Pellet suction system GA kW

Similar documents
Operating Instructions

Turbomat TM Operating Instructions. Froling GesmbH A-4710 Grieskirchen, Industriestraße 12

Turbomat TM Operating Instructions. Froling GesmbH A-4710 Grieskirchen, Industriestraße 12

Wood chip boiler T (Touch)

Wood chip boiler T

Operating Instructions

Installation Instructions

Wood chip boiler TX (Touch)

Wood chip boiler T

Pellet boiler P4 Pellet

Boiler controller SPS 4000

From a renowned company

Firewood boiler S1 Turbo

Boiler controller Lambdatronic S 3200

Boiler controller S-Tronic Plus

TTV 1500 / TTV 3000 OPERATING MANUAL CONVEYING FAN TRT-BA-TTV TC EN

OPERATING MANUAL ORWAK March 2005 PUBL. NO Edition 4

Dual fuel boiler SP Dual compact

P4 Wood Pellet Boiler

Boiler controller SPS 4000

Operation Manual R205BV, R209BV

S3 Turbo Firewood boiler. S3 Turbo AVAILABLE WITH BROADBAND LAMBDA PROBE AND SERVO-MOTORS.

100T Electric Shop Press

Pellet Boiler P4 Pellet

MIX Boiler & Font Range Service Manual

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

VETO CLEANER 500 FLUE GAS CLEANER

Lambdatronic H 3200 for wood chip boiler

User Manual GV25 GV35 GV702. Company information: Original instructions GV12066 (1)

HD Kompakt Service Manual

Translation of the Original Operating Instructions MAB 100 K

arded t ecolabel!

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

Owner s Manual. P4 Pellet Read and follow the operating instructions and safety information! Subject to technical change!

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50

K Operating Instructions. Before first use of the unit read these operating instructions and act in accordance with them.

Translation of the Original Operating Instructions RailMAB 915

150T Electric Shop Press

2CKA001473B System Manual Busch-Infoline. Handicapped toilet signal set 1510 UC

Product Range kw

Turbomat. Wood Chip and Pellet Boilers. Turbomat TM 150/200/250 TM 300/320/400/500 STURDY CONSTRUCTION INDUSTRIAL MODEL.

Grain crusher Universal. Purpose: This machine is designed for the crushing of grain in agricultural operation.

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

Operating instructions

Boiler controller Lambdatronic P 3200 P1 - Touch

S3 Turbo Firewood boiler. S3 Turbo AVAILABLE WITH BROADBAND LAMBDA PROBE AND SERVO-MOTORS.

Operating instructions

Turbomat. Wood Chip and Pellet Boilers. Turbomat TM 150/200/250 TM 300/320/400/500 STURDY CONSTRUCTION INDUSTRIAL MODEL.

Mix Boiler & Font Range ( #, #, #, , )

50T Electric Shop Press

CE Unit is suitable for material transport. The transported gas may be up to 80 C.

Installation and Operating Manual Drying Cabinet

SMHA Hatch High temperature fan HT-fan Installation and Maintenance

Shredder FD 8906CC Cross-Cut

Lambdatronic SP 3200 for dual fuel boiler

User Manual Box Exhaust Fan Series (Belt Drive)

Katherm NE - Natural convection with electric heating element 2.45

Installer manual AG-WL10

OPERATION AND MONTAGE MANUAL ROOF FANS

INSTRUCTION MANUAL (English version) Water still

Installation Instructions Part No , Part No Part No

Operating instructions

TFV 900 OPERATING MANUAL RADIAL FAN TRT-BA-TFV900-TC-001-EN

Installation instructions and operating manual. Sauna control system FCU1000 / FCU1200

Basically, the instruction handbook shall contain the following information:

OPERATION AND MONTAGE MANUAL ROOF FANS

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4

Installation and operating instructions. Temperature difference controller 6 inputs, 3 outputs, integrated data logger for SD card

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315

Installation Guide. Model: IC15- MF Model: IC15- MFSilent Model: IC30- MF Model: IC30- MFSilent

Vacuum cleaner Instruction manual

HOT 2000 USER MANUAL. Version 3.1. This manual shall be read in its entirety before using the machine.

