Greenfield. Greenfield. Proposed River Thames Marina Development: near Wallingford, Oxfordshire

Similar documents
Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

NON-TECHNICAL SUMMARY

PANSHANGER QUARRY, Hertfordshire

BREEDON NORTHERN LIMITED

University Park, Worcester Non Technical Summary December 2011

Rempstone Extension - East Leake 2014

Barvills Solar Farm Environmental Statement Non-Technical Summary

The Place Solar Farm

BLACK CAT QUARRY EXTENSION ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY VOLUME 3

NON-TECHNICAL SUMMARY

Fullamoor Quarry. Environmental Statement Non -Technical Summary

Inert Recycling (UK) Ltd Boxgrove Quarry Restoration Environmental Statement

NON TECHNICAL SUMMARY

Grantham Southern Quadrant Link Road Environmental Statement

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

Wallingford Neighbourhood Plan

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

Environmental Impact Assessment

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Land at Copshurst Quarry, Stoke-on-Trent. Environmental Impact Assessment. Environmental Statement, Non-Technical Summary.

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Open Report on behalf of Richard Wills Executive Director, Environment & Economy. Planning and Regulation Committee

Neighbourhood Planning Local Green Spaces

A payment of 1080 is due in this instance, for a meeting and follow up written response, and will be made by card over the phone.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Rannoch 132 / 33 kv Substation Extension

NON-TECHNICAL SUMMARY

Sustainability Statement. Whitby Business Park Area Action Plan

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

Longbridge Town Centre Phase 2 Planning Application

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

M4 Corridor around Newport Environmental Statement Volume 3: Appendices

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

Former RAF Sealand Site EIA

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Planning and Sustainability Statement

and Netherhall Road and Camp Farm EIA

Site ref: AS11 Site Name or Address: Land South of Ermyn Way

RYALL NORTH QUARRY, WORCESTERSHIRE

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

1 Annexe A Shortlist of sites proposed for the delivery of waste management infrastructure

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

i.6 Under this Key Area of Change the Daresbury Strategic Site will deliver:

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

Re-location of Rugby Farmers Mart

To secure a Green Belt around Cambridge whose boundaries are clearly defined and which will endure for the plan period and beyond.

South Whitehaven, Cumbria EIA

The extension into the Field Cottage buffer area (Ref CM/32/14) granted on 10 June 2014

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

The Gwennap Parish Vision Statement

Frequently Asked Questions

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

Site Assessment Technical Document Appendix A: Glossary

PLANNING APPLICATION CONONISH GOLD MINE, TYNDRUM. Planning and Environmental Statement Non-Technical Summary August 2017

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:-

Land at Rampton Road. Cottenham

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

Public Consultation. Land at Monks Farm, North Grove. Welcome

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site

Rooley Moor Neighbourhood Development Plan

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

Scoping Opinion of the Mineral Planning Authority, Dartmoor National Park Authority

Meridian Water Phase 1 Application

Brockholes Wetland and Woodland Nature Reserve, Preston Lancashire

A737/A738 Trunk Road (Dalry Bypass)

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd

Moat Lane Regeneration Project Environmental Statement

Briefing Document of CNP. June 2017

Environmental Statement (Volume 1) Non Technical Summary

Draft Ada Street Cardiff Area Plan

ALLERTHORPE NEIGHBOURHOOD PLAN

Report reference: LT/WTE/LZH/1655/01/SCOPING June 2015

8.0 Design and Form of Development 43/

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Marinas, Mooring and Boating Facilities 23

Start of works exhibition

WELCOME. North East Haverhill. The Planning Process

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011

Transcription:

Proposed River Thames Marina Development: near Wallingford, Oxfordshire Need & Alternatives to the Scheme It is necessary to consider planning policies and any related guidance concerning recreational use and the environment of the River Thames and the surrounding area as part of the marina proposal. Government planning policy (within the NPPF) confirms support for sustainable tourism and leisure that benefit visitors in rural areas, communities and visitors, and which respect the character of the countryside. These proposals for the provision of a new marina facility, providing sustainable tourism and additional leisure based activities in a rural environment, are considered to be in line with local and government planning policy. There are known to be a limited number of moorings surrounding Wallingford, with the closest existing facility for river bank moorings located at Benson, some km to the north. The nearest major marina facility to the proposed site is located at Abingdon, about 10km to the northwest. Alternatives - There are no available river bank areas located to the south of the site that do not lie within an AONB, for a distance of 10km. - There are therefore no available suitable areas of land with adequate road access and available river frontage in the vicinity of the proposed Wallingford marina site. - To the north the town of Wallingford restricts available river frontage and towards Abingdon other facilities are available. Working With The Community As part of the community liaison and engagement with local parish and town councils, a number of additional proposals are include as part of the marina scheme: Ÿ Dedicated slipway for Wallingford Accessible Boat Club Ÿ Potential for new boathouse and river access for Wallingford Rowing Club Ÿ Open water area for local canoe, kayak users Ÿ Angling area on parts of the river bank Ÿ Circular walking routearound marina facility with disabled access The Future If planning permission is granted for this development, the operations would be monitored by Oxfordshire County Council and other specialist organisations. The operator will commit to monitoring air quality, noise emissions and the local water environment to ensure that there will be no impacts from the proposed operations. The marina will offer a range of leisure and water based recreational options for river users and the local community. The construction phase will also provide a short term benefit to the local building sector by providing raw material for construction and building projects. Technical Advisers Air Quality Archaeology Ecological Assessment Flood Risk Geology & Geotechnical Hydrology & Hydrogeology Vibrock Ltd CgMS Ltd Pleydell Smithyman Edenvale Young ESI Ltd Land Classification & Soils R.G.O Burton Landscape Architects Noise Planning Consultants Transportation Kedd Ltd Vibrock Ltd David Tucker Associates Ltd Non-Technical Summary (NTS) Planning Application to allow the development of an offline River Thames marina basin with facilities buildings, boat workshop, floating pontoon moorings and new footbridge with construction phase involving the extraction and processing of sand and gravel, the importation of inert fill and the construction of new site accesses, landscaping and screening bunds. For Further Information Contact: Simon Rees 1 Commercial Road Keyworth Nottingham NG1 JS April 018 Tel: 011 9700 E-mail: admin@greenfield-associates.co.uk The NTS will be available on the website: www.oxfordshire.gov.uk www.londonrock.co.uk/wallingford Greenfield a s s o c i a t e s 7 Greenfield a s s o c i a t e s

N Site Description The proposed marina planning application covers approximately 19 hectares of land that lies within the Parish of Cholsey, in the County of Oxfordshire. The proposed application area comprises agricultural land that is currently used for arable and livestock grazing purposes. There are no buildings on the site other than a derelict barn. The site is bounded by the A9 (Reading Road) to the west and A10 (Nosworthy Way Wallingford By-pass) to the north, which is situated on an embankment. The eastern site boundary is formed by the southerly flowing River Thames, with a narrow strip of woodland forming the southern boundary. There is one Public Right of Way (the Thames Path National Trail) within the landholding. This Public Right of Way travels north south along the bank of the River Thames. Phased Extraction Scheme Prior to any materials being dug from the site, infrastructure including a new site entrance, processing plant and lagoons together with internal haul roads would be constructed. Soils and clays will be stripped and stored around the perimeter of the site to be used in the site restoration. Margins around the site boundaries would remain unworked to ensure no impacts to the boundary trees and hedgerows. The sand and gravel will be extracted in campaigns and the engineering works to create the marina basin will take place using imported inert fill materials. Construction Phases and Layout Construction Key Facts Ÿ Marina constructed over - years Ÿ Extraction area 1.ha Ÿ Extract 0,000 tonnes of sand and gravel Ÿ Sales output 10,000 tonnes per annum Ÿ Import 10,000m engineering clay to line the base of the marina Ÿ Marina basin water area 1ha Ÿ Finalising restoration in final year Ÿ Total development timescale years Construction Phase - Hours of Working The Marina Proposals Include: Ÿ New dedicated road access off A9 Ÿ New marina entrance off the River Thames Ÿ New footbridge over the marina entrance Ÿ Leisure and visitor moorings for 80 boats Ÿ ~0 car parking spaces (public & secure) Ÿ Marina office, shop and café/restaurant facility Ÿ Accessible toilets, showers, laundry facilities Monday to Friday 0700 to 1800 hours Saturday 0700 to 100 hours Sundays & Bank Holidays Closed Typical Construction Works Environmental Impact Assessment Independent specialist consultants have carried out technical studies using recognised techniques to evaluate the potential impacts of the proposed development. This work is called an Environmental Impact Assessment (EIA). The full results of these are published in the Environmental Statement (ES), which can be seen at the offices of Oxfordshire County Council, as well as on the council web sites. This Non Technical Summary (NTS) highlights the main elements of the ES, thus for a more detailed comprehensive assessment of the proposals please consult the full EIA. 1

