1 Final S.Ricks P.Collins C.Leafe S.Worton 20/07/09. 0 Draft for comment S.Ricks P.Collins C.Leafe S.Worton 10/07/09

Size: px
Start display at page:

Download "1 Final S.Ricks P.Collins C.Leafe S.Worton 20/07/09. 0 Draft for comment S.Ricks P.Collins C.Leafe S.Worton 10/07/09"

Transcription

1 Environmental Statement Non-Technical Summary July 2009 Notice This report was produced by Atkins for Network Rail for the specific purpose of compiling a Non-Technical Summary of the Environmental Statement prepared to support the TWA submission for the construction and operation of the Nuneaton North Chord. This report may not be used by any person other than Network Rail without Network Rail s express permission. In any event, Atkins accepts no liability for any costs, liabilities or losses arising as a result of the use of or reliance upon the contents of this report by any person other than Network Rail. Document History JOB NUMBER: DOCUMENT REF: /ENV/REP/517 1 Final S.Ricks P.Collins C.Leafe S.Worton 20/07/09 0 Draft for comment S.Ricks P.Collins C.Leafe S.Worton 10/07/09 Revision Purpose Description Originated Checked Reviewed Authorised Date _ENV_REP_517Rev1.doc

2 This Page has been left intentionally blank _ENV_REP_517Rev1.doc 2

3 Introduction This non-technical summary of the Environmental Statement has been prepared by Atkins for Network Rail to accompany an application under the Transport and Works Act. The application is being made to authorise the construction and operation of a new railway, referred to as the Nuneaton North Chord (NNC). The scheme will provide a route for rail freight traffic travelling from the Leicester direction to join the northbound West Coast Main Line (WCML) without disrupting services on the WCML. The scheme complements the upgrade of the Peterborough to Nuneaton route to facilitate more efficient movement of maritime containers by rail. This wider strategic scheme will promote the diversion of freight from Felixstowe port away from London, en route to destinations in the North West, West Midlands and Scotland to maximise the efficiency of the railway in transporting freight along these routes. The NNC aligns with Government policy to promote a shift of freight transport from road to rail. The map below shows the location of the scheme. It will extend over approximately 1.5km, from the northern edge of Nuneaton town in a northwesterly direction to a point north of Canal Farm. The scheme lies within Warwickshire, with the majority in Nuneaton and Bedworth Borough and the most northerly tip in North Warwickshire Borough. Nuneaton North Chord location plan (alignment shown by red line) _ENV_REP_517Rev1.doc 3

4 Consultation The Environmental Statement and design of the scheme has been informed through consultation with the following bodies: Warwickshire County Council Nuneaton and Bedworth County Council North Warwickshire Borough Council Environment Agency Natural England Summary of Findings The NNC is not expected to have significant impacts on the environment once mitigation measures have been implemented except for some short term effects on landscape and visual amenity during construction, and due to particular aspects of construction noise and vibration. Background and Need for the Scheme The NNC scheme is part of a national strategic project to allow more efficient transport of rail freight from UK ports and to facilitate the transport of the larger 9 6 containers increasingly used by deep sea shipping companies, around the country. Ports such as Felixstowe are of national importance for freight distribution and require efficient transport networks in order to remain competitive. The proposed construction of the NNC will help the rail network to increase its capability to deal with larger quantities of 9 6 shipping containers. The scheme will enable supply of rail freight services to meet demand and will also divert traffic away from the North London Line, allowing growth in passenger service provision, providing social, environmental and economic benefits by potentially reducing road traffic and improving journey time reliability. Reduction of Lorry Movements It is estimated that by facilitating a greater capacity and more efficient movement of freight by rail, the wider strategic scheme, of which the NNC is one part, will reduce the need for 225,000 road vehicle movements a year, reducing pressure on the road network and pollution created by these road movements. The Proposed Scheme A drawing showing key aspects of the scheme is included as an appendix. The NNC will connect to the Arley Line on the north side of Rocker Bridge; over the Birmingham Lines on a new bridge and earth embankment; via a new bridge over Stoney Road. It will then run on embankment adjacent to the existing WCML and connect to it approximately 300m north of the Canal Farm accommodation bridge. The NNC will not be electrified on first opening but has provision for future electrification. A permanent, single lane haul road with passing places will also be constructed, running parallel to the western and eastern edges of the proposed railway. This will allow access during construction and for operational maintenance. This road will have a tarmac surface, except where it is temporarily built within the floodplain of the River Anker, where it will be constructed of compacted hardcore. A temporary access road will also be required for construction. Much of this road is already in a suitable condition but parts of it will require improvement works. This will run from the entrance to Judkins Quarry and pass over the existing bridge over the Coventry Canal. Some strengthening works may be required to this bridge. The road will then follow a disused railway towards the NNC and meet the permanent haul road. Stoney Road will be used for limited access during the construction of the NNC, as will the access road to the Network Rail depot to the south of the Birmingham and Arley lines. The vast majority of traffic will enter via Judkins Quarry. This access will be controlled through a traffic _ENV_REP_517Rev1.doc 4

