Deploying SET and ESeal Technology Using Coiled Tubing. Marcus Vondenstein

Similar documents
OVERVIEW SERVICES: Coiled Tubing Nitrogen Pressure Pumping Thru Tubing Tools

Table of Contents. 55 Foot Mast Trailer Tab 1. A Stops Tab 2. Bailers Tab 3. Bailer Bottoms See Tab 3. Baker Plugs See Tab 24. Broaching Tools Tab 4

How to Solve Your Long Lateral Problems. A Deep Well Services White Paper in Conjunction with SPE Penn State

FREEZE CASE HISTORY. 3-½ Tailpipe 7" packer 5-¾ open hole Lateral = 1500 ft

Innovating WHILE DRILLING. Geosteering advances keeping wellbores in sweet spot CONTRACTOR MPD & UBO SAND CONTROL MARCH/APRIL 2011

PowerReach Service: Hybrid Coiled Tubing & Jointed Pipe Technology. Fraser McNeil

InTang DOWNHOLE EQUIPMENT RENTAL $ 3, HINTON 4800' 2 7/8" PH6 TUBING

Better Oil Tools Africa General presentation

Novel Coiled Tubing Perforation Approach Avoids Overflushing in Multistage Hydraulic Fracturing Operations in a Horizontal Well

4. Deflection Tools and Technique

Wellbore Diagnostics & Evaluation Using Fiber-Optic Enabled Coiled Tubing. Leak Detection & Production Logging Case Studies

Optimizing coiled tubing composite plug milling in new wells with high differential pressures between zones

Expandable Well Technology. David Butler

COST EFFECTIVE PERMANENT VERIFIABLE PLUG AND ABANDONMENT. GLOBAL 24 HOURS

Cased Hole Division. Jimmy Mathis Cased Hole Manager Youngsville, LA. District

Drilling-with-Casing (DwC ) Overcoming Wellbore Stability Issues

Perforating and Pipe Recovery with Digital Slickline First Application in Colombia Ballena Field

Integrated Well Abandonment

Flowtools Middle East LLC

Figure 6- Capillary Installation

ICOTA Roundtable Retrievable Temperature Logging using DTS. October 20, 2011

TECHNICAL PUBLICATION

DYNAMICS WHILE DRILLING DWD SOLUTIONS LODESTARINT.COM

FISHING WITH THE AGITATOR SYSTEM

Hydraulic Workover Unit (HWU) Application in Down-hole Milling Operations in Niger Delta

DOWNHOLE VIDEO DIAGNOSTICS FISHING AND MILLING CHEMICALS AND DISPLACEMENTS WELLBORE CLEANOUT TOOLS DVD.WELL

1 SIX WAYS to Reduce Well Intervention Costs

RELAY. Digital Slickline System INTELLIGENT SLICKLINE CONVEYANCE FOR WELL INTERVENTION

John M. Karanikas Chief Technology Officer Salamander Solutions. Downhole Heating A New and Robust Re-Creation of a Proven Technology

Casing Gas Separator: A New Gas Separation Technology

Weatherford Drilling with Casing

Proven Friction Reduction, Improved Weight Transfer. Agitator Systems

Rejuvenation Instructions

COILED TUBING SERVICES & SOLUTIONS

READY RACK HOSE WASHER

BRING MORE CONFIDENCE TO LONG-LATERAL MILLOUTS WITH THE KLX ENERGY SERVICES HAVOK DOWNHOLE MOTOR SYSTEM

FLD = Furnished by Trane U.S. Inc. / Installed by Equipment Submittal Page 3 of 13

Integrated Cased-Hole Services. Maximum Well Performance

STORAGE ROLLER CABINETS & TOOL CHESTS...8 MODULES...12 FURNITURE SHOP...18 MAGNETIC ACCESSORIES...21 WORKSHOP TROLLEYS...22 METAL CHESTS...

Engineering Test Facilities Carrollton, Texas Halliburton. All Rights Reserved. IMPROVING COMPLETION RELIABILITY THROUGH TESTING

(12) Patent Application Publication (10) Pub. No.: US 2005/ A1. Starr et al. (43) Pub. Date: Sep. 22, 2005

GS OILTOOLS PRESENTATION

Tube Cleaners.

