ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY

Size: px
Start display at page:

Download "ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY"

Transcription

1 ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY HWK-DOC-INF-ESNTA-02 FEBRUARY 2017 REVISION HACKNEY WICK CENTRAL OUTLINE PLANNING APPLICATION

2 Contents Introduction... 1 Application Site and Surroundings...2 The Proposed Development.2 Alternatives Considered..5 Environmental Impact Assessment Methodology. 5 Air Quality..7 Cultural Heritage and Archaeology..8 Daylight and Sunlight Overshadowing...10 Ecology..11 Geology, Soils and Contaminated Land 13 Noise and Vibration 15 Socio-Economics 16 Townscape and Visual Amenity. 17 Traffic and Transport..21 Water Resources and Flooding 23 Wind Microclimate..25 Cumulative Effects 26 Conclusions 27 What Happens Next 27

3 Introduction The London Legacy Development Corporation (LLDC) and London Borough of Hackney (hereinafter referred to as the Applicant ) have submitted an outline planning application for the Hackney Wick Central mixed use development (the Proposed Development ) on land north and south of Hackney Wick Station, immediately to the west of the River Lee Navigation (Hackney Cut) (the Application Site ). The adopted London Legacy Development Corporation Local Plan (2015) identifies Hackney Wick as a new Neighbourhood Centre which could support a mixed use community. The Proposed Development forms the central part of this area and will deliver the majority of Site Allocation SA1.1 (Hackney Wick Station Area) as identified in the adopted Local Plan. AECOM has been appointed by the Applicant to carry out an Environmental Impact Assessment (EIA) to accompany the outline planning application for the Proposed Development. This document is a non-technical summary of the main Environmental Statement (ES). It follows the structure of the main ES to enable the reader to quickly locate additional detail in the main volume as required. 1

4 Application Site and Surroundings The Application Site, of 5.95 hectares, is located to the west of Queen Elizabeth Olympic Park. It is within the administrative area of the LLDC and their Planning Policy and Decisions Team is the Local Planning Authority. The Application Site is bounded by the River Lee Navigation to the east, White Post Lane to the south, Berkshire Road/Wallis Road to the west, and the Leabank Square development to the north. Hackney Wick Overground Station sits at the heart of the area connecting to Stratford, Clapham and Richmond via North London. The Application Site covers two boroughs, with the area to the north of the railway line within the London Borough of Hackney, and the area to the south within the London Borough of Tower Hamlets. The Application Site is predominately buildings and hardstanding with some scattered vegetation, including a small amount of planting and grassland along the River Lee Navigation. The current land use comprises a mix of uses including a growing number of creative businesses and artists alongside traditional industrial uses including several printing companies and some builders merchants. The Application Site is recognised for its built heritage and lies within two Conservation Areas. It is also an important area for archaeology. Although there is little habitat within the Application Site itself, the London Canals Site of Metropolitan Importance for Nature Conservation (SMINC) is immediately adjacent to its eastern boundary. The Application Site is at a high risk of flooding but benefits from flood defences. The Proposed Development The current land use comprises a mix of uses including a growing number of creative businesses and artists alongside traditional industrial uses including several printing companies and some builders. merchants. The Proposed Development will provide a mixed use development comprising mostly business and residential uses, along with other uses including shopping, food and drink, and community uses. The majority of existing buildings will be demolished with the exception of certain buildings of built heritage importance. Outline planning permission will provide the parameters (that is, limits) within which future development within the Application Site can be built including floor space and the building envelope (that is, maximum heights and footprint). The heights of new buildings will vary from two to 11 storeys. The proposals will contribute towards a wider network of open space, connecting into surrounding infrastructure, including pedestrian and cycle routes, in order to make the area as accessible as possible to the neighbouring communities, and encourage more sustainable forms of transport. 2

5 Illustrative drawing showing a residential courtyard The proposed North-South Cut will improve site connectivity as well as being a key public space, framing the heritage asset Central Books (see below under Cultural Heritage and Archaeology). The Proposed Development will be constructed in three phases between 2018 and Future applicants will submit Reserved Matters Applications for individual Development Plots. A Design Code has been submitted for approval with the Outline Planning Application which sets out requirements to shape the way in which the detailed designs of individual Development Plots and Blocks are brought forward. The Proposed Development includes provision for vehicular access and parking, including undercroft or basement parking, working yards, residential courtyards, open spaces, squares and recreational spaces including play space. The proposals will contribute towards a wider network of open space, connecting into surrounding infrastructure, including pedestrian and cycle routes, in order to make the area as accessible as possible to the neighbouring communities, and encourage more sustainable forms of transport. The Proposed Development will provide for utilities diversions and connections. Discussions are ongoing to seek a connection to the ENGIE Energy Centre on Queen Elizabeth Olympic Park, although for the purposes of the EIA, it has been assumed that an on-site energy centre is required, the delivery of which would subject to obtaining necessary consents. 3

6 The Outline Planning Application is supported by an Illustrative Masterplan which represents one way in which the Proposed Development may come forward within the building envelope and floor spaces applied for. Aerial view of the Proposed Development based upon the Illustrative Masterplan. This represents one way in which the Proposed Development could be taken forward within the building envelopes defined by the Parameter Plans and floor spaces applied for. 4