5 management plan one of a number of mandatory environmental controls that will be implemented for the scheme as part of Network Rail s contractual requirements. Operation of the Scheme During the day, it is predicted that the NNC will facilitate the movement of an additional maximum of 14 freight trains. At night, the additional maximum is predicted to be 4 freight trains. Road traffic will be minimal, with vehicles occasionally gaining access to the NNC for inspection and maintenance purposes. Site and Surroundings The NNC extends from the northwest fringe of Nuneaton, approximately 600m to the north west of Nuneaton railway station at grid reference SP The scheme is approximately 1.5km long and runs through an area of landscape that is predominantly flat and agricultural and includes a network of hedgerows, mature trees and woodland blocks. Existing rail infrastructure includes the Birmingham and Arley Lines and the WCML A drawing showing the scheme can be found in the appendix at the end of this report. A former granite quarry, recycling centre and landfill are situated to the west and south west of the scheme. The Coventry Canal runs parallel to the scheme to the southwest and the River Anker mirrors its orientation to the northwest, with the northern end of the NNC entering the secondary floodplain of the River Anker. There are a number of residential properties in the vicinity of the NNC: To the south of the Arley Lines on Jodrell Street, Ashton Road and St Mary s Road. Residential properties 200m east of the NNC on Cleaver Gardens and Shawe Avenue in Weddington. Lingfield is approximately 220m to the east of the NNC. Canal Farm is located immediately to the east of the WCML. Isolated residential properties are also located adjacent to the Coventry Canal, including Canal Cottage 150m west of the NNC. There are industrial and commercial buildings to the south and west of the site. To the west, buildings associated with Judkins Quarry; and to the south of the Arley Lines, an industrial estate. The chord connects to the Arley Line near Rocker Bridge and crosses the Birmingham Lines. It then traverses an area of grassland to the northwest of this, on a new embankment, before crossing Stoney Road via a new bridge. The NNC passes through more grassland where a new culvert will be constructed to carry an overflow from the Coventry Canal. Existing Birmingham Lines Continuing northwest the NNC crosses a disused railway. This disused railway is currently in use as an access for works on the WCML and will also comprise part of the main construction access for the NNC. North of the disused railway the NNC crosses a strip of woodland in a new cutting, adjacent to the WCML. It will then pass under an access bridge for Canal Farm. This existing bridge will be extended as part of the scheme to maintain access for the farm. Land use at this point of the NNC and to the north is arable. The NNC crosses another culvert, again on a section of embankment, before joining the WCML. This culvert will be extended as part of the scheme _ENV_REP_517Rev1.doc 5

6 The main temporary construction compound for the NNC lies within an area of a former block factory. Access is gained over an existing bridge over the Coventry Canal, and through Judkins Quarry, from Midland Road/Tuttle Hill. This area is bounded to the west by the Coventry Canal, to the north by an area of woodland and a canal overflow and to the east by the disused railway. The area to the south of the compound largely comprises areas of hard-standing, bare, compacted earth, rubble and scrub. Another smaller compound will be situated near Canal Farm on arable farmland for the extension of the Canal Farm access bridge. Alternatives Considered There are no alternative locations that can be considered for the NNC. The chord is required to connect the Arley Lines to the WCML, passing over the Birmingham Lines, so the location of the NNC is fixed. However, a number of different engineering designs have been explored in order to achieve the scheme objectives. Two options were considered for crossing the WCML one using the existing Rocker Bridge and another constructing a new bridge. Consideration was also given to whether the new line would be carried on a viaduct or on an embankment. It was determined that the most cost effective and least disruptive option to existing rail infrastructure was to use the existing bridge and an earth embankment. Formerly, scheme design incorporated an extra section of railway line allowing trains to turn round. This no longer constitutes part of the scheme and the result is a scheme with a smaller land-take, requiring less material to build. This has additional environmental benefits due to a reduced number of Heavy Goods Vehicle (HGV) deliveries required to deliver materials to site. A number of temporary access routes and options for construction compounds were also considered for the construction phase of the scheme. The chosen options minimise land-take on unmade ground and minimise crossings of the Coventry Canal and its overflows. Environmental Design Aspects of environmental mitigation have been engineered into the design of the scheme. The land-take of the scheme within the secondary floodplain of the River Anker has been minimised through design and a flood compensation swale (or ditch) will be provided in order to compensate for the remaining land take within the floodplain (further information in the Water section). This swale and associated drainage ditches will be seeded with a wet meadow grass/ herb seed mix and planted with aquatic plants in order to promote a quality wetland habitat. An area of rough grassland towards the southern end of the NNC will be improved and planted with particular plants to provide a quality habitat for insects and reptiles. Newly constructed slopes (embankments and cuttings) will be seeded and planted appropriately to provide suitable reptile and insect habitat. A new, native, species-rich hedgerow will be planted for the length of the NNC. The hedgerow will include food-rich species such as hazel and bird cherry. Mitigation of Environmental Impacts Network Rail is committed to ensuring that the environmental impact of their work is minimised by identifying potential issues during the design stage and ensuring actions are taken to mitigate these issues throughout the lifecycle of the project. The Environmental Statement contains details of mitigation that will be implemented during the construction stage of the NNC. These requirements will form part of the contractual obligations for the successful contractor, chosen to build the scheme. The environmental performance of the contractor will be monitored throughout the works by Network Rail, who will audit the contractor s performance against site specific criteria and targets _ENV_REP_517Rev1.doc 6

