511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511
|
|
- Berniece Chapman
- 5 years ago
- Views:
Transcription
1 OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS GENERAL Rip Rap Rock Protection Excavation for placing Rip Rap, Rock Protection and Gravel Sheeting is part of each individual tender item. Rip rap is a special application of rock protection. It consists of rocks, broken rocks, cobbles, stones, boulders or concrete debris placed together in a set and stable manner to a specified thickness for the protection of earth slopes and surfaces. It is used in areas where erosion is a problem or anticipated, or where the appearance of the placed rocks is an important factor. Areas of Rip Rap applications may include: a) Earth slopes b) Culvert and sewer ends c) Streambeds and slopes d) Ditches with gradients 5% and greater e) Around manholes, catch basins or ditch inlets constructed in ditches or on ditch slopes. Rip rap is commonly used in conjunction with a filter medium such as geotextile or gravel sheeting. These prevent loss of fines from beneath the rip rap and subsequent collapse of the protection scheme. Rock protection consists of broken rocks, rocks, cobbles, boulders and/or concrete debris dumped or placed in random but stable manner. The primary use of rock protection is to protect ditches and channels from erosion, including the banks and underwater portions. Rock protection is laid to a specified depth and elevation and commonly placed in conjunction with a filter medium B511-1
2 Gravel Sheeting Gravel sheeting consists of a surface layer of granular material which has to conform to a specified gradation. It is used for erosion protection and also applied in areas of ground water seepage. The decision to include "Gravel Sheeting" into the contract rests with the Regional Geotechnical Section Geotextile Geotextile is a synthetic fabric. The prime function of this material is: (a) (b) (c) (d) To separate two types of soils of different sizes and structures which would readily mix under the influence of load and water migration. To filter or to hold back soil particles while allowing the passage of water. To drain or to ensure the rapid removal of moisture without buildup of hydrostatic pressures. To reinforce mainly by tensile strength of fabrics and their resistance to puncture (burst), tear and shear forces. The term "filter cloth" in conjunction with Geotextile is used for woven filter fabrics. The prime characteristic of filter cloth is the uniformity of size and frequency of openings. The term "mat" is used for non-woven fabrics in which the water must pass through channels instead of holes. Typical applications of Geotextile Fabric are: - Under rip rap - Under rock protection - Under gravel sheeting - Under fill on soft foundations - With french drains - Behind gabions The application of Geotextile is designated by its: 1. Strength class (i.e. Class I or II) 2. Fabric structure (woven or non-woven) B511-2
3 3. Equivalent opening size 4. Minimum nominal thickness The decision to place Geotextile on a contract is the responsibility of the Regional Geotechnical Section. If surface conditions, on which geotextile will be placed, are such that it is not possible to place the geotextile in a reasonably level manner (undulating ground or high water level) a levelling layer of approved material shall be placed to provide a satisfactory surface. In the case of a high water level, the levelling layer shall be placed to provide 0.3 m of freeboard above the swamp water level Reference Publication Tender Items 1. A comprehensive write-up on the use of Geotextiles is contained in the MTO publication "The Geotechnical use of Filter Fabrics in Highway Construction" Report EM-13 and Engineering Geotextiles Report EM Various aspects of the above tender items are discussed in the MTO Drainage Manual in Chapters: C-(Channels), D-(Culverts), G-(Subdrainage) and I-(Bridges). - Rip Rap - Rock Protection - Gravel Sheeting - Geotextile Specifications Special Provisions Standard Drawings The requirements for the above tender items are covered by OPSS 511. The designer should refer to Chapter "E" of this manual to review the applicable special provisions. A non-standard special provision must be included to advise the Contractor of a specific class of geotextile to be used on a contract. Rip Rap treatment with Geotextile for Ditch Inlet Manholes and for Sewer and Culvert Outlets is identified on the standard drawings in the 800 series B511-3