7 Alternatives Considered The Proposed Development, as set out in the Outline Planning Application, has been informed by considerable design work by the Applicant and their consultant team. A series of designs were considered and discussed with stakeholders, including Historic England, to ensure the design is of the highest quality. As described in the introduction, the location of the Proposed Development has been determined by local planning policy and the Application Site boundary has been drawn to reflect Site Allocation SA1.1. Several options were considered in how to deliver development within the Application Site boundary including either developing further guidance for developers which would form part of the Local Plan, or relying upon existing landowners to submit planning applications. However, the Applicant concluded that the most appropriate approach was to develop an Outline Planning Application that covered the entire extent of Site Allocation SA1.1 comprising multiple landowners and developers. This will result in a more coherent, comprehensive development to deliver Site Allocation SA1.1, particularly in terms of the preservation and enhancement of conservation and heritage, and one which will maintain the existing employment floorspace, secure a clear and legible north-south route and network of streets, passageways and yards and provide key locations for public activity and local amenities. The design evolution of the Proposed Development is summarised in Chapter 3 of the Environmental Statement. The EIA has influenced the design development, for example in relation to built heritage, daylight and sunlight, flood risk and townscape and visual amenity. Environmental Impact Assessment Methodology The Proposed Development has been the subject of a systematic and comprehensive EIA, which was undertaken in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations. The EIA assessed the potential environmental impacts of the Proposed Development during demolition, construction and operation. These are described in terms of changes to the existing situation (the baseline). EIA assesses environmental effects on resources (such as heritage buildings) and receptors (such as human beings). The environmental effects of the Proposed Development are assessed by judging the sensitivity (that is, its importance) of a resource or receptor against the magnitude (that is, the scale or extent) of the predicted impact. A development of this nature is certain to have some effects on the environment, both good and bad. What is important is that significant negative effects are identified and addressed through the design process, or through other mitigation measures. 5

8 The EIA has assumed certain incorporated aspects of design that will help to limit the extent of potential environmental effects. Most importantly, this includes mandatory application of the Design Code for future applicants. Where significant effects are still likely to occur, additional measures are proposed to reduce effects where practicable, with any effects that still remain (or residual effects) then determined. Such measures include a Construction Environmental Management Plan will be submitted, for each Development Plot, at the Reserved Matters Stage. As part of the assessment process a large amount of environmental information was gathered about the Application Site and a number of organisations were contacted to discuss the proposed approach to the assessment. These organisations included the London Boroughs of Hackney and Tower Hamlets, the Environment Agency, Natural England, Historic England, Transport for London and others. In addition, many other stakeholders and local people were invited to take part in the consultation and attend exhibitions. The content or scope of the EIA was agreed through the production of an EIA Scoping Report and the provision of a Scoping Opinion by the Local Planning Authority. Following this and subsequent discussions with the Local Planning Authority, the following environmental topics have been addressed in detail in the EIA: Air Quality Cultural Heritage and Archaeology Daylight, Sunlight and Overshadowing Ecology Geology, Soils and Contamination Land Noise and Vibration Socio-Economics Townscape and Visual Amenity Traffic and Transport; Water Resources and Flooding Wind Microclimate A development of this nature is certain to have some effects on the environment, both good and bad. What is important is that significant negative effects are identified and addressed through the design process, or through other mitigation measures. Significant effects are considered to be those effects which represent key factors or material influences in the decision making process. The beneficial effects are also reported in the Environmental Statement to ensure the benefits arising from the Proposed Development are realised and the balance of issues is understood. The remainder of this Non-Technical Summary sets out the findings of the impact assessment, on a topic by topic basis. 6

9 Air Quality Chapter 6 (Air Quality) reports the effects associated with releases of air pollutants during the construction and operational phases of the Proposed Development. The assessment considered dust generation during demolition and construction, the release of nitrogen dioxide and particulate matter as a result of both construction and operational traffic, and the operation of an energy centre. Baseline The London Borough of Hackney and London Borough of Tower Hamlets have both designated their whole boroughs as Air Quality Management Areas as the levels of nitrogen dioxide (NO 2 ) and small particulate matter (PM 10 ) were higher than the national and EU limits for these pollutants. Existing air quality in and around the Application Site has been established using data from the two boroughs and published data from the Department of the Environment, Food and Rural Affairs (DEFRA). This shows that, in 2015, NO 2 levels were predicted to exceed national and EU limits at some locations along the A106 and A12 whereas PM 10 levels were not predicted to exceed the national and EU limits. Summary of effects The construction phase of the Proposed Development has the potential to generate emissions of dust and PM 10, some of which will be transported in the air outside the construction site, potentially giving rise to negative effects. Without mitigation, there could be a high risk of dust soiling. A range of measures will be set out in a Dust Management Plan, to be developed postconsent as part of a Construction Environmental Management Plan for each Development Plot. Such measures include communication with people likely to be affected, site management and maintenance, dust monitoring and waste management. With these measures in place, no significant effects are likely. Construction traffic is not predicted to increase NO 2 emissions significantly. Nevertheless, measures will be put in place to manage emissions during construction. Routing of traffic will be managed through a Construction Traffic Management Plan (CTMP), to be developed postconsent, which will aim to keep traffic away from sensitive locations. In addition, to further minimise effects on local air quality, construction traffic and plant will comply with Greater London Authority and European Directive emissions standards. Once occupied, the Proposed Development is not predicted to increase NO 2 or PM 10 emissions and no significant effects are likely. The Proposed Development is air quality neutral, meaning that it will not lead to further deterioration of the air quality within the London Borough of Hackney and Tower Hamlets Air Quality Management Areas. 7

10 Cultural Heritage and Archaeology Chapter 7 (Cultural Heritage and Archaeology) reports the effects of the Proposed Development on archaeological and built heritage assets. The assessment focuses upon the Application Site and a surrounding 250m study area for archaeology, 500m study area for non-designated built heritage assets (such as locally listed buildings) and 1000m for designated built heritage assets (such as Conservation Areas and listed buildings). The built heritage assessment incorporates the findings of the Heritage Statement produced by Tibbalds which has been submitted as a standalone supporting document for the Outline Planning Application. Baseline The Application Site is designated as an Archaeological Priority Area for its potential for palaeoenvironmental evidence (that is, evidence of an environment at a period in the past) for past wetland and riverine environments, as well as being an area of extensive industrial development in the medieval and post-medieval periods. No archaeological remains of prehistoric, Roman, early medieval or medieval dates have been found during any previous investigations within the study area. There is considered to be a high potential for prehistoric palaeoenvironmental remains and post-medieval remains within the Application Site. There are two Conservation Areas within the Application Site: Hackney Wick Conservation Area and White Post Lane and Fish Island Conservation Area. Victoria Park Conservation Area is also located to the west of the Application Site. There are no listed buildings within the Application Site. There are a number of listed buildings/ structures recorded within the 1000m study area as well as Victoria Park Grade II* Registered Park and Garden to the west and Three Colts Bridge Scheduled Ancient Monument to the south west. Within the 500m study area, there are a number of non-designated heritage assets, some of which are also within the conservation areas. In total, 39 heritage assets have been assessed as part of the built heritage assessment. Summary of effects on archaeology Palaeoenvironmental (that is, an environment in the past) and prehistoric remains, likely to be present across the Application Site, would be removed during the excavation and construction of new foundations, basements and service trenches. However, remains would also survive outside of the construction footprint of the Proposed Development, and is widespread across the Lower Lea Valley. Therefore, removal of these deposits is not likely to be significant. There is the potential for the foundations of a number of demolished 19th century buildings to survive within the Application Site. However, these have limited archaeological and historical value as they are not unusual for this period and similar remains can be found across the wider area. Therefore, the effect of the removal of these foundations is not likely to be significant. 8