7 The following section of the report describes the assessment of the environmental impacts of the scheme. Agricultural Land Use The land use assessment identified the land-take associated with the NNC and its likely effect on individual farm units and rural land parcels, bearing in mind their size, type of use, and access arrangements. The scheme would result in the permanent landtake of 5.29 ha, of which approximately 1.67 ha is on Canal Farm. Most of the farmland is of best and most versatile quality, but the affected area is well below the 20 ha threshold at which concern is raised in the planning process. The only long term negative impact of the scheme relates to loss of land, which is judged to be of minor significance. However, even this negative impact will diminish over time as landowners adapt their management systems or acquire new land. Arable land at Canal Farm adjacent to the West Coast Main Line. Part of this land will be lost to the scheme. Noise and Vibration The noise and vibration assessment considered the potential impacts that the proposed NNC might have on existing noise levels in the area. Construction Noise and Vibration The calculated construction noise levels when combined with the existing ambient noise levels are shown to generally result in perceptible to substantial increases. The main impacts are expected at Lingfield due to the existing noise levels being very low and the high activity noise levels associated with demolition of Bridge 49. Although the impact upon Lingfield is substantial, the demolition will be spread across two days, and so the duration of the impact is minimal. Moderate adverse impacts will also affect Canal Farm due to the proximity of the property to the proposed works to extend the accommodation bridge. Also, Jodrell Street properties will be affected by the demolition of Stoney Road bridge. Piling vibration levels would be perceptible at the nearby residential property, Canal Farm, but as these activities are planned to be more than 20m away from the noise-sensitive buildings vibration levels would be expected to be below the conservative threshold for minor or cosmetic (i.e. non structural) damage. The HGV deliveries to and from the site could be expected to result perceptible to slight increases. Assuming the local road network is in a reasonable condition, ground-borne vibration from construction HGV traffic should not be an issue. Airborne vibration produced by the engines or exhausts could be a source of annoyance to local residents, however it would not result in any damage to buildings. Operational Noise and Vibration Positive and Negative Impacts at Opening The impacts in the opening year would be expected to be negligible during day-time and night-time at most properties assessed. The only exception would be properties on Jodrell Street where perceptible positive impacts are expected during day time and night-time _ENV_REP_517Rev1.doc 7

8 respectively due to a decrease in noise. This noise reduction would be due to the proposed NNC embankment screening the properties from noise originating from parts of the WCML. Future Impacts The future year assessment is based on an estimated number of maximum freight movements expected 15 years after the scheme and represents a worst case scenario. Operational noise and vibration impacts will not be significant and no mitigation has been proposed. During day-time, the long term impacts at most properties would be negligible. There would be perceptible positive beneficial impacts at Jodrell Street properties. At night, there would be a perceptible increase at most properties assessed. There would be perceptible beneficial impacts at Jodrell Street properties. No negative scheme impacts would be expected in the opening year and the long term impacts could be an increase in noise at the onset of perceptibility. Similar impacts could be expected outside of the study area. The assessment showed that the existing daytime and night-time vibration levels and those expected in the future year, both without and with the scheme, are well below levels requiring mitigation. Noise impacts from existing train traffic activity on the West Coast Main Line may be screened by the new embankment constructed as part of the scheme, having beneficial impacts to local properties. Air Quality The air quality assessment for the NNC considered the impacts with the greatest potential significance; namely: Dust emissions during demolition and construction; and Road traffic emissions during construction on ambient air quality in relation to health-based environmental criteria. Operation of the NNC would be unlikely to result in any significant impacts on local air quality and therefore railway effects were addressed qualitatively. Construction Dust The assessment of construction dust identified 178 potentially sensitive receptors within 100 metres of the NNC. A total of 1245 properties were identified between 100 and 500 metres of the site boundary; these are mostly considered to be receptors of lower sensitivity being urban residential areas further from the site, business units and commercial areas. By employing Network Rail s standard construction practices and best practicable means, the risk of dust emissions effects will be minimised. Local Air Quality Air quality monitoring data for the area around the NNC was reviewed. The monitoring data indicated that the pollutant concentrations in the immediate vicinity of the NNC will meet all relevant Air Quality Standard (AQS) objectives. An assessment of the effect of additional traffic likely to be generated by the construction of the NNC in 2010 was undertaken. Pollution levels are expected to be below the AQS objectives at properties on Tuttle Hill, both with and without the NNC during peak construction operations. The qualitative assessment of NNC operation indicated that emissions from rail locomotives are likely to have a negligible impact. Operation of the NNC is unlikely to result in impacts on local air quality in the long term _ENV_REP_517Rev1.doc 8

