Proposed Bond Construction Projects

Similar documents
Design Presentation. Chief Operations Officer Willie Burroughs

Master Project List Report

Forest Hills Facilities Plan

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

New High School Concept

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Master Facility Planning Update School Board Meeting May 26, 2016

Doing Business with Bartlett Cocke General Contractors

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Warren County Schools Plant and Operations

2014 Bond Project Guide

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Briar Crest Elementary

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

5 Year Capital Improvement Plan Update

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Mt. Diablo Unified School District 2010 Measure C Facilities Improvement Program

2014 Bond District-wide Facility Repairs

NYC Department of Education

Long-Range School Facility and Technology Improvement Plan

2014 Bond District-wide Facility Repairs

NYC Department of Education

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Oconomowoc Area School District Facility Construction Update August 25, 2017

NYC Department of Education

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

William S. Hart Union High School District. MODERNIZATION UPDATE May 7, 2008

Measure R Summary Through February 28, 2015 Board Meeting March 17, 2015

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Measure R Summary Through April 30, 2015 Board Meeting May 19, 2015

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Oxford Hills School District Capital Renewal Plan Updated March 2017

SCHEMATIC DESIGN PRESENTATION

Updated: 8/16/ Facilities Profile

MEASURE A. Completed Bond Projects

School District of New London. Community Listening Session & Referendum Consideration

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Ohlone College Measure G Project Scope Revisions

2005 Proposition II. Bond Construction & Projects Report

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Minneapolis Sculpture Garden Reconstruction and Cowles Conservatory Renovation. 6:00 p.m.

Facilities Management Services

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS

Measure W Review. East Nicolaus High School District March 9, 2017

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO /

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

Group Presenta-ons. Mee#ng #6 December 14, 2017

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Final Report from the Measure N Bond Oversight Committee February 5, 2014

Garden Grove Unified School District Board of Education. April 16, 2013

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

Measure R Measure R Interest Measure R Refunding

Edward Jenner Elementary Academy of the Arts

Facilities Management State-Funded and Billable Services

Community Unit School District 200 Facilities

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

LONG-RANGE FACILITIES PLAN

Exhibit A: Project Scope

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes

Tillamook High School Bond Projects

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Athletic Facilities Needs Assessment

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Updated: 5/6/16. Facility and Property Information Package

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

West Hartford Public School District

Comprehensive Study N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

E-SPLOST V. Facts and Information. August 2018

Telecommunications Survey

Community Response Buchanan Elementary. December 13, 2016

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm

Design Review of Facility Improvement Projects

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Chabot College: Plan Kickoff and Visioning Session with Student Senate

PROCTOR TERRACE ELEMENTARY SCHOOL

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

Beaufort County Community College. Maintenance and House Keeping Plan

30% Design Community Meeting

Charles W Earle Elementary School

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Capital Improvement Plan

Transcription:

Proposed Bond Construction Projects

The Facility Planning Process * September, 2006: - Board of Education established the Facilities and Asset Review Committee with the responsibility to evaluate all district facilities, their condition and asset value * November, 2006 April 2007: - The committee, made up of board members, parents, staff and community members, visited every district facility.

The Facility Planning Process (continued) April 2007-May 2007 The committee produced a Comprehensive report, citing: Existing facility conditions Possible assets Additional facility needs that are currently unmet

Issues Identified in the report Along with critical items such as much needed repairs to grounds and building infrastructure, several Site Administrators pointed out the need for Special Classroom/Co- Curricular facilities at various schools. With the total cost of the critical and special requests, the total quickly grew in excess of $430 Million. Priorities were identified and the final amount for the critical core needs was reduced to $265 Million, which will be on Measure Y. The identified Special Facilities requests will total approximately $90 Million which will be on Measure Z.

Following this slide are slides for the individual school sites. The first slide identifies those projects that were completed under Measure R (the 1998 bond issue) and state matching funds. The second slide identifies those projects that are proposed for the new bond issue. The total cost includes hard construction costs and soft costs( archtectural, regulatory and contingency costs).