CombiGrinder. Instruction manual. Grinder for cattle, horse and pet clipper blades. swiss made. Version/Index: CombiGrinder/A 09-16

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

TECHNICAL NOTICE GH/GHO/GAE V

User and maintenance manual

TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S

Montageanleitung RLO (Original) Mounting Instructions RLO (Translation of the original)

Installation Instructions

This label warns for risk of electrical shock when failing to observe.

INSTALLATION INSTRUCTIONS POINT OF USE WATER HEATERS EPU - US10 EPU - US15

TACOTHERM FRESH PETA / PETA X

Tempest TP420/180 Electric Pressure Washer

EHA Hoffmann International GmbH

INSTALLATION MANUAL GUTHD2. Universal Two Way Digital Thermostatic Valve for Shower Systems

USER S MANUAL ATH WH220

PE1 Pellet. PE1 Pellet. Pellet boiler - Canada. PE1 Pellet APPROVED FOR EPA 2020 EMISSION LIMITS.

AVANI Grinding Booth

Operating Manual. Combination Table Sealing Press. Series: Classic. CiMa-Pak Corporation Montreal Toronto New York. Telephone:

Log wood boiler S1 Turbo

INTRODUCTION. NOTE: Read the entire instruction manual before starting the installation. FIRE, EXPLOSION, ELECTRICAL SHOCK HAZARD

TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40

Operating instructions Electric agitator RE80Ex. T-Dok-520-GB-Rev.5 Article no Translation of the original operating instructions

ST1. Mod. USE AND MAINTENANCE MANUAL


USER S MANUAL NKP. Duct heater for supply air pre-heating with external control

INSTALLATION AND USER S MANUAL COOKER HOOD RS-600/A-S

hp Dust Collector With Vacuum Attachment

Instructions for installation and use English. More documents on: H B /09

GB User and maintenance manual

Transcription:

Installation and Operating Instructions Pellet suction system GA 130-350kW Translation of the original German operating and installation instructions for technicians and operators Read and follow the instructions and safety information! Technical changes, typographical errors and omissions reserved! M1740015_en Edition 27/01/2016 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Table of contents Table of contents 1 General 4 1.1 Product overview and functional description 5 2 Safety 6 2.1 Hazard levels of warnings 6 2.2 Permitted uses 6 2.2.1 Area of application 7 2.2.2 Permitted fuels 8 Wood pellets 8 2.3 Qualification of staff 8 2.3.1 Qualification of assembly staff 8 2.3.2 Personal protective equipment for assembly staff 8 2.3.3 Qualification of operating staff 9 2.3.4 Protective equipment for operating staff 9 2.4 Design information 9 2.4.1 Standards 9 2.4.2 Requirements at the installation site 10 2.5 Safety devices 11 2.6 Residual risks 11 3 Technical information 13 3.1 Dimensions 13 3.2 Technical specifications 14 4 Installation 15 4.1 Transport 15 4.2 Temporary storage 15 4.3 Materials supplied 15 4.4 Installation positions 16 4.5 Installing the pellet suction system 18 4.5.1 Install hose lines 22 4.6 Assembly information for hose lines 23 4.6.1 Potential equalisation 24 4.7 Connecting the system 25 4.7.1 Electrical connection 25 4.7.2 Power supply 25 4.7.3 Connecting the sprinkler system 25 4.7.4 Wiring 26 5 Operating the system 28 5.1 Initial start-up 28 5.2 During operation 28 6 Servicing 29 6.1 Maintenance schedule 29 2 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Table of contents 6.2 Maintenance contract 30 7 Troubleshooting 31 7.1 Procedure for fault messages 31 8 Appendix 32 8.1 Addresses 32 8.1.1 Address of manufacturer 32 8.1.2 Address of the installer 32 Installation and Operating Instructions M1740015_en 3