The Marina Facilities Air Quality Standard best practice dust control measures, as described in National Planning Policy Guidance would be used on site. These would include agreeing a dust management plan with the Minerals Planning Authority and monitoring any dust emissions. The air quality assessments confirm that by using standard best practice and following relevant guidance there will be no air quality or dust issues created throughout the working and restoration phases of the site operations. Background Noise and Dust Monitoring Locations 8 1 9 10 All vehicles working on the site will have silencers that will be well maintained and all mobile plant will be fitted with white noise reversing alarms not reversing bleepers. Noise monitoring will be carried out on the site to assess the noise levels during operations. Carefully located soil screening bunds will also ensure that no noise will be carried off site. 7 Over the whole application area (19ha), about 8% is identified as Best and Most Versatile and % is Grade b or lower. It is considered that the overall value of the land following the marina development and landscaping around the basin margins will be significantly greater than the current situation, since the areas will contain a wide range of species and habitats that are considered a priority within the UK and Oxfordshire Biodiversity Action Plan. The land is farmed for arable crops in only one field, with the remainder grazed by cattle during the summer months. The creation of new habitats, leisure and community facilities for both river users and the local residents will offset the loss the best and most versatile agricultural land. RAF Benson - Safeguarding Existing Noise Predicted worst level (db) case LA90,1h LAeq,1hr Ÿ Public Parking Ÿ Secure parking for boat owners Marina Recreational Facilities Ÿ Marina Shop Ÿ Café/ Restaurant Ÿ BBQ and picnic area Ÿ Dedicated area for canoe/kayak etc. hire Ÿ Circular walking route linked to the Thames Path Government Guidance LAeq 1 Elizabeth House Mogewell Park Nursery 1 Coachmans Cottage 7 The Lodge, Wallingford Road The Lodge, Winterbrook Lane 7 Winward House 7 Mead Furlong 8 Barrington Court 1 9 St John the Baptist Church 10 Spence Pavillion 0 A series of noise predictions have been made at noise sensitive locations around the proposed site, these have been assessed against the criteria set out in the NPPF (Government Guidance). All the predicted noise levels refer to worst case scenarios, when the operations are undertaken at their closest distances to sensitive properties and therefore have the greatest influence on the noise levels at these locations. The results indicate that the proposed operations can be undertaken without exceeding acceptable Government noise limits. The proposed site lies within the safeguarding area of RAF Benson, thus the operations must ensure that they do not present any potential hazards to aircraft in the local area. All ponds and lagoons will be kept to a minimum and will be engineered to discourage flocking birds. The site restoration has been designed to create a balance between nature conservation, marina operations and bird strike hazard management. Ÿ Marina Slipway During marina operations, predicted noise levels will not create adverse impacts. Location Soils & Agriculture Ÿ Out of water workshop for up to boats Ÿ Boat re-fuelling and pump-out dock During the construction phase, the processing plant will be located away from any residential property, situated near the site entrance and roundabout on the by-pass. It is predicted that there will be no noise impact from plant or loading of lorries. Noise Boat Maintenance & Facilities Monitoring noise levels during wash plant operations Assessment of Impacts: Ecology Current Site Habitats and Ecological Features The ecological specialists have concluded that the proposals will have no negative impact on the nearby AONB s. There will be habitat loss to allow the creation of the marina water area. However, the restoration scheme would provide diverse and locally scarce (UK BAP) habitats such as a pond, wet woodland and reedbed habitat. The site restoration proposals are likely to have long term, benefits to biodiversity. The phased progressive restoration will allow certain habitats to recover quickly and swiftly re-colonise worked areas. The assessment concludes that by implementing the recommended protection measures the proposed marina development will not have a significant impact on habitats or species. Proposed Environmental Protection Measures include: Ÿ Retention of vegetation and mature trees around the site boundaries. Ÿ Maintain undisturbed habitat margins from extraction areas to site boundaries. Ÿ Buffer Zone of 0m margin to the River Thames providing wildlife with continued habitat and foraging. Ÿ Installation of bird, bat and barn owl boxes.