Adams Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Abatement costs Playground Equipment

Adams Elementary Bond Projects Measure Y Hard Construction Costs: $2,786,572 Soft Costs: $1,645,023 Total: $4,431,595 Fire Alarm Requirements New Classroom Ceilings & Lighting New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Replace Damaged Exterior Wood Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement Buildings/Playfield Retaining Wall Repairs

Anza Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Painting, Interior Voice/Video/Data Access Compliance Cal-Cor Cor Replacement Playground Equipment

Anza Elementary Bond Projects Measure Y Hard Construction Costs: $3,804,205 Soft Costs: $2,245,774 Total: $6,049,979 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovations New Doors & Window System New Roofing Flooring Replacement Gutter Replacement Plaster/Painting Handicap Access Requirements Replace Damaged Exterior Wood Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Arlington Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Cal-Cor Cor Replacement Playground Equipment

Arlington Elementary Bond Projects Measure Y Hard Construction Costs: $2,040,938 Soft Costs: $1,204,847 Total: $3,245,785 Fire Alarm Requirements New Classroom Ceilings & Lighting New Door & Window System New Roofing Gutter Replacement Replace Damaged Exterior Wood Handicap Access Requirements Flooring Replacement at Portables Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Arnold Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Arnold Elementary/LAUNCH Preschool Bond Projects Measure Y Hard Construction Costs: $2,161,478 Soft Costs: $1,276,007 Total: $3,437,485 Fire Alarm Requirements New Classroom Ceilings & Lighting New Door & Window System Gutter Replacement at Portables Clean and Seal Exterior Brick Paint Interior Paint Exterior of Portables Replace Damaged Exterior Wood Replace Flooring at Portables Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Carr Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Carr Elementary Bond Projects Measure Y Hard Construction Costs: $3,987,256 Soft Costs: $2,353,837 Total: $6,341,093 Fire Alarm Requirements New Classroom Ceilings & Lighting New Doors & Window System New Roofing Gutter Replacement Painting Portables Replace Damaged Exterior Wood Flooring Replacement in Portables Replace 6 Leased Portables with New Facilities Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Edison Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Cal-Cor Cor Replacement Playground Equipment

Edison Elementary Bond Projects Measure Y Hard Construction Costs: $2,204,790 Soft Costs: $1,301,576 Total: $3,506,366 Fire Alarm Requirements New Classroom Ceilings & Lighting New Doors & Window System Gutter Replacement of Portables Painting of Portables Replace Damaged Exterior Wood Flooring Replacement in Portables Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Fern Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Addition/Renovatio ns Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Fern Elementary Bond Projects Measure Y Hard Construction Costs: $8,609,406 Soft Costs: $5,082,477 Total: $13,691,883 Fire Alarm Requirements Heating-New Boiler New Classroom Ceilings & Lighting New Doors & Window System, Annex only Gutter Replacement Plaster, Annex only Painting, Interior/Exterior Replace Damaged Exterior Wood 15 New Classrooms New Multipurpose/Kitchen 1 Pair of Restrooms Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Hickory Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Hickory Elementary Bond Projects Measure Y Hard Construction Costs: $3,513,554 Soft Costs: $2,074,191 Total: $5,587,745 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovation New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Replaced Damaged Exterior Wood Flooring Replacement inn Portables Demo 1 Classroom Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Lincoln Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovation Voice/Video/Data Access Compliance Cal-Cor Cor Replacement Playground Equipment

Lincoln Elementary Bond Projects Measure Y Hard Construction Costs: $2,590,895 Soft Costs: $1,529,509 Total: $4,120,404 Fire Alarm Requirements New Classroom Ceilings & Lighting Heating, Building A New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Painting of Portables Replace Damaged Exterior Wood Flooring Replacement, Building A & Portables Site Security Lighting Site Drainage Improvement Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Riviera Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Cal-Cor Cor Replacement Playground Equipment

Riviera Elementary Bond Projects Measure Y Hard Construction Costs: $2,729,555 Soft Costs: $1,611,365 Total: $4,340,920 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovations, Bldg. B New Doors & Window System Gutter Replacement, Portables Paint Exterior of Portables Replace Damaged Exterior Wood Replace 3 Leased Portables with New Facilities Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings Retaining Wall Repairs

Seaside Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Voice/Video/Data Access Compliance Playground Equipment

