:!l!i i. Condensing 4"FrR3

Similar documents
INSTALLER'S GUIDE. ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES

IMPORTANT -- This Document is customer property and is to remain with this unit. Please return to service infi)rmation pack upon completion of work.

Condensing Units 4TTR4A/B Models

Installer s Guide. Condensing Units 18-AC71D1-5 ! WARNING

Installer s Guide Replacement Condensing Units 2TTA3

INSTALLER'S GUIDE. ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES. Condensing Units 2A7A8030, 036, 048, & 060C1000A

INSTALLER'S GUIDE. ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES. Condensing Units 2A7M A1000A

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTR6048-SF-1A. Split System Cooling 4TTR6048A1000A CAUTION CAUTION WARNING

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTR6024-SF-1B. Split System Cooling 4TTR6024A1000B CAUTION CAUTION WARNING

7/8 NO NO NO PROPELLER DIRECT / /230/1/ SPINE FIN /8 8 LBS., 0 OZ. YES 7/8 3/8

Service Facts. Split System Cooling 3.0 Ton 4A7A6036J-SF-1B-EN. January A7A6036J1000A

IMPORTANT -- This Document is customer property and is to remain with this unit. Please return to service information pack upon completion of work.

208/230/1/60 5/8 5/8 5/8 5/8 5/8 20 CLIMATUFF /230/1/

4TTV0024A1000B 4TTV0036B1000B 4TTV0048A1000B 4TTV0060A1000B 4TTV0061A1000B

4TTB3060D1000B 208/230/1/60 35 SCROLL /230/1/ /8

4A6H5042G1000A 208/230/1/ DURATION - SCROLL 3/4 208/230/1/ NO (Use BAYKSKT263) YES YES PROPELLER DIRECT

208/230/1/ CLIMATUFF /230/1/ YES NO NO PROPELLER 23-1 DIRECT / /230/1/ SPINE FIN

Cased Aluminum "Convertible" Coils 4TXCB003CC3HC** 4TXCB004CC3HC** 4TXCC005CC3HC** 4TXCC006CC3HC**

4TTR6036B1000A 208/230/1/ CLIMATUFF - SCROLL 3/4 3/4 3/4 3/4 3/4 208/230/1/ NO YES NO PROPELLER DIRECT

2/4TXCC037BC3HCA 2/4TXCB042BC3HCA 4TXCC044BC3HCA 2/4TXCC043BC3HCA 2/4TXCB048BC3HCA

Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTB6-SF-3. Split System Cooling 4TTB6048A1000A, 4TTB6049A1000A CAUTION

Installation Instructions

4A6H5049E1000B 208/230/1/ /8 7/8 7/8 7/8 DURATION 208/230/1/ /230/1/ SPINE FIN 13 LBS., 10 OZ. YES

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Installation Instructions

CAUTION. Check Equipment and Job Site. Clearance Requirements. Unpack Unit

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

4TTB3030D1000B 208/230/1/60 4TTB3036D1000B 208/230/1/ RECIP /230/1/ RECIP YES YES

Installation Instructions

INSTALLATION GUIDE. 4AC 14* ASA1 SERIES R-410a CONDENSING UNITS R-410A ATTENTION, INSTALLER! ATTENTION, USER!

Installation Instructions

G Series. G Series Air Coils Installation ti Manual ENCASED/UNCASED AIR COILS. Geothermal/Water Source Heat Pumps R-410A Refrigerant 2-5 Ton

TABLE OF CONTENTS. NOTE: Read the entire instruction manual before starting the installation. TROUBLESHOOTING... 13

CONDENSING UNITS SPLIT-SYSTEM COOLING 1.5 TO 5 TONS INSTALLATION INSTRUCTION MODELS H*DE018 THRU H*DE060 NOMENCLATURE GENERAL LIMITATIONS INSPECTION

38GHP AIR-COOLED MULTI SPLIT CONDENSING UNITS

WineZone Ceiling Mount Ductless Split 15

CONDENSING UNITS SPLIT-SYSTEM COOLING 6-1/3 TONS INSTALLATION INSTRUCTION MODELS H*DB076 NOMENCLATURE GENERAL LIMITATIONS INSPECTION REFERENCE

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS

Installation Instructions

Installation Owner Diagnostics

INSTALLATION AND MAINTENANCE INSTRUCTIONS 4SCU16LT Series Split System Air Conditioner WARNING

