Presentation Agenda Presidio El Camino C.3 Design Concept Architectural Issues Landscape Integration/Adaptation Samaritan Medical Office C.3 Design Concept Building Construction Issues
Critical Information for StormwaterControl Plan Design Project Design Team Stormwater Design Team DEVELOPMENT PROJECT
Site Plan locations of structures, parking and open space areas Stormwater Design Team Project Design Team
Site Plan locations of structures, parking and open space areas Stormwater Design Team Project Design Team Site Planner Site Planner DEVELOPMENT PROJECT
Site Plan locations of structures, parking and open space areas Grading direction of surface flow Stormwater Design Team Project Design Team
Site Plan locations of structures, parking and open space areas Grading direction of surface flow Roof Plan ridges and slope directions Downspout /storm drain locations points of discharge Stormwater Design Team Project Design Team Engineer Building Architect Site Planner Site Planner DEVELOPMENT PROJECT
Site Plan locations of structures, parking and open space areas Grading Direction of Surface Flow Roof Plan ridges and slope directions Downspout/storm drain locations points of discharge Location and size of landscape areas Stormwater Design Team Project Design Team
Site plan locations of structures, parking and open space areas Grading direction of surface flow Roof plan ridges and slope directions Downspout/storm drain locations points of discharge Location and size of landscape areas Final storm drain system configuration Stormwater Design Team Project Design Team Landscape Architect Engineer Site Planner Mechanical Engineer Building Architect Site Planner DEVELOPMENT PROJECT
Site plan locations of structures, parking and open space areas Grading direction of surface flow Roof plan ridges and slope directions Downspout /storm drain locations points of discharge Location and size of available landscape areas Final storm drain system configuration Site soil & geo conditions and separation requirements Stormwater Design Team Geotechnical Engineer Project Design Team Landscape Architect Engineer Mechanical Engineer Building Architect Site Planner Site Planner DEVELOPMENT PROJECT
Presidio El Camino El Camino Real Lincoln Street Jefferson St. PROJECT SITE Lewis Street Madison St. Monroe Street Location: S/S El Camino Real, between Jefferson & Madison. Size: Approximately.73 acre
Site Plan Elevation
Original Stormwater Control Plan Concept Drainage area boundaries Biotreatment cell Biotreatment cell
Bioretention Cell Detail Biotreatment Cell Detail TREATMENT
Roof Line Changes
Stormwater Control Plan Concept Changes Revised roof plan with downspout locations plotted. Revised SWCP with new drainage area boundaries, biotreatment cells.
Revised SWCP with new drainage area boundaries, revised landscaping containing biotreatment cells.
Samaritan Medical Office Location: NE Corner S. Bascom Ave. & Samaritan Dr. Size: Approximately 1.8 acres
Existing Samaritan Medical Office Complex Proposed new medical office building and garage extension.
Original StormwaterControl Plan Concept Biotreatment cells, media filters.
Final StormwaterControl Plan Biotreatment cells, media filter, turf swale.
Geotechnical/Infiltration Issues Maintaining adequate separation between building foundations and biotreatment facilities influences their final placement.
Grading & Slopes Too steep. Garage foundation walls and finished floor elevation made biotreatment infeasible at this location. Final grading to accommodate media filter installation and trash enclosure access forced the relocation of the biotreatment cell.
Utility Conflicts Pre project condition Existing above and below ground utility lines, vaults and cabinets, and trees limit available area for biotreatment facilities. After project construction
Distance from building requires design change cobble swale added.
New location avoids conflicts with utility cabinets and existing trees, compliments monument sign.
Pedestrian Access Conflict with sanitary sewer location and concerns over discharging runoff onto sidewalk made biotreatment in the landscaping a less viable option.
Maximum Extent Practicable Squeezing in a swale to treat remainder portion of paved driveway surface.