11 Further archaeological investigation will be required at the Reserved Matters Application stage once detailed designs are developed for individual Development Plots. The exact nature and methodology for these assessments will be agreed in advance with the Archaeological Advisor for the Greater London Archaeology Advisory Service (GLAAS) and, if appropriate, Historic England s Scientific Advisor. The investigations could include sampling of palaeoenvironmental remains, intrusive investigations, such as trenching, and monitoring of areas identified for excavation e.g. for basements. Summary of effects on built heritage Potentially significant negative effects upon built heritage assets have been reduced as far as possible through the design process for the Proposed Development, particularly in relation to building heights. In addition, a fund will be set up for retained heritage buildings within the Application Site that are not associated with the Proposed Development and would not otherwise be improved. These include the Lord Napier public house, Everett House, the former Carless Institute and Central Books. The Proposed Development will have beneficial effects upon the Hackney Wick and Fish Island and White Post Lane Conservation Areas both physically and in terms of its setting. By securing creative workspace and retaining the use of existing heritage buildings, the Proposed Development will preserve and enhance the character and appearance of the Potentially significant negative effects upon built heritage assets have been reduced as far as possible through the design process for the Proposed Development, particularly in relation to building heights. Conservation Areas. The overall effect is positive for both Conservation Areas. No effects are anticipated on the setting of the Victoria Park Conservation Area. Central Books The Proposed Development will have positive effects upon several heritage assets notably the Rubber Works, a building which is currently in poor condition and is in use for storage and distribution and the Lord Napier public house, a building which is currently vacant and in poor repair and is likely to benefit from the heritage fund. The Proposed Development will also have negative effects as some heritage assets will be demolished, notably the Warehouse at the corner of Wallis Road and Berkshire Road (Walls to Corner Building). The Proposed Development will have positive effects upon the setting of several heritage assets notably the Church of St. Mary of Eton with St. Augustine (a Grade II* listed building), the Rubber Works and Central Books, a building currently in use for storage and distribution. There will also be negative effects upon the setting of some heritage assets notably the Gainsborough School together with its outbuildings (a Grade II listed building). Lord Napier public house 9

12 Daylight and Sunlight Overshadowing Chapter 8 (Daylight and Sunlight Overshadowing) reports the findings of an assessment of the likely environmental effects of the Proposed Development on daylight and sunlight amenity to existing properties surrounding the Application Site, and retained buildings within the Application Site; and overshadowing to existing amenity areas surrounding the Application Site, and the River Lee Navigation. The chapter also considers daylight and sunlight amenity for those properties proposed as part of the Proposed Development. The assessment was undertaken using detailed computer modelling and simulation. A total of 17 existing sensitive locations surrounding the Application Site and nine buildings which will be retained within the Application Site have been assessed. As a mainly industrial area, there are few existing public open spaces which are likely to be used by residents or the local community. Three open spaces surrounding the Application Site have been tested for overshadowing effects as well as the gardens of properties along Leabank Square and the adjacent River Lee Navigation. Baseline All existing buildings within the Application Site and some buildings surrounding the Application Site are expected to currently experience limited daylight availability on lower floors in locations where existing development is closely placed or where windows are obstructed by the building itself. Buildings within the surrounding area are shadowed at different times of the day. For example, buildings on Prince Edward Road (nos 5 and 14-16) are shadowed through to mid-morning, whereas 127 Wallis Road is generally shadowed throughout the day with the exception of a two hour period around mid-afternoon. The majority of gardens associated with properties along Leabank Square and existing open spaces within the Application Site receive recommended amounts of sunlight (a minimum of two hours of direct sun over half their area on 21 st March in accordance with guidance set by the Buildings Research Establishment). The bank of the River Lee Navigation adjacent to the Application Site also received the recommended amount of sunlight. Summary of effects The Design Code requires future applicants to undertake daylight and sunlight testing and demonstrate that their designs have been refined in order to minimise light reduction and provides specific guidance to future developers on how this should be done. This includes reducing heights and increasing space between buildings. Application of the Design Code has been tested by modelling the Illustrative Masterplan. 10

13 With the Illustrative Masterplan in place, the majority of buildings outside the Application Site are expected to experience reductions in daylight which exceed the levels set by the Buildings Research Establishment. The lower floors are expected to be more affected than upper floors. The buildings most affected are properties along Leabank Square and 84 Wallis Road, a building retained within the Application Site. Most buildings and spaces are likely to receive new overshadowing once the Proposed Development is constructed. The areas most affected are properties along Leabank Square and 43 White Post Lane, a building retained within the Application Site, and the gardens at the eastern end of Leabank Square. Testing the Illustrative Masterplan has shown that application of the Design Code significantly reduces the effects and it is therefore reasonable to expect that further design development for individual Development Plots will be undertaken by future developers to arrive at a final solution which would achieve acceptable levels of daylight and sunlight access to adjoining properties. Further improvements must be demonstrated by future developers when developing their designs. It is anticipated that the outline planning permission for the Proposed Development will include a planning condition requiring Reserved Matters Applications to be accompanied by a daylight and sunlight overshadowing assessment of the detailed development. Ecology Chapter 9 (Ecology) reports the assessment of ecological effects associated with the Proposed Development. A desk study, habitat survey and protected species surveys were completed to identify the ecological baseline of the Application Site. Data was collected in 2015 during spring, summer and autumn. Baseline The Application Site is not designated for nature conservation; however, there are a number of sites within the surrounding area including the London s Canals Site of Metropolitan Importance for Nature Conservation (SMINC) (which includes the River Lee Navigation), immediately to the east. The River Lee Navigation looking from the pedestrian footbridge towards Wallis Road. 11

