LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

Size: px
Start display at page:

Download "LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY"

Transcription

1 LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016

2 CONTENTS CONTENTS... i 1 Introduction The Proposed Development Need and Alternatives Considered Consultation, Scope of Assessment and Methodology Summary of Environmental Effects Further Information May 2016 i

3 1 Introduction 1.1 Halsbury Homes Ltd (the Applicant) proposes residential development at Park Mill Farm, Princes Risborough, Buckinghamshire. The proposed development site is located on the north west edge of Princes Risborough, approximately 500 metres from the centre of the town and to the south west of the A4129. The site location is shown in Figure The development, known as Land at Park Mill Farm, comprises up to 500 new dwellings, public open space, landscaping, new accesses and improvements to existing public transport infrastructure. The Purpose of This Document 1.3 The site was the subject of a planning application in 2010 for residential and mixed use development. The application was accompanied by an Environmental Statement, which reported the findings of the Environmental Impact Assessment (EIA) process. The currently proposed Park Mill Farm development is similar in nature to the 2010 development. Therefore, a process of EIA has been undertaken in accordance with UK legal requirements to identify the likely significant environmental effects of the proposed development. An Environmental Statement was produced in 2015, setting out the findings of the assessment process. 1.4 In response to a formal request for further information made by Wycombe District Council under Regulation 22 of the EIA Regulations, an ES Supplement has been prepared. The request for further information related to the following topic areas: Odour; Traffic and Transport; and Flood Risk. 1.5 The purpose of this document is to replace the of the October 2015 Environmental Statement in order to provide a single, incorporating a summary of the updated information provided in the ES Supplement. 1.6 Details of how to view the full Environmental Statement or the ES Supplement and obtain further copies of this are provided at the end of this document. May

4 Figure 1 Site Location Plan May

5 2 The Proposed Development The Site and Surrounding Area 2.1 The site comprises an area of approximately 20.7 hectares of predominantly open agricultural land (see Figure 1). 2.2 The Princes Risborough to Aylesbury railway line lies to the south east of the project site, which separates the site from existing residential development at the edge of Princes Risborough and from a recreation ground (Wades Park) associated with Risborough Springs Swim and Fitness Centre. To the south west of the site, a number of land uses border the site, including the Princes Risborough to Banbury railway line (separated from the site by a belt of vegetation), a wastewater treatment works and development adjacent to Summerleys Road. 2.3 To the north east of the site lies an area of industrial and commercial land use along the A4129 Longwick Road. The project site extends to Longwick Road adjacent to Old Oak Farm. Beyond this to the north of the project site lie open agricultural fields. The village of Longwick is located approximately 750 metres to the north west of the site. 2.4 The majority of the project site constitutes agricultural land with a relatively flat topography. 2.5 Existing vehicular access to the site is via surrounding land or by using the bridge under the railway at Mill Lane, which leads on to Summerleys Road. This bridge also provides access to other properties on Summerleys Road and to the Thames Water wastewater treatment works. There is currently no direct vehicular access between the project site and Longwick Road. 2.6 The key constraints for the site and surrounding area are shown in Figure 2. Description of Development 2.7 The project includes the following key components: New dwellings: Up to 500; Public open space, incorporating formal and informal areas; Landscape strategy, including retention of existing features and new planting; New access from A4128 Longwick Road for vehicles, pedestrians and cyclists and secondary accesses from Longwick Road and from Summerleys Road for pedestrians and cyclists; and Improvements to existing public transport infrastructure. 2.8 The key components of the project are shown on Figure 3. May

6 Figure 2 Constraints Plan May

7 Figure 3- Indicative Masterplan May

8 Residential Development 2.9 The project comprises up to 500 dwellings, including 2 and 3 bedroom terraced and semidetached houses as well as larger 3 and 4 bedroom semi-detached and detached houses, with an emphasis on providing family accommodation to meet local needs. Landscaping 2.10 The project makes provision for a total of approximately 6.92 hectares of open space, including public open space and planting (including tree planting areas serving both as landscape screening and providing ecological habitat). Together, the landscape and open space strategy provides a combination of areas that are formally landscaped and more informal recreational areas and planting around the periphery of the site An indicative landscape strategy has been designed for the project, taking into account existing ecological and landscape constraints and opportunities. The landscape strategy includes the following: Open space for amenity and informal recreation, including the proposed Common on the western side of the site. Open space areas would include formal areas for play and natural play spaces integrated to provide informal play throughout the development; Recreational open space, including amenity space, parkland and allotments, together with areas of habitat creation; Substantial belt of structural tree and shrub planting on the edge of the site, along the proposed entry corridor from Longwick Road and through the Central Park/Green Spine, flanking either side of the proposed road through the centre of the site, in order to provide a clear transition between landscapes and soften the visual impact. Large specimen trees would be provided to punctuate visual corridors and draw views towards higher ground. Planting within the site would comprise native and locally appropriate species, reflecting local landscape and townscape character; The sustainable drainage strategy would include the use of features, such as swales and an attenuation basin, providing green infrastructure and strong habitat potential; and Materials used for surfacing would reflect local vernacular, including blocks, setts and gravel for footpaths and shared paths across the site, appropriate to the type of user. Access 2.12 The primary access from Longwick Road would provide a route for vehicular traffic and a segregated walking and cycling route. Access within the site would be provided for pedestrians, cyclists and vehicles, with the internal street layout designed to minimise speeds and giving priority to pedestrian and cycle movements In addition, there are two existing points of access that would be retained as secondary accesses for pedestrian and cyclist use as follows: May