Thames Path: The Thames Path will remain open through the construction period. It is proposed that a footbridge is constructed over the marina entrance to provide continued access along the Thames Path. This bridge will have very gently sloping ramps to ensure that the path remains easily accessible to the public. The land surrounding bridge will be landscaped and planted to provide a pleasant view. Marina Entrance and Proposed Thames Path Footbridge Construction Phase The proposed access for the construction phase will be provided via a left in from Reading Road and left out onto Nosworthy Way (Diagram shown below). This arrangement would direct all construction traffic straight onto the preferred HGV routes as part of the strategic road network (A-roads and Motorways). The additional movements created during the construction phase are predicted to equate to an increase of less than 0.% on Reading Road and 0.% on Nosworthy Way of the existing traffic flows. Archaeology & Cultural Heritage The cultural heritage assessment has concluded that the proposed marina construction and development is not likely to result in a significant impact upon the heritage assets within or near to the site. Groundwater, Surface Water & Floodrisk Sand and gravel workings and marina development are classified as Water Compatible Development in the NPPF. Desktop and field studies have been undertaken and the potential impacts of the operations have been assessed. The results from the evaluation concludes that the archaeology present is not of such significance to preclude the proposed development. The detailed flood risk assessment has shown that the construction operations and marina development have no flood risk impacts on any third parties or downstream of the proposed development. Construction Phase Entrance and Exit design Time period in years Tonnes per year Working days per year Tonnes per day Tonne capacity truck Deliveries per day Two-way movements Deliveries / hr Two-way movments/ hr 0,000-10,000 71 0 8 Marina Access The construction entrance off Reading Road will be adapted to allow vehicles to enter and exit the site. The left turn exit onto the A10 will removed on completion of the marina. Marina traffic is likely to be seasonal and peak traffic will be on the weekends. Data suggests that peak traffic will occur on a Sunday afternoon, which would equate to on average 1 additional car on the road every minute. The proposed development that has been considered in respect of its potential effects on landscape and visual matters/ receptors involves two stages. Stage A- a temporary period of marina construction Stage B- the proposed permanent marina facility and its operations. Overall it is assessed that the temporary Stage A will result in Slight to Moderate Adverse temporary effects. No Significant Adverse effects are assessed to occur as a result of the proposed marina development. Groundwater So the mineral can be extracted dry, it will need to be de-watered. De-watering and discharge during the construction period would be controlled under a permit issued by the Environment Agency. Sand & Gravel -Tonnes Landscape and Visual Impact Flood Risk All marina and construction phase plant and buildings will be located off the floodplain. Flood modelling shows no increase in the water levels during the construction period and indicates a marginal reduction in flood water levels during the marina operation. Protection Measures No working on the floodplain or discharge of water during flood warnings. To maintain the integrity of the Thames riverbank a undisturbed buffer margin of 0m will be maintained. Marina pontoons will float to rise and fall with changing water levels. Construction Phase Vehicle Movements Highways and Transport Average over 1 year Public Rights of Way The site is generally well screened from existing and potential visual receptor views. However, the raised A10 section, users of the Thames Path and boat users on the Thames may have views into the sight. Environment Agency Flood Map for Planning It is considered that both the Marina and New Barn Farm Quarry site are separately well contained within their individual landscape settings. It is assessed that no cumulative visual or landscape effects on either the physical fabric or character of the landscape or any special values attached to it would occur.