14 The Application Site consists predominantly of buildings and hardstanding with some scattered vegetation, including a small amount of planting and grassland along the River Lee Navigation. There are a few small ornamental trees along the streets. The Application Site is cut in half by an overground railway line, vegetated embankment and associated infrastructure. The Application Site provides little in the way of suitable habitat for breeding birds and is considered to be suitable to support up to two breeding pairs of Black Redstart and one pair of breeding Peregrine. No bats were recorded using buildings either within or surrounding the Application Site for roosting. However, parts of the Application Site and surrounding area, notably the adjacent River Lee Navigation, are used by low numbers of bats for commuting and foraging. The Application Site provided no suitable foraging habitats for other protected mammal species. Summary of effects Ornamental tree planting along Prince Edward Road For the construction phase, the assessment considered: loss of and degradation to habitats, pollution incidents, disturbance of protected species from noise or light pollution, human activity and vehicular movements. None of these were found to have significant effects on ecology. Construction Environmental Management Plans, prepared and submitted for each Development Plot at the Reserved Matters Application stage, and implemented during construction, will include measures, such as pollution control, to avoid negative effects on habitats and species, and also measures to protect nesting birds. The Proposed Development offers the opportunity to significantly improve the Application Site for biodiversity as it provides increases in soft landscaping and trees, along with a variety of green and brown roofs (these are roofs designed to encourage biodiversity by planting, green roofs also retain water which can help with reducing flood risk). The primary streets and north-south routes also offer the opportunity to enhance ecological corridors through the Application Site, particularly for invertebrates. There is therefore ample opportunity for delivering a net gain in biodiversity, not only for existing important ecological features, such as Black Restart Example of a green roof and Peregrine, but also invertebrates, linking the Application Site to habitats in the surrounding area. The proposed improvements also offer an excellent opportunity to contribute to local biodiversity targets set by the London Boroughs of Hackney and Tower Hamlets as well as links to those set for Queen Elizabeth Olympic Park. 12

15 For the operational phase, the assessment considered: permanent loss of buildings and trees, degradation and overshadowing of habitats; disturbance of protected species from noise or light pollution, human activity and vehicular movements, as well as disruption to existing flight paths and corridors, collision mortality and increased predation from domestic animals. None of these were found to have significant effects on ecology due to the design of the Proposed Development and the requirements, within the Design Code, for future developers to enhance the Application Site for biodiversity. Geology, Soils and Contaminated Land Chapter 10 (Geology, Soils and Contaminated Land) reports the effects of the Proposed Development with respect to the land contamination and its effects on people, property and the water environment. The assessment considered the likelihood of land contamination to be uncovered or disturbed during the construction of the Proposed Development, and whether it could potentially affect people or property, or get into the water environment. It was based on document research and brings together the results of other nearby intrusive surveys to establish the baseline conditions. Baseline The Application Site consists of made ground (that is, ground that has been previously disturbed and contains man-made material such as bricks). Below this, the natural geology is alluvium and river terrace deposits. The Application Site also lies within a high risk zone of unexploded bombs, as the area was targeted in WWII due to the location of chemical works with the production of TNT and fuel to the military. Based on past industrial uses of the Application Site (as shown on the plan below), areas of known or suspected sources of contamination have been identified, which may have resulted in below ground land contamination. 13

16 Extract from Goad Fire Insurance Map 1893 Summary of effects During the demolition and construction phase of the Proposed Development there could be hazards to human health for site workers and the public if they are exposed to contaminated soils as well as unexploded bombs and asbestos. Soils and water resources (including surface water features and groundwater) may also be affected by construction activities, including site plant, operations and materials, as well as from waste soils which will be excavated for example to construct basements. However, these risks can be largely eliminated through the implementation of an appropriate Construction Environmental Management Plan for each Development Plot. A Materials Management Plan for each Development Plot will also be implemented to ensure careful handling, stockpiling and selection of materials. In addition, prior to demolition and construction activities commencing, an asbestos survey will be undertaken, alongside an Explosive Ordnance Threat Assessment. With these measures in place, there will be no significant effects. 14

17 Once the Proposed Development is completed and occupied, there could be hazards to the human health of site users, through exposure to contaminants by direct contact with of soils, and inhalation of dust and/or vapours. These could pose a chronic health risk and the effects could be significant. Mitigation measures for contaminated land will be determined through a detailed ground investigation at the Reserved Matters Application stage for each Development Plot, and remediation (if necessary) will be undertaken. Soils and water resources could also be affected once the Proposed Development is complete and occupied, for example the risk of pollution from the use, storage, emissions and accidental spillages of chemicals, oils and fuels or other hazardous substances. Potential effects on soils and controlled waters from the long term operations of the Proposed Development will be mitigated through compliance with relevant environmental pollution control measures and implementation of good design practices and ensuring emergency procedures/plans will be set in place for all spills and incidents. Building and structures could be affected by contaminants in the ground and the build-up of ground gases and vapours. These risks will be reduced, at the Reserved Matters Application stage, through the detailed design of buildings and foundations and by including gas protection measures in buildings where necessary. Gas protection measures for buildings will be determined though a gas monitoring and sampling programme. Noise and Vibration Chapter 11 (Noise and Vibration) reports the assessment of noise and vibration effects associated with the construction and operation of the Proposed Development. Construction noise and vibration predictions for the Proposed Development were carried out based on the methodology outlined in Code of practice for noise and vibration control on construction and open sites. Using the results of the baseline noise monitoring and road traffic data, provided as part of the Transport Assessment, and rail movements sourced from Transport for London timetable schedules, a digital noise model was produced. The model was used to calculate the noise of the Proposed Development during the operational phase. An assessment of the noise impacts resulting from construction traffic on the surrounding highway network was also carried out. Baseline Short term daytime and night-time noise measurements were carried out at locations representative of surrounding residential properties to establish the existing noise environment in the area. This survey also included measurements of noise from London Overground services on the railway line running through the Application Site. During the noise surveys, the dominant source of noise affecting the Application Site was road traffic from local roads and the A12. The majority of traffic was passenger vehicles with some heavier vehicles using the industrial units within the Application Site. Other noise sources included occasional aircraft flyovers and trains on the London Overground railway line. 15