9 From Longwick Road using the existing right of way; and From Summerleys Road using the bridge under the railway. This route would also provide emergency access Parking would be arranged on the site to suit the housing type, including car ports, garages, undercrofts and parking to the front of the property, in laybys (creating traffic calming) or within overlooked courtyards. Approximately 800 car parking spaces would be provided as part of the project to account for all occupant and visitor demand Safe and secure cycle parking facilities would be provided. Improvements to Highway Network 2.16 Improvements to existing bus, pedestrian and cycle facilities are proposed as part of the project. These improvements would include: Provision of a high quality walk and cycle route along the south west of Longwick Road, extending and improving the existing network; Introduction of traffic calming measures along the south west side of Longwick Road; Additional bus stops close to the project site, with bus shelters for the stop into Princes Risborough; Provision of a toucan crossing over Longwick Road directly to the south of the junction with Brooke Road/Wellington Street; The development will contribute towards a new local bus services to serve the site, provide links with the railway station and offer significant improvement in local public transport accessibility. The route would use diesel electric hybrid buses to reduce noise and air quality effects. Drainage and Flood Risk 2.17 A Flood Risk Assessment has been undertaken for the project. As part of this work, an overall strategy for surface water drainage at the site has been developed. The strategy includes the use of surface water attenuation measures and Sustainable Drainage Systems The principle of the drainage strategy is to collect surface water runoff form the project site and discharge to Kingsey Cuttle Brook at the greenfield runoff rate. This approach would also slightly reduce the rate of runoff to Summerleys Stream, providing benefits to existing properties on Summerleys Road. May

10 Construction Phase 2.19 Construction works would be undertaken in accordance with a Construction Environmental Management Plan (CEMP), approved by Wycombe District Council prior to commencement of the works. The current programme indicates a total construction period of approximately four years. Working hours are likely to be 07:00 to 19:00 hours Monday to Friday, 07:00 to 13:00 hours on Saturday and at no time on Sundays or on public or bank holidays. These hours would be subject to agreement with the local planning authority. In the event that works are required outside of these hours in exceptional circumstances, this would be agreed with the local planning authority prior to commencement of the activity The broad sequence of construction activities is likely to be: Enabling works (archaeological investigations, ground investigations where appropriate and arboricultural works); Site preparation: Construction of main site access to allow access for construction vehicles, setting up of working areas, existing utilities diversions if necessary and earthworks/regrading of the site; Construction of substructure; Provision of infrastructure, including construction of internal roads, drainage works and sewage pumping station; Erection of superstructures, including building finishes; Fit out of buildings; and Landscape works: Planting and soil preparation in accordance with the landscape strategy The project site would be fenced during construction. It is the intention of the applicant that the site would be registered under the Considerate Constructors Scheme or locally recognised certification scheme. Summary of Key Parameters 2.22 The table below provides a summary of the key parameters which have formed the basis for the assessment of effects. Table 1: Key Parameters for Environmental Assessment Element of Development Key Parameter for EIA Total Site Area 20.7 hectares Developable Area 11.9 hectares Number of dwellings 500 Maximum building height 3 storeys Number of car parking spaces 800 Area of public open space, landscape and ecological planting 6.92 hectares May

11 3 Need and Alternatives Considered Need for the Development National Policy Context 3.1 The National Planning Policy Framework sets out the need for new sustainable housing. With respect to housing development, Section 6 of the NPPF sets out national policy for delivering a wide choice of high quality homes. Paragraph 47 states that in order to significantly boost the supply of housing, local planning authorities should identify and annually update a supply of specific deliverable sites sufficient to promote five years worth of housing against their housing requirements, with an additional buffer of 5%. This buffer would increase to 20% for local authorities that have a record of persistent under delivery. 3.2 The Government has also published its Planning Practice Guidance. This guidance sets out the approach to the assessment of housing need and requires the scale of demand for housing to be identified by local planning authorities. Local Policy Context 3.3 The site lies within the administrative boundary of Wycombe District Council. The Local Plan includes a number of saved policies in relation to housing and sets out a number of sites allocated for housing development in order to meet the residential requirement. Park Mill Farm was set out as an allocation within the Local Plan and was identified in Policy H2(k) as having capacity for up to 570 dwellings. 3.4 The local planning authority is working towards the production of a new Local Plan. As part of this process, a number of more recent documents have been produced. The 2015 housing and economic needs assessment identifies that there is a need to increase housing delivery in Buckinghamshire to ensure that there would be sufficient housing to accommodate workers in the area. The study identified a need for 50,000 dwellings for Buckinghamshire over the 20 year period , equivalent to an average of 2,500 dwellings per year. The equivalent figures for Wycombe district were 15,011 dwellings or 751 dwellings per annum. 3.5 The 2016 housing and economic land availability assessment states that as of 1 April 2015, Wycombe district did not have a five year housing land supply. Overall, a significant shortfall was identified when compared to the requirement. 3.6 Overall, therefore, there is a clear need for housing within Wycombe district, identified through the Local Plan and the emerging documents informing the new Local Plan. The adopted Local Plan assumes that Park Mill Farm would form part of the housing required to meet that demand. Alternatives Considered 3.7 As set out above, Policy H2(k) of the Local Plan allocated 26.2 hectares of land at Park Mill Farm as having capacity for up to 570 dwellings. No alternative sites have been considered by the Applicant, as the Applicant can deliver the proposed development on the application site and Wycombe District Council, who considered the suitability of alternative sites at the time of the May