Seaside Elementary Bond Projects Measure Y Hard Construction Costs: $3,871,714 Soft Costs: $2,285,628 Total: $6,157,342 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovation, Bldg. B/E New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Torrance Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Torrance Elementary Bond Projects Measure Y Hard Construction Costs: $2,205,675 Soft Costs: $1,302,098 Total: $3,507,773 Fire Alarm Requirements New Classroom Ceilings & Lighting Ceiling Replacement, Cafeteria Restroom Renovations, Bldg. D/E New Doors & Window System New Roofing Gutter Replacement Clean & Seal Exterior Brick Painting Interior/Exterior Replace Damaged Exterior Wood Flooring Replacement in Portables Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Towers Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Towers Elementary Bond Projects Measure Y Hard Construction Costs: $5,092,738 Soft Costs: $3,006,447 Total: $8,099,185 Fire Alarm Requirements New Classroom Ceilings & Lighting Plumbing/Site/Water/Gas Main Restroom Renovation, Bldg. G New Doors & Window System New Roofing Gutter Replacement, Portables Clean & Seal Exterior Brick Painting Interior/Exterior Replace Damaged Exterior Wood Replace 2 Leased Portables & 15 District Owned Portables with New Facilities Handicap Access Requirements Site Security Lighting Plumbing, Site Water & Gas Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Victor Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting, Interior Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Victor Elementary Bond Projects Measure Y Hard Construction Costs: $2,306,799 Soft Costs: $1,361,796 Total: $3,668,595 Fire Alarm Requirements New Classroom Ceilings & Lighting New Doors & Window System Gutter Replacement Clean and Seal Exterior Brick Painting, Interior/Exterior Flooring Replacement in Portables Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Walteria Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Voice/Video/Data Access Compliance Playground Equipment

Walteria Elementary Bond Projects Measure Y Hard Construction Costs: $4,270,836 Soft Costs: $2,521,245 Total: $6,792,081 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovations, Bldg. B/D/F New Doors & Window System Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement Replace 4 Leased Portables with New Facilities & Replace 1 Pair Restrooms Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Wood Elementary Items completed under Measure R with State Matching Funds Plumbing Heating Restroom Renovations Painting, Interior Floor Replacement Voice/Video/Data Access Compliance Playground Equipment

Wood Elementary Bond Projects Measure Y Hard Construction Costs: $3,257,638 Soft Costs: $1,923,114 Total: $5,180,752 Fire Alarm Requirements New Classroom Ceilings & Lighting Heating, Building F Restroom Renovations, Bldg. F New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement in Portables Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Yukon Elementary Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Painting Interior/Exterior Voice/Video/Data Access Compliance Playground Equipment

Yukon Elementary Bond Projects Measure Y Hard Construction Costs: $1,217,010 Soft Costs: $718,450 Total: $1,935,460 Fire Alarm Requirements New Classroom Ceilings & Lighting New Doors & Window System Ceiling Replacement, Cafeteria Gutter Replacement Painting, Interior/Exterior Painting or Portables Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Calle Mayor Middle Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Voice/Video/Data Cal-Cor Cor Replacement Access Compliance Science Labs

Calle Mayor Middle Bond Projects Measure Y Hard Construction Costs: $3,195,412 Soft Costs: $1,886,380 Total: $5,081,792 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovations, Bldg. A New Doors & Window System Ceiling Replacement, Cafeteria New Roofing Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Casimir Middle Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Addition/ Renovations Voice/Video/Data Cal-Cor Cor Replacement Access Compliance Science Labs

Casimir Middle Bond Projects Measure Y Hard Construction Costs: $3,024,116 Soft Costs: $1,785,257 Total: $4,809,373 Fire Alarm Requirements New Classroom Ceilings & Lighting Heating, Bldg. D Restroom Renovations, Bldg. D New Doors & Window System Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement, Bldg. D and Portables Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Hull Middle Items completed under Measure R with State Matching Funds Voice/Video/Data Science Labs

Hull Middle Bond Projects Measure Y Hard Construction Costs: $14,249,624 Soft Costs: $8,412,123 Total: $22,661,747 Construct New Middle School Campus

Jefferson Middle Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Floor Replacement Voice/Video/Data Access Compliance

Jefferson Middlle Bond Projects Measure Y Hard Construction Costs: $2,835,879 Soft Costs: $1,674,133 Total: $4,510,012 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovations, Bldg. C/D New Doors & Window System Gutter Replacement, Portables Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement in Portables 2 New Science Labs Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Lynn Middle Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Voice/Video/Data Cal-Cor Cor Replacement Access Compliance Science Labs

Lynn Middle Bond Projects Measure Y Hard Construction Costs: $3,821,527 Soft Costs: $2,256,000 Total: $6,077,527 Fire Alarm Requirements New Classroom Ceilings & Lighting Restroom Renovations, Bldg. A/B New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement Demo 2 Rooms Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Madrona Middle Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Floor Replacement Voice/Video/Data Cal-Cor Cor Replacement Access Compliance Science Labs

Madrona Middle Bond Projects Measure Y Hard Construction Costs: $3,178,890 Soft Costs: $1,876,626, Total: $5,055,516 Fire Alarm Requirements Electrical, Bldg. G New Classroom Ceilings & Lighting Plumbing, Bldg. G Heating, Bldg. G. New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement at Portables Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Magruder Middle Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Voice/Video/Data Access Compliance Science Labs