1 General 1 General Thank you for choosing a quality product from Froling. The product features a state-ofthe-art design and conforms to all currently applicable standards and testing guidelines. Please read and observe the documentation provided and always keep it close to the system for reference. Observing the requirements and safety information in the documentation makes a significant contribution to safe, appropriate, environmentally friendly and economical operation of the system. The constant further development of our products means that there may be minor differences from the pictures and content. If you discover any errors, please let us know: doku@froeling.com. Subject to technical change. Issuing a delivery certificate This is an incomplete machine as defined by the Machinery Directive. The incomplete machine must only be started up when it has been confirmed that the machine, in which the incomplete machine has been installed, conforms to the provisions of Directive 2006/42/EC. Compliance with the open provisions and verification of the correct installation must be confirmed in the delivery certificate of the declaration of installation (included in documentation). Warranty and Guarantee Conditions Our sale and delivery conditions will be applicable. These conditions have been made available to customers, and customers have been made aware of them at the time of order completion. 4 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

General Product overview and functional description 1 1.1 Product overview and functional description A Cyclone container E Connections for suction hoses I Sensor B Gate valve F Adjustable foot J Upper part of gravity shaft C Filling level sensor G Channel feed screw K Geared motor D Cyclone cover H Bottom part of gravity shaft L Expansion switch cabinet The Froling pellet suction system GA 130-350kW consists of 2 cyclone containers (A) on a feed screw which is mounted on the stoker unit of the boiler in order to supply it with pellets. The cyclone containers are filled alternately with pellets from the store via their own discharge system (e.g. Froling pellet suction system RS4 / RS8). Each cyclone container has a filling level sensor (C), which ends the suction process when the cyclone container is full. Sensors (I) are located in the bottom part of the gravity shaft (H), which respond when there are no more pellets in the cyclone container. Subsequently, the sensors close the associated cyclone container using the gate valve (B) and the suction process for filling the cyclone container is started. The gate valve therefore enables the suction process during operation. In normal operation, one of the gate valves below the cyclones is always open and supplies the feed screw with pellets. This ensures that the boiler is supplied with pellets at all times, thus guaranteeing reliable 24h full load operation (depending on type of boiler used). Installation and Operating Instructions M1740015_en 5

2 Safety Hazard levels of warnings 2 Safety 2.1 Hazard levels of warnings This documentation uses warnings with the following hazard levels to indicate direct hazards and important safety instructions: DANGER The dangerous situation is imminent and if measures are not observed it will lead to serious injury or death. You must follow the instructions! WARNING The dangerous situation may occur and if measures are not observed it will lead to serious injury or death. Work with extreme care. CAUTION The dangerous situation may occur and if measures are not observed it will lead to minor injuries or damage to property. 2.2 Permitted uses The Froling Pellet suction system GA 130-350kW is intended solely for the loading of wood pellets for Froling boilers which are listed in the Area of Application section. For the loading of wood pellets from the store to the Froling Pellet suction system GA 130-150kW, only the discharge systems that are listed in the Area of Application section may be used. Only use fuels specified in the Permitted fuels section. The unit should only be operated when it is in full working order. It should be operated in accordance with the instructions, observing safety precautions, and you should ensure you are aware of the potential hazards. The inspection and cleaning intervals in the operating instructions should be observed. Ensure that any faults which might impair safety are rectified immediately. The manufacturer or supplier is not liable for any damage resulting from non-permitted uses. 6 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Safety Permitted uses 2 DANGER If the device is used incorrectly: Incorrect use of the system can cause severe injury and damage. When operating the system: Observe the instructions and information in the manuals Observe the details on procedures for operation, maintenance and cleaning, as well as troubleshooting in the respective manuals. Any work above and beyond this (e.g. servicing) must be carried out by a heating engineer approved by Fröling Heizkessel- und Behälterbau GesmbH or by Froling customer services 2.2.1 Area of application Permitted boilers The Froling Pellet suction system GA 130-350 may only be used in conjunction with the following Froling boilers: Wood chip and pellet boilers T4 130-150 Wood chip and pellet boilers TX 150-250 Wood chip and pellet boilers TI 350 Turbomat TM 150-320 Permitted discharge systems The Froling Pellet suction system GA 130-350 may only be used in conjunction with the following Froling discharge systems: RS4 pellet suction system RS8 pellet suction system E3 pellet mole Suction screw system Pellet bag silo types 7-50 NOTICE Each cyclone container needs its own discharge system, therefore two discharge systems are always required. The discharge systems must be the same type (e.g. 2x E3 pellet mole or 2x RS4 pellet suction system,...) Installation and Operating Instructions M1740015_en 7