18 No noticeable levels of ambient vibration (that is, vibration already present in the area) were observed. As such, the effect of ambient vibration is not considered to be a significant issue. Impacts Noise sensitive locations close to the Application Site will be negatively affected by noise and vibration during demolition and construction. Noise effects are likely to be greatest during ground works when heavier machinery is likely to be used. Residential dwellings along Leabank Square, Berkshire Road, Wallis Road and White Post Lane are likely to be most affected by temporary construction noise. Effects will be minimised through the implementation of Construction Environmental Management Plans, for each Development Plot, which will include measures such as the use of screens around plant and machinery to reduce noise, and adherence to working hours. Building services plant such as heating, ventilation and air conditioning will be designed and controlled to meet operational noise limits therefore it is considered that effects on occupants of the Proposed Development will not be significant. Internal noise levels for new residential units will be considered at the detailed design stage and the effects on future residents will be minimised through the use of glazing as well as consideration of the orientation and internal layouts of residential units. It is considered for the majority of the Application Site, in locations located away from busy roads, desired noise levels for external amenity spaces can be achieved. Socio-Economics Chapter 12 (Socio-Economics) reports the assessment of socio-economic effects of the Proposed Development including the effect on existing employees and businesses within the Application Site, local residents and businesses in the surrounding area. Effects on social infrastructure assets such as schools and healthcare facilities and local and regional economy have also been assessed. Baseline There is currently no residential development within the Application Site itself as the current land uses are commercial and industrial. It is estimated that existing premises within the Application Site could accommodate up to 760 people in employment with many of the jobs being in light industry, general industry and storage and distribution. Within the surrounding area there is generally a large working age population but with an above average unemployment rate. The Application Site has a good level of accessibility to education, healthcare, community facilities and open space within the surrounding area. 16

19 Summary of effects Due to the scale of the project and based upon the estimated construction value, it is anticipated that the demolition and construction of the Proposed Development will create approximately 455 new full time equivalent jobs. Although these jobs are temporary, they represent a significant economic benefit. Employment growth will also occur locally in supply chain firms within the construction industry. Additionally, part of the income of the construction workers and supply chain employment will be spent in the local area, for example in local convenience retail. However, the loss of existing employment and businesses units (as part of the demolition and construction works) will result in a temporary reduction in jobs for on-site employees. To reduce the negative effects associated with this, a principle of relocation has been proposed which will provide businesses with the opportunity to relocate within the Proposed Development. It is estimated that 996 full time equivalent jobs will be created by the Proposed Development, as well as employment opportunities to residents and businesses in the local area and an increase in the local housing stock. An increase in population in the area could have negative effects on social infrastructure, including childcare and education places, health and social care, as well as community and leisure, and open space and recreation resources in the local area. However, the design of the Proposed Development makes space for community and leisure facilities, as well as open space including play space. Also, there is sufficient capacity within existing social infrastructure facilities such as schools and healthcare provision to accommodate the new population. Townscape and Visual Amenity Chapter 13 (Townscape and Visual Amenity) reports the assessment of effects upon the surrounding townscape character and existing views in and around the Application Site. The study covers the whole of the area from which the Proposed Development would be seen. The existing townscape character has been identified based on a desktop study, field surveys and analysis. Land use, in terms of special historic and cultural values, as well as built-up areas, was also explored. A study area with a radius of 2km was chosen to determine the locations from which the Proposed Development would be visible. A Zone of Theoretical Visibility model was developed and a field assessment of views was carried out. Representative viewpoints (18 in total) were agreed with the Local Planning Authority. These represent residential properties, workplaces, recreational facilities, road users, pedestrians, and other outdoor sites used by the public, which would be likely to experience a change in existing views as a result of the Proposed Development. Photographs (also known as visually verified views ) were prepared to illustrate how the proposed building envelopes would look alongside existing and future development. 17

20 Baseline A number of townscape designations and areas of recognised value within the study area have been identified. These include Victoria Park Registered Park and Garden (located to the west of the Application Site), a number of listed buildings, and four Conservation Areas (Fish Island and White Post Lane and Hackney Wick within the Application Site itself and Victoria Park and Clapton Square within the surrounding area). National Cycle Route 1, a long distance cycle route follows the River Lea towpath and continues southwards passing adjacent to the Application Site before heading west along the Hertford Union Canal Towpath and into Victoria Park. There are also areas of Metropolitan Open Land and Local Open Space, however none fall within the Application Site itself. 90 Main Yard cafe/bar, dance studio and communal work space The Application Site has a distinctive, local creative community which is evident in both the buildings and internal uses and also with the large proportion of street art throughout. This contributes to a strong sense of place. Wallis Road is the spine of the area with streets and yards opening off of it. These yards are a combination of extensive spaces, such as the Main Yard, and tightly confined spaces such as at Lion Works. There is a range of buildings, predominantly brick, from historic industrial buildings to recent large-scale residential development adjacent to the waterways. There are also large, vacant plots throughout the area where buildings have been demolished. 18

21 The Application Site is theoretically visible in a range of short and long distance views from all directions. However, the density of development surrounding the Application Site is such that views in reality will be more limited. For example, large scale infrastructure such as the A12, A106 and railway lines and buildings on the other side of the River Lee Navigation such as the Olympic Stadium and Here East development screen the Application Site in long distance views. A106 Here East development Railway line Sweetwater development A12 Olympic Stadium Zone of Theoretical Visibility within 2km of the Application Site 19