INSTALLATION MANUAL R-22/R-407C OUTDOOR SPLIT-SYSTEM AIR CONDITIONING MODELS: GCGA SERIES 1.5 TO 6.3 TONS 1 & 3 PHASE LIST OF SECTIONS LIST OF FIGURES

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

INSTALLATION AND MAINTENANCE INSTRUCTIONS 4SHP13LE Series Split System Heat Pump

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

Installation Instructions

Installation Instructions

INSTALLATION AND MAINTENANCE INSTRUCTIONS 2SCU13 Series Split System Air Conditioner WARNING

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

Split System Cooling Product Data

Installation Instructions

Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Instructions

Product Data Split System Cooling

Product Data. Split System Cooling A. November 2013

Installation Instructions

TABLE OF CONTENTS INTRODUCTION. NOTE: Read the entire instruction manual before starting the installation.

Safety Labeling and Signal Words

INSTALLATION AND MAINTENANCE INSTRUCTIONS 4SHP16LT Series Split System Heat Pump

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS

SPLIT SYSTEM HEAT PUMP 1½ 5 TON HERITAGE 13 MODELS 2A6H A American Standard Heating & Air Conditioning

Horizontal/Side Discharge Condensing Units

Split System Cooling Product Data

Installation, Start-Up and Service Instructions

Split System Cooling Product Data

Split System Heat Pump Product Data

Ductless Split Air Conditioner

Service Facts. Split System Heat Pump 4A6H5019H-SF-1C-EN. August A6H5019H1000A

National Comfort Products 539 Dunksferry Road Bensalem, PA (215) Fax: (215)

Residential Piping and Long Line Guideline

Installation Instructions

INSTALLATION MANUAL COMFORT...BUILT TO LAST. 9,000, 12,000 and 18,000 BTU SINGLE-ZONE DUCTLESS MINI-SPLIT SYSTEM Heat Pump

Safety Labeling and Signal Words

XC13. IMPORTANT Operating pressures of this R 410A unit are higher than pressures in R 22 units. Always use service equipment rated for R410A.

INSTALLATION INSTRUCTIONS R 410A Split System Air Conditioners

Installation Instructions

Installation Instructions

Installer s Guide. Side Discharge AC Models 4A7L6018A1000A 4A7L6024A1000A 4A7L6030A1000A 4A7L6036A1000A 4A7L6042A1000A 4A7L6048A1000A 4A7L6060A1000A

HEAT PUMP INSTALLATION MANUAL

Condensing Unit Installation and Operating Instructions

INSTALLATION INSTRUCTIONS

4SHP13 & 14 Series Split System Heat Pump

INSTALLATION AND MAINTENANCE INSTRUCTIONS 2SHP13 Series Split System Heat Pump WARNING

INSTALLATION INSTRUCTIONS

Installation Instructions

Split System Heat Pump Product & Performance Data

C7 Series Split System Uncased Indoor Coils

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Transcription:

8-AC7 D- :!l!i i i Condensing 4"FrR3 n ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES IMPORTANT -- This Document is customer property and is to remain with this unit. Please return to service information pack upon completion of work. These instructions do not cover all variations in systems nor provide for every possible contingency to be met in connection with installation. All phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser's purposes, the matter should be referred to your installing dealer or local distributor. A. GENERAL This information is intended for use by individuals possessing adequate backgrounds of electrical and mechanical experience. Any attempt to repair a central air conditioning product may result in personal injury and or property damage. The manufacturer or seller cannot be responsible for the interpretation of this information, nor can it assume any liability in connection with its use. UNiT CONTAINS R-40A REFRIGERANT! R-40A OPERATING PRESSURE EXCEEDS THE LIMIT OF R-22. PROPER SERVICE EQUIPMENT IS REQUIRED. FAILURE TO USE PROPER SERVICE TOOLS MAY RESULT IN EQUIPMENT DAMAGE OR PERSONAL INJURY. SERVICE USE ONLY R-40A REFRIGERANT AND APPROVED POE COMPRESSOR OIL. 5 FT. ABOVE UNiT -- UNRESTRICTED NOTICE: Trane has always recommended installing Trane approved matched indoor and outdoor systems. The benefits of installing approved matched systems are maximum efficiency, optimum performance and best overall system reliability. These units use R-40A refrigerant which operates at 50 to 70% higher pressures than R-22. Use only R-40A approved service equipment. Refrigerant cylinders are painted a "Rose" color to indicate the type of refrigerant and may contain a "dip" tube to allow for charging of liquid refrigerant into the system. All R-40A systems use a POE oil that readily absorbs moisture from the atmosphere. To limit this "hygroscopic" action, the system should remain sealed whenever possible, if a system has been open to the atmosphere for more than 4 hours, the compressor oil must be replaced. Never break a vacuum with air and always change the driers when opening the system for component replacement. For specific handling concerns with R-40A and POE oil, reference Retrofit Bulletin TRN-APGO2-EN. Check for transportation damage after unit is uncrated. Report promptly, to the carrier, any damage found to the unit. To determine the electrical power requirements of the unit, refer to the nameplate of the unit. The electrical power available must agree with that listed on the nameplate. B. LOCATION AND PREPARATION OF THE UNiT. When removing unit from the pallet, notice the tabs on the basepan. Remove tabs by cutting with a sharp tool as shown in Figure 2 (see page 2). 2. The unit should be set on a level support pad at least as large as the unit base pan, such as a concrete slab. If this is not the application used please refer to application bulletin "Trane APB200-02". 3, The support pad must NOT be in direct contact with any structure. Unit must be positioned a minimum of 2" from any wall or surrounding shrubbery to insure

nstai er's @ BASEPAN TAB REMOVAL [se" VE BS AS I OWN) adequate airflow. Clearance must be provided in front of control box (access panels) & any other side requiring service access to meet National Electrical Code. Also, the unit location must be far enough away from any structure to prevent excess roof run-off water from pouring directly on the unit. Do not locate unit(s) close to bedroom(s). 4. The top discharge area must be unrestricted for at least five (5) feet above the unit. 5. When the outdoor unit is mounted on a roof! be sure the roof will support the unit's weight. Properly selected isolation is recommended to prevent sound or vibration transmission to the building structure. 6. The maximum length of refrigerant lines from outdoor to indoor unit should NOT exceed sixty (60) feet. 7. If outdoor unit is mounted above the air handler, maximum lift should not exceed sixty (60) fhet (suction line). If air handler is mounted above condensing unit, maximum lift should not exceed sixty (60) feet (liquid line). Refer to "Refrigerant Piping Software" Pub. No. 32-332-0" (the position of the * denotes the latest revision number). 8. Locate and install indoor coil or air handler in accordance with instruction included with that unit. C. installing REFRIGERANT LINES If using existing refrigerant lines make certain that all joints are brazed, not soldered. Condensing units have provisions for braze connections. Pressure taps are provided on the service valves of outdoor unit for compressor suction and liquid pressures. The indoor end of the recommended refrigerant line sets may be straight or with a 90 degree bend, depending upon situation requirements. This should be thoroughly checked out before ordering refrigerant line sets. The gas line must always be insulated. In scroll compressor applications, dome temperatures may be hot. Do not touch top of compressor, may cause minor to severe burning. The units are factory charged with the system charge required when using fiiteen (5) f_et of rated connecting line. Unit nameplate charge is with twenty-five (25) feet of line set. Final refrigerant charge adjustment is necessary. Use the Subcooling Charging procedure on page 6 or in the outdoor unit Service Facts.. Determine the most practical way to run the lines. 2. Consider types of bends to be made and space limitations. Large diameter tubing will be very difficult to rebend once it has been shaped. 3, 4. 5. 6. 7. 8. Determine the best starting point for routing the refrigerant tubing -- INSIDE OR OUTSIDE THE STRUCTURE. Provide a pull-thru hole of sufficient size to allow both liquid and gas lines. Be sure the tubing is of sufficient length. Uncoil the tubing -- do not kink or dent. Route the tubing making all required bends and properly secure the tubing before making connections. To prevent a noise within the building structure due to vibration transmission from the refrigerant lines, the following precautions should be taken: a. When the refrigerant lines have to be fastened to floor joists or other framing in a structure, use isolation type hangers. b. Isolation hangers should also be used -when refrigerant lines are run in stud spaces or enclosed ceilings. c. Where the refrigerant lines run through a wall or sill, they should be insulated and isolated. d. Isolate the lines from all ductwork. D. SERVICE VALVE OPERATION BRASS LIQUID AND GAS LINE SERVICE VALVES The Brass Liquid and Gas Line Service Valves are factory shipped in the seated position to hold factory charge. The pressure tap service port (when depressed) opens only to the field brazing side of the valve when the valve is in the seated position. The liquid line valve is not a back seating valve (see WARNING below). Extreme caution should be exercised when opening the Liquid Line Service Valve. Turn valve stem counterclock= wise only until the stem contacts the rolled edge. (See Figure 3.) No torque is required. BRASS GAS LINE BALL SERVICE VALVE The Brass Gas Line Ball Service Valve is shipped in the closed position to hold the factory refrigerant charge. The pressure tap service port (when depressed) opens only to the field brazing side when the valve is in the closed position. The Gas Line Ball Service Valve is full open with a /4 turn. See Figure 4. BRAZING REFRIGERANT LINES. Remove lower access cover to access service valves. 2, 3, 4. 5. 6. Before brazing, remove plugs from external copper stub tubes. Clean internal and external surfaces of stub tubes prior to brazing. Cut and fit tubing, minimizing the use of sharp 90 bends. Insulate the entire gas line and its fittings. Do NOT allow uninsulated liquid line to come in direct contact with bare gas line. Precautions should be taken to avoid heat damage to the pressure tap valve core during brazing. It is recommended that the pressure tap port valve core be removed and a wet rag wrapped around the valve body. 2006 American Standard inc. All Rights Reserved 8-AC7 D-