Thames Path: The Thames Path will remain open through the construction period. It is proposed that a footbridge is constructed over the marina entrance to provide continued access along the Thames Path. This bridge will have very gently sloping ramps to ensure that the path remains easily accessible to the public. The land surrounding bridge will be landscaped and planted to provide a pleasant view. Marina Entrance and Proposed Thames Path Footbridge Construction Phase The proposed access for the construction phase will be provided via a left in from Reading Road and left out onto Nosworthy Way (Diagram shown below). This arrangement would direct all construction traffic straight onto the preferred HGV routes as part of the strategic road network (A-roads and Motorways). The additional movements created during the construction phase are predicted to equate to an increase of less than 0.% on Reading Road and 0.% on Nosworthy Way of the existing traffic flows. Archaeology & Cultural Heritage The cultural heritage assessment has concluded that the proposed marina construction and development is not likely to result in a significant impact upon the heritage assets within or near to the site. Groundwater, Surface Water & Floodrisk Sand and gravel workings and marina development are classified as Water Compatible Development in the NPPF. Desktop and field studies have been undertaken and the potential impacts of the operations have been assessed. The results from the evaluation concludes that the archaeology present is not of such significance to preclude the proposed development. The detailed flood risk assessment has shown that the construction operations and marina development have no flood risk impacts on any third parties or downstream of the proposed development. Construction Phase Entrance and Exit design Time period in years Tonnes per year Working days per year Tonnes per day Tonne capacity truck Deliveries per day Two-way movements Deliveries / hr Two-way movments/ hr 0,000-10,000 71 0 8 Marina Access The construction entrance off Reading Road will be adapted to allow vehicles to enter and exit the site. The left turn exit onto the A10 will removed on completion of the marina. Marina traffic is likely to be seasonal and peak traffic will be on the weekends. Data suggests that peak traffic will occur on a Sunday afternoon, which would equate to on average 1 additional car on the road every minute. The proposed development that has been considered in respect of its potential effects on landscape and visual matters/ receptors involves two stages. Stage A- a temporary period of marina construction Stage B- the proposed permanent marina facility and its operations. Overall it is assessed that the temporary Stage A will result in Slight to Moderate Adverse temporary effects. No Significant Adverse effects are assessed to occur as a result of the proposed marina development. Groundwater So the mineral can be extracted dry, it will need to be de-watered. De-watering and discharge during the construction period would be controlled under a permit issued by the Environment Agency. Sand & Gravel -Tonnes Landscape and Visual Impact Flood Risk All marina and construction phase plant and buildings will be located off the floodplain. Flood modelling shows no increase in the water levels during the construction period and indicates a marginal reduction in flood water levels during the marina operation. Protection Measures No working on the floodplain or discharge of water during flood warnings. To maintain the integrity of the Thames riverbank a undisturbed buffer margin of 0m will be maintained. Marina pontoons will float to rise and fall with changing water levels. Construction Phase Vehicle Movements Highways and Transport Average over 1 year Public Rights of Way The site is generally well screened from existing and potential visual receptor views. However, the raised A10 section, users of the Thames Path and boat users on the Thames may have views into the sight. Environment Agency Flood Map for Planning It is considered that both the Marina and New Barn Farm Quarry site are separately well contained within their individual landscape settings. It is assessed that no cumulative visual or landscape effects on either the physical fabric or character of the landscape or any special values attached to it would occur.

