridor Implementation Program
City of Bristol Route 6 Corridor Implementation Program FITZGERALD & HALLIDAY, INC. Innovative Planning, Better Communities June 2017 Route 6 Corridor Plan IMPLEMENTATION PROGRAM The following Implementation
More informationThe Master Plan Framework
The Master Plan Framework The East Harbour Master Plan advances the development of 60 acres of former industrial lands east of the Don River. The Master Plan outlines a vision for a vibrant, transit-oriented
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More informationPublic input has been an important part of the plan development process.
Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the
More informationappendix and street interface guidelines
appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher
More informationURBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018
URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES
More information6 Growth Management Challenges and Opportunities
6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s
More informationA. WHAT IS A GENERAL PLAN?
I. Introduction A. WHAT IS A GENERAL PLAN? A general plan is the planning guideline for the future of a city. It contains goals and policies which regulate urban development, the protection of the natural
More information6 Strategic Vision and Vision Matrix
PUBLIC HANDOUT: FEBRUARY 11, 2013 TOWN COUNCIL MEETING STRATEGIC VISION PLAN: VISIONING INTO ACTION 6 Strategic Vision and Vision Matrix 6.1 Strategic Vision The Strategic Vision builds on the vision of
More informationTown of Oakville Streetscape Strategy
Town of Oakville Streetscape Strategy Endorsed by PDC on February 10, 2014 (PD-011-14) Town of Oakville Streetscape Strategy [endorsed by PDC February 10, 2014] 0 Town of Oakville Streetscape Strategy
More informationIssues Requiring Future Study
Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem
More informationAnimating the Rideau Canal December 2013
Executive Summary Animating the Rideau Canal December 2013 Why study the Rideau Canal? The Rideau Canal has been an important part of Ottawa throughout its history, and has shaped and been shaped by the
More information2136 & 2148 Trafalgar Road Town of Oakville Region of Halton
PLANNING JUSTIFICATION REPORT 2136 & 2148 Trafalgar Road Town of Oakville Region of Halton Zoning By-Law Amendment Application 2500674 Ontario Inc. November 2016 Table of Contents Page 1.0 Location/Summary
More informationBostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment
Bostwick Road Municipal Class Environmental Assessment October 13, 2016 Welcome! Welcome to the first Public Information Centre for the Bostwick Road Municipal Class Environmental Assessment. Representatives
More informationMavis Road Class Environmental Assessment
Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in
More informationIntroduction. Intent of the Plan. Urban Design and Land Use Approach
Introduction Intent of the Plan This is the Second Public Open House for the. The intent of the is to update current City policy in order to encourage future development that will ensure a diverse, lively,
More informationFDOT D4 Complete Streets
FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,
More informationCity of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004
City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual
More informationCrofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1
Crofton Manor 2803 West 41st Avenue WHAT WE HEARD Public Consultation: Phase 1 Background CROFTON MANOR What s Happening The City of Vancouver is undertaking a planning and public engagement process to
More informationDowntown Streetscape Manual & Built Form Standards
City of Guelph Downtown Streetscape Manual & Built Form Standards July 2014 Prepared by Brook McIlroy Inc. in association with Unterman McPhail Associates and McCormick Rankin Inc. City of Guelph Downtown
More informationBayview Avenue Official Plan Amendment, Zoning Amendment and Site Plan Control Applications Request for Direction Report
STAFF REPORT ACTION REQUIRED 2425 2427 Bayview Avenue Official Plan Amendment, Zoning Amendment and Site Plan Control Applications Request for Direction Report Date: May 28, 2015 To: From: Wards: Reference
More informationLower Merion Commercial Districts Issues and Characteristics Handbook November 2013
Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013 DRAFT TOWNSHIP-WIDE VISION: To maintain and enhance commercial areas to complement the surrounding high-quality residential
More informationFurther input invited as Colchester Growth Strategy nears final phase
IUE 3 / NOVEMBER 2015 Further input invited as Colchester Growth trategy nears final phase trathcona County is seeking public feedback as it enters the final phase of work on a Growth Management trategy
More informationYONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.
PART A: PREAMBLE 1.0 PURPOSE The purpose of this Secondary Plan is to provide a development framework for intensification of the Yonge/ Steeles corridor including the north side of Steeles Avenue West
More informationComplete Street and the EA Process. Queen Street Corridor- Brampton Golden Mile
Complete Street and the EA Process. Queen Street Corridor- Brampton Golden Mile Contents A. Vision B. Overview of Existing Conditions C. Queen Street Complete Street Criteria D. A quick look at the Queen
More informationROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018
Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road
More informationAgincourt Mall Planning Framework Review Public Open House #2 Consultation Summary
Agincourt Mall Planning Framework Review Public Open House #2 Consultation Summary This summary provides a high level summary of participant feedback. It is not intended to provide a verbatim transcript
More informationWELCOME. Welcome to this public exhibition about the future of the Aylesham Shopping Centre.
WELCOME Welcome to this public exhibition about the future of the Aylesham Shopping Centre. This exhibition has been organised by Tiger Developments Ltd and members of the project team are available today
More informationCITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.
CITY CLERK Consolidated Clause in Report 8, which was considered by City Council on October 26, 27 and 28, 2004. 28 Request for Direction Report - Site Plan Approval Application 03 200020 NNY 24 SA - Marek
More informationTORONTO COMPLETE STREETS GUIDELINES
TORONTO COMPLETE STREETS GUIDELINES Presentation by Fiona Chapman, Manager, Pedestrian Projects Public Realm Section, Transportation Services, City of Toronto June 2017 PURPOSE OF THE PROJECT To develop
More information