12 preparation of the Wycombe Local Plan, has recognised the suitability of the site for residential development. The suitability of the site has also been confirmed in proposals by the local planning authority for the expansion of Princes Risborough at a scale well beyond the capacity of Park Mill Farm. 3.8 Several designs for the project have been considered before arriving at the final layout and the evolution of the layout has been informed by: The constraints on the application site; The key design principles underpin the Concept Masterplan; and Feedback from previous consultations. 3.9 The EIA process has influenced the iterative design process for the project, through the identification of the above constraints and identification of environmental effects. Therefore there have been a number of iterations and refinements to the layout of the project An evaluation of site constraints and opportunities was undertaken to inform the site layout and design. Factors considered at this stage included: Preservation and protection of existing site features; Adjacent land uses and nearby residential buildings; Existing sources of noise from the adjacent railway lines and the A4129; Existing railway links, highway links and highway safety; Sustainable housing standards; Flood risk; Existing views and landscape character; and Wycombe District Council s aspirations to provide a strategic route to land north west of Princes Risborough In recognition of these site constraints, the project design has evolved to minimise environmental effects, where appropriate. Key features incorporated into the design include: Retention of key habitat areas, such as the veteran trees along the northern boundary, and provision of connective habitats, buffer habitats and green spaces, allotments and native planting; Provision of a buffer zone around existing the adjacent Sewage Treatment Works; Effective use of the site through appropriate densities in terms of scale, height and massing, and its relationship with the adjoining built and landscape environment; May

13 Retention of Public Rights of Way where possible; Delivering of a strategic route with a central alignment through the site, providing an opportunity to connect to the Station and to the north of the site; and Facilitation of Network Rail s intention to rationalise existing at grade crossings of the railway line and provide a grade separated solution Further details are provided in the Environmental Statement and in the Design and Access Statement submitted with the application. May

14 4 Consultation, Scope of Assessment and Methodology Scoping and Consultation 4.1 Scoping is the process of identifying the issues to be addressed in the EIA process. This process sets the context for the assessment process. 4.2 An EIA Scoping request was made for the application and was submitted to Wycombe District Council in April A Scoping Opinion was provided in May This was used to inform the scope of the October 2015 Environmental Statement. 4.3 Responses were received from a range of consultees contacted by the local planning authority. Taking into account the nature, size and location of the proposed development, the information provided with the Scoping Opinion and other consultation responses provided throughout the assessment process, the following topics have been covered within the EIA process: Table 2: Information Provided within the Environmental Statement Structure of the ES Summary of the ES using non-technical terminology Glossary Chapter 1 Introduction Chapter 2 The Site Chapter 3 Project Description Chapter 4 Construction Process and Programme Chapter 5 Need and Alternatives Considered Chapter 6 Environmental Assessment Methodology Chapter 7 Socio-economics Chapter 8 Landscape and Visual Impact Assessment Chapter 9 Ecology and Nature Conservation Chapter 10 Traffic and Access Chapter 11 Air Quality and Odour Chapter 12 Noise and Vibration Chapter 13 Water Resources and Flood Risk Chapter 14 Cultural Heritage Chapter 15 Agriculture and Soil Resources Chapter 16 Geology, Hydrogeology, Ground Conditions and Contamination Chapter 17 Summary of Mitigation and Monitoring Chapter 18 Summary of Effects and Significance 4.4 Effects on other aspects of the environment are not likely to be significant. The topics scoped out of the assessment include: Planning policy; Material Assets; and Radiation and heat. 4.5 In addition to the information provided in the October 2015 Environmental Statement and in response to the request for further information by Wycombe District Council, the ES Supplement provides further information in relation to the following: May

15 The results of odour modelling; An updated assessment of the effects in relation to traffic and transport; An updated assessment of the effects in relation to noise, taking into account the updated traffic flow data; and An updated assessment of the effects in relation to flood risk. 4.6 This provides a summary of the findings of the EIA process, including the information provided in response to the request for further information. Environmental Assessment Methodology 4.7 EIA is a means of identifying and collating information to inform an assessment of the likely significant environmental effects of a development. For each of the key environmental topics in the Environmental Statement, the following have been addressed: Methodology and assessment criteria; Description of the environmental baseline (existing conditions); Identification of likely effects and evaluation and assessment of the significance of identified effects, taking into account any measures designed to reduce or avoid environmental effects which form part of the project and to which the developer is committed; Identification of any further mitigation measures envisaged to avoid, reduce and, if possible, remedy adverse effects (in addition to those measures that form part of the project); and Assessment of any cumulative effects with other developments planned in the area. 4.8 In terms of significance, effects are described using the following scale: Substantial: Only adverse effects are normally assigned this level of significance. They represent key factors in the decision making process. These effects are generally, but not exclusively, associated with sites or features of international, national or regional importance that are likely to suffer a most damaging impact and loss of resource integrity; Major: These beneficial or adverse effects are considered to be very important considerations and are likely to be material in the decision making process; Moderate: These beneficial or adverse effects may be important, but are not likely to be key decision making factors. The cumulative effects of such factors may influence decision making if they lead to an increase in the overall adverse effect on a particular resource or receptor; Minor: These beneficial or adverse effects may be raised as local factors. They are unlikely to be critical in the decision making process, but are important in enhancing the subsequent design of the development; and May