nstai er's LIQUID LINE SERVICE VALVE ROLLED EDGE TO CAP / CAPTIVATE STEM SERVICE _ k_,v / PORT -- / LIQUID LINE CONNECTION Use care to make sure that no moisture enters pressure tap port, while wet rag is being used. Precautions should be taken to avoid heat damage to basepan during brazing. It is recommended to keep the flame directly off of the basepan. 7. Use a Dry Nitrogen Purge and Brazing Alloy without flux when brazing the field line to the copper factory connection. Flow dry nitrogen into either valve pressure tap port, thru the tubing and out the other port while brazing. 8. Braze using accepted good brazing techniques. LEAK CHECK IMPORTANT: Replace pressure tap port valve core before attaching hoses for evacuation. After the brazing operation of refrigerant lines to both the outdoor and indoor units is completed, the field brazed connections must be checked for leaks. Pressurize through the service valve ports, the indoor unit and field refrigerant lines with dry nitrogen to 350-400 psi. Use soap bubbles or other leak-checking methods to see that all field joints are leak-free! If not, release pressure; then repair! SYSTEM EVACUATION Since the outdoor unit has a refrigerant charge, the gas and liquid line valves must remain closed. 6. If vacuum gauge does not rise above 500 microns in one () minute, the evacuation should be complete. 7. Blank off vacuum pump and micron gauge, close valves on manifold gauge set. DO NOT VENT REFRIGERANT INTO THE ATMOSPHERE. A 3/6"Allen wrench is required to open liquid line service valve. A /4" Open End or Adjustable wrench is required to open gas line valve. A 3/4" Open End wrench is required to take off the valve stem cap. 8. The liquid line shut-off valve can now be opened. Remove shut-off valve cap. Fully insert hex wrench into the stein and backout counterclockwise until valve stein just touches rolled edge (approximately five [5] turns) observing WARNING statement on page 2. See Figure 3. 9. Replace liquid service pressure tap port cap and valve stem cap. These caps MUST BE REPLACED to prevent leaks. Replace valve stem cap and pressure tap cap finger tight, then tighten an additional /6 turn. 0. The gas valve can now be opened. Open the gas valve by removing the shut-off valve cap and turning the valve stein /4 turn counterclockwise, using /4" Open End or Adjustable wrench. See Figures 4 and 5.. The gas valve is now open for refrigerant flow. Replace valve stem cap to prevent leaks. Again, these caps MUST BE REPLACED to prevent leaks. Replace valve stem cap and pressure tap cap finger tight, then tighten an additional /6 turn. See Figures 4 and 5. If refrigerant lines are longer than fifteen (5) f_et and/or a different size than recommended, it will be necessary to adjust system refrigerant charge upon completion of installation. See page 6 or the unit Service Facts. GAS LINE BALL SERVICE VALVE UNIT OF SIDE VALVE CAP _ J-- /4 TURN ONLY COUNTERCLOCKWISE FOR FULL OPEN VALVE STEM. Upon completion of leak check, evacuate the refrigerant lines and indoor coil before opening the gas and liquid line valves. 2. Attach appropriate hoses from manifold gauge to gas and liquid line pressure taps. Unnecessary switching of hoses can be avoided and complete evacuation of all lines leading to sealed system can be accomplished with manifold center hose and connecting branch hose to a cylinder of R-40A and vacuum pump. 3. Attach center hose of manifold gauges to vacuum pump. 4. Evacuate until the micron gauge reads no higher than 350 mierons. 5. Close offvalve to vacuum pump and observe the mieron gauge. If gauge pressure rises above 500 microns in one () minute, then evacuation is incomplete or system has a leak. @ PRESSURE TAPPORT / GAS LINE CONNECTION GAS LINE SERVICE VALVE CAP_ UNIT SIDE OF CAPTIVATE STEM /ROLLED EDGE TO HEXHEADED SERVICE VALVE_ VALVE SYSTEM / SERVICE_ PORT GAS LINE CONNECTION 8-AC7 D- 3