4 There are no standard drawings available for Rock Protection and Gravel Sheeting. However, a typical application of Rock Protection is illustrated in the Structural Manual, drawing number SS COMPUTATION These are Plan Quantity Payment items Source of Information Construction recommendations for the above tender items are found in the Geotechnical Report as prepared by the Regional Geotechnical Section. The need for the application of Geotextiles with any of the associated tender items should be reviewed with the Geotechnical Section and should not be included automatically Method of Calculation 1. Rip Rap B511-4 The unit of measurement for Rip Rap is square metre. The areas recommended for Rip Rap are scaled from the plans. Slope measurements are to be scaled from cross-sections. The computation of the area is based on the width times length. 2. Rock Protection The unit of measurement for Rock Protection is cubic metre. The computation of the volume for Rock Protection is based on the area (average width times length) times the recommended depth. Areas and slope measurements are scaled from cross sections. 3. Gravel Sheeting 4. Geotextile The unit of measurement for Gravel Sheeting is square metre. The depth of Gravel to be applied, the depth of excavation required, and the possible use of geotextile are determined by the Regional Geotechnical Section. Gravel Sheeting does not require compaction. Slope measurements are scaled from cross-sections. The unit of measurement for Geotextile is square metre. Slope measurements are to be scaled from cross-sections. The computation of
5 the area is based on the width times length. No allowance is made for material overlap DOCUMENTATION Areas for the above tender items are shown on the construction plan sheets. Typical sections are to be included on the drawings to clarify complex applications. The depth of Gravel Sheeting and Rock Protection is identified on either a typical section or on the Quantities Sheet. Quantities for Gravel Sheeting and Geotextile are listed on any Miscellaneous Quantities sheet. Quantities for Rip Rap and Rock Protection are listed on the Quantities 1 or Quantities 2 sheet. Quantity entries for each tender item are totalled. These totals are the tender totals and are transfered to the tender documentation DOCUMENTATION ACCURACY Stations and quantity entries are recorded to the nearest whole number metre. Offsets are recorded in 0.1 of a metre B511-5
B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511
B511 - - OPSS 511 511.1 GENERAL 511.1.1 Rip-Rap Excavation for placing rip-rap, rock protection, and granular sheeting is part of each individual tender item. Rip-rap is a special application of rock protection.
More informationCONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 511 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING 511.01 SCOPE 511.02 REFERENCES 511.03 DEFINITIONS 511.04
More informationCONSTRUCTION SPECIFICATION FOR RIP-RAP, ROCK PROTECTION, AND GRANULAR SHEETING
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 511 NOVEMBER 2018 (Formerly OPSS 511, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 511 COMMON, November 2013 with no technical
More informationCONSTRUCTION SPECIFICATION FOR RIP-RAP, ROCK PROTECTION, AND GRANULAR SHEETING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 511 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR RIP-RAP, ROCK PROTECTION, AND GRANULAR SHEETING TABLE OF CONTENTS 511.01 SCOPE 511.02 REFERENCES 511.03
More informationE R O S I O N C O N T R O L
E R O S I O N C O N T R O L GEOTEXTILES T O U G H O V E R T I M E EROSION CONTROL 1.0 Features of PERMANENT PG 2 EROSION CONTROL 2.0 How Typar geotextiles PG 2 work 4.0 Installation guide PG 6 5.0 Overlap
More informationHYDRAULIC DESIGN involves several basic
Chapter 6 Tools for Hydr draulic and Road Design HYDRAULIC DESIGN involves several basic concepts that must be considered to build successful projects with a minimum risk of failure (Photo 6.1). Use of
More informationSPECIAL SPECIFICATION 3687 Impermeable Liner
1993 Specifications CSJ s 0569-01-043 & 0945-04-025 SPECIAL SPECIFICATION 3687 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane)
More informationCoir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects
Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects Using geotextiles to confine soil in lifts between layers of live plants has become an increasingly
More informationEROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build
More informationTechnical Supplement 14D. Geosynthetics in Stream Restoration. (210 VI NEH, August 2007)
Technical Supplement 14D (210 VI NEH, August 2007) Issued August 2007 Cover photo: Inert or manmade materials can be used in restoration designs where immediate stability is required and can be used in
More informationV. EROSION CONTROL. -Drainage swales separation -Under rip-rap protected -Under rip-rap unprotected
V. EROSION CONTROL This section describes three different types of erosion control applications where geotextiles can be used in conjunction with some form of stone or other energy dissipating material
More informationAppendix G. Detailed Design
Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information
More informationINSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS
INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS Prepared by TenCate Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel: (706) 693-2226 Fax:
More information1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner
1993 Specifications CSJ 0128-01-085 SPECIAL SPECIFICATION ITEM 5327 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane) shown
More informationAASHTO M Subsurface Drainage
Subsurface Drainage Description: This specification is applicable to placing a geotextile against the soil to allow long-term passage of water into a subsurface drain system retaining the in -situ soil.