16 Negligible: No effects or those that are beneath levels of perception, within normal bounds of variation or within the margin of forecasting error. May

17 5 Summary of Environmental Effects 5.1 This section provides a summary of the findings of the environmental assessment process. For full details of the assessments, please refer to the Environmental Statement and ES Supplement. Socio-economics 5.2 Both the local planning policy documents and the local community in Princes Risborough have for a period of time identified concerns that a lack of new housing development is leading to a declining and ageing population, resulting in a range of issues that can be described as problems of decline. The available evidence suggests that these concerns are well-founded. The population in Princes Risborough has not grown at the same rate as Wycombe District and the nation as a whole. It is clear from recent studies and reports that there is still a need for new development in the town and recognition that this could help to address and residual issues relating to decline. 5.3 If the town is to enjoy a more prosperous future, then significant development is required to set it on a different trajectory. Wycombe District Council has recognised that this is an appropriate way forward and one that will also deliver additional housing required to meet the needs of the District as a whole. 5.4 The proposed development at Park Mill Farm can only have beneficial effects in relation to the twin aims of re-vitalising the social structure of Princes Risborough and providing urgently needed housing, both in its own right and as a logical first phase of a much larger expansion of the town. Without the development, the population of the town is unlikely to rise much above the 2011 census figure in the medium term based on the limited potential for new housing from other sources. Whilst the additional population arising from Park Mill Farm has implications for additional infrastructure requirements, these would be addressed via contributions and thus the effects of the development on community facilities such as schools, medical practices and the police would be negligible. The additional population could give rise to increased expenditure in the town centre, improving the overall viability of the town as a retail destination, which would be a minor beneficial effect. The overall socio-economic effects are assessed as a long term moderate beneficial effect due to the increase in population, with a significant boost to under 16 and middle to older adult population age groups. 5.5 The cumulative increase in population would contribute to the reversal of decline identified by the community and would not change the long term moderate beneficial significance of effect. 5.6 The project would also have a minor beneficial impact in terms of job creation during the construction phase. The cumulative effect of the additional jobs created by both the Park Mill project and other proposed developments in the planning process, in context of relatively high levels of unemployment beyond the immediate study area, would not change the overall significance of the effect. Landscape and Visual Impact Assessment 5.7 The application site is located at the western edge of Princes Risborough and can be divided into two distinct areas: the main agricultural field, including a section divided by post and wire fencing May

18 for pony paddocks; and a corridor of scrub and rough grassland in a spur to Longwick Road in the north-eastern corner. To the south-west of the site is the Princes Risborough to Banbury railway line. 5.8 The site is very gently sloping from the south-eastern boundary, at an elevation of approximately 100 metres Above Ordnance Datum (AOD), down to approximately 95 metres AOD at the stream that forms the northern boundary of the application site. 5.9 There are few notable landscape features on the site. To the south, intermittent native deciduous scrub follows the boundary with the Princes Risborough to Aylesbury railway line. To the northeast the boundary with the industrial site off Longwick Road is a substantial native deciduous hedgerow. Between the north-eastern corner of the field and the spur towards Longwick Road, is a dense area of deciduous scrub woodland with a number of maturing specimens The spur in the north-eastern corner is mainly formed of rough grassland and ruderal species with a number of deciduous canopy tree species. The boundary with Oak Tree Farm is formed by deciduous scrub species which largely screen the buildings of Oak Tree Farm from this area. East of the railway line the boundary with the town is formed by houses, residential gardens and open space A Landscape and Visual Impact Assessment has been undertaken in accordance with guidance produced by the Landscape Institute and the Institute of Environmental Assessment and Management. This has considered the likely effects of the project on the existing character of the landscape and views The assessment found that the site s landscape and visual inter-relationship with the town and wider countryside are strongly influenced by the area s topography and the strong belts of trees, hedgerows, woodlands and built form in the surrounding landscape. This results in the site being visually well contained with the wider landscape and only close open views of the site being available from within the immediate site area and distant views from elevated locations to the east The design of the project and integral landscape proposals include the retention of as much of the existing boundary vegetation as possible and new tree, structure and hedgerow planting, which would both improve screening and help to assimilate the development into the surrounding landscape The assessment found that during the construction period none of the landscape character areas assessed would experience significant adverse effects (major or above). Of the sixteen viewpoints identified, three viewpoints within the site would experience a temporary significant adverse effect With respect to operation, the assessment of the project found that none of the character areas would experience a significant adverse effect over the long term. Therefore, the operational effect would not be significant in the context of the existing landscape character. The project would not detract from the character or appearance of the Area of Outstanding Natural Beauty or the Ridgeway. May