nsta er's E. ELECTRICAL CONNECTIONS When installing or servicing this equipment, ALWAYS exercise basic safety precautions to avoid the possibility of electric shock.. Power wiring and grounding of equipment must comply with local codes. 2. Power supply must agree with equipment nameplate. 3. Install a separate disconnect switch at the outdoor unit. 4. Ground the outdoor unit per local code requirements. 5. Provide flexible electrical conduit whenever vibration transmission may create a noise problem within the structure. 6. The use of color coded low voltage wire is recommended to simplify connections between the outdoor unit, the thermostat and the indoor unit. Table -- NEC Class II Control WIRE SIZE Wiring 24 VOLTS MAX. WIRE LENGTH 8 AWG 50 FT 6 AWG 225 FT. 4 AWG 300 FT. 7. Table i defines maximum total length of low voltage wiring from outdoor unit, to indoor unit, and to thermostat. 8. Mount the indoor thermostat in accordance with instruction included with the thermostat. Wire per appropriate hook-up diagram (included in these instructions). F. COMPRESSOR START-UP After all electrical wiring is complete, SET THE THERMO- STAT SYSTEM SWITCH IN THE OFF POSITION SO COMPRESSOR WILL NOT RUN, and apply power by closing the system main disconnect switch. This will activate the compressor sump heat (where used). Do not change the Thermostat System Switch until power has been applied for one () hour. Following this procedure -will prevent potential compressor overload trip at the initial start-up. G. OPERATIONAL AND CHECKOUT PROCEDURES Final phases of this installation are the unit Operational and Checkout Procedures which are found in this instruction (see table below and pages 6 and 8). To obtain proper performance, all units must be operated and charge adjustments made in accordance with procedures found on page 6 and in the Service Facts. important: Perform a final un# inspection to be sure that factory tubing has not shifted during shipment. Adjust tubing ff necessary so tubes do not rub against each other when the unit runs. Also be sure that wiring connections are tight and wire routing is secure. H. SEACOAST SHIELD Units installed -within one () mile of salt water, including seacoasts and inland waterways, require the addition of BAYSEAC00 (Seacoast Kit) at the time of installation. important: See Limited Warranty information in Use and Care Manual I. TROUBLESHOOTING TROUBLESHOOTING CHART m WHAT TO CHECK SYSTEMFAULTS REFRIGERANT CIRCUIT UquidPressureTooHigh P P S P S S S UquidPressureTooLow S P S S S S SuctionPressureTooHigh S P P S P SuctionPressureTooLow S S P S LiquidRefrig. FIoodback TXVSystem S S I.D.CoilFrosting P P S Compressor RunsInadequate ornocooling S P P S S P S ELECTRICAL Compressor&O.D. FanDoNotStart P P S P P P CompressorNll NotStartButO.D.FanRuns P S P P P S O.D.FanWon'tStart P P Compressor HumsButWon'tStart P P P P S S Compressor CyclesonlOL P S P P P S P S P S S S S S I.D.BlowerWon'tStart P S S P P P- Primary Causes S- SecondaryCauses 4 8-AC7 D-