2 Safety Permitted uses 2.2.2 Permitted fuels Wood pellets Note on standards Wood pellets made from natural wood with a diameter of 6 mm EU: Fuel acc. to EN ISO 17225 - Part 2: Wood pellets class A1 / D06 and/or: ENplus / DINplus certification scheme General note: Before refilling the store, check for pellet dust and clean if necessary. 2.3 Qualification of staff 2.3.1 Qualification of assembly staff CAUTION Assembly and installation by unqualified persons: Risk of personal injury and damage to property During assembly and installation: Observe the instructions and information in the manuals Only allow appropriately qualified personnel to work on the system Assembly, installation, initial startup and servicing must always be carried out by qualified personnel: - Heating technician / building technician - Electrical installation technician - Froling customer services The assembly staff must have read and understood the instructions in the documentation. 2.3.2 Personal protective equipment for assembly staff You must ensure that staff have the protective equipment specified by accident prevention regulations. For transportation, setup and assembly: - suitable work wear - protective gloves - sturdy shoes (min. protection class S1P) 8 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Safety Qualification of staff 2 2.3.3 Qualification of operating staff CAUTION If unauthorised persons enter the installation room / boiler room: Risk of personal injury and damage to property The operator is responsible for keeping unauthorised persons, in particular children, away from the system. Only trained operators are permitted to operate the unit. The operator must also have read and understood the instructions in the documentation. 2.3.4 Protective equipment for operating staff You must ensure that staff have the protective equipment specified by accident prevention regulations. For inspection and cleaning: - suitable workwear - protective gloves - sturdy shoes Additional for operating: - Hearing protection (sound level > 70 db) - Protective goggles 2.4 Design information Carrying out modifications to the system and changing or deactivating safety equipment is prohibited. Always comply with all fire, building, and electrical regulations when installing or operating the system, in addition to following the operating instructions and mandatory regulations that apply in the country in which the system is operated. 2.4.1 Standards The system must be installed and commissioned in accordance with the local fire and building regulations. The following standards and regulations should be observed in any case: ÖNORM / DIN EN 60204 Safety of machines; Electrical equipment of machines, Part 1: General requirements TRVB H 118 ÖNORM H 5170 Technical directives for fire protection/prevention (Austria) Construction and fire protection requirements (Austria) Installation and Operating Instructions M1740015_en 9

2 Safety Design information ÖNORM H 5190 EN ISO 13857 Heating systems - Acoustic insulation Safety of machines; Safety distances for maintaining a safe distance from hazardous areas 2.4.2 Requirements at the installation site CAUTION Noise pollution during operation of the pellet suction system Due to the suction of the pellets in the cyclone container, the system generates a high level of noise. Therefore: Install the pellet suction system only in areas which are suitable for high levels of operational noise. Wear ear protection when working in the installation room All walls and load-bearing elements must support the static load. The structural requirements may need to be discussed with a structural engineer. Local fire regulations must be respected. Water lines should not be located in close proximity to the pellet store or the feeder units due to the dangers posed by condensation and bursting water pipes. NOTICE! Observe the additional requirements at the installation site according to the instructions for the boiler used! NOTICE! Observe the information regarding the equipment of the pellet store according to the instructions for the discharge system! 10 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