22 Summary of effects Potential construction effects could result from visibility of construction activities and plant such as the presence and occupation of tower cranes and demolition works; and temporary site infrastructure, such as site traffic and construction compounds especially those located in areas adjacent to sensitive townscape and visual receptors. Measures to reduce townscape and visual effects during the demolition and construction phases will be set out in Construction Environmental Management Plans for each Development Plot. The location of the Proposed Development within and in proximity to designated townscapes and sensitive visual receptors has influenced the design, particularly the mass, scale and building and surfacing materials. This has helped to ensure that, wherever possible negative effects on the townscape and visual amenity are designed out, and the opportunity for beneficial effects is maximised. These will include surrounding work sites with hoarding and maintaining good housekeeping. Even with these measures in place, there will still be significant effects during demolition and construction, particularly for residents along Berkshire Road, Felstead Road, and people using the footbridge over the A12, the zebra crossing to the east of Wallis Bridge adjacent to the Copper Box Arena, River Lee Navigation Towpath and Hackney Wick Train Station. All residual townscape effects are beneficial as a result of the replacement of existing buildings of generally poor townscape merit with a comprehensive scheme comprising a new mixed-use development, designed to a high architectural standard. Potential effects upon completion and occupation of the Proposed Development include: effects of the Proposed Development on townscape resources and townscape character, including the perceived quality of the townscape, and upon designated townscapes; and effects of the Proposed Development on the composition and quality of views and visual amenity. The location of the Proposed Development within and in proximity to designated townscapes and sensitive visual receptors has influenced the design, particularly the mass, scale and building and surfacing materials. This has helped to ensure that, wherever possible negative effects on the townscape and visual amenity are designed out, and the opportunity for beneficial effects is maximised. The designs would be worked up in more detail in any reserved matters application and further discussion and dialogue with officers would take place at that stage. All residual townscape effects are beneficial as a result of the replacement of existing buildings of generally poor townscape merit with a comprehensive scheme comprising a new mixed-use development, designed to a high architectural standard. The effects across the majority of the study area will be beneficial and overall will improve visual amenity. There will be significant beneficial visual effects for some views including residents, pedestrians and road users along Berkshire Road, residents on Felstead Road, and 20

23 people using the footbridge over the A12, the zebra crossing to the east of Wallis Bridge adjacent to the Copper Box Arena and Hackney Wick Train Station. Traffic and Transport Chapter 14 (Traffic and Transport) reports the effects on vehicle movements, pedestrians and cyclists due to changes on the surrounding highway network and public transport arising from the construction and operation of the Proposed Development. Baseline conditions have been determined through site visits, desk based collation and review of materials and data held by third parties including Transport for London (TfL), and independently collected traffic survey data. Baseline The Application Site is well served by a range of transport modes and benefits from moderate to good existing public transport accessibility. Hackney Wick London Overground station is located centrally to the Application Site and serves the Application Site and wider area. There are well-established opportunities for walking and cycling with the proposed extension to the Santander Cycle Hire Scheme for Queen Elizabeth Olympic Park. Summary of effects During demolition and construction works there will be temporary negative effects on pedestrians and cyclists due to diversions or closures of footways and cycle lanes. There will be temporary changes in traffic levels including increased Heavy Goods Vehicle (HGV) traffic, as well as increased demand on bus and rail services, as a result of construction personnel travelling to and from the Application Site. Construction Traffic Management Plans will be prepared and implemented for each Development Plot, to manage vehicle movements to and from the Application Site, set out construction traffic routes for HGVs, pedestrian and cycling routes and set out other measures to minimise disruption. With Construction Traffic Management Plans in place, temporary effects during demolition and construction will not be significant. The Proposed Development will offer a high quality access and movement environment with access to, from and within the Application Site, focused on sustainable modes of transport (for example walking, cycling and public transport). The provision of high quality pedestrian and cycle facilities within the Application Site will ensure a safe and welcoming environment for all residents, employees and visitors. Pedestrian movement within the Application Site will take priority over other forms of transport. This will be achieved by creating improvements to areas accessible to the public (known as public realm ), better access to Hackney Wick Station, integrating proposed improvements to cycle infrastructure in the area, and through creating safe, convenient and comfortable pedestrian routes. A Travel Plan will be prepared to encourage the use of sustainable modes of travel and reduce the number of vehicle trips generated by residents, visitors and employees of the Application Site. 21

24 The proposed North-South Cut will improve site connectivity as well as being a key public space, framing the heritage asset Central Books. Illustrative image of a new cycle ramp improving access to the Queen Elizabeth Olympic Park for cyclists. The bridge proposals have been designed to integrate with the Proposed Development. Once constructed, the Proposed Development will have a significant beneficial effect on pedestrian movement through, within and surrounding the Application Site; and a beneficial effect on cycle movements. Due to an increased demand on public transport during construction, there will be a negative effect on rail services, however this is not considered to be significant; and it is anticipated there will be no significant effect on the local bus network. 22

25 Water Resources and Flooding Chapter 15 (Water Resources and Flooding) reports the assessment of effects on water resources and flood risk as a result of the construction and operation of the Proposed Development. A study area of approximately 500m around the Application Site has been considered in order to identify areas of surface water that could be affected by the Proposed Development. A desk study and site walkover survey was also undertaken. Computer modelling has been undertaken to assess flood risk and a Flood Risk Assessment has been prepared and submitted in support of the Outline Planning Application. Baseline The River Lee Navigation forms the eastern boundary of the Application Site and flows into the River Lea, a major tributary of the River Thames. The Application Site is located within an area considered to be at high risk of flooding if there were no flood defences in place. However, the Environment Agency s flood maps show that the Application Site benefits from flood defences. It is likely that rising sea levels due to climate change will have a considerable impact on the level of flood risk within the Application Site over the lifetime of the Proposed Development. The risk of surface water flooding is considered to be low although pooling may occur in some areas during heavy rainfall events. In addition, as the Proposed Development is located next to the River Lee Navigation, the Application Site is susceptible to groundwater flooding. Other sources of flooding such as sewer overflows are considered to be low risk. Summary of effects on surface water quality The River Lee Navigation could be negatively affected by construction activities including pollution of nearby water bodies, either directly, or indirectly, via the sewer system. Without mitigation, this could result in a significant negative effect. In addition, there could be effects on water quality from construction works to the river wall or works overhanging the canal which could result in a significant effect on water quality. The construction phase will be carried out in accordance with Construction Environmental Management Plans which will be prepared and implemented for each Development Plot. These will include measures such as a temporary drainage system to prevent contaminated runoff from entering surface water drains without treatment, and measures to control spillages and leaks. All works to the river wall will be completed in accordance with consents from the Environment Agency. With these measures in place, there will be no significant effects upon surface water quality during construction. A surface water drainage system has been designed to incorporate features such as blue, green and brown roofs on 80% of the roof area to hold back water (a blue roof is designed to hold back water but does not incorporate vegetation as a green or brown roof does). Tanks and oversized pipes will provide further capacity to hold back water within the Application Site. In addition, the green and brown roofs will provide some level of water treatment and oil interceptors are proposed for areas such as car parks. As low traffic flows are predicted and the drainage design for the Proposed Development incorporates Sustainable Drainage Systems 23