9 Landscape The proposed development will be located on existing agricultural land near to the urban fringe of Nuneaton. The effects of the proposals would be related to land use and vegetation structure due to the increase in railway infrastructure along the length of the scheme and resultant loss of agricultural land and limited lengths of hedgerow. Landscape and Visual Assessment The effect of the proposals on the landscape character and visual amenity of the study area has been assessed. Landscape character is the distinct and recognisable pattern of elements that occurs consistently in a particular type of landscape, and how these are perceived by people. It reflects particular combinations of landform, soils, vegetation, land use and human settlement. It creates the particular sense of place for different areas of the landscape. Visual receptors are single or groups of elements whose visual amenity would be affected by a proposal. The nature of visual receptors varies according to the location, type, activity of viewer and the importance of the view. The change of land use is permanent. However, the loss of hedgerow will be mitigated by a replacement planting scheme. The presence of the existing railway provides a context for the scheme, and the proposals would not introduce a new feature into the landscape. There would be a slight disruption to the landscape during construction due to the temporary presence of construction machinery and clearance. However, the overall effect of the scheme in the long term would be neutral. Visual Amenity There will be some moderate adverse effects to residential properties in close proximity to the scheme. The significance of visual effects during construction would be neutral to slightly negative. Mitigation planting including a native species hedgerow along the length of the NNC will help to integrate the new chord line with the surrounding landscape and reduce views of the security fence and the embankment from the south. Properties in Camp Hill may experience improved views due to the screening effects the proposed additional planting. The overall significance of visual effects during operation, and therefore long term effects, would be slight. The presence o the existing railway infrastructure provides context for the scheme _ENV_REP_517Rev1.doc 9

10 Biodiversity The effects of the construction and operation of NNC on species and habitats (both those that are statutorily protected and others of value) were assessed. A desk study to identify statutorily protected sites (such as Sites of Special Scientific Interest), nonstatutory sites (such as psincs (proposed Site of Importance for Nature Conservation)), and records of protected and notable species was undertaken. Site surveys were also conducted to identify protected and valuable species (including great crested newts, bats, badgers, birds, otters, water voles, white-clawed crayfish) and habitats on site. Habitats No statutory sites were identified within the study area, but two psincs (locally designated sites) would be directly affected by the construction of the NNC - Rugby to Tamworth Railway psinc and Waste Land at Abbey Junction psinc. Four other locally designated sites would be indirectly affected by the scheme, through linkage by watercourses or habitats allocated for ecological mitigation will be planted with native species to create suitable replacement habitat, including species-rich hedgerows and a wetland area. Badger setts were found adjacent to the West Coast Main Line. Notable Species The scheme will result in the loss of mature trees suitable for bat roosting. Twenty bat boxes will be installed in suitable locations to replace the lost roosting sites. Badger setts will be closed as a result of the works. Surveys have shown that these badgers use other setts in the area, and so they will continue to use the unaffected setts. Two watercourses will be culverted as part of the works. Culverts will be designed to allow otters and water voles to move freely along them. Reptiles were found to be living on site. In order to prevent injury to them during construction, high risk areas will be cleared before work begins. Waste Land at Abbey Junction psinc: one of two locally important sites for conservation that are directly affected. The dingy skipper, a nationally scarce butterfly known to the area, will benefit from a newly created and managed habitat. Conclusions The scheme will affect the loss of some habitat of local conservation value. However, some replacement habitat will be created in order to mitigate these losses. Appropriate measures and methods of working will be used during the works to ensure that protected species are not harmed. To mitigate these impacts the newly created railway embankments and other areas specifically _ENV_REP_517Rev1.doc 10