2 Safety Safety devices 2.5 Safety devices Safety equipment Safety function Gate valve: The gate valve closes the cyclone container when the sensor detects that no more pellets are present in the cyclone container, therefore enabling the suction during operation Safety switch, upper part of gravity shaft: Protection against access to the danger area of the dosing screw when the system is switched on If the inspection cover is opened, the system is switched off via the safety switch The power supply remains switched on Rotary valve: Burn back protection system (BPS) directly below the top of the gravity shaft. During the heating up phase, after loading has taken place and in the event of a fault, it reliably disconnects the discharge and infeed devices, preventing fire from spreading to the fuel store. Water Sprinkler System: Self-activating extinguisher system to limit burn back around the top of the gravity shaft. If the temperature in the top of the gravity shaft rises above 95 C, the valve of the sprinkler system opens, water flows out and prevents the fire from spreading to the fuel store. 2.6 Residual risks The suction system has been designed and built to comply with the relevant safety directives. Nevertheless by the nature of its operation and function, there are residual risks which cannot be eliminated completely. Installation and Operating Instructions M1740015_en 11

2 Safety Residual risks DANGER When working on electrical components: Risk of electrocution! When work is carried out on electrical components: Only have work carried out by a qualified electrician Observe the applicable standards and regulations Work must not be carried out on electrical components by unauthorised persons DANGER When working on the unit with a live power supply: Serious injury possible due to automatic startup! When working on the system or in the store, it is essential that the five safety directives are followed: Disconnect all poles on all sides Secure so that it cannot be switched on again Check that there is no power Earth and short circuit Cover any adjacent live parts and limit area of risk CAUTION If unauthorised fuel types are used: Non-standard fuels can cause stiffness and block the system, resulting in the failure/breakage of components. Therefore: Only use fuels specified in the "Permitted uses" section of these operating instructions. CAUTION Crushing hazard when operating the suction system without protective cover for gate valve Therefore: Ensure that the protective cover for the gate valve is fitted 12 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Technical information Dimensions 3 3 Technical information 3.1 Dimensions Item Description Unit Suction system with feed screw 15 Suction system with feed screw 30 α Angle of feed screw 15 30 H1 Overall height mm 1900 2200 H2 Height, upper part of gravity shaft mm 625 625 L Length of feed screw to centre of upper part of gravity shaft mm 2400 1650 D Diameter of cyclone container mm 480 Installation and Operating Instructions M1740015_en 13

3 Technical information Technical specifications 3.2 Technical specifications Description Power supply to control cabinet Power consumption of suction turbine Suction system with feed screw 15 with feed screw 30 230V / 50Hz / fused C16A 1850 W Weight, complete unit 270 kg 260 kg Capacity of each cyclone container (gross) Capacity of each cyclone container (net) Feed screw drive Description T4 130-150 TM/TX 150-250 Power supply to geared motor 205 l 110 kg 400 V / 50 Hz TM 320 TI 350 Power consumption of geared motor 0.25 kw 0.37 kw Speed of screw 4.5 rpm 10.5 rpm Safety limit switch 24 VDC 14 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Installation Transport 4 4 Installation 4.1 Transport The product is delivered on pallet(s). NOTICE Possibility of damage to components if handled incorrectly Follow the transport instructions on the packaging Transport components with care to avoid damage Protect components against damp Pay attention to the pallet's centre of gravity when lifting 4.2 Temporary storage If the system is to be assembled at a later stage: Store components at a protected location, which is dry and free from dust Damp conditions and frost can damage components, particularly electric ones! 4.3 Materials supplied A Feed screw, complete D Cardboard box containing accessories B 2 cyclone containers with gate valve E H3200 only: Expansion switch cabinet for H3200 with mounting bracket C 2 cyclone covers with bracket for suction turbine and connection of suction hoses Not illustra ted SPS only: Add-on module for SPS Installation and Operating Instructions M1740015_en 15