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

16. Peckham Peckham Area Vision

16. Peckham Peckham Area Vision 16. 16.1. Area Vision 16.1.1. is: A lively town centre providing a range of daytime and night time activities on Rye Lane including a Library, a Leisure Centre and many independent retailers which specialise

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Peckham Peckham Area Vision Map

Peckham Peckham Area Vision Map Area Vision Map PNAAP13 PNAAP8 Sumner Road Surrey Canal Walk Bird in Bush Park Key: NSP Site Allocations PNAAP Allocations Greenspace Low Line Cycle Network Primary Shopping Areas Square Surrey Canal Walk

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision 5. 5.1. Area Vision 5.1.1. are: A globally significant central London business district which is home to international business headquarters; At the heart of the commercial and cultural life of the capital

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

10. East Dulwich East Dulwich Area Vision

10. East Dulwich East Dulwich Area Vision 10. 10.1. Area Vision 10.1.1. is: A predominantly residential area characterised by mostly medium density housing, including many family homes. Many parts of have retained historic character and it includes

More information

NON - TECHNICAL SUMMARY

NON - TECHNICAL SUMMARY WATERMAN ENERGY, ENVIRONMENT & DESIGN LTD 60 ludgate hill / 30 old bailey environmental STATEMENT NON - TECHNICAL SUMMARY REV. 01 january 2011 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 1. Introduction

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

OUR AREA SECTION 02 I NEXT PAGE. 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline

OUR AREA SECTION 02 I NEXT PAGE. 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline 7 ADOPTED LOCAL PLAN SECTION 02 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline position of the Local Plan. It sets out the historical context and current

More information

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction Workspace 14 Limited (hereafter referred to as the Applicant ) has applied for full planning permission for the redevelopment of and 14 Marshgate Lane, situated on land bound by Marshgate

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

75-89 Wallis Road & 59 Berkshire Road, Hackney Wick, London, E9 5LN

75-89 Wallis Road & 59 Berkshire Road, Hackney Wick, London, E9 5LN East London Mixed-Use Development Opportunity CGI of Proposed Scheme Summary A mixed-use development opportunity located in Hackney Wick within the jurisdiction of the London Legacy Development Corporation.

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

6. Bermondsey 6.1. Bermondsey Area Vision

6. Bermondsey 6.1. Bermondsey Area Vision 6. 6.1. Area Vision 6.1.1. is: An inner-london neighbourhood characterised by modest worker ho associated with the historic Rotherhithe docks and local manufacturing industries such as biscuits, jam, vinegar

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Hackney A Place for Everyone

Hackney A Place for Everyone October 2016 Introducing Hackney A Place for Everyone Local Plan 2033 (LP33) A New Local Plan For Hackney What is the Local Plan 2033? The Local Plan will set out a vision for what Hackney will be like

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015

97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015 97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015 Public Realm and Landscape Proposals LEA BRIDGE ROAD, WALTHAMSTOW Public Realm & Landscape Proposals BDP(90)RPT001 December

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

1. Introduction. Site Boundary

1. Introduction. Site Boundary 1. Introduction Workspace Group Plc (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of (hereafter referred to as the Site ), situated to the

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Duddingston House Properties and Urbanist Hotels Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Environmental Statement Non-Technical Summary 3rd September 2015 www.oldroyalhighschool.com

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) Central Chelmsford Development Agency / Genesis 27/08/2014 Central Chelmsford Development Agency: Environmental Statement Quality Management

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

1 INTRODUCTION 1.1 INTRODUCTION

1 INTRODUCTION 1.1 INTRODUCTION 1 INTRODUCTION 1.1 INTRODUCTION RREEF (UK) Ltd in partnership with Sheffield City Council (SCC) is applying for planning permission for the construction of: a new indoor city centre market hall and indoor

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Welcome to our public exhibition

Welcome to our public exhibition About our scheme Welcome to our public exhibition Taylor Wimpey East Anglia intends to submit a detailed planning application for a new residential development of 39 high-quality homes at the B&M Concrete

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

13. London Bridge London Bridge Area Vision

13. London Bridge London Bridge Area Vision 13. 13.1. Area Vision 13.1.1. is: A globally significant central London business district which is home to international business headquarters; Internationally renowned for its prominent riverfront location

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010 GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY 24 December 2010 Our Ref: DT/JLL0509 Appeal Ref (optional): RPS 1 st Floor West Cottons Centre Cottons Lane London

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

Elephant and Castle. Elephant and Castle Area Vision Map. Elephant and Castle. 216 New Southwark Plan Proposed Submission Version NSP42 NSP49 NSP44

Elephant and Castle. Elephant and Castle Area Vision Map. Elephant and Castle. 216 New Southwark Plan Proposed Submission Version NSP42 NSP49 NSP44 Area Vision Map Lamberth North Station Waterloo Road Southwark Station NSP49 NSP43 Blackfriars Rd St George s Road Borough Road NSP48 Great Suffolk Street NSP42 NSP44 NSP45 Borough Station Newington Gardens

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

BROMLEY-BY-BOW SUPPLEMENTARY PLANNING DOCUMENT (ADOPTED - APRIL 2017)