nstal er's TYPICAL FIELD HOOK=UP DIAGRAMS T'STAT IR HANDIER AI COND TONER VARIABLE SPEED T'STA/ AIR HANDLER AIR CONDIIIONER... R... y... Wl ODT --------33 [!3 F2, Ob A... F53 t:7'b PRINTEDFROM B5290P02 PRINTED FROMB}52908P03 CONNECTIONS TO BE MADE FOR OPERATION OF BLOWERWllH HUMIDISTA] IN COOLING T 'SIAl I -STAGE OR 2-STAGE FURNACE A COND [loner T 'STA VAR AB[I SPEIO 2 SIAGE FURNAC AI COND!]IONER [3 r._f_ i-titi _.... y FI -- []..._ NOTE E!I PRINTEDFROMB52g03P02 NOF [] I_ f"_ Notes: -kw2 present only on 2 stage thermostat and furnace. Be sure power supply agrees with equipment nameplate. 2. Power wiring and grounding of equipment must comply with local codes. 3. Low voltage wiring to be No. 8 AWG minimum conductor. 4. ODT-B must be set lower than ODT-A. 5. If outdoor thermostats (ODT) are not used, connect W to W2 and W3. PR NTID FRO BIS290/P04 LEGEND... FACTORY WIRING _ FIELD WIRING 8-AC7 D- 5

nsta er's SUBCOOMNG CHARGING in COOLING ABOVE 55 F OD AMBIENT The Trane company has always recommended installing Trane approved matched indoor and outdoor systems. All Trane split systems are ARI rated with only TXV indoor systems. The benefits of installing approved indoor and outdoor split systems are maximum efficiency, optimum performance and the best overall system reliability. The following charging methods are therefore prescribed for systems with indoor TXVs.. Subcooling (in the cooling mode) is the recommended method of charging above 55 F ambient temperatures. 2. For best results - the indoor temperature should be kept between 70 F to 80 F. Add system heat if needed. 3. At start-up, or -whenever charge is removed or added, the system must be operated for a minimum twenty (20) minutes to stabilize before accurate measurements can be made. 4. Measure Liquid Line Temperature and Refrigerant Pressure at service valves. 5. Determine total refrigerant line length, and height (lift) if indoor section is above the condenser. 6. Determine the Design Subcool Charging Temperature from the unit nameplate. 7. Locate this value in the appropriate column of the Subcooling Charging Table. Locate your liquid line temperature in the left column of the table, and the intersecting liquid line pressure under your nameplate subcool value column. Add refrigerant to raise the pressure to match LIQUID TEMP ( F) the table, or remove refrigerant to lower the pressure. Again, -wait twenty (20) minutes for the system conditions to stabilize before adjusting charge again. 8. When system is correctly charged, you can refer to System Pressure Curves (in Service Facts) to verify typical performance. R=40A REFRIGERANT CHARGING CHART DESIGN SUBCOOLING ( F) 8 I 9! lo! 23 LIQUID GAGE PRESSURE (PSI) I 4 55 79 82 85 88 9 95 98 60 95 98 20 204 208 2 25 65 2 25 28 222 225 229 232 70 229 232 236 240 243 247 25 75 247 25 255 259 263 267 27 80 267 27 275 279 283 287 29 85 287 29 296 300 304 309 33 90 309 33 38 322 327 33 336 95 33 336 34 346 35 355 360 00 355 360 365 370 376 38 386 05 38 386 39 396 402 407 43 0 407 43 48 424 429 435 44 5 435 44 446 452 458 464 470 20 464 470 476 482 488 495 50 25 495 50 507 54 520 527 533 Referto Service Facts or Installer's for charging method. From Dwg. D54557P0 Rev. 2 SUBCOOL CHARGING TABLE CORRECTIONS FOR LINE LENGTH AND RISE co i!i ii i ZLU <m C5 =J LU rr-q i 0," 5 Table Pressure 20 5... lo 0 Subtract 0 psig from S.C. Table Pressure 0 20 25 30 40 60 80 TOTAL REFRIGERANT LINE LENGTH (FEET) l 6 8-AC7 D-