More informationSection Specification for Geotextile Used in Permanent Erosion Control Application
Project Name: Project Number: 1 GENERAL Section 02370 Specification for Geotextile Used in Permanent Erosion Control Application 1.1 SECTION INCLUDES A. Geotextile to prevent soil loss resulting in excessive
More informationAppendix B DETAILED DESIGN
Appendix B DETAILED DESIGN Design details for bioretention/bioswale Figures 1 and 2 provide cross-sectional details of standard bioswales and bioretention installations used in design drawings. Table 1
More informationPERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11
Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing
More informationLow Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent
Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep
More informationCI/SfB (16)(17) Common Arrangement D11 Uniclass L1411/ L132/ L6634. Woven Polypropylene Geotextiles.
CI/SfB (16)(17) Common Arrangement D11 Uniclass L1411/ L132/ L6634 Woven Polypropylene Geotextiles Rhyno Woven Polypropylene Geotextiles Since its introduction in 1999, Rhyno has been helping contractors
More informationTHE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
More informationAPPLICATIONS IN FILTRATION AND DRAINAGE & EROSION CONTROL
Lecture 36 APPLICATIONS IN FILTRATION AND DRAINAGE & EROSION CONTROL Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Geotextile filter requirements:
More informationIII.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions:
III.DRAINAGE This section describes the use of geotextiles in underdrains for two different field conditions: Protected (or light duty installations) and, Unprotected (for heavy duty installations). Both
More informationUrban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT
NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.
More informationSTORMWATER - GENERAL NOTES
STORM DRAINAGE CONSTRUCTION NOTES. All storm sewer pipe shall be reinforced concrete. 2. Storm drainage pipes shall be a minimum of fifteen (5) inch diameter (5" for short lateral runs only - up to 75
More informationMATERIAL SPECIFICATION FOR GEOTEXTILES
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 1860 November 2018 MATERIAL SPECIFICATION FOR GEOTEXTILES TABLE OF CONTENTS 1860.01 SCOPE 1860.02 REFERENCES 1860.03 DEFINITIONS 1860.04 DESIGN AND SUBMISSION
More informationGEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of Civil Engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 2
More informationLandfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting
Landfill Closure, Intermediate Cover & Post-Closure Care Municipal League Meeting 9-7-17 Gated and Closed Landfill Gated means no longer accepting waste. Closed means gated and final cover has been installed
More informationMATERIAL SPECIFICATION FOR GEOTEXTILES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1860 NOVEMBER 2004 MATERIAL SPECIFICATION FOR GEOTEXTILES TABLE OF CONTENTS 1860.01 SCOPE 1860.02 REFERENCES 1860.03 DEFINITIONS 1860.04 SUBMISSION
More informationRhyno. Woven Polypropylene Geotextiles. Geosynthetics Limited
Rhyno Woven Polypropylene Geotextiles Geosynthetics Limited Rhyno Woven Polypropylene Geotextiles Since its introduction in 1999, Rhyno has been helping contractors to reduce maintenance costs by extending
More informationTechnical Specification Guidelines
SECTION I- DESIGN CONSIDERATIONS PAGE 1.01 APPLICABILITY...I.2 1.02 PROTECTION AND PRECAUTIONS...I.3 1.03 SITE AND SUBSTRATE CONSIDERATIONS...I.3 1.04 PRODUCT CONSIDERATIONS...I.8 1.05 FASTENING CONSIDERATIONS...I.9
More informationcc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design P. Sanders FROM: Bart Asher, P.E. V.