BROMLEY-BY-BOW SUPPLEMENTARY PLANNING DOCUMENT (ADOPTED - APRIL 2017) BROMLEY-BY-BOW SUPPLEMENTARY PLANNING DOCUMENT (ADOPTED - APRIL 2017) CONTENTS 1. Introduction 4 PART A: SETTING THE SCENE 6 2. Background, purpose and structure of this SPD 6 3. Planning Policy Framework

More information

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction DV4 Properties Park Street Co. Ltd (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of 185 Park Street, situated on land bounded

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information

9 Archaeology & Cultural Heritage

9 Archaeology & Cultural Heritage High Clachaig Wind Farm Scoping Report Page 56 9 Archaeology & Cultural Heritage 9.1 Introduction Cultural heritage in this context means the above- and below-ground archaeological resources, built heritage,

More information

Rotherhithe Rotherhithe Area Vision Map

Rotherhithe Rotherhithe Area Vision Map Area Vision Map CWAAP1 Improved pedestrian and cycle links to the wider area Improved link from town centre to River Thames and docks CWAAP2 Brunel Museum NSP79 CWAAP3 Proposed Thames Crossing Station

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan Level 10, 1 Stratford Place Montfichet Road London E20 1EJ Tel: +44 (0) 20 3288 8821 Fax: +44 (0) 20 3288 1851 alex.savine@londonlegacy.co.uk Stuart Liddington The Planning Inspectorate 3/12 Kite Wing

More information

Non-Technical Summary

Non-Technical Summary Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,

More information

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed

More information

Masterplanning in Hackney Wick and Fish Island

Masterplanning in Hackney Wick and Fish Island Masterplanning in Hackney Wick and Fish Island Hannah Lambert Senior Designer London Legacy Development Corporation London Legacy Development Corporation is. Regeneration body answerable to Mayor of London

More information

Equestrian Skills Centre, SE18

Equestrian Skills Centre, SE18 Equestrian Skills Centre, SE18 Non Technical Summary (Volume 3) Campbell Reith Hill LLP July 2011 NON-TECHNICAL SUMMARY INTRODUCTION NTS1 The London Borough of Greenwich has submitted a full planning application

More information

HS2 Interchange Station Design

HS2 Interchange Station Design Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study Olympic Park, London SuDS used Porous asphalt strips Wetlands Swales Filter strips Filter drains Balancing ponds Rainwater harvesting 1. Location Olympic Park, Stratford, East London, E20 2ST. 2. Description

More information

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017 Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task

More information

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157 NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY September 2016 Our Ref: Q60157 Contents 1 INTRODUCTION... 2 2 EIA METHODOLOGY... 5 3 SITE DESCRIPTION AND SETTING... 6 4 ALTERNATIVES...

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Garden Bridge Planning Application

Garden Bridge Planning Application Planning Application Additional Verified photomontages and assessment September 2014 Contents Page 1 Visual assessment 2 1.1 Introduction 2 1.2 Baseline 2 1.3 Potential effects and good environmental

More information

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction ASDA Stores Limited and Ashbourne Beech Property Limited (hereafter referred to as the Applicants ) are seeking to obtain planning permission for the redevelopment of the existing supermarket

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

THE WHARVES DEPTFORD STATEMENT OF COMMUNITY INVOLVEMENT EXECUTIVE SUMMARY. May 2015 MOVING FORWARD

THE WHARVES DEPTFORD STATEMENT OF COMMUNITY INVOLVEMENT EXECUTIVE SUMMARY. May 2015 MOVING FORWARD THE WHARVES DEPTFORD MOVING FORWARD THE WHARVES DEPTFORD STATEMENT OF COMMUNITY INVOLVEMENT EXECUTIVE SUMMARY May 2015 2 The Wharves Deptford Statement of Community Involvement The Wharves Deptford Statement

More information

ABOUT CALA HOMES CALA HOMES

ABOUT CALA HOMES CALA HOMES WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments

More information

Aerial view of Hackney Wick. PTE - Diespeker Wharf, Islington. PTE - Deptford Lounge

Aerial view of Hackney Wick. PTE - Diespeker Wharf, Islington. PTE - Deptford Lounge 80-84 & 88 WALLIS ROAD Welcome Welcome to this public exhibition of our plans for 80-84 and 88 Wallis Road (known as Daro Factors). Our proposals aim to replace the low grade warehouse buildings and to

More information

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service Archaeology and Planning in Greater London A Charter for the Greater London Archaeology Advisory Service THE PURPOSE OF THE CHARTER This Charter sets out how English Heritage will provide archaeological

More information

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary. London Borough of Lambeth Lambeth Depots Environmental Impact Assessment Environmental Statement: Non-Technical Summary April 2009 This Non-Technical Summary (NTS) sets out the findings of an Environmental

More information

M4 Corridor around Newport Environmental Statement Volume 3: Appendices

M4 Corridor around Newport Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices At Issue March 2016 CVJV/AAR 3 rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Volume 3: Contents 1

More information

BACK TO CONTENTS I PREVIOUS PAGE I NEXT PAGE. Figure 13: Major wildlife corridors

BACK TO CONTENTS I PREVIOUS PAGE I NEXT PAGE. Figure 13: Major wildlife corridors Figure 13: Major wildlife corridors 69 ADOPTED LOCAL PLAN CREATING A HIGH-QUALITY BUILT AND NATURAL ENVIRONMENT SECTION 06 6.1 The unique interplay of green spaces, waterways and the built environment

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

EVALUATION OF MASTER PLAN ALTERNATIVES

EVALUATION OF MASTER PLAN ALTERNATIVES 7 The Environmental Report is required to identify, describe and evaluate reasonable alternatives, taking into account the objectives and geographical scope of the Master Plan 2008. Three plan alternatives

More information

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Maidstone Medical Campus Ltd is applying to Maidstone Borough Council for

More information

NATURAL AND BUILT ENVIRONMENT BACKGROUND PAPER

NATURAL AND BUILT ENVIRONMENT BACKGROUND PAPER NATURAL AND BUILT ENVIRONMENT BACKGROUND PAPER OCTOBER 2018 CONTENTS 1. Introduction 2 2. Legislative and policy context 2 3. Evidence Base 3 4. Key changes 8 4.1 Strategic Policy 8 4.2 The waterway environments

More information