4 Installation Installation positions 4.4 Installation positions CAUTION Noise pollution during operation of the pellet suction system Due to the suction of the pellets in the cyclone container, the system generates a high level of noise. Therefore: Install the pellet suction system only in areas which are suitable for high levels of operational noise. Wear ear protection when working in the installation room The position of the suction system in relation to the boiler can be flexibly selected using the pivot point above the rotary valve. The pellet discharge system can therefore be positioned as required. Some of the possible installation positions are illustrated in the following: NOTICE! These figures show the 15 pellet discharge system. For a 30 pellet discharge system, the space required is smaller! Installation position T4: Depending on which side the stoker is mounted, the pellet suction system can occupy any position between item A and item B. 16 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

4 Installation Installation positions Installation positions TM / TX / TI The following installation positions are shown for the Turbomat TM 150; these positions also apply for TM 200-320, TX and TI The pellet suction system can occupy any position between item A and item B. Installation and Operating Instructions M1740015_en 17

4 Installation Installing the pellet suction system 4.5 Installing the pellet suction system The installation of the pellet suction system is illustrated below using the Froling T4 150 wood chip boiler as an example. Installation of the Froling TX 150-250 wood chip boiler, TI 350 and Turbomat TM 150-320 is carried out in the same manner. Install the feed screw on the stoker of the boiler For 30 suction system: Install the flange of the extension piece (A) at the upper part of the gravity shaft to the flange of the stoker For 15 suction system: Install the flange at the upper part of the gravity shaft to the flange of the stoker Align the feed screw, as required, and secure it to the floor of the store room using the adjustable foot NOTICE! Position the feed screw so that the cyclone container sits exactly perpendicular to the flanges Fixing the adjustable foot: Make 1 hole in the floor on the left and right Drill the holes marked Drill diameter 15 mm Min. drill depth 105 mm Insert the heavy load anchors into the bore holes and tighten with a spanner (SW 17 mm) 18 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Installation Installing the pellet suction system 4 Install safety switch (A), thermal discharge safety device (B) and elbow (C) to upper part of gravity shaft Install 2 sensors (D) to the sides of the bottom part of the gravity shaft Install both cyclone containers to upper part of gravity shaft The quick release fasteners determine how the cyclone cover is to be fitted later on position the cyclone container so that the hose line connections on the cyclone cover are pointing in the desired direction Check that the cyclone container lies horizontally if necessary, correct the alignment of the feed screw Installation and Operating Instructions M1740015_en 19

4 Installation Installing the pellet suction system Install 1 filling level sensor each with seal washer (A) and space washer (B) to both cyclone containers Fit the cyclone cover with bracket for the suction connections onto the cyclone container and secure it using the quick release fasteners on the side Check that the connections for the hose lines (A) are pointing in the desired direction If required, correct the position of the cyclone container 20 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Installation Installing the pellet suction system 4 Remove the screws at the duct of the feed screw Fit securing plate for the controller at the duct with the screws previously removed The securing plate can also be installed so that the edge faces upwards (A) Fit control box to the securing plate Fit cover to the control box Installation and Operating Instructions M1740015_en 21

4 Installation Installing the pellet suction system 4.5.1 Install hose lines NOTICE! Observe the installation instructions for hose lines! See "Installation instructions for hose lines" [page 23] NOTICE! Do not mix up the connections for the suction hose and return air line! Remove the cover on the brackets for the suction connections Install suction hose (A): NOTICE! The suction hose must be in a single section! Fit suction hose at the inlet nozzle (B) with a hose clip The inlet nozzle for the suction hose is identified by a sticker labelled Pellets! Fit the return-air line (C): Fix the suction hose to the suction turbine (D) with a hose clip Lay hose lines to the suction point and cut to length, if required Refit the covers The exhaust air grille (E) on both sides of the covers must not be obscured! 22 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Installation Assembly information for hose lines 4 4.6 Assembly information for hose lines Please note the following with regard to the hose lines used in Froling vacuum discharge systems: Do not kink the hose lines! Minimum bending radius = 30cm Lay the hose lines as straight as possible! Sagging lines can lead to so-called pockets, which may cause problems with the pellet feed. Lay the hose lines in short sections away from walking areas Hose lines are not UV-proof. Therefore: Do not lay the hose lines outdoors Hose lines are suitable for temperatures up to 60 C. Therefore: Hose lines must not come into contact with flue gas pipes or uninsulated heating pipes. Hose lines must be earthed on both sides to ensure that no static charge builds up as a result of transporting the pellets. The suction hose to the boiler must be in a single section The return-air line can be made up of several sections, but consistent potential equalisation must be established throughout the line For systems over 130 kw, only suction hoses with PU inlet may be used due to the increased load. Installation and Operating Instructions M1740015_en 23