M E M O R A N D U M (SA-008-2011) cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design J. Moore P. Sanders FROM: Bart Asher, P.E. V. Forsythe TEBM, Geotechnical Branch
More informationWoven Polypropylene Geotextiles
CI/SfB (16) (17) Common Arrangement R12 Uniclass L1411 Woven Polypropylene Geotextiles Geosynthetics Rhyno Woven Polypropylene Geotextiles Since its introduction in 1999, Rhyno has been helping contractors
More informationStructural Storm Water Best Management Practices (BMPs)
Structural Storm Water Best Management Practices (BMPs) Storm Water Permitting: The SWPPP Revealed By Deron Austin, PE January 11, 2006 3:30-5:00 PM Orlando, Florida Presentation Outline Preface About
More informationCOIR GEOTEXTILES. Er. Sheela Mary Cherian, M.Tech, Assistant Executive Engineer. Woven coir netting / Mesh matting used as geotextiles
COIR GEOTEXTILES Er. Sheela Mary Cherian, M.Tech, Assistant Executive Engineer. Coir is a biodegradable organic fibre material which is coarse, rigid and strong. The constituents of coir have been found
More informationSTORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500
STORM DRAINAGE CONSTRUCTION NOTES 1. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE UNLESS APPROVED BY THE CITY ENGINEER. 2. STORM DRAINAGE PIPES SHALL BE A MINIMUM OF FIFTEEN (15) INCH DIAMETER (15"
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES
More informationCASE HISTORY USE OF TECHGEO NONWOVEN GEOTEXTILE AND TECHGEO NONWOVEN GEOTEXTILE BAGS FOR RIVERBANK PROTECTION
USE OF TECHGEO NONWOVEN GEOTEXTILE AND TECHGEO NONWOVEN GEOTEXTILE BAGS FOR RIVERBANK PROTECTION Project Description Project: Client: Contractor: Protection works to eroding left bank of river Churni at
More informationAlternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)
4.5-s EROSION CONTROL BLANKET SYSTEM Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) DESCRIPTION Erosion control blanket systems are woven or
More informationOPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES
OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES THE CARMONY BUILDING PARAGON REALTY NORTH GREEN STREET BROWNSBURG, HENDRICKS COUNTY INDIANA 8365 Keystone Crossing, Suite 201 Indianapolis,
More informationINSTALLATION GUIDELINES. Mirafi FM Filter Geotextiles for Basal Filtration Applications
CONTENTS 1 General 2 Product and Application 3 Material Identification, Storage and Handling 4 Fabrication of Geotextile Fascine Mattress 5 Installation of Geotextile Fascine Mattress 6 Jointing 7 Rock
More informationFOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE
AFTER FEBRUARY 1, 2010 ITEM 709 TRIANGULAR FILTER FABRIC FENCE 709.1 Description. This work shall consist of furnishing, installing, and removing temporary erosion protection and sediment control triangular
More informationCeTeau CeTeau GeoTextile
CeTeau CeTeau GeoTextile w w w. c e t e a u. c o m CeTeau CeTeau stands for innovative ground improvement technologies and specialized geosynthetic environmental techniques. With more than 10 years of
More informationJ. K. Gupta, Scientist D, Bureau of Indian Standards
Standardization in the field of Geotech 3 RD NATIONAL CONCLAVE ON STANDARDS FOR TECHNICAL TEXTILES 2 & 3 NOV 2017, NEW DELHI J. K. Gupta, Scientist D, Bureau of Indian Standards GEOTECH SECTOR AT A GLANCE
More informationMILL PONDS. Tel:
Mill Ponds is a local family business specialising in ponds and rural services around Sussex, Surrey and Hampshire. With over 35 years experience working with water and rural industries, we apply our knowledge
More information3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT
More informationSOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL
Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More informationSILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.
STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE
More informationChapter 8 REMEDIAL MEASURES 8.1 FACETS IN HAZARD CATEGORY
Chapter 8 REMEDIAL MEASURES 8.1 FACETS IN HAZARD CATEGORY Stabilization of rock slope happens when the driving force acting on a potentially unstable rock slope is reduced, while the resisting force increases
More informationTable 4.7.1: Swales Potential Application and Storm Water Regulation
4.7. Swales A swale is a vegetated open channel, planted with a combination of grasses and other herbaceous plants, shrubs, or trees. A traditional swale reduces peak flow at the discharge point by increasing
More informationSECTION 02230BP AGGREGATE BASE
SECTION 02230BP AGGREGATE BASE This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department of Energy
More informationIntroduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview
Introduction Nonwoven Geotextile (TechGeo) - Functions & Applications TechGeo is made from the highest quality PP fibers. It is a Nonwoven Geotextile, needle punched to form a strong fabric that relates
More informationHILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W
, LLC STERLING HWY. M.P. 142.8 28 33 TIM AVE. DEEP CREEK UNIT BOUNDARY 27 26 25 TIM AVE. CULVERT REPLACEMENT PROPOSED ACCESS ROAD 34 35 36 T2S T3S 31 NINILCHIK, ALASKA 5 4 3 2 BEGIN ROAD CONSTRUCTION 1
More informationSouth Fraser Perimeter Road (SFPR)
MSE WALLS & SLOPES PROJECT PROFILE South Fraser Perimeter Road (SFPR) Nilex provides multiple solutions for the new four-lane highway along Vancouver s Fraser River. LOCATION: Delta and Surrey, British
More informationCharudatta R. Prayag Deputy Director Ahmedabad Textile Industry s Research Association Ahmedabad
Introduction to Geotextiles and the use of Polyester in Geosynthetics, and a brief outline of the Scheme for promotion of usage of Geotextiles in the NER of the Ministry of Textiles, Govt. of India Charudatta
More informationDepartment of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16
GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings
More informationMARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures
MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field
More informationGeotextiles Submitted in partial fulfillment of the requirement for the award of degree of CIVIL
A Seminar report on Geotextiles Submitted in partial fulfillment of the requirement for the award of degree of CIVIL SUBMITTED TO: SUBMITTED BY: www.studymafia.org www.studymafia.org Preface I have made
More informationSubsoil conditions are examined using test borings, provided by soil engineer (geotechnical).