Magruder Middle Bond Projects Measure Y Hard Construction Costs: $5,891,154 Soft Costs: $3,477,784 Total: $9,368,938 Fire Alarm Requirements Electrical, Bldg. C New Classroom Ceilings & Lighting Plumbing, Bldg. C Heating, Bldg. C New Doors & Window System Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement, Bldg. C and Portables Replace 13 Leased Portables with New Facilities Handicap Access Requirements Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replace Irrigation Replacement at

Richardson Middle Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting, Interior/Exterior Floor Replacement Voice/Video/Data Access Compliance

Richardson Middle Bond Projects Measure Y Hard Construction Costs: $3,480,035 Soft Costs: $2,054,404 Total: $5,534,439 Fire Alarm Requirements New Classroom Ceilings & Lighting New Doors & Window System New Roofing Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Handicap Access Requirements 2 New Science Labs Replace 2 Leased Portables with New Facilities Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replace at Buildings

North High Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Voice/Video/Data Access Compliance

North High Bond Projects Measure Y Hard Construction Costs: $21,762,141 Soft Costs: $12,847,062 Total: $34,609,203 Fire Alarm Requirements Electrical, 4 Bldgs. New Classroom Ceilings & Lighting Plumbing, 4 Bldgs. Plumbing/Site/Gas/Water Mains Heating, 21 Buildings Restroom Renovations, 8 pair New Doors & Window Systems New Roofing, 16 Bldgs. Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement Handicap Access Requirements Elevators, 2 Bldgs. Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

South High Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Voice/Video/Data Access Compliance

South High Bond Projects Measure Y Hard Construction Costs: $17,185,509 Soft Costs: $10,145,293 Total: $27,330,802 Fire Alarm Requirements Electrical, 5 Bldgs. New Classroom Ceilings & Lighting Plumbing, 2 Bldgs/Drinking Fountains Heating, 5 Bldgs. Restroom Renovations, 1.5 Pair New Doors & Window System Roofing, 14 Bldgs. Gutter Replacement Clean and Seal Exterior Brick Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement Handicap Access Requirements Elevators, 5 Bldgs. Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Torrance High Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting, Interior Floor Replacement Voice/Video/Data Access Compliance Elevators, 4

Torrance High Bond Projects Measure Y Hard Construction Costs: $16,391,577 Soft Costs: $9,676,604 Total: $26,068,181 Fire Alarm Requirements Electrical, 7 Bldgs. New Classroom Ceilings & Lighting Plumbing, Drinking Fountains Plumbing/Site/Water/Gas Mains Heating, 8 Bldgs. Restroom Renovations, 10 pair New Doors & Window System New Roofing, 8 Bldgs. Gutter Replacement Plaster/Painting Painting, Interior Replace Damaged Exterior Wood Flooring Replacement, 8 Bldgs. Handicap Access Requirements Elevator, Bldg. F Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

West High Items completed under Measure R with State Matching Funds Electrical Plumbing Heating Restroom Renovations Painting Interior/Exterior Voice/Video/Date Access Compliance Elevators, 3

West High Bond Projects Measure Y Hard Construction Costs: $15,055,579 Soft Costs: $8,887,911 Total: $23,943,490 Fire Alarm Requirements New Classroom Ceilings & Lighting Heating, Replace Boilers Restroom Renovations, 4 Pair New Doors & Window System New Roofing, 8 Bldgs. Plaster/Painting Painting, Interior Flooring Replacement, 2 Cafeterias Site Security Lighting Site Drainage Improvements Asphalt Replacement Concrete Replacement Irrigation Replacement at Buildings

Elementary Schools New Bond Projects Measure Z (1) Music/Arts Room $2,385,510 Add Sewer/Water to Portable Classrooms $2,331,511 Covered Walkways $13,624,347 Field Irrigation $1,260,972 TOTAL $19,602,340

Middle Schools New Bond Projects Measure Z (1) Science Lab $2,862,612 Covered Walkways $5,947,495 Field Irrigation $600,000 TOTAL $9,410,107

High Schools New Bond Projects Measure Z Upgrade Gym Buildings $48,915,678 Stadiums (North, South, Torrance) New Aluminum Seating Weather Track/Artificial turf $9,064,938 West High School (Artificial Turf)$300,000 Covered Walkways $3,120,998 Field Irrigation $400,000 Total $61,801,614