nsta er's 4TTR3 OUTLINE DRAWING ALL DIMENSIONS ARE IN IVllVl(INCHES). B SERVICE PANE!--... E_ECTRICAL AND REFRIGERANT COMPONENTCLEARANCES PER PREVAILING CODES TOP DISC_IARGE AREA SHOULD BE UNRESIRIC_FD FOR AF LEASF 524 (5 J:EF]) ABOVE UN}T UNIT SHOULD BE PLACED SO ROOF RUN OFF WA/ER DOES NOI POUR DJRECI[Y ON UNIT, AND SHOULD BE A/ leas] 305 {2") FROM WALIo AND ALL SURROUNDING SHRUBBERY ON TWO SIDES OTItER TWO SIDES UNRESTRICTED K ELECTR!CAL SERVICE PANEL 22 2 (7/8) DIA LOW VOLTAGE 28 6 (}/8) DIA KO WITH _ 222 (7/8) DIA HOLE }N CONTROL BOX BOttOM FOR ELFC[RICAL POWER SUPPLY IolOUII5 line SERVICE VALVE "{" I D FEMALE BRAZE CONNECTION WITH I/4" SAE H FLARE PRFSSURF TAP FITTINGS J G FOR ALTERNATE \ ELECTRICAL ROUTING \ \ LGAS L}N[ J/4 TURN BALI SERVICE VAIVE, "D'_ }) FEMALE: BRAZED CONNECT}ON W}IH I/4" SAE F{ARE PRESSURE TAP FITTING MODELS BASE FIG. A B C D E F G H J K 4TTR308A 4TTR3024A 4TTR3030A 4TTR3036A 3 3 3 3 832 (32-3/4) 829 (32-5/8) 832 (32-3/4) 829 (32-5/8) 832 (32-3/4) 829 (32-5/8) 933 (36-3/4) 829 (32-5/8) 756 (29-3/4) 756 (29-3/4) 756 (29-3/4) 756 (29-3/4) /2 /4 43 (5-5/8) 92 (3-5/8) 20 (8-/4) 5/8 5/6 43 (5-5/8) 92 (3-5/8) 20 (8-/4) 3/4 5/6 43 (5-5/8) 92 (3-5/8) 20 (8-/4) 3/4 3/8 43 (5-5/8) 92 (3-5/8) 20 (8-/4) 79 (3-/8) 79 (3-/8) 79 (3-/8) 79 (3-/8) 69 rr oo Ob oo O4 LO 4TTR3042A 4 84 (33-/8) 946 (37-/4) 870 (34-/4) 3/4 3/8 52 (6) 98 (3-7/8) 29 (8-5/8) 86 (3-3/8) 4TTR3048A 4TTR3060A 4 4 84 (33-/8) 946 (37-/4) 045 (4-/8) 946 (37-/4) 870 (34-/4) 870 (34-/4) 7/8 3/8 52 (6) 98 (3-7/8) 29 (8-5/8) 7/8 3/8 52 (6) 98 (3-7/8) 29 (8-5/8) 86 (3-3/8) 86 (3-3/8) 508(20) d3 E 4-8-AC7 D- 7

nsta er's MOUNTING HOLE LOCATION _29, ( 56)_ i'4) Note: All dimensions are in IVllVl (Inches)....i58 (62_)... 482 { 8 99 )... 99 (2} 58) BASE 3,'95 (3i28) i (! 2/- For model base size, see table on page 7. 2 ",2/3 64 ) BASE4 From Dwg. 2D52637 Rev. CHECKOUT PROCEDURE After installation has been completed, it is recommended that the entire system be checked against the following list:. Refrigerant Line, Leak checked... [ ] 2. Suction Lines and Fittings properly insulated... [ ] 3. Have all Refrigerant Lines been secured and isolated properly?... [ 4. Have passages through masonry been sealed? If mortar is used, prevent mortar from coming into direct contact with copper tubing... [ 5, Verify tightness of all electrical connects... [ 6. Observe outdoor fan during on cycle for clearance and smooth operation... [ 7, Indoor coil drain line drains freely. Pour water into drain pan... [ ] ] 8, Supply registers and return grilles open and unobstructed... [ ] 9. Return air filter installed... [ ] 0. Thermostat thermometer is accurate. Check against a reliable thermometer. Adjust per instructions with thermostat... [ ]. Is correct speed tap being used? (Indoor blower motor)... [ ] 2. Operate complete system in each mode to insure safe operation... [ ] Trane ARI Standard A business of 20/240 UAC American Standard Companies www.trane.com C US Trane has a policy of continuous product and product data improvement and it reserves the right to change design and specifications without notice. 8-AC7 D- P.I. 7/06