4 Installation Assembly information for hose lines 4.6.1 Potential equalisation When connecting the hose lines to the individual connections, ensure there is consistent potential equalization throughout the line Expose approximately 3 cm of the earth wire at the end of the hose line TIP: Slit the insulation open along the wire with a knife Bend the earth wire inwards in a loop This prevents the earth wire from being damaged by the pellet movement. Slide the hose clamp onto the hose line Attach the hose line to the connector Ensure that contact is established between the earth wire and the connector Secure the hose line with a hose clamp 24 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

1 3 5 7 9 11 13151719 212325272931333537 Installation Connecting the system 4 4.7 Connecting the system 4.7.1 Electrical connection DANGER When working on electrical components: Risk of electrocution! When work is carried out on electrical components: Only have work carried out by a qualified electrician Observe the applicable standards and regulations Work must not be carried out on electrical components by unauthorised persons Lay cables of components to control cabinet Lay the cables so that nobody will trip over them! Do not lay the cable over or around sharp edges! Wire the connections according to the wiring diagram 4.7.2 Power supply Lay the mains cable to the expansion switch cabinet Connect the mating plug (included) to the mains cable Flexible sheathed cable must be used for the wiring; this must be of the correct size to comply with applicable regional standards and regulations The power supply line (mains connection) must be fitted with a C16A fuse by the customer. Connect the power supply cable at the mains connection provided 4.7.3 Connecting the sprinkler system Connection should only be carried out by authorised technicians. When connecting the sprinkler system, please also note: Put a stopcock and bolted joint in front of the thermal discharge safety device Important for easy dismantling in the event of maintenance work! Installation and Operating Instructions M1740015_en 25

4 Installation Connecting the system 4.7.4 Wiring Expansion switch cabinet H3200 Expansion switch cabinet SPS BUS connection 1 3 5 7 9 11 13151719 212325272931333537 Suction turbine Power supply Power supply Filling level sensors Cyclone container Bag silo vibration motor Sensors Bottom part of gravity shaft Gate valve Connection box for pellet mole For H3200: Establish the BUS connection (item A) for the controller (wood chip module or hydraulic module) For SPS: Connect BT9100 module (on the boiler control cabinet) via X2X link (item no. 18947/18948/18949) with BR9300 module (on the expansion switch cabinet item B) according to wiring diagram Wire the components listed on the expansion switch cabinet Item 1: Cyclone container 1 Item 2: Cyclone container 2 26 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Installation Connecting the system 4 Cyclone container 1 1 3 5 7 9 1113151719212325272931333537 37 Suction turbine 1 release 1 (pellet mole, vibration motor) sensor 1 transmitter receiver Filling level sensor cyclone container 1 gate valve 1 brown blue yellow green brown blue yellow green brown blue brown black blue brown blue white blue black yellow brown red green Wire the components as shown in the figure Cyclone container 2 1 3 5 7 9 111315171921232527293133353723252729313335 Suction turbine 2 release 2 (pellet mole, vibration motor) transmitter sensor 2 receiver filling level sensor cyclone container 2 gate valve 2 brown blue yellow green brown blue yellow green brown blue brown black blue brown blue white blue black yellow brown red green Wire the components as shown in the figure Installation and Operating Instructions M1740015_en 27