11 Cultural Heritage Cultural Heritage includes archaeological remains, historic buildings (including Listed Buildings), and historic landscapes. Government guidance describes archaeological remains as a finite and irreplaceable resource, the presence of which should be a material consideration in applications for new development. Where developments may affect such remains, it is preferable (where possible) that these cultural heritage assets are preserved in situ. The alternative is "preservation by record", whereby finds and features are excavated and recorded prior to works beginning. A number of cultural heritage assets where identified within a 500m radius of the proposed scheme, but only one, Stoney Road bridge, would definitely be impacted upon by the scheme. There is also a potential risk with regard to as yet unknown, buried archaeology. Buried Archaeology There is a risk that as yet unidentified archaeological remains from the post-medieval and modern periods may be found during construction of the scheme. If present, these remains could be destroyed by the removal of topsoil and subsoil. An archaeological watching brief will be undertaken during removal of topsoil and subsoil at key points of the site. This will allow for the preservation by record of any exposed and currently unrecorded remains. Stoney Road Bridge Only one known cultural heritage asset, a threespan archway, brick bridge will be affected by the scheme. This bridge carries Stoney Road over a disused railway, and is the last surviving vestige of the 19th Century railway infrastructure within the footprint of the proposed scheme. Although the asset is not designated, a Royal Commission on the Historic Monuments of England Level 1 Record of the structure will be undertaken prior to demolition, comprising a photographic and short descriptive record of the bridge for posterity. Stoney Road bridge will be recorded for posterity prior to its demolition as part of the scheme. Water The potential risks to groundwater and surface water have been assessed to determine impacts of the NNC s construction and operation on water flow and quality. The NNC passes between the River Anker to the east and the Coventry Canal to the west and crosses two watercourses which carry overflow water from the Coventry Canal. A number of small ponds have been identified within 1km of the proposed scheme. Groundwater levels along the proposed route suggest a north north westerly direction of flow. Flood Risk A Flood Risk Assessment has been prepared following Planning Policy Statement 25 (PPS 25) - Development and Flood Risk in England. A short section of the proposed scheme is located within secondary floodplain. Flood waters reach the area via a culvert beneath the existing WCML embankment from the River Anker. The new railway has been designed on an embankment and will not be affected by flooding. The scheme footprint has been designed to minimise land-take within the floodplain. However, to compensate for the area that is lost, a compensation ditch has been designed, in agreement with the Environment Agency. The proposed scheme, with the exception of the haul road generally allows infiltration of water. In addition, surface water runoff from the scheme will be captured using drainage ditches and swales and will not increase flood risk _ENV_REP_517Rev1.doc 11

12 Culvert under West Coast Main Line from River Anker Extract from the Environment Agency Flood Risk Map showing extent of flood zone (blue) in the scheme development area. Groundwater and Surface Water Quality The scheme has been assessed in relation to Planning Policy Statement 23: Planning and Pollution Control (PPS23), the Groundwater Regulations and the Regional Spatial Strategy for the West Midlands. The construction process has the potential to cause contamination of surface waters. However, implementation of Network Rail s standard environmental management practices during construction will reduce the contaminative risk to negligible. Mitigation against the impact on water quality during construction includes the implementation of good working practices and carrying out all site activities in accordance with the Environment Agency s Pollution Prevention Guidance (PPG). The change to the surface water runoff is considered minor. The introduction of surface water drains along the embankment will capture the runoff and divert it to the appropriate water courses. In addition, if the runoff has picked up sediment, the drains allow settlement and reduce the flow of sediment to watercourses, while also allowing infiltration of surface water into the ground. Groundwater quality and flow are not considered to be affected significantly by the scheme. Contaminated Land Soil and groundwater samples from across the site were taken for contamination testing during a geo-environmental investigation. A contaminated land risk assessment was undertaken, considering the risks to human health, controlled waters and property. Some contamination was found in an area between the Arley and Birmingham lines towards the southern end of the scheme, and evidence of isolated contamination was found in one groundwater sample, although this is likely to be from an isolated incident such as a small oil spill, rather than a significant build up of contamination over time. Overall the levels of contamination found were low and would not present significant risks to receptors. The Construction Environmental Management Plan will include best practice measures to avoid accidental spillages of polluting substances and to ensure any contaminated material that is excavated will not pose significant risks to receptors. Implementation of Network Rail s standard procedures will minimise the risk of contamination (for example through handling fuels/oils during maintenance works) during operation, ensuring that the risks of land contamination are negligible _ENV_REP_517Rev1.doc 12