19 5.16 Of the sixteen viewpoints assessed, three viewpoints within the site would experience a major adverse effect immediately after construction. Although views from public rights of way and properties would undergo significant change, the proposed development would be of a similar character to the residential district of the town and the scale of the development, density and layout would not be uncharacteristic in this context. Over time, the landscape design would mature to assimilate the new development with the existing settlement and soften views from sensitive visual receptors When viewed from the wider area, it is considered that the project would give rise to very limited adverse effects 5.18 In addition to the Park Mill Farm development, eight other sites around Princes Risborough may come forward for development. The predicted cumulative effects of these developments over and above those relating to Park Mill Farm have also been assessed. These additional developments, if consented, would result in some additional built development around Princes Risborough and Longwick and extend the intensity of the settlement area within both the Vale character area and Chalk Foothill character area. During the construction phase, there is some potential for temporary effects on landscape character due to potentially overlapping construction phases. However, the assessment found that the Park Mill project would not contribute to significant adverse cumulative effects on the character of the wider landscape or on views from identified receptors. Ecology and Nature Conservation 5.19 A suite of ecological survey and assessment has been undertaken within the study area in order to describe the baseline conditions at the site, identify the key ecological receptors which may be affected by the project, and assess the likely effects on those receptors Survey work was undertaken at the site in 2003, 2005 and 2010 to inform previous planning applications. In relation to the current project, ecology survey work was undertaken in 2015 to ensure the most current survey data was used to inform the assessment. Surveys have been undertaken for habitats (Phase 1 habitat survey), bats, badgers, great crested newts, reptiles and breeding birds. In addition, a desk study has been undertaken to identify relevant statutory and non-statutory designations, and obtain previous records of protected or notable species from the area The survey work and desk study identified the following key features: There is one statutory site of international and national conservation value of relevance Windsor Hill Site of Special Scientific Interest/Chiltern Beechwoods Special Area of Conservation is located 1.5 kilometres east of the site. There are two further statutory designations of relevance Brush Hill Local Nature Reserve and Whiteleaf Hill Local Nature Reserve are located approximately 1.5 kilometres east of the site. There are two non-statutory designations of relevance Summerleys Cottage Wood Biological Notification Site 0.19 kilometres west, and Longwick Bog Local Wildlife Site May

20 0.3 kilometres north of the site Survey work has identified that the site is dominated by arable land with small areas of grassland, trees, scrub and hedgerows. The habitats identified are common, widespread and of low ecological value (Figure 4). Two veteran trees are present on the northern site boundary which are of higher value and would be retained. The site at the time of the survey was intensively managed and subsequently plant diversity was low Survey work has identified bat roosts in two veteran crack willow trees on the northern site boundary. The roosts are likely to be used by small numbers of common pipistrelle as a day roost. These trees would be retained and protected as part of the project and buffered from the new built environment by an area of allotments and native planting. Mitigation would ensure that bats which may be using the trees during construction are not disturbed, and the operational lighting design would minimise effects on bats by minimising direct and indirect lighting of habitats and features used by bats Survey work has identified a low level of bat foraging and commuting activity across the site, with activity dominated by pipistrelle bats. Activity was likely to be low due to the arable nature of the site, which is not optimal foraging habitat for bats. Suitable commuting and foraging habitats, such as tree lines, would be retained and protected as part of the project, and enhanced by provision of new green infrastructure No badger setts are currently present within the site. Nonetheless, badgers may utilise the site for foraging to some extent. Badgers may benefit from habitats within open space within the development, but conversely may be at a slightly increased risk of road traffic accidents Survey work has identified that small numbers of grass snake occur within the site, associated with the grassland, scrub and watercourse in the area of the proposed access road, and the northern boundary. Mitigation would be implemented prior to construction to ensure that grass snakes are displaced away from the construction area Survey work for great crested newts has concluded they are likely to be absent from the site. A small population of smooth newts was recorded in a waterbody off-site during the surveys, and may use suitable areas of the site as terrestrial habitat Breeding bird surveys recorded a number of common bird species, with most activity being associated with the grassland and scrub where the proposed access road would be located. Notable species recorded in this area included house sparrow and song thrush, which, although common, have experienced significant declines in numbers. Two notable farmland bird species were recorded in the arable areas skylark and linnet. Red kite was recorded flying over the site and roosting in adjacent trees; this species receives additional legal protection, but is particularly common in this area. Mitigation would be implemented prior to any vegetation removal during the breeding season to ensure any active bird nests are protected By assessing the habitats present, it was determined the site was unlikely to support any notable invertebrate populations. The proposed new green infrastructure would be likely to enhance the site for invertebrates. May

21 5.30 Although habitat would be lost under the footprint of the development, this is primarily arable land, and would be replaced in part, by a more diverse range of habitats including grassland, orchard, allotments, swales or water attenuation basin, and native tree and shrub planting, which would result in a net biodiversity gain for the site By implementing mitigation, no significant adverse effects are expected on the ecological features of the site for the construction phase Significant adverse effects are not anticipated during operation of the development. With the proposed new green infrastructure implemented and established, minor beneficial effects (not significant) are anticipated for habitats, mammal species such as fox, reptiles, amphibians and invertebrates Significant beneficial effects are anticipated for roosting bats once the development is completed. This is due to the retention and protection of existing features suitable for roosting bats as part of the project, coupled with the increased opportunities created for roosting within the new buildings, which would be linked to surrounding foraging habitats by new green infrastructure. The assessment has considered the cumulative effects with other proposed developments, including effects on designated sites. Overall, no significant cumulative effects have been identified. May