Integrated Applications of Fiber-Optic Distributed Acoustic and Temperature Sensing. Francisco Porturas, Ziebel, Norway

ReelDirection NOV Well Intervention and Stimulation Equipment

Agitator Systems Handbook

As the. continue overruns are evident in. Introduction. industry planned downhole optimization. operations. dynamics real. making and effectively

Getz Equipment Innovators 450 lb Dual Portable Dry Chemical Fill System

Vickers. Service Data. Piston Pumps. PVH57/63 Variable Displacement Piston Pump - 11 Design M-2206-S. Revised 11/01/97

PRODUCTION WELL SERVICES. Diagnose, Restore, and Rejuvenate Rig-Free

Professional Series. Chemical Feed System Model # US Patent No. 6,752,930 B2

General System Layout Sketch

Kinetics Controls & Innovation Ltd RIGLESS WELL INTEGRITY & INTERVENTION ISOLATIONS. kciltd.co.uk

Tube Cleaners.

Broadband Networked Drillstring For High-Definition Downhole Data, Along String Evaluation and System Integration

C. L. Brillon, ConocoPhillips Canada; R. S. Shafer, ConocoPhillips Company and A. A. Bello, Schlumberger

Downhole video technology

TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED EVAPORATOR BLOWER 25, 30, 40 & 50 TON LA300, LB360, 480 & 600 (50 Hz) PROVEN PERFORMANCE GENERAL FEATURING

SAVE THESE INSTRUCTIONS

Quick Shot Tube Cleaning System

Service Data Vickers. Piston Pumps. PVH98/106 Variable Displacement Piston Pump - 11 Design M-2208-S. Revised 05/01/97

ENCLOSED UNIT TECHNICAL MANUAL Items # &

MARK-COSTELLO WASTE STERILIZER SPECIFICATION SHEET

Helpful Tip: NOTE:

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

FD 90 / FD 95 Rotary Perforators

Technology, expertise, quality, and service. Slickline. Measurement and activation services

ComPact Air Drive II USER S MANUAL

an ISO 9001:2008 Registered Company ShortPac HEAT/COOL (05000-QUX-A/05000-VUX-A)

Service Data Vickers. Piston Pumps. PVH74/81 Variable Displacement Piston Pump - 11 Design M-2207-S. Revised 11/01/97

BASIL 6000 TUNNEL CAGE WASHER

SLICK-E-LINE COMBINING MECHANICAL SLICKLINE CAPABILITY WITH REAL TIME LOGGING ONE CREW. ONE LINE. ONE RIG-UP.

Fleck 7000 Sediment Filter Installation & Start-Up Guide

Weatherford Completions Key-Techs Overview. Manuel Molina Technical Sales Manager

High-Pressure Jet Kerf Drilling Shows Significant Potential To Increase ROP

FIBER-OPTIC SENSING TECHNOLOGIES

Fleck 5600 Carbon Filter Installation & Start Up Guide

Eldex Column Heater. Operator s Manual

Mapping the orientation of downhole sensing cables and control lines using an engineered hybrid distributed acoustic sensing system

WATER PUMP REQUESTED INFORMATION STANDARD PROCEDURE RAM Pickup 6.7L Eng 2500 STANDARD PROCEDURE - COOLANT AIR EVACUATION

Guidelines for the Safe Operation of Tubing Conveyed Perforating Systems

SpeedClean. Work Smarter NEW! Innovative cleaning products for maximum HVAC system efficiency. Innovative Maintenance Tools.

Electrode Boilers Model CEJS Steam

HEAT PUMP INSTALLATION MANUAL

Clean Water Made Easy

Installation & Operation Instructions

INSTALLATION INSTRUCTIONS

Reliability and Satisfaction

CORPORATE OVERVIEW A LT E R N AT I V E T H I N K I N G

raymagic quad Installation, Operation & Maintenance Manual

CWS Plus Sediment Filter Installation & Start Up Guide

Fleck 2510 SXT Catalox Installation & Start Up Guide

BOP Management System Information

STUDIO SERIES L226W, L226C, L228C, LS326W, LS326C, LS328C OWNER S GUIDE

6. Cooling System XCITING 400i. This chapter covers the location and servicing of the cooling system components for the KYMCO XCITING 400i.

HEATING AND AIR CONDITIONING

CASED HOLE SERVICES

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

Owner s Manual Refrigerated Compressed Air Dryers Model F-100

INSTALLATION INSTRUCTIONS

Transcription:

Deploying SET and ESeal Technology Using Coiled Tubing Marcus Vondenstein

Challenge Seal squeeze perforations to withstand high pressure frac operations. Regulatory Agency had suspended operations due to poor cement behind the production casing. Sidetracking or a replacement well not an economic option.