13 Pedestrians, Cyclists, Equestrians and Community Effects The effects that both construction and operation of the scheme would have on pedestrians, cyclists, and equestrians were assessed, and the effects on the community, for example access to community facilities such as schools or post offices. Effects of Construction Construction may require some short-term diversion of pedestrian, cycle and equestrian routes. Construction traffic will share the access to Judkins Quarry off Tuttle Hill and to Canal Farm and Canal Farm Cottages. No access to community facilities will be cut-off during the construction works. A short term closure of the Coventry Canal towpath may be required in order to strengthen a bridge used for construction access to the scheme. A diversion will be provided for towpath users during this period. The Coventry Canal towpath may need to be temporarily diverted to accommodate bridge strengthening works. Effects of Operation Operation of the NNC is not expected to affect journey times for pedestrians, cyclists or equestrians. Traffic and Transportation An assessment has been made of both the Heavy Goods Vehicle (HGV) and total traffic impacts arising from the construction of the NNC utilising traffic data on affected roads and construction traffic forecasts. Construction vehicle access to the site would be via the existing entrance to Judkins Quarry off Tuttle Hill. The proposed access route has been discussed with Warwickshire County Council. It is identified as a primary access route on the Warwickshire Advisory Lorry route map and avoids site vehicles passing through Nuneaton. Traffic During Construction The construction impacts assess both HGVs and total traffic. The number of HGVs that would enter and exit the site during construction was estimated based on the volume of material that needs to be brought to the site and volume of demolition materials that need to be taken off site. It is estimated that the construction works will bring about a 50% increase in the number of HGVs along Tuttle Hill and Mancetter Road, with one arrival or departure every 8 minutes. This equates to an overall increase in traffic volume of less than 4%. These calculations assume a worst-case scenario of a concentrated period of activity of just 3 months (during embankment construction). It is possible that the same number of deliveries may be made over a 6 month period, considerably reducing the increase in HGV journeys per day. As well as the direct impacts on traffic, the following factors were also considered: effects on "fear and intimidation" of pedestrians using footpaths which HGVs would go past; severance effects (where a community becomes separated by a major transport route); and dust and dirt tracked on to the road by vehicles coming from the site. No significant impacts are anticipated _ENV_REP_517Rev1.doc 13

14 under any of these categories. A wheel washing facility will be employed for HGVs leaving the site and the off-road haul route be damped down in dry conditions. Traffic During Operation The only road traffic associated with the operation of the scheme would be occasional maintenance traffic - the effects of this would be negligible. Conclusions Construction of the scheme would see a substantial increase in the number of HGVs on the road network, although these will be following a prescribed and signposted route from the A5 so the impact to Nuneaton's residents will be minimal. This impact will be for a relatively short period of time (3-6 months) and with the implementation of a comprehensive construction traffic management plan, overall impact is considered only to be minor. Summary and Conclusions Once the mitigation measures set out in the Environmental Statement are implemented, such as creation of reptile and insect habitats, there are no significant negative impacts considered to occur as a result of the scheme due to changes to land use (agriculture), air quality, biodiversity, cultural heritage, hydrology, hydrogeology and flood risk, contaminated land, pedestrians, equestrians and community effects, and traffic and transport. Some moderate negative impacts on landscape and visual amenity have been identified for the construction stage of the scheme. During the operational phase of the scheme the overall effects on will be neutral. Positive effects on views from Camp Hill are expected due to additional scheme planting. Some moderate negative impacts for visual amenity have been identified for the construction stage of the scheme. However for the operational phase, these impacts are reduced to minor. Minor to moderate negative impacts on noise and vibration from construction plant and equipment have been predicted. However there are no significant impacts identified for the operational phase. A minor positive impact on noise has been identified for some receptors for the operation phase due to the potential screening effect of the new NNC embankment. Network Rail is committed to working with the community during construction of the NNC and will respond proactively to any concerns raised _ENV_REP_517Rev1.doc 14

15 Appendix Drawing Showing Scheme Design _ENV_REP_517Rev1.doc 15

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary Preliminary Environmental Information Report: Preliminary Environmental Information Report Report No: P01 S4 September 2018 Table of contents Introduction... 1 The proposed scheme... 2 Scheme details...

More information

A737/A738 Trunk Road (Dalry Bypass)

A737/A738 Trunk Road (Dalry Bypass) IN ASSOCIATION WITH DRAWING STATUS A737/A738 Trunk Road (Dalry Bypass) Environmental Statement July 2013 Introduction The A737 trunk road forms a strategic link from the M8 motorway, at Paisley, to Ayrshire.