22 Land at Park Mill Farm, Princes Risborough: Environmental Statement Figure 4 Phase 1 Habitat Survey May

23 Traffic and Access 5.34 Summerleys Road, to the southwest of the site, forms a signalised crossroad junction with the B4444 and the access road for Regent Park industrial estate. The B4444 routes between the priority T- junction with Picts Lane to the west of the town centre to the priority T junction with the B4009 Lower Icknield Way south-west of Longwick village. There is currently no direct vehicular access at all between the eastern portion of the site and A4129 Longwick Road. Longwick Road is subject to the derestricted national speed limit north of the access for Hypnos Ltd industrial land, and is 30 mph from Hypnos Ltd to Princes Risborough. Both the B4444 west of the site and the A4129 east of the site link with Princes Risborough town centre and the A4010, which is the main highway link through its centre The potential impacts of the traffic generated by the proposed development have been assessed, including the impacts of the traffic generated during the construction phase, effects during operation when it is fully occupied by residents and cumulatively with other known developments in the area The local roads have been characterised within and around the site through the evaluation of traffic survey data, records of Personal Injury Accident data, site visit notes and desk studies. Subsequently, the chapter presents an assessment of the potential impacts of the development related traffic on noise and vibration, visual effects, severance, driver delay, pedestrian delay, pedestrian amenity, accidents and safety, hazardous loads and dust and dirt. Details of mitigation that has been incorporated into the proposals are also presented The assessments undertaken have considered the change in traffic flows along the road network as a result of the project. The assessments have been made relative to the baseline conditions, which mean that roads with small baseline traffic volumes are more sensitive to changes in traffic in comparison to those with larger baseline traffic volumes The predicted changes in traffic volume along the road network are predicted to be small. In accordance with current guidance, assessments were made of the change in traffic upon visual effects, severance, driver delay, pedestrian delay, pedestrian amenity and accidents and safety. These assessments predicted that no significant effects would arise Similar assessment has been undertaken for cumulative traffic flows, considering the effects of the Park Mill project together with other proposed developments. This assessment predicts that no significant effects would arise. Air Quality and Odour 5.40 Wycombe District Council has designated an Air Quality Management Area along the M40 throughout the district. The designation is due to high levels of Nitrogen Oxide attributable to emissions from vehicles using the M40. The Air Quality Management Area is approximately 12 metres wide, but this width increases slightly at junctions. It lies approximately 11 kilometres to the south of the site and it is highly unlikely that the project would have any impact on this designation An assessment of air quality and odour has been undertaken, considering the air quality and odour effects from the construction phase and once the project is fully operational. May

24 5.42 During the construction phase, the most important consideration is dust. Without appropriate mitigation, dust could cause temporary soiling of surfaces, particularly windows, cars and laundry. The mitigation measures proposed (including a Dust Management Plan) would ensure that the risk of adverse dust effects is controlled to a level categorised as not significant For the operational phase, arrivals at and departures from the project site may change the number, type and speed of vehicles using the local road network. Changes in road vehicle emissions are the most important consideration during this phase of the development Detailed atmospheric dispersion modelling has been undertaken for the first year in which the development is expected to be fully operational, which is Pollutant concentrations are predicted to be well within the relevant health-based air quality objectives at the façades of both existing and proposed receptors. Therefore, air quality is acceptable at the development site, making it suitable for its proposed uses. The operational impact of the project on existing receptors is predicted to be negligible, taking into account the changes in pollutant concentrations and absolute levels. Using the significance criteria adopted for this assessment together with professional judgement, the operational air quality effects are not considered to be significant There is the potential for odour effects as a result of the existing Sewage Treatment works and the results of the assessment undertaken predict that the odour effect is likely to be negligible to slight at the project site, with the exception of a limited area (to the north and the southeast of the Sewage Treatment Works). This has informed the design of the project and it is proposed that no residential development would be located within these limited areas. With these design measures in place, no significant effects associated with odour are predicted for future residents within the site Effective implementation of relevant mitigation measures at all sites would ensure that the risk of cumulative effects is minimal and as a result no significant effects are anticipated. Noise and Vibration 5.47 An assessment of the likely noise and vibration effects associated with the project has been undertaken. The assessment focuses on the likely effects during construction and the effects of noise from off-site traffic generation associated with the use of the project. An assessment of the suitability of the application site for residential use is also provided The potential noise and vibration effects from the construction and operation of the project on the surrounding environment have been assessed qualitatively and quantitatively, as appropriate. The significance of effects has been determined on the basis of the relevant British Standards and planning policy. Baseline sound and vibration levels have been determined from site surveys and sound propagation models Sound and vibration levels in the area are primarily influenced by transportation sources, i.e. the Chiltern Main Line railway; the Princes Risborough to Aylesbury railway; and Longwick Road Construction noise and vibration would be minimised through the implementation of a Construction Environmental Management Plan in accordance with best practice. On this basis, the significance of effects in terms of construction noise and vibration would be no greater than minor adverse, which would not be significant. May