5 Operating the system Initial start-up 5 Operating the system 5.1 Initial start-up NOTICE Efficient operation can only be guaranteed if the system is set by specialist staff and the default factory settings are observed. Therefore: Initial startup should be carried out with an installer approved by Fröling Heizkessel- und Behälterbau GesmbH or with Froling customer services Description of cyclone container: (1): Cyclone container 1 (2): Cyclone container 2 Configure the pellet suction system according to the information contained in the H3200 boiler controller and SPS operating instructions. NOTICE! Caution: As soon as the cyclone containers are activated, the suction process starts, even if the boiler is in Boiler OFF status! 5.2 During operation The pellet suction system is controlled by the boiler controller. CAUTION Noise pollution during operation of the pellet suction system Due to the suction of the pellets in the cyclone container, the system generates a high level of noise. Therefore: Install the pellet suction system only in areas which are suitable for high levels of operational noise. Wear ear protection when working in the installation room NOTICE! When switching the suction process from cyclone container 1 to cyclone container 2, there can be a temporary undersupply of pellets, however, this does not lead to a system fault! 28 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Servicing Maintenance schedule 6 6 Servicing 6.1 Maintenance schedule W 1 W M Q 3 2 M Q F 4 F W = weekly, M = monthly, Q = quarterly, F = prior to each fill of the store No. Element Interval Operation 1 Motor / gears W Carry out a general visual inspection of drive motors No major oil leaks should be visible. 2 Gravity shaft / safety switch M Function test of the safety switch: Open the inspection cover of the gravity shaft The system should switch off immediately. Check the inlet area for material build-up and clean where necessary. Close gravity shaft cover Check fault message on the controller 3 Sprinkler system Q Sprinkler system function test: Open ball valve only slightly Heat the sensor to above 95 C (e.g. with a lighter) The valve should open and water should flow out. Press the button on the valve briefly Water should flow out Check the opening of the sensor for dirt (dust, fuel, etc.) and clean if necessary 4 Flange bearing F Lubricate bearing at lubricating nipple with grease gun Hose lines F Check hose lines for damage and wear and replace if necessary Installation and Operating Instructions M1740015_en 29

6 Servicing Maintenance contract 6.2 Maintenance contract Long service life with a maintenance contract! Regular maintenance and servicing by a qualified technician will ensure a long, trouble-free service life for the whole system. For this reason, FROLING offers a maintenance contract, which optimises operating safety. Please see the details in the accompanying guarantee certificate. Your Froling customer service office will also be happy to advise you. 30 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com

Troubleshooting Procedure for fault messages 7 7 Troubleshooting The term "fault" is a collective term for warnings, errors and alarms. The boiler reacts differently to the three types of message: WARNING ERROR ALARM In case of warnings the status LED flashes orange and the boiler initially continues controlled operation. When there is an error, the status LED flashes red, the boiler follows the shutdown procedure and remains in Fault status until the problem is resolved. An alarm triggers a system emergency stop. The status LED flashes red, the boiler switches off immediately and the heating circuit controller and pumps remain active. A window with the corresponding fault text will also appear. Pressing the Cancel icon takes you back to the basic display. If the quick select icon and the warning triangle flash alternately, there is still a fault. The Error display button will now appear in the quick menu. 7.1 Procedure for fault messages When a fault occurs a window with the corresponding fault text will appear. The right arrow will take you to possible causes of the fault. Tapping Solution will also display action to be taken to resolve the problem. If there are several options available, these will be listed one below the other. NOTICE! For more information about troubleshooting see operating instructions for the boiler controller. Once the fault has been resolved, tap the Cancel icon to return to the basic display. Installation and Operating Instructions M1740015_en 31

8 Appendix Addresses 8 Appendix 8.1 Addresses 8.1.1 Address of manufacturer FRÖLING Heizkessel- und Behälterbau GesmbH Industriestraße 12 A-4710 Grieskirchen AUSTRIA TEL 0043 (0)7248 606 0 FAX 0043 (0)7248 606 600 INTERNET www.froeling.com 8.1.2 Address of the installer Stamp 32 Fröling GesmbH A-4710 Grieskirchen, Industriestraße 12 www.froeling.com