Value added Proven Results Restored wellbore integrity; preventing re-drill Benefits Deployed on coiled-tubing, eliminating need to mobilize additional equipment Met regulatory requirements for restoring casing integrity High-performance patch to withstand high frac pressures

CTU Deployable Patch Update Two more patches run on CT in Eagle Ford last Month! Both patches were installed on the same well in seven hours! Live Well: 3000 psi. 5-1/2 20 lb/ft Solution: 4-1/4 Patch(s) Length ~34 ft each

Intervention and Solid Expandables Repairing leaks due to: Corroded casing Parted / split casing Failed connections Accidental firing of perforating guns Damaged frac sleeves Leaking DV tools Production / Water control Injection control

CTU Deployed EsealHP Patch Patch Run History and Area

Required Equipment

Operator Coil Tubing Unit: 8,500 psi minimum working pressure 60,000 lb minimum overpull(at setting depth) Pump Unit: 8,500 psi minimum working pressure 0.1 bpm minimum pump rate Lubricator (if required)

Operator Coil Tubing Connector Hydraulic Disconnect for emergency release (to allow 15/16 in. ball pass through) Crossover to connect with ESeal Patch Crane (120 ft minimum lifting height)

Enventure ESeal Patch: Assembly (inner-string included) is made up in shop ready to RIH Up to 64 ft long 2-7/8 in. PH6, 2-3/8 in. PH6, or 1-1/2 in. Hydril CS box looking up

Enventure ESeal Patch: Two each 13/16 in. brass/aluminum balls Two each 15/16 in. brass/aluminum balls Two each 3 in. foam balls

Wellbore Preparations

Wellbore Preparations Set Composite Bridge Plug (best practice): 30 ftbelow the mid-point of leak for 30 ftlong patches 45 ftbelow the mid-point of leak for 60 ftlong patches Used for: Depth correlation Pressure test Expanded ESeal Patch after shoe is drilled out

RIH with dummy/cleanout BHA: Tapered/junk mill Casing scraper 12 ft pony collar String mill Wellbore Preparations

Wellbore Preparations If millingtook place(cement retainers, damaged pipe/connections), RIH with: Tapered mill String mill String Magnet Junk Basket NOTE:Pump sweeps. If setting depth is in the curve or lateral lay out a lubricant polymer pill on horizontal up to the kick-off point before POOH to run ESeal Patch.

Installation Execution

Conduct Safety Meeting

Execution Make up crossover Lift ESealPatch in vertical position using straps and lift plug

Execution Secure ESealPatch to the basket of the bucket truck and remove lift plug

Execution Make up ESealPatch to Hydraulic Disconnect of Coil Tubing under lubricator. Turn ESeal Patch counterclockwise. Apply final makeup torque using two pipe wrenches and a come-a-long chain with a torque gauge.

Lift ESeal Patch inside Lubricator Execution

Execution Make up Lubricator to the BOP stack Zero in Coil Tubing Gauge, open BOPs

Execution RIH with ESeal Patch at ~100 ft/min in vertical and ~60 ft/min through curve and horizontal (can be circulated on backside to assist running through curve and lateral). Tag Composite Bridge Plug. Space out for expansion.

Execution Drop and pump the 13/16 in. aluminum ball at 1.5 bpm. Land Ball with 2,500 psi Continue Pumping at.25 bpmto 6,000 psi. Take overpull test to 10,000 lb Continue expansion with 10,000 overpull and 6,000 psi

Expansion Operations When cone exits the top of ESeal Patch, pressure will bleed off to zero POOH with expansion assembly, close BOPs, low pressure test

Shoe Drillout

Shoe Drillout RIH with drilloutor milloutbha (mill or bit OD the same as drift of expanded ESeal Patch) Drill out (mill out) shoe as per Enventure sbest practices Do not drill out Composite Bridge Plug. Composite Bridge Plug will be used to pressure test expanded ESeal Patch against

Shoe Drillout Pressure test expanded ESeal Patch as per Operator s specifications Drill out (mill out) Composite Bridge Plug Circulate hole clean, POOH with drillout BHA Resume operations as per Operator s Program

Conclusion Solid Expandables Intervention: Patches and liners Permanent Mechanical Casing Repairs Adaptable Deployable on Coil Tubing Drilling or Work Over Rig Snubbing Unit

2015 ICOTA Roundtable Thanks for your time!