25 5.51 The significance of the effects of noise from road traffic during operation of the project would be negligible An alternative means of ventilation would be provided to proposed properties to reduce the existing and potential future effects of noise from the local environment where necessary. With such measures in place, the design of the project would ensure that existing noise sources would not give rise to an adverse noise effect within the proposed development. Vibration from the railways would not be expected to give rise to adverse vibration effects within the proposed development Noise effects due to operational traffic in the context of the potential additional traffic associated with other cumulative schemes would not be significant. Water Resources and Flood Risk 5.54 An assessment of the likely significant effects of the project on water resources and flood risk has been undertaken. This includes consideration of water quality impacts, changes in local hydrology and flood risk, and impacts on local utility infrastructure The key receptors to hydrological impacts are considered to be the Kingsey Cuttle Brook, which passes through the north of the site, and the Summerleys Stream, which borders the south of the site. These watercourses are classified as ordinary (non-main) watercourses and are not used for sensitive abstractions or recreational use. However, they are locally important receptors as well as being a key source of flood risk within the area. The underlying groundwater is also a potential receptor to site impacts. Key receptors to changes in flood risk include construction workers and future site occupants A Flood Risk Assessment has been prepared for the site. This demonstrates that the site is located almost entirely within Flood Zone 1, which is classified as being at a low probability of fluvial (river) flooding. An area of Flood Zone 2 associated with Summerleys Stream encroaches fractionally onto the southern site boundary. A narrow, linear flood risk zone exists along the course of the Kingsey Cuttle Brook. This area of surface water risk is also indicative of a localised fluvial (river) flood risk along this watercourse. The Flood Risk Assessment also identifies a potential groundwater flood risk within the area due to high groundwater levels within the underlying aquifers. No previous flooding incidents have been recorded at the site from any source. However, a number of groundwater flooding incidents have been recorded within the wider Princes Risborough area. No previous sewer flooding incidents have been recorded at the site Mitigation measures proposed to be included during the construction phase include preparation of a Construction Environmental Management Plan to control any risks associated with accidental releases of materials and contaminated runoff, and the installation of a temporary drainage system to ensure there is no increase in flood risk during the construction phase. Water efficiency measures would be used to minimise water usage and a Flood Management Plan will be prepared to ensure the safety of construction workers During the operational phase, a Sustainable Drainage Strategy is proposed, which would restrict surface water runoff to greenfield rates through provision of on-site storage within swales and May

26 ponds / basins. The strategy would ensure that there would be no increase in flood risk as a result of the proposed development, and would also provide water quality treatment prior to discharge to the Kingsey Cuttle Brook. The strategy proposes a reduction in the volume of discharge to the Summerleys Stream which would result in a slight improvement to flood risk to the existing properties along Summerleys Road to the south of the site. The developer will work with Thames Water to ensure the development is phased to enable any required upgrade works to the water supply and foul sewer systems to be completed prior to occupation. A sequential approach has been taken within the application boundary, positioning the properties in the parts of the site identified to be at a low risk of flooding from all sources. Flood risk mitigation measures are described in the Flood Risk Assessment, and include raising finished floor levels and careful design of the access road crossing over Kingsey Cuttle Brook to ensure the development remains safe over its lifetime Overall, on the basis that the proposed mitigation measures are implemented, the significance of effects on water resources and flood risk during construction is considered to be negligible to minor adverse. The significance of effects on water resources during the operational phase is considered to be negligible to minor adverse and the significance of effects on flood risk during the operational phase is considered to be minor beneficial Although some of the cumulative schemes result in surface water discharges to the same watercourse, the developments would not cumulatively result in a significant adverse effect on flood risk or water quality as it is assumed the schemes would be subject to the same requirements and measures to protect water quality and prevent the risk of flooding None of the potential effects identified on water resources and flood risk are considered significant in terms of the EIA Regulations. Cultural Heritage 5.62 There is one scheduled monument ( The Mount ) located within a 1 kilometre radius of the project site. This is located some 170 metres southeast of the site. There are 68 listed buildings located within a 1 kilometre radius of the site, and these mostly lie within the built development of Princes Risborough. No listed buildings lie within 250 metres of the site (Figure 5) The Princes Risborough Conservation Area covers the historic core of the town and is located 170 metres southeast of the site at its nearest point. The Alscot Conservation Area comprises the historic core of Alscot and is located some 220 metres north of the site at its nearest point There are a number of recorded archaeological remains in the wider area; ranging in date from the prehistoric to the post medieval. There is evidence for Iron Age activity within the site area in the form of cut features and flints that have also been recovered from the site The effects of the project on the historic environment were assessed during the construction and operational phase. This includes an assessment of the likely significant effects of the project on heritage assets in terms of archaeology, built heritage and the historic landscape Mitigation measures comprise a programme of topsoil stripping and archaeological excavation and recording to be phased ahead of development. Based on this, the construction effect of the project on the Iron Age Settlement Site and flint artefacts would not be significant. May

27 5.67 There are a number of designated assets in the wider area and the effect, if any, of the proposed development on these has been assessed. No mitigation measures other than those built into the design of the project against effects on the settings of designated assets are envisaged as being necessary Overall, there would be no significant effects on any heritage assets There would be no cumulative effects on either below ground archaeology or on the settings of designated assets as a result of the project in conjunction with any of the other proposed schemes in the area. May