The Marina Facilities Air Quality Standard best practice dust control measures, as described in National Planning Policy Guidance would be used on site. These would include agreeing a dust management plan with the Minerals Planning Authority and monitoring any dust emissions. The air quality assessments confirm that by using standard best practice and following relevant guidance there will be no air quality or dust issues created throughout the working and restoration phases of the site operations. Background Noise and Dust Monitoring Locations 8 1 9 10 All vehicles working on the site will have silencers that will be well maintained and all mobile plant will be fitted with white noise reversing alarms not reversing bleepers. Noise monitoring will be carried out on the site to assess the noise levels during operations. Carefully located soil screening bunds will also ensure that no noise will be carried off site. 7 Over the whole application area (19ha), about 8% is identified as Best and Most Versatile and % is Grade b or lower. It is considered that the overall value of the land following the marina development and landscaping around the basin margins will be significantly greater than the current situation, since the areas will contain a wide range of species and habitats that are considered a priority within the UK and Oxfordshire Biodiversity Action Plan. The land is farmed for arable crops in only one field, with the remainder grazed by cattle during the summer months. The creation of new habitats, leisure and community facilities for both river users and the local residents will offset the loss the best and most versatile agricultural land. RAF Benson - Safeguarding Existing Noise Predicted worst level (db) case LA90,1h LAeq,1hr Ÿ Public Parking Ÿ Secure parking for boat owners Marina Recreational Facilities Ÿ Marina Shop Ÿ Café/ Restaurant Ÿ BBQ and picnic area Ÿ Dedicated area for canoe/kayak etc. hire Ÿ Circular walking route linked to the Thames Path Government Guidance LAeq 1 Elizabeth House Mogewell Park Nursery 1 Coachmans Cottage 7 The Lodge, Wallingford Road The Lodge, Winterbrook Lane 7 Winward House 7 Mead Furlong 8 Barrington Court 1 9 St John the Baptist Church 10 Spence Pavillion 0 A series of noise predictions have been made at noise sensitive locations around the proposed site, these have been assessed against the criteria set out in the NPPF (Government Guidance). All the predicted noise levels refer to worst case scenarios, when the operations are undertaken at their closest distances to sensitive properties and therefore have the greatest influence on the noise levels at these locations. The results indicate that the proposed operations can be undertaken without exceeding acceptable Government noise limits. The proposed site lies within the safeguarding area of RAF Benson, thus the operations must ensure that they do not present any potential hazards to aircraft in the local area. All ponds and lagoons will be kept to a minimum and will be engineered to discourage flocking birds. The site restoration has been designed to create a balance between nature conservation, marina operations and bird strike hazard management. Ÿ Marina Slipway During marina operations, predicted noise levels will not create adverse impacts. Location Soils & Agriculture Ÿ Out of water workshop for up to boats Ÿ Boat re-fuelling and pump-out dock During the construction phase, the processing plant will be located away from any residential property, situated near the site entrance and roundabout on the by-pass. It is predicted that there will be no noise impact from plant or loading of lorries. Noise Boat Maintenance & Facilities Monitoring noise levels during wash plant operations Assessment of Impacts: Ecology Current Site Habitats and Ecological Features The ecological specialists have concluded that the proposals will have no negative impact on the nearby AONB s. There will be habitat loss to allow the creation of the marina water area. However, the restoration scheme would provide diverse and locally scarce (UK BAP) habitats such as a pond, wet woodland and reedbed habitat. The site restoration proposals are likely to have long term, benefits to biodiversity. The phased progressive restoration will allow certain habitats to recover quickly and swiftly re-colonise worked areas. The assessment concludes that by implementing the recommended protection measures the proposed marina development will not have a significant impact on habitats or species. Proposed Environmental Protection Measures include: Ÿ Retention of vegetation and mature trees around the site boundaries. Ÿ Maintain undisturbed habitat margins from extraction areas to site boundaries. Ÿ Buffer Zone of 0m margin to the River Thames providing wildlife with continued habitat and foraging. Ÿ Installation of bird, bat and barn owl boxes.