SOIL & FOUNDATION TYPES: Subsurface investigations: Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical). Number of borings and location of borings depends on building
More informationand Water Features and Water Features
Liners for for Lakes, Lakes, Ponds Ponds and Water Features and Water Features Before 2 After The GT Difference The GT Difference Because all liners AREN T the same! At Geosynthetic Technology Limited
More informationGEOTEXTILE DESIGN DESIGN GUIDELINES APPENDIX H. FM /AFPAM , Vol 1. Geotextile Design H-1 UNPAVED-AGGREGATE DESIGN
FM 5-430-00-1/AFPAM 32-801, Vol 1 APPENDIX H GEOTEXTILE DESIGN DESIGN GUIDELINES The widespread acceptance of geotextiles for use in engineering designs has led to a proliferation of geotextile manufacturers
More informationI N D U S T R I A L Y A R D S
I N D U S T R I A L Y A R D S GEOTEXTILES INDUSTRIAL YARDS 1.0 Features of INDUSTRIAL PG 2 YARDS 2.0 How Typar geotextiles PG 2 work 4.0 Installation guide PG 7 5.0 Overlap and joining PG 8 6.0 Setting
More informationGEOWEB slope & shoreline protection OVERVIEW
SOIL STABILIZATION GEOWEB slope & shoreline protection OVERVIEW THE GEOWEB SYSTEM The Presto GEOWEB slope and shoreline protection system is an effective and economical solution to challenging slope-surface
More informationChapter 1 GENERAL SOUTH DAKOTA DRAINAGE MANUAL
Chapter 1 GENERAL SOUTH DAKOTA DRAINAGE MANUAL October 2011 Table of Contents Section Page 1.1 INTRODUCTION...1-1 1.2 BASIC APPROACH...1-2 1.3 FUNCTIONAL RESPONSIBILITIES...1-3 1.3.1 Office of Road Design...1-3
More informationCHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES
CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES 4.1 INFILTRATION BASIN AND TRENCH Figure 4.1. Infiltration basin and trench (Source: Department of Civil, Construction, and Environmental Engineering,
More informationBreak Layers. A guide to the design and specification of capillary break, salt barrier and frost barrier layers.
Break Layers A guide to the design and specification of capillary break, salt barrier and frost barrier layers. Upward movement of water in fine grained soil is a natural process that is usually beneficial
More informationfield note Culvert foundation improvement design concepts The challenge of low-cost culvert foundations
field note Culvert improvement design concepts Mark Partington, R.P.F., M.Sc., EP 1 Papa Masseck Thiam, Ing. Jr., M.Sc. 2 Introduction Canada s northern forested landscapes feature numerous wetlands, such
More informationAlternate Green Stream Bank Stabilization Methods
U.S. Army Corps of Engineers Philadelphia/Baltimore Districts Alternate Green Stream Bank Stabilization Methods Wissahickon Creek, Tannery Run and Rose Valley Creek Bo-Rit Asbestos Site Ambler, Pennsylvania
More informationTree Pits Construction Guide
Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment
More informationABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET
TABLE OF CONTENTS: ABBREVIATIONS: SHEET NO. A SHEET DESCRIPTION REFERENCE SHEETS TITLE SHEET COS CSO GPM PVC SF CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET
More informationFURNEAUX CREEK 5 CHANNEL
FURNEAUX CREEK 5 CHANNEL AND TRAIL IMPROVEMENTS TEXAS CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION PROJECT OF THE YEAR CATEGORY: ENVIRONMENT PROJECT OF $2 MILLION BUT LESS THAN $5 MILLION ENGINEERING DEPARTMENT,
More informationPROJECT CLIMATE RISK ASSESSMENT AND MANAGEMENT REPORT
Khyber Pakhtunkhwa Provincial Roads Improvement Project (RRP PAK 47360) PROJECT CLIMATE RISK ASSESSMENT AND MANAGEMENT REPORT I. Basic Project Information Project Title: Khyber Pakhtunkhwa Provincial Roads
More informationSTANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing
More informationInformation for File # JTF
Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil
More informationSHOREMAX FLEXIBLE TRANSITION MAT INSTALLATION GUIDE
SHOREMAX FLEXIBLE TRANSITION MAT INSTALLATION GUIDE Introduction to the Transition Mat FEATURES OF SHOREMAX TRANSITION MAT The North American Green RevetMax System Transition Mat is designed for protection
More informationACTIVITY: Geotextiles ES 12
Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationCHAPTER 8 SLOPE STABILITY ANALYSIS
TM 5-818-1 / AFM 88-3. Chap. 7 CHAPTER 8 SLOPE STABILITY ANALYSIS 8-1. General. This chapter is concerned with characteristics and critical aspects of the stability of excavation slopes; methods of designing
More informationTHE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.
THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.2 THE COMPLETE 2011 EDITION MAY BE FOUND AT: HTTP://WWW.SEATTLE.GOV/UTIL/ENGINEERING/STANDARD_PLANS_&_SPECS/INDEX.ASP
More informationPozidrain. A guide to the selection and specification of Pozidrain drainage geocomposite
Pozidrain A guide to the selection and specification of Pozidrain drainage geocomposite Pozidrain Pozidrain is the original wide width drainage and gas venting layer and offers a sustainable, environmentally
More informationStormwater protection
70 70 Visqueen High Performance Urban Drainage Geomembrane 70 Visqueen GX Geomembrane UDG 73 Hanson Aquaflow SC Membrane Stormwater protection A fully integrated stormwater management system provides relief
More informationHILCORP ALASKA, LLC KALOTSA PAD
, LLC ACCESS ROAD, PAD & FLOWLINE FLOWLINE END SEC 7 T1S R13W SM NINILCHIK, ALASKA FLOWLINE & ACCESS ROAD START PROPOSED 200' x 300' DRILL PAD M.P. 130 STERLING HWY ACCESS ROAD END INDEX S 0 1000 VICINITY
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationInfiltration basin under normal conditions, with generous grassed area for water soakage (Source: WSUD in the Sydney Region)
Practice Notes Infiltration basin under normal conditions, with generous grassed area for water soakage (Source: WSUD in the Sydney Region) Water sensitive development involves simple design and management
More informationDRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION
DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in
More informationSTREAM ALTERATION PRACTICES
STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow
More informationBasic Geosynthetics: A Guide to Best Practices in Forest Engineering
Basic Geosynthetics: A Guide to Best Practices in Forest Engineering Jonathan Fannin Ph.D., P. Eng., Forest Resources Management and Civil Engineering, University of British Columbia, Canada. ABSTRACT
More informationGuidelines for Streambank Protection
PDHonline Course C187 (3 PDH) Guidelines for Streambank Protection Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationRevETMax TM INSTALLATION GUIDE
RevETMax TM FLexIBLE TraNSITION MAT INSTALLATION GUIDE Introduction to Mats RevetMax Mats are an integrated erosion and sediment control system designed for protection of high scour and high velocity applications.
More informationMANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS
MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information
More informationLetter of Credit Itemized Cost Estimate For: 100% Site Development Costs
Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for
More informationCOMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL
COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL The following checklist summarizes development guidelines and standards. See the appropriate section for a complete explanation of the
More informationMATERIAL SPECIFICATION FOR GEOTEXTILES
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS 1860 APRIL 2018 (Formerly OPSS 1860, April 2012) Note: The MUNI implemented in April 2018 replaces OPSS 1860 COMMON, April 2012 with no technical content
More informationAmerican Railway Engineering and Maintenance of Way Association Letter Ballot
American Railway Engineering and Maintenance of Way Association Letter Ballot 1. Committee and Subcommittee: Committee 1, Roadway and Ballast, Subcommittee 10, Geosynthetics 2. Letter Ballot Number: 01-18-05
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-02 66 00 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UFGS-02 66 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationSLOPE STABILIZATION. A number of methods have been used to stabilize slopes, each of them found to be appropriate for a particular set of conditions
SLOPE STABILIZATION A number of methods have been used to stabilize slopes, each of them found to be appropriate for a particular set of conditions Application of Slope Purpose of stabilizing Time available
More informationInstallation Manual May 9/14 No revision
815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Manual May 9/14 No revision Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles
More informationSlope Stability in Harris County
Slope Stability in Harris County Slope Stability in Harris County Slope Stability in Harris County Overview of slope stability. Conditions, causes, and types of slope failures. HCFCD geotechnical investigation
More informationGEOMEMBRANE FIELD INSTALLATION
GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive
More information