28 Figure 5 Designated Assets May

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

INTRODUCTION. Land south of Bishopswood Lane, Tadley

INTRODUCTION. Land south of Bishopswood Lane, Tadley 0 INTRODUCTION THE SITE Introduction Gladman Developments Ltd. has successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial

More information

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary PINEWOODS HOLIDAY PARK: HORSE PADDOCK June 2014 1 Introduction 1.1 The existing Pinewoods Holiday Park is located approximately 1 km to the north of Wells-nextthe-Sea on the north Norfolk coast. Pinewoods

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Introduction An application for outline planning permission has been submitted

More information

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand. WELCOME Welcome to this public consultation event for our proposed development on land to the south of Twelve Leys in Wingrave. Thank you for taking the time to come along today. Homes is preparing a planning

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Re-location of Rugby Farmers Mart

Re-location of Rugby Farmers Mart Re-location of Rugby Farmers Mart LaSalle Investment Management Barberry Logo here Environmental Statement Non-Technical Summary August 2017 Re-location of Rugby Farmers Mart Non-Technical Summary Report

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

ABOUT CALA HOMES CALA HOMES

ABOUT CALA HOMES CALA HOMES WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies The criteria for assessing sites for future housing and business development in Dunsfold are set out below. (Development criteria, covering what it is

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Buckinghamshire Aylesbury Woodlands Advantage Ltd Aerial View from West

Buckinghamshire Aylesbury Woodlands Advantage Ltd Aerial View from West The proposed Aylesbury Woodlands site is located to the east of Aylesbury and is being promoted by Buckinghamshire Advantage, which is the infrastructure delivery arm of Buckinghamshire Thames Valley Local

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016 Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement September 2016 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment...

More information

Lower Herne Village Hollamby Estates (2005) Ltd Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE

Lower Herne Village Hollamby Estates (2005) Ltd Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE Table of Contents 1 INTRODUCTION 1 2 SITE LOCATION AND PROPOSED DEVELOPMENT 3 3 THE ASSESSMENT 8 4 CONCLUSIONS 16 5 WHAT HAPPENS

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed

More information

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement

More information

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary Preliminary Environmental Information Report: Preliminary Environmental Information Report Report No: P01 S4 September 2018 Table of contents Introduction... 1 The proposed scheme... 2 Scheme details...

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

Florida Farm North. Environmental Statement. Non-Technical Summary. July /04/MW/PN

Florida Farm North. Environmental Statement. Non-Technical Summary. July /04/MW/PN Florida Farm North Environmental Statement Non-Technical Summary July 2016 41575/04/MW/PN Nathaniel Lichfield & Partners 3rd Floor One St James's Square Manchester M2 6DN 01618376130 www.nlpplanning.com

More information

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD 0 WELCOME INTRODUCTION Gladman Developments Ltd have successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial and industrial

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

LAND WEST OF ST ANDREWS ROAD

LAND WEST OF ST ANDREWS ROAD LAND WEST OF ST ANDREWS ROAD ENVIRONMENTAL STATEMENT VOLUME 3 - NON-TECHNICAL SUMMARY Submitted by Nathaniel Lichfield & Partners on behalf of Redrow Homes Limited July 2014 Applicant: Consultant Team:

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom Elvetham Chase, Fleet Environmental Statement: Non-Technical Summary November 2016 A Ne w F e tte r P lace 8-10 New Fetter Lane London EC4A 1AZ United Kingdom T +44 (0) 20 7467 1470 F +44 (0) 20 7467 1471

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017

Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017 Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017 Site: ALP086 - Middle Lakes, Toddington Site size (ha): 2.83 Site: ALP086 - Middle Lakes, Toddington Site size (ha): 2.83 Site description

More information

Have your say WELCOME. Land off Mill Lane, Monks Risborough. Welcome

Have your say WELCOME. Land off Mill Lane, Monks Risborough. Welcome 01 WELCOME Welcome Gladman Developments Ltd have successfully invested in communities throughout the UK over the past 20 years, developing high quality and sustainable residential, commercial and industrial

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments Watford Local Plan Part 2 Publication Stage Environmental Report Appendix 3: Consultation Comments August 2016 Appendix 3 - Responses to Consultation of the Local Plan Part 2 As required by the SEA Directive,

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015 Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

Environmental Statement (Volume 1) Non Technical Summary

Environmental Statement (Volume 1) Non Technical Summary Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

i.6 Under this Key Area of Change the Daresbury Strategic Site will deliver:

i.6 Under this Key Area of Change the Daresbury Strategic Site will deliver: I.0 NON-TECHNICAL SUMMARY Introduction i.1 Redrow Homes NW Ltd is applying to Halton Borough Council for planning permission for the development of up to 300 high quality residential dwellings, including

More information

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a C_EDP3343_01a Introduction 1.1 This Ecology Briefing Paper has been prepared by The Environmental Dimension Partnership Ltd (EDP) on behalf of Linden Homes. This briefing paper considers the ecological

More information

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT January 2016 Contents Introduction section 1 Section 1 - Introduction Section 2 - Assessment Section 3 - Involvement Section 4 - Evaluation Section 5 - Design Section 6 - Layout

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information