N Site Description The proposed marina planning application covers approximately 19 hectares of land that lies within the Parish of Cholsey, in the County of Oxfordshire. The proposed application area comprises agricultural land that is currently used for arable and livestock grazing purposes. There are no buildings on the site other than a derelict barn. The site is bounded by the A9 (Reading Road) to the west and A10 (Nosworthy Way Wallingford By-pass) to the north, which is situated on an embankment. The eastern site boundary is formed by the southerly flowing River Thames, with a narrow strip of woodland forming the southern boundary. There is one Public Right of Way (the Thames Path National Trail) within the landholding. This Public Right of Way travels north south along the bank of the River Thames. Phased Extraction Scheme Prior to any materials being dug from the site, infrastructure including a new site entrance, processing plant and lagoons together with internal haul roads would be constructed. Soils and clays will be stripped and stored around the perimeter of the site to be used in the site restoration. Margins around the site boundaries would remain unworked to ensure no impacts to the boundary trees and hedgerows. The sand and gravel will be extracted in campaigns and the engineering works to create the marina basin will take place using imported inert fill materials. Construction Phases and Layout Construction Key Facts Ÿ Marina constructed over - years Ÿ Extraction area 1.ha Ÿ Extract 0,000 tonnes of sand and gravel Ÿ Sales output 10,000 tonnes per annum Ÿ Import 10,000m engineering clay to line the base of the marina Ÿ Marina basin water area 1ha Ÿ Finalising restoration in final year Ÿ Total development timescale years Construction Phase - Hours of Working The Marina Proposals Include: Ÿ New dedicated road access off A9 Ÿ New marina entrance off the River Thames Ÿ New footbridge over the marina entrance Ÿ Leisure and visitor moorings for 80 boats Ÿ ~0 car parking spaces (public & secure) Ÿ Marina office, shop and café/restaurant facility Ÿ Accessible toilets, showers, laundry facilities Monday to Friday 0700 to 1800 hours Saturday 0700 to 100 hours Sundays & Bank Holidays Closed Typical Construction Works Environmental Impact Assessment Independent specialist consultants have carried out technical studies using recognised techniques to evaluate the potential impacts of the proposed development. This work is called an Environmental Impact Assessment (EIA). The full results of these are published in the Environmental Statement (ES), which can be seen at the offices of Oxfordshire County Council, as well as on the council web sites. This Non Technical Summary (NTS) highlights the main elements of the ES, thus for a more detailed comprehensive assessment of the proposals please consult the full EIA. 1

Proposed River Thames Marina Development: near Wallingford, Oxfordshire Need & Alternatives to the Scheme It is necessary to consider planning policies and any related guidance concerning recreational use and the environment of the River Thames and the surrounding area as part of the marina proposal. Government planning policy (within the NPPF) confirms support for sustainable tourism and leisure that benefit visitors in rural areas, communities and visitors, and which respect the character of the countryside. These proposals for the provision of a new marina facility, providing sustainable tourism and additional leisure based activities in a rural environment, are considered to be in line with local and government planning policy. There are known to be a limited number of moorings surrounding Wallingford, with the closest existing facility for river bank moorings located at Benson, some km to the north. The nearest major marina facility to the proposed site is located at Abingdon, about 10km to the northwest. Alternatives - There are no available river bank areas located to the south of the site that do not lie within an AONB, for a distance of 10km. - There are therefore no available suitable areas of land with adequate road access and available river frontage in the vicinity of the proposed Wallingford marina site. - To the north the town of Wallingford restricts available river frontage and towards Abingdon other facilities are available. Working With The Community As part of the community liaison and engagement with local parish and town councils, a number of additional proposals are include as part of the marina scheme: Ÿ Dedicated slipway for Wallingford Accessible Boat Club Ÿ Potential for new boathouse and river access for Wallingford Rowing Club Ÿ Open water area for local canoe, kayak users Ÿ Angling area on parts of the river bank Ÿ Circular walking routearound marina facility with disabled access The Future If planning permission is granted for this development, the operations would be monitored by Oxfordshire County Council and other specialist organisations. The operator will commit to monitoring air quality, noise emissions and the local water environment to ensure that there will be no impacts from the proposed operations. The marina will offer a range of leisure and water based recreational options for river users and the local community. The construction phase will also provide a short term benefit to the local building sector by providing raw material for construction and building projects. Technical Advisers Air Quality Archaeology Ecological Assessment Flood Risk Geology & Geotechnical Hydrology & Hydrogeology Vibrock Ltd CgMS Ltd Pleydell Smithyman Edenvale Young ESI Ltd Land Classification & Soils R.G.O Burton Landscape Architects Noise Planning Consultants Transportation Kedd Ltd Vibrock Ltd David Tucker Associates Ltd Non-Technical Summary (NTS) Planning Application to allow the development of an offline River Thames marina basin with facilities buildings, boat workshop, floating pontoon moorings and new footbridge with construction phase involving the extraction and processing of sand and gravel, the importation of inert fill and the construction of new site accesses, landscaping and screening bunds. For Further Information Contact: Simon Rees 1 Commercial Road Keyworth Nottingham NG1 JS April 018 Tel: 011 9700 E-mail: admin@greenfield-associates.co.uk The NTS will be available on the website: www.oxfordshire.gov.uk www.londonrock.co.uk/wallingford Greenfield a s s o c i a t e s 7 Greenfield a s s o c i a t e s