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London Chapter 27 Route Window SE7 Church Manorway Bridge Transport for London CHURCH MANORWAY BRIDGE 27 Route Window SE7 Church Manorway bridge Introduction 27.1 The North Kent Line will be converted to four

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement

More information

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments Watford Local Plan Part 2 Publication Stage Environmental Report Appendix 3: Consultation Comments August 2016 Appendix 3 - Responses to Consultation of the Local Plan Part 2 As required by the SEA Directive,

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 9 January 2013 AUTHOR/S: Planning and New Communities Director S/2270/12/FL FEN DRAYTON 850m long flood defence embankment ranging in

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Slough International Freight Exchange Proposals, Colnbrook+

Slough International Freight Exchange Proposals, Colnbrook+ Welcome Welcome to this exhibition, which is being held in connection with our proposals for a new freight exchange facility on land to the north of the A4. Please take this opportunity to look at the

More information

M7 Naas to Newbridge Bypass Upgrade Scheme. Landscape and Visual Impact Assessment Brief of Evidence

M7 Naas to Newbridge Bypass Upgrade Scheme. Landscape and Visual Impact Assessment Brief of Evidence M7 Naas to Newbridge Bypass Upgrade Scheme Landscape and Visual Impact Assessment Brief of Evidence Presented by Richard Butler, Cunnane Stratton Reynolds Landscape Architect: BL Arch (University of Pretoria,

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

In Title Your Area 10: Lower Boddington to Southam & Offchurch

In Title Your Area 10: Lower Boddington to Southam & Offchurch LOCAL AREA In Title Your Area 10: Lower Boddington to Southam & Offchurch Find out here about: what is proposed between Lower Boddington and Southam & Offchurch; what this means for people living between

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Technical note. Option 3a (cyan route) Project: To: A428 Bus Enhancement Scheme. Rid Hollands, Colin Young

Technical note. Option 3a (cyan route) Project: To: A428 Bus Enhancement Scheme. Rid Hollands, Colin Young Project: A428 Bus Enhancement Scheme To: Rid Hollands, Colin Young Subject: Flood Risk Desktop study From: Liz Hillcoat, Charlotte Nunns Date: 26 Jan 2017 cc: Term Awarded Watercourse Main River Ordinary

More information

METHODOLOGY FOR IMPACT ASSESSMENT ON HERITAGE ASSETS IDENTIFICATION OF THE RECEPTOR ASSESSMENT OF THE RECEPTOR S IMPORTANCE

METHODOLOGY FOR IMPACT ASSESSMENT ON HERITAGE ASSETS IDENTIFICATION OF THE RECEPTOR ASSESSMENT OF THE RECEPTOR S IMPORTANCE METHODOLOGY FOR IMPACT ASSESSMENT ON HERITAGE ASSETS The determination of impacts on heritage assets follows the standard procedures applied to all Environmental Impact Assessment. This entails the identification

More information

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

Re-location of Rugby Farmers Mart

Re-location of Rugby Farmers Mart Re-location of Rugby Farmers Mart LaSalle Investment Management Barberry Logo here Environmental Statement Non-Technical Summary August 2017 Re-location of Rugby Farmers Mart Non-Technical Summary Report

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Response by the Wiltshire Archaeological and Natural History Society

Response by the Wiltshire Archaeological and Natural History Society Highways England Consultation A303 Stonehenge Response by the Wiltshire Archaeological and Natural History Society Background About the Society Founded in 1853 to educate the public by promoting, fostering

More information

Dolphingstone Farm, Prestonpans Environmental Statement. Non-Technical Summary. June Waterman Energy, Environment & Design Limited

Dolphingstone Farm, Prestonpans Environmental Statement. Non-Technical Summary. June Waterman Energy, Environment & Design Limited Dolphingstone Farm, Prestonpans Environmental Statement June 2015 Waterman Energy, Environment & Design Limited Third Floor, South Suite, 8 Nelson Mandela Place, Glasgow, G2 1BT, United Kingdom Introduction

More information

HS2 Environment. Protecting the environment

HS2 Environment. Protecting the environment HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant

More information

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Introduction An application for outline planning permission has been submitted

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

Land East of Cromwell Lane

Land East of Cromwell Lane Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Report for Rother Valley Railway Limited Track Reinstatement between Northbridge Street and Junction Road Environmental Statement - Volume 1 Final

Report for Rother Valley Railway Limited Track Reinstatement between Northbridge Street and Junction Road Environmental Statement - Volume 1 Final Non-Technical Summary June 2014 Report for Rother Valley Railway Limited Environmental Statement - Volume 1 Document Version Control Version Date Author Approver 10 16/05/2014 Tess Murray Emma Devenport

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Kirkcaldy South West. Invertiel and Tyrie Farms. Environmental Statement Non Technical Summary. Volume 1

Kirkcaldy South West. Invertiel and Tyrie Farms. Environmental Statement Non Technical Summary. Volume 1 Kirkcaldy South West Environmental Statement Non Technical Summary Volume 1 Invertiel and Tyrie Farms August 2010 CALA Homes (East) Ltd and Mactaggart & Mickel Ltd Volume 1 Non Technical Summary Contents

More information

We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists using them and to improve safety.

We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists using them and to improve safety. A69 Bridge End/Styford Junctions Frequently Asked Questions Background information What is happening? We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

EVALUATION OF MASTER PLAN ALTERNATIVES

EVALUATION OF MASTER PLAN ALTERNATIVES 7 The Environmental Report is required to identify, describe and evaluate reasonable alternatives, taking into account the objectives and geographical scope of the Master Plan 2008. Three plan alternatives

More information

Sandwich Town Tidal Defences Environmental Statement Non Technical Summary

Sandwich Town Tidal Defences Environmental Statement Non Technical Summary Sandwich Town Tidal Defences Environmental Statement Non Technical Summary Environment Agency Introduction The Environment Agency is proposing to construct a scheme to reduce the risk of tidal flooding

More information

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges Transport for London MIDDLEGREEN ROAD, ST MARY S ROAD AND TRENCHES BRIDGES 10 Route window W17 Middlegreen Road, St Mary

More information

In Title Your Area 5: Amersham to Great Missenden

In Title Your Area 5: Amersham to Great Missenden LOCAL AREA In Title Your Area 5: Amersham to Great Missenden Find out here about: what is proposed between Amersham and Great Missenden; what this means for people living between Amersham and Great Missenden;

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Rempstone Extension - East Leake 2014

Rempstone Extension - East Leake 2014 Overall Restoration of East Leake Quarry Sand Martin Face Southern Agricultural Corridor Wetland Ponds/Conservation Corridor following Sheepwash Brook Reinstated Bridleway/Footpaths Southern Agricultural

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London Chapter 7 Route window W20 Dover Road and Leigh Road bridges Transport for London ROUTE WINDOW W20 7 Route window W20 Dover Road and Leigh Road bridges Transport for London 7.6 7.7 7.8 Baseline conditions

More information

Policy DM19: Development and Nature Conservation

Policy DM19: Development and Nature Conservation Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure

More information

ABOUT CALA HOMES CALA HOMES

ABOUT CALA HOMES CALA HOMES WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments

More information

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2

More information

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom Elvetham Chase, Fleet Environmental Statement: Non-Technical Summary November 2016 A Ne w F e tte r P lace 8-10 New Fetter Lane London EC4A 1AZ United Kingdom T +44 (0) 20 7467 1470 F +44 (0) 20 7467 1471

More information

and Netherhall Road and Camp Farm EIA

and Netherhall Road and Camp Farm EIA and Netherhall Road and Camp Farm EIA Environmental Statement - Non Technical Summary December 2012 in association with 1. Introduction Story Homes applied to Allerdale Borough Council (ABC) in May 2011

More information

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey PLANNING I DESIGN I ENVIRONMENT 1.0 INTRODUCTION TEP conducted Site

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Duddingston House Properties and Urbanist Hotels Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Environmental Statement Non-Technical Summary 3rd September 2015 www.oldroyalhighschool.com

More information

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report High Speed Two Phase 2a: West Midlands to Crewe Response to Working Draft Environmental Impact Assessment Report Please find below the response of the Canal & River Trust. The Trust is the guardian of

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

1.6 The application area, which is shown in Figure 1.1 comprises approximately ha

1.6 The application area, which is shown in Figure 1.1 comprises approximately ha Brookhouse Group Limited, Brookhouse Northern Limited and Brookhouse Retail Limited Chapter 1 Introduction 1.1 Brookhouse Group Limited, Brookhouse Northern Limited and Brookhouse Retail Limited, hereafter

More information

A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6

A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6 A0 Stonehenge Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment Volume 6 September 2017 Appendix D Client Scheme Requirements (CSRs) and Policy Assessment D.1 CSR Assessment

More information

Proposed S.U.E. Drayton Fields Industrial Estate. Royal Oak Industrial Estate. Daventry Town Centre. Long Marsh Industrial Estate.

Proposed S.U.E. Drayton Fields Industrial Estate. Royal Oak Industrial Estate. Daventry Town Centre. Long Marsh Industrial Estate. local context and amenities Existing Local Facilities Nearby Education Facilities in Daventry Local Retail Welton C of E Primary School Well Lane, Welton. This is a mixed sex rural primary school and has

More information

B - Coalfield River Corridor Landscape Character Type

B - Coalfield River Corridor Landscape Character Type B - Coalfield River Corridor Landscape Character Type Landscape Character Type - Coalfield River Corridor The Coalfield River Corridors Landscape Character Type is located in the two converging valleys

More information

Land at Whiteditch Lane, Newport, Essex

Land at Whiteditch Lane, Newport, Essex Land at Whiteditch Lane, Newport, Essex Ecology Report Produced for Sworders Agricultural By March 2013 Document Control: Version Date Version Details Prepared by Checked by Approved by 0.1 01.03.2013

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017 Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task

More information